Loading...
HomeMy WebLinkAboutContract 58975-A1Date Received: 1/9/2024 Time Received: 7:55 a.m. City Secretary Contract No.: 58975-A1 FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 58975 A COMMUNITY FACILITIES AGREEMENT BETWEEN THE CITY OF FORT WORTH AND OPG CLIFTON RIVERSIDE PARTNERS, LLC This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 58975 ("First Amendment") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, and OPG Clifton Riverside Partners, LLC ("Developer"), a Texas limited liability company. WHEREAS, the City and Developer entered into a Community Facilities Agreement for the construction of public infrastructure Improvements for a Project known as Clifton Riverside Multifamily, City Project Number 103898 ("CFA"); and WHEREAS, Developer provided the City with a development bond as the financial guarantee for the Improvements in the CFA; and WHEREAS, Developer has not begun construction of the Improvements pursuant to the CFA; and WHEREAS, Developer has acquired new contractors with updated bids to construct the Improvements pursuant to the CFA, and the estimated construction costs have decreased from the previous general contractor's estimated costs; and WHEREAS, the City and Developer desire to amend the CFA to reflect the revised Cost Estimates and Cost Summary Table; and WHEREAS, Developer's existing development bond provides coverage in an amount greater than the new, estimated, construction costs and Developer has decided to forego a bond rider to reduce the bond amount to correspond with the new, estimated, construction costs; NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends City Secretary Contract Number 58975: 1. Section 36 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of this First Amendment, which is attached hereto and incorporated herein by reference. City of Fort Worth, Texas OFFICIAL RECORD First Amendment to City Secretary Contract No. 58975 CITY SECRETARY Page 1 of 5 FT. WORTH, TX 2. The Cost Estimates in the CFA are amended in their entirety to be and read as set forth in Exhibit B of this First Amendment, which is attached hereto and incorporated herein by reference. 3 a. All other provisions of City Secretary Contract No. 58975 which are not expressly amended herein, shall remain in full force and effect. b. All terms in this First Amendment that are capitalized, but not defined, shall have the meanings ascribed to those terms in City Secretary Contract No. 58975. [SIGNATURES ON FOLLOWING PAGE] City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58975 Page 2 of 5 IN TESTIMONY WHEREOF, the City and Developer have executed this First Amendment to be effective on the date signed by the City's Assistant City Manager. CITY OF FORT WORTH Z5G}KA, $GLY',14dU7� Dana Burghdoff (Jars , 2024I2f50 CST) Dana Burghdoff Assistant City Manager Date: Jan 8, 2024 Recommended by: Ei'ch m Naxi r Bichson Nguyen (JanY20X13:08 CST) Dwayne Hollars/Bichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: Thomas Royce Hansen Assistant City Attorney II M&C No. N/A Form 1295: N/A Date: Jan 8, 2024 pd44ULn�n aA foRr�d�d ATTEST: v°C. 09.E°0 U %cQaes �P° a� 4 �'EXASa� �bnnoaaa Jannette S. Goodall City Secretary DEVELOPER: OPG Clifton Riverside Partners, LLC By: OPG CR Managers, LLC its managing member Matthew Gillam Manager Date: Jan 8, 2024 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including all performance and reporting requirements. s^ Rebecca Diane owen (Jan 8, 202413:15 CST) Name: Rebecca Owen Title: Development Manager OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY First Amendment to City Secretary Contract No. 58975 FT. WORTH, Tx Page 3 of 5 EXHIBIT A 36. Cost Summary Sheet Project Name: Clifton Riverside Multifamily CFA No.: CFA22-0161 City Project No.: Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 110,792.00 2. Sewer Construction $ 24,021.00 Water and Sewer Construction Total $ 134,813.00 B. TPW Construction 1. Street $ 2. Storm Drain $ - 3. Street Lights Installed by Developer $ 80,637.83 4. Signals $ TPW Construction Cost Total $ 80,637.83 Total Construction Cost (excluding the fees): $ 215,450.83 Estimated Construction Fees: C. Construction Inspection Service Fee $18,750.00 D. Administrative Material Testing Service Fee $833.00 E. Water Testing Lab Fee $300.00 Total Estimated Construction Fees: $ 19,883.00 Choice Financial Guarantee Options, choose one Amount (Mark one) Bond = 100% $ 215,450.83 x Completion Aqreement = 100% / Holds Plat $ 215,450.83 Cash Escrow Water/Sanitary Sewer= 125% $ 168,516.25 Cash Escrow Pavinq/Storm Drain = 125% $ 100,797.29 Letter of Credit = 125% $ 269,313.54 City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58975 Page 4 of 5 EXHIBIT B Cost Estimates City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58975 Page 5 of 5 00 42 43 DAP-BIDPROPOSAL Page 1 of 1 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT I: WATER MPROVEMENTS 1 3201.0202 Asphalt Pvmt Repair Beyond Defined Width, 3301 17 SY 98 Arterial $100.00 $9,800.00 2 3201.0616 Conc Pvmt Repair, Arterial/Industrial 3201 29 SY 42 $125.00 $5,250.001 3 3305.0001 4" Waterline Lowering 33 05 12 EA 2 $5,675.00 $11,350.001 4 3305.0109 Trench Safety 33 05 10 LF 157 $1.00 $157.001 5 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 0.23 $4,000.00 $920.001 6 3311.0041 4" Water Pipe 3311 10, 12 LF 55 $60.00 $3,300.001 7 3311.0141 6" Water Pipe 3311 10, 12 LF 49 $70.00 $3,430.001 8 3311.0241 8" Water Pipe 3311 10, 12 LF 53 $80.00 $4,240.001 9 3312.0117 Connection to Existing 4"-12" Water Main 34 12 25 EA 3 $3,500.00 $10,500.001 10 3312.2802 4" Water Meter and Vault 33 12 11 EA 1 $36,850.00 $36,850.001 11 3312.3002 6" Gate Valve 33 12 20 EA 2 $1,650.00 $3,300.001 12 3312.3003 8" Gate Valve 33 12 20 EA 2 $4,425.00 $8,850.001 13 3312.3104 10" Cut -in Gate Valve 33 12 20 EA 1 $6,445.00 $6,445.001 14 3312.4001 6" x 4" Tapping Sleeve & Valve 33 12 25 EA 1 $3,000.00 $3,000.001 15 3312.2103 1 1/2" Water Service 33 12 10 EA 1 $3,400.00 $3,400.001 TOTA, UNIT I: WATER IMPROVEMENTS $110,792.001 UNIT It: SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post -CCTV Inspection 3301 31 LF 21 $100.00 $2,100.001 2 3301.0101 Manhole Vacuum Testing 3301 30 EA 1 $250.00 $250.001 3 3305.0109 Trench Safety 33 05 10 LF 21 $1.00 $21.001 4 3305.1003 20" Steel Casing 33 05 22 LF 18 $250.00 $4,500.001 5 3331.4115 8" Sewer Pipe 33 11 10, 33 31 12, 20 LF 21 $150.00 $3,150.00 6 3339.0001 Epoxy Manhole Liner 33 39 60 VF 18 $500.00 $9,000.001 7 3339.1001 4' Manhole 33 39 10, 20 EA 1 $5,000.00 $5,000.001 TOTAL UNIT It: SANITARY SEWER IMPROVEMENTS $24,021.001 Bid Summary UNIT I: WATER IMPROVEMENTS 1 $110,792.001 UNIT II: SANITARY SEWER IMPROVEMENTS $24,021.001 Total Construction Rid 1 $134,813.001 This Bid is submitted by the entity named below: BIDDER: BY: Andrew Nord Dagger Contracting, LLC 11;7 PO Box 1040 TITLE: Owner/GM' Roanoke, TX 76262 DATE: 8/11/2023 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION 60 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Versroa May 22, 2019 Copy of00 42 43_Brd Propwal_DAP (Dagger Utday Portions) UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 1 of 1 Bidder's Application Ridlist Item Description Specification Unit of Bid No. Section No. Measure Quantity UNIT V: STREET LIGHTING IMPROVI ,,JMENTS 1 2605.3118 Furnish/Install Conduit -Schedule 80 PVC 2 26 05 33 LF 356 2 3441.1502 Ground Box Type B, w/Apron 3441 10 EA 2 3441.3037 Furnish/Install 10' - 14' Washington Standard 3441 20 3 Light Pole & Fixture LED EA 5 4 3441.3303 Rdwy Ilium Foundation TY 7 34 41 20 EA 5 5 3441.3323 Furnish/Install 8' Wood Light Pole Arm 3441 20 EA 2 6 3441.1413 NO 6 Bare Elect. Condr SLID 34 41 20 EA 356 7 3441.3201 LED Lighting Fixture 3441 20 EA 2 3441.1771 Furnish/Install 120-240V Single Ph. Metered 3441 20 8 Pedestal EA 1 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS Bid Summary UNIT V: STREET LIGHTING IMPROVEMENTS Total Construction Bid This Bid is submitted by the entity named below: BIDDER: Hurst Electric 229 W. Hurst Blvd Hurst, Texas 76053 (817) 268-3000 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Bidder's Proposal Unit Price I Bid Value $83.17 $29,608.521 $2,101.12 $4,202.241 $4,895.89 $24,479.45 $916.00 $4,580.001 $150.00 $300.001 $4.08 $1,452.481 $2,230.00 $4,460.001 $11,545.14 $11,545.14 $80,627.831 0q.11y signed by Eduardo BY: Reason: 1 agree to the teens Eduardo Rojas defined by the pla,emeM d my signature on this document Oate M23112E 09 ors1-0a'99' TITLE: DATE: END OF SECTION $80,627.831 1 $80,627.831 60 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Copy of 00 42 43_Bid Proposal CAP As