Change Order Request
City Sec # 39655 ~--------' Project Name! Village Creek Reclaimed Water Delivery System Pu
1
mp Station No.1
Client Project #(s) ...._ _________________________________ ___.
Project Description
Change Order# Date 10/14/2010 Contractor! Ark Contracting Services
City Project Mgr.! Farida S Goderya , PhD , PE City Inspector Mike Hill ...._ ___________ __.
Original Contract Amount
Extras to Date
Credits to Date
Dept.
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Water
$3 ,167,580 .00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
Change Order No . 1 includes the installation of two items:
PCM 001 -96 inch Sluice Gate Operator; Additional Amount of $18 ,340 .00 ; No Contract Time Change.
Totals
$3,167 ,580 .00
$3 ,167,580 .00
42,427.00
$3 ,210 ,007 .00
$0.00
PCM 002 -Total Suspended Solids (TSS) Meter; Additional Amount of $24 ,087 .00 ; No Contract Time Change .
This Change Order No . 1 is for a combined sum amount of $42,427 .00 and O Calendar Days .
Select Day Type
. .
E
The existing 96-inch sluice gate is located between the west chlorine contact basin and final effluent pumps basin where the reclaimlmp
station is located . The actuator on this sluice gate was found to be broken and a replacement is needed to operate and isolate the tw asin
when the reclaim pump station is in operation . A new TSS meter was identified by the engineer and staff to be used in conjunction wi
proposed turbidity meter as requ ired by Texas Comm ission on Environmental Quality (TCEQ); to assist plant staff in maintaining min~
reclaim water standards at the reclaimed pump station.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
M&C Number C-24603 M&C Date Approved
1::-07 -1 0 Al l :;14 I N
,
CITY OF FORT WORTH
PROPOSED CONTRACT MODIFICATION (PCM)
Project Village Creek Reclaim-Pump Statioa No.l ProjectNo. P27S-70S30023l83
Fund: ____ Accomrt ______ Ceutw
ContractDr
Engineer
Consaruction
Manager
_Ar_k_Coan:ti __ n ... 1,_Servi_._c:es _____ Contracwr'1 Project No. 0 9 \ 2-i
_CP_&_Y __________ F.ngineer's Project Number CFW08085
Construction Manager's
----------ProjcctNumber
00213
_9_6'"_S_Jui_'ce_G_;a_lD_Opnlor..__ ________ PCM No. _OO_l ----1
The Owner proposes to make the followmg addldons, modifk:atiou or deletiom to the
werk descrlbed in the Contract Docoment&-Aathoriatlon to proceed with these cbangea
must be appro'ftd by Field Order or Oumae Order In accordance with the Contract
Doc:mnea1s.
BY:
Colt 1-Contractor furnishes all mmriall and labor
1. Replace wsti111 BlM Galls ACIUIIOr IDd giva old Acblator ID plant siaff.
2. Provide Rotort IQ7~173 and n:quin,d mountiq appurtcDaDCeL Contractor shall field
verify mountiag requiremcnta.
3. Remove cables from panel IO IICID&IDr, but maintain coadait for future use.
4. Provide 3#10, 1100 from paacl to actuator diaconncet in ciusu111 conduit
S. Provide 3 pole 30 A cin:uit bRalc.er in eitisting panel
6. Provide 3110, ti 00 cable from disconnect to Ac::tuaUr. Cable to be outdoor raced and 110
longer than 2.5' in lcoglh
7. Provide 30A·NBMA4X-316 SS diaconor.ct
8. Connect existing control cables from EJM Oate Ac::IDatcx
Cut 2 -Contractor to perform all the wmt II staced in Colt I with CfTW providing actuator
\. 1-1... C=::> -~r-'=::l~E::~~~--l"..-:::::=~-------Date:
I • "', l ~o
Page 2 of 2 -<'~') t' ~) O I l OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
,
CITY OF FORT WORTH
PROPOSED CONTRACT MODIFICATION (PCM)
Project Villase Creek Reclaim -Pume Station No. I Project No. . 'P2.75-70530023183
Fund: Account Center
Contractor Ark Contractin& Services Contractor's Project No. (14 I J. f<
Engineer CP&Y Engineer's Project Number CFW08085
Construction Construction Manager's 00213
Manager Project Number
PCM Description 96" Sluice Gate O~rator PCM No. 001
:
NOTIFICATION TO CONTRACTOR:
We are considering making the change to the contract described in the attached materials, and
request that you take the following action:
__ Notify us that you concur that this change does not require a change in contract time or amount
A field order will be issued ..
_X_ Submit a price proposal with detailed cost breakdown of labor, materials, equipment, and all
other costs associated with this change, and a revised schedule for performing the described
change.
__ Proceed with the change order under time and materials provisions of the contract
BY: ~ l~ ~ lF"~~~ ~ Date: 4-\ 2..C( "0 ~ C~a~
I ' CONTRACTOR'S RESPONSE:
We respond to your request as follows:
__ We concur that this is a no cost or time change. See attached field order.
>(' We submit the attached price proposal with detailed cost breakdown and revised schedule for.
Performing the described change ..
__ We are proceeding with change under time and materials provisions of the contract.
BY: '5E£ A171c:tra:.> Date:
ACTION TAKEN:
__ Proposed Contract Modification rejected. Contractor notified not to respond.
BY: Date
--Field Order Issued: No. Date By
__ Change Order Issued: No. Date By
Page 1 of 2 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
,
October 28, 2010
Ms. Farida Goderya, PE, PhD
Project Manager
Partners for a Better Quality of Life
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
RE: Village Creek Reclaim -Pump Station No. 1, Project No . P275-70530023183
PCM-001 96-inch Sluice Gate Operator
CP&Y Project No. CFW08085
Dear Ms. Goderya:
CP&Y recommends approval ~ustiflcation for approval of the PCM is presented in the
following paragraphs. ·
The Village Creek Reclaimed Water Eastern Delivery System Pump Station No. 1 is located at the Village
Creek Chlorine Contact Basin 2 effluent. Disinfected water from the CCB supplies the reclaimed water
pump station. Chlorine Contact Basin 2 has two parallel plug-flow chlorination basins, each with gates at
the influent and effluent ends of the basin. Either or both sides of the CCB may be in service as required
to treat the plant flow. To properly operate the CCB and to provide chlorinated water to the Reclaimed
Water Eastern Delivery System, the gates within the CCB must be functional.
The effluent sluice gate on the western half of Chlorine Contact Basin 2 has an inoperable gate actuator
and cannot be operated normally. The required repair will involve replacing the actuator and associated
electrical items.
We have reviewed the proposed costs and are of the opinion the costs are reasonable and fair.
Please feel free to contact me should you have any questions.
Sincerely yours,
CP&Y, Inc.
Michael F. Graves, PE (TX, OK)
Senior Associate
MFG/Ism
Enc los u re
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
115 West 7th Street, Suite 1500
Fort Worth, Texas 76102
817 .354 .0189 • 817 .354 .493 5 fax
www .cpyi .co m
, Ge'"' C)\:)~ CITY OF FORT WORTH PROPOSED CONTRACT MODD'ICATION (PCM) Project VillageCNldtReclaim-Pump StatiooNo.1 Project No. 00213 P27S-70S30023183 Fund: ----AccowlC ------Center Concracur Ark Contnc:tinJ Servica Contractor's Projcc:tNo. 09128 I Enginea' Coulructlon Manapr CP&Y Ensinoer's Project Number CFWOI085 Coulnactlon Manqcr's 00213 ----------Project Nmnber PCM Demiption TSS Mmr PCM No. 002 I ne Owner proposa 11D make tile foDowblg addltlolll, modfflcadou or deletiam to the work descrlbed la tile C•traet Documeaa Aadaorlaatilm to proceed with thae cbapt mut be appnnd by new Order or Cbage Order In 1Ceordnce wltll lhe Contract Donments. l\to \'-. c,-ll.t',-~ ~ \-\ -~~ V' (.i\~"' ,, \-~\r..4-~ C..:a ~':) \•~~) • ~ Tu') f>C:.,t'\ ~~1.. "'"'v. ;~~~ ----• l,..<---f'._.t.. I\... ,--., . .' ~ 1,>\..~ l'w~) I BYi F ~ , Date: OFFICIAL RECORD CITY SECRETARY : FT. WORTH, TX
'i
CITY OF FORT WORm
PROPOSED CONTRACT MODDICATION (PCM)
Projc:ct Vil1a&C Creek Reclaim -Pumo Station No.I PR>jc:ct No. P275-70S30023183
Flllld: Ac::comt Calla'
ContncClr Arlt Ccinlncti!!J Services Contractm'1 Pn>jcct No. 09128
Engineer CP&.Y Enpiccr'1 Project Numba' CFW08085
Conltruc:tion Comlructiut Maaaaer'• 00213
Manqer Project Numbs
PCM DelCliption TSSMmr PCMNo. 002
NO'IDICATIONTOCONTRACTOR:
We ue considering making the chanae to the coatract cleacribc:d in the attached materials. and
fflqUOSt that you tab the fbl]owing ICtioD:
__ Notify us that you coocur that lbil clwip docs not require a-.. in contract time or amount.
A field order will be iaud.
2L._ Submit a price propmal wi1b detailed cmt breakdown of~, mataiala, equipmcat, and all
other com aaoc:il1ed with thi1 cbanp. ad a l'CIViaed a:hcdale far perfarming dlll drsrlbed
chaap.
__ Proceed with the change order uader time and 1Dllh::rial1 provisions of the cantract.
BY: Michael Ckawl. P .E. Date: 7/12/10
CONTRACTOR,S RESPONSE:
Wo respood to your n,quest u followl:
__ We concur that thll is a no COit or time change. See attadaed field order.
_x_ We submit the attached price proposal with detailed COit bnudown and revised lllhedule for.
Perfo.rming the de9Cl11x:d change.
__ We ue procecdng with c:hangc under time aad mataials provilioas of the CUllnd.
BY: Todd Smith ,see attached) Dato: 7/Z1110
AC110N TAKEN:
__ Proposed Contract Modification rejecled. Cootrac:mr notified not to respond.
BY:
Field Order llaled: No. --
_ Oaange Order laued: No.
Pagel of2
Da -
Dal8 -
By
By
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
I
October 28, 2010
Ms. Farida Goderya, PE, PhD
Project Manager
Partners for a Better Quality of Life
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
RE : Village Creek Reclaim -Pump Station No. 1, Project No. P275-70530023183
PCM-002 TSS Meter
CP&Y Project No. CFW08085
Dear Ms. Goderya:
CP&Y recommends approval of PCM-002. Justification for approval of the PCM is presented in the
following paragraph.
The current design includes a turbidimeter that measures turbidity downstream of the reclaimed water
pump station. Since flows have increased over the last year, treated water quality concerns related to
fecal coliform counts have risen. The turbidimeter is required by the Texas Commission on
Environmental Quality; however, it is not considered an accurate predictor of potentially high fecal
coliform counts in the reclaimed water. Since fecal coliforms correlate better to Total Suspended Solids
(TSS) than turbidity, it was recommend by CP&Y and agreed to by plant staff to add a low concentration
TSS meter, which will provide operators more enhanced monitoring of the water quality in the
reclaimed water system.
We have reviewed the proposed costs and are of the opinion the costs are reasonable and fair.
Please feel free to contact me should you have any questions.
Sincerely yours,
CP&Y, Inc.
Michael F. Graves, PE (TX, OK)
Senior Associate
MFG/Ism
Enclosure
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
115 West 7th Street. Suitu 1500
Fort Worth, Texas 76102
817 .354 .0189 • 817 .354.4935 fax
www.cpyi.com
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL AC TION : Approved on 11 /16/2010
DATE: Tuesday , November 16 , 2010 REFE RENCE NO .: **C -24603
LOG NAME: 60RECLAIMED PUMP ST A TION CO 1
SUB JECT :
Authorize Change Order No . 1 in the Amount of $42,427 .00 to City Secretary Contract No . 39655 with Ark
Contracting Service s , LLC , for the Village Creek Recl aimed Water Ea stern Delivery Sy stem Pump Station
No. 1, Located at the Village Creek Wastewater Treatment Plant (COUNCIL DISTRICT 5)
REC OMMENDATION :
It is recommended that the City Council a uthorize the City Manager to execute Change Order No . 1 in the
Amount of $42,427 .00 to City Secretary Contract No. 39655 with Ark Contracting Services , LLC , for the
Vi ll age Creek R eclaimed Water Eastern Delivery Sy stem Pump Station No . 1, thereby revi sin g the total
contract to $3 ,210 ,007 .00 .
DISCUS SION:
On D ecember 8, 2009, (M&C C-23964) the City Council authorized the execution of a construction contract
in the amount of $3,167,580.00 with Ark Contracting mService s , LLC, for the Village Creek Reclaimed
Water Ea stern Delivery Sys tem Pump Station No. 1.
Change Order No . 1 include s the in stallation of two items: 96-inch Sluice Gate Actuator and Total
Su spended Solid s (TSS) meter. The exi sting 96 -inch sluice gate is located between the we st chlorine contact
basin and fi nal effl uent pumps basin where the reclaim pump station is located . The actuator on thi s sluice
gate wa s found to be broken and a replacement is needed to operate and isolate the two basins when the
reclaim pump station is in operation . A new TSS meter was identified by the engineer and staff to be used in
conjunction with propo sed turbidity meter as req uired by Texas Commission on En viro nmental Q uality
(TCEQ ); to assi st plant staff in maintaining minimum reclaim water standard s at the reclaimed pump station.
Staff has reviewed thi s change order and i s in agreement with the scope of work and costs as sociated with the
work.
This project is located in COUNCIL DISTRICT 5 , MAPSCO 68N.
F IS CA L INFORMA TION :
The Financial Management Service s Director certifies that funds are availab le in the current c apital budget,
as appropriated , of the Drinking Water SRF/ ARRA 2009 Fund.
FUND CEN TERS:
TO Fund/Account/Cent ers
CERTIFIC ATIONS :
Submitted for City Manm:er 's Office by :
FRO M Fund /Ac count/Center s
P 256 541200 701300021383 $42,427 .00
Fernando Costa (6122 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Ori2inatin2 Department Head;
Additional Information Contact:
ATTACHMENTS
1. 60Reclaimed Pump Station co 1 FAR pdf
S. Frank Crumb (8207)
Farida S. Goderya (82 14)
2. 60RECLAIMED PUMP STATION COI MAP REVISED.pdf