Loading...
HomeMy WebLinkAboutContract 46223-A1CITY SECRETARY; JI n "14 ,t_ A ( CONTRACT NO . Vf U' vv .J ~ f1 AMENDMENT NO. ONE TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES CITY SECRETARY CONTRACT NO. ----- COUNTY OF TARRANT WHEREAS, The City of Fort Worth and O 'Conner Architecture & Interior Design , LTD (Consultant) made and entered into City Secretary Contract No . 46223 (The Contract) which was authorized by the City Council by M&C C-27081 , the 18th day of November, 2014 , for Design of the new Municipal Vehicle Maintenance Facility at the Holly Water Treatment Plant ; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for coordination and documentation of various alternate packages . NOW THEREFORE, City and Consultant , acting herein by and through their duly authorized representatives , enter into the following agreement which amends the Contract: 1. Article I -Scope of Services , Paragraph (3) shall be added to read as follows : (3) Provide additional design services for the design and detailing of various alternate packages. The cost of this additional service is $24 ,795 .00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in O 'Conner Architecture & Interior Design , LTD Letter dated June 6 , 2017, subject: "AE/Fee Adjustment". 2 . Article II -Compensation , first paragraph , is amended as follows : "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A ". Payment shall be considered full compensation for all labor , materials, supplies , and equipment necessary to complete the services described in Attachment "A ". However the total fee paid by the City shall not exceed a total of $729,600.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." City of Fort Worth , Texas Standard Agreement for Professional Services AMENDMENT "' Revision Date : 8/16/2016 ~ .}, ~ Pag e1of2 ~ OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 3. All other prov1s1ons of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the ~ay 0~2017, in Fort Worth, Tarrant County, Texas. Consultants Name By: Raymond O'Conner, AIA Principal APPROVED AS TO FORM AND LEGALITY: By ~~ CONTRACT COMPLIANCE MANAGER: AP~ B & ~ JesuJ.Chapa Assistant City Manager :YECO-R~-~~D_,: ~------+------ M'aryr City Seer ry M&C Not Required Contract Authorization By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By : Pm CAM. °'' CMkN2 Brian R. Glass , AIA Architectural Services Manager City of Fort Worth , Texas Standard Agreement for Professi onal Services AM E NDMENT Revision Dale: 8/16/2016 Page2 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX -- June 6, 2017 Mr. Ronald Clements, AIA O'CONNOR ARCHITECTURE & INTERIOR DESIGN LTD Transportation and Public Works Department City of Fort Worth 401 West 131h Street Fort Worth, Texas 76102 Re; AE /Fee Adj ustment. Ronnie, As discussed, we re s pec tfully req uest an adjustment to our c ompensation in the amou nt of $2 4,795.00 to take us through the end of the project. This adjustment is due to the amount of effort involved in documentation for t he various alternate packages. Back up information is on the second page of this correspondence . Tha n ks for you r consideration . S incerely, Raymond M O'Connor, AIA 304 main street fort worth, t exos 7 6 102 p h (8 17) 877 069 1 fox (817 ) 877 4093 www.ooid.net , Below are outline subjects concerning the various tasks associated with the add services. Thanks again. Ray • Multiple building systems fo r t he exterior walls were designed and detailed (tiltwall, CMU & PEMB panels on CFMF), which required producing twice as many plans , elevations, sections, wall sections and details, specifications, as well as coordinating building system interfaces. • Two different building sizes (adding bays), which required producing two sets of floor plans, elevations, MEP, Equipment and select civil drawings . • In addi t ion to th e incre as ed pro duction time, research on materials for the two building systems was required and performed. • Considerable additional was needed to consolidate the various alternates into a conformed construction set, and permit revision set. Principal Architect $175.00 $130.00 $115.00 $110.00 $85.00 $75.00 X 20= $3,500 .00 Project Manager Project Architect Specification Writer Designer Technician/Intern CAD Technician Structural Enginee r Civil Engineer X 40=$ 5,200.00 X 35= $4,025.00 X 20= $2,200.00 X 42= $3,570 .00 x32= $2,400.00 $2,800.00 $1 ,100.00 304 main st reet suite l O 15 fort worth , texas 7 6 1 02 ph (8 17 ) 877 0691 fax (8 17 ) 877 4093 www.oaid.net