HomeMy WebLinkAboutContract 57891-R2CSC No. 57891-R2
SECOND RENEWAL TO CITY SECRETARY
CONTRACT NO. 57891
WHEREAS, on July 27, 2022, the City of Fort Worth ("City") and Woody Contractors,
Inc. ("Contractor"), collectively the ("Parties"), made and entered into City Secretary Contract No.
57891 (M&C 22-0524, June 28, 2022) (the "Contract") for Citywide Storm Drain Improvements,
City Project No.: 100092; and
WHEREAS the Contract may be renewed up to two times, in the amount of $2,000,000.00,
at the same terms, conditions, and unit prices as originally bid; and
WHEREAS the Contract is approaching the end of its first renewal term;
NOW, THEREFORE, the Parties, hereby agree as follows:
I.
a. The Contract is hereby renewed in the amount not to exceed $2,000,000.00 at the
same terms, conditions, and unit prices as originally bid.
b. Task (work) orders will continue to be issued and remain contingent upon the
availability of funds and the availability of the contractor.
II.
All other terms and conditions of the Contract remain unaffected and in full force and
effect.
IN WITNESS WHEREOF, the City and the Contractor have each executed this Second
Renewal by and through each Party's duly authorized signatory, effective as of the date subscribed
by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
William Johnson (J n 10, 202415:40 CST)
William Johnson
Assistant City Manager
Date: Jan 10, 2024
CONTRACT RENEWAL No. 2 CS NO. 57891
Citywide Storm Drain Improvements, City Project No. 100092
BY:
Woody Contractors, Inc.
royfi*_OA*Oan 5, 2024 09:40 CST)
Troy Woody
President
Date: Jan 5, 2024
OFFICIAL RECORD Page 1
CITY SECRETARY
FT. WORTH, TX
APPROVAL RECOMMENDED:
A.
By: Lauren Prieur(Jan 9, 202415:45 CST)
Lauren Prieur
Director, Transportation and Public Works
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
G ffre Rl an 5c2024� 08:24 CST
Geoffrey Smith, PE, CFM
Project Manager
APPROVED AS TO FORM AND LEGALITY
Mack (Jan 10, 2024 14:46 CST)
By:
Doug Black
Assistant City Attorney
FOHT9n4
ATTEST: aFo
PVeA =0
`4p4Q-6goco
Jannette Goodall
City Secretary
CONTRACT RENEWAL No. 2 CS NO. 57891
Citywide Storm Drain Improvements, City Project No. 100092
Form 1295 No.: 2022-892750
M&C No.: 22-0524
M&C Date: 06/28/2022
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 2
City of Fort Waith, Texas
Mayor and COUncil COMMUllication
DATE. OW28122 M&C FILE NUMBER: M&O 22-0524
LOG NAME: 20SWM CITYWIDE STORMDRAIN IMPROVEMENTS 2022
SUBJECT
(ALL) Aulhodzt Exactition of a Contract with Wady Contractors, Ik,, In " Amount Up to S2,00,000.00, for the Citywide Storm Drain
Improvements Projett with the Option to Renew Ibo Contract Up to Two Times
RECOMMENDATION:
It Is teroinmended that the City Coundl authqdza the execution of a conifact with Woody Conliaclurs, Inr, in.an amount up to. $2,LX0.0[M.00, for
the Citywide Stormy Drain I rnprovements project. p7ovlide for contl noencies, cona ' tiadfon managen-tent, surweying, irn�speclion and material testing
foe a total project amouni at $2,282,00b-OD with the oplion to renew 1he contrasttip to two limes under the same le"s, conditions and unit prices
provided stiff dent funding has been appropriated.
Approval at this Mayor and Council Comm4nicatlon (M&G) will authorize the execution of a cxmiract for the extension, repliacernent, and/or
improvement of existing City drainage Infrastructure on an ran -call basis. Work on individual locations will he authorized by work orders. The cott of
each woi k order will be based on the unit prices bid by the oonftctor for the work Items in the soNcRation.. The ma)dmum curywialive amount of all
work orders for this contract will be $2,000,000.00.
The bid anmnis died In the sobcdalton were based an hypothetical quantities for the PUrpWer of establishing unit prk)es for eadi voork itern.
Paymeril for each woric order.vAll be made tiased an actual measured: quantifies et those 1:)id prices. Funding will be verified individually for each
work nrder prior to. Its execution,
This project was advertised in the Fort Warlh SlarrTakigram on April 21, 2022 aM April 28, 2022. On May 19, 2M one bld was received, The
teml of the contract wH1 be until.work is completed. funds are expended, or the expiration of five -years. whichever occurs first.
Tile contract may be renewed up to two limes under the same terms, conditions and unll pr'WAS, at the C i(ys discietion,
814clera Amount
Woody Contractors. Inc, $'I 1,562.750.GCi
Project Cost Description Amount
Woody Contractors, Inc. $2.GCH3,GGD,0U
Contingencies, Construction Management $282,000.00
Surveying, Inspection Material Testing
Total Project Budget $2,282,000.00
These projects will have no ftact on the sponsoring dapnirlmeril's Opetaflon a Budget -
Funding is IoWgeled in the Drai"ge Improvement Projects prograrwTmbta project wrRh1n the Stornmater Capital PrOjectS. Fund for tine purpose Of
funding various task order projects, as apprapdated,
Business Equity- Woody Contractm, Inc- Is in oarnpilance wJlh IhO City's Business Equity Ordinance by committing to 14.00% Business Equity
p Qrticip-allon cm this projad . The CltVs Business Equity goal on this prajacA is J 3%.
The projects are located in ALL COUNCIL DISTRICTS,
PISGAL INFOWATION I CER71FICATION:
The 111fector of Finance cefti-fies that funds are available in the current capital budgel, as previously appmprialed. In the Stommater Capital
Projects Fund for the Drainage lrnpmvernent$i Pr*cts pMgrammable.prqjerA to suppoil the approval of the abave recommendation and exewlion
of 1ho contract, PrjEIT W ally experiftre being Inrurred, the Transputtalion & Publir ftWs 09partmeril hm; The respanqUilty to vallidate: the
availablIlty of funds
Submitte4 o Dana BIJFgWO-ff 8018
-Lj_-Oj-AW,I VA QjUca
E�lnatiln
�Susinasa Unit Heath Willam Johnson 7801
Additional Linda Young 2465
FORT WORTHCkll
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Woody Contractors Reactive Contract 2nd Renewal
M&C: 22-0524
Date:
To: Name
CPN: 100092
1 Troy Woody (twoody2020@aolxom)
CSO: 57891 DOC#:
Department Initials Date Out
Contractor -.. a Jan 5, 2024
2. Geoffrey Smith
TPW Project Mgr.
Jan 5, 2024
3. Linda Young
TPW Program Mgr.
Jan 8, 2024
4. Lissette Acevedo
TPW Sr. CPO
Jan 9, 2024
5. Patricia Wadsack
TPW Asst. Dir.
�[,
Jan 9, 2024
6. Lauren Prieur
TPW Dir.
Jan 9, 2024
7. Doug Black
Legal
.v
Jan 10, 2024
8. William Johnson
CMO
W
Jan 10, 2024
9. Ronald Gonzales
CSO
KC
Jan 10, 2024
10. Jannette Goodall
CSO
,S4J-
Jan 10, 2024
11. Allison Tidwell
CSO
A-
Jan 10, 2024
12. TPW-SW-Contracts
TPW SW
CC: Program Manager - Linda Young, Sr. CPO
- Lissette Acevedo, TPW BSPAP Recon
Team -
Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing
slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: []YES []No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tow sw contracts(dfortworthtexas.iiov Call 817-229-3283 with questions. Thank you!