HomeMy WebLinkAboutContract 59368-A1CSC No. 59368-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 59368
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 59368, (the
CONTRACT) which was administratively authorized on the 9th day of May, 2023
in the amount of $ 99,650.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Owner's Representation Services - Wagley Robertson Road, CPN
104154; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $779,980.00. (See Attached Funding Breakdown Sheet,
Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $879,630.00.
OFFICIAL RECORD
CITY SECRETARY
3 • FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
City of Fort Worth, Texas Owner's Representative Services - Wagley Robertson Road
Prof Services Agreement Amendment Template CPN 104154
Revision Date: 12/08/2023
Page 1 of 4
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
William Johnson (J n 10, 202416:05 CST)
William Johnson
Assistant City Manager
DATE: Jan 10, 2024
�.a4vvpn��
ATTEST:
�o
Pvo o=d
o.
?�a oQo *�
A p
4n �'EXA5oAb
��Laaa4'�'
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ENGINEER
Freese and Nichols, Inc.
Chrisris Bc 21, 2023 08:53 CST)
Chris B. Bosco, P.E.
Principal
DATE: Dec 21, 2023
Lauren Prieur (Jan 9, 202409:05 CST)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
David J. Kastendick, P.E.
Senior Project Manager
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Owner's Representative Services - Wagley Robertson Road
CPN 104154
APPROVED AS TO FORM AND LEGALITY:
fj�
DBIack (Jan 10, 202414:22 CST)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 3 of 4
M&C No.#: 23-1053
M&C Date: 12/12/23
Owner's Representative Services - Wagley Robertson Road
CPN 104154
FUNDING BREAKDOWN SHEET
City Secretary No. 59368
Amendment No. 1
Fund Dept ID Account Project
ID
34027 0200431 5330500 104154
Total:
CF1- CF2 -
Activity Bond
Reference
002330 22010199
Amount
$779,980.00
$779,980.00
City of Fort Worth, Texas Owner's Representative Services - Wagley Robertson Road
Prof Services Agreement Amendment Template CPN 104154
Revision Date: 12/08/2023
Page 4 of 4
FORT WORTH
ATTACHMENT "A"
Scope for Enaineerina Desian Related Services for Arterial Improvements
Owner's Representative Services for Waalev Robertson Road — CPN 104154
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The purpose of this amendment is to augment the scope of the original contract, which was
approved administratively with a limited scope to expedite early critical activities. This
amendment adds the remainder of the required services not included in the contract which
are described in this attachment.
The Project is to provide consulting services for the development of Design Build contracts
and preparation of design criteria packages for Wagley Robertson Road.
WORK TO BE PERFORMED
Task 1. Project Management
Task 2. Design Build Team Selection
Task 3. Design Criteria Package
Task 4. Survey, SUE and Geotechnical
Task 5. Right-Of=Way Acquisition Services
Task 6. Construction Phase Owner's Rep Services
TASK 1. PROJECT MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed, and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1.1. Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY.
1.2. ENGINEER shall prepare monthly briefing reports for the CITY (for thirty-eight (38)
months).
1.3 Prepare and maintain detailed Owner's Representative program schedule.
1.4 Project team coordination and Project Meetings
ASSUMPTIONS
• Project duration is assumed to be thirty-six (36) months for the entire project and
fourteen (14) months for Owner Representative project development until the DB
team begins final design and construction activities.
City of Fort Worth, Texas
Attachment A Owner's Representative Services — Wagley Robertson Road
Release Date: 07.22.2021 CPN 104154
Page 1 of 11
FORT WORTH
DELIVERABLES
A. eting invoices with progress summary reports
B. Program Schedule
TASK 2. DESIGN BUILD TEAM SELECTION.
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to identify, develop,
communicate through the defined deliverables, and recommend the design concept that
successfully addresses the design problem, and to obtain the CITY's endorsement of this
concept.
ENGINEER will provide consulting services for the Design -Build Team selection of the
project as follows.
2.1. The ENGINEER will coordinate City Attorney's office on DB contract and RFQ and
RFP documents for DB team selection.
2.2. The ENGINEER will review and prepare comments on the existing City DB Contract
for City Attorney review.
2.3. The ENGINEER will prepare and conduct contractor outreach pre -solicitation
meeting.
2.4. The ENGINEER will prepare request for qualification to solicitate letters of interest
from DB Teams
2.5 The ENGINEER will support the City in reviewing RFQs and developing the
shortlisted DB Teams.
2.6 The ENGINEER will prepare the RFP documents including providing the design
criteria packages included as part of task 3.
2.7 The ENGINEER will respond to DB Team questions during the development of DB
Team proposals.
2.8 The ENGINEER will work with the City on developing the selection criteria for DB
team interview evaluations.
2.9 The ENGINEER will attend and support the City in the interview and selection
process.
2.10 The ENGINEER will notify and participate in debriefings for the teams not selected.
2.11 The ENGINEER will advise and support the City through the DB team negotiations.
ASSUMPTIONS
• DB Team selection will be a two-step process
City of Fort Worth, Texas
Attachment A
Release Date: 07.22.2021
Page 2 of 11
Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH:,
DELIVERABLES
A. Draft Design Build Contract Document
B. Contractor Outreach Pre -solicitation presentation
C. Request for Qualifications
D. Request for Proposals
E. Selection Criteria Document
TASK 3. DESIGN CRITERIA PACKAGE
ENGINEER will prepare the design criteria package for Wagley Robertson Road project to
include the following scope.
3.1. The ENGINEER will visit the project site to prepare 20% design package that include
typical sections, plan & profile, ROW needs, and identify project risks.
3.2. The ENGINEER will coordinate meeting with TPW Project managers to review and
discuss conceptual design schematic (10 Meetings)
3.3. The ENGINEER will prepare an updated total project cost estimate
3.4. The ENGINEER will work with the City to determine the project limits, pavement
transitions, define the typical sections, and project right-of-way and easement limits.
3.5. The ENGINEER will prepare and maintain a project risk register and identify possible
solutions to reduce risks that our team will incorporate into the design criteria
package
3.6. The ENGINEER will initiate coordination with the franchise utility companies, collect
record drawings, delineate private easement, and develop a utility contact list
3.7. The ENGINEER will meet with the City Water Department to verify existing utilities
and determine if the Department plans for additional or upsized facilities.
3.8 The ENGINEER will prepare the design criteria package that includes the electronic
data files, record drawings within the project limits, utility coordination status report
with responsibility matrix, permit status report with responsibility matrix, design
schematic (20% design level), typical sections, SUE Utility plan sheets,
ROW/Easement Map, survey documents, drainage memo and models.
• The ENGINEER will review and comment on up to 2 plan submittals developed
by the DB team. Comments will be provided to the City and DB Team for
consideration.
3.9 The ENGINEER will prepare hydraulic models of the proposed project to identify a
viable hydraulic design which meets the City's floodplain criteria.
Data Collection
• Conduct one (1) site visit to evaluate the topography at each of the proposed
crossings and general stream hydraulic conditions such as vegetation and
roughness
City of Fort Worth, Texas Page 3 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH
• ENGINEER will obtain the best available model from the CITY. If necessary,
ENGINEER will obtain the latest model from Federal Emergency Management
Agency (FEMA).
• ENGINEER will obtain field topographic survey to define the existing crossing
and the adjacent stream channel. Available LIDAR topography will be obtained
for use in defining overbank areas and areas further from the crossing.
Hvdraulic Model Analvsis
• ENGINEER will review the models to evaluate the adequacy of the geospatial
reference of the model as well as topography, roughness, and other parameters.
Corrections deemed necessary to adequately model the project area will be
made to develop a Corrected Effective model.
• ENGINEER will add a minimum of four (4) hydraulic cross sections per crossing
and/or update topography for existing cross sections in the vicinity of the
proposed crossings to create the Existing Conditions model. It is assumed that
the Wagley Robertson site will include both the crossing at Big Fossil Creek and
the parallel unnamed tributary.
• ENGINEER will create a Proposed Conditions model by adding the creek
crossings to the Existing Conditions model. Culvert crossings at roadways will be
located with the goal of passing the 100-year event. Comparisons will be made to
the Existing Conditions model to identify hydraulic impacts in accordance with the
current City of Fort Worth Stormwater Criteria Manual.
• For each of the crossings, ENGINEER will provide an estimated minimum
roadway elevation, conceptual cross culvert size, and evaluate up to two (2)
general alternatives to minimize or eliminate hydraulic impacts. The evaluation of
any alternative will be abandoned if it is identified the implementation of the
solution is not feasible in the ENGINEER's opinion. If impacts cannot be feasibly
mitigated, it is expected that a FEMA Conditional Letter of Map Revision
(CLOMR) and Letter of Map Revision (LOMR) may be required by the design
team.
• Based on City standards and the analysis performed at each crossing,
ENGINEER will identify the pertinent design standards, City permits, and
anticipated FEMA submittals required for the project. It is understood this may
not be all-inclusive and the DB team must satisfy themselves that all necessary
permits have been obtained. This does not include an assessment of local, state,
or federal environmental permitting requirements.
• ENGINEER will prepare a draft memorandum including hydraulic work maps,
hydraulic results tables, and schematic figures of the crossing alternatives based
on the work described above for each site.
• After draft results are prepared, ENGINEER will attend up to two (2) meetings
with the CITY to discuss the alternatives to finalize the hydraulic concept.
• A final memorandum describing the hydraulic modeling and the selected
alternatives and final models will be provided after receipt of CITY comments.
City of Fort Worth, Texas Page 4 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH:,
ASSUMPTIONS
• Utility Coordination will be initiated, and the DB Team will finalize the relocation
coordination activities
• Assumes acceptable hydrology has been performed and will be provided by the
CITY including fully developed conditions.
• It is understood the identified alternatives are conceptual in nature and will need
to be finalized by the DB Team.
• If necessity, LOMR or CLOMR submittals to FEMA will be completed by the DB
Team for the project and are not included in this scope.
DELIVERABLES
A. Electronic Data Files
B. Schematic Design (20% Level)
C. Utility Coordination Status Report
D. Permitting Coordination Status Report
E. ROW/Easement Map and Survey Documents
F. Conceptual Hydraulic Evaluation Memorandum and Models
TASK 4. SURVEY, SUE, AND GEOTECHNICAL
ENGINEER will provide survey, SUE and Geotechnical services
4.1 Easement meets and bounds descriptions for the following parcels
• (2) Right -Of -Way Documents
• (8) Drainage Easements
• (6) Grading Easements
• (6) Temporary Construction Easements
4.2 Subsurface Utility Engineering (Level "B") designating including gas,
telecommunication, traffic signals, storm, water, and sanitary sewer within the project
limits from Coneflower Dr to Quicksilver Trail.
4.3 The ENGINEER will provide geotechnical investigation services to the City as follows
Field Exploration
• Select and mark up to six (6) boring locations (15-foot deep borings) and notify
Texas 811, appropriate CITY Department(s) to request location and marking of
existing underground utilities prior to the field exploration. Access to the selected
boring locations will be verified with the CITY prior to accessing the site with a
core drilling rig.
City of Fort Worth, Texas Page 5 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH
Subcontract with a geotechnical drilling contractor to drill up to six (6) borings.
Samples will be collected intermittently using hollow stem augers and either split -
spoon or tube samplers. Rock and rock -like materials will be tested insitu using
a Texas Department of Transportation (TxDOT) Cone Penetration Test, as
appropriate for the material. At completion, the boreholes will be backfilled with
auger cuttings and the pavement surfaces patched.
• Provide an Engineer or Geologist experienced in logging borings to direct the
drilling, log the borings, and handle and transport the samples. Visual
classification of the subsurface stratigraphy shall be provided per the Unified Soil
Classification System (USCS).
Laboratory Testing
• Perform testing on samples obtained from the borings to determine soil
classification and pertinent engineering properties of the subsurface materials.
ENGINEER will select samples for laboratory testing, assign tests, and review
the test results. Testing will be performed by a geotechnical testing
subcontractor.
• Laboratory tests will be assigned based on the specific subsurface materials
encountered during exploration. Test type and quantity may vary, but are
expected to include:
o Classification tests (liquid and plastic limits and percent passing the No. 200
sieve or gradation)
o Moisture content
o Dry unit weight
o Unconfined compressive strength
o pH lime series
o Soluble sulfate content
Engineering Analvsis and Reportinq
• Prepare a technical memorandum (in compliance with Citv of Fort Worth
Pavement Design Manual, 2015) of the geotechnical investigation to include:
o Boring locations, boring logs, laboratory test results, and a key to the symbols
used.
o Discussion of subsurface conditions and soil properties indicated by the field
and laboratory work, and the implications for design.
o Recommendations for pavement subgrade treatment
o Pavement thickness calculations for both rigid and flexible pavement
o Foundation and site preparation recommendations for the retaining walls.
o Earthwork related recommendations for use during development of the plans
and specifications
City of Fort Worth, Texas Page 6 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH
ASSUMPTIONS
• ENGINEER will complete subsurface utility information prior to Geotech borings being
drilled.
• For core drilling, traffic control will be required, including closing a lane of traffic and
providing flagmen.
• It is assumed that a truck -mounted drilling rig can access the drill locations. If drilling with
a track -mounted rig is necessary, it will be considered an additional service to this
contract.
• ENGINEER will coordinate with CITY to obtain the necessary permits for core drilling
within the roadway.
• Soil boring locations are planned to be within the existing pavement and in locations
where traffic control plans for roadway or lane closures will noted be necessary.
• Locations of the six (6) core borings will be adjusted for location based upon the existing
utilities and ingress/egress onto Wagley Robertson Road from the adjoining side streets.
DELIVERABLES
• A. Survey meets and bounds description documents
• B. Subsurface Utility Engineering electronic files for Level B SUE
• C. Geotechnical report: One (1) hard copy and one (1) electronic copy of geotechnical
technical memorandum (including exhibits, soil boring results, summary of observations
and pavement (surface and subgrade) recommendations.
TASK 5. ROW ACQUISITION SERVICES
5.1. The ENGINEER will provide appraisal services
• This scope of services is based on providing appraisals for up to 10 parcels
• Conduct a pre -appraisal contact with the property owner
• Afford the property owner or their representative the opportunity to
accompany the appraiser during their inspection of the property.
• The appraisal report shall conform to the Uniform Standards of Professional
Appraisal Practices.
• When the Appraisal is finalized, the Appraisal will be submitted to City for
final approval prior to making an offer.
5.2 The ENGINEER will provide right of way title and negotiation services
• This scope of services is based on obtaining easements for up to 10 parcels
• All acquisitions will comply with CFR Part 24 and the Uniform Relocation
Assistance and Real Property Act of 1970 (Uniform Act).
City of Fort Worth, Texas Page 7 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH:,
• Prepare and send an Introduction letter along with the Landowners' Bill of Rights
by Certified Mail -Return Receipt Requested (CMRRR)
• A written offer, appraisal report and required brochures will be sent to each
property owner or the property owner's designated representative.
• Up to five follow-up contacts will be made with each property owner with a goal to
reach an agreement conducive to all parties.
• If the property owner choses to make a counteroffer, we will advise them to
provide a written and signed letter along with the appropriate backup
documentation in support of the counteroffer.
• Once an agreement has been reached, the necessary instruments
(Memorandum of Agreement (MOA), Deed and W9) will be secured and provided
to the title company in request of a closing statement
• If after 30 days of negotiations and an impasse has been determined or the
property owner is non -responsive, a Final Offer Letter (FOL) will be delivered
along with the draft conveyance document and MOA.
ASSUMPTIONS
• Project includes acquisition of up to 10 parcels of right-of-way, drainage
easements, grading easements, and temporary construction easements.
• The scope of work does not include condemnation services
TASK 6. CONSTRUCTION PHASE OWNER'S REPRESENTATION SERVICES.
The ENGINEER will provide owner's representative services for the construction phase
6.1. As the Owner's Designated Representative, FNI will support Fort Worth during final
design and construction
Construction Kickoff and Progress Meetings
o Attendance (in person or virtual) at monthly meetings led by Design
Builder. (Up to 18 meetings)
• Submittal Review
o Support as requested by the City to review of submittals (i.e., shop
drawings, RFIs, etc.). These reviews are intended to be cursory in
nature to verify submittal contents are in general conformance with
the construction documents. Note that it is the DB Team's
responsibility to prepare and verify that submittal contents strictly
conform to the construction documents. The DB Team must identify
all components in the submittal necessary for a complete the work in
accordance with all applicable codes and regulations, and that will
have the aesthetic and operational characteristics that meets the
overall intent of the form and function of the roadway facility.
City of Fort Worth, Texas
Attachment A
Release Date: 07.22.2021
Page 8 of 11
Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH
Baseline Schedule Review
o Review the baseline construction schedule for compliance with the
General Conditions of the Construction Agreement.
Cost Management
o At the City PM Request, FNI will review the schedule of values
prepared by the DB Team for acceptance. Review the monthly cash
flow projections provided by the DB Team. Review the monthly
payment requests and supporting documentation and provide Fort
Worth with an opinion of alignment between the payment requested
and the actual work completed, and a recommendation for payment
as appropriate.
Issue Management
o At the City PM Request, FNI will review the Issues Log developed by
DB Team. Build and facilitate the resolution of any issue that requires
City of Fort Worth input or involvement. If necessary, provide an
interpretation of the drawings and specifications when questions arise
concerning the meaning or intent as it pertains to Owner defined
items.
Change Management
o At the City PM Request, FNI will review the documentation of
requested contract modifications for justification and compliance with
the General Conditions of the Construction Agreement. Provide
recommendations to City of Fort Worth on subsequent change order
documents for approved changes.
Project Completion
o When the DB Team requests that substantial completion be granted
for the Project (or applicable portions thereof), FNI will conduct a
walk-through of the Project with Fort Worth and prepare a punch list of
observed items requiring completion or correction prior to Substantial
Completion and again prior to Final Completion.
o Verify with DB Team that all inspections have been performed as
required by regulations, ordinances, and codes applicable to the
Work, including those to be performed by public agencies having
authority over the Work.
o Conduct a final review of the Project with Fort Worth and the DB
Team for conformance with all the Project documents. FNI will confirm
work is complete and in accordance with the Project documents prior
to recommending final payment.
o At the City PM request, FNI will review and confirm that the DB Team
has submitted all required documents to Fort Worth prior to
recommending the final payment.
• Construction field issue resolution
City of Fort Worth, Texas Page 9 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH:,
o At the City PM request, FNI will work with the DB Team, working
principally through the superintendent to address field issues and
assist in understanding the intent of Contract Documents.
o Assist in obtaining from the City additional details or information, when
required for proper execution of the Work.
ASSUMPTIONS
• he City of Fort Worth is responsible for construction management and inspection
services. FNI is serving in an advisory role during construction to support the City
PM as needed.
• FNI will not authorize any deviation from the contract documents or substitution
of materials or equipment (including "or -equal" items) without authorization from
the City.
• FNI will not undertake any of the responsibilities of the DB Team.
• FNI does not guarantee the DB Team's performance.
• FNI will not advise on, issue directions relative to or assume control over any
aspect of the means, methods, techniques, sequences, or procedures of
construction unless such advice or directions are specifically required b the
contract documents.
• FNI will not advise on, issue directions regarding or assume control over
safety precautions and programs in connection with the work or any activities or
operations by the DB Team.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Full Design Services in addition to the 20% level design included in this scope
• Condemnation Services
• Construction management and inspection services
• Materials testing
• Additional Topographic survey for extend project limits
• Level "A" Subsurface Utility Engineering
• Legal Representation for property acquisition
• Services related to development of the CITY's project financing and/or budget.
City of Fort Worth, Texas Page 10 of 11
Attachment A
Release Date: 07.22.2021 Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH:,
• Services related to disputes over pre -qualification, bid protests, bid rejection and
re -bidding of the contract for construction.
• Services necessary due to the default of the Contractor.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Permitting will be executed by the DB Team
• Effort exceeding those outlined in the "Assumptions" section of each task
description.
City of Fort Worth, Texas
Attachment A
Release Date: 07.22.2021
Page 11 of 11
Owner's Representative Services — Wagley Robertson Road
CPN 104154
Level of Effort Spreadsheet
Legend:
TASKIHOUR BREAKDOWN
'Efrod Split between Wagley Robertson & Everman Parkway
Design Services for
Owner's
Representation Services - Wagley Robertson Road (CPN 104154)
I
Labor(Hours)
Expense
I
I Owner's Rep
Roadway
Dmtnage Analysis c nical Services
I
Task Task Description
I Chuck Wolf
Chris Bosco
Farad Rajaball
Todd
Buckingham
Justin Oswald
Bryce
Emily Sestak Ella Pettichortl Hamelwrlght Tony Bosecker Aaron Brewer Margo Knapp
Mark Thinnes
TOGI Labor
Total Expense
Task Bub
Total
No.
I PM
AP-1, Lead
EIT
QC Review
QC Rwlew
Taek Lead EIT GIs Taak Leatl En sneer Ad-
GIS
Cost
I
Cost
a.ore.a�oaaiS29
P,oresa�onai$29
P.ore6c�onai$I-
P,oresa�onai$V
Prohaebne$21
amkae�oaaiE2 v,oresa�onei$z] P.araewonei$14] Proreae,one$29 rore,a,o�$2 suppon$14
1
mfe..,oa$147
Subconsultant
Rate
11
0000
MWBE
Non-MWBE
Travel
Reproduction
1.0 Taek 1 . Project Management
16
132
16
0
3
3
3
0
0
0
0
$48,450
$0
$0
$420
$0
$420
$0,87
1A Invobing(W Monflehincludes IDS DesigntConsWctwn)
40
$11,810
$0
$11,81
1.2 Monthly Boeing reports with the CM IN Months)
40
$11,8101
1 $0
$11,81
1.3 imimt Schadule Updates f11Monlhs)
20
$5,9101
i $0
$5,91
1.4 Prolecl Team Coordinaton and n-Person Meetings
i6
32
16
3
3
3
$18,9201
$420_
i $420
$19,34
I
$01
1 $0
$
2.0 Task 2. Design Build Contractor Selection
188
62
8
0
0
0 0 0 0 0 0
0
$]5,260
$
$0
$360
$0
$360
$7s,62
2.1 Coordination Meetings wild, City Attorneys ofl
8
$2,3701
$0
$2,37
2.2 Prepare revised IDS Conn.. for City Review
20
4
$7,0901
1 $0
$7,09
2.3 IDS Team Outreach (Pre-Sokcitation MeeOng)
4
6
$4,9501
1 $0
$4,95
2.4 DB Letter of Interest RFQ
✓♦
2
$2,9601
1 $0
$2,96
2.5 IDS Team RFQ Evaluation and Shortl at
16
16
$9,4501
$186
1 $180
$9,63
2.6 Prepare Request far Proposals (RFP)
24
4
$8,2701
1 $0
$8,27
2.] Respond to Questions from IDS Team During Proposal Development
24
$7.Ml
1 $0
$7,09
2.8 Prepare Selectgn Cr...
11
4
$4,7301
1 $D
$4,73
2.9 IDS Team Int-ews and Selection
16
16
$9,4W
$180
1 $180
$9,63
2.10 Notts Selected Team and! Conduct Debrief Meetings
12
8
$5,9101
1 $0
$5,91
2.11 IDS Team Connect Negotiation
40
4
1 $12,9901
1 $0
$12,99
I
$01
1 $0
$
3.0 bask 3. Design Criteria Package
262
112 42 0 0 0
0
$246,870
$0
$0
$0
$0
$0
$246,87
Road.
1 $0
$0
$
3.1 Project S"Visits
8
12
4 4
$5,9801
1 $0
$5,98
12 Owners Rep Dasgn Davabpment Meetings
12
24
24
$14,8501
1 $0
$14,85
33. Total Project Estimate
4
4
16
4
$6,2601
1 $0
$6,26
3.4 Prepare 20% Design Schematic and Evaluate Cost Impacts
4
46
100
26
$36,0001
1 $0
$36,00
3.5 Risk Registry
4
26
4
$8,1701
1 $0
$8,17
UtI11Nes
$01
1 $0
$
3.6 Initial Frenchise Unity Coordination
4
41
$8.2301
1 $0
$8,23
3.7 City Water Department Coordination
12
8
$4,9501
1 $0
$4,95
3.8 Design Criteria Package (Documents)
26
$5.9101
1 $0
$5,91
Electronic Data Files (Survey, SUE, Geotech)
12
$2.1201
1 $0
$2,12
AsbuiMReco. Drawings
20
$3,5201
1 $0
$3,52
Utility Stetas Report and Responsibility Matrix
8
12
$4,4801
i $0
$4,48
Per .,g Status Report and Responsibility Matrix
8
12
$4,480i
1 $0
$4,48
Schematic Dasgn (20%) Plan & Profle
80
160
24
$5B,mil
1 $0
$58,26
Prepare Typical Saclxms
10
20
4
$7,5X)
$0
$7,56
SUEDtiIM1y Plan Sheete
4
20
4
$5,]80
$0
$5,]9
RgM1t-of-way& Easement Map
10
40
4
$11,080
$0
$11,08
Right-of-way& Easement Documents
4
$1,1901
1 $0
$1,19
DB Team Plan Review (ap to 2)
10
30
$8.2401
1 $0
$8,24
3.9 Drainage Memo & Models
I
Sol
1 $0
$
Data Collection (Available Hydraulic Modeling)
8 12
$3,3801
1 $0
$3,38
Connected Effective Model (2 crossings)
2
4 16 12
$5,9301
1 $0
$5,93
Revised Existing Condition Models (2 crossings)
4
4 16
$4,7031
1 $0
$4,70
Altema dives Analysis (2 Alternatives)
4
6
16 32
$11,8401
1 $0
$11164
Identify Pemrifting Requirements
2
8 8
$3,5801
1 $D
$3,58
Draft Conceptual Hydraulic Evaluation Memorandum
6
12 24 16
$12.9701
1 $0
$12,97
Review Meeting with CITY Stormwater Deparhnent(2)
4
4
8 4
$4.5701
1 $0
$4,57
Final Conceptual Hydraulic Evaluation Memorandum
2
4 8 2
$3,0501
1 $0
$3,05
4.0 Teak 4. Survey, SUE, Geotechnical
0
Else0 0 20 48 12
4
f26,150
$60,000
E15,000
EO
f0
E]5,000
$101,35
'IS.-
$01
1
4.1 'ROWIEasemant Documents
_
10
$1,7601
i $0
$1 ]6
(2)Rightol-y Documents
f
$01
$3,000
_
_
i $3,000
$3,00
(8)Oramage Easements
$01
$12.000
1 $12,000
W00
(6) Grading Easements
$01
$9,000
1 $9,000
Woo
(6)Te pon�%/C t,�I ti0�I Easements
$01
$9,000
1 $9,000
$9,Oo
4.2 Subsurface UBllry�nglnearing (SUE)
$01
1 $0
$
Management, Research, Survey
4
10
$2,9501
$9,500
1 $9,500
$12,45
Laval V SUE
$01
$17,500
1 $17,500
$17,50
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement Owners Representative Services - Wagley Robertson Road
PMO (zial Release Date: 8 09 2012 CPN 104154
1 of 2
Level of Effort Spreadsheet
Legend: TASKIHOUR BREAKDOWN
'Efroit Split between Wagley Robertson & Everman Parkway Design Services for
Owner's Representation Services - Wagley Robertson Road (CPN 104154)
I Labor(Hour.) Expense I
I Owner's Rep Roadway Drainage A .11 c nical Services I
Tesk Task Description I Chuck Wolf Chris Bosco Fahad Rajaball Todd �
1Buckingham Justin Oswald Emily Sestak Ella PeXichortl Hamelwrlgh[ Tony B-.cker Aaron Brewer Margo Knapp Mark Thinner TDGI Labor Total Expense
No. Coat Coat Task $ub Total
I PM APMITark Lead Er QC Review QC Rwlew Taek Lead Er GIS Taek Leatl En sneer Admin GIS I
P.°r...,... I Proreewonaiz P...sionelI P....... Pmk..io..13 P.%..iooelz P,uta..ioneil Prorese�oneie ,er...�e°ei ( PP z mta..io°ai1 I Subconsultant Travel Reproduction)
Rate $29t $29.3 $1-/k' $VIA $2711 $20e $17 $14] $29I P $20OI °„$id P $14]I Mr— Non-MWBE
6.3 1 $01 1 $0 $
FieM Expl—hun $01 1 $0 $
Site Reconnaise—olSiake Bonngs 4 4 10 $3,8901 1 $0 $3,89
Utnities and Subconsultant Coordination 12 4 $2,9601 1 $0 $2,98
Field Log Bonngs 10 $2.0101 $10,500 1 $10,500 $12,51
Laboratory Testing $01 1 $0 $
Assign and Revew Lab Testing 4 $1,1901 $4,500 1 $4,500 $5,69
Draft and Review Boring Logs 2 4 $1,4001 1 $0 $1,40
Enginaenng Analysis and Reporting $01 1 $0 $
Cakuiations and Analysis 6 $1,7801 1 $0 $178
Geotechnical lnvestgation Technical Memorandum 4 4 8 12 8 41 $8.3901 1 $0 $8,39
5.1 IAppraisais (Up l010 parcels)
5.2 TBIe and ROW Negotlatlonr
Task 8. Geneal Construction Representatlon
98
1l8
120
0
0
0
0
0
10
0
0
0
E105,5]0
$0
EO
$420
6.1 Construction Phase Meetings (Assume up. 18 meetings)
20
60
20
16
$30,080
.29
Submittal Reviews as Requested (Assume 8 Revews)
20
$5,9101
Baseline Schedule Review
4
4
$2,3701
Coal Management Review
4
f0
46
$11,1WI
Issue Management
20
12
$9,4WI
Change Management
20
12
$9,4WI
Project Completion
10
40
$14,7601
C—trucbon FIaM Issue Resolution
20
20
60
$22.3701
I'lfLYQ
City of Fort Worth, Texas
AXachment B - Level of Effort Supplement
PMO (ml Release Date: 8 09 2012
Poo.. Summary
Total Hours
1, 196
Total Labor
$5]2,2601
TINel Expense
$190,5201
MWBE Subconrultan
$157,000:
Non-MWBE Subwnauttan
$15,0001
10% Sub Merkup
Subcip-,
$
MWBE
20.1°
Irptal Project Cos
$]r993
Owner's Representative Services- Wagley Robertson Road
CPN 104154
l
ATTACHMENT B
COMPENSATION
Design Services for
Owner's Representative Services
City Project No. 104154
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A
as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
LABOR CATEGORY
RATE
($/HOUR) **
Professional 1
$147
Professional
$176
Professional 3
$200
Professional
$231
Professional 5
$271
Professional 6
$295
CAD Technician/Designer 1
$124
CAD Technician/Designer 2
$163
CAD Technician/Designer 3
$199
Intern / Coop
$73
Senior Advisor
$193
** Provided rates are 2023 rates, which will be adjusted annually in February. Both parties agree
that amendments are not warranted if budget deficits were to result due to rate changes.
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 4
Owner's Representative Services — Wagley Robertson Road
CPN 104154
AM
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 4
Owner's Representative Services — Wagley Robertson Road
CPN 104154
AM
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Freese and Nichols, Inc. Owner's Representative
Services
Construction Phase
Prime Consultant Total
MBE/WBE Sub -Consultants
Pinnacle Consulting Management Group Inc.
The Rios Group
Salcedo Group Inc.
MBE/WBE Sub -Consultants Total
Fee Amount I %
$501,990.00
$105,990.00
$607,980.00 78.0%
$97,000.00
$27,000.00
$33,000.00
$157,000.00 20.1 %
Non-MBE/WBE Consultants
Texplor, Inc. $10,500.00
Beyond Engineering and Testing $4,500.00
Non-MBE/WBE Consultants Total: $15,000.00 1.9%
TOTAL $779,980.00 100.0%
Project Number & Name Total Fee MBE/WBE Fee MBE/ WBE
Owner's Representative Services $779,980.00 $157,000.00 20.1 %
City MBE/WBE Goal = 0% Consultant Comm tted MBE/WBE Goal = 0%
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 4
Owner's Representative Services - Wagley Robertson Road
CPN 104154
LIM
EXHIBIT "13-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 4 of 4
Owner's Representative Services— Wagley Robertson Road
CPN 104154
Professional Services Invoice Project Manager: IChris Bosco Summary
Project: Owner's Representative Services - Wagley Robertson Road
City Project #: 104154 1
City Sec Number: I supplier Instructions
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
Company Name: IFreese and Nichols, Inc.
I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Supplier's PM: Chris Bosco, P.E.
email: Chris.bosco@freese.com
Supplier Invoice #:
Office Address 801 Cherry Street # 280OFort Worth, Texas 76102
Payment Request #:
Telephone: 817-735-7359
Service Date:From
Fax:
Service Date:To
Invoice Date:
Remit Address 801 Cherry Street # 280OFort Worth, Texas 76102
Agreement LTD
Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance
Work Type 1 Design Services $879,630.00 $879,630.0C $879,630.00
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Totals This Invoice $879,630.00 $879,630.00 $879,630.00
Overall Percentage Spent:
Owner's Representative Services — Wagley Robertson Road
CPN 104154
Freese and Nichols, Inc. 817-735-7359
801 Cherry Street # 2800 801 Cherry Street # 2800
Fort Worth, Texas 76102 Fort Worth, Texas 76102
CFW Project Manager Chris Bosco
Supplier's Project Manager: IChris Bosco, P.E.
Supplier's PM email: Chris. bosco(o)freese.com
Name of Project: Owner's Representative Services - Wagley
Robertson Road
Labor Cateaoni Name
Invoice
Supplier Project No.
Proj. Invoice No.
Invoice date:
Period Service Date:From
Service Date:To
City Secretary Contract #:
P.O. Number:
Hours Rate ($/hr)
Professional - 1
$ 147
Professional - 2
$ 176
Professional - 3
$ 200
Professional - 4
$ 231
Professional - 5
$ 271
Professional - 6
$ 295
Construction Manager - 1
$ 127
Construction Manager - 2
$ 158
Construction Manager - 3
$ 168
Construction Manager - 4
$ 213
Construction Manager - 5
$ 257
Construction Manager - 6
$ 295
Construction Representative - 1
$ 114
Construction Representative - 2
$ 127
Construction Representative - 3
$ 158
Construction Representative - 4
$ 168
CAD Technician/Designer - 1
$ 124
CAD Technician/Designer - 2
$ 163
CAD Technician/Designer - 3
$ 199
Corporate Project Support - 1
$ 120
Corporate Project Support - 2
1
1
$ 143
Corporate Project Support - 3
$ 191
Intern/ Coop
$ 73
Senior Advisor
$ 193
Total Labor 0.0
Subcontract Service
Subcontractor Subtotal
10 Percent Markup on Subcontract Services
Nonlabor Expenses
Nonlabor Expense Subtotal
Total Expenses (Subcontract Services+Markup+Nonlabor Expenses)
TOTAL DUE THIS INVOICE
Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Owner's Representative Services - Wagley Robertson Road
CPN 104154
Professional Services Invoice Project Manager: Chris Bosco
Project: Owner's Representative Services - Wagley Rol
City Project #: 104154
Work Type Desc:
JDesign Services
supplier Instructions:
FID:
City Sec Number:
Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order:
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Name: Freese and Nichols, Inc.
Supplier's PM: Chris Bosco, P.E.
Supplier Invoice #: Chris Bosco, P.E.
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Pay Items
31 - Conceptual Design
31 - Conceptual Design
Description
Totals This Unit:
email: Chris.bosco@freese.com
Office Address 801 Cherry Street # 280OFort Worth, Texas 76102
Telephone: 817-735-7359
Fax:
Remit Address 801 Cherry Street # 280OFort Worth, Texas 76102
Agreement
Amount
$99,650.00
$779,980.00
$879,630.00
Agreement LTD
Amendment Amendment Amount to Completed
Number Amount Date Amount
$879,630.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current
Invoice
Remaining
Balance
$99,650.00
$779,980.00
$879,630.00
Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH.
� SubmR Ownefa Rep ContrectAmeMmem
City Oouncll Approval Owner's Rep Contract
City Council Meeting -Amendment Approval
Owner's Rep Services (Contract Arrendmiz
1 1-1.3 M—ly nawda and tic —ies
1.4 Protect CooMFao. antl Meetings (Pre -Design Phase)
21 Coordination.. Oily A9orney ORce
22 Fen WorIM1 Deaign Bmle Contract eawbpment
2.2.1 Coomination Meeting W Review Contract
1.3 UB Team Outreach (Pre-aolicitatlon Meeting)
2 4 DB Teem Sohceahon'Leger ¢I Interest' (RFO) (Mbsons)
2 5 DB Teams RFO Evaluation & Shodlist
2.6 DB Team - RFP Completlon (Milestone)
2 ] DB Teams Technial Proposal Develop—ne
2 B DB Prepare Team Sela— Creena (Cay & OR)
29 DB Team Interviews & Evaluation
2.10 DB Team Selecuon (Mi,,Wne)
211 Contract Nagokaaon
Contract Award and Execution
City Council Contract Approval
Dam cnlm,mn (adrvey)
Alignment and Concept Development
Prepare Design Criteria Package (OCP)
3 6 FIIIII,e Irk, Conflict Analysis
3 8 Roadway Design Package (20h Design)
3 8 Prepare ROW and Easement Footpnnt
3 9 Prepare H&H D2lnage Models
OCP Review Meeting
Compieted DCP (Milestone)
Franchise WIN.
UWty Ccardmaton
Owner's Representation Proqram Schedule
(Wagley Robertson Road)
—e. amn Ha. �Pm rreR� 1- 1
Wagley Robertson Road DB Project
0 deya Thu —1 Thu BI3R3
Submit Owner's Rep Contract Am¢ndment L. 39 days Thu 813123 Tue 9/26rza2
City Council Approval Owners Rep Contract
0 days Tuew-3 Tue—M33
city Connell Meeting -A mend ment Ap Novel C 9126
Owner's Rep Services (Contract Amendment)
1.0 Project Management
s mona wedsmlz3 Tae sanaa
1.1.1.3 Monthly Reports and Schedules
9mom Wed e/271231 Tue6141244
1.4 Project Coordination and Meetings (Pre -Design Phase)
�® 1 2.0 Design Build+eam Selection
20 days Thu 5rzW2a Wetl W21rz3
0 fi0 tlays Fn 6rz123 TM1U Brz4rz3 2.1 Coordination with city Arrnay Office
2.2 Fort Worth Design Build Contrail Development
0 tlays Fri 0/18123 Fri 8118123
2.2.1 Coordination Meeting to Review Comm O 8/18 1
0 tlays Fd 9I1123 Fri 911123
2.3 DB Team Outreach (Pre -Solicitation Meeti )
25 re, Mon 11-33 F. 12/1512313
2�6 DB Team Solicitslion "Lefler of Interest" (RFO)(Milestone)
25 days Mon 1VIW23 Fr11)19/2414
2.5 DB Teams RFO Evaluation 8 Shortlist
0 days Fri 1/19RA Fri 1119CA15
2.6 DB Team - RFP ompletion (Milestonh) 1119
.days Mon 1/22124 Fd 3I15rz4 to
2.] DB Teams Technical Proposal Development
20 tlays Mon 1rz2121 Fn 2/1fi12416
2.8 B Prepare Team Selection Criteria (City 8 OR)
20 days Mon 3/1&24 Fd 4112rz41]
2.9 DB Team Interviews &Evaluation
0 days Fri d11212/ Fri 0112YlA 18
.1D DB Team Selection (Milestone) 4/12
25 days Mon 4/i5120 F. 5/1 T/2620 I
2.11 Contract Negotiation
42 days Mon 5/20124 Tue 7116rz421
a days Tue]116124 Tue]I1612422 Contract Award and Execution
City) Council Contract Approval O 7116
�® 3.0 Design Criteria Package
0 deya W ed 7126/23 Wed 7l26/23
Data Collection (Survey) 7126
W tlays wed ]rz612a Tue 9-5 h
Alignment and Ctncept Developmem
W days Wetl 9I6123 Tea 1—M Prepare )as! n Criteria Package
(DCP)
10tlays Wetl 916/23 Tue 9/19rz326
3.6 Franchise (Utility Conflict Analysis
3o days Wed 9023 Tue 10/11Y2326
3.8 Roedw'�y Design Package (20% Design)
10 tlays Wed 10/1&23 Tue 10/31Y1329
3.8 Preppre ROW and Easement Footprint
45daye Wetl 10/1&23 Tue1211gI—
�A Prepare H&H Drainage Models
0 days Tue 12119/23 Tee 12119M331
D P Revi— Meeting hVlg
5 days wee lvzaza Tee lvzsrzaaz
Completed DCP (Milestone)
220 days Wee srzorza Tea I13 Franchise Utilities
11 moos Wed s/20123 Tue P23rza28
Utility Coordination
®® 4.0 $urveyr SUE and otechnical 1
Owners Representative Services- Wagley Robedson Road R.-Sul awz3
��
W _ CPN 104154
FORT WORTH.
Owner's Representation Proqram Schedule
(Wagley Robertson Road)
c "I. a
at&42Prepare Easement RO and Documents
�De and
50 days Wed 11/11A Tue 1/9A30
11 8 4.2 Prepare ROW and Ea.ement Documents
43&04 Subsurface Unit, Engmeenng
4odeys W. 92]l23 Tue 1121 R36
T
6.3 8 d 4 Subsur/ace Utility Engineerig
45 Gsolechniwl Inv estigatlon
40 days Wed 92]l23 Tue 11121/234
6.5 GB•eechnical Investigation
5.0 Right-of-way, Incquistion Services
• 51 ADD2isals
6o days®®3]
.,
• 5.2 RO Negotiations and Closing
12 moos Wed 413124 Tue 3141254t
t�5.1 Appraisals
5.2 ROW Negotiations and Closing
6.0 Construction Phase Services
General Owners RepresenUtlontlurflg Consiructlon
14mons
.. .,
General Owners Retesentation during Construction r
. "• = " • .. r -
"'
Design Build foam (Design and Construction)
Design D—Ibprv-(20%to]0%)
70 days VVW W17124 Tue 1012212422
Design Development (!0% to ]0%)
0 Owneys Rep & CM Plan R.-15
days W.10/23I2A Tue 11/12Y1446
Public Meeting
0 tlays Tue 10122124 Tue 102212A 46
Owner's Rep & CitWian Review
Public Meeting O 1e'22
4 Flnal 100°k Design (Signetl antl Sealetl)
00 tlays Wetl 11/13124 Tue 1lI1254]
[ Final 1001 Design (Signed and Sealed)
ULlity CooNine4on & Ralorabon
S moos W. ]2M20 Tue 3I4R535
Y U ility Coordination & Relocation
6 DB Team Prepares Final GMP
if
25 days Wed /13124 Tue 12i1]1244]
Review Coliabond—on GMP
20 tlaysGMP
and
�Pr"``'ina'GM`
Collboration ou GMP
antl Funtlin g Appropdatbns antl Council Approval
45 days Wed 1/15125 Tue 3/1s12552
MP and Funding Appropriations and Council Approval
City Council Contract Approval
adays Tue 3l1&2 Tue 311ena 53
City Council Contract Approval G 3lift
Constructlon -35
14 moos Wetl 3/19I25 Tue 4/142654
i .Dnsiruction
Owners Representative Services - Wagley Robertson Road
CPN 104154
VM aenssc sui asrzs
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/12/23 M&C FILE NUMBER: M&C 23-1053
LOG NAME: 2023 FREESE AND NICHOLS ARTERIAL PROJECTS
SUBJECT
(CD 7, CD 8, and CD 10) Authorize Execution of Amendments to Two Engineering Services Agreements, Each with Freese and Nichols, Inc for
the Everman Parkway and Wagley Robertson Arterial Roadway Projects, Adopt Appropriation Ordinances and Amend the Fiscal Years 2024-
2028 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Amendment No. 1 to City Secretary Contract Number 59439, an Engineering Services Agreement with Freese and
Nichols, Inc. in an amount of $896,440.00, for additional professional services associated with the Everman Parkway Project, for a total
contract amount of $996,220.00 (City Project No. 103271);
2. Authorize execution of Amendment No. 1 to City Secretary Contract Number 59368, an Engineering Services Agreement with Freese and
Nichols, Inc. in an amount of $771,850.00, for additional professional services associated with the Wagley Robertson Project, for a total
contract amount of $871,500.00 (City Project No. 104154);
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Drainage Rev Bonds Series 2023 Fund,
by increasing estimated receipts and appropriations in the Wagley Robertson Arterial Project (City Project No. 104154), in the amount of
$2,000,000.00 and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping Programmable project (City
Project No. P00120) by the same amount;
4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects Fund, by
increasing estimated receipts and appropriations in the Wagley Robertson Arterial Project (City Project No. 104154),in the amount of
$3,000,000.00 and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping Programmable project (City
Project No. P00120) by the same amount; and
5. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
In May 2023, kickoff engineering services contracts with Freese & Nichols, Inc. were administratively approved for a limited scope of work for
Design -Build Owner's Representative services associated with the Everman Parkway and Wagley Robertson arterial roadway projects. The
contracts are intended to expedite critical early project activities while the remainder of the contract scope is negotiated. The purpose of this
Mayor and Council Communication (M&C) is to authorize the execution of Amendment No. 1 to each of the engineering services contracts with
Freese and Nichols, Inc. for the remainder of the required services not included in the kickoff contracts as follows:
1. Contract No. 59439 for the Everman Parkway Arterial Project, between Cameron Hill Point and Rosedale Springs Drive, which was
administratively approved on May 20, 2023 in the amount of $99,780.00, is being amended in the amount of $896,440.00 for a total
contract amount of $996,220.00 and,
2. Contract No. 59368 for the Wagley Robertson Road Project between Coneflower Trail and Quicksilver Trail, which was administratively
approved on May 9, 2023 in the amount of $99,650.00, is being amended in the amount of $771,850.00 for a total contract amount of
$871,500.00.
Amendment No. 1 for each project revises the contract scope to include services relating to the development of Design -Build procurement
documents and processes, preliminary engineering services, assistance and advisory roles in procurement, and implementation of the Design -
Build contract.
The Everman Parkway project, contemplates the design and construction of a four -lane divided arterial with associated stormwater improvements,
wide sidewalks, and street lighting, and includes a railroad overpass.
The Wagley-Robertson Road project will replace a two-lane rural road with a four -lane divided arterial, stormwater infrastructure, and street lighting.
The project contemplates significant drainage improvements to remove the existing roadway from the floodplain and to reduce the chances of
roadway overtopping currently experienced. In 2022, when the project was added to the 2022 Bond Program, Transportation Public Work's
Stormwater Division agreed to participate in the project with a contribution of $5,000,000.00. This M&C will appropriate those funds into the
project. The following table summarizes previous contract actions and amendments:
The additional Stormwater funding for this project was not included in the FY2024-2028 Capital Improvement Program because the sources of the
additional funding were unknown at the time of the CIP development. The action in this M&C will amend the FY2024-2028 Capital Improvement
Program as approved in connection with Ordinance 26453-09-2023.
Funding is budgeted in the TPW Dept Highway & Streets Department's Stormwater Capital Projects and Drainage Rev Bonds Series 2023 Funds
OwnersRepresentativese
for the purpose of funding the Wagley Robertson project.vices— Wagley RobertCPN 1041541M154
Everman Parkway
Initial Contract 59439, May 20, 2023, administratively approved, $99,780.00, CPN 103271
Wagley-Robertson
Initial Contract 59368, May 9, 2023, administratively approved, $99,650.00, CPN 104154
The following table summarizes the total project funding for Everman Parkway:
Fund Existing Additional Project Total
Funding Funding
34027- 2022 Bond Program Fund $11,100,000.00 0.00 $11,100,000.00
30108- Transportation Impact Fee $400,000.00 0.00 $400,000.00
Cap Fund
0.00
30104 — Developer Contribution Fund $3,066,876.54 $3,066,876.54
30106 — Intergovernmental $15,350,000.00 0.00 $15,350,000.00
Contribution Fund
39008 — Trans Impact Fee Cap $400,000.00 0.00 $400,000.00
Legacy Fund
Project Total $30,316,876.54 $0.00 $30,316,876.54
DVIN-BE Office: Freese and Nichols, Inc is in compliance with the City's Business Equity Ordinance by committing to 30% MWBE participation
on this project. The City's MWBE goal on this project is 13%.
This project is located in COUNCIL DISTRICT 8.
The following table summarizes the total project funding for Wag ley -Robertson:
Fund Existing Additional Project Total
Funding Funding
34014- 2014 Bond Program Fund $4,500,000.00 0.00 $4,500,000.00
34027- 2022 Bond Program Fund $11,000,000.00 0.00 $11,000,000.00
52008 — Drainage Rev Bond Series $2,000,000.00 $2,000,000.00
2023 Fund
52002 — Stormwater Capital $3,000,000.00 $3,000,000.00
Projects Fund
Project Total $15,500,000.00 $5,000,000.00 $20,500,000.00
DVIN-BE Office: Freese and Nichols, Inc is in compliance with the City's Business Equity Ordinance by committing to 23% MWBE participation
on this project. The City's MWBE goal on this project is 20%.
This project is located in COUNCIL DISTRICT 7 and 10.
FISCAL INFORMATION / CERTIFICATION: Owners Representative Services — wagleyRobertsonRoad
CPN 104154
The Director of Finance certifies that funds are currently available in the SW Hazardous Rd Overtopping project within the Stormwater Capital
Projects and the Drainage Rev Bonds Series 2023 Funds and upon approval of the above recommendations and adoption of the attached
appropriation ordinances, funds will be available in the Stormwater Capital Projects and the Drainage Rev Bonds Series 2023 for the Wagley
Robertson project to support the above recommendations and execution of the amendments. Prior to an expenditure being incurred, the
Transportation and Public Works Department has the responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: William Johnson 5806
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
Owner's Representative Services — Wagley Robertson Road
CPN 104154
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Wagley Robertson Rd
Owner's D-B Rep Amendl - FNI
M&C: 23-01053 CPN: 104154 CSO: 59368 DOC#:
Date:
To: Name
Department
Initials
Date Out
l . Chris Bosco -Signature
FNI
Dec 21, 2023
2. David Kastendick-Signature
TPW
D9
Dec 21, 2023
3. Raul Lopez -Review
TPW
C-Z
Dec 21, 2023
4. Lissette Acevedo -Review
TPW
o(w
Jan 3, 2024
5. Patricia Wadsack-Review
TPW
Jan 9, 2024
6. Lauren Prieur-Signature
TPW
Jan 9, 2024
7. Doug Black -Signature
Legal
d.b wb
Jan 10, 2024
8. William Johnson -Signature
CMO
W,
Jan 10, 2024
9. Jannette Goodall
CSO
7SG
Jan 10, 2024
10. TPW Contracts
TPW
CC: TPW BSPAP Recon Team, TPW Records
Room, Michelle McCullough
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any and
all City Departments requesting City Manager's signature for
approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has
signed the routing slip, David will
review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(&,fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!