Loading...
HomeMy WebLinkAboutContract 46224-A1 (2)/ - RECEIVED AUG -4 2015 C\1Y OFFORT WORTH CTIY SECRETARY AMENDMENT No. 1 CITY SEC RETARV,1b"""''' A \ CONTRACT NO. i cx::,s+-~\ TO CITY SECRETARY CONTRACT No . 46224 WHEREAS' the City of Fort Worth (ENGINEER) made and entered into City CONTRACT) which was admi nistratively (CITY) and Halff Associates , In c ., Secretary Contract No . 4 622 4 , ( the authorized on the 8th day of December , 20 14 in the a mount of$ 1 8 ,200 ; and WHEREAS, the following project : CONTRACT involves engineering services for the OPEN CHANNEL STUDIES TECHNICAL REVIEW , SWS -053 ; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT t o include an increased scope of work and revised fee . NOW THEREFORE , CITY and ENGINEER , acting herein by and through their duly authorized representatives , enter into the following agreement , which ame n ds the CON TR ACT : 1 . Article I of the CONTRACT is amended to include the add iti o nal engineering services specified in a proposal dated July 7 , 2015 , of which is attached hereto and incorporated herein. The cost for the additional design services to be performed by Engineer $30 ,700 . 2 . a copy to City totals Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract , as amended , so that the total fee paid by the City for all work and services shall be an amo u nt of $48 ,900 . 3. All other provisions of the Contract , Ci ty of Fort Worth Profe ss iona l Services Agree ment Amendment Temp late PMO Official Release 8/1/2012 Page 1 of2 ~ SCAN ED which are not expressly OFFICIAL RECORD CITY SECRETARY FT. WORTH , TX amended herein , shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory , below . APPROVED: City of Fort Worth Jj;lernando Co~~a ~~...>~ -:S-c.t.sf t-- Assistant City Manager DATE :B-~ -)S- RECOMMENDED : u.u Director , Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST : City of Fort Worth Professional Services Agreement Amendment Template PMO Official Re lease 8/1/2012 Page 2 of 2 ENGINEER Half£ Associates, Inc. Terry M. Barr , P .E., CFM Authorized Agent DATE : M&C : Date: 07 I 0 1 I 2-0, s ' I OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX iii HALFF. July 7, 2015 Ms. Mary Hanna, P.E., CFM City of Fort Worth Storm Water Division Transportation and Public Works 1000 Throckmorton Fort Worth, TX 76102 RE : Contract Amendment for Open Channel Studies Technical Review Dear Ms . Hanna : Halff Associates is pleased to present this proposal for the above referenced project. This proposal includes the following services and associated budget: I. II. Ill. IV. Review and Comments of 75% Reports and Data Review and Comments of 90% Reports and Data Review and Comments of 100% Reports and Data Review Meetings for 75%, 90% and 100% Submittals TOTAL PROPOSED CONTRACT AMOUNT $5,700 $13,200 $7,600 $4,200 $30,700 Included is the standard Amendment to Engineering Contract form, Scope (Attachment "A"), Method of Payment (Exhibit B-1), Professional Services Fee Summary (Exhibit B-3), and Level of Effort Estimate (Exhibit B-4) to be considered. Thank you for the opportunity for us to continue assisting the City, if you have any questions please feel free to call me at (817) 847-1422. Sincerely, Ha FF ASSOCIATES~ IN ~ ~ Project Manager Cc: File HALFF ASSOCIATES . INC. 4000 FOSSIL CREEK BOULEVARD FORT WORTH, TX 76137-2720 TEL (817) 847-1422 FAX (817) 232-9784 WWW.HALFF.COM ATTACHMENT A SCOPE OF WORK OPEN CHANNEL STUDIES TECHNICAL REVIEW -AMENDMENT 1 CITY OF FORT WORTH STUDY SWS-053 Preface The C ity is currently conducting open channel and neighborhood drainage studies to rev iew the current drainage conditions in mu ltiple watersheds to identify and evaluate potential improvements in var ious watersheds throughout the City. Halff Associates ' task will be to provide continuing assistance to the City in the open channel program. Studies listed below are in addition to those specified in the original contract dated December 8 , 2014 . I. Review and Comments for 75% Reports and Data a . Halff will perform a review of the ex isting conditions (75%) reports to ensure that report format is being followed appropriately and that all required data , including HEC-HMS and HEC-RAS models and GIS information , has been provided. Detailed technical reviews of the reports , models , and floodpla in mapping w i ll be prepared , and comments prov ided to City staff. There are two (2) anticipated studies included in this task : • SWS-021 • SWS-024 Greenbriar Creek (dynamic modeling) Summerfields Creek II. Review and Comments for 90% Reports and Data a . Halff will perform a review of the revised existing conditions and proposed mitigation alternatives (90%) reports to ensure that report format is being followed appropriately and that all required data , including HEC-HMS and HEC-RAS models and GIS information , has been provided . Detailed technical reviews of the reports , models , and floodplain mapping w ill be prepared . In addition , a review of the damage analysis and cost estimates will be performed . Comments will be provided to City staff. There are eight (8) anticipated stud ies included in this task will conduct review meetings for the studies that meet the following conditions: • SWS-007 • SWS -013 • SWS-021 • SWS-022 • SWS-024 • SWS-025 • SWS-028 • SWS-046 Broadmoor Neighborhood Study (dynamic modeling) Upper Willow Creek Greenbriar Creek (dynamic modeling) Ridglea/Luther Creek (dynamic modeling) Summerfields Creek Glenwood Creek Overton Creeks Little Fossil Creek 1 ATTACHMENT A SCOPE OF WORK OPEN CHANNEL STUDIES TECHNICAL REVIEW -AMENDMENT 1 CITY OF FORT WORTH STUDY SWS-053 Ill. Review and Comments for 100% Reports and Data a. Halff will perform a review of the final report (100%) reports to ensure that report format is being followed appropriately and that all required data, including HEC-HMS and HEC-RAS models, GIS information, and cost estimates have been provided. No detailed technical reviews will be performed . A brief overview of the damage analysis and cost estimates will be performed to ensure 90% comments were addressed. Comments will be provided to City staff. There are eight (8) anticipated studies included in this task: • SWS-007 • SWS-013 • SWS-021 • SWS-022 • SWS-024 • SWS-025 • SWS-028 • SWS-046 Broadmoor Neighborhood Study (dynamic modeling) Upper Willow Creek Greenbriar Creek (dynamic modeling) Ridglea/Luther Creek (dynamic modeling) Summerfields Creek Glenwood Creek Overton Creeks Little Fossil Creek IV. Study Review Meetings a. Halff will conduct review meetings for the studies that are reviewed. These include the following meetings : 1. Studies that are reviewed for the existing conditions (75%) submittal. Two (2) studies are included : • SWS-021 • SWS-024 Greenbriar Creek Summerfields Creek 2. Studies reviewed for the proposed mitigation alternatives (90%) submittal. Eight (8) studies are included : • SWS-007 • SWS-013 • SWS-021 • SWS-022 • SWS-024 • SWS-025 • SWS-028 • SWS-046 Broadmoor Neighborhood Study (dynamic modeling) Upper Willow Creek Greenbriar Creek (dynamic modeling) Ridglea/Luther Creek (dynamic modeling) Summerfields Creek Glenwood Creek Overton Creeks Little Fossil Creek 2 ATTACHMENT A SCOPE OF WORK OPEN CHANNEL STUDIES TECHNICAL REVIEW -AMENDMENT 1 CITY OF FORT WORTH STUDY SWS-053 3. Studies that have submitted a 100% (Final) report . It is not anticipated that each 100% report will require a review meeting; however, Halff will conduct up to three (3) meetings to d iscuss the final report and address any questions or concerns regarding the submittals. These meetings will be at the discretion of the City. 3 ATTACHMENT B COMPENSATION OPEN CHANNEL STUDIES TECHNICAL REVIEW CITY OF FORT WORTH STUDY SWS-053 I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $30,700 as summarized in Exhibit B-1 -Engineer Invoice and Section IV -Summary of Total Project Fees . The total lump sum fee shall be considered full compensation for the services described in Attachment A , including all labor materials , supplies , and equipment necessary to deliver the services . B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City 's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item Ill of this Attachment B. B. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. C . Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. Ill. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Department of Transportation/ Public Works Storm Water Division monthly progress reports and schedules in the format required by the City. City of Fort Worth , Texas Attachment B PMO Official Release Date : 8.09 .2012 Page 1 of 3 B-1 IV. Summary of Total Project Fees ATTACHMENT B COMPENSATION Firm Primary Responsibility Prime Consultant Halff Assoc iates , Inc. Technical Review of Open Channel Studies Proposed MBE/SBE Sub-Consultants Non-MBE/SBE Consultants TOTAL Project Number & Name Total Fee Open Channel Stud ies Technical $ 30 700 Review Fee Amount % $30 ,700 100% $ 30 700 100% MBE/SBE Fee MBE/SBE % $ 0 0 % City MBE/SBE Goal = Q % Consultant Comm itted Goal = O % City of Fort Wort h, Texas Attach ment B PMO Official Release Date: 8.09 .2012 Page 2 of 3 B-2 Halff ~ssociates, Inc. 4000 Fossil Creek Boulevard Fort Worth, TX 76137 Tel: 817-847-1422 Fax: 817-232-9784 email: tbarr@halff.com COFW Project Manager Consultant's Project Manager: Proj. Invoice No. Invoice date: Period (From -To) Purchase Order No. T&PW Proj No. City Secy. Cont. No. Mary Hanna, PE, CFM Terry Barr, PE, CFM In voice -T&PW 3 -F19XXXX 7/10/2015 6/01/2015 -6/31/2015 P0-15-00086100 SWS-053 46224 Name of Project : Open Channel Study Technical Review Work Phase Percent Complete TA01 Rev iew of Reports and Data 0% T A02 Review Meetings 0% T A03 Henderson Report 0% CONTRACT AMOUNT 0% TOTAL CONTRACT AMOUNT TOTAL CONTRACT AMOUNT TO DATE (including amendments) Work Phase No. DESCRIPTION OF WORK THIS INVOICE TA01 Review of Reports and Data $ - TA02 Review Meetings $ - TA03 Henderson Report $ - ' $ - List all amendments to date (Do not in v oice for addition a l work until the related a mendment h as been ex ecuted by the ci ty ) Amendment Description No. 1 Additio nal Stud ies for Review 2 3 4 Make all checks pay abl e to : Ha lff As sociates , Inc. Submi tt ed by : Terry Barr, PE , CFM Proj ect Ma na ge r Ha lff Associ ates , In c . 4000 Fos sil Creek Bo ul eva rd Fort W orth , TX 76 137 TOTALS City Secy. Date Total Amount Contract No. Executed by 46224-A1 XX!XXIXXXX $ 30 ,700 .00 $ - $ - $ - $ 30,700.00 TOTAL THIS INVOICE STORM DRAINAGE Revised Amt. incl. Orig . Amount Amendment $ -$ - $ 7 ,800.00 $ 34,300 .00 $ 3 ,200 .00 $ 7.400 .00 $ 7 ,200 .00 $ 7 ,200 .00 $ 18 ,200 .00 $ 48 ,900 .00 $ 18 ,200 .00 $ 48 ,900 .00 STORM DRAINAGE TOTAL CONTRACT PREVIOUS AMT. INVOICES REMAINING $ -$ 7 ,800 .00 $ -$ 3,200 .00 $ -$ 7 ,200 .00 $ -$ 18 ,200 .00 $0.00! EXHIBIT "8-1" (SUPPLEMENT TO ATTACHMENT 8) OPEN CHANNEL STUDIES TECHNICAL REVIEW CITY OF FORT WORTH STUDY SWS-053 METHOD OF PAYMENT & PROGRESS REPORT REQUIREMENTS I. Method of Payment Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice from the ENGINEER outlining the current labor and expenses of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion of Attachment "A ", Task I, submittal and approval by the City , a sum not to exceed 95 percent of the Task I fee. Until satisfactory completion of Attachment "A ", Task II , submittal and approval by the City , a sum not to exceed 95 percent of the Task II fee. Until satisfactory completion of Attachment "A ", Task Ill , submittal and approval by the City , a sum not to exceed 95 percent of the Task Ill fee . Until satisfactory completion of Attachment "A ", Task IV, submittal and approval by the City , a sum not to exceed 95 percent of the Task IV fee . The balance of fees , less previous payments , shall be payable after delivery of the FINAL report and electronic files . II. Progress Reports A. The Engineer shall submit to the designated representative of Department of Transportation/Public Works Stormwater Divis ion monthly progress reports covering all phases of the analysis in the format required by the City . EXHIBIT "B-1" Page 1 of 1 EXHIBIT "8-3" (SUPPLEMENT TO ATTACHMENT B) OPEN CHANNEL STUDIES TECHNICAL REVIEW CITY OF FORT WORTH STUDY SWS-053 PROFESSIONAL SERVICES FEE SUMMARY TASK Task 1: Review of 75% Reports and Data Task 2: Review of 90% Reports and Data Task 3 : Review of 100% Reports and Data Task 4 : Study Review Meetings SERVICE TOTAL EXHIBIT "B-3" Page 1 of 1 FEE $5 ,700 $13,200 $7,600 $4,200 $30,700 OPEN CHANNEL STUDIES TECHNICAL REVIEW (SWS-053) LEVEL OF EFFORT ESTIMATE EXHIBIT "B-4" (SUPPLEMENT TO ATTACHMENT B) Project Phases and Tasks* Task 1 : 75% Review and Comments (2) SWS-021 Greenbriar Creek -Dynamic SWS-024 Summerfields Creek -Standard Subtotal Task 1 Task 2: 90% Review and Comments (8) 90% Review and Comments -Standard (5) 90% Review and Comments -Dynamic (3) Subtotal Task 2 Task 3 : 100% Report Comments 100% Review and Comments -Standard (5) 100% Review and Comments -Dynamic (3) Subtotal Task 3 Task 4: Review Meetings 75% Review Meeting (2) 90 % Review Meetings (8) 100% Review Meetings (3) Subtotal Task 4 PROJEC_T TOTALS ,_ $199.03 ;;$159.23 4 2 6 5 6 11 5 3 8 0 8 6 14 20 12 32 10 6 16 4 16 6 26 C: ., C) ~ C: Q) ·-Q) C: ·= ·; Cl ~ C: 1- w $102.93 12 10 22 30 27 57 16 18 34 0 113 t:: 5 0 0 ::: 1'i w::, Cl) Hours $3,305.12 $2,382 .74 $5,688 $7,267.65 $5,884.05 $13,152 $4,234 .33 $3,405 .21 $7,640 $636.92 $2,547.68 $955.38 $4,140 2l VJ 0 (.) $0 $0 $0 $10 $40 $20 $20 $3,310 $2,380 $5,700 $7,270 $5,880 $13,200 $4,230 $3~10 $7,600 ; $651!; $2,590 $980 $4,200 $30,700