HomeMy WebLinkAboutContract 58649-PM1 (2)12/023 OF +► ' • •. o ....................... ROBERT J. CRONIN JR ............ 0......... 122288 •� CSC No. 58649-PM1 PROJECT MANUAL FOR THE CONSTRUCTION OF Paving and Street Lighting to Serve Trinity Landing Multifamily IPRC Record No. IPRC22-0196 City Project No.104444 FID No. 30114-0200431-104444-EO7685 File No. K-3038 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth December 2023 mama 519 E. Border Street Arlington, TX 76010 www.mmatexas.com tbpe # f-2759 tbpls#10088000 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 41 00 00 42 43 0043 13 Bid Fefm Proposal Form Unit Price Bid Bond nn in s 05/22/2019 nn in 4 nno n�= Bidde :s Pf:eq, alifiecaiea's Prequalification Statement nn in 4 09/01/2015 0045 12 0045 13 Bidde . Pfegtta1 f;,,a4ien kWia 1i3n n21nvsr09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law r, Enterprise 04/02/2014 nQi 0045 40 00 52 43 iner-ity Business Goal Agreement a 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 00 7200 Maintenance Bond Genef.,i Conditions 01/31/2012 i ii ii T 00 73 00 0073 10 c,,,.,.io,,.,enta y r rdifi np Standard City Conditions of the Construction Contract for Developer n7inm�vzi 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 012500 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 813129 01 3233 Pr-egeet Meet* — Preconstruction Video 07/0i/2 z 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project No. 104444 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents [List the Specifications which have been modified for this specific project and strike through the Specifications that were not modified. If none are modified, then write the word "NONE" to signify as such for this complete section.] Date Division 02 - Existing Conditions Modified 02 41 13 Selective Site Demolition 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 ✓1 13 C f,t - lle Tow St-engtl, T a4e -;.,1 irr S n 112 i�� 0334 16 Concrete Base Material for Trench Repair 12/20/2012 Division 26 - Electrical 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 3 1�r�z3 31 2 n 00 mil• 1 n 1 i � v-rzTvv � fir. �3H�S 312500 �1 255 0�0 Erosion and Sediment Control 12/20/2012 3'9 dens 171 /7 z 3 ,moo Ripr-ap 1 2/20l7r2012 Division 32 - Exterior Improvements 3201 17 D^,-..-.. nepA Asphalt U.,ying P&,i,a�Y 12/20/2012 32 0119 Tempefary A0Oralt A---Ang Repaif. 12/20/2012 '27�9 Cenef:ete n., ing Depa 12/20/2012 32 1123 Flexible Base Courses 12/20/2012 32 1129 Lime Treated Base Courses 12/20/2012 32 1133 Gamont Tire^*^a Base r^" ^" 12/20/2012 Z7�T Liquid TFe t^a Sol Stab l;,o, 08/21/2015 '27�o Asphalt t Paving 12/20/2012 Z7�3 n s,.ha t Pa-yi g r -ae-k Sea] 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 14 16 Dial TJ:xt 1%-A*g 112 i�4-2 32 1613 Concrete Curb and Gutters and Valley Gutters 12/20/2012 11/22/2013 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project No. 104444 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 27�5• Curb Ad 11/04/2013 3'�3 Chain Fences and Gates 12/20/2012 3'�6 Wire Fences aa Gates 12/20/2012 323129 Wood > enees and Gatos 12/20/2012 Z7�3 Cast i Dlaee Cone-ete n:rnbvg Wxy s 06/05/2018 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 3293 43 Trees a -a C" L.,.,& i 2 /zs 201, vzz Division 33-Utilities NONE Division 34 -Transportation NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn:Hfortworthtexas.2ov/tnw/contractors/ or httDs:HaDvs.fortworthtexas.Lyov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 02 41 14 Utility Removal/Abandonment 12/20/2012 02 41 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Gemmen :rark- P_omIts f ,. >rleetr-i ..,l 11 / Demolition fer- Eleetfieal Systems 12/rz�svriviz 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 312323 Beffe 01/0 4�13 34 00 Embon'rrrxt0 01 /gin 31 25 00 Erosion and Sediment Control 12/20/2012 31�0 GabienS 171 /7 z 313700 Rim 11 /�12 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project No. 104444 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 Division 32 - Exterior Improvements 32 01 1 ^7 �-z-v-frT D o,-..-,a-ne..� � Y� �� � �/ f� t � W.' 12/7zzr2W2012 32 01 i8 320129 Tempefary Aaoyalt I\- �f Genefete Pa-y rg n opal 12/'zzr200012 11 /�12 '27�3 32 1129 Flexible Base !`.,ufses Lime Treated Base Courses 12/'f�zrzvriviz 12/20/2012 32 1133 Gament Traated Base r 12/7 z 27� Liquid Tfeated rail Fhalll'y {'f n4/o 1�15 32 1216 37�3 Asphalt Paving n r ee 1afAs 12/20/2012 12/�12 32 13 13 s..hak Pa-yi g -aek Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 3�1 4 Iry Z7�3 '27�3 Bfi-AL Un't -' Mg C fef:ete Curb and C„#er-s and Valley Cmite -s- Pave,,.- MadEifigs 12 /�rtvnv12 1 n/nrvr cv�v1v 1 11 1 /'i ce 32 5 3231 3 '27�0 ef4 ram,,,-b Address PaipAing F a Gates C�nr. ��r� W -e l-eftees .-ad Ga4es 1 1 /n�13 12/2n/2n12 �>z 12/�12 '27�9 3232 13 WeedF-eftees and Gates Ccol. k- P.VE3wpc4 o Ro his 11 /'�S2 n6/no c�II 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Z7�3 Hydro -Mulching, Seeding, and Sodding Tf:ees and C`L...ubs 12/20/2012 12/'f�rsvriviz Division 33 330130 - Utilities Sewer- a -a M.,nhel e Testing 12 /'fry svriviz 33 01 3 1 33 03-10 33 04 10 33 04 11 33 04 12 Closed Ci .,.•. -euit Television (CCTV) Tripe..+ ,.•, %ram PuWJl,g of Existing Sewer- Systems TeipA Beading and Eleetfieal isel..tie r,.,...esior Geatfel Toss Stat ens >\aagaesitff node r.,tt,edie Pfete tie Systeffl 03/03,L2016 12/'frr.,-zvriviz 12/'izzr20QO12 12/7 z 12/�12 33 04 300 33 04 50 3-3--03-�0 33 05 12 Te pef:ar-y Wa4er- Setwie Gleaning of Sewef Mains L' 1✓ a.7.. ent F:ll r Tom' Tr��rAl'I �i�r, .mil!., , an Baek Wate Line Lower n�/non 12/2z 12/19 12/�12 33 05 13 f -in Fr-ame, Cover- and Gad Rik�pj Cast 1f:e 01/12,L2016 33 n�0 Fr -.,me, Goye,.. *,l r a i Ringz Composite n1 /o� 22/-2016 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012 110 Grade C fef:ete Wate f Vaults 11 /�12 330520 33-03-21 22 330523 23 33 05 24 33 05 26 Tuvr.wl T �n ar- Plate Steel Casing -Ripe i7.,.,..a T-tmnol i+g T,,.,mel Liner- last lla4:...,..,F(`.,.-4ef: Pipe i Casing Plat-e 171 /'ircr20QO12 12/72 12l'frL 20,L2012 12/'f�zrzvriviz 06/iovr19QO13 12/20Qz E)- e- U4 ht-y Nla-kefs/T ..,... e fs CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Project No. 104444 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 ZZ 05 30 �-v�-�v ZZ 11 05 T eea4io , eFL' ,,. U 12/20 2012 �vcRsrvrry �7IlLt1.�4 iz-r�vrtvzz Belt Nuts, and !`_.,stets- 17/20/7l112 0 ✓� 11 11 11 12 D etile T«ems Pipe 12/2z Ductile ken Fittings 12/20QO12 Polyvinyl .1 l„ i e D«essufe Pipe 1 11 1 /1 33 2 1 1 2Conefete 33 11 14 33 0 22�} C (PVCl ,40 Pr-essufe Pipe, Ba f xx 7«appe.l Stool !'ylif ,1e« Type 12/'frz�-20A2012 Bur- ea Stool Pipe and Fittings 17/7 z Wa4e« Se« ; es 1 i 1. t 7 i et 02/10 n�17 Large Water- Meters 12/20,L2012 33 12 20 33 12 21 33 1225 33 1230 D es;l; of t Seated Ga4e Valve 1 7 /'f�zrzvriviz AWW-A Rubbe« Seated Bt4ter- fly 3717/'f�zr20A2012 Genneetion t Existing W,.te« Mains 02/no�13 r,.,,.,binati r n;« Velye kaae kiWkas f « Potable Water- S„ste , � 12/20QO12 F;«Hydrantsn 1 /n 33 0 33 1250 33 12 60 -4 Wat01,,Sar./wp�l: Sta4iefis 17/'f�r20A2012 StandaM Blow eFf Valve Assembly 06/1 3 3331 2 33 31 3 22� 333120 20 r„«ea i Ulaee Pipe irmn4 12/20QO12 Fibef;lwa P oCc «ee,a Pipe for- Gr-a-y;t„ EG.Aitar -Sewefs 12 /20QO12 �z High Density Polyethylene (HDPE) Pipe F « Sa-aitafy Sewe« 12/'fr�-20A2012 Polyvinyl C l„«;.le (PVC) !`_«ay ty Safiiiafy Sewer- Pipe 06/19,L2014 Polyvinyl !''l,le«;,le Closed Profile !`_r-ay ty S.,* t. Sewer- ZZ 21 71 TJ�TLT (PVC) y 1'l/�n/�n1� rtravravzz Pipe 44 11 Sa-aitafy Sewar Vi* titan g 12 /�12 33 31 23 33 31 50 San tafy Sewer- D;,.o ELvl t 17/'f�zrzvriviz San tafy Sewer- Setwiee refmeetiers and Setwiee T ; e nn /o Q 333170 3339 0 r,.,,. bin ti r n;« v,ye f « S. a;t.,« Sewe« >;e«ee Mains 12/20QO12 + Cr Pl1 ae-C-3r1J4\ilJ Manholes 17/7z n«eeast ren 33 39 20 333930 33 3940 fete M.,n elegy 12/20A2012 F4-berg1xeManholes 11 /'�12 Wastewater- n eeess rt,.,,,,t,e« (xzt n r4 11 /'1 z 22� �3-4-�A Epe*y T e s F « Sa-aita fy Sewe« St,-„et„«es 12/2z Rein f fee,7 Ge,.efete St U;.,e/!'�„1„e«t� n�/n1 � �O��,e« o„,/2n1 1n 1 11 High Tleasiy . Polyethylene (14PPE) Pipe F « St.,,-.-„ Tl«.,i 12/'fizr20A2012 l.. 11 12 33 4600 Rein f fee.l D.)1,.etL,1e*e /ERUBl Dire 1 11 1 /1 5 S„1� 1 17/7rc�-20QO12 33 4601 Slattedo Diuirr. n�/no 1�,�n 3-46 02 33 49 10 Tfureoh awAnj n�/n�1 Cast i Ulaee Manholes .,.-..1 T,,netio Boxes 12/'fez 33 49 20 33 4940 Curb and Pf:E)p h lets 171 /7 z Storm Dw� nRage ue.,,aw,.11s and Wingw,.11s n7/no 1�Q01 Division 34 - Transportation 34 41 1tl0 At 11 t 17/14 O15 .v-r rr�t&e�riieflt�4 C—eatfeaef C—a�iacc �rivrzvr� 3 n n�02 Att&elimenttB Geitf.01RAx Ef�o��en 2 34� 41-1.03 Attaehment C Se �a}twafe Speei ieatien 0142012 ?/I i i 1E Reet -ulcer I rd FlArirrg Beaeon 111 1 /�vl3 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Project No. 104444 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 6 34 41 20 Roadway Illumination Assemblies 12/20/2012 3n n�01 Afta6al LED Ao Darrsk7.N:ro0 06110 c�15 Sit il�vi Freeway LED D...,.1..,,T..l.. i&x.4--s 06/iwrrszvi-S 34 41 20 �n3 � Resi efi4i l LED n,,,,,1,. ay rn1 �ar�si�i.: rs 06/1 c/2 c 34 41 30 Alurn�Mr. Fl.g*s 11 / 1�n 34 41 50 3471 13 Single Mode Fiber- Optie Cable Traffic Control 02/26QO16 11/22/2013 Appendix GC-4.02 Subsurface and Physical Conditions END OF SECTION CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project No. 104444 Revised March 20, 2020 1114343 LMP - BIO Pi111D%AL liugc 1 .4 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM TRINITY LANDING UNIT PRICE BID Bidder's Application Project Item Inronnatlou Bidder's Proposal B&dhst It Descrtption Spec,ficanw, I Utalt of I sod Unll A>I r I DO Volix Smion N& .ilto"14 unam I UNIT IV: PAVING IMPROVEMENTS 1 0241.1300 Remove Conc Curb&Gutter 0241 15 — LF .� 232 $21.50 $4,988.00 2 3211.0501 6" Lime Treatment 32 11 29 SY 169 $172.00 $29,068.00 3 3213.0401 6" Concrete Driveway 32 13 13 SY 169 $69.75 $11,787.75 4 3213.0311 4" Conic Sidewalk, Adjacent to Curb 32 13 2a SF 5451 $6.20 $33,796.20 5 3213.0301 4" Conc Sidewalk 32 1320 _SF 1280 $6.20 $7,936_00 6 3211.0460 Hydrated Lime 32 11 29 TON 0.35 $1,260.00 $441,00 7 3471.0001 Traffic Control 3471 13 M_ O 2 $3,600.00 $7,200.00 8 3212.0401 HMAC Transition 32 12 16 _ iN 1 $ 3,500.00 $ 3,500.00 9 3291.0100 Topsoil 3291 19 Cy 10 L 36.50 $ 365.00 10 3292.0100 Block Sod Placemerit 3292 13 _ _ SY 58 s 28,00 $ 1,624.00 11 3441.4110 Remove and Reinstall Sign Panel and Post 3441 30 EA. 1 $ 1,500.00 3 1,500.00 TOTAL $ 102,205.95 CITYCIF rfIRT 1h%WrlI SF m'rAl!NVDmARI) �CONr�STRC'TIUNSPI" IITIONICiM27S-VIIOPCRA'ARrl'ROJFcr.4 ]Irly _00 42 43 Rid Prop—lDAI' al N, yh1'-EmmolmnAI. Nee 2of3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM TRINITY LANDING UNIT PRICE BID Bidder's Application Project Item Infonnanoo Bidder's Proposal Bidt Iteml Descnpnon Specification I Unit of 'nil Purr I Hui ti'ollsK N` Seu IMS 4leaesnt Quantit}. UNfrV:mWil-m 71hb6IMPROVEMEPTS 1 2605.3018 2" CONDT PVC SCH 80, Open Cut 26 05 33 LF 652 $ 22.50 $ 14,670.00 2 3441.1502 Ground Box Type B, w/Apron 3441 10 EA- 4 $ 18,900.00 $ 75,600.00 9 3441.3037 Furnish/Install 10'- 14' Washington Standard Light Pole 3441 20 EA 12 $ 3,180.00 $ 38.160.00 & Fixture LED A 3444.1320 6/C 14 AWG Mulfi-Conductor Cable 3441 10 LF .956 5 38.63 # 75.560.28 G 3441.3303 Rdwy Illum Foundation TY 7 3441 20 EA 12 S 1,890.00 Z 22,680.00 a 3441.3323 Furnish/Install 8' Wood tight Pole Arre 3441 20 EA 2 S 3,700.00 $ 7,400-05 7 2605.3014 2" COND7 RM (Riser) 26 05 33 LF 25 S 22.50 S 562.50 1 3441.1772 Furnish/Install 240-480 Volt Single Phase Transocket 3441 20 EA 1 5 61.800.00 $ 61,800.00 Metered Pedestal 9 3441.3201 LED Lighting Fixture 3441 20 Erg 2 $ 3.1150.00 $ �.j 6,360.00 TOTAL 302.792.78 {I I Y 41F rim V M-n I STANDARD CONSTRUCTION SI'RCIFICA nON D6V61 0PER AR-ARInJI PROJEL" 5 aW J2 43_Bid Propasul_DN' f— V,. Idn R N I" 1*4'_ 43 1Wd -1110 J31 ' T Page 3 of 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM TRINITY LANDING UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidhst Item Specification Unit of $IiM I Decc1'�ISQ Rid VhIhC, npnon A.* Section No 'X4�riure Quantity Bid Summar) UNIT IV; PAVING IMPROVEMENTS $102,205.95 UNIT V: STREET LIGHTING IMPROVEMENTS $302,792.78 Total Construction Bid $404 998.13 This Bid is submitted Iry the entih named beloit 111 ODER-, SICHivit in k Gsnrral Vwirr�iar 4550 Trat is Street; Suite 565 Dallas, Tesas 75205 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Cmtditiom. ciTy 1M{ilk I NkiATfl ST.',NDARD CONS Ik11l TION SPPCIFICA I IWN I)OCUM}iN I. • DEVY1 OPER AU'ARDE:D PROJECTS I —'dnwrnhi'y t# �Cit'1 61V. it 15 i TITLE: Project Manager DATE: 12/19/2022 EYp DF nC nu.,g 50 working days after the date "hen the W 42 43Bid Propo,A DAP 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Mai or Work Tvoe" box provide the complete major work tvue and actual description as Drovided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Roadway and Pedestrian Stone Hawk General Contractor RB023838 10/3/2023 Lighting The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: StoneHawk General Contractor 4550 Travis Street, Suite 565 Dallas, Texas 75205 c Wilkils (Signature) TITLE: Project Manager DATE: 20-Dec-22 END OF SECTION CITY 0F FORT WORTH STANDARD CON5TRUCTION PREQUALIFICATION STATEMENT-- DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 _00 45 12_Prequalificatior Statement 2015_DAP (3) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 104444 Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: StoneHawk General Contractor Company 4550 Travis Street, Suite 565 Address Dallas. Texas 75205 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Richard Wilkins ` (Pleas inte��, Signatur . Title: Proiect Manager (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Kj��j);1 &U - s . known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of for the purposes and consideration therein expressed and in the capacity therein stated. GIV N UNDER MY HAND AND SEAL OF OFFICE this oZ 3 �� day of 20.43 Notaroublic in andfor of Texas END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 =��y'e�ae SUZANNE COPEIAND � Notary Public, Stete of Texas }= My Commission Expires lin,. %AaY 27, 2024 "'•�`9,",„`+� NOTARY ID 13247147-6, 8 Trinity Landing Paving and Street Lighting Project Number 104444 00 52 43 - 1 Developer Awarded Project Agreement Pagel of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 12/22/2022 is made by and between the Developer, 5 (SCP TRINITY LAND, A DELAWARE LLC), authorized to do business in Texas ("Developer") 6 , and StoneHawk General Contractor, LLC , authorized to 7 do business in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 Trinity Landinz Multifamilv Paving and Street Lichtinz 17 Proiect Number 104444 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within {50) working days the date when 24 the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City 25 Conditions of the Construction Contract for Developer Awarded Projects. 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that Developer 28 will suffer financial loss if the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 30 the Standard City Conditions of the Construction Contract for Developer Awarded 31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 33 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 35 Developer Zero Dollars ($0.00) for each day that expires after the time specified in 36 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised June 16, 2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current funds of Four Hundred Four Thousand Nine Hundred Ninety Eight and 73/100 Dollars 40 ($ 404,998.73 ). 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer and 44 Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 b. Insurance ACORD Form(s) 51 c. Payment Bond (DAP Version) 52 d. Performance Bond (DAP Version) 53 e. Maintenance Bond (DAP Version) 54 f. Power of Attorney for the Bonds 55 g. Worker's Compensation Affidavit 56 3. Standard City General Conditions of the Construction Contract for Developer 57 Awarded Projects. 58 4. Supplementary Conditions. 59 5. Specifications specifically made a part of the Contract Documents by attachment 60 or, if not attached, as incorporated by reference and described in the Table of 61 Contents of the Project's Contract Documents. 62 6. Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued, become an incorporated part of the Contract Documents: 67 a. Notice to Proceed. 68 b. Field Orders. 69 c. Change Orders. 70 d. Letter of Final Acceptance. 71 72 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 73 Article 6. INDEMNIFICATION 74 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 75 expense, the city, its officers, servants and employees, from and against any and all 76 claims arising out of, or alleged to arise out of, the work and services to be performed 77 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 78 under this contract. This indemnification provision is specifically intended to overate 79 and be effective even if it is alleged or proven that all or some of the damages being 80 sought were caused. in whole or in part, by anv act. omission or negligence of the citv. 81 This indemnity provision is intended to include, without limitation, indemnity for 82 costs, expenses and legal fees incurred by the city in defending against such claims and 83 causes of actions. 84 85 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 86 the city, its officers, servants and employees, from and against any and all loss, damage 87 or destruction of property of the city, arising out of, or alleged to arise out of, the work 88 and services to be performed by the contractor, its officers, agents, employees, 89 subcontractors, licensees or invitees under this contract. This indemnification 90 provision is suecificallv intended to operate and be effective even if it is alleged or 91 vroven that all or some of the damages being sought were caused, in whole or in part, 92 by anv act, omission or negligence of the city. 93 94 Article 7. MISCELLANEOUS 95 7.1 Terms. 96 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 97 the Construction Contract for Developer Awarded Projects. 98 7.2 Assignment of Contract. 99 This Agreement, including all of the Contract Documents may not be assigned by the 100 Contractor without the advanced express written consent of the Developer. 101 7.3 Successors and Assigns. 102 Developer and Contractor each binds itself, its partners, successors, assigns and legal 103 representatives to the other party hereto, in respect to all covenants, agreements and 104 obligations contained in the Contract Documents. 105 7.4 Severability. 106 Any provision or part of the Contract Documents held to be unconstitutional, void or 107 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 108 remaining provisions shall continue to be valid and binding upon DEVELOPER and 109 CONTRACTOR. 110 7.5 Governing Law and Venue. 111 This Agreement, including all of the Contract Documents is performable in the State of 112 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 113 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised June 16, 2016 114 115 7.6 Authority to Sign. 116 117 118 119 120 121 122 123 005243-4 Developer Awarded Project Agreement Page 4 of 4 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: StoneHawk General Contractor c , B. (Signature) Richard Wilkins (Printed Name) Title: Proiect Manager Company Name: Address:4550 Travis Street. Suite 565 City/State/Zip:Dallas, Texas 75205 Developer: _SCP Trinity Land, a Delaware LLC .By: 7t�t gf`u e) Brandon Hopkins (Printed Na1ne) Title: Director of Construction Company name: SCP Trinity Land, a Delaware LLC Address: 4550 Travis St. Suite 565 City/State/Zip: Dallas, TX 75205 12/20/2022 Date Date 124 ei3l a6z 3 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised June 16, 2016 ^ 1 2 4 5 6 7 8 SECTION 00 62 13 PERFORMANCE BOND 00 6213 -1 PERFORMANCE BOND Page 1 of 3 Bond No. SUR006664 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, StoneHawk General Contractor, LLC , known as 9 "Principal" herein and Argonaut Insurance Company a corporate 10 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, SCP 12 Trinity Land a Delaware LLC, authorized to do business in Texas ("Developer") and the City of 13 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, 14 Four Hundred Four Thousand Nine hundred Ninety Eight and 7311 o0 Doll ($ 404,998.73 x 15 lawful money of the United States, to be paid in Port 'North, Tarrant County, Texas for the 16 payment of which suns well and truly to be made jointly unto the Developer and the City as dual 17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 18 and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFANumber CFA22-0174 and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 23 the 22nd day of December , 2022 , which Contract is hereby referred to and made a 24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 25 and other accessories defined by law, in the prosecution of the Work, including any Change 26 Orders, as provided for in said Contract designated as Trinity Landing Multifamily Paving and 27 Street Lighting. CITY OF FORTWORTH 7 rrw y° Landing .Rul€ijb rrily Pining raid Street Lighting STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROD rCT'S Pivject Number 104.444 Revised January 31, 3012 fit? 6213-2 PERFORMANCE BOND Page 2 of 3 1 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 2 shall faithfully perform it obligations under the Contract and shall in all respects duly and 3 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 4 specifications, and contract documents therein referred to, and as well during any period of 5 extension of the Contract that may be granted on the part of the Developer and/or City, then this 6 obligation shall be and become null and void, otherwise to remain in full force and effect. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 21 at day of March .2023 _. ATTEST: (P pal) Secretary Witness as to Principal PRINCIPAL: Stone1lawk General Contractor, LLC BY: Signature (KO'C4.1 wo 4WC'(' Vic, 661'avq Name and Title Address: 4550Travis St. Suite #565 Dallas, TX 75205 SURETY: Argonaut Insurance Company BY: �St au ure . Maryana. Zhuk, Attorney -in -Fact Name and Title Address: 225 W Washington St, 24th Floor Chicago, IL 60606 CITY Or, FORT WORM Tradt1v Lawling lllidffOnay Paving andSlveei Lkqhfing STANDARD CITY CONDMONS — DEVELOPER AWARDED PROJECTS Projeet Number 104444 Revised January 31, 2012 1 2 3 4 5 6 7 8 9 TO It 12 00 6213 - 3 PEKFORhMNCF-- BOND Page 3 of 3 T,je,phone Number: 833-820-9137 *Note: If signed by an officer of the Surety Company, there must be on file a:chit led extract from the by -lags showing that this person has authority to sign such obligation. ;If, Surety's physical address is different from its mailing address, both must be provided'. The date of the bond shall nc;be prior to the date the Contract is awarded. CITY OF FORT WORTH Trinity Landing Mulftramily Paring and Saver Lighting STANDARD Cr1-Y CONDITIONS — DEVELOPER AWARDED PROJECTS P),ojecf Nll*b1044,0 Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 006214-1 PAYMENT BOND Page I of2 SECTION 00 6214 PAYMENT BOND Bond No. SUR006664 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, StoneHawk General Contractor, LLC known as "Principal" herein, and Argonaut Insurance Company . a corporate surety ( or sureties if more than one), duty authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and fin-nly bound unto the Developer, SCP Trinity Land, a Delaware LLC, authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal SUIT► of Four Hundred Four Thousand Nine Hundred Ninety Eiglit and 73/100 Dollars ($ 404,998.7.3 ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum welt and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: is WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number CFA22-0174;and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the 2211d day of December - 2022 . which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as Trinity Landing Midtffamdy Paving and 26 Street Lig{iling. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 29 Chapter 2253 of the Texas Govenunent Code, as amended) in the prosecution of the Work under 30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 31 force and effect. CITY OF FORT WORTH Tnpfity Landing Mull!fautily Paving rend S1r•eei Lighting STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised January 31, 2012 0062 t4-2 PAYMENT BOND Page 2 or2 I This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended., and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 21st day of 6 March .2023 h s 9 10 1I 12 13 14 ATTEST: �V6 At {Principal} Secretary a Witness as to Principal ATTEST: (Surety) Secretary Witnessfto Salty PRINCIPAL: Stonel-lawk General Contractor, LLC BY: Signature t�f'aw1 "��� �►Cl✓ / U'6t Name and Title Address: 4550 Travis St. Suite #565 Dallas, TX 75205 SURETY: Argonaut Insurance Company rfi BY: S#at re -. -.. Maryana Zhuk, Attorney -in -Fact Name and Title Address:. 225 W Washington St, 24th Floor Chicago, IL 60606 Telephone Number: 833-820-9137 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH Trinity Landing Jlhdlijhnnty Paving and Sheet Lighting STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Manher 104444 Revised Jaiwary 31, 20I2 006219-1 MAINTENANCE BOND Page] of3 I SECTION 00 62 19 2 MAINTENANCE BOND Bond No. SUR006664 3 4 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we StoneHawk General Contractor, LLC known as 9 "Principal" herein and Argonaut Insurance Company a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as I I "Surety" herein (whether one or more), are held and firmly bound unto the Developer, SCP 12 Trinity Land, a Delaware LLC, authorized to do business in Texas {"Developer") and the City of 13 Fort Worth, a Texas municipal corporation ("City'), in the sum 14 of Four Hundred Four Thousand Nine Hundred Ninety Eight and 73/100 Dollars($ 404,998.73 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment 16 of which sum well and truly be made jointly unto the Developer and the City as dual obligees and 17 their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns; 18 jointly and severally, firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreement CFA Number CFA22-0174;and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 22nd day of December . 2OL2, which Contract is 25 hereby referred to and a made part hereof for all Purposes as if fully set forth herein, to furnish all 26 materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as Trinity Landing Multifamily 19 Pcwing ar2d Si yet Lighting; and 30 31 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 32 accordance with the plans, specifications and Contract Documents that the Work is and will 33 remain free from defects in materials or workmanship for and during the period of two (2) years 34 after the date of Final Acceptance of the Work by the City ("Maintenance Period7); and MY OF FORT WORTH Trinity; Landing Pining and Street bghiing STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECYS, PrqjectNumbei- 104444 Revised January 31,2012 0062 19-2 MAINTENANCE BOND Page 2 of 3 1 2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 3 upon receiving notice from the Developer and/or City of the need thereof at any time within the 4 Maintenance Period. 5 6 NOW THEREFORE, the condition of this obligation is such that if Principal shall 7 remedy any defective Work, for which timely notice was provided by Developer or City, to a 8 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 9 remain in full force and effect. 10 11 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 12 noticed defective Work, it is agreed that the Developer or City may cause any and all such 13 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 14 by the Principal and the Surety under this Maintenance Bond; and IS 16 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 17 Tarrant County, Texas or the United. States District Court for the Northern District of Texas, port 18 Worth Division; and. 19 20 PROVIDED FURTHER, that this obligation shall be continuous in nature and 21 successive recoveries may be had hereon for successive breaches, 22 23 24 CITY OF FORT WORTH D-mity Landing 1fultifanuly Paving and Street 7 tghdng STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS project Number 104444 Revised January 31, 2012 1 2 4 5 6 7 8 9 10 1-1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 15 36 37 38 39 40 41 42 006219-3 MAINTENANCE BOND Page 3 of3 IN WffNFSS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 21st day of March —23 T ATT Z (Principal) Secretary 4L- 'Mhjs-s-a-s to Principal ATTEST: All-T. (Surety) Secretary ) 111�3 I vtyWitnest4toui, PRINCIPAL: Stoneflawk General Contractor, LLC BY- Signa Signature % &L gri,cw Wo'i �reac, V , Name and Title Address: 4550 Travis St Suite 9565 Dallas, *TX 75205 SURETY: Argonaut Insurance Company BY.. Maryana Zhuk, Attorney -in -Fact Name and Title Address: 225 W Washington St, 24th Floor Chicago, IL 60606 Telephone Number: 833-92 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Trinity LandingUidt!family Pmdng and Sireel Lighting STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS Project Number 104444 Revised January 31,2012 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology.......... 1.01 Defined Terms ............................... 1.02 Terminology .................................. Article 2 — Preliminary Matters ....................... 2.01 Before Starting Construction...... 2.02 Preconstruction Conference........ 2.03 Public Meeting ............................ Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ............................................ 5.19 Delegation of Professional Design Services 5.20 Right to Audit: ............................................. 5.21 Nondiscrimination ........................................ Article 6 - Other Work at the Site....... 6.01 Related Work at Site ....... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction....... 8.01 City's Project Representative ................................. 8.02 Authorized Variations in Work .............................. 8.03 Rejecting Defective Work ...................................... 8.04 Determinations for Work Performed ...................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............ 11.01 Notice of Defects.............................................................................................................. 11.02 Access to Work................................................................................................................. 11.03 Tests and Inspections........................................................................................................ 11.04 Uncovering Work............................................................................................................. 11.05 City May Stop the Work................................................................................................... 11.06 Correction or Removal of Defective Work...................................................................... 11.07 Correction Period.............................................................................................................. 11.08 City May Correct Defective Work................................................................................... Article 12 - Completion ........................................... 12.01 Contractor's Warranty of Title ............ 12.02 Partial Utilization ................................. 12.03 Final Inspection .................................... 12.04 Final Acceptance .................................. Article 13 - Suspension of Work ..................................... 13.01 City May Suspend Work ............................. Article 14 - Miscellaneous ......................................... 14.01 Giving Notice ......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 24 24 25 25 26 26 26 26 26 27 a a ... 29 ... 29 ... 29 ... 29 ... 30 ... 30 ... 30 ... 30 ... 31 ................................. 32 ................................. 32 ................................. 32 ................................. 32 ................................. 33 ............................................................. 33 ............................................................. 33 34 34 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations...............................................................................................................35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NONE Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: NONE Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. 0 Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 011100-1 DAP SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Pagel of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Project Number 104444 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Project Number 104444 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Project Number 104444 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES Pagel of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. No 22 separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or catalog 31 numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, if a reduction in cost or time results, it will 46 be documented by Change Order. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 1 4. Substitution will be rejected if- 2 a. Submittal is not through the Contractor with his stamp of approval 3 b. Request is not made in accordance with this Specification Section 4 c. In the Developer's opinion, acceptance will require substantial revision of the 5 original design 6 d. In the City's or Developer's opinion, substitution will not perform adequately 7 the function consistent with the design intent 8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. In making request for substitution or in using an approved product, the Contractor 13 represents that the Contractor: 14 1. Has investigated proposed product, and has determined that it is adequate or 15 superior in all respects to that specified, and that it will perform function for which it 16 is intended 17 2. Will provide same guarantee for substitute item as for product specified 18 3. Will coordinate installation of accepted substitution into Work, to include building 19 modifications if necessary, making such changes as may be required for Work to be 20 complete in all respects 21 4. Waives all claims for additional costs related to substitution which subsequently 22 arise 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended By Date Remarks Date Rejected Received late CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 SECTION 01 31 19 PRECONSTRUCTION MEETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 0131 19- 1 DAP PRECONSTRUCTION MEETING Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 0131 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals In. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings f£ Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 0131 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0132 33 PRECONSTRUCTION VIDEO 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. Though not mandatory, it is highly recommended on infill developer projects. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 1. General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal crossreference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: [I� i1ZIZla1 a 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions 2. The Project title and number 3. Contractor identification 4. The names o£ a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare - parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non- conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES SECTION 0135 13 SPECIAL PROJECT PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 7 The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Etc. £ Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 33 12 25 — Connection to Existing Water Mains 1.2 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction Specification 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination with the Texas Department of Transportation 1. When work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (TxDOT): a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 0131 13 E. Water Department Coordination During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. F. Public Notification Prior to Beginning Construction Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. G. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 0135 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1.4 SUBMITTALS [NOT USED] 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.6 CLOSEOUT SUBMITTALS [NOT USED] 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.8 QUALITY ASSURANCE [NOT USED] 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.10 FIELD [SITE] CONDITIONS [NOT USED] 1.11 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: Page 6 of 7 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 Date: EXHIBIT B FORT WORTH DOE NO. XXXX Project Dame: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE Removed reference to Buzzsaw and noted that electronic submittals be uploaded 03/20/2020 D.V. Magana through the City's document management system. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised March 20, 2020 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 c. Coordination 1) Contact City 1 week before water for construction is desired d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised JULY 1, 2011 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Pagel of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised July 1, 2011 0157 13- 1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 3926088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP 1. Submit in accordance with Section 0133 00, except as stated herein. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised July 1, 2011 0157 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised July 1, 2011 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 66 00 - 3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE I NAME I SUMMARY OF CHANGE CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Pagel of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under "Measurement" will be paid for at the unit 14 price per each "Work Order Mobilization" in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section l.l.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under "Measurement" will be paid for at the unit 29 price per each "Work Order Emergency Mobilization" in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section l.l.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 7 CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 7 1 SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. See Changes (Highlighted in Yellow). 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will be 27 allowed. 28 3. As -Built Survey 29 a. Measurement 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and the materials furnished in accordance with this 33 Item are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 1.3 REFERENCES 36 A. Definitions 37 1. Construction Survev - The survey measurements made prior to or while 38 construction is in progress to control elevation, horizontal position, dimensions and 39 configuration of structures/improvements included in the Project Drawings. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 7 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. The Contractor's selection of a surveyor must comply with Texas Government 22 Code 2254 (qualifications based selection) for this project. 23 1.5 SUBMITTALS 24 A. Submittals, if required, shall be in accordance with Section 0133 00. 25 B. All submittals shall be received and reviewed by the City prior to delivery of work. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 27 A. Field Quality Control Submittals 28 1. Documentation verifying accuracy of field engineering work, including coordinate 29 conversions if plans do not indicate grid or ground coordinates. 30 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 31 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 32 1.7 CLOSEOUT SUBMITTALS 33 B. As -built Redline Drawing Submittal 34 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 35 constructed improvements signed and sealed by Registered Professional Land 36 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 37 — Survey Staking Standards) . 38 2. Contractor shall submit the proposed as -built and completed redline drawing 39 submittal one (1) week prior to scheduling the project final inspection for City 40 review and comment. Revisions, if necessary, shall be made to the as -built redline 41 drawings and resubmitted to the City prior to scheduling the construction final 42 inspection. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 7 1 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 2 1.9 QUALITY ASSURANCE 3 A. Construction Staking 4 1. Construction staking will be performed by the Contractor. 5 2. Coordination 6 a. Contact City and Developer's Project Representative at least one week in 7 advance notifying the City of when Construction Staking is scheduled. 8 b. It is the Contractor's responsibility to coordinate staking such that 9 construction activities are not delayed or negatively impacted. 10 3. General 11 a. Contractor is responsible for preserving and maintaining stakes. If 12 Developer's Project Representative is required to re -stake for any reason, the 13 Contractor will be responsible for costs to perform staking. If in the opinion of 14 the City, a sufficient number of stakes or markings have been lost, destroyed 15 disturbed or omitted that the contracted Work cannot take place then the 16 Contractor will be required to stake or re -stake the deficient areas. 17 B. Construction Survey 18 1. Construction Survey will be performed by the Contractor. 19 2. Coordination 20 a. Contractor to verify that horizontal and vertical control data established in the 21 design survey and required for construction survey is available and in place. 22 3. General 23 a. Construction survey will be performed in order to construct the work shown 24 on the Construction Drawings and specified in the Contract Documents. 25 b. For construction methods other than open cut, the Contractor shall perform 26 construction survey and verify control data including, but not limited to, the 27 following: 28 1) Verification that established benchmarks and control are accurate. 29 2) Use of Benchmarks to furnish and maintain all reference lines and grades 30 for tunneling. 31 3) Use of line and grades to establish the location of the pipe. 32 4) Submit to the City copies of field notes used to establish all lines and 33 grades, if requested, and allow the City to check guidance system setup prior 34 to beginning each tunneling drive. 35 5) Provide access for the City, if requested, to verify the guidance system and 36 the line and grade of the carrier pipe. 37 6) The Contractor remains fully responsible for the accuracy of the work and 38 correction of it, as required. 39 7) Monitor line and grade continuously during construction. 40 8) Record deviation with respect to design line and grade once at each pipe 41 joint and submit daily records to the City. 42 9) If the installation does not meet the specified tolerances (as outlined in 43 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct 44 the installation in accordance with the Contract Documents. 45 C. As -Built Survey 46 1. Required As -Built Survey will be performed by the Contractor. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 7 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 25O linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 25O linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 7 1 b) Manholes and Junction Structures 2 (1) Rim and flowline elevations and coordinates for each 3 manhole and junction structure. 4 4) Stormwater — Not Applicable 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.11 FIELD [SITE] CONDITIONS [NOT USED] 7 1.12 WARRANTY 8 PART2- PRODUCTS 9 A. A construction survey will produce, but will not be limited to: 10 1. Recovery of relevant control points, points of curvature and points of intersection. 11 2. Establish temporary horizontal and vertical control elevations (benchmarks) 12 sufficiently permanent and located in a manner to be used throughout construction. 13 3. The location of planned facilities, easements and improvements. 14 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 15 areas, utilities, streets, highways, tunnels, and other construction. 16 b. A record of revisions or corrections noted in an orderly manner for reference. 17 c. A drawing, when required by the client, indicating the horizontal and vertical 18 location of facilities, easements and improvements, as built. 19 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 20 construction staking projects. These cut sheets shall be on the standard city template 21 which can be obtained from the Survey Superintendent (817-392-7925). 22 5. Digital survey files in the following formats shall be acceptable: 23 a. AutoCAD (.dwg) 24 b. ESRI Shapefile (.shp) 25 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 26 standard templates, if available) 27 6. Survey files shall include vertical and horizontal data tied to original project 28 control and benchmarks, and shall include feature descriptions 29 PART 3 - EXECUTION 30 3.1 INSTALLERS 31 A. Tolerances: 32 1. The staked location of any improvement or facility should be as accurate as 33 practical and necessary. The degree of precision required is dependent on many 34 factors all of which must remain judgmental. The tolerances listed hereafter are 35 based on generalities and, under certain circumstances, shall yield to specific 36 requirements. The surveyor shall assess any situation by review of the overall plans 37 and through consultation with responsible parties as to the need for specific 38 tolerances. 39 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 40 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 41 1.0 ft. tolerance. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 7 1 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 2 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 3 walkways shall be located within the confines of the site boundaries and, 4 occasionally, along a boundary or any other restrictive line. Away from any 5 restrictive line, these facilities should be staked with an accuracy producing no 6 more than 0.05ft. tolerance from their specified locations. 7 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 8 electric lines, shall be located horizontally within their prescribed areas or 9 easements. Within assigned areas, these utilities should be staked with an 10 accuracy producing no more than 0.1 ft tolerance from a specified location. 11 e. The accuracy required for the vertical location of utilities varies widely. Many 12 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 13 should be maintained. Underground and overhead utilities on planned profile, 14 but not depending on gravity flow for performance, should not exceed 0.1 ft. 15 tolerance. 16 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 17 specifications or in compliance to standards. The City reserves the right to request a 18 calibration report at any time and recommends regular maintenance schedule be 19 performed by a certified technician every 6 months. 20 1. Field measurements of angles and distances shall be done in such fashion as to 21 satisfy the closures and tolerances expressed in Part 3.1.A. 22 2. Vertical locations shall be established from a pre -established benchmark and 23 checked by closing to a different bench mark on the same datum. 24 3. Construction survey field work shall correspond to the client's plans. Irregularities 25 or conflicts found shall be reported promptly to the City. 26 4. Revisions, corrections and other pertinent data shall be logged for future reference. 27 28 3.2 EXAMINATION [NOT USED] 29 3.3 PREPARATION [NOT USED] 30 3.4 APPLICATION 31 3.5 REPAIR / RESTORATION 32 A. If the Contractor's work damages or destroys one or more of the control 33 monuments/points set by the Developer's Project Representative, the monuments shall be 34 adequately referenced for expedient restoration. 35 1. Notify City or Developer's Project Representative if any control data needs to be 36 restored or replaced due to damage caused during construction operations. 37 a. Contractor shall perform replacements and/or restorations. 38 b. The City or Developer's Project Representative may require at anytime a 39 survey "Field Check" of any monument or benchmarks that are set be verified 40 by the Developer's Project Representative before further associated work can 41 move forward. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 7 1 3.6 RE -INSTALLATION [NOT USED] 2 3.7 FIELD [OR] SITE QUALITY CONTROL 3 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 4 Developer's Project Representative in accordance with this Specification. This includes 5 easements and right of way, if noted on the plans. 6 B. Do not change or relocate stakes or control data without approval from the City. 7 3.8 SYSTEM STARTUP 8 A. Survey Checks 9 1. The City reserves the right to perform a Survey Check at any time deemed 10 necessary. 11 2. Checks by City personnel or 3' party contracted surveyor are not intended to 12 relieve the contractor of his/her responsibility for accuracy. 13 14 3.9 ADJUSTING [NOT USED] 15 3.10 CLEANING [NOT USED] 16 3.11 CLOSEOUT ACTIVITIES [NOT USED] 17 3.12 PROTECTION [NOT USED] 18 3.13 MAINTENANCE [NOT USED] 19 3.14 ATTACHMENTS [NOT USED] 20 21 ON END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised February 14, 2018 SECTION 0174 23 CLEANING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 017423-1 DAP CLEANING Page 1 of 4 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 '/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 c. Text: Manufacturer's printed data, or neatly typewritten d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. f. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. g. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking £ Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1-GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Project Number 104444 Revised April 7, 2014 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is available through the City's website at: https:Happs.fortworthtexas.gov/ProjectResources/ and following the directory path; 02 - Construction Documents/Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 9, 2020 Trinity Landing Multifamily Paving and Street Lighting Project Number 104444 01 60 00 PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 3/9/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 9, 2020 Trinity Landing Multifamily Paving and Street Lighting Project Number 104444 APPENDIX GC-4.02 Subsurface and Physical Conditions GR-01 60 00 Product Requirements CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS PROJECT NO. 104444 Revised July 1, 2011 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS PROJECT NO. 104444 Revised July 1, 2011 PI ECS Southwest,, LLP Geotechnical Engineering Report Trinity Crossing Development SWC of Trinity Blvd and Post Oak Blvd Fort Worth, Texas ECS Project Number 63:1537 February 2, 2022 ME Frc' 0 QS x OF T,�y'�'# �1i MARK FF.OFTAIAL MAN EN Ishtiaque Hossain, PhD, P.E. Geotechnical Department Manager IHossain@ecslimited.com ECS SOUTHWEST, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities TX Registered Eng`neer'ng Firm F,8469 February 2, 2022 Mr. Matt Swedenburg Development Associate StoneHawk Capital Partners 2772 Routh Street Dallas, TX 75201 ECS Project No. 63:1537 Reference: Geotechnical Engineering Report Trinity Crossing Development SWC of Trinity Blvd and Post Oak Blvd Fort Worth, Texas Dear Mr. Swedenburg: ECS Southwest, LLP (ECS) has completed the subsurface exploration, laboratory testing, and geotechnical engineering analyses for the above -referenced project. Our services were performed in general accordance with our agreed to scope of work. This report presents our understanding of the geotechnical aspects of the project along with the results of the field exploration and laboratory testing conducted, and our design and construction recommendations. It has been our pleasure to be of service to StoneHawk Capital Partners during the design phase of this project. We would appreciate the opportunity to remain involved during the continuation of the design phase, and we would like to provide our services during construction phase operations as well to verify subsurface conditions assumed for this report. Should you have any questions concerning the information contained in this report, or if we can be of further assistance to you, please contact US. Respectfully submitted, ECS Southwest, LLP Mark R. Zortman, P.E. Principal Engineer mzortman@ecslimited.com 2621 White Settlement Road, Fort Worth, TX 76107 • T: 682-350-2250 • www.ecslimited.com ECS Capitol Services, PLLC • ECS Florida, LLC • ECS Mid -Atlantic, LLC • ECS Midwest, LLC • ECS Southeast, LLP • ECS Southwest, LLP Trinity Crossing Development ECS Project No. 63:1537 TABLE OF CONTENTS February 2, 2022 Page EXECUTIVE SUMMARY.............................................................................................................1 1.0 INTRODUCTION..................................................................................................................2 2.0 PROJECT INFORMATION.....................................................................................................3 2.1 Project Location/Current Site Use..........................................................................................3 2.2 Proposed Construction...........................................................................................................3 3.0 FIELD EXPLORATION...........................................................................................................4 3.1 Subsurface Characterization..................................................................................................4 3.2 Groundwater Observations....................................................................................................5 3.3 Laboratory Testing.................................................................................................................6 4.0 DESIGN RECOMMENDATIONS.............................................................................................7 4.1 Foundations - Monolithic Slab-On-Grade..............................................................................7 4.2 Building Perimeter Conditions...............................................................................................8 4.3 Site Retaining Walls................................................................................................................9 4.4 Seismic Design Considerations.............................................................................................10 4.5 Pavement Sections — Exterior parking and travel................................................................11 5.9 Detention.............................................................................................................................13 5.0 SITE CONSTRUCTION RECOMMENDATIONS.......................................................................14 5.1 Subgrade Preparation..........................................................................................................14 5.1.1 Stripping and Grubbing...............................................................................................14 5.1.2 Proofrolling (Soil Subgrades)......................................................................................14 5.1.3 Site Temporary Dewatering........................................................................................14 5.2 Earthwork Operations..........................................................................................................15 5.3 Material Specifications.........................................................................................................16 5.3.1 Clay Fill (Building Pads)...............................................................................................16 5.3.2 Common Fill (Outside Building Pads)..........................................................................16 5.3.3 Granular Cap - Select Fill.............................................................................................16 5.3.4 Granular Cap - Lime Stabilized....................................................................................17 5.4 Foundation and Slab Observations......................................................................................17 5.5 Utility Installations...............................................................................................................17 6.0 CLOSING...........................................................................................................................19 Trinity Crossing Development ECS Project No. 63:1537 APPENDICES Appendix A — Figures • Site Location Map • Boring Location Diagram • Subsurface Profiles • Regional Geology Appendix B — Field Operations • Reference Notes for Boring Logs • Boring Logs B-1 to B-9, and P-1 to P-3 Appendix C — Laboratory Testing • Laboratory Testing Summary Appendix D — Supplemental Report Documents • Clay Plug at Utility Trench February 2, 2022 Page ii Trinity Crossing Development ECS Project No. 63:1537 EXECUTIVE SUMMARY February 2, 2022 Page 1 The following summarizes the main findings of the exploration, particularly those that may have a cost impact on the planned development. Further, our principal foundation recommendations are summarized. This Executive Summary is intended as a very brief overview of the primary geotechnical conditions that are expected to affect design and construction. Information gleaned from the executive summary should not be utilized in lieu of reading the entire geotechnical report. • Based on the information supplied by the StoneHawk Capital Partners dated September 15, 2021 and October 27, 2021, the project consists of multi -family community development. Associated parking structure, spaces and driveways are also included in the project. • The borings encountered silty and clayey sand followed by fat clay and some lean clay. Below the overburden soils, gray shale was encountered to maximum boring termination depth of about 30 feet. • Groundwater was not observed in any borings during and at completion of drilling operations. • For the multifamily residential structures and parking structure building subgrade improvements may be required to reduce the PVM to 2.0 inches or less. • The planned residential buildings and parking structure can be supported on a monolithic post -tensioned slab on a grade foundation system. • It is recommended that ECS conduct a geotechnical review of the project plans (prior to issuance for construction) to check to see that ECS' geotechnical recommendations have been properly interpreted and implemented. • To prevent misinterpretation of ECS recommendations, ECS should be retained to perform quality control testing and documentation during construction of the earthwork and foundations for the project. Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 2 1.0 INTRODUCTION The purpose of this study was to provide geotechnical information for the design of multi -family community development on an approximately 6.495 acres. Associated utility improvements, parking structure and surface parking/driveways are also included in the project. The recommendations developed for this report are based on project information provided by the client, dated September 15, 2021. Our services were provided in accordance with our Proposal No. 63:2014-GP dated September 20, 2021, and was executed on September 21, 2021, which includes our Terms and Conditions of Service. This report contains the procedures and results of our subsurface exploration and laboratory testing programs, review of existing site conditions, engineering analyses, and recommendations for the design and construction of the project. The report includes the following items. • A brief review and description of our field and laboratory test procedures and the results of testing conducted. • A review of surface topographical features and site conditions. • A review of area and site geologic conditions. • A review of subsurface soil stratigraphy with pertinent available physical properties. • A final copy of our soil test borings. • Recommendations for foundation. • Recommendations for site retaining walls. • Recommendations for pavements. • Recommendations for detention pond. • Recommendations for site preparation and construction of compacted fills, including an evaluation of on -site soils for use as compacted fills. Trinity Crossing Development ECS Project No. 63:1537 2.0 PROJECT INFORMATION 2.1 PROJECT LOCATION/CURRENT SITE USE February 2, 2022 Page 3 The project site is located south west corner of Trinity Blvd and Post Oak Blvd in Fort Worth, Texas (GPS: 32.8215 N, 97.0683 W). The site had dense vegetation and trees which were cleared prior to the subsurface exploration. The location is depicted in Figure 2.1.1 as shown below. Figure 2.1.1 Site Location 2.2 PROPOSED CONSTRUCTION saw _ s Based on concept grading exhibit prepared by MMA (dated 10/27/2021) , the site slopes down from the northeast to southwest with maximum and minimum elevation of about 535 ft and 502 feet, respectively. The following information explains our understanding of the planned development including the proposed buildings: SUBJECT DESIGN INFORMATION / ASSUMPTIONS Site Area 6.495 acres Number of Stories (assumed) 4 stories multifamily buildings above grade with no underground structures, parking structure (slip deck) Usage Residential Finished Grade Elevation 515.55 to 536.52 ft Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 4 3.0 FIELD EXPLORATION The field exploration was planned with the objective of characterizing the project site in general geotechnical and geological terms and to evaluate subsequent field and laboratory data to assist in the determination of geotechnical recommendations. The subsurface conditions were explored by twelve borings drilled to a maximum depth of about 30 feet below the existing site grades. A truck -mounted drill rig with continuous flight augers was utilized to drill the borings. The boring locations were determined by and identified in the field by ECS personnel using the supplied diagram. The approximate as -drilled boring locations are shown on the Boring Location Diagram in Appendix A. The ground surface elevations noted in this report were obtained from the topographical map prepared by G Curtis Surveyors, LLC, which provided elevation contours in 2-foot intervals Representative soil samples were obtained by means of the split -barrel and Shelby tube sampling procedures in accordance with ASTM Specifications D-1586 and D-1587, respectively. In the split - barrel sampling procedure, a 2-inch O.D., and split -barrel sampler is driven into the soil a distance of 18 inches by means of a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs. In the Shelby tube sampling procedure, a thin walled, steel seamless tube with sharp cutting edges is pushed hydraulically into the soil, and a relatively undisturbed sample is obtained. Texas Cone Penetrometer tests were performed to evaluate the load carrying capacity of the gray shale encountered. These tests were performed in general accordance with test method Tex-132- E in the Texas Department of Transportation (TxDOT) Manual of Testing Procedures. The results of these tests are shown on the attached boring logs at the depths of occurrence. Field logs of the soils encountered in the borings were maintained by the drill crew. After recovery, each geotechnical soil sample was removed from the sampler and visually classified. Representative portions of each soil sample were then wrapped in plastic and transported to our laboratory for further visual examination and laboratory testing. After completion of the drilling operations, the boreholes were backfilled with auger cuttings to the existing ground surface and pavements were patched with concrete. 3.1 SUBSURFACE CHARACTERIZATION The near surface geologic mapping is largely underlain by the Woodbine Formation (Kwb). The residual soils of the Woodbine Formation can show nonhomogeneous stratigraphy. The primary components include Sandy clay, Fat clay and Clayey sand. The clays are typically not very thick but have a very high shrink and swell potential. Sand and Silts can also occur in the soil profile. Very hard Sandstones, in the form of boulders and discontinuous lenses (shelf rock) can also be encountered. Please refer to the regional geology in Appendix A. Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 5 The subsurface conditions encountered were generally consistent with published geological mapping. The following sections provide generalized characterizations of the soil and rock strata. Please refer to the boring logs in Appendix B. Subsurface Stratigraphy Approximate Depth to Elevation of Bottom of Bottom of Strata (ft) Strata (l) (ft) 2 to 102 4 to 18' 13 to 254,8 6 to 225 186 25 to 357•$ Notes: EL. + 515.0 to 527.0 EL. + 507.0 to 518.0 EL. + 489.0 to 497.0 EL. + 489.0 to 519.0 EL. + 493.0 to 502.0 Description (SM) SILTY SAND, brown, orange brown, light gray II (SC) CLAYEY SAND, brown, light gray, orange brown (CL) LEAN CLAY, brown, III orange brown, light brown, gray (CH) SANDY FAT CLAY, brown, light gray, orange IV brown, with calcareous deposits and cemented sand seams (CH) SHALEY CLAY, light V brown, orange brown, with sand seams EL. + 479.0 to 501.0 VI SHALE, gray, with sand seams Consistency Loose to Very Dense Medium Dense to Very Dense Hard to Very Hard Stiff to Very Hard Very Hard (1) Please note that the ground surface elevations were obtained from concept grading exhibit prepared by MMA (dated 10/27/2021). Elevation ranges are approximate +/- several feet. (2) Encountered in borings B-1, B-2, B-9, _P-1, and P-2. (3) Encountered in boring B-4, B-6, B-9 and P-3. (4) Encountered in boring B-5, B-8, and B-9. (5) Encountered in boring B-1, B-2, B-3, B-4, B-6, and B-7. (6) Encountered in boring B-7, and B-8. (7) Encountered in boring B-1, B-2, B-3, B-4, B-5, B-6, B-7, and B-8. (8) Boring termination depth. 3.2 GROUNDWATER OBSERVATIONS Groundwater level observations were made in the borings during drilling operations. In auger drilling operations, water is not introduced into the borehole and the groundwater position can often be determined by observing water flowing into the excavation. Furthermore, visual observation of soil samples retrieved can often be used in evaluating the groundwater conditions. Groundwater seepage was not encountered in the borings during drilling or when checked upon the completion of drilling. Variations in groundwater levels can occur as a result of changes in precipitation, evaporation, surface water runoff, construction activities, and other factors not immediately apparent at the time of this exploration. The highest groundwater observations are normally observed in the late winter and early spring. Therefore, the groundwater conditions at this site could be different at Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 6 the time of construction. The possibility of groundwater level fluctuation should be considered when developing the design and construction plans for the project. 3.3 LABORATORY TESTING The laboratory testing consisted of selected tests performed on samples obtained during our field exploration operations. Classification and index property tests were performed on representative soil samples. The tests included moisture content, Atterberg limits and gradation tests (percent passing No. 200 sieve). Soil samples were visually classified on the basis of texture and plasticity in accordance with ASTM D2488 Standard Practice for Description and Identification of Soils (Visual -Manual Procedures) and including USCS classification symbols, and ASTM D2487 Standard Practice for Classification for Engineering Purposes (Unified Soil Classification System (USCS). After classification, the samples were grouped in the major zones noted on the boring logs in Appendix B. The group symbols for each soil type are indicated in parentheses along with the soil descriptions. The stratification lines between strata on the logs are approximate; in situ, the transitions may be gradual. Trinity Crossing Development ECS Project No. 63:1537 4.0 DESIGN RECOMMENDATIONS February 2, 2022 Page 7 The following recommendations have been developed on the basis of previously described project characteristics and subsurface conditions. If there are any changes to the project characteristics or if different subsurface conditions are encountered during construction, ECS should be consulted so that the recommendations of this report can be reviewed. Based on the concept grading exhibit prepared by MMA (dated 10/27/2021 we anticipate fills of about 0.5 to 11.5 feet at this site. If the finished grade elevations deviates from this assumed grade, the recommendations provided below should be evaluated by our office. 4.1 FOUNDATIONS - MONOLITHIC SLAB -ON -GRADE We recommend that the planned residential structures be supported by a monolithic slab-on- grade/grade beam structural foundation system. This system may be designed by post -tensioning. Expansive clays are present at the site. The potential movements of floor slabs placed at or above the existing grade are estimated to be about 2.0 to 4.0 inches based on dry conditions. The actual movements could be greater if poor drainage, ponded water, and/or other unusual sources of moisture are allowed to saturate the soils beneath the structure after construction. The table below shows the estimated cut and fill within each boring location across the site. Boring Existing Elevation (ft) Proposed Elevation (ft) Cut (-)/Fill (+) ( ) B-1 515 518 + 3 B-2 526 530 + 4 B-3 515 517 + 2 B-4 525 530 + 5 B-5 504 Detention Area - B-6 522 525.5 + 3.5 B-7 521 524 + 3 B-8 512 523.5 + 11.5 B-9 522 523.5 + 1.5 P-1 537 537 - P-2 529 529.5 + 0.5 P-3 520 523 + 3 Subgrade Improvements are required for multi -family residential buildings to reduce the PVM to 2 inches or less. Please refer to the table below for estimated PVM and pad improvement recommendations. These subgrade improvements should extend at least 5 feet beyond the edge of the building pads and depths provided are measured from the planned slab subgrades. Trinity Crossing Development ECS Project No. 63:1537 February 2, 2022 Page 8 Recommended Subgrade Improvements Depth of Total Depth of Moisture Improved Zone Anticipated PVM Conditioning (feet)" (inch) (feet)' 8 8 1 4 4 1.5 2 2 2 1 All Fill Above Existing Grades Should Be Moisture Conditioned z - If the moisture of the pads is maintained throughout construction, no cap is required. Otherwise, the pads should be covered with a 12-inches granular cap, 8-inches of lime stabilized clay, or covered with poly. These design parameters assume that positive drainage will be provided away from the structures and with moderate irrigation of surrounding lawn and planter areas with no excessive wetting or drying of soils adjacent to the foundations. Greater potential movements could occur with extreme wetting or drying of the soils due to ponding of water, plumbing leaks, or lack of irrigation. The following design parameters are recommended for the Post -Tensioning Institute's slab -on - grade design method (3rd Edition): Recommended PTI Design Parameters (PVR 2 inches or Less) Perimeter Beam Depth Below I Center Lift I Edge Lift Exterior Grade Em (feet) J Ym (inches) Ern (feet) I Ym (inches) 12 inches 7.5 0.7 3.8 1.1 24 inches 7.5 0.6 3.8 0.9 30 inches 7.5 0.5 3.8 0.5 36 inches 7.5 0.4 3.8 0.4 A net allowable soil bearing pressure of 3,000 psf can be used to design grade beams founded on the reworked existing soils as described in the section titled "Earthwork Operations". Grade beams should have a minimum width of 12 inches to reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures. Fills should be sloped to drain surface water away from the structure. A 10-mil vapor barrier of polyethylene sheeting or similar material should be placed beneath the slab to minimize moisture migration through the slab. If a vapor barrier is considered to provide moisture protection, special attention should be given to the surface curing of the slabs to minimize uneven drying of the slabs and associated cracking and/or slab curling. The use of a blotter or cushion layer above the vapor barrier can also be considered for project -specific reasons. 4.2 BUILDING PERIMETER CONDITIONS Soils placed along the exterior of each building should be on -site clay soils placed and compacted in accordance with this report. The purpose of this clay backfill is to reduce the opportunity for surface or subsurface water infiltration beneath the structure. Additionally, where penetrations into the structure occur, a clay plug (or suitable synthetic alternative) should be placed at the Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 9 building line to reduce the opportunity for infiltrating water, regardless of the backfill material. A typical clay plug at utility trench detail is provided in Appendix D of the report. Positive drainage away from the structures should also be provided. Additionally, Irrigation of lawn and landscaped areas should be moderate, with no excessive wetting or drying of soils around the perimeter of the structures allowed. Trees and bushes/shrubs planted near the perimeter of the structures can withdraw large amounts of water from the soils and should be planted at least their anticipated mature height away from the buildings. Where flatwork is placed against or near the structure, a positive seal must be installed and adequately maintained to reduce water intrusion. Down spouts and gutters should be used to collect and distribute water away from the structure. Routine maintenance is required to ensure that the recommendations contained in this report are followed and maintained. Greater potential movements could occur with extreme wetting or drying of the soils due to poor drainage, ponding of water, plumbing leaks, lack of irrigation, and/or lack of routine maintenance, etc. 4.3 SITE RETAINING WALLS Unlike below grade walls, site retaining walls are free to rotate at the top (not restrained). For these walls the "Active" (ka) soil condition should be used along with a triangular distribution of earth pressures. In addition, site retaining walls should be designed to withstand lateral earth pressures exerted by the backfill and any surcharge loads within the "Critical Soil Zone". The Critical Zone is defined as the area between the back of the retaining wall footing and an imaginary line projected upward and rearward at a 45-degree angle (see figure below). The lateral earth pressures developed behind site retaining walls are a function of the backfill soil type, backfill slope angle, and any surcharge loads. For the design of site retaining walls, we recommend the soil parameters provided below. RETAINING WALL BACKFILL IN THE CRITICAL SOIL ZONE Soil Parameter Estimated Value Soil Classification PI 20 or less On -site soils Coefficient of Active Earth Pressure (Ka) 0.29 0.59 Retained Soil Moist Unit Weight (y) ........................................................................................................ 125 pcf 120 pcf Cohesion (C) ........................................................................................................................................................................................................... - 100 psf Angle of Internal Friction ((�) ........................................................................................................ 32' 18' Active Equivalent Fluid Pressure 40H (psf) 70H (psf) Trinity Crossing Development ECS Project No. 63:1537 FOUNDATION SOILS I Soil Parameter I Estimated value I Allowable Soil Bearing Pressure Minimum Wall Embedment Below Grade Coefficient of Passive Earth Pressure (Kp) Soil Moist Unit Weight (y) ....................................................................................................................................... Cohesion (C) ....................................................................................................................................... Interface Friction Angle [Concrete on Soil] ((�f) ....................................................................................................................................... Sliding Friction Coefficient [Concrete on Soil] (µ) ....................................................................................................................................... Passive Equivalent Fluid Pressure 3,000 24 inches 2.04 120 pcf 0 psf ..................... 20' 0.3 245H (psf) February 2, 2022 Page 10 It is critical that the soils used for backfill of the retaining walls meet the soil parameters recommended above. If the soils available do not meet those parameters, then ECS should be contacted to provide revised values, and to confirm that only suitable soils will be used for wall backfill. Care should be used to avoid the operation of heavy equipment to compact the wall backfill since it may overload and damage the wall. In addition, such loads are not typically considered in the design of site retaining walls, and are not provided for in our recommendations. Wall Drainage: Retaining walls should be provided with a wall and foundation drainage system to relieve hydrostatic pressures which may develop behind the walls. This system should consist of weepholes through the wall and/or a 4-inch perforated, closed joint drain line located along the backside of the walls above the top of the footing. The drain line should be surrounded by a minimum of 6 inches of AASHTO #57 Stone wrapped with an approved non -woven geotextile, such as Mirafi 140-N or equivalent. Wall drains can consist of a 12-inch wide zone of free draining gravel, such as AASHTO #57 Stone, employed directly behind the wall and separated from the soils beyond with a non -woven geotextile. Alternatively, the wall drain can consist of a suitable geocomposite drainage board material. The wall drain should be hydraulically connected to the foundation drain. 4.4 SEISMIC DESIGN CONSIDERATIONS Seismic Site Classification: The International Building Code (IBC) 2015 requires site classification for seismic design based on the upper 100 feet of a soil profile. The methods are utilized in classifying sites, namely the shear wave velocity (vs) method; the undrained shear strength (s,,) method. and the Standard Penetration Resistance (N-value) method. The undrained shear strength (s,,) method was used in classifying this site. Trinity Crossing Development ECS Project No. 63:1537 Seismic Site Classification SEISMIC SITE CLASSIFICATION February 2, 2022 Page 11 Site Class Soil Profile Name Shear Wave Velocity, Vs, (ft./s) N value (bpf) Su (psf) A Hard Rock Vs > 5,000 fps N/A N/A B Rock 2,500 < Vs 5 5,000 fps N/A N/A C Very dense soil and soft rock 1,200 < Vs 5 2,500 fps >50 sU>_ 2,000 D Stiff Soil Profile 600 5 Vs <_ 1,200 fps 15 to 60 1,000 5 sU 5 2000 E Soft Soil Profile Vs < 600 fps <15 s' < 1000 Based upon our interpretation of the subsurface conditions, the appropriate Seismic Site Classification is "C" as shown in the preceding table. Ground Motion Parameters: In addition to the seismic site classification, ECS has determined the design spectral response acceleration parameters following the IBC methodology. The Mapped Reponses were estimated from the USGS website https://earthquake.usgs.gov/ws/designmaps/. The design responses for the short (0.2 sec, SDs) and 1-second period (Sp1) are noted in bold at the far right end of the following table. Ground Motion Parameters GROUND MOTION PARAMETERS [IBC 2015 Method] Mapped Spectral Values of Site Maximum Spectral Design Spectral Period Response Coefficient Response Acceleration Response (sec) Accelerations for Site Class Adjusted for Site Class (g) acceleration (g) (g) Reference Figures 1613.3.1 Tables 1613.3.3 Eqs. 16-37 & Eqs. 16-39 & (1) & (2) (1) & (2) 16-38 16-40 0.2 Ss 0.097 Fa 1.6 Snns=FaSS 0.155 Sos=2/3SMs 0.103 1.0 51 0.053 Fv 2.4 SM1=F„S1 0.127 So1=2/3SM1 0.085 The Site Class definition should not be confused with the Seismic Design Category designation which the Structural Engineer typically assesses. If a higher site classification is beneficial to the project, we can provide additional testing methods that may yield more favorable results. 4.5 PAVEMENT SECTIONS — EXTERIOR PARKING AND TRAVEL As previously noted, the PVM of this site is up to about 2.0 to 4.0 inches. Should these movements be unacceptable for the pavements, the recommendations included in this report to achieve more desirable future movements, should be followed. All proposed paved areas should be proof rolled with heavy compaction equipment to attempt to locate any soft or undesirable soils so they can be removed and replaced with properly placed and compacted soils. Any new fill may consist of on -site soils or similar. These materials should be compacted to at least 95% of the Maximum Dry Density at or above optimum as obtained using the Standard Proctor Method (ASTM D-698). Care should be taken to verify and preserve the specified moisture levels in the reworked clays prior to placement of the pavements. Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 12 Both asphalt pavement and Portland cement concrete pavement can be considered for this site. Lime stabilization is recommended beneath asphaltic concrete pavements. Portland cement concrete pavement may be placed on lime stabilized subgrade or compacted subgrade without lime stabilization. If lime stabilization is considered, we recommend testing the soils for soluble sulfate during construction. We should be contacted to evaluate the feasibility of lime stabilization. For lime stabilization, a preliminary application rate of 8% lime by dry weight of clay can be used. The actual amount of lime required should be confirmed by additional laboratory tests (lime series) during the construction phase. The lime stabilization should conform TOOT Item 260. The stabilized soil should be compacted to at least 95% of the Maximum Dry Density at workable moisture contents of about 3 percentage points above the optimum moisture content as obtained using the Standard Proctor Method (ASTM D-698). Stabilization should extend at least 1 foot beyond the pavement edges. Typical pavement sections are provided below. The Standard Duty and Medium Duty asphalt pavements with lime stabilization are adequate for design life of 50,000 and 100,000 ESAL, respectively. The Standard Duty and Medium Duty concrete pavements without lime stabilization are adequate for design life of 50,000 and 125,000 ESAL, respectively. If lime stabilization is performed beneath concrete pavements, the Standard Duty and Medium Duty concrete pavements are adequate for design life of 80,000 and 200,000 ESAL, respectively. In some cases, jurisdictional standards for pavement section construction may exceed those provided below. In that case, the pavement sections should follow the jurisdictional standards. Pavement Sections — Private Drives and Parking C) Asphaltic Concrete Pavement Portland Cement Concrete (PC Material Designation Pavement Automobile Firelane Automobile Firelane Standard Dutv Heavv Dutv Standard Dutv Heavv Dutv Asphalt Surface Course 2 inches 2 inches - - Asphalt Binder Course' 3 inches 4 inches -- -- Portland Cement Concrete - - 5 inches 6 inches Subgrades 6 inches 6 inches 6 inches 6 inches Re -worked Lime stabilized Re -worked Lime stabilized ' Flexible base material may be substituted for the asphalt binder using a substitute ratio of 2.5 inches of flexible base for each inch of asphalt binder. z In lieu of lime stabilization, the Portland cement concrete thickness should be increased by one inch. 3 Granular base (or flex base) materials may be substituted with the lime stabilization at an equivalent thickness substitution. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should reduce the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. Pavement should be specified, constructed and tested to meet the following requirements: 1. Reinforcing steel may consist of #3 reinforcing steel bars placed at 18 inches on Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 13 center each way. 2. Portland Cement Concrete: Minimum compressive strength of 3,600 lbs. per sq inch at 28 days. Concrete should be designed with 3 to 6 percent entrained air. 3. Hot Mix Asphaltic Concrete: Item 340 of the TxDOT Standard Specifications, Type A or B Base Course (binder), Type D Surface Course. The coarse aggregate in the surface course should be crushed limestone rather than gravel. 4. Flexible Base Material: Item 247 of the TxDOT Standard Specifications, Type D, Grade 1 or 2. The material should be compacted to a minimum 95 percent of standard Proctor maximum dry density (ASTM D 698) and within three percentage points of the material's optimum moisture content. 5.9 DETENTION For any underground detention facility, at minimum, a non -woven geotextile should be placed as a "separation" layer between any soil and granular drainage material. This will likely include placement over the subgrade soils, excavation sidewalls and any fill material above the facility. The geotextile selected should meet the requirements of AASHTO M288 Class 2 for a separation fabric. The contractor should provide ECS the anticipated separation geotextile for review and approval. All fills placed within the limits of the detention facility should be placed in lifts not exceeding 8 inches in loose thickness, moisture conditioned on the wet side of the optimum moisture content (+2% or higher) and compacted to at least 95% of the Maximum Dry Density obtained in accordance with ASTM Specification D-698, Standard Proctor Method. Any fills should be benched into natural soils in order to minimize weak planes and seepage zones between the new fill and natural soils. All subgrade soils should be scarified, re -worked, moisture conditioned and compacted to these requirements as well. Trinity Crossing Development ECS Project No. 63:1537 5.0 SITE CONSTRUCTION RECOMMENDATIONS 5.1 SUBGRADE PREPARATION February 2, 2022 Page 14 In a dry and undisturbed state, the soil at the site will provide good subgrade support for fill placement and construction operations. However, the soils at the site contain fines which are considered moderately erodible, moisture and disturbance sensitive when wet and degrade quickly with disturbance from contractor operations. Therefore, good site drainage should be maintained during earthwork operations in order to keep the surface water away from the project area during the construction phase. We recommend that an attempt be made to enhance the natural drainage without interrupting its pattern. The erosion and sedimentation shall be controlled in accordance with sound engineering practice and current jurisdictional requirements. 5.1.1 Stripping and Grubbing The subgrade preparation should consist of stripping vegetation, rootmat, topsoil, existing pavements, and soft or yielding materials from the 5-foot expanded pavement limits. In grassy areas of the site may have about 6 inches of topsoil. Deeper topsoil or organic laden soils may be present in other landscaping areas. The root balls in large trees may extend deep and will require additional localized stripping depth to completely remove the organics. ECS should be retained to verify that topsoil and yielding surficial materials have been removed prior to the placement of new fill or construction of pavements. 5.1.2 Proofrolling (Soil Subgrades) Prior to fill placement or other construction on subgrades, the subgrades should be evaluated by an ECS field technician. The exposed subgrade should be proofrolled with construction equipment having a minimum axle load of 10 tons [e.g. fully loaded tandem -axle dump truck]. Proofrolling should be traversed in two perpendicular directions with overlapping passes of the vehicle under the observation of an ECS technician. This procedure is intended to assist in identifying any localized yielding materials. Where proofrolling identifies areas that are yielding or "pumping" subgrade those areas should be repaired prior to the placement of subsequent fill or other construction materials. Methods of stabilization include undercutting, moisture conditioning, or chemical stabilization. The situation should be discussed with ECS to determine the appropriate procedure. Test pits may be excavated to explore the shallow subsurface materials to help in identifying the cause of the observed unstable materials, and to assist in the evaluation of appropriate actions to prepare the subgrade. 5.1.3 Site Temporary Dewatering Perched Groundwater: Groundwater on this site can be characterized as being broadly perched above less permeable materials. The depth at which perched water is present on the site varies with surface elevation. In higher areas and on ridge lines, perched water may be present, including above design cut elevations, but is less concentrated. Soils at contact with perched water levels were very moist to wet. In most cases, moisture then decreased with depth. Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 15 Limited Excavation Dewatering: Based upon our subsurface exploration at this site, we believe construction dewatering at this site will be mainly limited to removing accumulated rain water from low lying areas and some minor seepage from the support of excavation (SOE). Deep wells should not be required for the temporary dewatering system. However, the dewatering operations can be handled by the use of conventional submersible pumps directly in the excavation, temporary trenches, and/or French drains. If temporary sump pits are used, we recommend they be established at an elevation approximately 4 feet below the bottom of the excavation subgrade or bottom of footing. A perforated 55 gallon drum or other temporary structure could be used to house the pump. If dewatering cannot be accomplished by other means, we recommend continuous dewatering of the excavations using electric pumps or manned gasoline pumps be used during construction. Details of a typical French drainage installation are included in Appendix D. A typical French drain consists of an 18 to 24-inch wide by 18 to 24-inch deep bed of AASHTO #57 stone wrapped in a medium duty, non -woven geotextile. Actual dimensions should be as determined necessary during construction. After the installation has been completed, the geotextile should be wrapped over the top of the gravel followed by placement of backfill. 5.2 EARTHWORK OPERATIONS Prior to placement of any new general fill, subgrades should be scarified to a depth of 6 inches, compacted to at least 95% of Maximum Dry Density as obtained by the Standard Proctor Method (ASTM D-698) and moisture conditioned above the optimum value. Fills should be benched into the existing soils. Onsite soils can be used as fill materials. Imported soil used for general fill should not have a Plasticity Index (PI) of greater than the material encountered onsite. General fill material, outside of the building subgrade improvements, should be placed at or above optimum moisture content and compacted to at least 95% of the Maximum Dry Density as obtained by the Standard Proctor Method (ASTM D-698). Fill soils should be placed in 8 inch loose lifts for mass grading operations and 4 inch lifts for trench type excavations where walk behind or "jumping jack" compaction equipment is used. Upon completion of the filling operations, care should be taken to maintain the soil moisture content prior to construction of floor slabs and pavements. Soil moisture levels can be preserved by various methods that can include covering with plastic, watering, etc. If the soil becomes desiccated, the affected material should be removed and replaced, or these materials should be scarified, moisture conditioned and recompacted. Utility cuts should not be left open for extended periods of time and should be properly backfilled. Backfilling should be accomplished with properly compacted on -site soils, rather than granular materials. The clay plug at utility trench detail provided in Appendix D is an acceptable method for the utility trench cut-off. Field density and moisture tests should be performed on each lift as necessary to verify that adequate compaction is achieved. As a guide, one test per 2,500 square feet per lift is recommended in the building and paving areas (two tests minimum per lift). Utility trench backfill Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 16 should be tested at a rate of one test per lift per each 150 linear feet of trench (two tests minimum per lift). Certain jurisdictional requirements may require testing in addition to that noted previously. Therefore, these specifications should be reviewed and the more stringent specifications should be followed. 5.3 MATERIAL SPECIFICATIONS 5.3.1 Clay Fill (Building Pads) Reworking of the existing clay subgrades, new building pad fill, and where moisture conditioning is required, is performed to increase the moisture of the clays to a level that reduces their ability to absorb additional water that could result in post -construction heave in these soils. Moisture conditioning will be required for subgrades and new fills within the building pads. These improvements are necessary in order to achieve a uniform PVM of 2.0 inches or less. The subgrade improvements should extend at least 5 feet beyond the edge of the building pads and be covered with poly if foundation construction is not started within 60 days of pad completion. The moisture conditioning should consist of undercutting, scarifying and/or reworking, as required to achieve the required subgrade improvement. During this process, the clay should receive adequate amounts of water to ensure a uniform moisture content of at least +3% or higher above the optimum moisture content. During the addition of water, the soils should be adequately mixed, and re -mixed, to ensure a uniform distribution of the moisture throughout the soil mass. Once appropriately mixed, the material should be compacted to at least 93% of the Maximum Dry Density as obtained using the Standard Proctor Method (ASTM D-698). If constant moisture cannot be maintained, or foundation construction cannot begin within 60 days of pad completion, then we recommend the use of poly to minimize moisture loss of the moisture conditioned pad(s) and in order to maintain the desired PVM. We recommend a vapor barrier (plastic sheeting) be placed above the moisture conditioned soils and extend to the edge of the improved zone (i.e. 5 feet beyond the edge of the building pads). On site soils may be placed over the plastic barrier for protection. 5.3.2 Common Fill (Outside Building Pads) On site or imported fill, outside of the moisture conditioned zone noted previously, may be placed and compacted to at least 95% of the Maximum Dry Density as obtained using the Standard Proctor Method (ASTM D-698). These soils should be reworked to ensure a uniform distribution of water in order to achieve a uniform moisture content distribution at or above the optimum moisture content. 5.3.3 Granular Cap - Select Fill For the purposes of this report, select fill may consist of on site or imported material that is free of debris and organic matter and has a Plasticity Index (PI) less than 15. Crushed limestone, or crushed concrete, may be used for this purpose. The crushed material used for this process should have a minimum Dry Density of 115 pcf. The PI of this material should be evaluated by ECS at the time of construction and may largely be based on the granularity of the material, rather than the PI. The crushed material should have a maximum dimension of 2 inches Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 17 (if used within the final 4 feet of fill) or 4 inches if used deeper than 4 feet below the slab subgrade. This material should be placed and compacted at workable moisture contents above the optimum moisture content and compacted to at least 95% of the Maximum Dry Density as obtain using the Standard Proctor Method (ASTM D-698). 5.3.4 Granular Cap - Lime Stabilized In lieu of importing select fill, as defined above, the on -site clay soils may be lime stabilized. The advantage to lime stabilization over untreated fill is the nearly "weatherproof" nature of the soil and once placed and compacted the material essentially retains the virtually impermeable nature of the parent clay, limiting water infiltration beneath the building. A preliminary lime application rate of 8% hydrated lime by dry weight of clay should be used for budgeting purposes. The lime stabilized clay should be thoroughly mixed and appropriately mellowed for at least 48 hours and tested for gradation and lime reactivity (pH) prior to final placement and compaction. Once appropriately mixed and mellowed, this material may then be placed and compacted at workable moisture contents at least +3% above the optimum moisture content and compacted to at least 95% of the Maximum Dry Density as obtain using the Standard Proctor Method (ASTM D- 698). 5.4 FOUNDATION AND SLAB OBSERVATIONS Protection of Foundation Excavations: Exposure to the environment may weaken the soils in foundations if the foundation excavations remain open for too long a time. Therefore, foundation concrete should be placed immediately after the excavation has been completed, cleaned, and observed. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation immediately prior to placement of concrete. 5.5 UTILITY INSTALLATIONS Utility Subgrades: The soils encountered in our exploration are expected to be generally acceptable for support of utility pipes. The pipe subgrades should be observed and probed for stability by ECS. Any loose or yielding materials encountered should be removed and replaced with acceptable material. Utility Backfilling: The granular bedding material (often AASHTO #57 stone) should be at least 4 inches thick, but not less than that specified by the civil engineer's project drawings and specifications. We recommend that the bedding materials be placed up to the springline of the pipe. Fill placed for support of the utilities, as well as backfill over the utilities, should satisfy the project requirements. Excavation Safety: All excavations and slopes should be constructed and maintained in accordance with OSHA excavation safety standards. The contractor is solely responsible for designing, constructing, and maintaining stable temporary excavations and slopes. The Trinity Crossing Development ECS Project No. 63:1537 February 2, 2022 Page 18 contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. Trinity Crossing Development February 2, 2022 ECS Project No. 63:1537 Page 19 6.0 CLOSING ECS has prepared this report of findings, evaluations, and recommendations to guide geotechnical-related design and construction aspects of the project. The description of the proposed project is based on information provided to ECS by the client. If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately in order that we can review the report in light of the changes and provide additional or alternate recommendations as may be required to reflect the proposed construction. Field observations, monitoring, and quality assurance testing during earthwork and foundation installation are an extension of and integral to the geotechnical design recommendation. We recommend that the owner retain these quality assurance services and that ECS be allowed to continue our involvement throughout these critical phases of construction to provide general consultation as issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report. APPENDIX A — Figures Site Location Map Boring Location Diagram Subsurface Profiles Regional Geology s rrrr C Limper C Sour GeoEye, Mb%Maxar, egsraphi�i, Ciio//�ilbus D71�� Rost Oek : Viiiage Perk CU � a Lia${Ok Rd SITE LOCATION DIAGRAM TRINITY CROSSING DEVELOPMENT SWC OF TRINITY BLVD AND POST OAK BLVD, FORT WORTH, TEXAS STONEHAWK CAPITAL PARTNERS = L 00 Feet ENGINEER M RZ SCALE AS NOTED PROJECT NO. 63-1537 SHEET 1 OF 1 DATE 10/6/2021 � •- .� Rfvf" -- E APPIoTd F0 cIb- va- r FF950W- c 1�Ls1 1 f `• ; +�. , i _xaa - 'may � - �` �� 9 Le end 9 Approximate Boring Locations Approximate Boring Locations JT = j 0 150 300 ,�� I ,�} Fee �1 BORING LOCATION DIAGRAM MRZEER TRINITY CROSSING DEVELOPMENT SCALE AS NOTED PROJECT NO. 63:1537 SHEET SWC OF TRINITY BLVD AND POST OAK BLVD, FORT WORTH, TEXAS 1 OF 1 DATE STONEHAWK CAPITAL PARTNERS 11 /3/2021 523 522 521 520 519 518 517 516 515 514 513 512 511 510 509 508 507 506 505 504 503 502 501 500 499 498 497 Legend 496 Key 495 494 ®Fat 493 CLAY (CH) 492 CLAYEY 491 SAND (SC) 489 EMSILTY 488 SAND (SM)487 Lean 486 CLAY (CL) 485 Shale 484 483 480.00 462 481 Notes: ----------------------------------------------------------------------------------------------------------- . --------------------------�- -------------------------------------------------------------------------- 19 17 —-------------------------Co -----------------------------------------27---- ------------------------ -------------------------------------------------------------------------- O 44 * * 47 -------------------------------------------------------------- ---- ............... o--------------------------------------------------- SA462 --- --m---------------------------------------------- -------------------- ------------------- ------------------------------------------------ --------------------- 24---- - -------------4J--- ----------------------30----------------- 39---- -------------------------------------------------------------------------------------- ------------------------------------------------ ---------------------------- --------------------------------------------------------------- ---CH------------------ ------------ 34---- ------------------------------------------------ --------------------- 48----------------- 5B---- ------------------------------------- ----------------------- 48 ------------------------------------------------------------------------------------------------------- 54---- ------------ --- ------------------------------------------------ ----------------- ------------------------------------------------ 87 CL ------------------------------------------ CH -------------------------------------------------------------------------------------------------------------------------------55 --- ------------------------------------------------ ------------------------------------------------------------------------------------- 71---- ------------------------------------ ------ ------------------------------------------------ ---------------------------- --------------------------------------------------------------------------------- 87---- ------------------ ------------------------------------------------ 72---- ------------- 65----------------------------------------------------------------------- ------------------------------------------------ ---------------------------- Shale ---------------------------- -------------------- ` /4T------GFF--------------------------------------------------------- -Shale------------------ ---GH ------------------------------------------ @25.0' ----------------------------------------------- --Shale------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------4=71'-- ------------------------------------------------ ---------------------------- -Shale-------------------------------------------------------- -------------------------------------------------- @30.0' 1- EOB END OF BORING AR AUGER REFUSAL SR SAMPLER REFUSAL. 2-THE NUMBER BELOW THE STRIPS IS THE DISTANCE ALONG THE BASELINE 3-SEE INDIVIDUAL BORING LOGAND GEOTECHNICAL INFORMATION 4- STANDARD PENETRATION TEST RESISTANCE (LEFT OF BORING) IN BLOWS PER FOOT (ASTM D1586). PI Xtic Limit Wate ntent Liquid A it I �7 WL (First Encountered) [FINES CONTENT %] 1 WL (Completion) BOTTOM OF CASING 7 WL (Seasonal High Water) loaz LOSS of CIRCULATION Q WL (Stabilized) -Shale- @30.0' — 523 — 522 — 521 — 520 — 519 — 518 — 517 — 516 — 515 — 514 — 513 — 512 — 511 — 510 — 509 — 508 — 507 — 506 — 505 — 504 — 503 — 502 — 501 — 500 — 499 — 498 — 497 — 496 — 495 — 494 — 493 — 492 — 491 — 490 — 489 — 488 — 487 — 486 — 485 — 484 — 483 — 482 — 481 - Fill GENERALIZED SUBSURFACE SOIL PROFILE Section line A -A' - Possible Fill Trinity Crossing Development Probable Fill 9 StoneHawk Capital Partners - Rock SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 Prolect NO: 63:1537 1Date: 10/27/2021 527 526 525 524 523 522 521 520 519 518 517 516 515 514 513 512 511 510 509 508 507 506 505 504 503 Legend 502 Key 501 500 SILTY 499 SAND (SM)498 ®Fat 497 CLAY (CH) 496 CLAYEY 495 SAND (SC) 494 Lean 493 CLAY (CL) 492 Shale 491 490 487.00 489 488 Notes: 1- EOB END OF BORING AR AUGER REFUSAL SR SAMPLER REFUSAL. 2-THE NUMBER BELOW THE STRIPS IS THE DISTANCE ALONG THE BASELINE 3-SEE INDIVIDUAL BORING LOGAND GEOTECHNICAL INFORMATION 4- STANDARD PENETRATION TEST RESISTANCE (LEFT OF BORING) IN BLOWS PER FOOT (ASTM D1586). CH -------------------------- -------------------------- -------------------------- -------------------------- -------------------------- Shale -------------------------- -------------------------- -------------------------- ------------------------------------------------------------------------------------------------------------------------------------------ --------------------------------------ta----------------------------------------------- ----------------------------------------------- O O ------------------------------------------------------------------------------------- ----------------------------------------------- -----------------------------JR 37-- = SG ------------------------------------- • 27 ---------------------------------------82 -----------------------------47---------------------------------------68 --- SM -------------------------------------- SC----------------------- 62--------------------------------------- 57--- --------------------------------------------- .----------------------------------- --- C-H------------------------------------ --------------------------------------------- ----------------------------------------------------------------------------- --- -- -------------------------------------- CL -- - ------------------------------------------------------------------------------------------------------------------ Shale -------------- T1------------------------------------56 --- --------------------------------------------- --EOTS------------------------------------------------------------------------- -------------------------------------------- @250• ................ ---------------------------------- AR --------------- PI Xtic Limit Wate ntent Liquid A it I �7 WL (First Encountered) [FINES CONTENT %] 1 WL (Completion) BOTTOM OF CASING 7 WL (Seasonal High Water) loaz LOSS of CIRCULATION Q WL (Stabilized) R — 527 — 526 525 — 524 — 523 522 — 521 — 520 — 519 — 518 — 517 — 516 — 515 — 514 — 513 — 512 — 511 — 510 — 509 — 508 — 507 — 506 — 505 — 504 — 503 — 502 — 501 — 500 — 499 — 498 — 497 — 496 — 495 — 494 — 493 — 492 — 491 — 490 — 489 — 488 - Fill GENERALIZED SUBSURFACE SOIL PROFILE Section line B-B' - Possible Fill Trinity Crossing Development Probable Fill En StoneHawk Capital Partners - Rock SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 Prolect NO: 63:1537 1Date: 10/22/2021 WN ti 14 ill tL , NY' 'Ile f to —o PY ol foil" ♦Ak — REGIONAL GEOLC itv Crossina Develi [JEJU1111111H r1t] 4 id APPENDIX B — Field Operations Reference Notes for Boring Logs Boring Logs B-1 to B-9 and P-1 to P-3 REFERENCE NOTES FOR BORING LOGS MATERIAL' 2 DRILLING SAMPLING SYMBOLS & ABBREVIATIONS SS Split Spoon Sampler PM Pressuremeter Test ASPHALT ST Shelby Tube Sampler RD Rock Bit Drilling WS Wash Sample RC Rock Core, NX, BX, AX CONCRETE BS Bulk Sample of Cuttings REC Rock Sample Recovery % PA Power Auger (no sample) RQD Rock Quality Designation % GRAVEL HSA Hollow Stem Auger TOPSOIL PARTICLE SIZE IDENTIFICATION DESIGNATION PARTICLE SIZES VOID Boulders 12 inches (300 mm) or larger BRICK Cobbles 3 inches to 12 inches (75 mm to 300 mm) 0 0 ❑ do AGGREGATE BASE COURSE Gravel: Coarse Fine 3/4 inch to 3 inches (19 mm to 75 mm) 4.75 mm to 19 mm (No. 4 sieve to 3/4 inch) � GW WELL -GRADED GRAVEL Sand: Coarse Medium 2.00 mm to 4.75 mm (No. 10 to No. 4 sieve) 0.425 to 2.00 40 to No. 10 } gravel -sand mixtures, little or no fines Fine mm mm (No. sieve) a 0.074 mm to 0.425 mm (No. 200 to No. 40 sieve) �� � GP POORLY -GRADED GRAVEL Fines" Silt & Clay ("Fines") <0.074 mm (smaller than a No. 200 sieve) � o gravel -sand mixtures, little or no fines GM SILTY GRAVEL gravel -sand -silt mixtures COHESIVE SILTS & CLAYS COARSE FINE GC CLAYEY GRAVEL UNCONFINED RELATIVE GRAINED GRAINED gravel -sand -clay mixtures COMPRESSIVE SPT5 CONSISTENCY' AMOUNT mll mll 6 �6 • SW WELL -GRADED SAND STRENGTH, QP4 (BPF) (COHESIVE) Trace <5 <5 • gravelly sand, little or no fines <0.25 <2 Very Soft SP POORLY -GRADED SAND 0.25 - <0.50 2-4 Soft With 10 - 20 10 - 25 gravelly sand, little or no fines 0.50 - <1.00 5-8 Firm Adjective 25 - 45 30 - 45 SM SILTY SAND 1.00 - <2.00 9 - 15 Stiff (ex: "Silty') sand -silt mixtures 2.00 <4.00 16 - 30 Very Stiff SC CLAYEY SAND 4.00 - 8.00 31 - 50 Hard sand -clay mixtures >8.00 >50 Very Hard s WATER LEVELS ML SILT non -plastic to medium plasticity GRAVELS, SANDS &NQN-COHESIVE SILTS WL (First Encountered) MH ELASTIC SILT high plasticity SPT5 DENSITY . WL (Completion) CL LEAN CLAY <5 Very Loose low to medium plasticity 5-10 Loose WL (Seasonal High Water) CH FAT CLAY 11 - 30 Medium Dense high plasticity 31 - 50 Dense WL (Stabilized) OL ORGANIC SILT or CLAY >50 Very Dense non -plastic to low plasticity OH ORGANIC SILT or CLAY FILL AND ROCK high plasticity PT PEAT � r � highly organic soils FILL POSSIBLE FILL PROBABLE FILL ROCK 'Classifications and symbols per ASTM D 2488-17 (Visual -Manual Procedure) unless noted otherwise. 2To be consistent with general practice, "POORLY GRADED" has been removed from GP, GP -GM, GP -GC, SP, SP-SM, SP-SC soil types on the boring logs. 3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol [Ex: (SM-FILL)]. 4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot (tsf). "Standard Penetration Test (SPT) refers to the number of hammer blows (blow count) of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches (ASTM D 1586). "N-value" is another term for "blow count" and is expressed in blows per foot (bpf). SPT correlations per 7.4.2 Method B and need to be corrected if using an auto hammer. 'The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in granular soils. In clay and cohesive silts, the determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally employed. 'Minor deviation from ASTM D 2488-17 Note 14. $Percentages are estimated to the nearest 5% per ASTM D 2488-17. Reference Notes for Boring Logs (09-02-2021).doc © 2021 ECS Corporate Services, LLC. All Rights Reserved CLIENT: PROJECT NO.: BORING NO.: StoneHawk Capital Partners 63:1537 B-1 PROJECT NAME: DRILLER/CONTRACTOR: Trinity Crossing Development Total Depth SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: 14943293.1 2562620.0 515.0 co Z Z J LL W W Z \ F w DESCRIPTION OF MATERIAL > w a a OU Q W m Z N V7 (SM) SILTY SAND, brown, orange brown, S-1 ST 24 24 loose to medium dense S-2 SS 18 18 11-7-17 (24) _ (CH) SANDY FAT CLAY, brown, light gray, \ 13-14-16 5 S-3 SS 18 18 orange brown, very stiff to hard 510— (30) S-4 SS 18 18 14-23-25 — (48) S-5 SS 18 18 19-20-28 — (48) 10— 505 — $-6 SS 18 18 — 29-37-35 1F 500— (72) SHALE, weathered, sandy, light gray, sandy 29-50/4" — S-7 SS 10 10 — 20— \ 495— (so/a°) SHALE, gray 25 END OF DRILLING AT 25.0 FT 490- 30 — 485 — K SHEET: lofl Ec�, I LOSS OF CIRCULATION IBO2 BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit X n, ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY RQD REC O CALIBRATED PENETROMETER TON/SF B TEXAS CONE PENETRATION BLOWS/FT 00.50 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BEG RADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 06 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct062021 HAMMER TYPE: Auto (EQUIPMENT: LOGGED BY: T WL (Stabilized) Truck MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG e100/ 2.00" CLIENT: StoneHawk Capital Partners PROJECT NAME: Trinity Crossing Development SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: 14943333.8 2562812.6 Z DO � m � Z = z W w DESCRIPTION OF MATERIAL > d J J W a a N 0 PROJECT NO.: BORING NO 63:1537 B-2 DRILLER/CONTRACTOR: Total Depth (SM) SILTY SAND, brown, orange brown, — S-1 ST 24 24 light gray, medium dense S-2 SS 18 18 5- S-3 SS 18 18 (CH) SANDY FAT CLAY, brown, light gray, medium dense to very dense, with XXN = S-4 SS 18 18 calcareous deposits and cemented sand seams _ S-5 SS 18 18 10— — S-6 SS 9 9 15— SHALE, gray, with sand seams 20 — 25 — 30— END OF DRILLING AT 30.0 FT 0� SURFACE ELEVATION: 526.0 W J Z �D Q) N o W Q O w m z w (23) 9-11-13 521 — (24) 7-16-21 (37) 25-26-27 (53) 516 — _ 28-50/3" (50/3") 511 — 506 — 501 — 496 — SHEET: lofl EC41 LOSS OF CIRCULATION IDD% BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit x o ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY ROD REC O CALIBRATED PENETROMETER TON/SF 8 TEXAS CONE PENETRATION 13LOWSIFT 00.50 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOILTYPES. IN -SITU THE TRANSITION MAYBE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 062021 CAVE IN DEPTH: I 1 WL (Completion) Dry IBORING Oct 062021 HAMMER TYPE: Auto 7 WL (Seasonal High Water) (COMPLETED: QUIPMENT: LOGGED BY: T WL (Stabilized) �Truck CME45 �MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG Ill 4.25" EII100i 2.25" Wooi 0.75" CLIENT: PROJECT NO.: BORING NO.: SHEET: StoneHawk Capital Partners 63:1537 B-3 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: Eco Trinity Crossing Development Total Depth C� SITE LOCATION: LOSS OF CIRCULATION IBO2 SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: ' BOTTOM OF CASING 14943164.3 2562704.3 515.0 oc Plastic Limit Water Content Liquid Limit co z Z LL X w Z = z L DESCRIPTION OF MATERIAL J V ® STANDARD PENETRATION BLOWS/FT w [L J a- W Q W Q Q ROCK QUALITY DESIGNATION & RECOVERY w U Q w COZ - RQD REC O Q N Q W O CALIBRATED PENETROMETER TON/SF B TEXAS CONE PENETRATION BLOWS/FT (SM) SILTY SAND, brown, orange brown, _- - S-1 5T 24 24 light gray, medium dense I'l - 01.so _ = - 17-20-21 S-2 55 18 18 (CH) SANDY FAT CLAY, brown, orange \ - (41) ' brown, gray, light gray, stiff to very hard, 5- S-3 SS 18 18 with calcareous nodules, and sand seams 510- 14(39)23 9 S-4 SS 18 18 19(58) B — (58) S-5 SS 18 18 16-20-29 9 — (49) 10 - 505 - S-6 SS 18 18 - 16-25-40 (65) s 1 F 500 - SHALE, gray, with sand seams 20 - 495 - H100/ 3.50" 100/ 25_ END OF DRILLING AT 25.0 FT 490_ �3.00" 30 - 485 - J THE STRATIFICATION LINES REPRESENTTHE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 06 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct062021 HAMMER TYPE: Auto EQUIPMENT: LOGGED BY: �Z WL (Stabilized) TruckCME45 MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG CLIENT: StoneHawk Capital Partners PROJECT NAME: Trinity Crossing Development SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: 14943241.6 2562948.9 Z co d Z = z W DESCRIPTION OF MATERIAL c�c J W d G d O PROJECT NO.: BORING NO. 63:1537 B-4 DRILLER/CONTRACTOR: Total Depth (CH) FAT CLAY WITH SAND, light gray, S-1 ST 24 24 orange brown, hard S-2 ST 24 24 5 — S-3 ST 24 24 _ S-4 SS 18 18 (SC) CLAYEY SAND, brown, light gray, orange brown, dense to very dense _ S-5 SS 18 18 10— S-6 SS 18 18 1E 20 — 25 — 30 — K SHALE, gray with sand layers END OF DRILLING AT 25.0 FT SURFACE ELEVATION: 525.0 W W Z \ J N o � J W CO Z 5 w 520 10-15-16 (31) 15-21-29 — (50) 515— — 18-28-31 (59) 510- 505 500 495 SHEET: loft Eco LOSS OF CIRCULATION IBO2 BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit X � � ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY RQD REC 0 CALIBRATED PENETROMETER TON/SF B TEXAS CONE PENETRATION BLOWS/FT 04.50 1 0 (:) 4.50 04.50 THE STRATIFICATION LINES REPRESENTTHE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 06 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct062021 HAMMER TYPE: Auto EQUIPMENT: LOGGED BY: �Z WL (Stabilized) TruckCME45 MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG H 100/ 3.25" Ej 100/ 2.75" CLIENT: PROJECT NO.: BORING NO.: SHEET: StoneHawk Capital Partners 63:1537 B-5 1 of 1 C PROJECT NAME: DRILLER/CONTRACTOR: Trinity Crossing Development Total Depth SITE LOCATION: LOSS OF CIRCULATION 1001 SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: ' BOTTOM OF CASING 14943037.9 2562665.7 504.0 or Plastic Limit Water Content Liquid Limit co d z z J LL x o w z = z L DESCRIPTION OF MATERIAL J V ® STANDARD PENETRATION BLOWS/FT w [L J CL W Q W Q Q ROCK QUALITY DESIGNATION & RECOVERY w U Q w COZ - RQD REC O Q N Q W 0 CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT (CL) LEAN CLAY with SAND, brown, S-1 ST 24 24 orange brown, light brown, gray, hard, - 04.50 with shale seams S-2 ST 24 24 — 04.50 5— S-3 SS 18 18 499— 19(40)18 0 S-4 SS 18 18 is(58) B — (ss) S-5 SS 18 18 16(45) a — 45) 10— 494— S-6 ST 24 24 \ 04.00 1` = SHALE, weathered, light gray, with sand \\X 489- seams S-7 SS 16 16 \ — 30-50-50/4 g.0011D 20 — \ 484 — (too/Zo ) SHALE, gray, with sand seams 25— 0-479— 8100/ END OF DRILLING AT 25.0 FT 3.00" 30 — 474 — THE STRATIFICATION LINES REPRESENTTHE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 06 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct062021 HAMMER TYPE: Auto (EQUIPMENT: LOGGED BY: T WL (Stabilized) Truck MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG CLIENT: StoneHawk Capital Partners PROJECT NAME: Trinity Crossing Development SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: 14943085.5 2562939.8 co z m d � Z Z = z � W DESCRIPTION OF MATERIAL c�c J W d G d O PROJECT NO.: BORING NO. 63:1537 B-6 DRILLER/CONTRACTOR: Total Depth (SC) CLAYEY SAND, brown, orange — S-1 5T 24 24 brown, light brown, medium dense, with S-2 SS 18 18 clay seams 0. 5— S-3 SS 18 18 (CH) SANDY FAT CLAY, brown, light brown, light gray, very stiff to hard, with S-4 SS 18 18 sand seams _ S-5 SS 18 18 10— S-6 SS 18 18 1F S-7 SS 18 18 20 — \ SHALE, gray, with sand seams 25 — 30— END OF DRILLING AT 30.0 FT K SURFACE ELEVATION: 522.0 v? H W w Z J N o � J W m Z w 9-9-10 (19) 12-12-15 517— (27) 19-23-24 (47) 17-27-35 — (62) 512- - 28-35-48 507 (83) — 24-32-39 402 (71) — 497 — 492 — SHEET: loft 111110 Eco LOSS OF CIRCULATION IBB2 BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit X n, ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY RQD REC 0 CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT 04.50 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BEG RADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 07 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct072021 HAMMER TYPE: Auto EQUIPMENT: LOGGED BY: �Z WL (Stabilized) TruckCME45 MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG 100/ 1.25" E 100/ 0.50" CLIENT: StoneHawk Capital Partners PROJECT NO.: 63:1537 BORING NO.: B-7 SHEET: 1 of 1 111110 PROJECT NAME: DRILLER/CONTRACTOR: Eco Trinity Crossing Development Total Depth C� SITE LOCATION: LOSS OF CIRCULATION 1001 SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 14943050.4 2563091.2 521.0 or Plastic Limit Water Content Liquid Limit co d z z J ~L x o L w z J ® STANDARD PENETRATION BLOWS/FT = z W w DESCRIPTION OF MATERIAL V [L J CL Q W Q Q ROCK QUALITY DESIGNATION & RECOVERY w O N U Q w COZ - RQD REC Q Q W Q CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT (CH) SANDY FAT CLAY, orange brown,XXN — S-1 5T 24 24 04.50 brown, light brown, very stiff to hard - - S-2 SS 18 18 s 7 — (117) 13(44)za 5 — S-3 SS 18 18 516 — 4 S-4 SS 18 18 16-19-22 _ — (a1) S-5 SS 18 18 — 13-19-26 5 (as) 10 511— (CH) SHALEY CLAY, light brown, orange — 13-24-30 S-6 SS 18 18 \ (54) 4 1E brown, with sand seams, very hard 506— S-7 SS 18 18 SHALE, gray, with sand layers — 31-37-50 T (87) 20 501— 25 496— 100/ 8200" END OF DRILLING AT 25.0 FT 30 — 491— J THE STRATIFICATION LINES REPRESENTTHE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 07 2021 CAVE IN DEPTH: 1 WL (Completion) I Dry BORING COMPLETED: Oct072021 HAMMER TYPE: Auto SE WL (Seasonal High Water) EQUIPMENT:LOGGED BY: �Z WL (Stabilized) TruckCME45 MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: StoneHawk Capital Partners 63:1537 B-8 PROJECT NAME: DRILLER/CONTRACTOR: Trinity Crossing Development Total Depth SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: 14942965.3 2563190.2 512.0 co d z Z J ~L LL G > w w Z F w DESCRIPTION OF MATERIAL > w a a OU Q W m Z N V7 — S-1 5T 24 24 (CL) SANDY LEAN CLAY, brown, orange brown, light brown, light gray, hard to very hard, with sand seams 13-17-17 - S-2 SS 18 18 — (34) 21-25-23 5— S-3 SS 18 18 507— (48) S-4 SS 18 18 — z4-42-4s (87) S-5 SS 18 18 18-24-31 — (55) 10— 502— S-6 SS 18 18 (CH) SHALEY CLAY, light brown, orange — 26-23-48 1� brown, very hard, with sand seams \ 497— (71) — S-7 SS 13 13 (CH) SANDY FAT CLAY, light gray, with — 50-50-50/1-- \ (100/7 20— cemented sand layers 492— SHALE, gray, with sand layers, cemented sand seams 25 — 487 — 30— END OF DRILLING AT 30.0 FT 482 K SHEET: loft 111110 Eco LOSS OF CIRCULATION IBB2 BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit x o ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY RQD REC 0 CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT 03.00 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BEG RADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 07 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct072021 HAMMER TYPE: Auto EQUIPMENT: LOGGED BY: �Z WL (Stabilized) TruckCME45 MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG 00/T' 100/ 2.00" E100/ 2.00" CLIENT: PROJECT NO.: BORING NO.: SHEET: StoneHawk Capital Partners 63:1537 B-9 1 of 1 C PROJECT NAME: DRILLER/CONTRACTOR: Trinity Crossing Development Total Depth SITE LOCATION: LOSS OF CIRCULATION IBB2 SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: ' BOTTOM OF CASING 14942906.4 2562933.2 522.0 or Plastic Limit Water Content Liquid Limit co d z z J LL x o w z = z L DESCRIPTION OF MATERIAL J V ® STANDARD PENETRATION BLOWS/FT w d J CL W Q W Q Q ROCK QUALITY DESIGNATION & RECOVERY w U Q w COZ - RQD REC O Q N Q W O CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT (SC) CLAYEY SAND, brown, orange S-1 5T 24 24 brown, dense to very dense, with trace - Os.00 S-2 SS 18 18 iron 1s-19-1s (37) 5 _ S-3 SS 18 18% 517— 37(82 a7 _ S-4 SS 18 18 (SM) SILTY SAND, orange brown, brown 19-34-34 light brown, dense I`: — (68) B S-5 SS 18 18 (CL) SHALEY LEAN CLAY, light brown, \ = 15-31-26 (57) brown, orange brown, gray, hard, with 10— sand seams, calcareous deposits, trace 512— iron — S-6 SS 18 18 — 15-17-25 (z 1 � 507 42) — — 15-24-32 S-7 SS 18 18 B 20 502 — (56) S-8 SS 18 18 \ — 21-29-34 ®63 � (63) 2' END OF DRILLING AT 25.0 FT 497 30 — 492 — THE STRATIFICATION LINES REPRESENTTHE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 07 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct072021 HAMMER TYPE: Auto (EQUIPMENT: �Z WL(Stabilized) ETruckCME45 MH4 LOGGED BY: DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: StoneHawk Capital Partners 63:1537 P-1 PROJECT NAME: DRILLER/CONTRACTOR: Trinity Crossing Development Total Depth SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: 14943410.6 2563004.3 537.0 m d z Z J ~L LL G > w w z F w DESCRIPTION OF MATERIAL > w a a OU Q W m Z N V7 (SM) SILTY SAND, orange brown, brown, — S-1 5T 24 24 light brown, dense to very dense, with clay 22-28-32 - S-2 SS 18 18 — (60) 5 _ S-3 SS 18 18 532 — 16-26-36 (62) S-4 SS 11 11 - 24-50/5" (50/511) S-5 SS 11 11 - 30-50/5° (50/5°) 10— 527 END OF DRILLING AT 10.0 FT 15 — 522 — 20— 517— 25— 512- 30 — 507 — K SHEET: lofl Ec�, I LOSS OF CIRCULATION IBB2 BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit x o ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY RQD REC O CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT 01.00 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BEG RADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 07 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct072021 HAMMER TYPE: Auto (EQUIPMENT: LOGGED BY: T WL (Stabilized) Truck MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: StoneHawk Capital Partners 63:1537 P-2 PROJECT NAME: DRILLER/CONTRACTOR: Trinity Crossing Development Total Depth SITE LOCATION: SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: 14943212.1 2563013.7 529.0 m d z Z J ~L LL G > w w z F w DESCRIPTION OF MATERIAL > w a a OU Q W m Z N V7 (SM) SILTY SAND, brown, orange brown, — S-1 5T 24 24 gray, medium dense to dense, with trace - S-2 SS 18 18 iron 15-28-18 — (46) 5— S-3 SS 18 18 524— 9-11-14 (zs) S-4 SS 18 18 14-25-20 _ — (4s) _ S-5 SS 18 18 21-27-26 — (53) 10— — 519— END OF DRILLING AT 10.0 FT 15— 514- 20 — 509 — 25 — 504 — 30 — 499 — K SHEET: lofl Ec�, I LOSS OF CIRCULATION IBB2 BOTTOM OF CASING ' Plastic Limit Water Content Liquid Limit x o ® STANDARD PENETRATION BLOWS/FT ROCK QUALITY DESIGNATION & RECOVERY RQD REC Q CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BEG RADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 06 2021 CAVE IN DEPTH: I 1 WL (Completion) Dry BORING SE WL (Seasonal High Water) COMPLETED: Oct062021 HAMMER TYPE: Auto (EQUIPMENT: LOGGED BY: T WL (Stabilized) Truck MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG CLIENT: StoneHawk Capital Partners PROJECT NO.: 63:1537 BORING NO.: P-3 SHEET: 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: C Trinity Crossing Development Total Depth SITE LOCATION: LOSS OF CIRCULATION IBB2 SWC of Trinity Blvd and Post Oak Blvd, Fort Worth, Texas 76155 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 14943116.4 2563179.4 520.0 or Plastic Limit Water Content Liquid Limit co d z z J ~L x o L w z J ® STANDARD PENETRATION BLOWS/FT = z W w DESCRIPTION OF MATERIAL V [L J CL Q W Q Q ROCK QUALITY DESIGNATION & RECOVERY w O N U Q w COZ - RQD REC Q Q W Q CALIBRATED PENETROMETER TON/SF I8 TEXAS CONE PENETRATION BLOWS/FT - S-1 5T 24 24 (SC) CLAYEY SAND, orange brown, 04.50 brown, light brown, medium dense to - - S-2 SS 18 18 dense 7-10-12 z — (22) 13(3s)18 5 - S-3 SS 18 18% 515 — 5 _ S-4 SS 18 18 — 14-17-16 a (33) _ S-5 SS 18 18 14-21-29 D — (s0) 10— 510— END OF DRILLING AT 10.0 FT 15 - 505 - 20 - 500 - 25 - 495 - 30 - 490 - THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL SZ WL (First Encountered) Dry BORING STARTED: Oct 07 2021 CAVE IN DEPTH: 1 WL (Completion) I Dry BORING COMPLETED: Oct072021 HAMMER TYPE: Auto SE WL (Seasonal High Water) (EQUIPMENT: LOGGED BY: T WL (Stabilized) ITruckCME45 MH4 DRILLING METHOD: CFA GEOTECHNICAL BOREHOLE LOG APPENDIX C — Laboratory Testing Laboratory Testing Summary ECS Southwest, LLP Fort Worth, Texas Laboratory Testing Summary Date: 10/18/2021 Project Number: 63:1537 Project Name: Trinity Crossing Development Project Engineer: MH Principal Engineer: MRZ Summary By: Atterberg Limits Percent Dry One -Dimensional Swel16 Unconfined Boring Sample Number Number S-1 B-1 S-3 S-5 B-2 S-4 S-1 B-3 S-4 B-4 S-3 S-2 B-5 S-6 S-1 B-6 S-3 S-2 B-7 S-4 S-6 S-1 B 8 S-3 S-2 B-9 S-4 S-1 P-1 S-3 P-2 S-1 S-2 P-3 S-3 Notes: Definitions: Depth MCA Soil Passing Unit Final Compssion (feet) (%) Type2 ILL PL PI No. 200 Weight Moisture Surcharge Swell Strength (tsf) Sieves (Pcf) M (Psf) M) 0' - 2' 7.0 SM 24 17 7 19.7 4'-6' 11.3 8'- 10' 10.4 6'- 8' 13.5 CH 70 21 49 54.5 0' - 2' 6.4 SM 18 15 3 23.0 6'- 8' 12.5 4'- 6' 9.4 CH 50 17 33 78.6 2'- 4' 6.7 CL 36 14 22 73.3 13' - 15' 15.0 CL 39 15 24 80.1 0' - 2' 7.1 Sc 37 17 20 32.8 4'- 6' 12.9 2'- 4' 12.9 CH 73 23 50 6'- 8' 8.7 92.8 13' - 15' 12.0 0' - 2' 7.2 4'- 6' 5.5 CL 38 11 27 50.8 2'- 4' 6.0 6'- 8' 2.3 SM 20 17 3 13.5 0' - 2' 5.3 S M 32 17 15 17.5 4'- 6' 2.4 0' - 2' 6.0 S M 17 16 1 14.9 2'- 4' 15.0 4'-6- 10.0 1. ASTM D 2216, 2. ASTM D 2487, 3. ASTM D 4318, 4. ASTM D 7260, 5. ASTM D 1140, 6. ASTM D 4546 MC: Moisture Content, Soil Type: USCS (Unified Soil Classification System), LL: Liquid Limit, PL: Plastic Limit, PI: Plasticity Index, NP: Non Plastic pH APPENDIX D — Supplemental Report Documents Clay Plug at Utility Trench TYPICAL DETAIL DIAGRAM REFER TO MEP AND/OR CIVIL DRAWINGS FOR TYPICAL BEDDING MATERIALS AT EXTERIOR FACE OF BUILDING. REPLACE BEDDING MATERIALS WITH SITE CLAY SOIL. EXTEND CLAY 2 FEET FROM BUILDING. PLACE IN 8" MAX. LOOSE LIFTS. COMPACT TO 92% OF STANDARD PROCTOR (ASTM D-698), ABOVE OPTIMUM MOISTURE CONTENT. CLAY PLUG AT UTILITY TRENCH ENGINEER SCALE NTS DRAFTSMAN PROJECT NO. CLL REVISIONS SHEET 1 OF 1 DATE 11/7/08 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Trinity Landing Multifamily Paving and Street Lighting STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS PROJECT NO. 104444 Revised July 1, 2011 FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 02/13/2023 Approval Spec No. Concrete Classification Manufacturer Model No. National Spec 9/9/2022 03 30 00 Mix Design American Concrete Company 30CAF029 3000 psi Concrete for Sidewalks & ADA Ramps 9/9/2022 03 30 00 Mix Design American Concrete Company 01JAF382 1000 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design American Concrete Company 40CNF065 4000 psi Concrete for Manholes & Utility Structures 9/9/2022 03 30 00 Mix Design American Concrete Company 45CAF076 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001737 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos DIOOO0001791 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D 1000000 1793 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001103 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000002107 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos DIOOO0001273 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001617 3600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Argos DIOOO0008381 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Argos D10000009857 50 psi Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Argos DIOOO0001055 3000 psi Concrete for Inlets, Junction Boxes, Manholes, Channel Liners, Sidewalks, Driveways, Curb & Gutter 9/9/2022 03 30 00 Mix Design Argos D1000001043S 3000 psi Concrete for Sidewalks, Curbs 9/9/2022 03 30 00 Mix Design Argos DIOOOOO1565S 3000 psi Concrete for Curbs, Curb & Gutters, Sidewalks, Driveways, ADA Ramps 9/9/2022 03 30 00 Mix Design Argos D1000001615 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking 9/9/2022 03 30 00 Mix Design Argos DIOOO0001061 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking 9/9/2022 03 30 00 Mix Design Argos DI0000001083S 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking 9/9/2022 03 30 00 Mix Design Argos D 1000000 1083 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking 9/9/2022 03 30 00 Mix Design Argos D 1000000 1685 4000 psi Concrete for Valve Pads 9/9/2022 03 30 00 Mix Design Argos DIOOO0005751 750 Psi Concrete Base for Trench Repair 9/9/2022 03 30 00 Mix Design Argos D10000001681 4000 psi Concrete for Headwalls, Retaining Walls, Box Culverts, Valley Gutters 9/9/2022 03 30 00 Mix Design Big D Concrete 7SKGRT 3000 psi Concrete for Grouting 9/9/2022 03 30 00 Mix Design Big D Concrete 14500AE 4500 psi Concrete for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Big Town Concrete 452065-1 4500 psi hand placed paving 9/9/2022 03 30 00 Mix Design Big Town Concrete 450065-1 4500 psi hand placed paving 9/9/2022 03 30 00 Mix Design Bumco Texas 45U500BG 4500 psi Concrete Mix for Hand Placed Paving, Storm Structures 9/9/2022 03 30 00 Mix Design Branco Texas 40U553BG 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Bumco Texas 55UI20AG 4000 psi Concrete Mix for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Buraco Texas 30U100AG 3000 psi Concrete Mix for Pipe Collars, Inlets, Thrust Blocks, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Bianco Texas 30U1O1AG 3000 psi Concrete Mix for Flatwork 9/9/2022 03 30 00 Mix Design Buraco Texas 30U500BG 3000 psi Concrete Mix for Blocking, Driveways, Curb & Gutters, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Branco Texas 40U500BG 4000 psi Concrete Mix for Storm Drain Structures, Driveways, Screen Walls 9/9/2022 03 30 00 Mix Design Buraco Texas 36U500BG 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations 9/9/2022 03 30 00 Mix Design Burnco Texas 08Y450BA 800 psi Concrete Mix for Base for Trench Repair 9/9/2022 03 30 00 Mix Design Buraco Texas OIY690BF 100 psi Concrete Mix for Flowable Fill 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC602021 4500 psi concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC552091 3600 psi for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC602091 3600 psi for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC359101 Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Carder Concrete FWFF237501 Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC602001 4000 psi Concrete for Storm Drain Structures, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive Approaches, Lighting & Traffic Signal Foundations 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC502021 3500 psi concrete for Sidewalks, Driveways, Ramps, Curb & Gutter 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC502001 3000 psi for Sidewalks, Driveways, Ramps, Curb & Gutter, Flatwork 9/9/2022 03 30 00 Mix Design Charley's Concrete 4142 3600 psi Concrete for Curb Inlets, Junction Boxes 9/9/2022 03 30 00 Mix Design Charley's Concrete 4518 4000 psi Concrete for Headwalls, Wingwalls 9/9/2022 03 30 00 Mix Design Charley's Concrete 5167 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Charley's Concrete 4609 4500 psi Concrete Mix for Hand Placed Paving, Manholes 9/9/2022 03 30 00 Mix Design Charley's Concrete 6103 4500 psi Concrete Mix for Hand Placed Paving, Manholes 9/9/2022 03 30 00 Mix Design Charley's Concrete 4502 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Charley's Concrete 3759 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Charley's Concrete 1502 150 psi Concrete for Flowable Fill-CLSM 9/9/2022 03 30 00 Mix Design Charley's Concrete 1518 150 Psi Concrete for Flowable Fill-CLSM 9/9/2022 03 30 00 Mix Design Charley's Concrete 5642 4000 psi Concrete for Storm Drain Structures 9/9/2022 03 30 00 Mix Design Charley's Concrete 6595 5000 psi Concrete Mix for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Charley's Concrete 6589 4500 psi Concrete Mix for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Chisholm Trail Redi Mix C13020AE 3000 psi Concrete for Driveways, Curb & Gutter 9/9/2022 03 30 00 Mix Design City Concrete Company 11-350-FF 50-150 psi Concrete for Flowable Fill-CLSM FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 02/13/2023 Approval Spec No. Classification Manufacturer model No. National Spec Concrete (Continued) 9/9/2022 03 30 00 Mix Design City Concrete Company 30HA2511 3000 psi Concrete for Rip -Rap 9/9/2022 03 30 00 Mix Design City Concrete Company 30HA20II 3000 psi Concrete Mix for Blocking, Sidewalks, Flatwork, Pads 9/9/2022 03 30 00 Mix Design City Concrete Company 45NG25II 3600 psi Concrete Mix for Drilled Shafts 9/9/2022 03 30 00 Mix Design City Concrete Company 50QG25II 3600 psi Slurry Displaced Drilled Shaft 9/9/2022 03 30 00 Mix Design City Concrete Company 45NA20H 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design City Concrete Company 36LA2011 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design City Concrete Company 36JAOO1J 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design City Concrete Company 40LA2011 4000 psi Concrete Mix for Storm Drain Structures 11/16/2022 03 30 00 Mix Design City Concrete Company CLNG25II 3600 psi concrete for Drilled Shaft 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 250 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 350 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 9 70 psi Flowable Fill - CLSM 9/9/2022 03 34 13 Mix Design Cow Town Redi Mix 9-5-2 70 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 220-8 50 psi Concrete Mix for Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 320-8 50 psi Concrete Mix for Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 230-8 750 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 330-58 750 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 353 3000 psi Concrete Mix for Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 253-W 3000 psi Concrete Mix Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TXDOT Retaining Walls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls, Lighting and Traffic Signal Foundations 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260-1 3600 psi Concrete Mix for Headwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260-2 3600 psi Concrete Mix for Box Culverts, Headwalls, Lighting and Traffic Signal Foundations 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 360 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls, Lighting & Traffic Signal Foundations 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 360-1 3600 psi Concrete Mix for Box Culverts, Headwalls, Wingwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 264-N 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 366 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 265 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 365 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370-NC 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370ANC 5000 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 375-NC 5000 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 267 4200 psi Concrete Mix for Manholes and Drainage Structures 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 270 5000 psi Concrete Mix for Cast -in -Place Box Culverts 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370 5000 psi Concrete Mix for Cast -in -Place Box Culverts 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255-2 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 257 3600 psi Concrete mix for Valley Gutters 11/14/2022 32 13 13 Mix Design Cow Town Redi Mix 357-M 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 33 13 13 Mix Design Cow Town Redi Mix 257-M 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 34 13 13 Mix Design Cow Town Redi Mix 260-M 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 35 13 13 Mix Design Cow Town Redi Mix 360-M 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255-LP 3000 psi Concrete Mix for Curb & Gutter 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 355-LP 3000 psi Concrete Mix for Curb & Gutter 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255 3500 psi Concrete Mix for Flatwork, Inlets, Thrust Blocking Concrete Encasement 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 355 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 365-STX 4000 psi Concrete for Bridge slabs, top slabs of direct traffic culverts, approach slabs 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 357 3600 psi Concrete Mix for Valley Gutters 1/18/2023 03 30 00 Mix Design Cow Town Redi Mix 380-NC 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design GCH Concrete Services GCH4000 4000 psi Concrete for for Sidewalks, Ramps, Headwalls, Inlets, and Storm Drain Structures 9/9/2022 03 30 00 Mix Design GCH Concrete Services GCHVS 4000 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design GCH Concrete Services GCH4500 4500 psi Concrete Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates C47PV5E5 3000 psi Concrete for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-70J23504 3000 psi Concrete for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-147QW5D5 3000 psi Concrete Mix for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-056PS5D5 4000 psi Concrete Machine Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-161UV5DM 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-IOMQS50N 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 161PS5EM 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates C47PV5E5 3000 psi Concrete Mix for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1551 3000 psi Concrete Mix for Blocking 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5177 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 161PS5EM 4500 psi Concrete Mix for Hand Placed Paving Concrete(Continued) FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 02/13/2023 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1261 3000 psi Concrete Mix for Sidewalks 9/9/2022 4 30 00 Mix Design Holcim - SOR, Inc. 2125 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1701 4000 psi Concrete Mix for Storm Drain Structures, Sanitary Sewer Manholes 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5409 4000 psi Concrete Mix for Sidewalks, Inlets 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5507 4500 psi Concrete Mix for Hand Placed Paving 12/15/2022 3 30 00 Mix Design Holcim - SOR, Inc. 3741 100 psi concrete for flowable fill/CSLM 9/9/2022 04 30 00 Mix Design Holcim - SOR, Inc. 5017 200 psi Concrete for Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 9600 3600 psi Concrete for Drill Shafts 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1851 4500 psi Concrete for Storm Drain Structures, Hand Placed Paving 12/5/2022 4 30 00 Mix Design Holcim - SOR, Inc. 1822 3600 psi Concrete for Drilled Shafts 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1859 4000 psi Concrete for Drilled Shafts 1/24/2023 03 30 00 Mix Design Liquid Stone *C451DHR-A 4500psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2131014 3000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2132214 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta D9490SC 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2131214 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2131314 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2136014 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2136214 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2141224 4,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2141024 4,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2136224 3,600 psi Concrete for Curb Inlets 9/9/2022 03 30 00 Mix Design Martin Marietta R2141233 3,600 psi Concrete for Storm Structures, Inlets, Blocking & Encasement 9/9/2022 03 30 00 Mix Design Martin Marietta FLOW25A 50 psi Concrete for Flowable Fill/CLSM 9/9/2022 03 30 00 Mix Design Martin Marietta R2142233 3,600 psi Concrete for Manholes, Inlets & Headwalls 9/9/2022 03 30 00 Mix Design Martin Marietta R2146333 3,600 psi Concrete for Manholes, Inlets & Headwalls, Concrete Encasement 9/9/2022 03 30 00 Mix Design Martin Marietta R21412304,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads 9/9/2022 03 30 00 Mix Design Martin Marietta R2146035 4,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads 9/9/2022 03 30 00 Mix Design Martin Marietta R2146335 4,500 psi Concrete for Hand Placed Paving, Inlets, Storm Drain Structures 9/9/2022 03 30 00 Mix Design Martin Marietta R2146034 4,500 psi Concrete for Manholes, Inlets & Headwalls, Hand Placed Paving 9/9/2022 0334 13 Mix Design Martin Marietta R214123 4,000 psi Concrete for Inlets, Manholes, Headwalls 9/9/2022 03 30 00 Mix Design Martin Marietta R2141231 4,000 psi Concrete for Inlets, Sidewalks 9/9/2022 03 30 00 Mix Design Martin Marietta R2161070 6,000 (3,000 @ 24-hrs.) psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Martin Marietta D9492SFC 4,000 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146233 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146238 4,500 psi Concrete for Hand Placed Paving, Inlets, Storm Drain Structures 9/9/2022 03 30 00 Mix Design Martin Marietta R2146336 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146235 4,500 psi Concrete for Hand Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta Q214IN27 4,000 psi Concrete for Machine Placed paving 11/2/2022 32 13 13 Mix Design Martin Marietta Q214IK30 4,000 psi Concrete for Machine Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta R2146N36 4,500 psi Concrete for Hand Placed Paving 11/15/2022 33 13 13 Mix Design Martin Marietta R2146K36 4,500 psi Concrete for Hand Placed Paving 11/15/2022 34 13 13 Mix Design Martin Marietta R2146P36 4,500 psi Concrete for Hand Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta R2146K36 4,500 psi Concrete for Hand Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta R2146N35 4,000 psi Concrete for Inlets, Manholes, Headwalls 11/2/2022 32 13 13 Mix Design Martin Marietta R2146K34 4,000 psi Concrete for Inlets, Manholes, Headwalls 11/2/2022 32 13 13 Mix Design Martin Marietta R2141N24 4,000 psi Concrete for Sidewalks and Ramps 11/2/2022 32 13 13 Mix Design Martin Marietta R2141K24 4,000 psi Concrete for Sidewalks and Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2146038 4,500 psi Concrete for Inlets, Storm Drain Structures 9/9/2022 03 30 00 Mix Design Martin Marietta R2146036 4,500 psi Concrete for Hand Placed Paving, Inlets 9/9/2022 03 30 00 Mix Design Martin Marietta R2146042 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146242 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146236 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta D9493SC 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2147241 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design NCS Redi Mix NCS5020A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks 9/9/2022 03 30 00 Mix Design NCS Redi Mix NCS6020AHP 4500 psi Concrete Mix for Valley Gutters, Hand Placed Paving 9/9/2022 03 30 00 Mix Design NBR Ready Mix TX C-YY 3000 psi Concrete Mix for Curb Inlets 9/9/2022 03 30 00 Mix Design NBR Ready Mix TX C-NY 3000 psi Concrete Mix for Curb Inlets 1/24/2023 03 30 00 Mix Design Rapid Redi Mix RRM6320AHP 4500 psi Concrete for Hand Placed Paving 1/24/2023 03 30 00 Mix Design Rapid Redi Mix RRM5525A 3600 psi Concrete for Valley Gutters, Sidewalks, Approaches, ADA Ramps Concrete(Continued) 1/24/2023 103 30 00 1Mix Design Rapid Redi Mix RRM6020A 3600 psi Concrete for Lighting and Traffic Signal Foundations FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 02/13/2023 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM6020ASS 4000 psi Concrete for Strom Drain Structures 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM5320A 3000 psi Concrete for Blocking 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM5020A 3000 psi Concrete for Curb, Gutter, Driveways, Sidewalk, Ramps 9/9/2022 03 30 00 Mix Design Redi-Mix DCA2E554 3000 psi Concrete Mix for Rip Rap 9/9/2022 03 30 00 Mix Design Redi-Mix VOJ11524 3000 psi Concrete Mix for Curb & Gutter 9/9/2022 0334 13 Mix Design Redi-Mix FOCIO021 215 psi Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Redi-Mix 1OJ11524 3000 psi Concrete Mix for Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Redi-Mix 1OJ11504 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Redi-Mix 1OL11504 3,600 psi Concrete Mix for Sidewalks, Curb & Gutter 9/9/2022 03 30 00 Mix Design Redi-Mix 1OL11524 3600 psi Concrete Mix Manholes, Inlets, Junction Boxes, Headwalls 9/9/2022 03 30 00 Mix Design Redi-Mix 1RJ11524 3500 psi Concrete Mix for Thrust Blocks, Valve Pads 9/29/2022 03 30 00 Mix Design Redi-Mix IOL21524 4000 psi Concrete Mix for Manholes 9/9/2022 03 30 00 Mix Design Redi-Mix 15611524 4000 psi Concrete Mix for Cast -in -Place Storm Drain Structures 9/9/2022 03 30 00 Mix Design Redi-Mix 1OL115E4 3600 psi Concrete Mix for Bridge substructures 9/9/2022 03 30 00 Mix Design Redi-Mix DCC2G5E2 3600 psi Concrete Mix for Drilled Shafts 9/29/2022 03 30 00 Mix Design Redi-Mix DCU1G5E2 3600 psi Underwater Drilled Shafts 9/9/2022 03 30 00 Mix Design Redi-Mix 156115D4 4000 psi Bridge Slabs 9/9/2022 0334 13 Mix Design Redi-Mix F35238VN 100 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Redi-Mix FOD138VM 100 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Redi-Mix 1OJ11554 3000 psi Concrete Mix for Rip -Rap 9/9/2022 03 30 00 Mix Design Redi-Mix POG138K9 1000 psi Concrete Mix for Trench Repair Base Material 9/9/2022 03 30 00 Mix Design Redi-Mix IOKI1524 3600 psi Concrete Mix for Encasement 9/9/2022 03 30 00 Mix Design Redi-Mix ION11507 4500 psi (2600 psi @ 24 hrs.) Concrete Mix for HES Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 1ON11504 5000 psi (3600 psi @ 2 days) Concrete Mix for HES Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 50K11524 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Redi-Mix I OM 115134 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 9/9/2022 03 30 00 Mix Design Redi-Mix 1OM11524 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OM 11504 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 145CD5P4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 11/2/2022 03 30 00 Mix Design Redi-Mix 145P25P4 4500 psi Concrete for Storm Drain Structures 12/5/2022 03 30 00 Mix Design Redi-Mix 1OK115C4 3500 psi Concrete for Thrust Blocks, Valve Pads 12/5/2022 03 30 00 Mix Design Redi-Mix 156115C4 4000 psi Concrete for CIP Storm Drain Structures 12/5/2022 03 30 00 Mix Design Redi-Mix 1OL115C4 3600 psi Concrete for Manhole, Inlet, Junction Box, Headwall 9/9/2022 0334 13 Mix Design SRM Concrete 30000 3,000 psi Concrete for Sidewalks and Ramps, Curb & Gutter 9/9/2022 0334 13 Mix Design SRM Concrete 40050 4,000 psi Concrete for Headwalls, Retaining Wall 9/9/2022 03 30 00 Mix Design SRM Concrete 35023 3,600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 40068 3,600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 45000 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 45300 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 40326 4,500 (3,00 @ 3-days) psi Concrete for HES Paving 10/10/2022 03 30 00 Mix Design SRM Concrete 35000 3600 psi Concrete for Sewer Manholes 10/10/2022 03 30 00 Mix Design SRM Concrete 35300 3600 psi Concrete for Swere Manholes 9/9/2022 03 30 00 Mix Design SRM Concrete 35022 3,600 psi Concrete for Junction Box 9/9/2022 03 30 00 Mix Design SRM Concrete 30050 3,000 psi Concrete for Sidewalks, Ramps, Inlets, Junction Boxes, Thrust Blocks, Curb and Gutter, Driveways, Barrier Ramp 2/10/2023 03 30 00 Mix Design SRM Concrete 50310 5,000 psi Concrete for HES Paving 1/13/2023 32 13 13 Mix Design SRM Concrete 45023 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW6020AEP 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW60AHP 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete TCFW6020AHP 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW7520AMR 4500 (3000 psi @ 3-days) psi Concrete HES Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW6520AMR 4500 (3000 psi @ 3-days) psi HES Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5520AMP 3600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5320A 3000 psi Concrete Mix for Blocking 9/9/2022 0334 13 Mix Design Tarrant Concrete FWFF 150CLSM 50-150 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Tarrant Concrete FWFF275 50-150 psi Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW6020A2 4000 psi Concrete Mix for Storm Drain Structures 10/10/2022 03 30 00 Mix Design Tarrant Concrete TCFW6025A2 4000 psi Concrete for Manholes 10/10/2022 03 30 00 Mix Design Tarrant Concrete TCFW5020A 3000 psi Concrete for Sidewalks 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5025A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Titan Ready Mix 3020AE 3000 psi Concrete for Sidewalks 9/9/2022 03 30 00 Mix Design Tarrant Concrete CP5020A 3000 psi Concrete Mix for Curb and Gutter Concrete(Continued) 9/9/2022 103 30 00 1Mix Design Tarrant Concrete IFW5525A2 3600 psi Concrete Mix for Sidewalks, Drive Approaches, ADA Ramp FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 02/13/2023 9/9/2022 03 30 00 Mix Design Titan Ready Mix TRC4520 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0250.230 3000 psi Concrete Mix for Flatwork, Curb & Gutter, Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 270.230 5000 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0250.2301 3000 psi Concret Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0260.2302 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0255.2301 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0260.2301 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0265.2301 4500 psi Concrete Mix for Valley Gutters, Hand Placed Paving 9/9/2022 03 30 00 Mix Design Wise Redi Mix 3678 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations Asphalt Pavin G 9/9/2022 32 12 16 Mix Design Austin Asphalt FT5D137965 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design Austin Asphalt DA513135965 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design Austin Asphalt FT5B117965 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Austin Asphalt FTIBI39965 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Austin Asphalt FT1B117.2 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1901D PG64-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1112B PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1612B PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Sunmount Paving 341DV6422 PG64-22 Type D Fine Surface 11/26/2022 32 12 16 Mix Design Surmount Paving 340DV6422 PG64-22 Type D Fine Surface 12/5/2022 33 12 16 Mix Design Sunmount Paving 3076BV6422 PG62-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Surmount Paving 341-BRAP6422ERG PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 37-211305-20 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 44-211305-17 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 211305 (1757) PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 222475 (1857) PG64-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design TXBIT 29-222475-19 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design TXBIT 1-222475-20 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design TXBIT 64-224125-18 PG70-22 Type D Fine Surface 9/9/2022 32 12 16 Mix Design TXBIT 12-222475-19 PG64-22 Type D Fine Surface Detectable Warninf Surface 9/9/2022 32 13 20 DWS - Pavers Pine Hall Brick (Winston Salem, NC) Tactile Pavers 9/9/2022 32 1320 DWS - Pavers Western Brick Co. (Houston, TX) Detectable Warning Pavers 9/9/2022 32 1320 DWS - Composite Engineered Plastics, Inc. Armor Tile (Williamsville, NY) 9/9/2022 32 1320 DWS - Composite ADA Solutions (Wilmington, MA) Heritage Brick CIP Composite Paver Silicone Joint Sealant 9/9/2022 132 1373 Joint Sealant Dow 890SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 132 1373 Joint Sealant Tremco 900SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 132 1373 Joint Sealant Pecom 300SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 132 1373 Joint Sealant Crafco RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 9/9/2022 3305 10 Embedment Sand Silver Creek Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Crouch Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 02/13/2023 Classification Manufacturer Model No. National Spec Frame, Cover and Grade Rings - Cast Iron** for Stormwater Structures 9/9/2022 33 05 13 Manhole Frames and Covers Neena Foundry 32" Diameter Lifttnate Water Manhole Gasketed Frame and Cover w/I.onghom Logo, Model No. NF-1743LT66 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 32" Diameter Liftmate Sanitary Sewer Manhole Frame and Cover w/Longhorn Logo, Model No. NF-1743LT69 9/9/2022 33 05 13 Manhole Frames and Covers SIP Industries 32" Diameter Fort Worth Sanitary Sewer Manhole Frame and Cover, Item No. NF-2280 9/9/2022 3305 13 Manhole Frames and Covers EJCO Ergo XL Assembly 32" Diameter Sanitary Sewer Manhole Frame and Cover, Model No. 00148021LO10 9/9/2022 33 05 13 Manhole Frames and Covers Neena Foundry 32" Diameter Liftmate Storm Sewer Junction Box and Manhole Frame and Cover w/Longhom Logo, Model No. NF-1743LTXX 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 24" Diameter Lif[mate Storm Sewer Inlet Manhole Frame and Cover w/Longhom Logo, Model No. NF-1650LT61 9/9/2022 33 05 13 Manhole Frames and Covers AccuCast (Govind Steel Company, Ltd.) 24" Diameter MHRC #220605 ** ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Cover Neena Foundry 32" Diameter NF-1274-T91 ASTM A48 AASHTO M306 9/9/2022 33 05 13 Manhole Frames and Covers Neena Foundry 32" Diameter NFA 743-LM (Hinged) ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frame Neena Foundry 32.25" Diameter NF-1930-30 ASTM A48 AASHTO M306 9/9/2022 33 05 13 Manhole Frames and Covers Neena Foundry 32" Diameter NFA 743-HV ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frames and Covers SIP Industries 24" Diameter 2279ST** ASTM A48 AASHTO M306 9/9/2022 33 05 13 Manhole Frames and Covers SIP Industries 32" Diameter 2280ST ASTM A48 AASHTO M306 9/9/2022 33 05 13 Manhole Frames and Covers EJCO 32.25" Diameter EJ1033 X2/A ASTM A48 AASHTO M306 —Note: All new development and new installation manhole lids sha �1 meet the minimum 30" opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for exisfing uranholes that require replacement frames and covers Reinforced Concrete Storm Drain Pipe/Culverts 9/9/2022 3341 10 Precast Box Culverts Forterm Precast Box Culverts 9/9/2022 3341 10 Concrete Pipe Wyes and Bends Forterra RCP Wye and Bends 9/9/2022 3349 10 Precast Box Culverts Rinker Materials Rinker Materials Reinforced Concrete Box Culvert ASTM C789, C850 ASTM C789, C850 9/9/2022 3349 10 Concrete Pipe Rinker Materials Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe ASTM C76, C655 ASTM C76, C655 9/9/2022 3341 10 Concrete Pipe Forterra Reinforced Concrete Pipe - Tongue and Groove +D48 PolYPxTylene Storm Drain Pipe 9/9/2022 �33 41 li Polypropylene Pipe Advanced Drainage Systems, Inc. HP Polypropylene Storm Drain Pipe Storm Drain Manholes and Junction Boxes 9/9/2022 3349 10 Stacked Manhole Oldcastle Precast 4' x 4' Stacked Manhole ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 5' x 8' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 4' x 4' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 5' x 5' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 6' x 6' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 8' x 8' Storm Junction Box Base ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast Tx 8' Storm Junction Box Base ASTM C478 9/9/2022 3349 10 Junction Box Cowtown Redi Mix No. 260-2 6 Sack 3600 psi Concrete for Concrete Collars ACI 318-14 9/9/2022 3349 10 Manhole Rinker Materials Rinker Materials Reinforced 48" Diameter Spread Footing Manhole ASTM C433 9/9/2022 3349 10 Manhole Connector Trelleborg Engineered Systems Kor-N-Seal 106/406 Series Pipe to Manhole Connector ASTM C923 9/9/2022 3349 10 Junction Box Forterm 4'x 4' FRT-4x4-409-PRECAST-BASE ASTM C913 9/9/2022 3349 10 Junction Box Forterra 5' x 5' FRT-5x5-409-PRECAST-TOP ASTM C913 9/9/2022 3349 10 Junction Box Forterm Tx 5' FRT-5x5-409-PRECAST-BASE ASTM C913 9/9/2022 3349 10 Junction Box Forterra 6'x 6' FRT-6x6-409-PRECAST-TOP ASTM C913 9/9/2022 3349 10 Junction Box Forterm 6'x 6' FRT-6x6-409-PRECAST-BASE ASTM C913 9/9/2022 3349 10 Junction Box Thompson Pipe Group 4'x 4' TPG-4x4-409-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 4'x 4' TPG-4x4-409-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 4'x 4' TPG-4x4-412-PRECAST 4-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 5 'x 5' TPG-5x5-410-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 5 'x 5' TPG-5x5-410-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 5 'x 5' TPG-5x5-412-PRECAST 5-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 6'x 6' TPG-6x6-411-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 6'x 6' TPG-6x6-411-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 6'x 6' TPG-6x6-412-PRECAST 6-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 7 'x 7' TPG-7x7-411-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 7 'x 7' TPG-7x7-411-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 7 'x 7' TPG-7x7-412-PRECAST 4-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 8 'x 8' TPG-8x8-411-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 8 'x 8' TPG-8x8-411-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 8 'x 8' TPG-8x8-412-PRECAST 5-FT RISER ASTM C615 FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 02/13/2023 Classification Manufacturer Model No. National Spec Storm Drain Curb and Drop Inlets 9/9/2022 33 49 20 Curb Inlets Forterra 10' x 3' FRT-lOx3-405-PRECAST ASTM C913 9/9/2022 33 49 20 Curb Inlets Forterm 10' x 3' FRT-lOx3-406-PRECAST ASTM C913 9/9/2022 33 49 20 Curb Inlets Forterra 10' x 4.5' FRT-lOx4-407-PRECAST ASTM C913 9/9/2022 33 49 20 Curb Inlets Forterm 10' x 4.5' FRT-lOx4-420-PRECAST ASTM C913 9/9/2022 33 49 20 Junction Box Forterra 4' x 4' FRT-4x4-409-PRECAST-TOP ASTM C913 9/9/2022 33 49 20 Curb Inlet Thompson Pipe Group 10' x 3' TPG-IOx3-405-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Curb Inlet Thompson Pipe Group 15' x 3' TPG-15x3-405-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Curb Inlet Thompson Pipe Group 20' x 3' TPG-20X3-405-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Drop Inlet Thompson Pipe Group 4' x 4' TPG-4X4-408-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Drop Inlet Thompson Pipe Group 5' x 5' TPG-5X5-408-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Drop Inlet Thompson Pipe Group 6' x 6' TPG-6X6-408-PRECAST INLET ASTM C615