Loading...
HomeMy WebLinkAboutContract 39664-CO4• 'i FOR T WOR TH ~ CITY SECRETARY DISTRIBUTION COPIES: CONTRACT NO . ;H\o~4 -C..O ~ I-FILE 2-CONSTRUCTION SERVICES 3-PROJECT MANAGER 4-CONTRACTOR CHANGE ORDER NO. 4 PROJECT DESCRIPTION I DATE June 21, 2010 CITY OF FORT WORTH ADMINISTRATIVE CHANGE-ORDER REQUEST I csco # 39664 PO #10-00057564 Excavation , Load in g, Transportation and Disposal of impacted soi ls from 2500 Brennan Avenue and 3479 West Vickery Blvd. (Former Howell Instruments). ORIGINAL CONTRACT AMOUNT ....................................... $ __ 4~5~3~,0~53~.o~o~-- EXTRAS TO DATE ....................................... $ 106,004.00 CREDITS TO DA TE ...................................... $ ----~0-~00~-- CONTRACT COST TO DATE ----------------------- AMOUNT OF PROPOSED CHANGE ORDER ------------------ REVISED CONTRACT AMOUNT ---------------------- TOT AL FUNDS APPROVED BY COUNCIL ------------------ IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: PROJECT NO . DEM:09-17 SOILS CITYM&C No. C23984 $ 0.00 $ (1 ,630.00) $ 557,427.00 $ 559,057.00 1. CONDUCT on-site breakup of oversized concrete material uncovered during excavation activities at the 3479 West Vickery Project. The break-up process is necessary to allow for loading into trucks for ultimate disposal at the landfill at a cost of $1,860 ; 2 . CONDUCT EXCAVATION ONLY ; 1,860 CY C lass I Non-hazardous waste soi ls at 2500 Brennan Avenue Project for an overall contract cost in the amount of$11,160 ; 3. CONDUCT soil moving and turning of stockp il es to expedite drying of soils at a cost of $3,600 ; 4. NOT CONDUCT remaining 17 days of surface water pumping at 2500 Brennan Avenue Project for an overall contract reduction in the amount of $11 ,050 (see Section 6. Compensation -Table 6); 5. NOT CONDUCT remainin g one day of investigative trenching at 2500 Brennan Avenu e Project for an overall contract reduction in the amount of$1,800 ·(see Change Order # I); 6. NOT REQUIRED ; storage of contaminated surface water at 2500 Brennan Avenue Project for an overall contract reduction in the amount of$2,000 (see Section 6. Compensation -Tab le 4); 7. NOT REQUIRED ; disposal of contaminated surface water at 2500 Brennan Avenu e Project for an overall contract reduction in the amount of $3,400 (see Section 6. Compensation -Tab le 5); and 8. Items# 3, 4, 5 and 6 above are REDUCTIONS in contract work. All wo rk to be performed in accordance with the Invitation to Bid specifications. It is understood and agreed that the acceptance of thi s Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. 0'/-1 4 -1 0 P 1 4 :.59 I N OFFICIA L RECORD I CITY SECRETARY FT. WORTH • . ;- Original Contract Time 30 da s Contractor Additional Approved Time To Date None Date Eagle Construction and Environmental Services, L.LC. ram Manager ~@ Assistant City Attorney Arthur Bashor Date Date Date NO M&C REQUIRED Approved Contract Time To Date 30 days Environmental Supervisor Roger Grantham Additional Time for This Change Order None Date 6/t1!10 Assistant Director / Managing Department Michael Gange Date Assistant City Manager Fernando Costa ~ ..• · .. ~Q Council Action (If Required) Date Date D Approved D Disapproved D Other--~ OFFICIAL RECORD 1 CITY SECRETARY FT. WORTH, T~