HomeMy WebLinkAboutContract 55428-CO4CSC No. 55428-CO4
FORTWORTU,
City of Fort Worth
Change Order Request
Project Name North Riverside Drive Shiver Road to N Tarrant Parkway
Client Project #(s)l 100453
Project Description
Contractorl
City Project Mgr.l
I City Sec # l 55428
Reconstruction of N Riverside Drive increasing capacity from two to four lanes with the addition of shared use paths, drainage, lighting and related
infrastructure improvements. Includes reconstruction of intersection at N Tarrant Pkwy, including new signals and accessibility improvements.
McMahon Contracting Change Order #1 4 1 Date
Bradley Radovich City Inspectorl
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$6,208,416.20
$798,657.03
$7,007,073.23
$67,548.31
$7,074,621.54
$1,062,800.00
$264,142.97
12/19/2023
Stanley Sutterfield
Contract Time
Totals (CD�
$6,208,416.20 30
$798,657.03 90
$7,007,073.23 520
$67,548.31 0
$7,074,621.54 520
$1,062,800.00
$264,142.97
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 13.95%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $7,760,520.25
The scope changes associated with this change order includes electrical revisions to two streetlights; One streetlight was relocated to accomodate the addition of left turn lane
as described in CO #3 for this project, and the other pole was relocated to provide additional clearance from the curb as a result of being struck by a semi truck. The additional
turn lane caused a revision to the overall lighting and power plan in the area. The additional contract time for this work was included in CO #3. Also included in this CO is a
retrofit to the short retaining wall at the North end of the project. Normal movement of the wall was restrained by the adjacent sidewalk, curb and gutter, the adjacent inlet
structure, and roadway section. The retrofit isolates the sidewalk from natural movement of the stiffer adjacent retaining wall and roadway structure. These repairs were
designed by the project consulting engineer. No additional time is requested as this work was performed by a sub -contractor concurrently with the rest of the project
construction. Additionally this Change ordeer includes a final reconciliation between installed quantities and measured quantities from the As -Built survey performed by the
Consulting Engnineer for the major work items of Concrete Paving, Sidewalks and Driveway approaches. A summary of the As -Built Quantities is attached. Unit prices
presented here follow contract unit prices where applicable. Unit prices for items not included in the original bid were evaluated by City staff and the design consultant against
unit prices for recent TXDOT and CFW project unit prices and were found to be reasonable and comparable. This evaluation is available in the project files.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ntractor's Company Name ontractor Name Contract Si nat W Date
McMahon Contracting, LP Scott Cummings ° Jan 4, 2024
Inspector/Inspection Supervisor
Date
Project an ontract Compliance Manager
Date
Dec 22, 2023
1_4�. /w�
Dec 22, 2023
Program Manager
Date
Senior Capital Project Officer
Date
Jan 4,2024
.�Qd-
Jan 8, 2024
Assistant Director (Dept)
Date
Director, Contracting Department Dept
Date
Jan 9, 2024
Jan 9, 2024
Assistant City Attorney
Date
lAssistant City Manager
Date
Jan 10, 2024
,,..
Jan 11, 2024
Council Action if quired
M&C Number I NR
4,po4UOgnIl
ago ^9ao"
Jannette Goodall, City Secretary pvoo=d
b
dad n�454ga
M&C Date Approved I NR
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT W/�R_ TH City of Fort Worth
`' Change Order Additions
Project Name 1 North Riverside Drive Shiver Road to N Tarrant Parkway City Sec # 55428
Client Project # 1 100453 1
Contractorl McMahon Contracting I PMI Bradley Radovich I Inspectorl Stanley Sutterfeld I
Change Order Submittal # ® Date 1 12119/2023 1
ADDITIONS
HEM
UESCRIP I IUN
UEP I
Uty
Unit
Unit Cost
I otal 1
39
2605.3016 2" Conduit PVC Sch 80 ST�
TPW
270.0
LF
$45.O0
I
$12,150.001
NEW
2605.3016 2" Conduit PVC Sch 801
TPW
125.1J
LF
$50.00
$6,250.001
Exploratory Excavations
TPW
5.0
EA
$475.00
$2,375.001
Fumish/Install TY (A) Ground Box W/Lid (34 41 10)
TPW
2.1J
EA
$1,800.00
$3,600.001
55
Rdwy Illumination Foundation TY 3, 5, 6, and 8 (34 41 20)
TPW
1.0
EA
$3,800.OU
$3,800.001
Demo Street Light Foundation 2' Below Grade
TPW
1.1J
EA
$1,315.00
$1,315.001
NEW
SubContractor Markup
TPW
LQ
LS
$5,898.00
1
$5,898.001
NEW
Retaining Wall Modifications.
TPW
1.000OOOOU
LS
$24,087.00
1
$24,087.001
NEW
Tree Removal (For driveway construction)
TPW
1.000OOOOU
LS
$735.00
1
$735.001
7
4" Conc Sidewalk
TPW
2,262.000OOOO1J
SF
$6.44
1
$14,567.281
8
6" Concrete Driveway
TPW
1,268.000OOOO1J
SF
$5.58
1
$7,075.441
Traffic Control
TPW
3.000OOOO1J
MO
$2,917.61
1
$8,752.831
5
6" Conc Median
TPW
280.000OOOO1J
SF
$32.53
1
$9,108.401
Tf'W $99,713.951
1
1
1
Sub Total Additions $99,713.961
Change Order Additions Page 2 of 4
FO1¢_OeTH City of Fort Worth
Change Order Deletions
Project Name 1 North Riverside Drive Shiver Road to N Tarrant Parkway City Sec # 1 55428
Client Project # 1 100453 1
Contractorl McMahon Contracting I PMI Bradley Radovich I Inspectorl Stanley Butterfield I
Change Order Submittal # ® Date 1 12/19/2023 1
I I tM
1.1 1 u" concrete Paving
DELETIONS
UtSUKIF'I IUN UFF'I U Unit Unitl:ost total 1
I F'vv 466. UUUUUUU SY $66./3 $32,1155.1i41
1
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
1
TM $32,165.641
1
1
1
Sub Total Deletions $32,165.641
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
See attached Acceptance of Prev Commitment NA
Total $0.00
Previous Change Orders
Co # DATE I AMOUNT
$0.00
$457,278.89
$341,378.14
Total I $798,657.03
EMAHON
CONTRACTING L.P.
Riverside Phase 4
DETAILED COST BREAKDOWN
Hooded Turn Lane Illumination
LABOR
DESCRIPTION
LABOR COST
LABOR MARKUP
155% LABOR BURDEN
TOTAL LABOR COST
EQUIPMENT
DESCRIPTION
EQUIPMENT COST
115% EQUIPMEi T MARKUP
TOTAL EQUIPMENT COST
MATERIALS
DESCRIPTION
MATERIAL COST
MATERIAL MARKUP
TOTAL MATERIAL COST
SUBCONTRACTORS
I DESCRIPTION
12" CONDUIT PVC SCH 80 (T)
12" CONDUIT PVC SCH 80 (B)
EXPLORATORY EXCAVATIONS
FURNISH/INSTALL TY (A) GROUND BOX W/LID
�RDWY ILLUMINATION FOUNDATION TY 3, 5, 6, AND E
DEMO STREET LIGHT FOUNDATION Z BELOW GRAE
SUBCONTRACTOR COST
SUBCONTRACTOR MARKUP
TOTAL SUBCONTRACTOR COST
COSTSUMMARY
TOTAL LABOR COST $
TOTAL EQUIPMENT COST $
TOTAL MATERIAL COST $
TOTAL SUBCONTRACTOR COST $
1% BOND $
TOTAL COST $
Total Cost: $
Unit Cost: $
HR
Hr
EXTENDED
QTY
UNIT
REQUIRED
RATE
COST
Hr
190.00
$ 48.00
$
Hr
190.00
$ 25.00
$
Hr
190.00
$ 24.00
$
Hr
190.00
$ 22.00
$
Hr
190.00
$ 21.50
$
Hr
190.00
$ 19.00
$
15%
$
HR
HR
EXTENDED
QTY
UNIT
REQUIRED
RATE
COST
HR
190.00
$ 119.00
$
HR
190.00
$ 45.00
$
HR
190.00
$ 18.00
$
HR
190.00
$ 49.00
$
15%
$
UNIT
EXTENDED
QTY
UNIT
COST
COST
TN
39.00
$
LF
27.60
$
15%
$
UNIT
EXTENDED
QTY
UNIT
COST
COST
270.00
LF
$ 45.00
$ 12,150.00
125.00
LF
$ 50.00
$ 6,250.00
5.00
EA
$ 475.00
$ 2,375.00
2.00
EA
1800.00
$ 3,600.00
1.00
EA
3800.00
$ 3,800.00
1.00
EA
1315.00
$ 1,315.00
$ 29,490.00
20%
$ 5,898.00
$ 35,388.00
35, 388.00
353.88
35,741.88
35,741.88
35,741.88 1 EA
EMAHON
CONTRACT►Il6 L.P.
Riverside Phase 4
DETAILED COST BREAKDOWN
Sidewalk Retaining Wall Modifications
LABOR
HR Hr EXTENDED
DESCRIPTION QTY UNIT REQUIRED RATE COST
Foreman - Utility
0.00
Hr
190.00 $ 48.00
$
Operator - Backhoe
0.00
Hr
190.00 $ 25.00
$
Operator - Excavator
0.00
Hr
190.00 $ 24.00
$
Pipe Layer
0.00
Hr
190.00 $ 22.00
$
Laborer - Skilled
0.00
Hr
190.00 $ 21.50
$
Laborer - Common
0.00
Hr
190.00 $ 19.00
$
$
LABOR COST
$
LABOR MARKUP
15%
$
155% LABOR BURDEN
$
TOTAL LABOR COST
$
EQUIPMENT
HR HR
EXTENDED
DESCRIPTION
QTY
UNIT
REQUIRED RATE
COST
1330 Track hoe
0.00
HR
190.00 $ 119.00
$
113ackhoe
0.00
HR
190.00 $ 45.00
$
�Foreman Truck
0.00
HR
190.00 $ 18.00
$
�Sheeps Foot Compactor
0.00
HR
190.00 $ 49.00
$
$
1EQUIPMENT COST
$
1 15% EQUIPMENT MARKUP
15%
$
TOTAL EQUIPMENT COST
$
MATERIALS
UNIT EXTENDED
DESCRIPTION
QTY
UNIT
COST COST
13/4" ravel Bedding
0.00
TN
39.00 $
18" C900 PVC Pipe
0.00
LF
27.60 $
1
$
MATERIAL COST
$
MATERIAL MARKUP
15% $
TOTAL MATERIAL COST
$
SUBCONTRACTORS
UNIT EXTENDED
DESCRIPTION
QTY
UNIT
COST COST
Sidewalk Retaining Wall Modifications
1.00
LS
$22,940.00 $ 22,940.00
$
$
$
$
$
$
$
SUBCONTRACTOR COST
$ 22,940.00
SUBCONTRACTOR MARKUP
5% $ 1,147.00
TOTAL SUBCONTRACTOR COST
$ 24,087.00
COSTSUMMARY
TOTAL LABOR COST
$
TOTAL EQUIPMENT COST
$
TOTAL MATERIAL COST
$
-
TOTAL SUBCONTRACTOR COST
$
24,087.00
1%BOND
$
240.87
TOTAL COST
$
24,327.87
Total Cost: $
24,327.87
Unit Cost: $
19.62
1240 SF
EL CALA CONSTRUCTION, LLC
"CONCRETE"
BID PROPOSAL
Bid Date: 9/15/2023
General Contractor: McMahon Contracting Contact: Andrew Marquez
Project: North Riverside Drive Phase 4 - Modifications Phone: 817-908-2704
Project Address: Email: andrewm@mcmahoncontracting.com
SCOPE OF WORK: 03300 CONCRETE - PROVIDE MATERIAL, EQUIPMENT, LABOR, TOOLS, AND INSURANCE FOR NEW CONCRETE
Item Number Description Spec Number Unit Quantity Unit Price Extended Price
Demo and Haul Off 4" Concrete SF 1240 $ 3.00 $ 3,720.00
Install New 10" Concrete Sidewalks SF 1240 $ 15.50 $ 19,220.00
1. Per New City of FW Detail $ $
2. Proposed - Demo and Pour Back in (2) Two Times $ $
3. Reference to Sheet 92A $ $
$ S
$ S
$ S
Total S 22,940.00
Construction Cost Total S 22,940.00
I NOTES:
11. Surveying & Staking - xcluded
12. Joint Sealant - Excluded
13. Permits - Excluded
14. Testing Lab - Excluded
I5. Subgrade to be accepted at +/-0.10
16. Proposal is Good for 6 Months and is Subject to Price Increase
I
Acknowledge Addendum: None I
BID INCLUDES: In addition to the above items: Mobilization and demobilization, equipment, concrete tools, excavation, fine grading, furnish and install rebar, epoxy,
smooth or rebar dowels, expansion joints, red wood, construction joints, hand tools or saw cut control joints, cure compound, stripping forms, daily cleaning, cleaning site,
safety, and GL and WC's insurance; per plans and specifications and meet requirements to complete job. This job must be performed during normal business hours.
Monday thru Friday from: 7:00a.m. to 5:00p.m.
BID EXCLUDES: Surveying, staking, saw cut existing concrete, demolition and removal, clear & grubbing, crane, furnish and install select Till, lime stabilization, carton
void forms, soil retainer board, HES concrete material, french drain, granular fill, entry sign, grass, glue, bollards, water stop, testing lab, cylinders, proctors and densities
testing, asphalt paving, asphalt patching, furnish and install pvc sleeves, core drilling, hand rails, tree removal, any underground utilities, traffic control, barricading, site
joint sealants, landscaping and irrigation, re -grassing disturbed areas, pruning trees, water, material sales taxes, any permits, striping, signage, brick pavers, and surety
bond. Work on Saturday, Sunday or more than 10 hours per day is additional charge to the contract.
Westwood
Transportation & Public Works Department
City of Fort Worth, Texas
N. Riverside Drive - Phase 4
City Project No. 100453
Final Concrete Pavement Quantities (As -built)
DESCRIPTION
Final'boncrete Pavement Quantities (As -built)
Roadway Concrete Pavement
Concrete Sidewalk / Shared Path
Concrete Driveway Approach
Concrete Median
UNIT I QTY
SY 30,583
SF 53,720
SF 23,512
SF 3,969
Notes:
1- As -built was completed in December 2023 after the completion of Rev12.
2- Sidewalk Concrete quantities do not include curb ramps..
3- Portion of OT Driveway approach on NTP was reconstructed around 06/2022 based on site visit record.
9800 Hillwood Pkwy., Suite 250
Fort Worth, TX 76177
(817)562-3350
Prepared By: R.G.
Checked By: B.H.
Date: 1211312023
FORTWORTH
Routing and Transmittal Slip
TPW Capital Delivery Dept
DOCUMENT TITLE: Change Order #4— N Riverside Drive
M&C 23-0568 CPN 100453
DATE: 07-06-2023
TO:
CSO #55428 DOC# 1
1. Scott Cummings-
ScottC@mcmahoncontracting.com
Department
McMahon -
INITIALS DATE
OUT
S SC Jan 4, 2024
2. Stanley.Sutterfield@fortworthtexas.gov
TPW
Inspector -
HS',S
Dec 22, 2023
Signature
Hss
3. Bradley Radovich
TPW — PM
BMR
Signature
BMR
Dec 22, 2023
4. Raul Lopez- Program Manager
TPW -
Signature
AA
Jan 4, 2024
5. Lissette Acevedo Snr Capital Project
TPW -
Officer
Signature
Jan 8, 2024
6. Patricia Wadsack-Assistant Director
TPW
]►� �� /�
L Jan
9, 2024
Signature
l� f Y
7. Lauren Prieur - Director
TPW -
Jan 91 2024
Signature
ALP
8. Doug Black
City Attorney
dwb
Jan 10, 2024
9. William Johnson — ACM
CMO-
Signature
W,
Jan 11, 2024
10. Jannette Goodall
CSO
, ,7cr
Jan 11, 2024
DOCUMENTS FOR CITY MANAGER'S SIGNTURE:
All documents received from any
and all City
Departments requesting City Manager's signature for approval MUST BE
ROUTED TO
THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David
will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑ No
RUSH: ❑ Yes ❑ No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No
ROUTING TO CSO: XX Yes ❑ No
Action Required:
FORT WORTH
❑ As Requested ❑ Attach Signature, Initial and Notary Tabs
❑ For Your Information
❑ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call Bradley Radovich at 682-432-4525 for pick up when completed. Thank you.
Memo to CO 4 — N Riverside Drive CPN 100453
The Contractor has completed the work that included an additional LT lane requested by Assisted Living
just N of N Tarrant Parkway. This change order covers the reconciliation of installed items and the final
measured as -built survey performed by Peloton Land Solutions. The project has had final walk through
and this CO contains the McMahon's final negotiated invoiceable expenses prior to project closeout.