CITY OF FORT WORTH
CHANGE ORDER REQUEST
CITY SECRETARY
CONTRACT NO. '3Cf 5r,Q-C,o ~
1/;rei2 ~~lfflEJfAi""Tiro~---TPffi~:T"Ai---------------iil:Jmr.Ai"------,
2q07 CRITICAL CAP(T'AL PROJECTS GROUP A-DIST.I (BOSTON,CHICAGO,CLAIREIIONT,LYNNHAVEN) . '
31122 ,
ORIGINAL CONTRACT AMOUNT.................................................................... $
EXTRAS TO DATE ........................................................................... $
CREDITS TO DATE .......................................................................... $
CONTRACT COST TO DATE ............................................................................ $
AMOUNT OF PROPOSED CHANGE ORDER ............................... -.-· .. ··········· $
REVISED CONTRACT AIIOUNT .: ................................................ : ........... :....... $
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ............................... $
REMAINING FUNDS AVAILABLE FOR THIS CHANGE ORDER ..•••.••...•.••.•.•.. $
ADDITIONAL FUNDING (IF NECESSARY) ....................................................... $
WATER
8U.197.oo · $ . ' $
615,197.00
11,200.00
878,397.00
25,000.00
25,000.00
•• $
$
$
$
$
$
CHANGE ORDERS TO DATE (INCWDING THIS ONEJ AS -" OF ORIGINAL CONTRACT COST
MAX "1J.OW~ C..~CT AIIOl,JNT (ORIGINAL CON~CT COST+ 2~ ..
ITEM Dir:~c---• ···-• -· --1 iuNS DEPARTM~NT QTY
45. ADO. SPECIAL CONNECTIONS TO 24,• RCCP WATElUINI .WATER 2 .00
25. ADD. GROUT SANITARY SEWER LINE SEWER 701 .00 ·
42. INC. REMOVE STORM DRAIN PIPE T/PW ., ;;; 97.00
45. INC. 24• CLASSIII RCP : T/PW ~· I 24.00
49. Ir«;. TRENCH EXCAVATION & BACKFIU .· T/PW •. 51 .00
57. ADD .) STORM DRAIN JUNCTION BOX REMOVAL T/PW,· 1.00
IN ACCORDANCE WITH THIS CHANGE ORDER THE CONTRACTOR SHALL:
SEWER T / PW TOTALS 257;909.o, $ 1,382.422.14 $ 2,28&,525.54
-12.m.oo, :· : 12,019.00
289,985.00 $ 1,382,422.54 $ 2,297,804.54
3,329.75 $ 4,918.00 S 19,445.75
273,314.75 $ 1,387,338.54 $ 2,317,050.29
12,811.30 $ 40,873.00 ..,
818.30 $ 40,873.00
2,513.45 $ • 2,513.45
% 1.3S
$ 2,8N._90IH3. ·
UNIT . UNIT COST TOTAL
-EA $. -5 ,600.00 $ 11,200.00
LF s ~, . 4 .75 $ 3,329.75
I LF $' 10.00 $ 970.00
LF $ 89.00. $ 2 ,136.00
CY $ ,, 10.00 $ 510.00
EA $ ,. . 1,300.00 $ 1,300.00
WATER $ 11,200.00
SEWER $ 3,329.75
T/PW $ 4,918.00
SUBTOTAL A $ 19,445.75'
It Is -and agram tllal Ille """"IUfN» otthlo Chango Clnlorby Ille connclor -M oc:c,onl and-and---~ In lwl i--and mono,) for al CDllaarlllng oul of, or-ID, llle-Cllange
Clnlor.
DATE:
STABILE & WINN , INC. ·
-Taa 1lel c.o.
10CD
--OTIER
I NO M&C RE QUIRED
0 9-28 -1 0 All:45 I N
I
DATE: 08 / 1912010
TRANSPORTATION AND PUBLIC WORKS
"' .r, CHANGE ORDER JUSTIFICATION RECORD AND PROJECT SUMMARY SHEET
PROJECT NAME : 2007 CRITICAL CAPITAL PROJECTS GROUP A-OIST.8 (BOSTON,CHICA®,CLAIREMONT,L YNNHAVEN) ·
CHANGE ORDER Ni: 2
INSPECTOR: JOHN CROWLEY
PROJECT MANAGER: KHAL JAAFARf
ORIGINAL CONTRACT AMOUNT
EXTRAS TO DATE ' .
CREDITS TO DATE ··
ORIGINAL AMOUNT TO DATE
AMOUNT OF PROPOSED CHANGE ORDER
REVISED CONTRACT AMOUNT
ORIG. CONTINGENCY FUNDS AVAILABLE
FOR CHANGE ORDERS
REMAINING FUNDS AVAILABLE
FOR THIS CHANGE ORDER
ADDITIONAL FUNDING (IF NECESSARY)
REASON(S) FOR CHANGE ORDER:
$
$
$
$
$
$
$
$
$
PHONE Ni: (817) 944-0975 ·
PHONE Ni: (817) 392-7872
CITY SECRET ARY Ni: 39522 ,, , . .
COMBINED WATER SEWER I..Lm
2,285,525.54 ' $ 665,197.00i _$'' 257,9()6.00 .. $ · 1,362.~22.54
12,079.00 s·. ..:-· $• /. 12,079.00 1 $ ... ,. , ·*-· I
$ s·: , ,·.·'' 11
2,297,604.54 $ 665,197.00 $ 269,985.00 $ 1,362,422.54
19,445.75 $ 11,200.00 $ 3,329.75 $ 4,916.00
2,317,050.29 $ 676,397 .00 $ 273,314.75 $ 1,367,338.54
78,768.30 $:' ' 25,000.00' .,, $',) ,:' 12;895.3([ $·-.
' ' i1 40,87 ~QO
66,689.30 $ 25,000.00 $ 816.30 $ 40,873.00
2,513.45 $ $ 2,513.45 $
During installation of the 24" water line it was discovered that the connections would be made to a 24" RCP pipe' instead of
24• Ductile Iron pipe as is called out on tfte plans. Tl)~-conpection to the 24" RCP requires ~ fittings that resulted irf
extra, cost and I~ AJso , during the installation of the s.nitary Sewer llnea on Meadowbrook Dr, it WU discovered the ·, ~ ,
plans G88 out. for the abandonment of existing Sewer lines by filling with Flowabl& f!II, No pay item was prov~ for tt,e ;: ·
proper abandonment of existing: Sewer' lines. The contract dC>ef ~ot pn;,vide this proc;ess of abandonment as an incidental
due to the fact that _the abandoned sewer Hne is in different ditch line. Pay item 25 is needed to facilitate the work anct cost
for proper abandonment of~ exi~ng Sewer lines. (?uri~th& instati.tion·i,f the 2~" '!Jafsr line, conflicts ·with Storm Drain" .
pipe was dlscoverect. lt was necessary to remove and relocate Storm Drain pipe. TJ,ls resulted in increased quantities of
Strom Drain pipe removal and new pipe: ]'he increased quantities for ciass Ill RCP pipe 'andremoval is ·needed to facilitate
the extra work. and· materials. ; , • · , · ' · · .. ',,.,,
~ofC~Dept ..
~~L J cM& ~r\ .
~ 0 fAL ECORD