Loading...
HomeMy WebLinkAboutContract 41910-A6 CITY SECRETARY CONTRACT NO. AMENDMENT NO. 6 TO CITY SECRETARY CONTRACT N' . 41910 SYSTEM PURCHASE AGREEMENT BETWEEN CITY OF FORT WORTH AND MOTOROLA SOLUTIONS INC. This Amendment N'o�. 6 ("Amendment") to City Secretary Contract No. 41910 System Purchase Agreement ("Agreement"), is made and entered into by and between the City of Fort Worth the "C,ity"), a home rule municipal corporation situated in portions of T'arrant, Denton, and Wise Counties, Texas acting by and through Susan Alanis; its duly authorized Assistant City Manager, and Motorola Solutions, Inc., ("Consultant"), acting by and through Dan Delaney its duly authorized MSSI Vice President, collectively referred to as the "Parties." RECITALS The following provisions are true and correct and form the basis of this Amendment.. WHEREAS, on or about June 14, 2011, the parties entered into a System Purchase Agreement ("Agreement") to purchase a P25 Radio Communication System. The Agreement is a public document on file in the City's Secretary Office and referenced as: City Secretary Contract No. ("CSC") 41910-7 and WHEREAS, on or about May 23, 2012, the parties subsequently amended the Agreement via CSC No. 4191 O-Al I to incorporate changes a:lgreed, to: during, the Design Review and in accordance with the Agreement, to modify pricing structure, system description, scope of services, acceptance testing, equipment, LTE services, and other items as deemed necessary and agreed to by the Parties,- and further amended the agreement on or about' May, 23, 2012, o. via CSC N 41910-A2, to extend the pricing provision and modify provisions for equipment, storage; and, further amended the Agreement on or about August 1, 2012,1 via CSC No. 419101- A-3 to incorporate changes in the Astro, Repeater (ARS) site location from Texas Motor Speedway "T' S" to American Tower Corporation Roanoke Site ("Roanoke ATC"); and further amended the Agreement on or about January 251, 2013, via CSC No. 41910-A-4 to incorporate changes for subscriber hardware and installations,: training, and work at radio sites deemed necessary and agreed to by the Parties and further amended the Agreement on or about April 2,61 2013, via CSC No. 41(91 01-A-5 to incorporate changes in design, equipment, and installation, for work at Burnett Plaza %".)it,e, Roanoke Site, Bergh 2 site, and Eagle Mountain Site. CSC Nos. 419107 41910-Al, 4,19,101--A2, 41910-A31 41910-A4, and 41910-A5 are hereby collectively referred to as the ("Agreement"); and WHEREAS;, the Parties now wish to amend the agreement to incorporate changes in design, equipment, installation and work at Burnett Plaza Site, Eagle Mountain Site, Rolling Hills Site) North Beach Site, Roanoke Site, Bergh, Site, Bolt Street Site, and Westland 6 ,Site.. CFW/MOTOROLA mrjmmwvor&� Amendment No.6 to CS,C New 41910 OFFICIAL RECORD Page I CITY'SECRETARY RECEIVED AUG 19 2013 FTe WORTH,TX NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby a�cknowl�edged�, the City and Consultant agree as follows,- 1. The agreement shall be modified to incorporate changes, in design, e�qu%pment, installation and work as agreed to by the Parties set forth herein and in Exhibit "A," Change Order No. 6 and the attached documents, including the Burnett Plaza Site Statement of Work (S,OW), and the Change Order Pricing Summary; all of which are attached hereto or incorporated by reference and hereby made part of this Agreement. 2,. All other provisions of the Agreement that are not expressly amended herein shall remain in full force and effect. Executed on this the ay of 2013. ZT_ CITY OF FORT WORTH. MOTOROLA SOLUTIONS, INC.: yil B By. 7 6usjan Alanis A V C,-C /1,C + sss 1N itant City Manager Date.- <e? Date., VOR ATTES 0 By *a rY' J. a JP City Secr ary APPROVED AS TO FORM AND LEGALITY: B Maleshia Farmer Senior Assistant City Attorney Contract Authoril'zationw 10 M&C G-17303 Date Approved'. June 14, 201,1 OFFICIAL RECORD 11 1A FFJ :E ORD Y L R C] CITY SECRETARY CFW/MOTOROLA T Mo TH TX 9rV Amendment No.6 to CSC No.41910 A% Page 2 rFT,VORTHIs morojwoLA SOL UTIONS (03"HANGE ORDER EXHIBIT "A" Change Order No. 6 Date., _ju 2013 Project Name.- Fort Worth P25_Pp9rade Prqjpct-TX-1101192A customer Name: - of"Fort Worth Cus,tome'r Project Mgr- Alan Girton ....The._ err of this Chagge Order is to*. 1 Remo ve Sma�rtX Equipment and Services 2. Remove 20 kVA UPS for Burnett Plaza Smart. 3. Add Ultra an 11 Module for External Customer Expansion, 4. Add 3 Waveguides, Fiber, and Coaxial Cable for Burnett Plaza 5. Add Single Instant Recall Recorder for 39, Fire and Police Consoles 6. Add 100 Chargers and 10 Multichargers,for Fire Department 7. Add Coaxial Protection Cages at Westland 6 and Roanoke Radio,Sites Contract# City of.Fort Worth: Contract 41910 Contract Date,.- 6/23/11 Motorola Solutions Contract* 11-1 1006/DL In accordance with,the terms and conditions of the contract,identified above between the City of Fort Worth and Motorola Solutions, Inc., the following changes are approved- Contract Price Aglustments Original Contract Value- $39,35,641.55 Previous Change Order amounts for Change Order numbers 0 through 5 No Price Adjustments Increase project credit from This Change Order-. '$2,263,,301.15 to $2,472,1343.28. Total credit issued with this change order is $209$042.,13 New Contract Value� $39,345,641 55 Completion Date,A4justments Original Completion Date, 12,/31/2014 Current Completion Date pricr to this Change Ordev 2128/2015 Netw Completion Date: N/A Changp�tq_§y �ee p I!q SPA ll�rqvtistonsl, T"here are no changes to the System Purchase A greement (SPA) Provisions with this change order. Chanqf��'in E ment: !.quip The equipment changes are identified in the following attachment, which is incorporated into this Change Order by this reference 1 Chan qe�.Or e. r 6 Pricipq­.Surnmar 0 �y -dated July 3 , �2013 Fort Worth P25 Upgrade R-a 2 Protect MOrOPOLA SOLUTIONS CHANGE ORDER in­qf�s.iwn Services The changes in services are identified in the following attachments, which are incorporated into this Change Order by this reference 1. Change Order 6 Pricing Summary-dated July 30, 2013 2. Chaqqe '**krder 6,— Burnett Plaza SOW version 3 chedulle Chaqlps: There are no schedule changes,with this Change Order. Pric*l%��ha g,es: fhe—' 'rice of the contract is not altered with this Change Order. As,a result of this change order, the I outstandinig project purchasing credit remaining available for the City of Fort Worth is changed from $2$2631301.15 to:$2,472,343.28. Total credit s with this chap $209, 2.13. q�order,is 04 _qV Changes. There are no Warranty changes with this Change Order. Customer Respon .ibillftiies: The changes to the customer responsibilities are identified in the following attachment 1. Change Order 6—Burnett Plaza SOW vers,ion, 3 Payment Schedule Changes: J�h�n are Payment Schedule Changes with this Change Order. Unless amended above, all other terms and conditions cwt the Contract shall remain in full force. If there I . are any inconsistencies between the provisions of this Change Order and the provisions of the Contract,, the provisions of the Change Order will rev ail. Reviewed by: Date. -7 101 ns, P e t Manager Reviewed by- Date: Cit of orth Project Manager �e!-t Worth P26 Upgrade Pa.,ge 2 of 2 P r e Change, Order 61— Burnett Plaza Site SOW version, 3 Burnett Plaza is a downtown, high, rise building site that will include civil,construction,, electrical, and antenna system installation services as described in this SOW'. The City of Fort Worth will lease a communications equipment room on the 31't floor for the 1325 system deployment, with anteinna systems installed on the roof above the 42nD floor.Tasks to be involved with this site implementation are described in this Statement of Work. The responsibilities listed in this Change Order 6 Statement of Work replace the responsibilities in the Change Order 5 Statement of Work. All installations will be compliant with City codes and Motorola's R56 Standards and Guidelines for Communications Sites,which include applicable NEC and other guidelines, to the extent,possible. City of Fort Worth Civil and Construction Responsibilities 1. Lease the communications equipment room and rooftop usage as needed for the project 2. Provide and make arrangements for Motorola and Motorola subcontractor access to the site to complete the work 3. Perform engineering and design work of the communications room, and supporting requirements, including: structural analysis, provisions for all power and HVAC systems, any and, all' coring needed for cables and wiring, and advise of any requirements needed to complete the work described, in this SOW 4. Construct the communications room, including, but not limited to: floors, walls, ceilings, doors, lochs, windows, window coverings, lights, HVAC, air dlucts, temperature control, and security equipment 5. Comply with any City codes required for the construction and electrical work 6. Provide the final construction drawings of the leased and support areas for use in completing the work, including Motorola-supplied information for any Motorola equipment or work to be performed 7. Provide the final electrical design, including the main service sizing and electrical one-line drawings 8. Update the final drawings,with Motorola, input of redlines, identifying any corrections needed, as may be decided during construction and implementation 9. Supply the primary 3-phase electrical service, and electrical service panel, inside the, communications equipment room: on the 31't floor— of sufficient capacity to supply ail of the communications equipment and all additional requirements of the communications room, a. The Motorola-supplied U'PS-backed distribution panel will require a 200-amp circuit from the City-supplied main panel 10. Provide the electrical transformer that will supply 120VAC power to the communications equipment, including the UPS-backed electrical panel(s) 11. Install Motorola supplied Type,2 protection on the main electrical service per 11,56 standards 12. All permitting as necessary for work described in this SOW 13. Provide and install generator with fuel tank and all accessories to fully power-back the main panel supplied in the communications room, along with all equipment to be operated in the room 14. Provide cored holes of at least 25"x 25" to support the cable ladder and all coaxial cables between floors that lead up,from the 3,1"floor to the roof.W'ith the exception of the transitions above the 4t floor, cored holes should be positioned,on top of each other, with only minor exceptions in a few areas between floors that may require slight adjustment to the cable ladder path. 15. Burnett Plaza buildling management will need to approve the installation and work before proceeding., 161. Provide and install all telecommunication links for connection to the P25 system or any of the communications equipment 17. Install,any communications equipment needed that is not to be installed by Motorola a. Motorola will install the identified equipment for the P25 radio communications system,, as defined' in the original contract, and this,S,OW b. Motorola will relocate and install the 700 MHz base station for Interface with the Daillas/COlG system in the new,communications room—which was originally provided in the Phase 1 P25 Project 18. Install any necessary sensors and/or wire any alarms for equipment that is not installed by Motorola to the, MOSCAD punch block. For example, door alarms,generator, ATS, dehydrator, Type 2 SPD, and HVAC. 191. Ground any ancillary support items to M,GB or IPGB per Motorola R56 standards (i.e.g, metal door frame, HVAC holusing, City-installed electrical panels, ducts, vents,., etc.) 20. Ensure that 500 kcrnil down conductor is connected'to building electrical service grounding electrode(s) 21. Reposition any electrical devices or conduits, necessary to support the coaxial cable entry on the 31't floor, and the coaxial cable path through the cored-holes to the roof 22. Install any non-UPS backed electrical suibpainiels,acrd ground to IPGB, along with any additional outlets inside the room Motorola Civil, Construction, and Electrical Installation Responsibi 1i-times 1. Supply and install cable tray system 2. Install separate conduit, wire old, or similar power cable raceway, decoupled from the main cable tray, to support the electrical power wiring over the communication racks 3. install 36-hole coaxial cable entry panel on wall leading to adjacent eliectricail,chase area 4. Supply and install copper Master Ground Bus (MGR) under coaxial cable entry panel to support up to 36 2-hoe lug connections 5. Supply and install#2/0 equipment ground bus,on cable tray system per Motorola, R56 standards 6. Transport 64 kVA, UPS, bypass switch cabinet, and battery cabinet from Motorola project warehouse to final site location 7. Install 6,4 kVA UPS, bypass switch, and batteries per floor layout 8. Supply and install one main UPS distribution panel (approximately 201"W x 60"'H x 611D) 9. Supply and install'Type 1 surge protector on UPS-backed distribution panel 10. Supply and install, four 42-circuit electrical subpanels (approximately 20"W x 38"Hi x 6"D) that can support up to 1681 V'AC circuits, backed by the UPS 11. Install up to twelve (12), Motorola-SLippl,ied Transtector OP820 Series Surge Protectors at the top of communication racks a. These will have, to be Installed in a later visit, after communication racks have been installed by others b. Note that 9 of the 12 OP820 SP )s are identified in the current Motorola-supplied floor layout c. Up to 3 additional can be installed for City-supplied communications equipment in the racks, or separate drops (up to 20) can be supplied instead. 'This will be determined in the City's final design prior to instaillation,for a,total,of 15 0 circuits. 12. Individually wire each of eight (8) circuits per OP820 SIT to a 20-amp circuit breaker, in the U'PS- ba,cked electrical suibpa,nel, (up to 9i6 circuits) 13. Supply and install Interior Perimeter Ground Bus, (IRGB) per otoroil,a R56 standards and floor layout,—minimum #1/0 AWG 14. Supply and Install ground wire and bond the following to the MGB or 1PGB per Motorola, R56 standards al., Each of up to 25 commiunication racks and/or cabinets that may be Installed in the room b. Coaxial cable entry (MGB) c. UPS cabinets (MGB) d. Electrical panels (I:PGB) e. Cable tray system (MGB) fw Power raceway system (IPGB) g. Any metal components of the fire suppiression system (TBD) h. Punchblocks if necessary(IPGB), i. Fire extingulis,her attachment, if needed j. Motorola-Installed metal conduit(IPGB) 15. Supply and install R56 compliant"W" rated fire extinguisher 16. Supply and install R5,6 compliant eye-wash kit 17. Supply and install one Personal Protection Equipment (PPE) kit (includes full face shield,goggles, baking soda, acid resistance apron, and gloves)—per R56 paragraph 3.13.2 18. Supply and install punch-block panel with 4 punch blocks for alarm hookups 19. Wire fifty-four (54) 20 amp, UPS backed circuits directly to Moto rola-supplied radio equipment in communication racks. These will have to be installed after the commu n!cation racks of equipment have been insitallled by others. 20. Provide NEC required arc fla,sh and shock hazard warning la,be,ls on all Motorola-Installed electrical equipment added to the building electrical system 21. Label powered component or circuit on each breaker in panel and each 0138 circuit 2,2. Coordinate, attend, and assist manufacturer startup test of UPS 23. Wire available alarms of the following Motorola-installed components to the punch-block panel for Interface with the MOSCAD system-. a. UPS and bypass switch b. Type 1 SPD, 24. Provide redline inputs for correction to the City's construction dra wings, as may apply, at completion of the installation work.The City will formally apply the redline input to the construction drawings. 25. Supply and install Sci'entel,-specified,, plenum, rated 6-strand multi-fiber cable, with connectors, from the 42nd floor communications room,,through existing Burnett Plaza chases, to the 31" floor communications room 26. Supply and install Scientel-specified fiber distribution panels for the 6-strand fiber, on the wall at the nearest practical point to the final communications equipment, and terminate fiber in the distribution panels 27. Supply and install Scientel-specified unistrut and waveguide support materials in 31st floor communications room to support 3 microwave waveguides routed to,the microwave equipmeint location City oif Fort Wori Antenna Systeim Installation Reis ponsi bi lifies, 1. Relocate or remove all existing obstacles, on each floor of the antenna system cabling route, that are necessary to install the, new wave guide and coaxial cables and support ladders or trays, prior to Motorola beginning the innstalilation of the antenna systems and, supports. Obstacles noted, during site walks include,for example, various electrical components,, panels, conduits, piping, transformers, etc. 2. With the exception of the coaxial cable entry to the commun Wations room on floor 31, core all holes necessary for the antenna system, installation, including above the 42nd floor to the roof 31. Provide 1 i 42 antenna for Motorola installation (Siren system) 4. Provide 2 DB224 antennas for Motorola installation (Hiigh Water system) 5. Supply end install jumpers inside of communications room from Moto rolla-insta I led polyphasers to City-installed radios for High Water and Siren systems 6. Supply and install all jumpers and interconnections of Motorola-installed coaxial cables to the N,PSPAC repeaters at such time as the City relocates these to the 31 floor.This will include final termination to the existing antennas, tower mounted amplifier, and repeaters. a. Note:The City will be responsible for any further antenna system sweeps,associated with the completion of the NPSP,A `antenna systern installation, and performance related to existing equipment to be reused 7. Remove previously stored 7'00 MHz rooftop antennas and store,ellsewhere Motorola Antenna System Installation Responsibilities 1. Transport all Motorola-provided equipment to site 2. or with the City of Fort Worth and Burnett Plaza building management to create a final construction schedule, coordinate all installations, and observe any requirements for the work Pre-Work to Antenna System Installations(prior to delivery of Motorola-supplied antenna system i equipment)-. 3. Supply and install 6-hole, 20"' cable ladder between all floors and to the roof level-. up to, 12 floors @ 13 feet per floor 4. Supply and instalil horizontal cable tray and all cable support hardware on 31't floor between the cable entry of the equipment room and the vertical cable ladder a. Provide copper bus bars and bloind to building interior 50O cmil down conductor on 361h and 3,1t floors b. Bond interior cable ladder to, interior 500 kcmil, down conductor on top floor and to bus bars,on 36 th and 31"'floors 5. Supply and install cable tray and all cable support hardware on 41st floor generator room level horizontally(up to 4,0 feet) for further route,vertically to the roof 6. Supply and install cable tray and all cable support hardware in the 41't floor generator room to route all waveguide and coaxial cable to the opposite side of the room , with further routing ,d; through the 42 1 floor and to the roof 7. Supply and instaill, outside "doghouse or coaxial cable covering and protection,, on the roof— obtain Burnett Pliaza approval prior to beginning work 8. 91. Bond exterior cable ladder to LPS down conductor at top and bottom of run —irreversible crimp or cadweld 10. Supply and install any hardware, or work needed to transition coaxial cables to inside, parapet area—with Burnett Plaza approval 11. Supply and install any necessary hardware or cable ladder to top of parapet area (approximatelly 25') for routing coaxial cables to final location of antennas and Tower Mounted Amplifiers (TMAs) 12. Provide and install tinned,-copper external ground bar (EGB) at doghouse entry area, and bond to LP'S down conductor a. Note., tinned-copper will not be needed for internal ground b�alrs, they may be copper only 13. Provide and install' cable entry port panel as needed, 14. Bond doghouse covering, entry port panel, and adjacent vent covering to ECB 15. Bond newly-installed, exterior cable ladder and covering, to LPS down conductor at top and bottom 16. Schedule and provide for hoisting all materials,to the rooftop as may be necessary Antenna System Installations I of 3 (once Motoriola-supplied equipment is del rled).- 17. Transport 8 RF antennas, 2, TMAs, 4 GPIS antennas, all associated i waveguide and coaxial cable, and all ancillary equipment to,the site,for installation a., Note: Two RF antennas and 1 TMA have already been installed and will be used as part of the finilal, 8 P25 system antennas and 3 TM s. New coaxial cable will be supplied and installed to use with these, 2 existing antennas and 1 TM A, as they will be transition,ed to the new 31"t floor equipment r,00lr . b. Note: The, City of Fort Worth will supply 2 additional antennas (0B420 andl 224) for installation of 2 additional radios (Siren and High Water systems). Motorola willl install these antennas, and will supply and install the associated) antenna mounts, plenum and UV rated coaxial cables, connectors, ground kits, hoist grips, polyphasers, and top mounted jump:ers,for these!2 additional radios. 18. Hoist all equipment to rooftop as required 19. Lower previously used 700 MHz Phase 1 COG antennas currently stored on the rooftop, and provide to Fort Worth for relocation and storage. 20. Supply,and install 5 transmit antennas, and 8 associated 15/8," ILI F coaxial cables (approximately 2,5101" of plenum and 150' non-plenum coaxial cable per antenna) a. Four of the 15/8" LDF will be installed with 4 new P25 antennas bi. One of the 15/8" LDF will be installed and prepared for later connection to an existing P25 system antenna c. One of the 151/8" LD,F'will be installed with the top:connector weatherproof plugged,, near the existing,700 MHz COG TX antenna for later connection when replacement radios are installed on the 31't floor d. One of these 15/8" LDF will be installed with the top connector weatherproof plugged, near the existing Siren radio antenna for later connection when the Siren radio,is moved down to the 31't floor e. one of these 151/8" LDF will be installed with the top connector weatherproof plugged, near the existing Smartnet system transmit antenna and used by the City at a later time for the relocated NPS,PAC repeaters 21. Supply and install 3 receive antennas, and 7 associated 7/8" LDF coaxial cable (approxirnately 250' of plenum and 1501' of non-plenum coaxial cable per antenna) al. Two of the 7/8" LIEF will be installed with 2 new P25 antennas b. One of the 7/8" LDF will be installed with the top connector weatherproof plugged, near an exi'siting P251 system RX antenna,for later connection to the P25 system on the 31" floor c. One of the 7/8"will be installed with the top connector weatherproof plugged, near the existin:g'700 MHz COG RX antenna for later,connection when the replacement radios are installed on the 31"floor d. One of these 7/8" LDF will be installed; with the top,connector weatherproof plugged, near the existing High Water radio antenna for later connection when the High Water radio is moved down to the 31't floor e. One of these 7/8" LDF will be installed and terminated to a new City-supplied DB 2 High Water antenna i. Motorola/MTSI will mount the new City-supplied DB224 antenna f. One of these 7/8" LDF will be installed with the top connector weatherproof plugged, near the existing Smiartnet,system receive antenna and used by the City at a later time for the relocated NPSPAC repeaters 22. Supply andl install 2 tower-mounted amplifiers, and 4 associated 1,/2" LDF coaxial cable (approximately 250" of plenum and 150' of non-plenum coaxial cable per TMA) a. Two Y?" LDF °iill be installed with 2 new P25 TMAs, b. One Y2" LDF w ill be installed with top connector weatherproof plugged, near an existing P25 TMA for later connection after new equipment is installed!on the 31't floor c. One of these Y2" LDF will be installed with the top connectoir weatherproof plugged, near the existing Smartnet system tower-mounted amplifier and used by the C'ity at a lateir time for the relocated NPSPAC repeaters, B. Supply and install 4 rooftop mounted GS antennas and 4 associated: Y2" coaxial cable (approximately 250' of plenum and 150' of non-plenum coaxial cable per antenna) 24. The ea i'sting Phase 2 P25 TX antenna, RX antenna, and TMA will remain in operation, initially with existing coaxial cable that terminates in the, City of Fort Worth 42nd flooir equipment room. Motor ola/MTSI will install the new coaxial cable, weatherproof, and terminate near the existing, antennas and TMA for later hooikupi. Later, after completion of eqluipment, installations and program,, return to disconnect the existing coaxial cable that currently terminates to equipment on the 4,2,nd I floor, and connect the newer cables that have been pre-in�stall'ed and terminate to the new area on the 31't floor. 25. Supply and install Scientel-specified 2 EW- O and 1 EW-63 waveguides, approxim atelly 150' jacketed, and 250 non-jacketed a. Remove the Jacketing of all 3 waveguidies after entry to the spec,ifield, plenurn areas, to comply with plenum rating requirements b. One EW-90 wave guide will be installed with top connector weatherproof plugged near an existing 11,(MHz dish for later connection after,equipment is installed on the 31't floor c. One EW-90 wav,eguide will be installed with top connector weatherproof plugged near a City-splecified location for termination to a new City-installed dish d. One EW-63 wave guide will be installed with top connector weatherproof plugged near an existing 6 GHz dish for later connection after equipment is installed on the, 31s'flloor 26. Supply and install Scientel-specified waveguide pressurization equipment, on the 31't floor and pressurize all 3 wa:veguid,es 27. Supply and install all coaxial cable and waveguide attachment hardware 28. Supply and install transitions between, plenum and non-plenum for each Moto ro la-in�sta I led coaxial cable at the rooftop doigh�ouise, and ground each to the EGB (two-hole lugs) a. Note: Motorola will supply UV rated coaxial cable for outside u,se (approximiately 150'), and plenum rated cable for inside use (approximately 250'). 29. Supply and iinst,aall 4-level trapeze for both the entry and exit side of the coaxial cable window on 31"floor and ground per R56 standards 30. Supply and install surge protectors for each Moto ro la-i nsta I led' coaxial cable on the trapeze, internal to the equipment room 31. Suipply and install copper Master Ground Bar (MGB) internal to the equipment room., underneath the coaxila�ll cable window a. Bond the MIGIB, to the 500 kcmil down conductor located in electrical chase area using #1/0 AWG ground cable 32. Supply and install copper External Ground Bar (EGG) external' to the equipment room, underneath the coaxial cable window a. Bond the MG:B to the 500 kcmil down conductor located in electrical chase area using 4'110 A'WG'grOLind cable 33. Ground all coaxial cables at top and bottom, as well as every 75" where possible,, using, Motorola-supplied ground kits in this case, at antenna location, rooftop doghouse, 36", and 31't floors) 34. Perform and record antenna system sweeps at the time of installation for all Motorola-installed antenna system components per R56 35. Seal cored holes between floors and on rooftop per City code, after installation of all coaxial cable 36. Mark all cored holes at each floor,top and bottom, as City of Fort Worth;, owned space—per City 37. Supply and install' cable entry boots at 36-hole entry to equipment room 381. color code and metal tag all antennas an-d coaxial'cables Antenna System Installations 2 of 3: 3191. Return to site to perform final P25 terminations for 1 TX antenna, 1 RX antenna, and 1 TMA as previously described, 40. Remove unused coaxial cable and associated hardware, an�d' transplort to a site specified by the City of Fort Worth, or dispose of, if requested Antenna System Installations 3 of'3-. 1. Return to site to perform final terminations for Siren System, High Water System, and NPSPAC systems by connecting, previously installed coaxial cable to existing antenna systems once communications equipment has been installed or re located to the 31 floor 2. Remove unused coaxial cable and associated hardware, and transport to a site,sp,ecificed by the City of Fort Worth, or dispose of, if requested Antenna System Installation Summary Chart -—-------------- # Antenna Antenna Status Cabling* Antenna Installer P25 TX 1 To be installed 15/8" LDF Motorola/MTSI 2 P25 TX 2 To be installed 1 5/8 111 LD,F MotoroIa/MTSI 3 P25 TX 3 To be installed 15/81' LDF Motorola/MTSI 4 P25 TX 4 To be installed 15/8" LDF Motorola/MTS1 5 P25 TX .55, Existing 15/8" LD,F Existing 6 P25 RX I To be installed 7/811 LDF Motorola/MITSI 7 P25 TTA 1 To be installed 1/2" LDF Motorola/MTSI 8 P25 RX 2 To be installed 7'/8" L D,F Motorola/MTS1 9 P25 TTA 2 To be installled 1/2"! LD,F —Mod orola/MTSl 10 P25 RX 3 Existing 7/8" LDF **Existing 11 P25 T 3 Existing 1/211 LDF "Existing 12 P25 GP'S 1 To beinstalled 1/2" LDF Motorola,/MTS1 13 P125 GPIS 2 'To be installed 1/2 LDF M:otorola:/MTS1 14 P25:GPS: 3 To be installed 1/2" LDF Motorola/MTSl P:,25 GPS 4 be installed 1/2"' LiDF torola/MTS1 16 7010 MHz COG TX Existing 11 5/8"' LD:F **'Existing 17 '71010 MHz COG RX I Existing 7/ LDF Exi'stin�g Hz Existing 1/2f12"" LDF **Existing 18 7010 M- COG TTA 19 N PS PACTX Existing 15/8" LDF !-*-Exisiting 20 N PS PAC RX Exist'i ng 7'/8 111 LDS "Exilisting, 21 NIPS,PA,C TTA Existing 1/2" LDF Existing, W Ex i st"in�g 22 6 GHz to Bergh, 2 Existing E -63 * 23 11 GHz to Public Safety Existing EW-90 Existing 24 11 GHz to! Rolling Hills To be installed E'W-90 **CFW/Sicteintel 25 DB42,0 Siren System Existing 1,5/81" LDF F"Existing 26 D 2 4 High Water Existing 7/'8" LDF Existing 27 DB224 High Water To be installed 7/8 LDF Moto rolla TS I *Note,.,All, listed coaxial cable andl wave aide to be installed by Mofor ola/MTS1 from rooftop to 31st, floor communications,room **Note-.'This will be done in a later trip,after communications equipment can be c t over from existing, on,42nd floor to new on 31st floor. Motorola Communicatilons Equipment Installation Responsibilities 0 1,. Relocate, Phase 1700 M Hz Base Station from 41"fll oor e,q u ipment room ail nd reinstall in 31 floor equipment room Relocate 61-cha Rhase 2 system hardware into new 31't floor equipment room Motorola Slysiteims Integration Responsibilities 1. Site w,a I k,s, 2. Update design documents (calculations, diagrams, etc.) 3. Update City-wide coverage map 4. Update equipment lists,SOWS, contracts, subcontracts, a!nld process Change Order 5 5. Program 6-channel Phlas,e 2 system into newly installed P2,5 equipment in 31't floor a. In parallel with existing, 6-channel Phase 2 system on 41't floor b. Eniable new 6-channlel system on, different hardware c. Execute cu,t-over from 41"floor 6-channel Phase 2 system to 31st floor 6-chiannel Phase 2 system 6. Integrate,and reprogram rellocated hardware on 31"t floor - rq UD vi 4-n t4 Ln -a Cu Ll Q) 0), a) 4-5 ai 4-1 4ftl z ol 00 �Dl 00 4.0 . ............. C) (Y) 0 00 00 rf) rn IZ C5 0) 17; m Mi 00 C) c`0 rlllllllI C) Lr) QD co UI) CY) Mi r1l r-I 0 Lj) r-i ry) r-I VH L n r-4 jZ 0 0 m Ln co N a), 0 r-q r-I C CY) r4 C5 Lri H ryi IN) Ir-i CY) M 00 ry) 0 Iqt LX) r'l 0 Lr) 00 C ry) M -% -% lb� % ft 00 ol Mi M CN Ln H aj C » LL > L- 4-J 0 (1) mI m U. W 4- bD " -0 t 0 0, 0 Ln Ln E E x x 1 0 (U Qi m cul Ln, Cc 0 -3 0 0 ol -0 L- OJ 4-J 0 u u Ln (1) Co cc: L- 1.2 c u u > > 4-J E E o 0 �F- m X 4-j 4-u J 0 u u 0 0 0 4-J U, 0 M Qjl I ai 0 U U +-j 4-J 4wJ LU Q)i 0 4-J CO C M M 0 U 0 4--J e- Ln 4-J > (3) C: tM 4-1 C tLo Q) 01 -0 % to 0; twi M 04,+1 u 41 w (1) 4-J -0 Ulf u (IJ tLo CU > LL LL r LL cu U + -0 z Q) L- N tn r E co u 0 L- Ou FMM (.0 (1) CL u CL 0 CL 0 F- 0 0 4-4 0 0 a- CL < < ai M V) ro L/) M 1 4-0 CL 4-4 CL (Vl 4.J ro 4-4 4-J Cu 0 4-0 4-J 4-o ail ra 4-J ca co Co! < LL cc Co 00; 0 u u u 4-1 Ol CL CL C: < < 0 (A L/) :3 101 0 u u co 0