COI�TTRACT CSC NO. 5870I
FOR
THE CONSTRUCTI011T 4F
�0�2 Sond Year 1 �- Contract �
City Praject No. 142931
Maitie Parker David Cooke
Mayox City Manager
Chris Harder
Director, Water Depa�-txnent
Lauren Prieux, P.E.
Interim Dire�tor, Transportation and Public Works Departtn�nt
Prrepared for
The Ciiy a� Fart Worth
Transportation and Public Works Depaa�tmen�
�0��
�
• ������?��
ExP�RiEf�lc� � rr�nsparratian
504 West Sevenih Stxeet, Suit� 1100
Fort Worth, TX'�61Q�
$��� � ���s�
BRENT��E. �SHIMANEK
��.........131147 •...........F�
0
8/2612022
��� �����
C�� ��Fo���ior�t�
Y
Standard Construct�on Specification
Documents
Adapted September 2011
ao ao 00
STANbATZD CONS'�RUCT[ON SPECiF�CATTOis DOCUiv[ENTS
Page ] of G
S�CYIDPf OQ 00 Qa
TABLE OF CONTENTS
Division 00 � General Canditions
� 00 OS Ifl Mayor and Council Communication
� �fl OS 1 S Acidenda
� 00 11 13 Invitation to Bidders
� 00 21 13 Instz•uctions ta Bidders
� 00 35 13 Conflict of Interest Statement
� 00 41 00 Bid Forin
� �0 42 43 Proposal Form Unit Price
� 00 43 13 Bid Bond
� OD 43 37 Vendor Compliance to State Law Non�resident Bidder
� 00 45 11 Bidders Pr�qualificatioiis
� 00 45 12 Yrequalifcation Stateinent
� 00 45 �3 Prequali�cation Application
� QO 45 26 Cantractor Compliance with Workers' Compensation Law
� 04 45 40 Business Equity Gaal
� OQ 52 43 Agreement
� 00 61 13 Perforinance Band
� 00 6I 14 Payment Band
� (}0 61 19 Maintenance Bond
00 6I 25 Certificate of Insurance
QO 72 00 General Conditions
QO 73 00 S�pplementary Conditions
Divisinn O1- General Requirements
Ol 1 l 00 Summary of Work
Q1 25 00 5ubstitution Procedures
01 31 19 Preconstruction Meeting
O1 31 20 Project Meetings
Q1 32 16 Constructioa Schedul�
01 32 33 Preconstruction Videa
Ol 33 00 Su�mittals
01 35 I3 Special Pro,�ectProcedures
01 45 23 Testing and Inspection Services
O1 50 00 Temporaiy k'acilities and Controls
�1 55 26 Street Use Yermit and Modifications to Traf�'ic Control
Ol 57 I 3 Storin Water Pollution Preventi�n Plan
01 58 13 Temporary Project Signage
Ol b0 00 Product Requrrements
Ol 66 OQ Product S�orage and Handling Requirements
01 70 00 Mobilizatian and Remobilizatian
O1 71 23 Construction Staking and Survey
Ol 74 23 Cleaning
O1 77 I9 Closeout Requirements
O1 7$ 23 Operatidn and Maintenance Data
O1 7$ 39 Praject Record Documents
CITY OF FORT WORTH
STANDARb CONSTRUCTJON SPECIFICA,TIpN �qCUM�iVTS
Revised September 9, 2022
Last Revised
07/01/2011
o��ov2ai � _
07/19/2421
11/02/2Q21
02/24/2020
09/34/2021
01/20/2Q12
09/11/2017
06/27/2011
08/1312� 11
09/3 0/2021
08/13/2021
Q7/a l /2011
14/2'7/2021
11/23/2021
07/01/2011
07/01/241 S
07/01/2011
07/01/2U 11
08123/2fl21
03/09/202p
Last Revised
12/20/2� 12
07101/20i 1
08/17/2012
07/01/2011
08/13/2021
07/01/2011
12/20/2012
03/11/2022
03/09/2020
07/41/2011
03/22/2021
Q7/01/2011
071011�011
a��oa�2a2a
d7/41/2011
11 {22/2016
Q2/14/201 S
07/01/2011
03/22/2021
12/2Q/2012
07/0I/2011
2022 Sond Year I-- Contract 5
Ciiy Project No. I D2931
ao 00 00
STANDARD CONSTRl1CT10N SPGCI�ICATION �OCUM�NTS
�'age 2 of 6
Technical Specificafions which have been modi�ed by thc Engine�r specifcally for this
Project; �ard copies are included in the Pro�ect's Con�ract Dntuments
Division 31 - Earthwork
31 00 OD � Szte Cl�aring
Division 34 - Transpartation
` 34 71 13 � Special Pro�isiQn to Traffic Cor�tral
Technical Speciiications listed be�ow are included for this Pra,ject by re%rence and can be
viewedldownloaded from the City's website at:
i�tto:l/fo rtworthtexas.�ov/tnw/contractorsl
or
https://apps.iartwort�texas.�ovlPro�ectResoureesl
Division 02 - Exis#in� Conditic�ns
� 02 41 13 Selective Site Demolil:ion
� 02 4T 14 Utility Reznoval/Abandoiimenfi
� 02 41 15 Paving Removal
Division 03 - Concrete
03 30 00 Cast-Xn-Place Cancrete
03 34 13 Controlled Low S�iei�gth Matei•ial (CLSM}
03 3� 16 Canc�•ete Base Material for Trench Repair
03 80 00 Modi�cations ta Existing Conerete Structures
Division �fi - Electrical
��z �vzr�a-nvv ��7rC�CC11�tt,'A7G�J�tlD�
�� £or�tnliticn fo:r �iln.txical ���a►�:�
�� nc ��
���
�r�� �'nu�r�;�ouisu LZioh� cnu Itr✓�c���c�e r�r Ll�,.+,.;,,,i_c_t.n� �.r_
''��o--o�-�Q ��.�t��:�s �/Iat� L�.�at Cor�1a��
Divisio� 3l. - Earthwork
� 3l 00 00 Site Clearin�
� 31 23 1G Uncjassified Excavation
� �� ��
� 31 24 00 E�nn.baz�kments
� 31 25 00 Erosion and Sediment Contral
� �'��o �a�+�t�
� �� �
Divisian 3� � Exterior Improvements
� 32 dl 17 Perrnanent Asphalt Paving Repait•
� 32 d1 18 Temporary Asphalt Pavin� Repair
� 32 O1 29 Concrete Pa�ing Repair
� 32 11 23 Flexib�e Base Courses
CITY OF FORT WORTH
STANI7ARb CONS7"RUCTION SPECIFICA'i`ION DOCUMENTS
Revised �eptember 9, 2022
Last Revised
03/11/2022 �
12120l2412 �
D2/b2/2016 �
o3li�rzoz2 �
1 2/2 012 0 1 2 �
12/2Q/2fl12 `
12/20/2012 �
r�amyr.��
�
�
�r�
�.��
03/22/2b2I
01/28/2Q 13
O I/�/�V ?.
01/28/2013
Q4/29/2021
1?1,2L1��U�
; ul�C1�V 3
12/20/2012 �
12/20/20 L2 �
I2/20f2012 �
T2/2D/2012 �
2022 Bond Year l— Contract 5
City ProjeGt Na. 102931
OQ 00 00
STANDA.[tl7 CONSTRUCTION SPECIFEC1ITION 1]OCUMENTS
Page 3 of 6
32 I1 29
32I133
�..'' „�� ,�-
32 12 16
���
32 13 13
32 13 20
3�1373
���-4-�-g
32 16 13
32 � 7 2�
32 1'125
�'��
�' 7�v
����—�
32 32 13
32 9l 19
32 92 13
2`'iL11
�7�� i�.-�i-,nm�,
Lime Treated Base Caurses
Cement Treated Base Courses
Asphalt Paving
�n�h�'.t I�^zi;,�..�,,��a��
Concrete Paving
Concrete Sidewalks, Dri�eways aiid Barrier Free Rarnps
Cancrete Paving Joint Sealants
��'�c rJilit ��
Concrete Cuz•b a��d Guttez•s and Valley Gutters
Pa�vement Markings
Curb Address Paintin�
Pt,.,.., A..,.,...,,� .,,�.1 11.,4.,.,
�0� F�r��ss
Cast-in-Place Concrete Retainin� WalIs
Topsail Placement and Finishing of Raadway Righ#-of-ways
Sodding
'��a� ri�t;r,�-�ee�
�a� az� �l�u'��
12/20/2012
06/10/2022
ngf���
12/20/2412
, � i�_��.�o; ���
Q6I10/2022
12/09/202I
12/20/2012
, � »-��
06/1012q22
06/1Q/2022
1110�/2013
7 '! !'1_1z,i,z:v�v i �
i�)M�z
1 '11')�ll�t
Ob105/2018
03/11I2D22
05/i3/2021
ncn��
i � r�_�n
Divisinn 33 - Utilities
33 O1 3a 5ewer and Manhole Testii��
33 al 31 Cl�sed Circuit T�levision (CCTV) Inspection — Sanitary 5ewer
33 O1 32 Closed Circuit Television (CCTV) Inspection — Storm Drain
���Q �s� �lii�pi�; ���iri:tin��s�
�� nn f n
� a--o�--ry
�2�-o�-z-i t f�'l�::�i
�2� A�f.,..,,�,�.;,,.�. A.,,...J.. !'+.,+L....l:., D....�.,.,+;..« C+:..,+.,..,..
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
33 04 50 Cleai�ing of Pipes
33 05 10 Utility Trench Excavation, Embedment, and Backfill
33 OS 12 Water Line Lowerin�
33 OS 13 Fra�ne, Cov�er and Grade Rings
33 05 l4 Adj�sting Manholes, Inlets, Valve Boxes, and Other Structures to
Grade
33 O5 16 Cancrete Water Vaults
33 OS 17 Concrete Collars
� � nc �n n ,,,..... �,...t,..�
�--v�-�v a-=ugcrr�vriri.�
�� nc �y rr,,,,,,oi r:.-.o.. ui.,+o
�--�,-�T
���i cfool n„�;,,n n;.,.,
�3--93-�� ��el-i��
�'�4 r.,�f.,ii.,,;,. „Fr�..^�^i� Pip�r`a�isg [tr'�C�a�t�
33 US 26 Utility Markers/Locators
33 OS 3� Location af Existing Utilities
33 11 OS Bolts, Nuts, and Gaskets
33 I 1 10 Ductile Iron Pipe
33 I 1 11 Ductil0 Iron Fittings
33 I 1 12 Polyvinyl Chloride {PVC) Pressure Pipe
09/07/201 S
�3/11I2022
03/11/2022
�f�B1�A1�
17 !'f�z
17 I'1�z
�'7 l��z:rz�vi s�v i�,
o��a��zoi i
02/46/2013
o�i� xizozz
04/02/2021
12/20/2012
09/09/2022
Q3/11/2022
12/20/2012
03/1 I/2q22
i�������
i�r�� nr�z
��-F�9l�91�
, � r���
n�rio ���
12/20/2012
12/20/2012
12/20l2012
1 2/2012 0 1 2
0 912012 0 1 7
09/09/2022
CITY OP F'OkT WORTH 2O22 Bond Year 1-- Contraet 5
STANQARD CONSTRUCTIQN SP�C1rICATTpAI DOGUMENTS City Project No. 102931
Revised Seprembar 9, 2022
ao oa o0
S'I'ANDARD CONSTRUCTION SPECIFICFI,TION QOCiJMENTS
Page 4 of 6
��
� ��T
3� 12 10
33 I� 11
33 I2 20
��
33 12 25
�3-9
33 12 4�
�$
2 Z� �_ i-.�c,_vv
� ��z
�3 �J 13.
�� ���
33 31 20
� ��T
��
� ���
33 31 50
32 � 7C
33 39 10
33 39 20
� ���'�Q
���
��
33 4I 1Q
�-4-�1-�
�1�
3� '13 1?
33 46 Qb
�
�--Q-�-�
� 2��
� 33 49 20
� ���� �� To
�e�s'1��ulc �:�;�, r��� �cx�r., ,.n.�� cfaai_r .t�n�a.• rr.,�.,,
�:�r�cd Etocllil�o sr�d �itt✓r.i�G
Water S�rvices 1-inch to 2-inch
r „ a �x�„ta.._��rat �.r
Resilienfi Seated Gate Valve
n�x�ix� n nT,�.�.�,. co„foa a,.,+o,.a.. �r.,t<.o�
Coiuiection to Existzn� Water Mains
r�,....�.,,.,f;,,�, n ... �cr..i.,,, n ., ..,wt:,.ry � .. n,,..,,wt,. �x�.,+,,,. e.,�+,,,,,,,
Fire Ilydrants
�J4'�tcr � :��3e-�#at-�er�
c+,..,.,�„r,a nt.,.. „F�tr.,i,>„ n � �,�1„
G.rr•.r1 in �lu�o �i�. (C��
li�►CY��CG� �Gllif:/19�u Pipe r,�r Gs�a��ibj �nit�r�� EJ�°r.�a:c
u:.��� r��,-.,,;+.. n„i,•�tl?.JrC1A �III��L}�1�-�£7 E[�'"11-�7� Ei�@i'
Polyvinyl Chloride (PVC) Gcaviry Sai�itary Sewer Pipe
�r.�in�l CLIo��'r�{�G) Clc�.�v ��
�i�e
�arrta�� �'i��i� a��
Fi.�rr.tc�� E�i�c�- �:��o Lr.�rfi,i�r�.��i
Sanitary Sewer Service Cannecti4ns and Service Line
r�..,,.�.;r.,�:,,., n:,. ��.,t,,,, � 1' �`1'_11�nIVj, e„t.,,.,. �,.,.,.,, n,r,,;,,�
Cast-in-Place Cancrete Manholes
Precast Concrete Manholes
�✓�.1;�� 3�"n�
�ot��,�ti�� n�..�� ��.�,�,,��� 11Ti7 A !�\
��&L'IiG� f ���S7S.6�SPG.S
Reinforced Concrete Storm Sewer Pipe/Ce�lverts
Is��h T'���;,�,�.ry 1or� (LT���}
��i�fEr7ad 1'r1r�/ctl��lt� ^ �cnr��� n:..,,
n���l�u �i� r� Ete�� U�' ��
�ubdrainage
O1^��rnn� Drrir.�G
��i2. u?C.i11�
GGt ui 11�L�a �?/Ic!'l1SC �
Cucb and Drop Inlets
c�*����'l�fiG ��.v Yy� ij� �,.� sxr;,, .,ri�
T�r��
r�n��
02/14/2p17
I111.'1�2('J.3
05/06/2015
nn r�o ���
0210b/2013
-��I2C!`'V '?
OI/03/2014
��r�_F�,.�P zo��
n��7��rz,�..n�
-�-'J20�2� 12�
z�r��
e���a��oi�
�9109/2022
I3l2Cl2D �2
Divxsio�x 34 - Transportatian
� �4-4-�e ��a���
���I 11 1C.V 1:'�okn���t?. C
� �'' ^�� ?.t�l�-r.�r� � Cont�r�k��+-�3�
�?/I 91 I Q:9� Ait.�,h���t C c o
� � 4--4-��
� �4-4-�� �e��infi ���
I �-Q--� ���I1�:fIJiS 1�1�9
I� n ���no,r�, T rr�
1��ta;i�1 �.�u Rc�d�
� �1 1I 20.Q�
� 21 11 �C.QZ �esi�'n�ticj :.��.}° T ar.it�rn�
� 34 41 30 Aluminu�n Signs
� �^�-���Q �e-�I�cdc �ibe�-E�tio C�b�e
, � ��-�-��
y � r7��
0412b12Q 13
i �l�� n��
12/20/2012
12/20/2012
1�J�0/�D 12
, �,-,�
nn r���
o�ror�2o� i
�$1�
, , /? 2/2V. ��
��
12/20/2012
�� ���r � _�� ���
n�ln�, � ���
1'7 !']�z
0311 � 12422
�� �n z_�-, o,-rF o � �,
�?I"l�0^�
r�rt��
n�r�
ni��
, , ,�-��
n� no ��z,
r�f��z
8�1-5/�91 S
n�ria c��
n�rr��
1111212Q 13
n� »�r,���
CITY OF FORT WORTH 2D22 Bond Year 1—Contract 5
STANDARD CdNSTRUCTION SP�CI['ICATION DOCUMENTS City Project Na L02931
Revised Septcmber 9, 2D22
00 0o aa
STANDARD CONSTRiJCTION SPECIFICA'fIOI�i DOCUiv[ENTS
34 71 i 3
Traffic Control
Page 5 of 6
� 03/22/2021 �
Appendix
GC-4A2
GG-6.06.D
GC-6.07
GR-4I 64 00
Subsurfaca and Pl�ysical Conditions
Minority and Women Owned Business Enterprise Compiiance
Wage Rates
Product Requue�nants
END OF SECTI�N
CITY OF PORT WORTH 2O22 Bond Year I— Contract 5
STANDARD CONSTRCJCTION SPCCIFICATIOt�! DOCUMENTS City ProjectNo, 10293I
Revised Septemher 9, 2022
��tj� �� ��!'� �V�1'ti'1, T�K�S
��yar �r�d �our��il �or�rr�ur��c��ior�
DATE: ��1��l�� MJ�xC Fll.� NUNtB�F�� flA&� 22-0+3'�4
L�G fVAME: �0202� B�CVC] Y�AI� 1�(]CVTRACT ;s��1��i.ENI]�C�
�.�n:ar��r
{��7 9} �uiha�ze �.xee�it�on r�f ��on#ra�i wFkh fu1r.C;len�o� �4rt�iructi�n Comp�ny. In�., irx I��i� ,�rrr,�ui�t oi ��,401,9�8_50, [or Coit�b�r�o� �tre�t
Pavi[�g Improvem��r�s. ��annwaEe� Im�eov���nis, and Waker�nd �ar�ik�ry ��w���41a1� Re�lac�n��ntsfarfU22 Bartd Y��r 1-ConCr��t5 Pro�ect.
A�apt �0.ppra�riatlon Ordinanr.�s �n Eifec3 a Par�inn r,f Water`s C�ntrib�S�n�� to i=�scai Y�ars ZQ��-2Q�7 �apital Im��rovorrt�nt Program an� Amend
fh� Fisral Y�ars 2[?23-�0�7 Capi��l Cmpravernenl �'ragr�m {Z022 Bond Pros�ram}
���'� nnanF r� r� 4TI0 N:
1t as re�orrnner�ded IY�at thc� ��ty �aur�c.i�;
9_ Autk�a�aze exe�uUnrM �f a cnr��ract w1117 f4�c��endan �ans�ru�fiun �om�any, Jnc., in kh� amaunt af $�,40i,9�8_�0, for c�n7hfn�� s�eei �s�ir�
intipra,re�rrer�ls, stormw�l�:r in7provements. and wster and ssnilary sewar n�si� replac��ner�ks far ihe 2��� �on0 Year 1 Y�ar�krack s
}�roje�k (�ily f�raj�cR �fa, 10�J31j;
2. Adapl ihe ailac�e�d ap}�rapeiatFan orcfinance �n�rees»g r�c���ats �n� app��priations �n th� Uk+ater and ��war �apac3l P��jects F��7d in the
amaur�t af ��,9�1,128.a4, lrans�err�cf fro�r avaaisbls ��t�ds yv�kt�in the 1Nat�r and ��wer Fursd. ftir kh� pur�aas� a# fund+ng th� 20�f �or�ci Y�ar
��a�tr�c# 5�rr4keca {^�ty i�r�jeck iU�, �029�1 � ta efiect a�orliar� �F Water s Can[r�bu�ion ta 1h� �`iscaf Years 2��3-��27 �a�iEa� Crnpr�uemenfi
I�rogram;
3. Ada�rt Fhe attacheck appro�rriatiar� ardinan�e adjsastin� appra�rialions in the 2J2� B��d Pragr�m Fund $y Grxer�aslny ��pra�ta�aians ir� �I�e
2��� �or�d `R'eat t- �o�rlr�c:t 5�,ra��c! {��Ey f�ra�ec� EVa, 10��31 � 1,7 an a�x,�unt of �3,237,1 ��,�0 ar�d decr�asing apprn�ri�tioRs Iri tri� �Rr�ei
�ntipro�c�m�r�R-f�eler�ar�#irig �fre�ts �xrcgrarnrrtabie praject {�'ity Praject f�o_ FB�Of Oj by ifti� same ai3�aunt.
A, Ado��t tfte at[acl7�d a��aropriatl�n c�rd�nane,a ad�4,sting es�irr��l�rl r�cei�is �nrJ appra�ris€ians lit ��re �trsii�7w�ter Capiial ����jec�s ft�nd by
Inc�easaflg esdmated receEpts and at���ap�:arfc�ns i�7 lhe Stroei I��ving I�pro��man�s� Stortr't Dr2in and W�ter �nd ��nai�ry Se�ver M31n
Ftaplacemer�ts [car �022 Br�rrd Yea� 1- Contract 5 fxr�jecl (�ity Proje�; hla. i 62�3 a} Res the ama4ini df �� 55,800.0� ar�a d�crea��n� e�ilrr3aled
rece:�a�s a�d appro�r�at�ans in th� Ur�i��c�e Irn�rav�me;71� pro,�ram���a�l� praject (Gity Pro�ect [�a_ PC�4�+�3} ksy ihe sar��e air�aue��= and
5, Amend th�a Yi�VU's �onkribt�kian to �=�ia�ai Years 20��-�0�7 �aglt�l Gmpr�v�m��# i�r�gr�m.
D�SC�1��tON:
Th�s f�ayor and �c�unci! Cairrrnu�Eca�ion {�18,G} �s to au[trar�ze a cae�slru�fial� car�lfact ioi' Year 1 I��fglib�r�❑oc� �iroets Impr���mer7ts pra�ecE
�SsaclBt� w�th ti7a �Q�2 Borrd �roqrar�x. For ���� �onr! 1'ear �-Corstract 5 prr,�j�ck, th+s incl4��es w�#er, sar�iiary sew�r. storrn�r�ln anr3 slreek
p�vir�g impfav�m��ats oe� ��E�roxi��at�Cy 2.�.9 la�e nailes, ara ihe F�Yl�wl�g s[reeis
Stre.el
AS� �r�s�C9n4 �#reel �
IiAvenue � S
�v�n�,e �
Frain To �c�pe �
V�cK�ry Bou�ev��dl Ave�l�e E� Pavemer�i �h�an�� Wa�����Pavin��Stormtn+ator
R��+erside Drive Asl� ��esccn� �fre�r# Water�P��nrxg �
�
ASh �r�st�en� �treei Martin Luther #{i�7g freewa� Vl+ater� �aving �
Av�n��� I� Asi� Cees�er�t Str��t Martin �uthar 1{ing Freeway Wa�er�Paving
E�rrwwa� A+�enue �elzise �`��raoe �1arErn Lukher IChig �reeway W�ter 1l��ving
�.Jvalcle �Ire�# E Riclim❑nd A�r�ns�e f�t�rlil� L��i��r Klrrq Fre�way lNaterl5ew�rll'a�+ing
��Izise l'errac�' �Aven�ie � �A��nu� D 'W�t��
Ann �tree�' Av�i7ue C Avenue D +UVater
�
'L�u� I� ck�se praximi#y ta the �{}�� Bond Yea� 7�o€�Rraat 5�ro�ecl s�reet� atka�re. the Vh�aier aep�rsi��e�� 17as requ�skes� iar water m�in ex�en=sr,,��
an f3€��Ize T�:rrac� ar�d Ar�n �treet �n nrder �a I��� Rh�r. v�at�r �ys�em and F�rc�v�de �ncre�s�Q eifi��enGy. Asph��� pavmg r�habikriation will be
cortduc�ed o17 i�aihE roatiways sa�b�eq�eni ko w2��er mair� ��tis�alla#ian,
T}�e proJ��� was ad+�ettksed f�r �ri�i on S��k�rnlser i, ��22 an�1 �epkemb�� B. ���� in tl�e !�"�rt Ys�r�r��i �t�r-��'€r�e�ra�n. On �egt�in�er 29, 2�22, t�c�
fp�fqWlrtg t�Eds wafie reC�el�ad-
Bit�der
��utt���ndan Cons{I'4�cl�an �o..
I�c
IStahil� $1NEnn, Irtc_
Jacksan �onslrucl+or�, Lkd_
���e Bld �Alker�t�#� �l
{(��ncr�t� {Asphalt pa+�ing} 'riin� a# �rnnp�etian
�a+��n�}
$�,�Q�,�2�_5� ��,43�,$1�.dfl 4�� C�lendar Days
�.���.11Q_� s �5.�0'�".��i{�,25
�7,'i13.B#S9_Q� �G.55�.94A_�0
in �R ��kem}�1 h� se��+re altama�� blds. sEaif adveatised ii7a p��oj�k wi�h Base k�id as cor�erele lald lo r�cari�lruc! �xEsairr� siraets InCluded in i�� ��nd
vrik� c�ncrele Ira�+�l lanes, and A��temaiiv� � as Rel7��i[it�tln� 4f exls�i,7g rn��way wik� nPw �3s�aY+aEk an� repl�c�r���rsf �f dair�ag�d c�ir� and gutt�r
�la�F re��mnlen�s �snr�rrd �f k17L r�an�ra�k for �a� kli� {c�,n{.r�rke C���ion}. �;on�Fete pa��r�r� sypic�lly ha� a lrr��r�fy year li�e s�an +���rile aspl�i�li paving
h�s a len years spae�. I� arJd�kaan, th� maln�enaaice cnst af cancrei� pa�+err7en! Is leas, tFsari as��haYt pava����nl.
7he Transporiatiarr 8, P�bli� 1Narks Qepartra�eret's shar� orr tF�is �onkar�Gt �s �2,8$�,�97,[}0 (F�a�r�nr�; �7,7GB,7�'�,50; �tonrrwater �1�7,7��,�Oj, l'he
p�vin� fund� �or tF�ls �ro��G# ar� Ir�cluded In the �4�� Mors� #�r�grarr�. i'�ie UUat�r i�o�artmen�'s ehare �n t��s caniraci Fs ��, 547,��� 5� a�d w�ll be
3v�il�ble in It12 Vl+�#�� �4 ��v�r ��pit�1 P��je+�+s ��i�d for ii3e �f�je�k (�ity Proj��1 No 1���3� �. In ad�it:on I� th� c❑n1r�c1 mm�un#, $$���,1$9.;;�
{V�at�r �2+�3.28'k,��. �ewer $3�_570.�0 Pa�+lr�g �332,t)1�_�{�, Storrrs�uaE�r� $i5.3�3.5�} �S r�qu�re�d forproJ��k �nan��em9n�, ma#erial testin� and
insp���inrs ar�d ��8�,9�i�.Q� �Wai�r �7 i�,�96,0�, �v+�+er� ��{,�,95�.{}b. �avir�g. � 13�,3�U,��, �tarn�iwaler� �r��,7�1 ��) is �+rov:deu [�r proj�ct
tcsntkn��n�ea �
1'�r�s �ro;ect will have no rr�lp�ct ort t1�e Trar�sporEat+an &�ublsc Worlts' �r on #!a� UU�ter pep�rtr��enis' ��}�rat�ng budg�ts wl��n �am�ale[�ci 7f��
sarri�ary se�uer a�mpo��en� oi �#�a� prp�ec! Is par� of ihe UL��i�r pe�ar�m$na's �ar�G#ary Sr�kvc�r C�uo�flaw �nifi�iiv� Program. ApproxirriateGy 3,0�;3 Isnear
fe�t of r.�st Iron watet plpe wl�l be remnv�d �rrd replae�d as pa�t of k�r�s project,
'€'he aclrorr in t�rks ��f; w�ll ame�7d '�PW's canl�if�ulJon i� �lae F+sco11'e�rs 2023��fl�7 C�plk�st iri+prt�vam�rrk P�gra� �s f�llaws
�0�2 gar�d Year i ��nt�ac[ 5-�+GC�EE�Ea�Jh`
�apilal PFaject �Y2023 CEI�
F�r�d ��m� �lppra��l2tion�
C�l�me
,' U1+&S ] p293� —
�2�Ikr�l �b�� ��nd
�rnjecf� �- Y� 1 —
Fund ��nlra�t 5
��1�0�
�Q�2 Bap�d 1�2'd3� —
Presgrsm � �Q2� Bo�7d
�4ind 1'��r 1 --
"��a�7 �unlr��t 5
5�prm
INaler 102�31 —
�ap�E�l 2C2? B�nd
�rofects Ye�f 1 —
�un+� C:onl�a�k 5
524��
A�U1�rily
�h�s A+!$C
7F�is h��C
T�tMs f4S&C
�ud�e[ (:F��ng� F�eviserJ
InGr�asall�eca'aasv FY2Q��
8�dgei
52;9�1,1 �8_40 $P,9�� _'i��.0{�.
$3,�3T.7�#€a,40 �G3.�37.rt�$.4�~
�15�,8Q0,00 $�SS.S�Q.1]�'
F�in�ing �s k�udge�ed In tl�e Trans��r to +�la#�rl�aw�r acc��int of thc� V�ater and ��wer np$rat�rrg l�udg�t fior tne purpose �t tundir�� t�s 2022 Bar�d
Y�ar 1—�o�kr�ct S pro�e�t t�f��rti tI�Q �Ja�Br& S�wsr �apiial F�rfl��e.�s ��nd.
A�Propr���o�rs for Ih�w�t�r, �nl��ry �w�r and �xavin� �rrtpro�rernerr�� f�r202� ��rnri 1*ear �-�onlraGt 5�rojeCt by Fui�d wH� �ns�st �ft�e
fokl�v,�n�;
�ur�d
�x�stGng
Ap}�rbptrS[��ns
Addsli�rral Pr��ecl�ota�'
�1�pf4pfi�trOf�S
�{i�� E��n�l Prognm - Fu�+cl
3�027
Sl�rrrll��tQr Gs�ltsl
[Pra�4�ts F�nd - 520�2
f
w�:� Ga��tal P�a�ects - �u�tf
�600�
�Q07 �riti�al C�pi�,�k
Pro�eG{� F�IIxJ 3�OOfi
Pr�J�a Tat��
$�,00
$�,00 '�
��5�.57�,Q4
$31d,632,OCk
�r�€�9.�45_�{I
'i��a�bers r��ii��fe� for presonta��an puipas�s.
�3,�37.�1��_00 �3,237.14�_00
*�15�.�{14,�{1 $�a5,8E1�1,��1
�2,��9.728.00 $3,17'fi,B��,Q{l
S� �3 GA.03�_��
$f.�1�4,�7�4.�� $6,86�.'7�9.�1�
��,s�n�ss ��ui[y� hh��l�ndan �nnskf�r�kinn C:�,. �nc, 3s Gn compliano� �+���h �h� �kky'� ���aness Equily Ord�nan�e by cramrrfiNing lo ! 3`Y� Bustness
Equkiy p,�rti�i�ra��c��� a�tl d�cu�3tier�t�r��} 9ood fai9h ��C�rl, �u1c�i�r�stnri �an��rr��lE�� �o., Inc. Id�*n�lii�d s�ver�i �ubc�r�tra�ling ar�d suppliei
�ppar#uniNas_ F-Gou,��+e�, the frms canEacEad kn lf�e nre�s i�err#i�ad did nr�t �espond or dld noi submil it�e lawesk bids Thc� (:Iky':a Bus�r��ss E�uily
g�ai For lM��s projec� Is �5"r6.
�iis �roject i� i�i{.It�deo ir� ti►� 202� �4nd I�r��ram, x�7o �ity's �x��nda�ae �4rrlm�rcl�� F�pe� (ECP� {f4�8G ?2-�Bfl7; �rd�nan�e 25G75-���0�2)
pr�+�l��s IlquiciiEy lo su��nr� 1he appro�r��trc�r�, Avalla}�!e �eso�ir�e� wllt ha i,isetcf �t� acfual�y mak$ �r�y �r�Eanm pF��re�� paym�nEs �,r�lrF debk I�
�ssurrJ On�e de�it �ss�rs�led w4it�r $ prnje�! 19 s�tr�, d�Ekl ��roce�rts wafl rafrn���fse th� �ntenrn t�n��c�ng s�urce Fr� ac�r.�src€�nr� w�th tF�e �iake,ti��r�t
�xpressing �F�aaE Inten� t� �v�m�,f�rsa li�,�f �vas a�flpl�� �� p�rt rrf �ff� ard�rral�c� ca��vassing t�e bar�d �leciion �C7rainanr,� ��35'I 5•OS��C7����
i'i��s �ro�ack is focated �n C�U�J�IL E��S'�F�i�T �,
�IS�AL IN�QF2II�IATIOS�1 � C�R�I�ICATIORL:
TI� C�ite�ae �r€ �inan�e cerktfk�s il��a� iu�7ds are a�a�liilale �r! ,i7e �:4�� r[:r�s aperatin� bu[ig�k af k�e Waier &$ewJer FUr�CI �t�d up�n th� �ppro+ral of 137e
abo�re recom��,enda4lr�ns a€+d �d❑pt�orr o[ L�e,�#tac.�-�ed a�,�ar��rriati�,r� arc�inances, ��nds will l�e a�+a�la�a:� Fr� lh� curr�n# caA�lal bud����. a�
ap�pmpr}ale<I. in iha W�,� Capi�al p�o;ecxs. �t�rrrsw�ter C�p�t�l F'roJe�ts anc: 2a22 Band F'+.��+�rs�i�f Fun�s [or t�e ���� Bond Y�ar 1-�a�traci 5
pro�ect to su�a,�L ll�e a�provai crf i�ie abnve r�com�ner�katians and �xo�uti�n af fl�� c�ns�r�actio�3 �ontract. Prior #� arsy exp�i�diture beinc� inra.�rred,
the Trang�prk�t�nn k�u�d�r. til�arks ak�d U1+aler �e�artmer�is k�a+re th� resqora�sbil�ky af uerifyin� tha av,���h��iry �xf Funds.
5ubm�tted �or Ci��r N4ar�an�rs {]fFic+� bva V�Il�t�m ,lohnson �806
{jrin6�tz}in� A��cirtppe ��niF Flp;all• �Uf6l1 �fl9�.lf ����
Additi�€�b� lnfor�ax�4i�n Cgt�f��i: Moniy Nall 8�62
CITY OF FORT WORTH
Transpvrtation and Pub�ic Works
2022 Bond Year 1— Contract 5
City Project No.102931
ADDENDUM NQ.1
Un�t 1: Water Improvements
Unit 2: Sanitary Sewer Imprnvernents
Unit 3: P�tving Impravements
Unit 4; 5tormwater Irnpravements
ADDENDUM RELEASE DATE: September 16, 2022
BID RECEIAT DATE: September 29, 2022
INFORMATION TO BIDDERS:
This Addendurn, forms part of the Plans, Contract Docuzaaents & Specifications for the above
referenced Project and modif es the original Specifications and Contract Documents. Bidder shall
acicnowledge receipt of this addendum in the s�ace �rovided below; in the proposal (SECTION 00
41 a�) and aaknowledge receipt on ihe outer enve�ope af your bid. Fa,i�rre t�. acicnowledge receipt
of this ac�dendum couid subjact �he bidder to disqualification.
The plans and speeificaiian documents for 2022 BOND YEAR I— CONTRACT 5, City Project
No. 1R2931 are herehy revised by Addendum No. ] as follows:
1. Construction plans have been modified as follo}�
• Sheet 1: Revised cover sheet to include signatures
� Sheet 11: Revised shape and text to permanent asphalt repair
� S�eet 44: Revised text for light paIe io be relocated (By �thers)
� Sheet 66: Upciaied detaiis to the latest versions
o S�eet G$: Updated cfetails to the latest versions.
� Sheet b4: Updated RibbonlLaydown Cwrb Details
2. Project Manual seetion 0� 00 00 TABLE OF CONTENTS shall be replaced with
section 0 Q�0 00 TABLE OF CONTENTS Iast revised September 9, 2022, attached to
this addendurri. Revised TABLE OF CONTENTS reflects updated "Last Revised" dates
and natnc;s for technical specifications that have been revised and tha strike through text
has been removed for #echnical specificatinn 33 45 QO Subdrainage.
3. Project Manual section 0� 42 43 PROPOSAL FORM shall be replaced with section 00 42
43 PROP05AT� �'�RM, attached to this addendum. Changes include:
• Revised Bid Quantity for Unit 3 Alternate A(POL) Itern No. Ia - Unclassified
Exaavation by Plan.
� Rzyised Description and Specr"fication 5ection No. for LTnit 1 Water
CITY OF FORT WORTH 2O22 Band Year 1- Contract 5
STAIVDARD CONSTRiJCT10N SPECIFICATIbN DOCUMENTS CityProjectNo.102931
Revised �eptember lA, 2U22 Addendum - 1
�tnpravements Item 56 - 8" CemLiine.
� Revised Descr�ption and Spec�f cation S�c�ion No. for Unit 3 Paving
Improvements Itiem 52 - 8" CemLir�e.
� Revised Description and Specification Section No. for L1nit 3 Alter•nate A(FOL}
Item 8a - 8" CemLime.
p Added bid item No. 61, 4" Pipe Underdrain, Type 8 under Unit 3 Paving
Improvements.
4. Project Manual Technical Specification 31 10 00 — 2 SITE CLEAR.ING Page 2 of 6 sha11
be replaced with the revised SITE CLEARjNG Page 2 of 6 sheet within this addendum.
The revised sheet reflects cl�anges to Che payment section af Tree Protection.
5. Projact Manual Appendix section "CITY OF FORT WORTH TRANSPQRTATION &
PUBLIC WORKS DEPARTIVIENT S'�ORMWATER MANAGEMENT DIVISION
STANDARD PRODUCT LIST" shall be repiaced with the attached "CITY OF FORT
WQRTH TRANSPORTATION/PUBLIC WORKS DEI'ARTMENT STANDARD
PRODUCT LIST AS OF 91912022."
6. Project Clarifications
During the pre-bid meeting, the attendeas asked the follawing questions and the City of
Fort Warth responded in the follnwing manner:
Question I. S'heet 11 �- Does the water line treneh need perrnanent reprxir at the intersectaon
where it will be milled cand overlaad?
Response l, Yes, plan sheet w�ll be �e-issued to reflect proper treneh repair type. Unit 1 Bid
Items �2 and 24 for perrnan�nt pavemerat asphalt trench Nepaat� at�e alt�ecrdy included
i�r the Bia'Proposal Workbaok.
Question 2. Sheet 43 — Contractor requested infar�mation abaut the raate ��egar�ling the 24"
sycarraore tree near paving STA 2-�90 cand profiecting at wathout damagxng/kdlling it.
Response 2. Contractor will make evet�y effart to p�ntect tree as �hown. In the event that roots
larger than 2" in diameter are encoa�ntered during derrtolition and excavatiora or�
there are ofiher work atems that could significantly damage the tree during
construction, the Cont�actor shull infarm the Ciiy Forester prior� to any f2lYtI2�Y
work beirag peYformed.
Question 3. �heet 44 — Who is redocattng the light pole?
Respo�a.se 3. �he City of �`ort Worth Transpa�tation Management Field Operations Group will
relocate the Iight pole prior to con.structiota. Plan sheet will be revfsed to andicate
pole being relocated by other-s.
Question 4. Sheet 69 —Instead of the ribban curb t�ansition, why nat use a ribbon curb sized to
match the standard curb and g�etter width?
CITY OF FORT WORT�I 2022 Bond Year 1- ConEract 5
STANDARD CONSTRUCTIOI� SPECIFICATION DOC[JNIENT3 CityPmject3�n.102931
Revised September 14, iD22 Addendtim - 1
Response 4.
Questaon 5
Rabbon Curb detc�il will be revised to 24" wrde instead of 18" and wtll be revised to
show the vertacal iransiFaort fYorrt G" curb heaght to 0".
What is the flex base bfd item for (Untt 3, Item 25)?
Respar�se 5. The flex base hid item is intended for use as trc�nsitinn beyond the dimits ofpro�osed
concrete driveways to where existir�g driver�vays are nai paved, as well as for use ira
areas where proposeci curb i� being raased.
Questian 6. Who is respansible for getting �aght of entry far the work around Avenue B and Ash
C�escentSt?
Respanse 6. The cantractor wtl7 acguire �ermissiorz frorn the owner of the home or busaness i�t
questiota for temporary access to their�roperty to complete v�ork items. If fot�mad
rights-of-entry are t�equested by the property owner, the eantractor will bt-ing it to
the attention of City Staff who �vidl crcquare a fonrtai right of entry.
Question 7. What if the City chooses concrete? Will more information Iae provided to construct
the st�eets?
Response 7. If the cancrete paveme�ti base bid is chosen 6y the City, additional inforrnation for
canstruction wall be provided in the farm of �ather cross sections, typiead section
indacating crass sdopes at station in�ervals, or centerline pro�le.
Questiora 8
Response 8.
Question 9
Ver�lfy the unclassif ed excavatian quantity for Alter�t�ate A(POL).
ifeYifted, quantity wtll be revised in Addendum I.
Why are v►�e maving the inlet on �Ish Cres�cent St? YYhat's goirtg to hap�aen to the
water going za the existing inlet?
Response 9. Inlet is in the tr^ansition from a craw�aed to supeY eievated sectaon to match the
gr�ade of Vackery Blvd. The existircg inlet lacation gets very little-ta-no flow, due to
the existing transition. I�alet is being moved to tlae ather side ofAsh Crescent to
better capture Stor-mwater runoff.
CITY ph' FOItT WORTH 2p22 Bond Year 1- Contract 5
STANAARI) CONSTRUCTTON SI'ECiFICATION DOCUIvIENTS CityP�jocENo.1Q293�
Revised Sepiember 14, 2022 Addendum - 1
This Addendum Na. 1 forms part of the Specifications & Contract Documenfis for the above
referenced project and modifies the original Project ManuaI & Contract Documents of the same.
Acknowledge your receipt of Addendum No. t by eorn�leting the rec�uested information at the
fallowing locations:
(1) In the space provided in �ection 00 41 D0, Bid Form, Page 3 of 3
{2) Indicate in upper case letters on the outside of your sealed bid envelope:
"RECEIVED AND ACKN�VJI.EDGED ADDENDUM NO. 1"
A signed copy oiAddendurri No. 1 should be incZuded in the sealed bid envelape at tl�e tinne of
bid submittal. Failure to �cknowledge the receipt of Addendum No. l could cause the subject
�idder to be considered "NONRESPONSIVE," resuIting in disqualification.
Addendum No. I
RECEIP;,F��KNQ W LED GEMENT:
4� , � ��
$ � -� ��,�.�--�_ � .
y.�� __ _
Company:
�c�i�rzdon �G�r��i�u�i� �.,1rn�.
Address: �? 8. �ox ���3
�3tt����� TX �9Y
City: State:
Lauren Prieur, P.E.
�nterim Director, TPW
By:���
Mary Hanna, P.E.
Pragram Manager, TPW
END OF SECTION
CITY QF FQRT WpRTH
STANDARB CONSTRUCTIQN SPECIFICATION DOCUME�+ITS
Re�ised Septetnber IA, 2022
2Q22 Bond Year 1- Contract 5
City Project Nn. 102931
Addendum - 1
crrY o� �oRT woR�
Transpartat�on and PublKc Works
20�� Bond Year 1— Contract �
City Project No.102931
ADDENDUM NO. �
Unit 1: Watcr Lnprovemenfs
Unit �: Sanifary Sewer Improvements
UneE 3: Paving Ln�rovements
Ut►it 4: Stornnw�ster ImpraveRnents
ADDENDUM RELEASE DATE: Septernber 22, 2022
BID RECETPT DATE: September 29, 2022
INF�RMATION TO BIDDERS:
This Addendum, fo�-ms part af the Plans, Contract Docur�ents & Specifications for the above
referenced Project and modiiies the original Specifications and Conlract Documents. Bidder sha11
acknowledge receipt of this addendum in the space pcovided below, in the praposal {SECTION 00
41 00) and acknowledge receipt on the outer enveiope Qf your hid. Failure to acknawledge r�ceipt
of this addendum cQuld subject tha bidder to disqualification.
The plans and specification documents for 2022 BOND YEAR 1— CONTRACT 5, City Pro,�ect
No. 102931 are hereby revised by Addendum No. 2 as follows:
1_ Construction plans have been modified as follQws:
• Shaet 69A: Sheet has been added to pro�+ide jcainting details
CITY QF FQRT WORTH 2O22 BDnd Year 1- Contract 5
5TAN17ARD CONSTRUCTION SPBCIFICATION DbCIIMEN'IS CilyProjectNo. 1U293t
Revised September 22, 2022 Addendum - 2
This Addendum No. 2 forrns part of the Specifications & Contract Documents for the above
referenced projeet and modifies the original Project Manual & Contract DocumenYs of the same.
Aclrnawledge your receipt of Addendum No. 2 by corr�pletin.g the reqnested infnrmation at the
following locations;
(1} In the space provideci in Section 00 41 00, Bid �`arm, Page 3 of 3
{2} indicate in upper casa letters on the outside of your sealed bid envelope:
"RECEiVED AND ACKNDWLEDGED ADDENDUM NO. 2"
A signed copy of Addendum No. 2 sliould be included in the sealed bid envelope at the tinne of
bid submittal. Failure to acknowledge the receipt of Adder�durn No. 2 could cause the subject
bidder to be considered "NONRESPONSIVE," result�ng in disqualification.
Addendum No. 2
RECETPT ACKNOWLEDGEMENT: Lauren Pri�ur, P.E.
` � Interim Director, TPW
By: _ _ r ` By: ��
���L
� Mary I�anna, P.E.
CDmp�.t�y: ���., t�. Program Manager, T�W
Address: � �' ��x ���
C�r�Ev:;�a, �'i(�_'
City:
State:
END OF SECTION
CITY OF FORT WORTH 2Q22 Bond Year 1- GantracE 5
STANDARD CO]�iST'RUCTION SPECIFICATIONf DOCLIMEN'TS L`ityPmjactNo. 102931
I�evised 5epteinher 22, 2022 Addendunt - 2
UO 2I 13
[NSTRUCTIONS T� BIDDEAS
Page 1 of 10
SECTION fl0 21 13
INSTRUCTIONS TO BIDDERS
1. Defined Terms
1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section
Oa 72 00 - GENERAL C�NDITIONS.
1.2. Certain additzonal terms used in these INSTRLiCTIONS TO BIDDERS have the
meanings indicated below which are �pplicable to both the singular and plural tl�ereof.
1.2.I. Bidder: Any persnn, firm, partnership, campany, associatiou, or corporatinn acting
directly through a duly authorized representative, �iibmitting a l�id for performing
the work contemplated under the Contract Documents.
1.2.2. N�nresident Bidc�er: Any person, firm, partnership, company, association, or
corporatian acting directly through a duly authorized representative, submitting a
bid for performing th� wnrk cantemplated under th� Contract Documents whose
principal place of business zs not in the 5tate af Texas.
1.2.3. Successful Bidder: The lowest r�spansible and r�sponsive Bidder to whorn City
(oz� the basis of City's evaluation as hereinafter pxovided) makes an award.
�. Copies nf Biciding Dncuments
2.1.Neither City nor Engineer shail assume any responsibiliiy for errors or misinterpretations
resulting from the Bidders use of incornplete sets of Bidding DocumenYs.
2.2. City and Engi�eer in making capies af Bidding Documeiits availahle do so only �or fihe
purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
for any other use.
3. Prequalification of Sidders (Prime Contractors and Sabcontractors)
3.1. Biddets or their designaied subcontractors are required ta be prequalified for the waric
types requiring prequalification as per Sections 00 45 11 BIDDERS
PREQiTALIFICATIaNS and Db 45 12 PREQUALIFICATION STATEMENT. Firms
seeking pre-qualification, must submit the documentation identified in Sectiion �JO 45 11
on Section 00 45 13 PREQUALIFICATION APPLICATTON at least seven (7)
calendar days prior to Bid opening for review and, if qualif'ied, acceptance. The
suhconfractors listed by a Bidder on OQ 45 12 must be prequa3ified for the apprapriate
work iypes. Subcontractors must £ollow the same timelines as Bidders for obtaining
prequalification review. Bidciers ar Subcontractors who are not prequalified at the time
bids are opened and reviewed may cause the bid ta be rejected.
Prequalificatifln requireinent wark types and documentation are available by accessing all
required files thraugh the City's website at:
�s:ll apps.#brtwortht�:xas. �ot /Yro Ie.:�tSdIIFC@5i �
C]TY pP PQRT WORTH 2D22 Bond Year !—Contract 5
STANDARD CONSTRUCTION SPECIFICATIdN DOCUIvIENT City Project No. 102931
Revised/Updeted NovemUer 2, 2021
00 21 13
INSTRUC'1'IONS 'PO BIDDERS
Page 2 of 1fl
3.1.1. Paving — Requirements document Iocated at:
htt s:lla s.fortworthtexas.go�IProiectResourceslRe�ourcesP/Q2%2(]-
%24Construction%20Documents/Contractor%20Prea ualificatia��/TP W°/n20Pavin�
%20Contractor%20Prea ualificatic�n%20Pro�ramIPREOUALIFICATION%20RE0
UIREMENTS°/a20FOR%2QFA V ING%2000NTRACTORS.x�df
3.1.2. Roadway ai�d Pedest�•zan Lightiz�g — Requirements docu�nei�t located at:
httns:/lanus.fortwarthtexas. eov/Pr�iectResaurcas/ResourcesP/02°io20-
%20Cor�struction%2UDocuments/Contractar%20Preaualification/TP W %2 ORoadwa
v%20and°/a20Pedestrian°/a20Lishtins%20Preaual��atian%ZOFroeram/STREET%
20LIG�i'T°i�20�'RF.QT r �L%20REOMNTS.ndf
3.1.3. Watc�� and Sanitary Sewar — Requirements document iocated at:
htins:l/anos. fartworChtexas. �ov/Pro iectResaurceslResourcesP/02%2 0-
%20Construction%20�ocmnents/Contractar%20Preaual i fication/Water%2Qand%2
OSan itarv%20 Sewer%24Co�ttaetor°/a20Prea ual ifica�ion%24Prograrn/ W S S%20are
a uaI°1o20req uirements.ndf
3.2. Each Bidder, unless currently praqu�lifi�d, must submit to City a� least seven {7)
calendar days prior to Bid opening, the dacu�neiltation identified in Section 00 �45 11,
BIDDERS PREQi1ALIFICATIONS.
3.2.1. Submission of and/of• questions related to p��equalification shauld be addressed to
the Ciiy co�itac� as pro�vided in Paragraph 6.l .
3.3. The City res�rves th� right ta require any pce-quali�ied conta•aetor whn is th� apparent low
bidder for a project to submit sucl� additional information as tlie City, in its sole
disc�•etion may require, including but not limited to manpower and equipment records,
infarmation about key persannel to be assigned to the project, and construction schedule
to assist the City in evalual:ing and assessing the ability of the apparent low bidder to
deliver a quality product and successfully complete projects foz• tlae a�noLint bid within
the stipulated time fcame. Based upon the City's assessment of the submitted
iii�Orin&tiOn, a r�camm�ndation regardiilg the award of a contract will 6e tnade to tlle
City Council. Failure to submit the additional informatian, if requested, may be grounds
far rejectij�g the apparent low bidder as non-responsi�e. AfFected contractars will be
nati�ed ij� writing of a recammendation to the City CounciI.
3.4.In addition to prequali�catio��, additional requireanei�ts for qualifcatioi� may be required
withiii various sections of the Contract Docurnents.
4. Examination of Bidding aud CQntract Documents, Ofi.�er Related Data, and Site
4.1. Before submitting a Bid, each Bidder;
C1TY OF FORT WORTH 2O22 Sond Year 1— Contraat 5
ST�1I1Dt1IZI7 CONSTRllCTTON SPECIT'ICATION DOCUMENT City Project �Io. 102931
Aevised/Updated Novemher 2, 2027
002� ►a
INSTRUCTIONS TO BIBDERS
Page 3 of 10
4.1.1. Sk�all examiue and car�f�lly study the Contz•act Dacuinents and otf�er related data
identified in the Bidding Documents (including "technical data" referred to in
1'aragtaph 4.2. t�elow). No information given by City or any represent�.tive of the
City other �1�aia that contained in the Contract Documents and off'icially
promulgated addenda tliereto, shall be binding upon tlie City.
4.1.2. S}�ouId visit the site to beconne familiar with and satisfy Bidder as to fhe geneeal,
local and site conditions tliat may affect cost, progress, performance or furnishing
of the Work.
4.1.3. Shall consider federal, state and local Laws and Regulations that inay affect cost,
progress, perfarmance or furnishing of the Work.
4,1.4. OMI'I"I`ED
4,1.5. Shall study all: (i} reports af expIarations and tests of subsurface conditions at ar
coniiguous to the Site and all drawings of physical condifians relating to eXistiug
surface or subsurface structures at tlle Site (except Underground Facilities} that
have been identified in #he Cantract Documents as containing reliable "tecIinical
data" and (ii) reports and drawings of Hazardous En�iranmental Conditions, if any,
at the Siie that have been identif ed 'm the Contrac� Documents as cantaining
reIiable "tech.nical data."
4. I.6. Is advised that ihe Contract Documents on iile with the City shall canstitute aIl of
the informatian which the Ciiy will furnish. AlI additianal information and data
which the City will sugply after promulgation of the formal Contract Documents
shall be issued in the form af written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the origi»al
Contract Documents. No information given by the City other thap that contained in
the Contract Docurnents and officially promulgated add�nda thereto, shall be
binding upan the City.
4.1.7. Sh4uld perform independent research, investigations, tests, borings, and such other
means as may be necessax� to gain a complete knawledge af the conditions whicl�
will be encountered during the coiistructian of the project. For projects with
restricted access, upon. request, City may provide each Bidder access to the site to
conduct such e�aminatians, investigatipns, explorations, tests and studies as each
Bidde�• deems necessary for submission Qf a Bid. Bidder must ftll all holes and
clean up and restor� Yhe site ta its farmer conditions upan completion of such
explarations, investigations, tests and studies.
4.1.8. Shall determine the difficuIties of t11� Work and all attet�ding circumstances
affecting the cost of doing the Work, time required for its completion, and obta.in all
infaernation required to make a proposaI. Bidders shall rely exclusively and solely
upon their own estimates, investigatiQn, �•esearch, tests, explorations, and ather data
which are necessary for full and e4mplet� information upon v�+hich the proposal is
to be based. It is understood that the submission of a prapnsal or bid is prima facie
evidence tha# the Bidder has made the investigations, examinations and tests herein
required.
CITY OF PORT WORTH 2O22 Bond Year I— Contract S
ST/#1VDARB CONSTRUCTIpN Sl'ECIFICA�'1DN DOCUMCNT City ProjectNa. 10293I
Revised/Clpdated Novemher 2, 2021
OQ 21 13
II�STRUCTIONS TO BIL3DER5
Paga �4 of ] 0
4.l 9. ShaI1 promptly notify City of all conflicts, errors, ambiguities or discrepancies in or
between 111e Coi�tract Documents ai�d such ather related documents. The Contractor
shall not take advantage of any gross error or omission in the Coiiia•act Documents,
a��d the City shall ba perinitted to inake such corrections or i��terpretaYions as �nay
be dee�ned necessary for ful�llment af the intent oftYte Contract Docutnents.
4.2. Refere��ce is �nade to Section 00 73 00 — Supplemex�tary Cot�ditions for zdenti�cation of:
4.2.1. those reporfs of exploratioz7s and tests of subsurface conditions at or contiguous to
tiie site which have been utilized by City in preparation of the Contract Docume�ts.
The Ings of Soil Borings, if any, on the plans aa•e for general infbrmation only.
Neither the City �aar the Etlgineer guaraiikee that tile data shown is representative of
conditions which actually exist.
4.2.2. those drawir�gs of physicai conditio��s in or relating to existiiig surface and
subsurface structur�s (except Underground Facilities} whiel7 are at or contiiguous to
the site that have been utilized by City in prepa�•aiion of the Cp��tract Dacuments.
4.2.3. copies of such reports and drawings will be made available by City to aiiy Bidder
on request. Those reparts and drawings may not be part of 1:he Contract
Dacuments, 6ut �lze "technical dafa" contained iherein upon whieh Bidder is ea�tii:led
to rely as provided in Paragraph �.02. of tlie General Conditions has been identified
and established in Paragraph SC 4.02 nfthe Suppt�mentary Conditions. Bidder is
z'asponsib�e foz' any interpratation or conclusion drawn from any "teehnical data" ar
any other c�ata, interpretations, opinions or iniormation.
4.2.4.Standard insurance requirements, coverages and limits.
4.3. The submission of a Bid will constitute an inc4ntravei�tible representation by Bidder: (i)
that Bicider has complied with every requirement oftl�is Paragraph 4, (ii) thaY without
exceptian the Bid is premised upon performing and furnishing fhe Work required by the
Contract Docurrients and applying the speci�ic means, me�ods, techniques, sequenoes ar
procedures af canstruction {if any) that may be shown or int�icated or expressly required
by the Contract Documents, (iii) that Bidder has given City written notiee oialI
conflicts, ez•rors, a�nbiguities and discrepa�icies iii tiie Contract Documents and tl�e
written resolutions tl�ereof by City are acceptable to Bidder, and when said conFlicts,
etc., have not b�en resoIved tl�ra��gh the intarpretations by City as described in
Paragraph 6., and (iv) that the Contract Documents are geqeraIly sufficient to indicate
and canvey t�nderstanding of all terms and conditinns for periarming and furnishing the
Woric.
4.4. The pro�isions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorin.ated
biphenyls (PCBs), Petroteum, Hazardous Waste or Radioactive Material covered by
Paragraph 4.d6, of the General Conditions, unl�ss speci�cally identified in the Contract
Doeur�tents.
a. AvailabiIity o�Lands �or Work, Etc.
CITY OF FORT WORTH 2O22 Bond Year 1— Contract 5
S'TANDARD CONSTRUCTIOI�€ SP�CD�ICATION DOCUNi�NT City ProjectNo. 10293]
Revised/Updated November 2, 2021
00 21 13
INSTRUCTIONS TO BIDBERS
Pa�e 5 of ] 0
5.1. The lands upon wlzicli the Work is #o be performed, rigi�ts-of-way and easements %r
access thereto and other l�ids designated for use by CanYractor in perf4rming the Wprk
are identi�ed in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, constj•uction equipment or storage of
materials �nd equipmenfi to be incorporated in the Wdrk are to be obtaineci anti �aid for
by Contractor, Easemants far permanent si�ruch�res or perma��ent changes i» existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Documents.
5.2. Outstandi�ig righY-of-way, easeinents, and/or pet�mits to be acquired by ihe Ci�y are listed
in Paragraph SC 4.01 of the Supplementary Canditions. I�� ihe e�vent the necessary right-
of-way, easezx�.ents, andlor permits are not obtained, the City reserves the right to cancel
the award of coiltract at any tin�e before the Bidder begiiis any coilstruction work on tlie
project.
5.3. The Bidder shalI be prepared to commenee construction without all executed right of-
way, easements, ancUor permits, and shall submit a schedule to tha City of llow
canstructioaa will proceed ii7 the othex areas af the praject that do not require permits
and/or easeinents.
6. Interpretatiens and Addenda
6.1. All questions abaut ihe meaniizg ar intent of tha Bidding Docuanents are ta be directed to
City in writing on or before 2 p.zn., the Monday prior to the Bid opening. Questions
received after this day may not be responded tQ. Interpre�ations or clarifications
considered nec�ssary by City in response to such quest�ons will be issued by Addenda
delivered Lo alI parties recoxded hy City as having received tlie Bidding Documents.
Only questions answered by forrr�al written Addenda will be binding. Oraj and ather
in�erpretations or clariFications will be without l�gal effect.
Address questions to:
City of Fort Warth
200 Texas Street
�'ort Worth, TX 7'6102
Attu; Greg Rabbins, P.E., Transpoi�tation and Public Works
Emai1: i�r��,orr Robbinsca�fortworthtexas.sov
Phone: 817-392-2333
6.2. Addenda may also be issuad to modify the Bic�ding Documents as deemed advisable by
City.
6.3. Addenda or clarifzcatzons may be posted via the City's electronic document management
and collaboration system at http�.,�idoc.,.b360.autodc,��.com,sharea�e62�i1bb-666b-4�1a� -q(lbc-
e52?f5f6i�f4S
C1TY OP FO�T WORTH 2O22 Bond Year L--Con#ract S
STANDARD CONSTRUCTIdN SPECIFICATiON D�CUMENT City ProjectNo. 10293I
Revised/[Jpdeted i�ovcmUer 2, 2021
ooai i�
INSTRUCTIqNS TQ BIDDERS
Page 6 af ] 0
6.4. A pcabid conference may be l�eld at tlle time and place indicated 'u1 the Adv�rtisement or
INVITATION TO BIDD�RS. Representatives of City will be present to discuss the
1'roject. Bidders are encouraged to attend and participate in the con%rence. City wiIl
tra.�lsmit to all prospective Bidders of record suc11 Addeilda as City considers necessary
in response to questions arising at the conference. OraI statements may not be relied
upon an.d will tzof be binding ar Iegally effeciive.
7. Bid Security
7.1. Each Bid must be aecompanied by a Bid Bond made payable to City in an �rr�ount nf five
(5) �aercent of Bidder's m�imum Bid price, on the form aitached or equivalent, issued
by a surety meeting the requirements of Paxagr�p115.01 of the General Canditions.
7.2. TMe Bid Bonds pravided by a Bidder will be retained until the conditions of the Notice of
Award have been satisfied. If th� Successiul Bidder fails to execute and return the
Contract Documents within 14 days after the Notiee of Award co��veying same, City
may consider Bidder to be in default, rescind fihe Notice of Award and act on tI�e Bid
Boi7d. S�ch action shalI be City's exclusive remedy in �he event Bidder is deemad to
have defaulted.
8. Contrac# Times
The number of days witllin whick�, or the dates by which, Milestones are to be achieved in
accordance r�itI1 the General Requireinents and ihe Worlc is to be cornplefad and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bzd Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement,
ld, Substitute and "Qr-Equal" Items
Tl�e Cont��act, ii awarded, will be on the basis of materiaIs and equipment described in the
Biddizag Docu�nents without consideration ofpossible substitute or "or-equal" items.
Whenever it is indieated or specified in the Bidding Documents that a"substitute" or "ot•-
equal" item of matarial or equipin�ni inay be furnislled or used by Cantractor if accepiable to
City, application for suci� aceeptanee will not be considered by City until after the Effecti�e
Date oithe Agr�emcnt. Tl�e proc�dure for subinission nf any such application by Cont�-actor
�arid consideration hy City is set farth ii1 Paragraphs 6.p5A., 6.b5B. and 6.OSC. of t�te General
Conditions and is supplerriented irt Section O 1 25 00 of the General Requireme�3ts.
ll. Subcontractors, 5uppliers and Others
11.1. In accordance with the Ci�y's Business Eq�.iity Ordinance No.2S165�10-2021 the City
has gnals for the participation of minority business andlor wome�z business
enterprises in Ciiy cantraets $100,000 or greater, Sea Section DO 4S 40 for the
M1WBE Project Gaala and additional requiremeiits. Failure to cornply shalI render
the Bidder as non-responsive.
Business Equity Ordinance No.25I65-I 0-2021, as amended (repIacing Ordinanc�
No. 24534-1 I-2020), eadified at:
h#tas:ilcodelibrarv.amle�al.com/codeslftworthllatest/ftworth tx/0-(}-0-22593
CITY fJF FORT WORTH 2D22 Bond Year 1— Coniract 5
STANbAl2b CONSTRUCTION SPECIPICA'I'lON bOCUMCNT' City Prajectt�Io. 1p2931
FZevised/Updated November 2, 202I
aozi is
1Pl5TRUCTIONS TO 6IDI]ERS
Page 7 of I 0
11.2. No Coiif�actar shall be requi�'ed to employ any Subcontractor, Supplier, other person
or arganization against whom Cniit�actor or City has raasonable objection.
12. Sir� Form
12.1. The Bid Fortn is incluc�ed with tl�e Bidding Documents; additional eopies may be
obtained from the City.
I2.2. All bIanks on the Bid Form must be campleted and tlle Bid Far�n signed in ink.
Erasures o�• a.lterations shall be initialed in inlc by the persan signing the Bid Form. A
Bid price shall be indicated inr each Bid �tem, alternative, azid unit price item listed
tlie�•ein. Ii7 the case of optional alternatives, the words 'No Bid," "No Change," or
"Not Appiica6le" may be entered. Bidder shall state ttie prices for which tl�e Bidder
propases to do th� r�vark contcrnplated or fu��nish rnaterials required. All entries sha11
be legible.
123. Bids by corporations shall be executed in the corporate name hy the president ar a
�ice-p�•esident or other coz•parate o�cer accampanied by evider�ce of authority to
sign. Tl1e eorporate seal si�all be affixed. The corporate address and state of
incorporation shall be shown below ihe signature.
12,4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whosa title rnust appear und�r the signatura accorr�panied by evidence of
autharity to sign. The of�cial address of the partnership s}�aIl be shawn below ihe
signature.
12.5. Bids by lizn.ited liability companies sha11 be executed in t�e name ofthe firm by a
member and accompanied by evidence of authority ta sign. The state oi iarmatian �f
the �'irm and the off cial address af the firm shall be showu.
12.6.
12.7.
12.8.
12.9.
Bids by individuals shall show the Bidder's name and off'icial address.
Bids by joint ventures shall be executed by each joint venture in the manner indieated
an the Bid Form. The official address of the�oint venture shall be shown.
A11 na.�es shall be typed or printed in ink below the signature.
The Bid shall contain an acknowledgement flf receipt of aIl Addenda, the numbers of
which sha�l be filled in an the Bid Form.
12.10. Postal and e-mail addresses and telephone nuzn.ber for cozx�.municatians regarding the
Bid shall be shawn.
12.11. Evidence of authority to canduct biisiness as a Noncesident Bidder ir� the state of
Texas shal! be provided in accordance with Section 00 43 37 — Vendor Cnmpliance
to State Law Non Resident Bidder.
CI7"Y qF FOitT WpRI'H 2O22 IIond Year 1— Contract 5
STANDARD CONSTRUCTIOI�] SPECIFICATION DOCUMENT City Project No. Z Q2931
Revised/llpdated Novem6er 2, 2021
00 21 13
IN3TRUC1'lONS TO B1DD�R5
Page 8 of 10
13. Submission of Bids
Bids shall be subna.itted an the prescribed Bid �o�•m, p:rovided with tl�e Bidding Docum�nts,
at tiie time and place indicated in the Advertisement or IN VITATION TO BIDDERS,
addre�sed to Puz•cl�aszng Manager of the City, and shall be enclosed in arr opaqUe sealed
envelope, marked with tite City Project Nuinber, Project title, the natne and address of
Bidd�r, and accomp��ied by the Bid security a�id other required documents. If the Bid is sent
tl�rougii the mail or other delivexy system, the sealed envelope shall be enclosed in a sepacate
envelope with the notation "BID ENCLOSED" an the face of it.
1�. Withdrawal of Bids
14.1. Bids add�•essed to the Purcl�asing Manager a.ud filed with tha Purcl�asing Of�ce xn.ay
be withdrawu prior to the time sefi for bid opening. A reyuest for withdrawal must be
made in writing a��d delivered to tlie Purchasi�lg Office to t•eceive a titne staznp przor
to the opening of Bids. A timely withdrawn bid will be returned to tlie Bidder or, if
tl�e requ�st is wit��in one hour of bid opening, wilI not be read aloud and will
tliereafter be retu�•ned unopened.
14.2. In the event any Bid far wl�ich a withdrawal request has heen timely �led has beei�
inadvettently opened, said Bid and any record thei•eof will subsequently be marlced
"Withdrawn" and wil] be given i�o fu�her consideration for tl�e award of contract.
15. Opening of Sids
Bids will be opened and read aloud publicly. A�� abstract af the amounts of the base Bids and
majar altertiates (if any) will he made available to Bidders aftar the opening of Bids.
16. Bic�s to Remain �ubject to Acceptance
All Bida wiIl remain subject to acceptance for a minimum of 90 days or the time perind
specif ed for Notice of Award and execution and delivery of a complete Agreement by
Successful Bidder. Cit}r rnay, at City's saie discretion, release any Bid and nullify the Bid
security prior to that date.
19. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
ta reject any ar all nonconforming, ��onrespollsive, unbalanced or conditioi�al Bids
and to reject the Bid of any Bidde�• if City beIieves that it would not be in fi�e best
i��terest oftl�a Project to make aai award to tliat Bidder. City reser�as the right to
wai�e informalities not involving price, contract time or changes in the Work and
award a oontract to such Bidder. Discrepancies between tl�e multiplication of units of
Wflrlc and unit prices will be resolved in favar of the unit prices. Discrepancies
between the n�dicated sum of any column of iigures and the correct sum thereof will
be resalveci ii� favor of the cor�•ect surn. Discrepancies betwaen words and figur�s
w'tll be resolved in favor of the words.
CITY OF PORT WORT[3 2022 Bond Year 1— Contracl 5
STANDAR.D CpNSTRUCTTON SP�CIFICAT'ION DDCiJ1V�NT City ProjectNo. 10293f
Revised/Updated Novecaber 2, 2021
oazi i3
INSTRifCTIONS TO BIDDERS
Page 9 of 10
17. I.1. A��y or all bids will be rejected if City has reason to believe tl�at collusion exists
among the Bidders, Bidder is an interested party tn any litigatinn against City,
City or Bidder m.ay have a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract ar has defaulted on a previous
contract, Bidder has performed � prior contract in an unsatisfactory manner, or
Bidder k�as uncompleted work wlsich in t11e judgment of the City will prevent or
hinder the prompt comple�ion of additional work if awarded.
17.2. In additioii to Bidder's relevant prequali�cation requirements, City may consider the
qualifications and ea�perience of Subcantraators, Suppliers, and other persons and
arganizatians proposed far those por�iions of fhe Work wher� the ide�itity of such
Subcantractors, Suppiiers, and other persons and organizaiions must be submitted as
provided in the Contract Docu�nents or upon the request oftlie City. City also may
consid�r the op�ratiilg costs, marntenance requirements, performance data and
guarantees of major items of materiais and equipment proposed for izacarparatiari in
the Work when such data is required to be submitted prior to the Notiee af Award.
17.3. City inay coilduct such investigations as City deems necessary to assist in the
evaluatiQn of any Bid and to establish the responsibility, qualificatians, and financial
ability ofBidders, proposed Subcontractars, Suppliers and other persons and
organizations to pe�'form and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perfor�aa with his own organization, work of a value not less than
35% of the value err�braced on the Cont�•act, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarded to Iowest respansihle and
responsive Bidder whose evaluation by City indicates that the award will he in the
best inierests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award
cont�act to a Nonresic�ent Bidd�r unIess the Nanresident Bidd�r's bid is Iawer than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas res�dent bidder would be reqUired to underbici allonresident Bidder to obtain a
comparable contract in the state in which the nanresident's principal place of
business is located.
17.7. A contraGt is not awarded Until fornnai City Council authorization. If the Cont�•act is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. Nn other act of City or others vdill constitute
acceptance of a Bid. Upon the cantract award, a Notice of Award will be issued by
the City.
I 7.7.1. The contractor is reqaired to fill aui and sign the Cer#ificate of Interested
Parties Form 1295 and the forn� must be sabmitted to the Project Manager
before the contract rpvil! be presented ta the City Council. The form can be
obtained at httas:/Iwww.ethics.stat�.he.�t�idatalfoE��/1�95/1�9�.�di
17.8. Failure or refusal to comply with the requiremenis may result in rejectioii of Bid.
18. Signing of Agreement
CITY �F FORT WqRTH 2O22 Bond Yeaz 1— Contract 5
STANDARD CONSTRI3CTION SFECIFICATI�N DOCUNIE[wfT CityProjectNo. 102931
Revisad/Updatcd November 2, 2021
oazi �3
R�ISTRUCTIONS 7'O IIIDDERS
Page 10 af I Q
18.1. When Ciiy iss�zes a Natice of Awa��d #o the 5uccessful Bidder, it will be accornpanied
by f11e required ilumb�r of unsigned counterparts of the Project Manual. Within l 4
days thereafter, Contractor sha11 sign at�d deliver the f•ec�uired nuznber of counterparts
of the Project Manual to City with the re�quired Bonds, Certificates of Insurance, and
alI other requirad do�cumentalion.
18.2. City shall thereafter deliver one fully signed counterpart to Contractor.
END O�' �ECTION
CITY QF FQRS WORTI� 202213ond Year 1-- Contract 5
STANDAAD CONSTRUCTION SPECIFICATIDN D�CUM�NT City Project No. 102931
Revisad/Updalad t�Iovembcr 2, 2021
003513
CONF'LICT OF (NTEREST STATEMEN7
�'age 1 of 1
s�c��o� oa 3� � �
CONFLICT OF INTEREST STAT�MENT
Each bidder, off�ror or respond�nt ta a City af Fort Warth procurement is required to complete a
Canflict of Interes# Questior�naire or cer#ify that one is current and an file with #he City SeCretary's
Qffice pursuant to state law.
If a member of the Fort Worth City C�uncil, any one or more of the City Manag�r ar Assistant
City Managers, or an agent af the City who exercise discretEon in the planning, recommending,
selecting or cor�tracting with a bidder, offeror or respande�t is affiliated with your company, then
a Loca! Government Officer Canflicts Disclosure Statement {CIS) may be required.
Yau are urged to cor�sult with counsel regarding the applicability of these forms and Local
Go�ernment Cocie Chapter 176 to your company.
The referenced forms rnay be download�d fram the links provided belaw.
� �Ilwww. thics.st te. . s/torrrsl df
'n�:llwww.ethics.s#ate. .uslfo nr�1�15,,Q.�
❑
0
❑
❑
❑
❑
�IDDER:
CIQ Form doe� r�ot appfy
CIQ Form is on file wiih Ciiy Secretary
CIQ Form is b�ing provided to the City Secretary
CIS Form does not appfy
CIS Form is on File with Gity 5ecretary
CI5 Form is being pro�ided t� the Cifiy Secrefiary
McClendon Const Co Inc
- • :. ...
Burleson, TX 76097
�f�D OF ��CiION
By: Dar��dl�cc�endo�
.
Signature: ,�.. �/�' �
.� � .� �. - -.
Title:
Pr�sid�nt
GITY OF FORT WORTH
S�AN�ARD CQNS'FRUCTION SPECIFICATION DOCUMENl'S 2Q22 Bond, Year 9, Confract 5
Revised February 24, 2020 City Project Number 1�2939 - Bid Proposal Workbook - Addendum 1
oa a� no
BEQ FORM
Page 1 of 3
secri�� oo a� oa
BID FQRM
TO: The Puechasing Menager
clo: The Purchasing pi�ision
200 Texas Street
City of Fort Worth, Texas 76102
FOR:
2022 Bond Year 1- Contract 5
City Project Na.: 102931
UnitslSections: Unit 1: Water Impro��ments
Unit 2: 5anitary Sewer Improrrements
Unit 3: Paving Impro�ements
Uni� 4: Stormwater Impro�ements
1. �nter Into Agreement
The undersigned Bidder proposes and agrees, if this Sid is accepted, to enier infa an Agreement with Ciiy in the form
included in the Bidding Documenfs to pertQrm artd furnish all Wark as specifled or indicated in the Contract �ocuments
for the Bid Price antk within the Contracf Time indicated in this Bid and in accardance with the oiher terms and
conditions of the Cantract Documents.
3. BIDDER Acknowledgetnents and Certification
2.1. In submitting t�is Bid, Bidder accepts all of the terms and nditians of the fNV17ATION TO BIDDERS and
INSTRUCTIONS TO B�Db�RS, including without firni#atian ose dealing wi#h the disposition of 8id 8ond.
2.2. Bidder is aware of all c�sts to pro�Ede the required insurance, will do so pending contract award, and wilf
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and nat made in the interest of or on hehalf of any undisclosed
individual or �ntity and is not submit�ed in conformity with any collusive agreement flr rules of any group,
associatian, organization, ar corporation.
2.4. Bidder has not direotly or indirectly induced or solicited any other Bidder to submit a false ar sham Bid.
2.5. Bidder has not solicited or induced any indi�idual or entity to refrain from bidding.
2.6. Bidder has noi engaged in carrupt, fraudulent, collusive, or coerci�e practices in compeiing for the Contract.
For the purposes of fhis Paragraph:
a. "corrupi practice" means the offering, gi�ing, receiving, or soliciting of any thing of value likely ta
influence the action of a public o�cial in the bidding process.
b, "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to khe detriment of City (b) to establish Bid prices at ar�iFcial non-competitive
levels, or {c) to depri�e City of the benefts of free and open campeiition.
c. "collusi�e practice" means a scheme or arrangement between two or more Bidders, with or
withaut the knowledge of City, a purpose of which is to estab[ish Bid prices at artificial, non-
competiti�e leveis.
CITY OF FOR7 WpRTH
STANDAl2D CONSTRUCTIdN SPECEFICATIOIV DOCUM�NTS 2022 Bond, Year 1, Contract 5
Revised 9130I2021 Cify I'rojeCt Num6er 102931 - Bid Propasal Workboak - Addendum 1
0641 D6
glp FQRM
Page 2 of 3
d. "coercive practice" means harming or thre�tening to harm, direetly ar indirectly, persons or their
property to influence their participation in the bidding process or afFect the execution of the
Contract,
3. Peequalification
7he Bidder acknowledges that th� following work types must 6e per#ormed only by prequaEified contractors and
subcontractors:
a. Water Distribution, 12-inch diameter and smaller
b. Water Transmission, 24-inch diameter anck smaller
c. Sewer Collection Sysfem, 12-inches and smalfer
d. Asphalt Paving ConstructionlReconstructian (15,��0 Square Yards and GREATER)
e, Concrete Paving ConstructionlReconstructian (15,D00 5quare Yards a�d GREATER)
f. CCN, 8-inches and smaller
�
h,
4. Time of Comple#ion
4.1. The Work will be complete far Final Aceeptance within 400 CD days after the date wh�n the
the Contract Time commences to run as pr��+ided in Paragraph 2.03 of the Generaf Conditions.
4.2. Bidder accepts tile pro�9sions af the Agreemertt as ta liquidated damages in the event of failure to complete
the Work {andlor achie�ement of Milestanes} within the fim�s specified in the Agreement.
a. Attached to this Bid
The following dacumen�s are attaahed to a�d made a part ofi this Bic�:
a. This Bid Form, Seckion OD 41 00
b. Required Bid Band, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the G�neral Canditions.
c. Proposal �orm, Section 00 42 43
d. Vendor Compiiance to State Law Non Resident Bidder, Section 00 �43 37
e. MWBE Forms (opfional at time of bid)
f. Prequalification Statement, Section OQ 4512
g. Conflict of Interest Affida�it, Section OD 35 13
*If necessary, C!Q or CIS forrrts are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 af the Instructions ta Bidders
C1TY OF FORT WDRTH
STANDAR� C�N57F2UCTIqN SPECIFICATIOM1i �OCl3MENTS 2U22 Band, Year 1, Contraci 5
Revised 9130/2021 CIty Project Number 1U2837 - Bid Proposal Wnrkbook - Addendum 1
6. Total Bid Amount
00 4i 60
81D FDRNf
Page 3 of 3
5.�1. Bidder will complete the Work in accordance u�ith the Contract Documents for the following bid amount. In
the space provided below, please enter the total �id amaunt for this project. Only this figure will be reacf
publiciy by the Ci#y at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this propasal that the total bid amount entered below is
subjecf io verification andlor madificatian by multiplying the unit i�id prices for each pay item bq the
respecti�e estimated quantities shown in this proposal and then totaling all of the extended amounts.
8.3, � .,a7bJ[I l:; �16:r �..�iv o�fl Eia.�i. �-.-. [re:� :. �i+js,;�--si.:- " ____ ____ . `_ _`
� "ul Base �id <uae this If a}�pllcable, othera•' =- � �'`'- #REF!
�ltem�te Bid �use t�ris if applicable, othe�rvir'
I.)eductive Aftemat��tu - '.� �ic�ble _
��1.'_ 'd,��r_�t� �---�.
� ^�ia -�.s- _-
To#al Bid
7. �Id Submittal
This Bid is submitted on
R9129I2022
Resp�ully�ubmiite[j�^ �
gy �-� � � _ � _�
�,. �`` � � nafure —
Dan McCEendon
(Printed Name)
Title: President
Company: McClendan Const Ca Inc
Address: PO Box 999
Burleson, TX 76097
State of Incarporation: iexas
Email: dan@mcclendoncanstructian.com
Phone: 8 9 71295-4066
�R1D 0� SEC�IOIV
#REF!
#REF!
#RE�!
#REF!
by the entity named below.
IReceipt is acknowledged of the �nitial
{following Addenda �
�Addendum IVo. 1: ; , r �
�Addendurn No. Z: `' 12 ��..
JAddendum No. 3: {� ��
lAddendum No. 4: �" �` '`�"�r���
�,---
Corporate Seal:
CITY OF FORT WORTH
STANpAR� CONSTRUCTIOiV SPECIFICATipN �OCUMENTS 2022 Bond, YeaF 1, Coritract 5
Revised 9/30/2021 City Projeet Num6er 702931 - Bid Proqosal Woritboak - Adde�dum 9
0o az ��
Bm PTt4POSAL
Pxge 1 of 9
S�CI'l�l� 0� �2 43
PftOPDSAL FORM
I�N�� PF�IC� ����
Prnject Item �o�aiion
Bidlist Iteml �
Description
?�Io.
�7aeit 1: Wa�erc ]Cmproveffieats
� 33i 1.0561 1fi" PVC C905 Water Pipe
2 3311.0261 8" PVC Water Pipe �
3 3311 A251 $" dEP Water
4 3311.0161 6" PVC Water Pipe
5 3312.0106 Cor�nection ta Existing t 6" Water Mair�
6 3312.01'E7 Conneciion ta Existing 4"-12" Water MaiR �� J
7 3312.2204 2" Pri�ate Waier Service
8 3312.Z2�i 2" Water Service, Meter Reconnectian r
g 33i 2.2203 2" Water Service
10 33'12.2004 1" Pri�ate Water Service
11 3312.2001 1" Water Seroice, Meter Recor�necfion
12 33122003 1" Water 5ervice
13 3312.3008 16" Gate Val�e wl Vauft
14 3312.3003 8" Gate Vai�e �
q5 3312,3002 fi" Gate Valve �
1g 33T2.OD01 Fire Hydra�i _
17 3311.0001 ��ctile Iron Water Fittings w! Resfraint
18 D241.13D1 Rema�e 4" Water Val�e ��
19 0241.1302 Remo�e 8" Water Val�e
Z� 3201.�400 Terr�porary Asphalt Paving Repair (2" HMAC on 6" Flexbase)
21 3201.0111 4' Wide Asphalt Pvmt F2epair, Residentisl
22 3201.012� 4' Wide Asphalt PYmt Repair, Arterial
23 3201.Q201 Asphaft ��mt Repair Beyond Defined Width, Residential
24 3201.02D2 Asphali A�mt Repair Beyond Defined Width, Arterial T
Spec'if'ication Section No.
33 '[ 1 12
__ 331i12
3314 70 _
34 11 12
__ 33 92 25
__ 33 12 25
331210
3312 10
33 12 70
331210
� 3312'EO
3312i0
_ 33 12 20
33 '� 2 20
33 12 24 �
33 12 40
33 11 71
02 41 74
02 41 14
32 D1 18
32 01 17
32 01 17
32 01 17
__ 32 01 17
s�aa��s �opos�t
'Uaut of Bid Uni.# Price
Measure Quantity
L� 45 $275.00
LF 5623 $98.00
LF 39 $133.00
LF 73 $i8.OQ
EJ# 2 � $9,950.40
EP, 11 � $3,900.00
LF 5 $1,150.�Q
EA 1 $6,a50.00
EA 1 $4,700.00
LF _ 40C� $56.a�
EA A�8 $2,625.OD
E4 81 $2,S50.OD
EA 2 $21,950.D0
F_A 26 $5,40D.00
�A � 5 $3,850.D0
EA 5 $7,300.00
TOI� � 6 $6,900.00
EA '! $1,375.00
EA � 1fi $1,O�Q.00
LF
l.F
LF
SY
SY
��¢�C'+��°� �4�p�i�a�i�r�
�ooa
85
100
_ 115
100
Bid Val�e
$92,375,00
$55i ,05A�.00
$5,f87.OD,
$5,694.00
$19,900.00
_ $42,900.00
� $5,750.00
$6, 05D. Q4
$4,700.00
$22,4a�.00
$126,OOa.00
$214, 650.00
$�3,900.D0
$9 40,400.00
$19,250.00
$36,500.40
$41,400.00
$1,37�.D0
$16,840A0
$27.Q0 $189,0OO.OQ
� �so.00 �s,soo.00
$80.OU $$,000_00
$115.00 $'I3,225.00
$715.00 $17,50D.00
CFTY pF FORT WOTtTH
STANDAiLD CON51RUC7TON SPECIFICATION DOC[I3vfENTS 2022 Boatl, Xear 1, Conffact 5
Aevised 9/3412021 City Projeci Nnmber 102931- Bid Pioposal VJozkbook - Addeadum 1
00 42 43
BID PROPOSAi.
Page 2 af 9
S�GTtONi 00 �2 43
PROPOSALFORM
IJNt� Plvl�� �ID
Sidtist Item
1Vn.
25
26
27
28
29
30
3i
32
�
34
35
36
37
38
39
4p
41
42
43
4A�
45
46
A7
48
49
50
Descaiptian
Project Item Infoxznation
32D1.0616 Conc P�mt Repair, Arterialllndustrial
3305.0003 8" Waterline Lowering
33a5.0'109 Trench Safety
3305.0202 4mported EmbedmentlBackfill, CSS
3305.02D3 Irnpo�ted �mbedmenUBackfifl, CLSM
33a5.0207 Imported �mbedrnenfBacicfifl, Select Fill
0241.9510 Salvage Fire Hydrant
02�1.16�1 Water Line Grou#i�g
0241.1218 4"-12" Water Abandonmeni P[ug
0241.1118 4"-12" Pressure Plug
0241.15QB 2" Su�€ace Miliing
3212.D302 2" Asphalt Pvmt Type D
3304.�1 �1 Temporary Water Services
3305.01 a3 Ex�laratory Exca�ation o# Existi�g Utilities
0241.04�1 Remove Concrete Drive
0241.0402 Remove Asphalt Drive
0241.13DD Rernove Conc Curb&Gutter
3'123.0'1D1 Unclassified F.acca�ation by Plan
3124.0101 Embankment by Plan
3291.01 UQ Topsail
3292.09 QO Biock Sod Placement
024i.1700 Pa�ement Pul�erization (1'I")
3216.01a1 6" Canc Curb and Guiier
3273.04a1 6" Concte#e Driveway
3292.03D3 3" Asphaii Pvmt Type D
3217.5001 Curb Address PaEnting
Specification Section No.
32 �9 29
33D512
330510
33Q510
33 05 10
33 05 1�
02 41 'i 4
OZ 41 'I4
02 41 14
02 41 14
02 41 'E 5
32 12 'E6
83 04 30
33 05 30
02 41 13
02 41 13
02 41 15
3'f 23 16
31 24 04
32 94 19
32 92 13
02 4'f 1 v
32 16 �3
32 13 20
32 12 96
32 17 25
i7nit of
Messure
SY
Ea
LF
CY
CY
CY
EA
CY
EA
EA
SY
^ SY
LS
�a
SF
SF
LF
CY
CY
CY
SY
SY
LF
5F
SY
EA
���d�r�s A�p���a�i�n
��aa�s �opo�
Bid
Qnantity
1Q0
s
5741
'E 00
�oa
1400
3
5
5
4
320
s2o
i
- 10
250
655
600
950
150
6�
525
298�
1600
180D
21$U
12
LTnit Price
$145.D0
�s,2oo.oa
$2.00
$140.a�
$188.04
$44.00
$1, 900.00
$4$5.00
$2,200.D0
$3,aao.oa
$26.25
�so.oa
$55,OD4.Da
�z,�oa.ao
$4.DQ
$4.40
$6.00
��2a.oa
$10.Oa
$28.00
$6.50
$16.50
$66.00
$14.�0
$32.00
�7a.00
Bid Value
$'E 4,5�Q. QO
$49,2�0.00
$11,482.00
$14,ODO.OD
$18,800.00
$40,OQD.OD
$5, 7QO.OQ
$2,425.00
$11,D�0.00
$12,000.00
$8,4D0.00
$�s,000_oa
$55,0�0.00
$25, OD0.00
$1,o00.0a
$Z,szo.00
$3,600.00
$�s,aoo.00
$9 ,500.00
$1,680.00
$3,412.5D
$35,970.00
$105,600.00
$25,200.D0
$69,76�.�0
$$4q_00
CITY OF FORT WORTH
STANDARD CONS1Rl3C'1TON SP�C47CA7ION DOCC]MENTS 2022 Bond, Ye� 1, Contact 5
Revised 9/3a12021 Ciry Project Numher 102931- Bid Proposal WorkSaok - Addendmn 1
00 42 43
BID PROPOSAL
Page 3 of 9
SEGTiOf� 00 42 43
P�tOPOSAL FORM
lJNI�" �RIC� I���]
Pro�e�c Irem Information
Bidlist Itenz
No.
51
52
53
54
55
56
57
58
59
6L�
Aescription
3217A102 6" SLD P�mt Marking HAS (Y)
3217.0202 8" SL.D P►+mt Marking HAS (`n
32'I7.2002 Raised Market TY Y
3471.0001 Traffic Confrol �
9999.00D2 Laydown Conc G�rb and Gutter
321'f.060'[ 8" CemLime (321blSl�
3125,0'i0'f SWPPP � 1 aere
0171.�7 01 Canstruction Staking
0171.0102 As-BuiEf S�trvey (Redli�te Survey)
9999.0�01 Construciion Allowance (Water)
EJnia 2: Sa�i�ry 3ewer 1�atepr'oveffie�ts
1 3334.4115 $" Sewer Pipe
2 3331.3141 4" Sewer Service
3 3339.70D1 4' Manhole
4 3339.9 003 4' Exfra Depth Manhole
3201 _04b0 Temooranr As�halt Pa�ina Repair f2" HMAC on 8" Flexbase)
5
B
7-
8
9
70
32�1.0119 4' Wide Asphalt Pvmt R��air, Residential
3201.0201 Asphalt P�mt Repair Seyond Defined Width, Residentia�
3301.0002 Pos#-CCN Ir�spection �
3301.0'E01 Manhole Vacuum Testing
3305.01 D9 Trench Safety � mm
CITY DF PORT WOiLTH
5i'ANDARD CONSTKLiCTiON SPECIFICATION DOCUNIEIVTS
Revised 9/30/2024
�i��el��°s A�p�i�a�ior�
s�aa��5 �oQo�t
Specifcation Section Nv. Unit of Bid Unit Pmice Bid Value
Nieasure Q�antiry I
� 321723 LF 50 $20.00 $1,000.00�
32 17 23 Lf 75 $20.00 $300.00
32 17 23 EA 4� $50.�0 $200.a0
34 71 13 MO 4 $13,250.OD $53,aao.oa
321613 LF 7Q $71A0 $4,974.D4
32 19 29 TON 50 $335.0{1 $16,7��.Oa
� 31 25 00 LS 1 $7,10a.00 $7, i 00.00
� �9 71 23 LS 1 $12,750.00 �$12,75�.00
�i 71 23 LS i $4,350.00 $4,350.00
017123 LS 'f $9a0,000.00 ��ao,000.00
�otal - �7nnt 1: W�der Inap�'ove¢ne�ts _ � _ $2,297,99 9.50
33 '[ 1 10, 33 31 12, 33 31 20
33 39 50
33 39 14, 33 39 20
33 39 10, 33 39 20 �
3Z 01 18
32 01 17
_ 32 0'E 17
33 01 31
33 01 30
� 330510
LF 200 $132.Oa $26,400.04
EP, 1 $2,�00.00 $2,OD0.0�
EA � 3 � $8,550.00 $25,6�0.00
VF 4 $150.00 $6�0.00
L�
LF
SY
LF
EA
LF
210 $27'.OD $5,670.00
20 $70.00 $1,400.0�
20 $110.00 $2,200.00
20D � $14.00 $2,800.40
3� $410.Q0 $1,230.04
190 - - $30_00 $5,700.04
20?� So�ad, Year 1, Coah'sct 5
City Project N3im6er i02931- Bid Roposal WorfcUoak - Addendum 1
00 42 43
BID PROPOSAL
Page 4 of 9
.S�Ci�00� Q�} �2 �
PROP05ALFORM
I�I�IT ��1CIE ���
�o��� it�► ��on
Bidlist item
No.
91
i2
93
�4
1�
96
97
18
19
zo
21
22
23
DescriQtaon
3305.Q1'f2 Concrete Gallar
3305.0113 Trench Water Stops
3345.0114 Manhote Adjustment, Major w/Caver
3305.0242 Imported EmbedmentlBackflll, CSS
3305.0203 Imported Embedrr�entBackfrll, CLSM
3345.0207 Imported Embedrr�entlBackfll, Select Fill
�2�41.220'E Rerno�e 4' Sewer Manhoie
33�5.0143 Exploratory F�cca�vation of Existing Utili�ies
3471.00Q1 Traffic Control
3125.0�01 SWPPP ? 1 acre i �
0171.D'f 01 Construction 5tafci�g �
0171.6902 As-Buift Survey (Redline Survey)
9999.00a�4 Construction Allowance (Sewer)
�1¢�it 3: P�vnng I�prove�ents
� g 0241.11 aD Fternove Asphalt Pvmt
2B 3123.0101 Unclassified E�cca�ation by Plan
3B 3213.01 a1 fi" Cone Pvmf
4B 3211.Q502 8" Lime Treatment
5B 3211.040D Hydrated Lime (8" @ 4QIbISY) �
BB 3305.0107 Manhoie Adjustmen#, Minor
7B 3305.011 i Vaive Sox Adjustrrtent
$ 0249.010a Remove Sidewa[k
9 02�41.0300 Remove ADA Ramp
fi 0 0241.0407 Remo�e Cancrete Drive �
���d¢��r�� Ap�ploc�toe��
Btaaer5 �o��
Speeification Seetion I�Fo.
33 �5 9 7
� 33 D� 15
33 D5 14 �
� 33 05 10
33 a5 10
33 05 1 �
02 49 14
33 05 30
34 77 13 _
31 2S 00
Di 79 23
01 71 23
01 71 23
Unif of Bid Unit Yrice
Meas�e Q�antify
EA 3 $750.OD
EA �~ 9 $3,050.00
EA 8 $5,550.00
CY 20 $140.00
CY 20 $188.00
CY 20 $40.00
Ep, 1 $1,6b0.00
EA 3 $2,500.00
M� 1 $'I3,250.00
L5 1 $4,550.�0
LS 1 $1,650.OQ
LS 1 $20Q.D0
LS i l _ $50,OOO.aO
'I'o�ml - �7ni� 2: S�ma�$sy Sawe¢� I�►ipa�ovem�ents
02 41 15
31 23 16
� 32 13 13
32 41 29
32 11 29
� 33 05 14
33 45 14 ^
02 41 i 3
OZ 41 93
D2 41 '13 �
SY
CY
SY
SY
TOIV
EA
_ �`
5F
EA
� SF
13955
5060
152Q0
16200
330
2
30 _ _
��so
2
695Q
�
Bid Value ,
$2,250.00
$3,450.00
$44,4p0.00
$2,800.00
$3,760.D0
$800. DQ
$1,650.04
$7,540.00
$�3,25Q.D0
��,�so.ao
$ i ,650.00
$2�O.OD
$50,OOO.D�
$209,59 O.OD
$1D.00 $139,550.00
$22.�0 $1'�1,320.00
$62.20 $945,4�0.00
$7.50 $129,500.00
$281.00 $92,730.00
$300.04 $600.00
$250.OD $7,50DAQ
$3.50 $12,460.00
$30�.00 � $60D.D4
$3.50 $24,325.00
CITY 4F FORT WORTH
STANDAR➢ CONSTRUCTION SPECIFICATiON DC?CUM�TTS 2A22 Band, Year 1, Canvaci 5
ZCevised 9130/2p21 Ciry Fxaject Number IOZ931- Bid Proposal W�icbook - Addendum 1
00 42 43
&ID PRDPOSAL
Pege 5 of 9
SECTlON[ 00 42 A�3
PROPOSALFORM
4.11N�Y PF�fl�E �fl�
Projeet Item information
Bidli5t Item
No.
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
- 26
z7
28
29
30
31
32
33
34
35
36
I)escri�on
0241.04D2 Remove Asphait Drive
0241.0600 Remove Wal! �4'
0241.0702 Relocate Mailhox - Tradifional
0241.0703 Relocate Mailbox - Brick
0241.0705 Remo�e and Replace Mailbox Brick
0241.4000 Remo�e Conc P�mt
4241.1300 Remove Canc Curb&Gufter
0241.1�400 Remove Canc Valley Gufter
3110.0101 Site Clear�ng
31 � D.0�102 6"-12" Tree Removal
3110.0103 12"-� 8" Tree Removal �
3110.0105 24" and Larger Tree Remo�al
3124.010i Fm6ankment by Plan
3125.010'[ SWPPP � 1 acre
321'[.0112 6" Flexible Base, Type A, GR-1
3212.040� HMAC Transitio�
3213.a30� 4" Conc Sidewalk
3213.0311 4" Conc 5idewalk, Adjacent to Curb
3213.0321 Conc Sidewalk, Adjacen# to �et Wall
3213.0322 Conc Curb at Back of Sidewalk
3213.0401 6" Concrete Driveway
3213.p501 Barrier Free Ramp, 7ype R-1
3273.q504 Barrier Free Ramp, Type M-2 �
3213.0506 Barrier Free Ramp, Type P-9
3213.p507 Barrier Free Ramp, Type P-2
3277.5001 CurbAddress Painting
5pecification Section No.
02 41 13
02 41 13
0241 13
02 41 13
02 4'I 13
02 4'[ 15
02 �41 7 5
02 41 9 5
31 10 06
31 10 0�
31 '! 0 00
3'� 'i 0 00
31 24 p0
31 Z5 00
32 11 Z3
3212 16
32 13 20
32 13 20
321320
32 13 20
32 '[ 3 20
32 13 20
321320
32 'f 3 20
32 13 20
32 '! 7 25
�i¢�dea�°s �►�p�i�a�io�
Bidder's Proposal
Unit af
Nfeasure
SF
LF
�
EA
EA
5Y
LF
SY
SY
EA
EA
EA
CY
LS
SY
TN
SF
SF
SF
LF
SF
EA
EA
EA
_ � .
EA
Bid
Quantity
1Q25
410
i
2
2
150D
3350
300
660
6
4
1
625
1
1000
80
25490
7230
250D
2000
9643
2
2
'i 0
4
51
Unit Price
$3.50
$25.00
$150.00
$1,200AQ
$1,50Q.0�
$36.00
�7.so
$25.50
$6.50
$700.00
$1,05Q.00
$2,'f 50.00
$40.�0
$10,500.�0
$10.�0
$250. DD
$9.50
$9 D.DO
$11.00
$7.50
$13.00
$2,950.00
$2,45D.00
$2,000.00
$2,700.00
$70.00
Sid Value
$3, 587.50
$� �,250.00
$1,050.00
$2,44�.00
$3,00�.00
�sa,00a.ao
$25,'I25.00
$7,650.00
$4,290AD
$4,200.�0
$4,200.00
$2,150.00
$6,250.00
$'[ 0,5DO.Oa
$'E 0,0��. DO
$20,Da0.QD
$242,155.00
$72,3D0.00
$27,SD0.00
$15,000.00
$125,359.00
$5,900.0�
$4,900.0�
$20,OD0.00
$10,SOO.fl4
$3,570.00
CITY OF FOR7 WORFH
STANDARD CON5IRUCTTON SPECIF'ICATION AOCiTMF:t�'TS 2022 Hon� Yeaz 1, Contract 5
Kevised 9/30/2021 Ciry Pioject Numi�er 10?931- Bid'Proposal Work600k - Addeadsan 1
00 42 43
BfD PROPOSAL
Page 6 of 4
S�CTiON 00 42 43
PROP05ALFORM
I�I�IT �IF��C� �I�
Bidtist Item
No.
37
38
39
�4q
41
42
43
4�4
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
fi0
81
Descriptian
Project Item Inf�rmaiion
3291.0100 TopsoiE
3292.0'f 00 Block Sod Placemen#
3232.Ot00 Conc Ret Wall AdjaceR� to Sidewaik
3305.0408 Miscellaneoc�s 5truc#ure Adjustment (Meters)
3441.4003 Furnishllnstall Alum Sign Greund Mount City Std.
3441.4004 Fumishllnstall Alurrt Sign Ex. Pole Mount
3441.4109 Remo�e Sign Panel
3�L1.4'f 10 Remove and Reinstal! Sign Panel end Post
3123.0'i01 Unclassified Exca�ation by Plan (Avenue B)
0241.1700 Pavement Pul�erization (11") (A�enue B}
3216.01�1 6" Canc Cur6 and Guifer (Aue�ue B}
32t2.D303 3" Asphalt Pvmt Type D(Avenue B)
3305.D111 Valve Bax Adjustment wl Concreie Collar (Avenue B)
3305A112 Mar�hole Ad�usiment wlConcrete Collar (Avenue B}
9999.�011 Laydown Conc Cur'� and Gutter
3291.D601 8" CemLime (321bISY) (A�enue B)
3471.�001 TrafFic Car�troi
a171.�101 Construciion Staking
3999.D005 Barrier Free Ramp, Modified Type R-1
9999.0006 Barrier Free Ramp, Modifieci Type P-1
9999.0407 Sarrier Free Ramp, Modified Type P-2
9999.a008 Gancrete Steps
9999.0009 Miscellaneous Utility Adjustment (Irrigation)
9999.OD10 Consiruction Allowance (Pa►+ing)
3346.D�08 - 4" Pipe Underdrain, Type 8
Spec.afication 5ectian I�fo.
32 91 'i 9
32 92 9 3
32 32 '! 3
33 05 14
34 4i 3D
34 41 30
34 �-1 30
34 41 3Q
312396
02 41 15
321613
321218
33 05 14
33 0517
32 '16 13
327133
34 71 13
41 7'� 23
32 13 20
32 13 20
32 13 20
32 13 30
33 48 00
U�uit of
Measure
CY
SY
5F
EA
E,4
EA
EA
EA
CY
SY
LF
SY
EP,
EA
LF
TOAI
MO
L5
EA
EA
EA
SF
�s
LS
LF
I��d��r�� /�p��6c���o�
Biader's Proposal
Bid
Qu�n�ty
100Q
�ODOD
132Q
28
S
2
3
8
1S5
61a
350
610
1
8
700
15
7
1
1
15
1
100
1
1
50
Unit Price
$28A4
$6.50
$47.00
$60.00
$700.00
$300.00
$'[ 50.00
$7'S0.00
$7o.oa
$ i 8.00
$69.00
$30.50
$300.00
$400.40
$73.�0
$345. QO
$13,250.0�
$24,900.00
$2,950.00
$2,500.D0
$3,500.04
$60.00
$so,aoo.oa
$i OO,OOfl.OQ
$52.DQ �
Bid Value
$28,OOD.00
$E5,Q00.00
$62,040.00
$ 7 ,680.00
$5,600.Oa
$600.00
$450.00
$6,000.00
$11,554.00
$1 D,980.00
$24,150.00
$18,605A0
$30q.40
$3,200.00
$51,100.00
$5,175.04
$92, 750.60
$24,9QO.a0
$2,950.OD
$37,5�0.00
$3,500.OQ
$6,fl00.00
$sa,oa�.oa
$100,OQD.OD
$2,600.OD
CITY OF FORT WORTH ?072 Bond, Yeaz I, Contract 5
ST.SPIDA,TtT7 CONSTRi1CTi0N SPEC�'ICATION DOCiI�vIk:NTS
Revised 9I30f202 f Gity Project Mamber 1U2431 - Bid Praposal Woi3cbook - Addendum 1
00 0.2 43
BID T'1tOPO5AL
Page 7 af 9
SEC��0�1 0� 42 �G3
PR0�05ALFORM
���T IPIF��C� �ID
B��ist rceml
No.
1a
2a
3a
4a
5a
6a
7a
8a
9a
Desc.siption
�o���c �� r�o��on
IInit 3 Alternate A (X'�1.)
3123.0101 Unclassi�ied Faccava#ion by Plan
b24'[.1700 Pa�ement Pulverization (11")
3216.D101 6" Conc Curb and Gutter
32�2.0303 3" Asphalt P�mt Type D
3216A301 7" Conc Valley Gutter, ResidentiaE
3305.0141 Va1Ue eox Adj�stmeRt v�rl Concrete C��lar
3305.0112 ManhoEe Adjustrnen# wlConcrete Cotlar
3211.Q601 8" CemLime (321bISY)
�educE �t�rras 1$-��
�
U�nifi �: S4ormnwapeP lfmprove�e�eas
1 D241.3014 Remove 21" Storm L9ne
2 3725.Q101 SWPPP ? 1 acre
3 32D1.04�4 iemporary Asphalt Pa�ing Repair (2" HMAC on fi" Flexbase)
4 32ti1.0'121 4' �de Asphali P�mt Repair, Ar#erial
5 32a1.0202 Aspktalt P�mt Repair Beyond De'Fned Widih, Arteriaf
B 32'Ifi.0101 6" Conc Curb and Gutter
7 3297.0901 6" 5L� Pvmt Marfcing HAS (VII)
8 3299.010� Topsoil
9 3292.0100 BEock Sod Placement
10 3301.0012 Post-CCTV Enspection of Storm Drain
11 330b.01 Q9 Trench Safeiy
CY
SY
LF
SY
SY
EA
EA
TON
Specification Section I�a. Unit of Bid U�t Price
Measure Q¢an�ity
�104�1- Unit 3 B�se Sid (io�cre#e wl ?^ve B PO1G)
31 23 16
02 41 9 5
32 16 73
32 12 16
321613
33 65 14
33 a5 17
32 '11 33
02 41 1 A�
31 25 00
32 a1 18
32 01 17
32 01 17
32 1 B 13
32 17 23
32 91 19
32 92 13
33 O1 31
3$ 05 14
600
140D0
10190
14000
300
30
8
265
$115.00
$11.00
$64.57
$30.75
$'[ 69.70
$299.70
$399.40
$325.QD
$2,768,791.50
$69,000.00
$154,QOQ.00
$652,802.70
$43�,500.0�
$50,910.00
$8,991.00
$3,195.20
$86,125.04
-$1,418,fr40. Q4
�i�¢�er'� �op�ala��t6o�
s�aa�s z�opos�
Bid Value
�'o�al - �]nefi 3 A,�teffe�te A {F�I.)
� �
LF
LS
LF
LF
SY
LF
LF
CY
SY
LF
LF
25
1
150
150
50
70
25
3
25
150
14�
$280.Ofl
$3, 8Q0.00
$2�i.00
�o.00
$110.00
$69.00
$SD.00
$28.00
$6.50
$14.00
$3.00
$36,883.9Q
$6,25D.00
$3, 800.00
$3,SD0.00
$6,aoa_oo
$5,500.00
$4,830.00
$1,250.00
$84.00
$162.50
$2,100.00
$429.00
ClTY OF FpRT WORTH
STANDAIiD CONS'�UC1TpN SPECk1CATIpI3 DOCUA'�I+F'i'S 202? Bond, Yea 1, Cantatt 5
Itevised 4/30/2021 City Pmject Num6er 102931- Bid Prcposal Wnrkbook - Addendum I
40 42 4i
IIID PROPQSAf.
Page 8 af 9
s�c�io� ao az a�s
PFiOPOSA�. FORM
l�Nl� Pi�IC�E �I�
Project Item InformaEion
Bzdlist Item
No. Deseription
12 33D5.a103 Exploratory Exca�aiion af Existing Uiilities �
13 3341.0201 24" RCP, Class III
14 3341.0302 30" RCP, Class III
15 33+�9.5a01 10' Curb Inlet
1B 3471.0001 Traffic Control T
97 Q171.0701 Consiruction Statting
18 0771.0702 As-Built Survey (Redline Survey)
1g 9999.0015 Remove 5' Curb Inlet
T 20 9999.0016 Cor�siruction Allowanc� {Siormwater)
���Icl��°s A�Op�i�a�i�r�
1'otad - �Jene2 � Storeoewaler Iem�eovem�eeets _ _ $127.705.50
Specification Section No.
� 33 05 3D
33 49 14
33 41 1 �
33 49 2�
34 71 T 3
� D1 71 23
--- p1 71 23
02 41 44
� 0'I 71 23
CJnit of
Measnre
EA �
LF
LF
EA
MO
�5
�S
EA
LS
Ziid 3ammary
�Tnit Il: W�ter Impro�eu�euts
YJnit 2: Sewer Im�rovements
�1nit 3: Pavimg Innpravements ]Base �id (Co�cretej
Unit 3a: Paving LmpQovements Alternate A(POI.)
QJnit � �atormwuter Lmprovements
Totai 1&ase ]Bi� (concrete w/ Ave B QOI.) Yini# 1, 2, 3, &+�
Bidder's Propasal
Bid u�t �� Sid Value
Qn�r�ry
2 $3,000.�4 _ $6,400.�0
71 � $275.00 $'E9,525.�0
— 72 $350.00 � $25,2�4.00
1 $43,150.DQ $'�3,150.00
� 1 $'i3,250.d0 $13,250.00
1 $2,125.U0 $2,125.OD
1 $200.0� $2D4.OQ
1 $4,250.00 $4,250.OD
1 $10,a00,00 $10,DD0.00
$2,297,9l9.50
$209,510.00
�2,766,791.50
�36,�83.90
$127,705.50
7Cota1 55,401,426.5fl
crrx oF �o�T wvR�
ST,ADiDARD CONSTAUCTiOt+i SPECIFiCATiON DDCUMENTS 2022 Boat� Year 1, C9ntract S
Revise3 9/30/2021 City Pcoject N�mber t02931- $id Proposaf Workhaak - Addendum I
/
�0 a2 43
S�PF`��9 9
s����O� � Fa��
P��ppSP
������a�
gid
t5sn� °f Q�.'�1
����
� .,�tiOn �S�jOs1�L`1o' ��}��� A
Iu,._- �,,;f,
�`Cn� �� ��Z�.es� 5P"`" c� �;�pt.�g�°ii�,
� � p,�tera�te
���"t�
�o.
�go�
��F�°n Q� e��Ct �4�` � �Y ���, Z
�e 1+�� b�dde�
�bt �� �elect� e t �� 9�C�p1�
['�� tb� 1�
�� �t�, �es�
�`,��t,(�C�
�� i
� �� �,p��
�1
B�ya�.ae
��jYPnGe es �3$�i-f
�Qta�
�
5
d,Y� 1'�� 1
24� ��a4k� p,dd��
Gt .�02g51-$��'ro4osal`N
Z3v�
CixYyso�
�ZCA��� Sl������9
RT,�Ug,`S13 ,���c�pb
G�q OF FQ �SS��G
s� � i2��'
����
�I� C��I��
CoMorms with ihe Arrrer�can Institute of
/41'ChIt9CtS, Q.I.A. �dCUfi1611i {�Cf. ra+ ��Q
KNOW ALL BY TH�SE PRi�SENT�, That wc, �C�lendo�t Constr�ucgion Company, Inc.
�4813Aemorial Plaza, Bur[eson, 'Cexas '�60�4
es Principal, hereinAfter called the Principal,
and che Nierchants �andinq Compan,y [f�utual�
of �'O �ox 1�449�, Des Moines, IA► 64306
, a carporation duly organized und�r
the 3aws pf the Siate of lowa , as St►re�y', hereinaficr called tha S�rety, are held and fumly ba�nd unto
Cify of Fort Warth as Oblig�e, hereinafter called the Qbligee,
in the sum of *** �'IVE P�RC�NT O� 'iOiAl. Al9�OlJNT �ID BY PRINCIPAL�`**
Dollars { 5°/a iAB ), far the payment of which sum well and kruly tn bc madc, the sa�d �'rutcipal and the said
Surety, bind burselves, our heus, cxecutors, administrators, successors and ass'sgrts, joir�tly and severally, �rmly by these presents.
WH�12EA5, the Principal has subtnitted a bid far
�0�� �nn�i Y�a� 1 Gentpa�j� � �;�N_�102939
NOW, THEREFORE, if the Obligee shall aaoept the bid of the Prinaipal and the Prjneipal shall eat�r into a Contract with thfl Oblige� in
accordance wi� the terms of such $id, and give such bond or bonds as may be specified in the bidding or Contract Documents u+ith
good and suffs`cient sureiy for the faithful performance of s�ch Contraet and for the pmmpt payme�t of labor and material furnished in
the prosecution thereof, or ui the e�ent of the failure pf the, Principal to enter such Contract and give such bond or bands, if the Principal
shall gay to tt�e �bligee ti�e difFi etet�ce �at to exceed the pertalty hereof between the amount speci�i�d in said bid and such larger amount
for which the Obligee may in goofl t`aith contract witli another party to perfarm the Work covered by said bid, then this ohligation shall
6� null and void, otherwis� to remain in full force and effect,
Signed and scaled rhis
. .�
�9th
�
day of
September
,
�0��
Ilflc an Construct➢on Compan ,► . (����)
� �'���
witness '
� Title
Merchants �ondjng Co par�d �A�u#ual]
�VC�JL�- �J��� �,�
�" Witness { By,_� l�
�lixabeth Ortiz � At�orney-in-Fact
���� ��
������� �������
����� o� ���o����
KnowAll Persans By'ff�se Presenfs, that M�.RCHAIVTS BON�ING COMPANY ([dIUTUAL) �nd MERCHANTS NATIONAL BON�ING, INC.,
6oth befng carparatians af fhe 5#ate of Inwa (hereln callecHvely callsd the "Companies") do hereby make, canslitute and appoinl, indl�idualiy,
Ana Tomes; AndrewRddison; �etty J Fieeh; Bryan K Mnnra; Elizabeth Ortiz; Michael D Hendrickson; Patricia Ann Lyttfe; Patrick Coyie
tf�efr true and Eawful Attarney(s)-in-Fact, to sign lis name as surety(ies} and to execute, seal �nd achnawledge any and all loonds, undertakings,
contracts and olher written Enstruments in the nature thereafi, on behalf ef the Campanles in their business of guaranteeing the fldellty
af persons, gusrenteeing the pertormance af contracis and executing or guaranteeing 6ands and undartakfngs required ar permrtted 9n any
actlans ar proceedings allawed by law.
This Po+xer-af-Aitomey [s granked and is signed and sealed by facsimile under and by euthority of the following By-Laws adapted by tha Board
af �ireclors oT Merchants Bonding Cnmpany (Mutual) on April 23, 2411 and amended August 14, 2095 and adop#�d by ihe Board oF pireatars
af MerchantsNatianal Bonding, Inc., on bctoher 16, 2046.
"The President, 5ecretary, irsasurer, or any ,4ssistant Treasurer or eny Assistant Secrefary or any Vlce President shall have power and authoriky
ko appnint Alfornays-in-�ac�, and to authorize them to execute on behalfi af fhe Company, and aitach the seal of the Company thereta, 6onds and
undertak[ngs, recognizances, confracts af indernnity and akherwritings ohlfgatary in the nature thereof,"
°The signalure ot any authorized a�cer and the seal of the Company may be affixed by tacsimlle �r e�ectroni� transmissian to any Power of Attomey
or Ceriffioafion thereof authnrizing the execution and delivery of any bond, undertaking, recagn9zance, or olher suretyshlp ahligatians nf the
Company, and suah signature and seal rlhen so used shall f�ave the same iorce and eifact as thaugh manually fixerf,"
In connectinn with o6ligations in favor of the Florida �epartment of Transporfation pn1y, it is agreed that the power and aut harfly hereby glven to the
Aitarney-in-Fact fncludes any and all cansents for #he release af reiained percentages andlor final estimates on angineering and construcfion
cnnlracts req�ired hy the State of Florfda �eparfinent oi Transportation, It ls fulty understood that consenting to tha State oiF�orida �epartment
ofTranspo�talinn ma[cing payrnent af Ehe final estimate ta tF�e Cantraetor andlor its assignee, shall not relie�e this surety company af any oF
Ets ob1(gaflons under its 6nnd.
In connec#ion with abligations in favor of fhe Kentucky �epartment of Highways anly, it is agreed that the powar and authority hereby givan
io the Attornay-in-Faci oannot be modifled or revnked unlass priar written personaf noEice af such intent has heen given io the Commissloner-
Deparlment of Highways ai the Commanwealfh of Kenlueky at least khirty (30) days prior io the modification ar revocatlon.
In �fness Whereof, the Campanies have cauaed this fnslrumenl to he signed and sealed ihis 19th day of March , 2029 .
•�•�" ►oi� "'��� �......,,
t � . - c� c tl
��`'�� ��Q�/� <����� a �����'�QQA�'a,� �� nfIERCHA{1175 BOfY�ING G4MPAMY {MIiTUAI.)
: Ia � �1 ��'�� � : � �; cu0 9�,;. �; MERCHANT NATIONAL BONUING, INC,
=�c� -o- �';�o :w:�'' _o.. �: ; .
:�'s �= ` �'� 1933 ' �` �
:�• �4fl3 ; ��; o y�,, Y,�,�� By �
•r'�r_ ti'. , : ��.�� �+{%}j �� r
+�'����"�"�-�•a���� ry"]Y�������`Qer� President
STAT�OFIO�iV1A ••�'"■n�a�r,�+• e���.•ss•
CQIJNTY OF DALLAS ss.
On thls 19kh day of March 2029 , 6eiore me appeared Larry Taylor, ta me persanally knawn, who being by rna duly swom
did say that he fs Presldent of MERCHANTS BON�ING CpMFANY (NiUTLfAI.) and M�RCHANi5 NAiIaNAL BONDING, I�IC.; and that iha
sea[s affixed fo tite foregoing insirument are the Gorporaie 5eals of ihe Campanies; and that the said inslrumer�t was sfgned and sealed in beha(f
af the Campanies by aulharity of their respectiva Boards oi QirecEars,
�P�� � s
� e a o p �
. �
�aw�-
PO��Y I�L450N
Commission iVumber754�7�
My Commission Expires
Ja�uary 07, 2D23
{Expiralian af notary's commission
does rrot irnralidafe this instrumentj
����
�
Natary Public
I, Wllllam Warner, Jr., 5ecretary of M�RCHANTS BONDfNG C�MPANY (Ml1tUAL) end MERCHANT5 NATIONAL 60NDING, WC., da here6y
certiiy thai the ahoue and foregoing is a true and correct copy of the P�WER-OF-A'iT�RNEY execu�ed hy said Companies, which is stiil in iull
iorca and effect and has not heen amended or revoEced. �
In Witness Whereof,
POA 00'[� (112D)
f heve hereunto se# my hand an
�,,... �.,.,,,
�,�p�l� �d,q�'•,,�
:� ;�C����Q R'Q����:
, a4 : � �
,� � 2003 ; ��9;
:��•�•. : �� �•`
+4••• '°�+e��iF��+`i,�
d affixed the seal ofthe Companies on this 29�h day ofi s�ptember , 2022 .
oy��,o�++./��•
� ���{4u "• ���a �1
�•�o��.Pog :��' .� �
�p. e
• ' � 9J, $� � �e�/��`�k.�/ �
: a`�: � -a- �`�: ' .�' ,
��1� Q.�:.
° � : �i ��.+� � : �' ♦ $6Cf@�8f�
'��f'� •: ' • ti •
.tl6a� , :�,�L�`
r��• � � `�c'
�����R!►•
+ -
���� -. �� l
� R.TA�C � �E. � � ��,��+''14.�,N A
�i�l��l�'T,ANT I�TQ�'�'I�IE
To obtain iniarrnation or mal�e a complaint:
You may contact your insurance agent at the telephone number provided ioy your insurance
agent.
You may call Merchants Banding Campany's tol]-free telephone numY�er for information or tc�
make a com�laint at:
1 •��0�67���� 71
You may contact the Texas Deparkment of Insurance to obtain information an cflmpanies,
coverages, rights or complaints at:
1-��0�23��3�3�
You may writ� the Texas Depar�ment of Insuranca ai:
P. O. Bax 1494 Q�4
Austin, TX 7�714-8104
Fax: (512) 475-1771
Weta: http:lfwvuuv.tdi.staie.tx.us
E-mail: ConsumerFrotection�u �di.state.tx.us
�Ft�R+I�UNlp APl� �LAlllfl �I�P4�i�S: Should you� ha�e a dispute cnncerning yn�r premium or
aY�aut a c�aim yau should con#acfi the a�enfi fi�st. If #he dispute is not resalved, yau may confact
the Texas Depar�ment of Insurance.
pii��b Ybia R�OiI�� T� Y�UR ��LI�Y: This notice is for infarmation only and dnes not
become a parf or condition af the attached dacume�t.
SUP 0032 TX (1109)
00 43 37
!lENDOR COMPLIANCE TO STATE LAW
Page 1 of 1
S�C�ION OQ 43 3�
VENDOR COMPLIANCE TO STAi'E LAW NON R�51DENi �IDpER
Texas Go�ernment Code CF�apter 2252 was adopted for the award of contracts to nonresident bidders. This
law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state
contractors whose corporaie offices ar principal place of business are outside the State of Texas) bid projects
for eons#ruc#ia�, improvements, supplies or services in Texas at an amaunt lowrer than the lawest Texas
resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident
bidder irt orcker to obtain a comparable contract in the 5tate which #he nonresidenYs principal place of business
is located.
The appropriate blanks in Sec#ion A must be filled out by all nonresident bidders in order far your bid to meet
specEfications. The faifure of nonresident bidde�s to do so will automatically disqualify that bidder. Resident
bidders must cheek the box in Section B.
A. Npnresident bidders in the 5tate o# , our principal place o# business,
are required to be percent lower than resident bidders by State Law. A copy of th�
statute is attached.
Nonresident bidders in the State of , our principal place ofi business,
are not required to underbid resident bidders.
B. The principal place of business of our campany or our parent company or majority awn�r is
in the State of Texas.0
�IDD�R:
McClendon Const Co Inc
Po Box 999
Burlesan, 7X 78097
�By: D� McClendon
i � � �f ��' � r,� � -
ti+� ��,� '� ' J�
(Signature} --
.�
Titie: President
Date: 9/29/2022
END OF SECTION
ciTv oF FORr wo�rH
STANDARD CdNSTRUC710N SI'ECiFICAT10N �OCUMENTS
Revised 9130I2021
2p22 eond, Year 1, ContracE 5
City Project Number 102931 - Bld C'roposal Workbook - Addendum i
ooa5ii-i
BIDDERS PREQUALIPICATIONS
Page 1 of 3
2
4
5
6
7
9
10
11
12
13
14
15
srcTrorr o0 4s i�
BIDDERS PREQUALIFICATIONS
l. Summary. A Bldder or thei� designated subcontractors a.re required to be prequalified or
l�ave applied for preq�aaEificatior� by the Ciiy for the work types req�a�rir�g p�•�quali€ication
prior to subrnitting bids. To be considered for award of coniract the Bidder must submit
Section 00 4S 12, PREQUALiFICATION STATEMENT for the work type{s} listed with
their Bid. Any eontraetor or subcontractor ualao is not pcequalified for the worl� type{s} listed
must subnnit Section 00 45 13, PREQLTALIFICATION APPLICATION in accordance with
the requirements below. �he information mast b� submitted seven ('�} days prior tn the
dafe of the opening of 6ids. Subcontractors must %llow the same tirnelines as contractors
for obtaining prequalificxtion review. Bidders or Subcontractors who are not prequalified at
the time bic�s are op�ned arid reviev�ed may cause the b�d to be rejected.
16 The prequal�ication process will establish a bid limit based on a technical e�aluatian and
17 financial analysis of the con�•ac#or. For exa�nple, a coniractorwishing to submit bids on
18 proj�c�s to be opened on the 7th oiApri! must file the information by the 31st day of March
19 in order to eligible to wark on these projects. In arcierta facilitatethe approvalof a Bidder's
20 Pr�qualification Application, the follo�uing must accompany the submission.
21 a. A camplete s�t af auditied or re�iewed financial stateznents.
22 (1} Classified Balance Sheet
23 (2} Income State�nent
24 {3) Statement of Cash Flows
25 (4} Statement of Retair�ed Earnings
2G {5} Notes to the Financial Statemet�ts, if any
27 b. A certified copy of the firr�'s organ�zational documents (Cor�orate Charter, Articles
28 of Incorporaiian, Articles of Organi�ation, Cex-tificate of Fortnation, LLC
29 Regulations, and Certificate ofLimited Partnership Agreement).
30 c. A completed Bidder I'requalificatian Application.
31 ( I) The firm's Texas Taxpayer ldentification Number as issued by the Texas
32 Comptroller of Public Accounts. To obtain a Texas Taxpayer ldentification
33 number visit the Texas Corriptroller ofPublic Accoun.ts online at the
34 following web address www.windo�r.state.tx.us/t�permit/and filIoutthe
35 applicatian to apply for your Texas tax ID,
36 (2) The firm's e-maii address and fax number.
37 (3) The fum's DUNS number as issued by Dun & Bradstreet. This number
38 is used by the City for required reporting on FederalAid projects. The DLJNS
39 nucnber may b� obtained at www.dnb.cam.
40 d. Resumes reflecting thc construction experience of the prin.ciples o�the firm for firms
41 submitting their in�itial preq�aalificatian. These resumes should include the size and
42 scope of the war�C perfarmed,
43 e. Otlaer information as requested by the City.
4�
45
�
47
4&
49
�. Prequalification Requirements
a. Frnancial Statemet�ts. Fi�ancial sta�ement submissian must be provided in
accordance w�th the following:
(1) The City requires that the original Financial Statement or a certified copy
be submrtted for consideratian.
CITY OP FORT WORTH
STANDAR.D CONSTRUGTION SPECIFICATION DOCUMENTS
Revised Aagust 13, 2021
2622 Bo�td Year 1— Cott[rac# 5
Ciry PrnjectNo. 102931
d045f1 -2
QIDDEIZS PR�QiIALIFICATTONS
Yage 2 of 3
2
3
4
7
$
9
l0
11
12
13
l4
15
lb
17
18
19
20
21
22
23
24
25
2f
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
4A�
45
b.
(2) To be satisfactory, the financial statements rnusibe aUdiied ar reviewed
by an independent, certifietf public accoUntiing firm registered and in
good standing in any sl-ate. Current Texas statues alsa require that
acenunting firms perforrriing audits or reviews on business entrties witk�in
the State ofTexas be properly licensed or registered with the Texas State
Baard o�Public Accoun.tancy.
(3) The accounting firm shauld state in. the audii report or review whef.her
the odntractor is an individual, corporation, or limited liability coxnpany.
(4) Financial Statements m�ast be present�d in LT.S. doliars at the current rate
af exchange �f t�e Balance Sheet date.
(5) The City will not racognize a.�ay cex•tzfied public accountant as
independent who is noC, in fact, independent.
{6) The accounianti's opinion an �he financial staternents of Che contracting
coz�pany should state that the audit or revi�w h�s heen conducted in
accordance with auditing standards generally accept�d in%he LTnited
States of America. This must be sta#ed in the accauntuag firin's opinian.
It shouid: { L} express an unquaiiiied opinion, ar (2) express a qu�lified
opinion on the statements talcen as a whole.
{7) The City reserves the right to requ�re a r�ew statem�nt at any iune.
{S) The financiai statement must be preparsd as af the last day of any month,
not tnare tha� one year old and must be on file with the City 16 months
thereafter, in accordance with Paragraph 1.
{9} The City will datermine a cantractor's bidding capacity for the purposes
of awarding contracts. Bidding capaciiy is deternnined by multiplying the
pnsitive net worlcing capital (warlcing capital— current assets— current
liabiiities) by a factor of 10. Only those stateinents reflecting a positive
net worlcing capita� position wiil be consic�ered satisfactot�y for
preyualification purpase�.
(10) In the case that a bidding date falls within the time a new fina�cial
�tatemeni is being pr�pared, the previaus sfiatement shall be updated with
proper �erification.
BidderPr�equalaficationApplieation. ABidder Preyuali�cation Appfication mustbe
submitted along with audited or reviewed financial statements by firms wishing to be
eligible ta bid on aIl classes of construction and rnaintenance projects, Incom�lete
Applieations will be rejec#ed.
(1} In those schedules where there is nothing to report, the notation of
"None" or "N/A" should be inserted.
(2} A mini�num of five (5) ref�rences of rel�ted work must be provided.
(3} Subrnis;sion of an equipment schedule which indicates equipment under
the coniroI of the Contractor and which is relaie�d io the type of worlc for
which the Gontactor is seeking preyualification. The schedule must
include the manufacturer, model and general common description af
each piece of equipment. Abbreviations or rrieans oi describing
equipment other tha.�a provided abQve will not be accepted.
46 3. Eligibility for Award of Contract
47 a. The Czty shall be the sole judge as to a contractor's prequalif�cation.
48 h. The City may reject, suspend, or modi�y any prequalification for failure by tl�e
49 contractor tc� demonstrate acceptable financial ability or perfot-�nance.
SO c. Tne City vvill issUe a letter as ta the status of the prequalification appraval.
CITY OF FORT WORTH 2O22 Bond Xea�� 1— Conta�act 5
STANDARL7 CONSTRUGTIqN SP�CIFICATIDN 170CUMEIVTS City Project Na. 102931
Revised August 13, 2021
dU 45 il -3
BIDpERS PREQUALIFICA"I'IOhI$
Page 3 of 3
If a contractor has a �alid prequalification letter, the contractor will be eligible to
per�'orm the prequalified work types untilthe expiration date stated in tl�e letter.
4
END OF SECTION
CITY OF F�RT WORTH 20^�2 Bo�id Yaar 1--Contract 5
3TA�IDAItD Cdt�STRUCTION SPECIFICATIDN DOCj.TMEI�TS City Project No. [02931
Revised August i3, 2021
OD 4512
PREQUALIFICA710H S7A7�M�NT
Page 1 of 1
SECTION 04 4� 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the infarmation below �y identi#ying the prequalified
contrac�ors ancflor subcantractors whom they intend to utilize for the major work type(s) listed.
Major Work Type
Water Distribution, 12-inch
diameter and smal�er
Water Transmission, 24-inch
diameter and smalle�
Sewer Collection Systern, 12-
ir�ches and smaller
H�pna�� ra��ng
ConstructionlReconsiruction
(15,000 Square Yards and
�CYf�f�:'t� F'a��ng
Cons#ructionlReconstruction
{95,000 Sq�are Yards and
C� FtFATF R 1
GraT�x Utilities
GraTex lJtifities
GraTex Utilities
Peachtree Construction
McClendon Const Co Inc
Prequalificat�on
�xpiration Date
7115I2023
The undersign�d hereby certifes that the contractors andlor subcarstractors describecf in the tabEe aba�e are
currently prequalified far the work types listed.
BIDDER:
MeClendon Canst Co lnc
�o BoX sss
Burleson, 7X 76097
; ` By: �an Mc�le�don �
; , l � �
. J'. -•y// ��� ,
_,.... � _ �
L, �� � (Signature)
Title: President
� T��
— —�
�
Da#e: ���r'� I ,�� Z �-
CITY OF FORT WORTH
STAN�ARD CDNSTRl1CTION SP�CkFICATIDN DOCUMENTS
Revised 09/30/2021
Cantractorl5ubconkractor Company Name
EPlD O� SECTIOfV
2022 Bond, Year 1, Contract S
City Projeet Number 102931 - Bid Praposal Warkl�ook - Addendum 1
aa4sz6-t
COI�TRAGTOR COIvIC'LIANCB Vi+ITH WORKER'5 COMPEN�ATiO1V LAW
P�ge 1 of 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
i6
17
18
19
20
z1
zz
23
24
25
26
27
za
29
30
31
32
33
34
35
36
37
38
39
SECTION ()0 4� �6
CONTRACTOR COMPLIANCE VtiTITH WORKER'S COMPENSA'I'I�N LAW
Pursuant to Te�as �.abor Cade Section 406.096(a), as arnendeci, Cantractor certi�es that it
provides warker's compensation insurance coverage for all oi its employ�es azt�ployed on City
Project No.10293L Contrac#or further ceriifes that, pursuant to Texas Labor Code, Sectian
406.096(b}, as amended, it will provide to City its subcontraetor's cer�ificates of camplianee with
worker's compensation coverage.
C4NTRACTOR:
•�, �j �,,l
___ �,�ri�'1 �b�t���,, �Ei�1�.�: F-�'��'t � • �� "�` �'� _
Company (P�e se Pri )
r' � -�., �}�`� Signature: --
. _ �
Address �
A, � �
[tj�Y'�G��.--� �I�, 7�c:.` '"� � Tit1e: �Y�gl� - -.,
CitylStatelZip (Please Prin#)
`I'kI� STATE OF TEXAS
COUNTY OF TARRANT
§
�
�EFORE ME, the under�igned autharity, on this day persanally appeared
�,,, r�_ �_jt,_.la,(c, �•. , lcnawn to ine to be the person whose name is
suE�seribed to the fore oin� nstrument, and ac ow�edged to me that he/she executed the same as
the act and deed of �`� �,� �. /G.,� �,.. �. � far the purposes and
consideration therein expressed and in the capacity t�erein stated.
CT,�V�N UNDER MY HAND AND SEAL OF OFFICE this � day of
���.��Der , 20G.--•
, � 4
�' �otary Pu ' r►a �or th� State of Texas
�
_�, � �, --
� � o{�YP�r � � Just3n K �lair �
END OF S�CTION �� :� Noiery Puhl'sc, 5tate of Taxas
��'�� Camm. Expires 02fU5Y2025
�,��� Notary ID 1292�J439-7 _
� +�+ •� vYi�' .¢ '�pU,-Lra�F4F:.P' K -".wd'- L.
CITX OF FORT WOR`I`H
STANDARD CflN5`PIiUCTION SPECIFICATION AOCUMENTS
Revised lu[y I, 2011
2022 $and Year 1— Contract 5
City Prvject No. 102931
00 45 4D - I
BE�siness Equity Goal
Page 1 of2
1 SECTION 00 4� 40
2 Business Equity Goal
4
5 APPLICATION OF POLICY
b If the iotal dollat value of the cvntract is $1 Q0,040 ar more, then a Bi2siness Equity goal is applicable.
7 A Business Equity Firm refers to certified Minority-, and/or Women�, owned Business Enterprises
8 (MIWBEs).
] 0 POLICY STATEMENT
] l It is tI�e policy of the City of F�z�t Wor�h to ensure the full and equitable participation of B�tsiness Equity
12 Firms when applicable, in the procurement of a�l goods and se�'vices. All requirements and regulations
13 stated in the City's Business Equity Ordinance Na.25165-10-2Q2I, {replacing Ordinance No. 24534-11-
14 2020 {codifi�d at: httqs;l/co�e�ibrarv.amle�al.corNcoc�cs/ftworthllatest/ftwartl�_1a�l0-0-0-22593) apply to
ls this hid.
16
i7 BUSINE�S EnUITY PROJECT GOAL
18 The City's B�siness EquiEy goal on this project is 25% of the total bid value of the contract (Base bid'
19 applies to Parks and Community Servicesj.
20
21 METH�DS TO COMPI,Y WITH TH� GOAL
22 Qn City contracts where a Business Equiiy Goal is appiied, afferors are requireci to comply with the Cit�'s
23 Business Equity OrdinancE by meeting or exceeding the above stated goal ar otherwise comply with the
24 ardinanca thraugh one of the following methods: 1. Commercially usef�l services performed by a
25 Sasiness Equity prime contractor, 2. Bnsiness Equiiy s�bcontracting participation, 3. Cambination
26 of Business Equiiy prime services and Busiuess Equity s�tbcontracting part7icipation, 4. Business
27 Equity Joint Venture/Mentor-Pratege participation, 5. Good Faith Effort documentation, or 6.
28 Prime contractor Waiver documentatEon.
24
3D
31
32
33
34
35
SUBNIITTAL OF REQU�RED DQCUMENTATION
Applicable dQcuments (listed below) must be received by the Purchasing Division, OR the offeror shall
�MAIL tile Business Equity documeniatian to the assigned City of k`o� Worlh Project Mazzager or
Department Designee. Documents are to be received no later than 2:Op �.m., on the third City
business day atlter th� bid opening date, exclusive of the bid opening da#e.
36 The Offerar must submit one or more of the follflwing documents:
37 1. Utiiization Form and Letter(s) of Tntent, if the goal is met or exceeded;
38 2. Good Faith Effort Form and Utilization Form, inctuding supportin� documentation, if
39 participation is less than stated goal, or no Busine�s Equity participation is accomplished;
40 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform
41 aIl subcontracting/suppiier opportunities; or
42 4. Joint Venture/Mentor Prot�g� Form, if goal is rrfet or exceeded with a Joint Venture ar Mentor-
43 Protege participation.
44
45 Thesc forms can be found at:
A�6 Business Equity Uiilization Form and Letter of Intent
47 lztt„ps:�ra�ps fom �ortpt�xas.�ov�ProiectResaurLeslKesaur.:esY/6U - MW13�;/�3usiness �c�uih Utilization
48 Forn� I1VII` 2022 22032�.ndf
�19 �
C1TY pF �pRT WORTH 2O22 Bond Year 1— Contract S
STANDARI7 CONSTIii7C'CiON SP�CIFICATION DOCUMENTS City ProjectNa. 1D2931
Revised Ontnber 27, 2021
aoasaa-z
Business �qt�ity Goal
Page 2 of 2
1 Lette�• of I�itent
2 httns:l/antis.�ortworthtexas.�ov/Proie�tResourc�s/ResourcesP/60 - MWBE/Letter of Intent DVIN
3 2Q21.pdf
4
Business Equity Good Faith Effort Form
httos://aous.forEworthtexas.�ovlProiectResources/AesaurcesP/b0 - MWBE/Good Fait� Effort
Form DVIN 2022.ndf
9 Business Equity Priine Cantractar Waiver Foa•m
lq l�ttns:lla�at�s.fortworthtexas.�o�/ProiectResources/ResourcesP160 - MWBEIMWBE Prime Cantractor
11 Waiver-220313.ndf �
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
KTII
31
Business Equity Joint Venture Form
httns://anns.fortworthtexas.eovlProiectResources/Re�ourcesP/60 - MWBE/MWBE Joint
Vwntisre 220225.t�df
FAILURE TO ACHI�V� TH� GQAL OR OTHERWTSE COMPLY WITH THE ORDINANCE WILL
R�SULT IN THE BIDD�R/OF��ROR B�ING DECLARED NON-RESPONSIVE AND THE BID
REJECTED.
FAILUR� TO SUBMIT TH� REOUIRED SU,SIN�S�S EQiTTY DOCUMENTATION OR OTHERWISE
COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON-
RESPONSIVE. THE BID REJECTED AND MAY SIIBJECT THE BIDDERIOF�EROR TO 5ANCTIONS
AS DESCRIBED IN SEC. �0-373 OF THE DRDINANCE.
Far QuesHons, Please Contact The Susiness Equity Divisian of the DePartment ofDiversity and
I�nclusion at (81'�) 39�-�6`74.
END �F SECTION
CITY OC POitT WORT�I
STA�IDARD CONSTRi7CTION SPECiFIGATION DOGUIv1ENTS
Rerised Octaber 27, 2021
2022 8ond I'ear 1— Contract 5
City Project Na. 102931
06 52 43 - 1
Agreemant
Page 1 of6
SECTION OQ 52 43
AGREEME�IT
THIS AGRE�MENT, authorized on Novemher 29, 2022, is made by and between the City of
For� Wortll, a Texas tiome rule municipality, acting by and tlirough its duly autharized City
Manager, ("City"}, and McClendon Coaastruction Company, Izac., authori�ed to do
business in Texas, acfiiiig by and through its duly authorized represen�ative, ("Contractor").
City and Contractor m�y jointly he re%rred to as Parties.
Ci�y and Contractor, in considei�ation of the mutual covenants hareinafter set fortll, agree
as fallows:
Article 1. WORK
Contractor shalI complete a!1 Work as sp�cified or indiaated in the Con�ract Dncuments for the
Projeet identified herein.
Article 2. PRO,�ECT
The pcQject %r vvhieh the�W ork under the Contract Documents may be the whole or only a part
is generally described as follows:
2�22 Bond Year 1— Contract 5
Citv Proiect No. 102931
Article 3. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accardance with the Contract
Documents ar� amount, in current funds, of ft�+e miili�n, four hundred and one thousand, nine
hundred and twanty-six and 501100 DoIlars ($5,�01,9Zb.50). Contract pzice nnay be adjusted by
cha.�ge orders duly authorized by tl�e Parties.
A�cle 4. CONTRA.CT TIME
4.1 Final Acceptance.
The Work shall be compl�te for Final Acceptance within 400 days aftar the data wh�n the
Con#ract Tirz�e cozxamances to run, as pravided in Paragrapl� 2.Q2 of the General C�nditions,
plus any extension thereof allowed in accordance with Article I2 of the General
Conditians.
4.2 Liyuidated Damages
Contractor recognizes that time is of the essence %r completion af Miiesiones, ii any, and
to achieve Fina1 Accepfance of the Wor�C and City and the pub�ic wi11 suffer from loss of
use if the Work is nat completed within the time(s) specified in Paragraph 4.1 above. The
Cantractor also recognizes tha delays, expense and difficulties involved in pro�ing in a
legaI proceeding, the actual loss suf�erred by the City i� the Work is not completed on
ti�e. Accordingly, instead of requiring any such proof, Contractor agrees that
as liquidated darriages for delay (but not as a penalty), Cantractor shall pay Gity
Six Hundred Fifty and OG�/I00 Dollars ($65. o. oa) for each day that expires a$er
the time specified in Paragraph 4. f for Final Aceeptan�e until the Crty issues the
Final Latter of Acceptance.
C1TY QF FORT WQItTH 2O22 Band Year 1— Contract 5
STANDACiU CONSTR�TCT[DN SPECIFICATION DOCUMENTS City Pmject No. 1 D2931
Revised 1 1123/2 02 1
U05243-2
AgreBinent
Page 2 of b
Article 5. CONTRACT DOCUMENT�
5.1 CONTENTS:
A. The Contract Documents wliich comprise the entire agreement betw�en City and
Contractor concerning the Work consist afthe following:
1. Tl�is Agreeznent.
2, Attachments to this Agreerrtent:
a. Bid Fortn
1} Pa•oposal Fornn
2) Vendor Compliance to 5#ate Law Noii-Rasident �iidder
3) Prequali�cation. �tate�aaent
4� �tate and Federal documents (If applicable)
b. Curr�nt Pr��ailing Wage Rat� Table
c. ���surance ACORD Form(s)
d. Payment Bond
e. Perfor�ance Boz�d
f. Maintenanee Bond
g. Powar of Attorn�y for the Boiids
h. Warker's Compensatian �ff"ic�avit
i. MBE and/ot• SBE L7tilization Form
3. Genez�al Conditions.
4. Supplementaty Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment
ar, if nat attached, as incorporated by referenee artd described in the Table af
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Cantractor prior to Notice af Award.
9. The following which may be delivered or issued after #he Effective Date of the
Agreement and, if issued, become a�1 incoa•porated par� of tlle Contract Docuinents:
a. Notice to Proceed.
b. F'ield Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. INDEMNIFICATION
6.I Contraetor cavenants and agrees to indemnify, hold barmless and defend, at its own
expanse, the city, i�s afficers, servants and employees, fram and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the eontractor, its officers, agents, effiployees, subcontractors, licenses or invitees
e�uder this contract. This indemni$cation provision is_ specificaliv intended to aperate
and be effective even if it is �lle�ed or proven th�t all or some of the damages beinS
sou�ht were caused, in whole or in part, bv any act, omission or negligence of the ciiy.
This indemnity provisian is intended to include, withoat limita#idn, indemnity fflr
costs, e�:�erases and le�al �'ees incurred by the city in defending against such claims and
causes o#' actions.
CITY OF FORT WORTH 2p22 Bond Year I— Conhact 5
STANDARD GONSTRUCTIDN SP�CIFICATTqN DqCU�NTS City ProjectNo, 1p2931
Revised 11/2312U21
ao sz a3 � 3
Agreement
Page 3 of G
6.2 Cantractor cpvenan#s and agrees ta i�demnify and hold harmless, at its own expense,
the cily, its officers, servants and employees, from and against any and all loss, dama�e
or destruction of properiy of the cify, arising out nf, or alleged to arise nut of, the work
and services fo be perfprmed by the contractor, its afficers, agents, emplpyees,
subconiractors, licensees or iuvitees under this contract. This indemnifcation
pro�ision is snecificallv intended ta oberate and be effective even if it i� alle�ed or
proven that all or some of the dama�es being sought were ca�sed, in whale ar in nart,
bv anv act. omission or ne�li�ence of the citv.
Article 7. M�SC�LLANE�US
7.1 Ternas.
Terms used in this Agreement which are defiu€d in Article 1 of the General Canditinns wilI
iiave the �eanings indieated in the General Conditions.
7.2 Assignment of Confract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written conse��t of tha City.
7.3 Successors aind Assigns.
City and Contractor each binds itseIf, ifs partners, successors, assigns ar�d legal
representatives to the other pa;rty hereto, in respect ta aIl covenauts, agreements and
obIigations contained in the Contraet Documents.
7.4 Severabi3itylNon-Waiver of Claims.
Any provision or part of the Contract Documents held to be u�constitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall c4ntinue to b� valid an.d binding upon City and Coniractor.
The failure of Ciiy or Confrac#or to insist upon t�e performance of any term or provision of
this Agreement or ta exercise any right granted herein shail not consfitute a waiver of City's
or Contrac#or's resgective right to insist upon appropriate perFarmance or to assert any such
right on any future occasion.
7.5 Governing Law and Venue.
This Agreement, including all of the Cnntract Documents is perf'ormable in the State of
Te�as. Venue shall be Tarrant Gaunty, Te�as, Qr the United S#ates District Caurt for the
Northern District of Texas, Fart Worth Division.
7.6 Autllority to Sign.
Contractar sha11 aitach evidence of authority to sign Agreement if signed by someone other
than the duly authorized signatory of the Contractor.
7.7 Nan-appropriation of Funds.
In the event no funds or insufFicient funds are appropriated by Ciiy in any fiscal period far
any payments due hereunder, City will notify Vendor of such occurrence and this
Agreement shall terminate on the last day of the fiscal p�riod for which appropriations were
reccived vwithout penalty ar expense fio City of any kind whatsoever, except as to the
partions ofthe �aayments herein agreed upon for which funds have been a�propriated.
CITY OF PORT WQRT�I 2622 Bond Year 1— Contract 5
STAAIDARD CONSTRUCTION 5FECiFICATION DOCUMENT5 City ProjsctNa. 1D2931
Aevised L 112 312 02 1
OD5243-4
Agreement
I'age 4 of 6
7.8 Prohibition On Contracts With Companies Boycotting Israel.
Contractor, unless a sole praprietor, acknawledges that in accar�ance v�+ith Chapier 227 i of
the Texas Government Code, if Contractor has I4 or more full time-employees and the
cantract value is $1 D0,000 0�• mare, the City is prohibited fram eilterii�g i�.to a contract with
a company %r goods or ser�ices unless the contract cantains a written verification from tlie
company that it: (1} does noi boycott IsraeI; and {2) will nat boycott Israel during the term
of the contract. The terms "boycatt Israel" and "compa�iy" shall hava the meanings
aseribed to those tertns in S�ction $08.001 of the Texas Government Code. By signing this
contract, Contractor certifies #hat Contractor's signature pwovides wr3tten
verification to the City that if Chapter 2�271, Texas Governrnent Code applies,
Contractor: (].) does �not baycott Israel; and (2) will no# baycott Israel during the ter�
oi the coniract.
7.9 Prol�ibitian on Boycotting Energy Conapa�:ias.
Coniractor acknowledges that in accordaace witl� Chapter 2274 of the Texas Government
Cade-�{as added by Acts 20�1, 87th Leg., R.S., S.B. 13, § 2), tlie City is prohihited fi•am
entering into a con�ract for goods ar services that has a value of $100,000 or more, which
will be paid whoIly or partly from public funds of the City, with a company (with 10 or
more full-tzzne etnployees} u��less the contrae# eantains a written verificatian from tlie
company that it: (1) does not boycatt energy companies; and (2) will not boycott energy
companies durLig th� term of the contract. The terms "boycott eiiergy campany" and
"company" have the meaning ascribed ta those tez•ms by Ghapier 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the �xteni
tb�at CLapter ��'�4 a�' tl�e Govername�nt Code is applicable to fihis Agreement, �y
signing this Agreement, Contractor certifies that Confractor's signature provides
v�vrit�en verification to the City that Contractor: {1) does not boycott energy
companies; and (2} will not boycott �nergy eompanies during the term of this
Agreemant.
7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Cont��actor acknowledges tllat except as otherwise pravided hy Chapter 2274 of the Texas
Government Code (as added by Acts 202T, 87th Leg., R.S., S.B. I9, §].), tlae City is
prnhibited from entering into a contract %r goods or services t��at has a value of $10Q,000
ar more whicl-� wzli be paid wholly o:r pa�•tly fro�n publie funds of the City, with a company
(with 10 or more fi�ll-time employees) Lmless the contract contains a written verification
from the company that it: (1) does not har+e a practice, policy, guidance, or directive �hat
discriminates against a�rearm entity or firearm trade assaciatian; and (2) will nat
discriminate during the fierm oi tlie con�ract against a firearm entity or firearm trade
aS50Clfltlpll. Z'}ie terms "discriminate," "firearm ei7t1Ty" aTl(� "�rearm �i'aCi� a�SOC1a�10C1"
have the meaning ascribed to those terms by Chapter 2274 Qf the Texas Government Code
(as added by Acts 2021, 87th �,eg., R.S., S.B. 19, § 1). To the eartent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing this Agraement,
Contracfor certi�es that Contractar's signa�ure provides written verification to the
City that Coutractor: (1) does nat have a practice, paIicy, guidance, or directive that
discrirninates against a firearm entity or firearm trade �ssociation; and (2) will not
discriminate against a firearm entify or f[rearm trade �ssociatio�n during tk�e term of
this Agreement.
CITY OF EOFtT WQRTH 2Q22 Bond Year L—�onhact 5
STAAIDARD CONSTRUCTION 5PECIPICATIpN DOCUMEN7"5 Cily Project No. 102931
Revised 11/23l2021
005243-5
Agreemer�t
Page S of 6
7.11 Immig��ation Nationality Aet.
Contractor sha11 verify the identity and empioymEnt eligibility of its employees who
perform work under this Agreement, including completing tl�e Employment Eligibility
Verification Forzn (I-9}. Upon request by City, Contractor shall provide City with copies of
all I-9 %rms and supporting eligibility documezrtation far each employee vwho performs
work under this Agreement. Contractor shall adhera to all Federal a.nd State Iaws as well as
establish appropriate procedures and contrals so that no services will be performed by any
Contractor emp�oyee who is not legally eligible to perform such services.
C�NTRA.CTQR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS
FROM ANY PENALTIES, LIABTLTTIES, OR LOSS�S DUE TO VIOLATIONS OF
TH�S PARAGRAPH BY C�NTRACTOR, CONTRACT�R'S EMPLOYEES,
SUBCONTRACTORS, AG�NTS, OR LICEN�EES. City, upon written notice tQ
Contractor, shall ha�e the right to iminediately terininate this Agreement for violations of
�his provision by Contractor.
�.12 No Third-Par�.y Beneficiaries.
Tl�is Agreement gives no righis or benefits to anyone other than the Gity and the Contractor
and there are na third-party beneficiaries.
7.13 No Causa of Ac�ion Against Engineer.
Confractor, its subconiractors and equipment and materials s�tppliers an the PROJECT or tkeir
sureties, shall maintain no direct action against the Engin�er, its offcers, employees, and
subcontractors, for any claim arising out of, in connection witt�, or :resulting from the
enginaering services performed. Only the City will be the heneficiary af any undertaking by
the Engineer. The presence ar duties of the �nguleer's personnel at a cnns�ructian site,
whether as on-site representatives or otherv�+ise, do not make the Enginesr or its personnal
in any way responsible for those duties that belong to the City and/or the City's construction
eontractars or other entities, and do n.ot r�lieve the canstruction coritractors or any other
entity of their obligafions, duties, and responsibilities, including, but not limited to, alI
constructian metl�ods, means, techuiques, sequences, and procedures necessary for
coordinating and completing all portions of the cons�ruction work in accordance with the
Contract Documents and any health or safe#y precautions required by such canstructioz�
work. The Engineer and its persnnnel have no authority to exercise any control o�er any
construction contractor or other entity or their eznployees in connection with th�ir work or
any health or safeiy precautions.
CITY OF FQRT WORTH 2O22 Bond Year 1— Caniract S
STAi+]I]ARD CONSTRUCTION SPECIFICATION DQCLIMENTS City Project Nn. 102931
12evised 11/23/2021
OOS2�i3-G
Agrcemwri
Pn�e G of G
IN WITNESS W��R�O�', City anci Cantractar I�ave eacl� executed ti�is Agreen�e��t to ve
effective as af #lie date si�bscribed by the City's desi�;i�atect Assistaiit City Manxger ("Effective
Date"),
Conti�acYnr:
By:
�
Si�nattit�e
Dan �I1cClendon
{PriEtted Name)
President
Title
Po �oX 9g�
Addrass
Burleson, TX 7609 �
ci�y/sfiat�lzi�
Date
Jan 3, ���3
City afFo�•t Waz•tl�
By � W� �
� -
William Jolii�soki
Assistant City Manage��
J a n �, �423
Date
Attest;
.T�ar�ra�t-P .5. �aadall ^ .
Ja��r�ette Goodall, Ci�.y Sect•etacy
(Seal)
MBzC; 22-D974
Date: 11/29/2022
Fo��rn 1295 No.: 2Q22-947431
Cont�•act Ca�npliai�ce Maa�ager:
By ssgEiiiig, I acicnowledge i}zat I ant fil�e pers�n
responsihfe far tha monitoring and
administratia�� af tl�is cantrac#, incl��ding
ensuriug a!1 pe��formai�ce a��d �•epnctit�g
ret��iix•atne��ts.
����
Gi�eg Robbif�s, P,E, — - - --
P��oject Manage��
Approved as to Fo�•zn ai�d Lagality:
�7P,bP.6Lry,dl�/�'�D—/IARf�I.t%'�I ��
Douglas W. Blacic
Sr, ;4ssistai7t City Attoi•�1ey
APPROVAL. R�COMMENDED:
� ,.�
Lau�•e�i Prieur, P.E., Is�t�rim Director
Txanspai•tatiot� & PEiblic Wo�•ks Depa����ne�tit
C['1'Y OF FOR'C V1+Olt'1'H 2O2z Dond Yeer I— Contrnct 5
STANDARn C4NS'�'rtUC�CIpN 5PEC1fICA'['ION �OCUMEN'i'S Cily Project No. 162931
izevised I 11231�021
Bond Number iXC615274
I
2
3
a
5
f>
7
8
�
«
5ECTION o0 61 13
Pi�RrORMANCI3 I30NIJ
aaG1 11- I
�+r:rtr•o�c�in�v�ct. i3�tvE�
I'ngc I ur2
T��r �rnTr o� Trx�s �
§ 1{�iOW ALL C3Y THGS� P[iCSC]VTS:
COUNTY OF TARItA�VT §
Thfit we, McClenQon Canstruntion Cpnin�ny, tnc., known ns
4`Principal" herein and Merehan#s Bandin� Gampany jMutual] , a cor�c�tale
st�rcty{surctics, if moP4 I�lilll 011C� (�LIIY iili[IlOPk7.CCI IO CIp E11151l1C5ti Itl kll� SlillB qI�T�Xilti, knnwn as
I I "Surety" herein (whctflct� one or moro), :�re hcld fli�d lirmly kya«nd unto t�te City of l�nt't Worlh, a
12 miu}icipal car��raliUn cresited nursuant ta t!}e 1a�a�s of'!'cx��s, Rnowr� �s "Ciiy" hcrein, iEi thc pennl
13 sutn o% fi�e millioii, taur l�uiidred and o��e t�totisa�tid. nit�c: hi��icEred ai�d t�i�en�v-six aitd SQIIOU Doklars
t4 ($5.401.92G.Sp}, 1�tvful ti�oncy of tkie llnitcd SSaFcs, to l�c >>aici ii� rart Wartlt,
I S '['arran[ County, 'I'crus {'t7r tl�e pay�t�ent of tvliicli sum tvc[I n»d tr�tly to bc rnndc, �vc bind
I G our5clves, our heirs, cxectitnrs, administrators, succcssor4 �Ind ��ssi�ns, jointly and sevcrally,
l7 firtt�ly by thesc pecscE�ls.
IR Wl�[CR�AS, liu; I'ri��ci�i11 EIi1S C17IGiC(I 111�D il CCI'Iii111 li'I'IltCil L'OI1�CilCt 1Y1�I1 (Ilt. Ck�Y
i9 a��arded the 29d� day ot'Nnvember, 2022, whiclti Contras:c is I�erel�y �eferred to and
?0 !llli(IL' S j71t'� Il@1'COF �C}Y iIII jlliT�J[ltiCS �!S lr fL1II)� set f��r1131tcrCiit, !a 1'uritish all ntalcrit�ls, cRi2i�mcnc
? i labor and other acccssories dc�ned by iaw, in the prosccutior� of th� Work, 1iiCIlIC�I�1�' ilE1y CI1c�17�C
22 O��dcrs, ilS p1'flVk(�CCI �OP Ifl SEl1CI COt7iCF1CI GIES1�Iit1iC(I iiti ZO�Z �Ufl�I YCSiI' I—COi1ZPiICt S, City
23
z��
Fro ject �io. 1 p2931.
NOW, Tf•II�;R�f�'�I�E, tltie canditirni of this obli�atinn is such tltiat if tlac s�ici f'rincip�l
25 sEtnll faitliFiilly perlorm it obYi�;�tions itndcr the Conlrticl ijE�d sl�€ill 9n a11 respects titily n�td
2G flithfully perfp�•m ll�e Work, incltidin� Chungc E?rdcrti, under lf�c Contracl, ��ccordi���; la t13c: ��lans,
27 specifications, and contr�ct c[c�cuments iherei�i referrec! lo, and {�s �veil during an}� perioc� of
28 cxteRisian afthe Cc�ntr��ct thut muy be �ranted o�� tfic p�rt of tk�c City, tI10E1 iI1tS p�3ll�'ill[O�i 5�1�lII �C
29 Find I�ecome nttll �s�id voiQ, otl�envise tn ren�Ain in fiill Porcc nnd effect.
3a
31
�ROVIU�D �L1kTH��t, that if any le�;al acticrn be liled qay kl�is �qi�d, ve�7uc sh�ll lie iEi
'['arrank Co�uily, Tcxtts or ihc CJniteci St�tcs Districl Ct�url fat� tf�� 1Vorll7er�� I]islricl ol"fc;cas, f�urt
32 Wnrili Divisian.
Cli'Y QF FOK'I' 1S'UIt7'll 2022 Ilnnsl Ycnr !— Contruct 5
57'A3�€UARD CfltVSi'RCIC'CI(}h! Sl'iiC1t�1GATfON DOCiIA�N'I'S Ciry I'rajcct Nct, 1Q2931
itcvixcd l�ly E, 2f11 I
oaait�-�
PERFOR,\i�1AfC� BOND
i�,�b� z Ui� a
T13is bon�i is mac�c �tnd executed i�� coEnpliance with the prnvisions oFChapter 2253 of t�tie
z 'E'exns Govcrnmcnt Cac3c, �s ai��cndcd, luul ik�� Ilii�lllklCS [)Il 1I115 �)qI�{� SI1EiII IlC LIC[CCI11t11CC� 11i
3
m
accQrdance wiih ti�e provisiQns at's�ici statuc.
IN WIf1�1ESS W��I:IZEOF, tlic PE•incipal and t!►e SE�rciy hnvc SEGNLD pnd S�ALI�D
S ti�is iitistrun�ent by duly aititlio��iicd a�;ci�ls �»d of�cers an tl}is Ehc �th ��day af
G December . 20 22 .
7
8
9
ia
t�
12 _ _�
131 �, � �
! I! � � i //��
�S 4 � � � � [ _
I G nai�af Serfi�n`ry 4
17
. ,
!!i /� f�
99 - �
20 . ,
�1 ' .
22 1�itAi:s� as to �iri ci il
?3
��� � .
25
7�
��
2K
��
30
31
32
:i3
3A
�� ������
37 1Vitnnss ns to Surery
38
3�
40
�'ILINCII��Ii.:
McCle]��gn C�nslructivn Camoanv. inc.
r _ � � ., _ � �.� . —.,
- .:- ' -
t�v- � � � -
_ __ � .�..�
� ��ibn�iiuru ~� -
�
__y .� �,� ��� -a,�� .�
\
Nnmc nn l'itle
AcEciress: PO Box 996
�urleson. TX 7E028
SUitC'I'Y:
Merehants �ondin�g Carr�r,uanv [Mutuaq
l,: J • , —� �
k3Y• r.,%'.r:._ ° � _L_,
St���ttiti�;rp
8etty J, Reeh �'Attorney-in-Fack
Ni111iC illll�'I'i�lc
Address; �'O Box 9448�
�es Moines. lA 50306
'fclephcmc N��mhcr: z10,697.2230
+I1 y°Note; i1'si�;ned by �uy t�l'liccr nl'tlie 5urety Campt�ny, thcrc i�iusl Ue an filc a certitied cxErt�cl
�I2 Frorn the hy�l�tws tihowi»g thAt tltis pe��san has nutl�arity lc� si��� sucE� ok�ligatio��. I1'
�3 Surely's physical fi�ld�•c�;s is different fra�� its i��ailin�; zdciress, bc�t>> m�ist be provic�eci,
�14 Tlie datc c�f'tltic l�or�d sl��ill ntri hc priar to tl�c cl��tc thc Ccmlr{�cl is t�w.irdc�J.
�5
GlTl' C11� i�UR'C W01t'['I [ 2022 f3nnd t cnr 1—Can�ruci 5
STdN[i)AAD C4l+iSTRUCT30N Sf'IiC[FiCATiON I]qGUN1GNTS Ciry Nrojcct t+fu. Iq2931
licvi5cd Ji:ly 1. 2tl[ 1
�0 Box'TXCfi16274
I
2
:3
4
S
G
7
s
Ti�i� STAT� O1� T�XAS
COUNTY OF TARRAI�T
SI�CTi[}N f�0 G1 1�'
iAYM�:N'1' �30ND
na�i ia- i
>>nvtia?NT• �inr�n
>>nEt � �,rz
§
§ I{A]OW ALL E3Y THCSC I'IiCSC1VT5:
§
Tli�t �we, MCC�C�I(ID�! Canstructi�n Ca��ip�ny, I���., kno�vn as
"Princi�al" hercin, �►nci Merchants BondEng Gampany [Mutualj
,�
� earporat�; sitrely {surciics}, duly auchorizcci lo do business iu thc Statc al' 'I'ex��s, kno4vn as
f 0 "Surcty" hct•ein (ivl�ctiicr c�nc �r more), are held anc� �rntly botmd unta the City ol' �art WarEti, �
i i tnunicipttl cdipa•ution creatcci purstiant to tEtc l�ws of tlSc 5tate of'1'extts, knotvn as "(;ity" hc�•cin,
12 in the pen�l sutt� of fvc ��illion, fn�Er htindred tfntl one th0Us�lnd, iiinc l�undred ��nd
13 t�ventv-six atad 50/1 aQ Iloll�rs (�5,401.92G.50}, I���vf'ul money of il�e Uitiitcd
I� States, to be �aid in Fort Worth, Tarrant Caunty, Tex«s, for thc ��yment oi «�hich siim �vell ���d
IS Er�ily be itiacfc, w� Uii�d otkrsci�fes, aur I�cirs, exccutors, �idministrators, successnrs flnd �ssi�i��,
I G ,joiiikly a�id sc�crally, firntily by thesc }�r�sents;
17 WH�R�AS, 1'rincip�l has entered into � ccrtnin w�•itteu Coniract witl� Cily, Eiw�rcled the
I8 29th d�y of� NQVCI1lI)CP, 2022, whic�� Cnntrtict is lyercl�y t•cfcrrecl to t�nd
f9 made a pa�•t hereaf t'or all purposes as if fuIl}� s�t fnrth hc�ein, to furnish all matcrials. equipinent,
24 labor and otlier acccssorins as dclincd hy lat1�, i�t Ihc proscctttio�� oFtl�e �Vorl: as prnvidcd !'pr itt
? I said Cantract and desibn�l�ti �s 20�2 f3ond Ye�r 1� Contr�ct 5, City Prajc4t No, 10�,931.
2.2 NOW, TH1�R�E�ORC, TI•t� CONpi'I'GON OT "I'I-lI5 OBLIDA"I'lON is such llt�t ii'
23 1�rincipal sh7ll pay all monies oti�rin� to any (�nd t�lf) �ayment bond henefici�ry (as tiefiuec! in
2�4 Chapter 2253 c�i'the'1'cxtis G�vcrnmcnt Cpc3c;, �is nmc��dcd} i�� the prosecutiu» ol'ti�c Wprk uuder
25 tlte Contract, tl�etr tliis nUli��ttic�n sliall be and l�ecott�e nul] f�nd vaid; otlterwise to rcn�t�in ii� fiill
2(i
?.i
?g
29
3D
force And cffect.
'['!us l�onc� is itt�tde �ind cxccuted in complicincc ►vith tl�e ��rovisions of Cha��lcr 2253 nf Elie
Texas Government Cc�cle, as ame��ded, Rnd all li�kfilitics an this Uond shalk be determined in
accordEince �vitl� t6io prpvisions of s�iid statutt;,
CITY OC 1�QR7' W4k"!71 3(122 13vnd Yrur l—Con�ract 5
STANllARD CQtdSTRUC'C[(?N S]'i:CIF1CA'C[O�f DOCUtvil�iVl'S Ci�y f�rojccl l�o, Ip2931
Ii�viseeiJuly 1, 261 l
006f 14-2
f'AYzvf �:N"I' IiONT)
fhtge 2 of2
k fE� WiTNF.SS WNI:RT�OT�', the �'rincip�l ai�d S►irety liave e�ch SICrNE:n ��t�c1 SEALrD
2 this I1]5lPllI11Cl7t by duly aut�tori•r.cd �gcnts and officers on this thc �th �n�, ��-
3 December .20 22 .
�
��r�ir�crrni.:
McClendon Construction Company, Inc.
A'�"f'L' S.�.: _ _ ` �
__ _ � . M
. �r
— � � + —=�-
( cipf�l) ecrc.��iry �
' � , . � ��
,
�� �j��ss ��s �. F'ri��cipal
— -. � � - — ;
- '�- _
8Y: _ �x���
c lE1'G
41 �.1 ,��;. C V��,,,��jp^C�
N��nc; ��nd Title
Adc�ress: PO Box 996
Burlesan, TX 7Gp28
SURE'CY;
Merchanis Banding Cpmpany [Mutual�
ATTE�S'I':
(5�ircty) Sccretary
������0..�
Witncss �is �o Surcty
3
6
7
8
9
i0
i�
l2
Adc�ress; PO Box �4498
Des Moines. IA 50306
"Tc1epE�onc Numbcr: ���.�gy.2230
Note: 1�' si�;neci l�y ar� af�cer of tl�e Surcty, there ntust he o�i Tle n ccr[iiicd cxtr7ct �ram the
by�lt4yS SIIOLS'lI1�T LI]At C}]t5 persn» has �«tltiorily to si6n sucfi obligalion, II' Surety's pl7ysic�l
address is dif'Eerent f'ram �ts inailir��; �ddress, both must be �rovided,
�'i�e dt�ic of tifc bonc� shall not be prior to tl�e c�atc ti7e Catitrttci is n�vArded.
� _; —:
BY; ' � ; _� ��,� -. -
5i�n��tiir��
,
8etty ,l. E��eh, Altorney-in-�act
N��nc �nci Title
rND QF SECTIO�'
CI'f'1' OI� l�plt"I' WU[i'I'l l 2022 Rni�d Ycar 1—Conu:iel S
STANDAk[) CON57'RiJCTipN SPECIr1C'A'17()N ppCUA9F.NTS City T'rnject 3Vo. 102931
iteviscdlu[y 1,2p11
Bond Numb�rTXC61627� ua6� i�• �
n���ira�eN,�Nc� oc�Ni�
Nugc 1 nf 3
i sccTrow �� c � 1 ��
2 MAINTENANCl� F30ND
3
�4 T1-I� STAT� OF T�XAS �
5 § KiVOW Al.L BY TH�S� I'rt�SGNT5;
G CQLTNTY Ol+ TARRANT §
7 '1"I�s►l w� McClcndoi� Consl�•��clion Coii�p}iny, li�c,, ki�c��v�i �is
8 "Principal" �,�r�iE� �,n� ��rchants �on�ling Com��ny [Mca�u�l] , Ei COl'p01'A�8 SUI'Cty
� �SL11'CiICS, il'11lOfL' l�lall QE1C� C3lfly auEl�c�ri�eti tp do UuSi�tess iri ilic Stz�c cyf"icx��ti, knc�wn f�s
10 "Surety" ltierein (whetl�er ane or mare), arc held anck iirmly bound unto the C:ity nF E�art 1i�orth, h
1 I m�tnicipul car�or�tiart crchted p�n•suEint ta the I��ws af tl}e Stat� of Tcxns, knc�wn ns "City" lierein,
12 in th4 stim of ��e millian, four hui7dred ttnd one t��oust�ncf, i�ine Itundred �tnd i�vcnty�six und 54/kUU DnllHrs
13 (�5,401,92t.50), I�twfuE moi�cy c�l'll�c Lli�ited Stales, lo bc ��tid in Prsrt VJnrtit,
1�4 T�rrant Cnuncy, 'I'exas, for pnyntcr3t of whicl� sum «�ell and tr�uly be made unto thc City ar�d its
I5 succ:cstinrs, �vc liind aurselvcs, oun c�irs, CXCGl1�005, 7dnii«istr�tors, succCssnrs and assigns, joinlly
!6 and sevcrally, Crmly by tl�esc pres�;r�ls.
17
18 WH�R�AS, the Pri�Yci�nl has entcred i��ln ��erlt�in ►vritken contr�tcl willt Il1c CiTy �w�rded
]9 the 2911r d�►y ofNovci��Ue��. 2Q22, tvhich Contrs�cl is hereby �
20 refcrrcd to �nd a made part hcreof i'or �il purposcs �s if i'ully se! tortl3 hcreia�, lo fi�enisE7 all
21 rnaterials, cc�uinment I�Uc�r and olher ncccssori�s f�s dc(iitied by ln�v, i�i tltc prnsec��tic�r� oFthe
22 Wnrk, includin� Any Worfc resulling Frnm A dul�r �utl�orizecl Chan�e Orcler (cc�lleetively h�rein,
23 thc "Wark") Fis �7rovided fc�r in si�id cantr�ct flnd desi�n��lecl tis �6Z� �Unci YcFir 1— Cuntrnct 5,
2� City hr°njcct Np, L02931.; nnd
25
�b WHEREAS, Pri��4ipal binds itself ta usc such materia�s ancl ta so conStr�ict tl�e Work in
2� acca�•d�nce with tl�e pl�ns, s�ecifiic�itions flnd Contrfict Dacu�nents thf�t tlie Wut•k is ��nd tvill
28 remflii� I'rc:cs l�ron] dc:lLcts itl irii►��CIf115 ar Wprk1]lanskti�z 1(�r EIt]d dtlring t�1c �Cl'iocl of lwo (Z) yc.irs
29 after fho d��te of T'inal Acceptnnce pF lhe War�: by tlic Ciiy ("M��i��tenancc Period"), ai�d
34
31 WH[s�tFAS, Principal bi��ds itsclf �p r�pair or reconstruct fhc Wnrk in rvholc or in �art
32 u�on receivinb noticc Irom thc City ol'the necd thcrefijr a[ �ny time ►vithin thc Mainlenance
33 Periocf.
34
CIl'Y Ul� I�b1i'I' W�fi'I'll 2U22 Bund 1'ear I— CntNiu�I S
STA3Vf)A1Z1) CU�STAiJC7"IUt�' SPEC�i�ICA'C1UN QOCIlMEsi�IT5 Ciry Ptojcel i�'u. I(!2�)31
itcvisctf July 1, 2011
UUGi f0-i
MA1N'I'LiNANC}i AE)Nll
Pugc 2 u!'3
i NOW 'I HiRLFORE, the conditian of tf�is o61i�;ation is such tl�at if F�rincipal sl�All
2 rcET��dy uitiy d�[octivc War4�, far whicl� tiittt;ly naticc �vus ��rnvidcci by City, lc� a caii�nletior►
3 st�l�stactnry to the City, tl�en this oblig�tion shall �ecamc null �ind void; otl�erwise ta rem�in in
� li�l1 li�rce na�d ef'icc�.
S
G 1'ItOVIDCD, HOWEVT;R, if �'�'incipal shnll Fuil sa to rcpair or rcconsiruct any limcly
7 noliccd defeckive Wnrk, it is agreed lh�it Ehe City �nay catise �ny �nd 71� su�lf defcctivc Wark ta
8 Ue rep�iircd a��dlor rccai�siructcd wifli all i�ssneifltcd costs thcrcaf 1}cin� barnc lsy th4 Pr�t�cip�31 ��nd
9 the Surety u�zder ihis Maii�tenance bond; und
1 [}
l I PROViD�I) i�URTHER, tls�it il'any le�ai action he filed on this Rond, vent�s si�all !ic in
12 'I'Eu•r��nl Co►�nty,'I'cxtts ar tl�c Unitcd SIF�tcs District Ca►irl fnr thc Narll�crn 1]istrict oi"I'cx�s, l�a�•l
13 Wortlt Di�isio�ti; and
14
15 P�OVInEU �URTHER, tl�at this obligation sh�i[ b� �antinuous in i�aturc anc�
1C s�iccissi�e recoveries »iny Uc l�ati hercon ['or stiaces4ivc: hrc:ad�es,
!7
I$
19
crry ar• rr»z•r waEt•ri i 2p22 I3ond Yrar I— Conlrac� 5
S7`ANf)ARD CbN5T[dLfC'[7U�i S�F,CIFICA"f[ON n��Cl7t�lGN'fS City Yrojecl A1a. 102931
Itevisctl ]uly� 1. 201 I
006) 19-3
�t���r*�n�tc:L t�oHi�
['t,�tc 3 nr3
1
Tiil WIT1�dESS WH�Ri+:OI�`, thc Princip�i and the Surcty h�uc cach 51C,NGD nnd SEAI.ED this
? insSrurnini by duly authorizcd �igenls an�i �fficers on lhis tklc �th d��y nf
� D��embe� _ , 2022 _.
4
S
G
7
g
i
10 -- _-,a
:
I 1 � , T: � �—
12 � �.,� .
i� - ' ��
IQ ' � riE�cipa c��nry
IS , i
1G , , ,
17 ������
16
19 '!� ,
2t3 �r��ss as ��F�r`�ipn�
21 ?
22 ` .
23
?q
?5
26
z�
2 ii
�9 AT�'I;�'3':
3d
31
32 (Surcly) S tEiry
3� ��J� CXC�.S°�
35 Witncss as to Surcry
3G
PRENCiPAL:
McClondan Gonatruclian CompBny, Inc,
� ' ,a --�-�^- - 4�---
_ " �, "7
r�V,> — —�,t _ J �
� Sign�turc
V � ' , � �
�y�_ �
`� .s �'�4- ../�`e"1� .y �` ��-���.r+r� �.-�
Narne �nd "I`itle
Acfclress; PO Bqx 99Fi
S�rleson, '�X 7G028
SUItL"TY:
Meraha 4s Bondin�_ m an �Mutuai�
: � . �
BY: � ' � •
' Si��i„iurc '
Betty J, Fteeh, Attorney-in-Fact
Nantie nnd "I'iile
Address: PO Box 14488
[}es Moines. IR 5030�
'I'cic��lione Numhcr: 21a.697.2230
37 '�Notc: If'si�ned by a�� pfticer of titc 5urety Company, thCre Ft�ust bc� p�t file a certiCeC� eXtrt�cl
38 frant ttic hy-la�vs shotvin�; that this �erion has �ut�tnrity to si�;n sucl� ohli�;ntion, ii�
3t) Surety's physiessi �c�dress is differenE f'rc�i�i i�s �t�t�iiitib �iddress, �c�tEi �»ust be pravidecl,
4p Thc c�ate of the b�nd shall i�oi U� prior t� El�c datc tl�c Contract is itwfircicd.
41
CI'['Y OI� f�UR7' WOEt'I']1 2ff�2 F3ond Yc��r !-Contrncl5
S7i4iJUARD CO%fS'fRUC'I'fi}N 5f'liC;ll�lCAT[ON f)�CUMHN'['S Cily Projccl hiu. IQ2931
ri�V�,E�i ����y �, aai i
��������
BO�DIhTG COARPA1�1Yn�
PO11V�R OF /�ii0��1�1�
Know A!I Persons By ihese Presents, that MERCFiANTS BdNDING COMPANY (Ml1TUAL} and MERCHANiS IVATIONAL BDNI7ING, INC.,
6ath 6eing carporations of the State of lawa (herein collectively called the "Com�anias") do hereby make, constitute and appa9nt, individually,
Ana Tomes; Andre+rr Addison; Beriy J Reeh; Bryan K Moore; Elizabeth Ortlz; Michael D Hendricksan; Patricia Ann Lyllle; PatrlrAc Coyle
thelr true and lawFul Attorney(s}-in-Fact, fo sign its name as surefy(les) and to execute, seal and acknowladge any and all bonds, undertakings,
cantracts and other wrrikken instrumenls in the nature fhereof, on behalf of Ehe Compan9es in thelr business of guaranteeing the fldelify
of persans, guaranteeing the performance of contr'acts and executing or guaranteeing bflnds and undertakings required or permltted in any
actions or procesdings aElo+n+ed by law.
This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by th�; Board
a# Directors of Merchants Bonding Company (Mufualj an April 23, 2011 and amended August 14, 2015 and adnpted by the �nard of Directors
of MerchanfsNational Bonding, Inc., on October t6, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer ar any Assistant Secretary or any Vice president shall hays power and auihority
to appoint Attorneys-in-FacE, and to authorize them to execute on behalf of ihe Company, and attach ihe seal of the Company thereto, bonds and
undertakings, recognizancas, coniracfs of indemnity and other wrltings ohligatory in the nature therea#."
"The signature of any authorized oificer and the seal oi the Company may be affoced by facsimile or electronic transmissio� to any Power of Attorney
or Certifcaiion thereof authorizing #he execution and de[Every of any bond, underEaking, recognlzance, or oiher surelyshlp a611gallons of the
Company, and such signature and seal when so used shall have the same farce and effect as though manually flxed."
In connection wilh ohligatinns in favor of the Ffarida pepartm�nt af Transpnrkation anly, it is agreed that the power and aut hority hereby givett to the
Attomey-in-Fac# includes any and all cansents far #he release of retained pereantages andlor final estimates on engineenng and cons#ruction
oonlracts required by the State af �Iorida C]epartment of 7ransportation, tt is fully understood that consenti ng ta tne State of Florida �epartment
of Transportatlon making payment of the fnal estimate to ihe Contractor andlor its assignee, shall not relieve this sureiy company of any of
Its o6ligations under its hond.
ln connection wHh oblEgatlons En Favor of the lCentucky �epartmenl of Highways only, it is agreed tl�ak the �ower and authority hereby gi�en
ko the Altomey-In-Fact cannol be madified or revoked unfess prior wriflen personal notice of such intent has h�:n given to the Commissloner-
Depar#ment of Highways of t�e Commonwealth of Kenfucky at Isast thirty (30) days prior to the modfficaiion ar re�ocaiion.
In Wifness Whereof, the Companies have caused khis instrument to be signed and sealed this 19th day of March , 2029
���Mni���
�� �� vo...s�
���'t°��1p � �< �•�'+ : ; ��,�� � ��MA �• MERCHANT5 B011lDIHG COMP�tIVY (MUTUAL)
`�y�:'��� RqJ�':��: e ��VQ�P�9��.�F�� MERCMANT Ni4T10NALBONDING�INC.
�a_ e�� .e7;� ;�.. .
:� �� �:� o oF�. - -o- .
; ��• 2aos ;���; : ��F 1933 �-�c: gv �
;�'• �.: : �'•'. .��� ���
�.��/�� •��►,r a°:`y1,I/� ��1��°e �IESIO�BfFt
�_
e
STA7EDFlOWA •r����+������*`'`y ������ee`�
CDUNTYOF �ALLRS ss.
On this 19th day af March 2a21 , befpre me appeared Larry Taylor, to me personally known, who being by me duly swom
dEd say that he fs President of MERCHANTS 80E�DING COMPAEVY (MUTUAL) and ME�2CHANTS NATIONAL BON�ING, INC.; and that the
seals afffxed to the fQregoing instrument are t[na Corporate Seals of the Companies; and fha# the said instrument was signed and sealed in behalf
of ihe Companies 6y autMority oi tF�eir respectiVe Boards of DlrecEors.
,�Q�� � s }�o��Y i�Q�o�
o � Commission I�umber 7505T8
x � � � ° My Commission Expires
+ �owA � January 07, 2023
����
�
Plotary Aublie
(Expiration o# notary's commission
does nat irnraGdate this instrumenk)
I, William 1Narner, Jr., Secretary af MERCHANTS BOMDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC,, do hereby
oertify that the abnve and foregoing is a true and correct copy of tha POWER-OF-ATTORNEY executed hy sald Cornpanies, which is still in fuA
force and effect and has nat been amended or revoked.
ln Witness Whereof, f ha�e hereunto set my hand and affRxed the seal of ths Companies on this5�h day � �ecember 2Q�2
<<.��.�.,,�. 4 •"' ' °'.
�.��g1UlRl,q�''•., o°01N�+ Cp�•o
.`�r,��'��PpR� ��8' �'�'O�p�PO,9,v����� � � � •
' a � � " e �. • �' o r` • a ,�'�°'��'�
=d6`� : e .�;`� `�;�
;��. a0D3 ,:,,��e y 1933 ; y; Secretary
. '`'; • +��; • ;�O o
d+`'•
�.,8' ''�. °e .�W�• ••'�� o°
'•.k��"':�""��.�• �. � e�
POAQDI8{112�) ',,f��IR�l�fa��y' �epoae�•
1� ������L���
B O 1�T D I 1� G C O Ah PANY,�
ME[LCHANTS L30ND[NG COM!'ANY (MUTUAL? • P.D. BOX 14498 � DES MOINES, IOWA56366-3�98
PHONE: (800) 67$�8171 • FAX: (5l5) 243-3854
ADpENDUM Ta BOND
This Addendum is in reference to the bond[s) to which it is attached.
M erchar�ts B ondi ng C omjaany ( M utual )(' M ercha�tso) deerr� the dig�ta� or e� ectroni c i mage of
M�charns�corporate seal below affixed to the bonc�s) to the sarr�e exterit as i� a raised car�arate seal was
pl�ysically stamped ar i mpressed upon the bond(s). T he digital or electronic seal below shal I ha�e the sar�e
forte and effect as tho�gh manual ly fixed to the bond(s),
A 1 f terms o� the bond{s} remai n the same.
Signed and effective March 23, 202Q.
MERCHANTS 801�dING COMPANY {MIJl"IJAL)
�......
•�p1�� CO�i,°•�
;$o.o�,Poy '°�.
.
; y ;' � q� :�.c'.
.w:� -o- �� .
+�:`� �^�„•
: � • 1933 ; �'
, ���� 1;�c «'
.
'•. �" � '' \ �:
.�� ��„��.
��� ----- �-- _� ----------
� �
LarryTaylor, Pres�dent
�.,� �� ��,�� �
����'���`i ��1�+��'�.��
�l�'�1C ���1"�1 �! 1 1 �! � � JL��
To obtain informatian or make a complaint:
You may contact your insurance agent at the telephor�e number prorrided by your insurance
agen#.
You may call Merchants Bonding Campany's toll-free telephone number for information or to
make a complaint at:
1-�OQ�878-� 17'I
You may contact tfi�e Texas Dsparkment of Insurance ta obtair� information on companies,
coverages, rights or camplaints at:
'! �BQa��Sa-3439
You may wr�te the Texas Department of I nsurance at:
P. O. Box 149104
Austin, TX 78714-91�4
Fax: (512) 475-177�
Web: http:llwww.tdi.state.fx.us
E-mail: ConsumerProtectian@tdi.state.#�c.us
PREMIU�I AND CI_AIM DISPUTES: Should you ha�e a dispute concerning you� premium or
about a claim you shauld contact ihe agent firs#. If the �ispute is not resolved, you may contact
#he Texas Departmen# of Insurance.
AT7'ACH THIS NOTIC� TO YOL1R POLICY: This noiice is for information only and does not
become a part or condition af the attached docurr�ent.
SUP OD32 TX (1109)
�� ��
N��vitu ��vSUKtu �vic��endon c:onstructipn c:ompany, inc.
POLiCY NUMB�R; �pp��19886
YFII� �N�d����i�Ni C�A�I��� iNE P�LIGY. �L�AS� R�I� li ��R��'IILLY.
i ��� ���iF�CTC}Ft'� ��AI���� A��I�I�f�A� IIdSU���
�YV�����YVI��I� -- F�h�IVI �
'Fhls endorsement matlifies insurance pravided urtder the following,
�AMM�R�IAL G�NI�RAL LIA�ILITY COVEk�A�� �AR7
Pollcy Number
C PP2119886
�ol�cy €xpiratlon �ate
1/3112023
Mamed Insured
McGlendon Construction Company, Inc.
Agency Number
0755324
[late
1/31/2022
Agency
I B T X- Acrisure
�'ollcy �fi�ective Date
1131/2022
Account Number
Issuing Gpmpany
�Amerisure Insurance Campany
'I. g. 5��710N 11-{N�iO IS AN IMS[J��a is amended to add as an ad�itlonal insured ar�y person or
organiz�tion whom you are required to add as an additianal insured on thls policy under a written contract or wrltten
agreement relating to your business.
b. The writfen eontract ar written agreement must:
(1) Regulre addifional Insured statusfora time perlod during the term ofthls pollcy; and
(�) B� �xecuted prior to the "bodily InJury", "property damage", or "personsl and ad�ertising injury" leading to a
claim underihis policy,
C. If, however:
(1) "Your work" began under a letter of intent or work order; and
(2� The letter nf intent nr wnrk nrder led tn a written contract or written agreement within 30 days of beginning
such work; and
(9) Yourcustam�r's cus#omary aontracts requlre persor�s or organizatians to be named as additlonal insureds;
we will provide additional Insured status as specified in this endorsement,
�. The insurance prnvided underthis endorsement is limited as follaws:
a. That p�rsan or o�ganiza#iorr is an additional Insured anly witi� respect to liability caused, in whale or In part, by:
(1) Pre�nises yau:
(�) own;
(bj Rent;
(C� Lease; or
(dj Occupy;
(�j Ongoing operatlans performed by you or on your behalf. �ngoing operations does rtot appfy to "badily
inJury" ar "praperty damaga" ocaurring aftsr;
(a) AIf work to be parformed by you or on your behalf forthe addit]onal insured(s) at the site afthe
coveredoperatlons is complete, including related materials, pa�s arequlpmet�t (Qtherthan ser�ice,
malntenance or repairs); or
�b) That partion of "yourwarK' out of which the Injury or cfamage arises is put to its inter�ded use by any
person or organizatlon otherthan another contractorworlcing fora principal as a part ofthe same
praJect,
Includescapyrlghted materlal of Insurance Services dffice, Inc.
CG i0 8510'I� Pages q ofi3
(3) Cornpleted operations caverage, but only if�
(a) Ths written cantr�etorwritten �greement requires completed operaflons caverage or"your work"
coverage; and
�b) This coverage part provides ca�erage for "bodily inJury" or "prop�rty damage" Included wlthin the
"prod�cts-campleted aperatians hazard",
However, the insuranee aifnrded to suah addltlonal fnsured only applies to the exfent permitted by law,
b. Ifthe written contract or wrHten agr�ement:
('I� Raquires "arising vut of' [anguage; or
(2) Requires yau tn provide additional insured aoverage to fhat persan or organizatlon by the use af either or
bo#h of the follawing;
(a) Additianal lnsured—awners, LesseesorContractors--5aheduled Person OrOrgat�ization
andars�ment CG 201010 01; or
(b} Addlfivnal Insured —Owners, Lessees ar Gontractors--Cnmpleted �peratfons endorsemenf CG 24
37 10 01;
the� the phrase "caused, In whole o� in part, by" In paragraph 2.�. abova is replac,ed by "arising ouk af'.
�, ifthe written cantract or written agreement requlres yau to pravlde additianal insur�d caysrage to #i�at person
nr or��nizatlan by the use of:
('[) Additlon�llnsured—Owners,LesseesorContractors-5cf�eduledPersanOrOrganizatlonendorsement
CG 2010 U7 D4 or CG 2010 fl4 � 3; or
(2} AddEtional Insured — Owners, Lessees or Cantraats�rs — Completed Operatlons endorsernent CG 20 37 07
D4 or C� 20 37 04 13; or
(3) Bnth #hnse endnrsements with either of those editior� dates; or
(4) Eltherorbothofithefollawing:
(a) Addltlonal In�urved �--Owners, Lessees or Contractors — Scheduled person �r Organizafion
endorserrienf CG 2a 10 without an edition date specified; or
tb) Additianal lnsured -- Owners, Lessees Qr Contractars —Corr�pleted Operatlons endors�m�nt CG 20
37withoutanediiion date specifled;
then paragra�h 2.a. abave applle5,
d. Premises, as respec�fs paragraph 2.a.(1 � above, include common or publlc areas about such premises if so
required in the writfen cantractorwritten agreement,
e. Addltfonal insured status provlded under paragraphs �.a.(1)(b) or 1.a.(1j(cj abave does not extend beyond
the end of a premises lease or rental agreement,
f. The limits of Insurance that apply to fhe additlonal insured are the lea�t of thase sPeaifisd in the:
('I) Wrifiien contrac�
(2) INritten agreament; or
(3) Dsalaratians of this pql icy,
T�e Ilmits af insurance are Incluslve of and not in addition to the Ilmlts of insurance shown in th� Declara#iar�s,
g. The insurane� pravided to the additional insured does nat apply to "bodily Injury", "praparky damage", or
"personal and adverfising Injury" arising oui o# an archltect's, engineer'sf ar surv�yor's rendering of, orfailure
to render, any pro�esslonal services, including but not IEmlted to:
(�) The preparing, appraving, ar faifing to prepare or approve:
(8] Maps;
{b) Drav�rings;
(c) Opinlons;
Includescapyrighted materlal of Insurance Services C}fflce, lnc.
Page2of3 CG70S�90'15
(dj Reports;
(ej Surveys;
(fl Change orders;
(g] Design speciflcations; and
(2) Supsrvisary, inspectlan, �r anglneering services.
h. SECTIOR� Id—C�MM�RCIAL G�id�RA� �3A�l�ITY CC}id�l?IONS, paragraph 4. ��har Insurance is
deleted and replaaed with the following;
�4. �th�r Insurance.
Coverage prav9ded �y this endarsernent is excess o�er any other vaiid and collectlble Insurance available
to the additional insured whether:
8. Primary;
b. Exc�ss;
c. CnntEngeni; or
d. On any ather basis;
but if the written contracf ar written agreement requlres prEma�y and non-cantrlbutory caverage, this
Insurance will be primary and nan-contributary rel�ti�e to other Insurance available ta the additlonal
Insured which covers that person or arganization as a Named Insured, and we will nat share with that
ofher ir�surance.
i. Iftha wntten contraet arwritten agreerrrent as outlined abov� requlres additlonal Insuted status by use ofi GG
2010 11 85, then th� cvverage �ro�ided under this CG 74 &� endorsernent does naf ap�ly except for
paragraph �.h. Other Irtsuranas. Additinnal Insured statx.is is Ilmlted to tha# provided by CG 20 10 11 85
shown below and paragraph �.h. Other InsuranGe shown above.
A��I I IONA� 1NS�JRI�1� 4 OWN�i�S, L�SS��S nR
CAN7RA�TORS (�ORM B)
This endorsement modifles Insurance pro�ided underthe following;
COMM�RCIAL GEN�RAL I�IABILITY COVERAGE PART,
$C��DUI.�
Idame afi �ers�n or Organiaation: Blanket where r�quired by written contract or written agreement that
the terrns of CG 20 1011 85 apply.
(If na entry appears above, Information required tn carnplete this endorserr�ent will be shown in #he
D�clarafians as applic�ble to t�is endorsement,)
WHQ 15 AN INSUREd (Sectlan II) is amended ta inalude as an Insured the person or organlzation shown
in the Schedule, but anly wiih respect to liabili#y arising aut of "your work" forthat insured by or for you,
CG 201011$v Copyright, Insuranc� S�rvices Office, Inc., 198�4
The insurance provided by this endors�rr��nt does not apply to �ny prernises or vuark forwhich ti�e person or
orga�lzation is 5peciflcally Ilsted as ar� addltional Insured on another endorsement �ttached to this pollcy,
Includes copyrlghted material nf Insurance Services Q�ce, Inc.
GG 70 8510 �i5 Pages 3 ofi3
�TAl�TI)ARD G]El�ERA.L COlrT�IT][�l�S
OF'�''�E ��1�TS�CR��TION �ONTRA.�T
CITYO�' FOI2T WQRTI-I
STANDAR�CONSTRUCTION 5P8CIFICATION I10CUMENTS
Revision: SQ3/1021
STAN�]AR� GENERAL CONDZTZONS OF THE
CONSTRUCTION CONTRACT
TAELE OF CONTEl�T�
Page
Artzcle 1— Defuutio�s a� Tezminalogy ..........................................................................................................1
1.01 Defined Terms ............................................................................................................................... l
1.02 Terminology ..................................................................................................................................6
Article 2—Prelirriinary Matters .........................................................................................................................7
Z.01 Capies of Documents ....................................................................................................................7
2.02 Commencement of Contract Time; Notice to Proceed ................................................................ 7
2.03 �tartirag ihe Work ........... .. ................................................................... .......................................... 8
2.0�4 Before Starting Construction ........................................................................................................ $
2.OS Preconstrizc�ion Con�erence .......................................................................................................... 8
2.06 Publi.c Meefiiz�g .............................................................................................................................8
2.07 Ixv�ti.al Accepta.nce of Schedules ....................................................................................................8
Artiele 3-- Contract Documents: Intent, A�nending, Reuse ............................................................................ 8
3 . 01 Intent . . . . . . . . . . . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. ... .. . .. . .. .. . .. . .. .. . .. . .. . 8
3.02 Reference Standards ...................................................................................................................... 9
3.03 Reporting and Reso�ving D�screpancies .......................................................................................9
3.04 Amending andSupplemenfiuig CantractDocuments .................................................................�0
3.05 Reuse of Documents ...................................................................................................................1Q
3.06 Electronic Data ............................................................................................................................11
Article 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental
Canditians; Reference Points ........................................................................................................... l l
4.01 Availa.bilii.y of Lands .........................................................................................•........................11
4.02 Subsurface and Physical Conditior� .................................................... ..............12
........... .............
4.d3 Differing Subsurface or Physical Conditions .............................................................................12
4.a4 Underground Facilities ...............................................................................................................13
4.�5 Reference Points .........................................................................................................................14
4.06 Hazardous Environmental Cr�ndation ai: �ite ..............................................................................14
Article S —Bonds a�d Insur�nce .....................................................................................................................16
S.O1 Licensed Sureiies anc�I�urers ................................................................................................... I6
S.Q2 Perfarmance, Payment, and Maintenance Bonds .......................................................................16
5.03 Gertificates of Insurance .............................................................................................................16
5.04 Coniractor's 7nsura.nce ................................................................................................................ l $
5.05 Acceptance of Bonds and Insurance; Option to Replace ...........................................................19
Article 6 — Contractor's Responszbilities ........................................................................................................19
6.Q1 Supervi�ion and Superintendence ...............................................................................................19
CIT'Y OP FOI2'I' WOI2'1'H
�TANDARDCON�TRl1CTI0N SPECIFICAT]OM DOCUM�NTS
Revision: 8232{�Ll
6.02 Labor; Working Hours ................................................................................................................20
6.43 Services, Mater:�als, and Equipment ...........................................................................................20
6.0� Project Schedule ..........................................................................................................................21
b.05 Substikutes and "Or-Equals" .......................................................................................................21
6.06 Concexning Subcontractars, Suppl�ers, and Others .................................................................... 24
6.07 Wage Ra�es .................................................................................................................................. 25
6.08 Patent Fees and Royalties ...........................................................................................................26
6. 09 P ertnit� and Utilitie s . . . ... . . . . . . . . . . . . .... . ... .. .. . .. . .. .. . ... .. .. ... . .. .. . ... .. .. . .. . .... . .. . .. .. ... . .... . ... .. .. . .. . .. .. . .. .. . .. . .. .. . 27
6.10 Laws and Regulat�ons ................................................................................................................. 27
6.11 Taxes ...........................................................................................................................................28
6.12 Use oi Site and �thex Axeas .......................................................................................................2$
6.13 RecordDocuments ......................................................................................................................29
b.14 Safety and ProtectaQn ..................................................................................................................29
b.15 Safety Represent�.tive .................................................................................................................. 30
6.16 Hazard Communicati�n Programs .............................................................................................30
6.17 Emergencies and/or Rectification ...............................................................................................30
6.18 Su�mittals .................................................................................................................................... 31
6.19 Continuing the Work ...................................................................................................................32
6.20 Contractor's General Warranty and Guarantee ..........................................................................32
6.21 Indetnn�'ication .........................................................................................................................33
6.22 Delegation of Professional Design Services ..............................................................................3�4
6.23 Right to Audit .............................................................................................................................. 34
6.24 Noncliscrimination .......................................................................................................................35
Article 7- Other Work ai the Site ...................................................................................................................35
7.01 Rela.ted Work at Site ...................................................................................................................35
7.02 Coordir�ation ................................................................................................................................35
Articl� $ -- City's Responsbilities ...................................................................................................................36
8.01 Cnmmunications to Cantractor ...................................................................................................36
8.02 Furnish Data ................................................................................................................................ 36
$.03 Pay WhenDue ............................................................................................................................ 36
8.04 Lands andEasements; Reports and Test� ...................................................................................36
$.OS Cha.nge Orders ............................................................................................................................. 36
8.06 Inspectioz�s, Tests, and Approvals .............................................................................................. 36
8.07 Limitat�ons on City's Responsb�7ities .......................................................................................37
8.08 Undi�closed Hazardous En�vironmenta.l Condition .................................................................... 37
S.a9 Campliance wi�h Safeiy Program ...............................................................................................37
Article 9- City's Observation Status Durimg Construction ........................................................................... 37
9.01 City's Projeci Manager . ... ........................................................................................................37
9.02 Visits to �ite ................................................................................................................................ 37
9.03 Aukharized Variations in Work ..................................................................................................38
9.04 Rejecting Defective Work ..........................................................................................................3$
9.05 DeterminaYions for Work Performed .......................................................................................... 38
9.06 Decisions an Requirements of Contraci Documents and Acceptability of Woxk .....................38
clrYOF Foxr wo�Tx
STANDARDCONSTRUCTION SAECIrICA�ION DOCUMENTS
Revision: 823/2(�1
�lrticle 10 - Changes in the Work; Claitns; Extra Wark ................................................................................38
1Q.01 Aufihorized Changes in� the Worl� ...............................................................................................38
10.02 Unauthorized Cham�ges in the Woric ...........................................................................................39
10.03 Execution of Cl�a.nge C)rders .......................................................................................................39
10.04 E�ra Work ..................................................................................................................................39
10.05 Noti#ication to Surety ..................................................................................................................39
10.06 Contract Claims Pracess .............................................................................................................40
Article 11 - Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ......................41
I1. O 1 Cost of the Work .. .. .. .... ..... ... .. ..... ........ ... ......... .. ... ..... ... .. .............. ..... .. ... ...... ... ..... ..... ..... ..... ........ 41
11.02 Al�owances .......................................................................................................... ..................43
..
11.03 Unit Price WQrk ..........................................................................................................................44
11.04 Plar�s Quantity Meas�rement ......................................................................................................45
Article ]2 - Change of Contract Price; Change o� Contract Time ................................................................. 46
12.01 Ci�a.nge of Contract Price ............................................................................................................46
12.02 Change of Contract Titne ............................................................................................................47
12.03 Delays ..........................................................................................................................................47
Article I3 - Tests andInspections; Correction, Remaval or Acceptance ofDefective'Work ...................... 48
13.01 Notice of Defects ........................................................................................................................48
I3.02 Access to Work ...........................................................................................................................48
13.03 Tests and Inspections .................................................................................................................. �S
I3.OA� Uncove�ring Work ........................................................................................................................ �9
1.3.05 City May Stop the Work .............................................................................................................A�9
13.06 Correc�ion ax Removal of Defective Wc�rk ................................................................................50
13.07 Carrection Period ........................................................................................................................ 5Q
13.08 Acceptanc� of D�fective Work ................................................................................................... 51
13.09 City May Correct D�fectiue Work ............................................................................................. S1
Article 14 - Payments to Contractor and Completion .................................................................................... 52
14.01 Schedule of Values ...................................................................................................................... �2
14.a2 Pxo�ress Paynn.ents ......................................................................................................................52
14.0� Contractor's Warranry af Tikle ................................................................................................... 54
14.�4 P�rtial U#il�zation ........................................................................................................................ 55
14.05 Fina.l Inspection ........................................................................................................................... �5
14.Ob Final Acceptance ......................................................................................................................... 55
14.07 Fina.l Payment ..............................................................................................................................5b
14.08 Finai Completion Delayed and Partia.i Retainage Release ........................................................56
14.09 Waiver of Claitns ........................................................................................................................ 57
Artie�e 15 - Suspension of Work and Termination ........................................................................................57
15.�1 Gity May Suspend Work .............................................................................................................57
15.02 Ciky May Termit�ate for Cause ................................................................................................... 58
15.03 Ci�ty May Terniinate For Convenience ....................................................................................... 60
Article 16 -- Dispute Resolution ......................................................................
16.01 Methods and Procedures .............................................................
................................... 61
................................... 61
CITYOF FORT WORTH
STANIlAl2_T7CONSTRUCT[DN SPCCIFICATION DOCUMCt�fTS
Revisian: ii�i11-(?Zi
Article17 — Miscellaneous .............................................................................................................................. 62
17.01 C�ving Notice . .................... ........ ............................................ ..................................................... 62
17.02 Computation ofTimes ................................................................................................................62
17.03 Cumulative Remedies ................................................................................................................. 62
17. Q4 Survival of Obligations ................................................................................................ ............... 63
17.05 Headings ......................................................................................................................................63
CITYOF FOLtT WORT�I
STANDARDCONSTRUCTION SPEC[FICATION DOCUMENTS
T2evision: Sf232QZ1
aonoa-i
GENERAL CONDITION S
Page ] af63
ARTICLE 1— DEFINITION� AND TE�tMIN�LOGY
1.01 Defined Te�ms
A. Wherever used in these General Condi�.oz�s ox � other Contract Documents, the terms listed below
have the meanings indicated which are appli.cable to both tke singuiar and plural thereof, and
wards denotsng gender sha.11 incluc�e the mascul�.e, fez�ai��i��e and z�euter. Said terms are generally
capitalized ox wri�tten in. italics, but z�a� always. When used in a cante�t cansist�nt with the
definition of a listed-defi�t�.ed term, the term shall have a meani�g as defined below whathar
caprtalized or italicized pr ntherwise. In addition to terms specifically defined, terms with initial
ca�a�al letters in the Cantract Docurnents include references to identified articles and paragraphs,
and the titles af other documents or �orms.
1. Addenda Written ar graphic instruments issued prior to the opening of Bids which clarify,
correct, or change the Bidding Requirements or the proposed Contract Documents. �
2. Agpeer�ent The written inst�urnent which is evide�ee of the agreement between City and
Cantractor coverivag the Work.
3. Applicatinn for Pay�nent Tha form acceptable to City which is to be used by Contractor
during the course of the Work in requesting progress or final payments and which i� to be
accompanied by �uch supporting documentation as is required by the Contraet Docuznents.
4. A�bestos—Any rru�terial that contains moxe than one percent asbestos and is friabl� or is
releasi.n.g asbestosfbers into the air above currenf action l�vels esf.ablished by the United States
Occupatzon.al Sa�ety and Health Admrnistration.
5. Award -- Authorization by the City Counc� for tha City ta enter into an Agreement.
6. Bid—The offer or proposal of a Biddex submitted on the pxescrbed %rm setting forth the
prices for the Worlc to be pexformed.
7. I3idder The individua.l or entity who submits a Bid directly to City.
S. �'3iddi�ag Dncurrtents—The Biddin.g Requiurezn.en#s and the proposed Contract Dacurnents
(including alI Addenda).
9. Bidding Requi�ements The advertiseinent or Invifation to Bid, Instructions to Bidders, Bid
security af accepta.ble form, if any, and the Bid Form with any supplements.
10. Business Day — A business day is defined as a day ihat the City conducts narnnal bus�ess,
generally Monday through Friday, except fox federal or state ho�days obsezved by the City,
11. Calendar �ay —A day consisting of 24 hours measur�d from n�idnight to the next midnight.
c��r� o� �a�-r waRTH
STAiVDARDCON51'R[1CTION S['ECIF[CATiON DOCUMENTS
Revision: S/�il�OZ]
00720D-1
GENERAL CONDI710iV S
Page 2 oF 63
12. Change Order A document, which is prepared and approved by the Ciiy, which is �igned
by Contractor and Cxty and authoriz�s an addition, deletion, or revision in ihe Worlc or an
adjustmeni it2 the Contract Price or the Cant�act Time, �ssued on or after the Effective Dat�
of the Agreem�nt.
13. City-- The City of Fort Worth, Texas, a home-rule munieipal corparation, authorized and
chartered under the Te�as State Statutes, acting by its governing body through its City
Manager, his designee, or agents authorized under his behalf, each of which is requirec� by
Charter to perform specific duties with responsilaility for final enforcemen� of the contract�
involving the City of Fort Wort� is by Charter vested in the City Manager and is the en�ity
�with whom Contractor has entered irito the Agreement and far whom the Work is to lae
performed.
14. Cfty Atto�ney — The officially appointed City Attorney of the Ciry of ForE Worth, Texas, or
his duly authorized representative.
15. City Council - The dUly elec�ed and qualified governing body of the City of Fort Worth,
Texas.
15. City Manager — The ofFcially appointed and authorized City Manager of the City of Fort
Worth, Tex�.s, or his duly authorized representative.
17. Contract Clairr�A. dennand or assertion � City or Cnntaractor seekiug an adjusf�neni of
Contract Price or Contraci Tm�e, or both, or �kl�er relief �rikh respec� to the terms of the
Contract. A demand for rnoney or services by a third party is not a Con1ract Cla.im.
18. Contraci—The entire and integrated wr'itten docurnent beri�een �e City and Contractor
concerning the Woxk. The Co�fi�act contains the Agreement and all Contract Docur�ients and
supersedes priox negafiiatians, representatians, or agreements, whether written or oraL
19. Contract Docu�nents—Those items so designated in the Agreement. All items listed in the
Agreement a�e Contract Docutnents. Approved Subrnitfal�, other Contractar submittal�, and
the reparts and drawings o� subsurface and physical conditians are not Contrac# Documents.
2Q. Contract Price The mon�ys paya�le by City to Contractor %r completion of the Work in
accordance wi�h the Contract Documents as stated in the Agreement (subject to the provisions
o� Paragraph 11,03 in the case of Unit Price Work}.
21. Cont�act Tfine The number o� da.ys ar th� dates stated in the Agreement to: (i) achieve
Milestones, if any and {u) eomplete ihe Wark so ihat it is ready for Final Acceptance.
22. Coni�actor� The individual or entity with whom City has entered �into the Agreezm.ent.
23. Cost of the Work—SeeParagrapk� 11.01 o£these General Conditions for definition.
crrvor FonT wo�rx
STANDARI]COIV�TRUCTION SPECIFICATION I?OGiiMENTS
Revision: 8�L'�/1021
oa�zoo-i
G�N�RA[. CONDITI4N S
Page 3 of 63
2�#. Da�tcage CZaa�ra,s — A demand �or maney ar services aris�g �rom t1�e Project or Szte fronrz a
third party, City or Contractor e�clusive of a Contract Claim.
25. Day or day — A day, unless oiherwise defiried, shaIl mean a Calendar Day.
26. Director af Avi�xtion — The officiall� appointed Director of the Avia.tion Department of the
City of Fort Woxth, Te�.s, or his duly appoin.ted repxesentative, assistant, or agents.
27. Dir�ector of Parks and Camt�aunity Ser�vices — The officially appaintied Drrectar of the Parks
and Con�ununity �ervic�s Department of the City of Fort Warth, Texas, or his duly appointed
representative, assistant, or agents.
28. DirectoY of Planning c�nd Developnaent — The officially appointed Direetor of the Pl�nning
and Developrzient Departmeni: of the City of I'ort Warth, Texas, or his duly appointed
representative, assistant, or agents.
29. Di�ector of Transpo�tation Public War�ks — The officially appointed Director of the
Transportation Public Worlcs Department of the City of Fort Warth, Texas, ar his duly
appointed representative, assistant, or agents.
3D. Director of Water Department — The bfficially appointed Director of the Waier Deparbment
of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents.
31. D�awings—That part o� the Contract Docwnents pr�pared or approved by Engineer which
graphically shows the scope, e�ttent, and cl�racter of the Work to be perfaimed by Contractor.
Submittals are not Drawings as so defined.
32. .�ffective Dafe of the Agreemetat—The date inriicaied in the Agreement on which it becomes
effective, but if no such date is indicated, i� means the date on which the Agreernent is signed
and delivered by the last of the two parties to szgn and deliver.
33. Er�gineer--Th� �icensad professianal enginaer or �ngine�ring firm registered in �lie State of
Texas perfartning professional services for the City.
3�4. �xtra YYork — Additional work made necessary by changes or alterations of the Contract
Dacuments or of quantities or far other reasons far which no prices are provided in the Cantract
Documents. Exira work shall be part of the Work.
35. Field Orde� ----A written arder issued by City which requires changes in the Wprk but which
docs not involve a cha�ige in the C�ntract Pric�, Contract Time, or the intent flf tl�e Engirieer.
Field Ordars are paid from Fie1d Order AIlowances incorporated into the Contract by fiinded
wark typ� at ihe time of awar�.
36. Final Accepta�ce — The vvri�en notice given by the City to the Contracior that the Work
specified in the Contract Documents has been completed to the sa�isfaction of the City.
CITY�F F�RT WORTH
STANpAItDCONSTRUCTION SP�CIFICATION DOCUMEid'I'S
Revision: �021
QD7200-I
GENEF2ALCONUITIONS
Page 4 of G3
37. Final Inspectian -- In�pection carried out by the City io verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entuely, and in
conformance with the Contract Documents.
38. General Requirements�eciions of Division 1 of the Contract Documenis.
39. Hazardous Environrnental Condition—The presence at lhe Site of Asbestas, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, or other �nn.atezi.als iaz such quantities or
circumstances that may present a substantial danger #o persons or pxoperty e�osed fkaereto.
40. Hazardous Y�aste Hazardous waste is dei7ned as an� salid �vaste listed as hazardous or
possesses one or more hazardous characteri�tic� as defined in the federal waste reg�la.tions,
as amended from tune to time.
41. La�vs and Itegulations Any and all applieable ]aws, rules, regula.frQns, ardinances, cades,
a�d ordexs of any and all governmental bodies, agencies, authorities, and courts ha�ing
jurisdic�ion.
42. Liens—Ck�arges, security interests, or encumbrances upon Project funds, rea� property, or
pexsoa�al property.
43. Major Item — An Item of wark included in th� Contract Documents tha,t has a iotal cost equal
to or greater than 5% of the original Cantract Price or $25,000 wYuchever is 1ess.
44. Milesione—A principal e�ent specif'ied in the Contract Documents relatin� to an intermediate
Contract Time prior to Final Accep�ance of the Work.
45. Notice of Awa�d The written noiice by City to �e Suc�essful Bidder statit�g tlaat upon
timely complia.nce by filze Successful Bidder witri the condiiions precedent listed therein, City
wili sign and deliver the Agreement.
46. Natice to Praceed—Awrittennotice given by City to Contractox fr�ing the dafe on wluch the
Contraci Time will commence to run an�l an which Contractor shaIl start to perfornr�. the Wark
specified in Contract Documents.
47. PCBs Polychlorinated biphenyls.
48. Petroleu�Petroleu�rn, includ.ing czude ail or any fraction thereof whick is liquid at standard
conditions of teYnperatuire and press�'e (60 degrees Fahrenheit and 14.7 pounds per square
inch absolute), such as oi1, petraleum, fitel o�, oil sludge, oil refitse, gasoline, k�ros�ne, and
oil mi�ced witlz other non-Ha�ardaus Waste and cxude oils.
49. Plans — See definition of Drawings.
c�T�r o� xo�T woxT�
STANDARDCONSTRUCTION SPECIFICAT1flN DOCUMENTS
Revision: 8�132021
ao�zoo-i
GENERAL CONDITION S
Page 5 of G3
50. Pr-ojeet5chedule A schedule, prepar�d and maintained by Contractor, in accordance with
the Ger�eral Requirement�, describing the sequence and duration of the aciivities comprising
the Contractor's plan to aceomplish the Wark witivn ihe Contract Time.
51. Pr�oject—The Worktobe pexformed �nc�er the Contract Documents.
52. Project Manager—The autharized representa.tive af the City wha will be assigned to the
�ite.
53. Publfc Meeting -- An announced rneeiing conducted by the City to faciIitate public
participation a.nd to assist the public in gaining an informed view of i:he Project.
59�. Radioactive Mate�ial—Source, special nuclear, or bpproduct rnaferia,l as defined by the
Afiomic Energy Acf of 1954 (42 USC Sectian 2011 et seq.) as amended �ram time to time.
55. Regx�la� Workrng I�ou�s —Haur� beginning at 7:OQ a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding l�gal hofidays).
56. Samples—Physical e�caznples of material�, equipment, or woxkmanship tlaat are
representat�ive of some portion o� the Work and which establish the standards by which such
portion. of tk�e Work �vill be judged.
57. Schedule of Suhmittr�l� A schedul�, prepared and �naintained by Contractor, of required
submittals and the time requirements to suppart sched�fed performance af rela.ted construction
aetivities.
SS. Schedule of T�alues—A schedule, prepared and ma.intained by Cantractor, �.11acating portions
o� the Coniract Price to variaus portzans af the Work and used as the basis �ar reviewing
Cantracfior's Applications far Paymenfi.
59. Siie—Lands or areas indicated in the Contract Documents as being firrnished by Ci.ty upon
which the 'Work is �o be performed, including rights-of-�ray, permits, aad easements for access
thereio, and such other la.nds fiu7iished by Ciry which are designated for the use of Gontractor.
b0. Specifications That part af the Caniract Documents consistitig a� wrrkten requiremen�s for
materiaJs, equipm�nt, systems, standards and worl�rnanship as applied to the Work, and certain
adz�ai��istratxve requirements and pxocedural matters applicable thereta. Specifi�a�ions may be
specifically mac�e a part of the Contract Documents by atta.chment or, if not attach�d, may be
incorparated by reference as indicated iri the Table of Cont�nts (Div�sion 00 00 00) of each
�'roj�ct.
61. Subcont�actor—An indi�idual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a pa.rt of the �Vork at the Site.
CITYOF FORT WOIZTH
"sTANbARbCONSTRUCT101� 3PEC[F[CATIOM DOCUMENTS
Revision: 81�3I7.(��]
U0720D-1
GE�fEF2AL COND ITIO N S
Page 6 of 63
62. Subrnittals All drawings, cliagrams, illustrations, schedules, and othex dafia or in�orrnatinn
which are specifically prepared or assembled by or for Contractor and submitted by Con�raciox
to illustrate some portion of the Work.
63. Substaniial Completion — Tiie stage iz� the prog�ress o� tkte Project when the V4rork is
sufficzently complete in aecordance with the Contxact Docurn.ents �or Final Inspection.
b4. Successful Bidder The Bidder submit'ting the lowest and znost xesponsive Bid to whom City
makes an Award.
65. Supe�intendent— The repxesentatave of t�ie Cnntractar wha is available at all times and able
to receive instructions from the City and to act �or ihe Contrac�or.
66. ,�upplen2entary Conditians—That paxt of the Contract Documents which amends or
supplements these General Canditians.
67. Supplie� A manufacturer, fabricatar, supplier, distributor, materia.lman, or vendor having a
direct contract with Contrac�or ar with any �ubconiractar to furnish materia.ls or equipment
to be incorporated in the Wark by Contractor or �ubcon�raetor.
68. Unde�ground Facilities All underground pi�alines, conduits, ducts, cables, wues,
manho�es, vaults, tanks, tunne�s, or other such facilities or aitacl�ments, and any encasemer�
co�taining such faci�ities, including but not ]im.ited to, those tl�at convey electricity, gases,
steam, liquid petrole�atn products, telephone ar other communications, cable television,
�ovater, wastewater, storm water, other liquids or chemicals, ar traffic or other control systems.
69 Unit Price Work�ee Paragraph 1 i.03 of these General Conditions for defulition.
70. Weekend Wo�l�ingHau.�s— Hours beginning at 9:00 a.m. and end'u�.g at 5�Q p.zn., Saturda.y,
Sunda.y or legal haliday, as approved in advance by the City.
71. Work—The entire construction or the variaus separately zdenti�iable parts thereof required to
be pro�ided under the Contract Documents. Work inCludes and is the result of performing oz
providing all labor, services, and docurnentatzan necessaty to praduce such canstruciion
including any GYtange Order or Field Order, and fiu�nishing, insta]]ing, and 'mcorporatmg al�
materials and equipment into such construction, all as requiured by the Cantract Dacuments.
72. Working Day — A working day is de�'iu�ed as a day, not including Saturdays, 5undays, or legal
haliclays authorized by the City �ox contract purposes, in which weather or other condiiions
not under the control of the Contractor will permit the perfarmance af the principal unit of
work underway for a continuous perzod of not less than 7 hours bet�reen 7 a.m. and 6 p,r�.
1.02 �'erminalogy
A. Th� wards and terms discus,sed in Paragraph 1.02.B thraugh E are not defined but, when used in
th� Bidding Requirernents or Contract Documents, have the �dicated meaning.
B. Intent of Cep�ain Terms o� Adjectives:
CITYO� FORT WORTH
STIINDARDCONSTRUCT101� SPECIFICAT[ON DOCl1MEN'P5
Revision: $2�3f1.QZ1
DO7200-I
GENERAL CflND ITi01� S
P age 7 nf G3
1. The Contract Doeuments include the terms "as allowed," "a� approved," "as ordered," "as
di�eeted" or terms of I�ce efFect ar import to authorize a� exercise of judgment b� City. In
addition, t.�le adjectives "reasonable," "SUI�b�e," "aceeptable," `�roper," "5��15�aCtOT�," OI'
adjectives of Iik� effect or import are used to describe an action or determination of City as to
the Work. It is intended that such exerc�se of professional judgment, action, or determination
wiJl be solely to evaluate, in general, the Work for compliance with the information in ihe
Can.t�ract Documents and with ihe design co�cept of the Project as a funciioning whole as
shown ar ir�dicated in the Contrac# Docu�xxen.ts {unless there is a spec�c sta#ement indicating
atherwise).
C. �efective:
1. The word "defective," when modifyirig the word "Work," refers to Work that i�
Lu�satisfactQry, faulty, or deficient in tha.t it:
a. does not confaim to the Contract Documents; or
b. does not meet the requirernents of any applicable irispe�tion, r�fer�;�ce standard, test, or
approval referred to in the Contract Documents; or
c. has been daxnaged prior to City's written acceptance.
D. Fu�nish, In�tall, Perfo�m, �rovide:
1. The word "Furnish" or the word "Install" or th�. word "Perfortn" or the word "Provide" or
the word "Supply," or any combination ar similar direciive or usage thereof, shall mean
furnishing and iracorporating in the Work including all necessary la.bor, materials, equipment,
and evezything necessary to perform the Wark indicated, unless specifically Iimited in the
cantext used.
E. Unless stated otherwi�e in the Contract Documents, words or phrases that have a well known
techrucal ar construetion industry or trade rneaning ar� us�d in the Contract Dpcuments in
accordance with such recognized meaning.
ARTICLE � — PRELINIINARY MATTERS
2.01 Copies ofDocuments
City shall furivsh to Contractor one {1) ariginal executed copy and one (1) el�ctronic copy of �ihe
Cantract Documents, and four {4} additional copies of the Drawings. Additional �apies will be
fiazx�.ished upon request at the cost of reproduction.
2.02 Cammen�ement of Contract Ti�ne; Notice ta Proceed
The Contract Time �vill commence to run on the day indicated in the Notice to Proceed. A Notice to
Proceed may be given no earlier than 14 days after the Effec�ive Date of the Agreement, unle�s agreed
ta by bath parties in writing.
CITY DF FQRT WORTH
STANDAI2DCONSTRUCT[OIV 5P8CIFICAT[ON DOCiJMENT5
Revision: 8CL3/�{JQ.1
007204-1
GENERAL CONDI710N S
Page 8oFG3
2.03 Starting the Wo�k
Contractor sha11 start to perforrn the Work on the date when �e Contraci T'rme commences to run.
No Work sha11 be done at t�ie Site prior to the date an which the Contract Time commences to run..
2.0� .8efo�e Sta�tingCa�struc�ion
Baseline Scheduies: �ub�it in accardance with the Contract Daciunents, and pxiar ta stat�ting the
Wark.
2.05 P�ecnnstruction Confe�ence
Before any Work at the Site is started, fihe Contractor shall attend a Preconstructian Conference as
spacif'ied in the ContractDocuments.
2.06 Public Meeting
Con�ractor may not mabiIize any equipment, materials ar resources to the Si1:e priox to Contractar
attending the Pul�lic Meetin.g as scheduled by the City.
2.07 Iniiial Acceptance ofSchedules
No progr�ss payment shall be made to Contractor unt� acceptab�e schedules are submitted to City in
accordance withthe Schedule Specification as provided in the Con�ract Documents.
ARTICLE 3— CONTRACT DOCUMENTS: INTENT, AMENDING, REU�E
3.O1 Intent
A. The Contract Documenfs are complementary, what is required by one is as bin.c�iz�.g as if req�i�'ed
by all.
B. It is the intenf af' the Contraet Docutnents to describe a functionally complete praject (or iaart
thereo� to be constructed in accordance with the Conf.ract Document�. Any labor, documentation,
se�vices, matez�ials, or equipment thai reasonably may be inferred from �.e Contract Doct.unents
or from prevailung custom ar trade usage as being required to produee the it�dacated result vvill be
provided whether or not spec�cally called for, at no additiona.l cost to Ciry.
C. Cla�rificatzons and int�rpretatiar� of �he Contract Documenis shall be issued by City.
D. The Specifications rnay vary in form, format and style. Some Specifica�ion sections may be written
in varying degrees of streamlined or declarative style and some s�ctions may be relatively
narra�ive by c�mparison. Omission of such words and pht�ases as "the Contractor shall," "in
COi1fOi1211� WI�1," "a5 S�lOWri,°' OT "�.S specified" are 1rii�ritlOTl� 1T1 StC�aTl�llle(� SeC�IOI]S.
Omitted words and �hrases sha.11 be supplied by inference. Similar typas of provisions may appear
in various parts of a section or articles witl�in. a paz�i depending on the foxrna,t of the
CITYQP FORT WORTII
STf�NDARDCQNS'�Ri1CTI0N SPECIFIGATION �OCUMENTS
Revision: 8FL311D21
oo�aoo-i
GENERAL CON�ITION S
Page 9 of 63
section. The Contractar shall not take advanfage af arxy vaziation. of form, fot-mat or style in
ma.king Contract Claims.
E. The eross re�erencing o� sp.ecification sections under the subparagraph h�ading "Related
�ections include but are �at necessarily limited to:" and elsewhere within each Specificatioz�
section is provided as an aid and convenience to the C�niractor. The Cor�t�actor shall nat rely �n
the cross r�f�r�ncing provided and shall be responsi�le to caardinate the entue Work under the
Contract Docum�nts and provide a complete Projeet whether or not the cross r�ferencing is
provided in eac� sectian or whether or nat t�e cxoss xeferencing is complete.
3.02 Refe�ence Stan�ards
A. Standards, Speci�cations, Codes, Laws, and Regulaiions
1. Raference to standards, speciiications, manuals, or codes of any technical society, argani�at'ron,
or association, ar ta Laws or R�gulations, whetber such reference be specific or by implication,
shall mean the standard, sp�cifica�ion, manua�, code, or Laws or Regulations in effect at the
tizne of opening of Bids (ar on the Effective Date o� the Agz�eement if there were no Bic�s},
except as may be oiherwise speci�'icaliy stated in the Contzact Docuznents.
2. No provision o� any such standard, spec�fca�ion, manual, ar code, or any in.struction af a
�upplier, shall be e�fective to change the duties or respor�sibilities of City, Cont,ractox, oar any
of thei� subcontractars, consultants, agents, or �mployees, from �hose set for�h in the Cantract
Documents. No such provisian ar instxuction shall be effective to assign to �ity, or any of its
officers, directors, members, partners, employees, a.gents, consuitants, or subcontracf�rs, any
duty ar authority to supervise or direct the performance of the Wark ar any duty or authority
to undertake respansibility incansis#ent wit�. the provisions of the Contract Documents.
3.03 Repo�ting and ResolvFngDiscre�ancies
A. Reporting Drsc�epancies:
i. Contrc�ctor's Review of Coni�act Documents Before Starting T�Yo�-k: Before undertaking each
part of the VVork, Contractor sha1l carefully study and cozz�pare the Contract Doeuments and
check a.n�. verify pertinent figures therein against all ap}aJicable field measurements and
condihons. Contractor shall promptly repart in writing to City any conflict, error, ambiguity,
ar discrepancy which Contractor discovers, ar has actual kn�wledge of, and sY�all oUtain a
written interpretaiion or clarifcation from City befare proceeding �with any Wor� affecbed
ther�by.
2. Contracto�'s �eview of Contract Dacunzents DuYing Perforrmance of Work: If, during the
performance of the Work, Contractor discovexs any cox�flzct, error, ambiguity, or discrepancy
wiihin the Coniract Dacu�nents, ar b�tw��n tke Cantract Document,s and (a) any ap�licable
Law or Regulation ,(b} any standard, specif'ication, manual, ox code, or (c) any instructian of
any Supplier, then Contractor shall promgtly r�port it to City ir� writing. Contractor shall not
proceect. with the Work affected thereby (excapt in an emergen.cy as xequired hy Paragraph
CIT�'OF PORT WflRTH
STAI�lDARI�CONSTRUCTION SPEC[1�[CATION ❑OCUNEENTS
Revision: 8rL3/2021
ao �ra no - i
G�N�RAL CONDITION S
Page ]Oof63
6.17.A) until an amendment or supplemerrt to th� Contraci Documents has been. assued by
one of the methods indic ate d in P aragraph 3, 04.
3. Cantractor shall not be liable to City for failure tv re�ort any canflict, error, ambiguity, or
discrepancy in ihe Conirac# Documents unless Contractor had actual lrnawledge thereo�
B. Resolving Disc�epancaes:
l. E�c�pt as rnay be otherwise specifcally stated an the Co�tract Docurnents, the provision� of
tlle Contract Documents shall take precedence in resolving any conflict, �i�'or, ambiguity, or
discrepancy hetween the provisions of the Contract Docwments and the pravisions of any
standaxd, speci�i.cation, ma�ual, ar tl�e instruction of any Supplier (whether ar not specif'rcally
incozpoxated by reference in the Contract Documen�s).
2. In case of diserepancies, figured dimensians shall gavezn over scaled dimensions, Plans shall
govern over Sp�cifica�ions, Sup�lementary Conditians sk�all gavern over General Conditions
and Specifications, and quantiti�s shown on the Plans shall govern over those shown in the
p�roposal.
3.04 Amending and Supple�nenting Cont�actDocutnents
A. The Contract Documents ma.y be amended to pravide for additions, deletions, and revisions in
the Work or to modify the ierms and condittions thereof by a Cl�ange Order.
B. The requirements of the Con�tact Documents ma,y be supplemenied, and rninor variatians and
deviations in the Work not mvolving a change in Contract Price oi• Cantract Time, may be
autharized, by one or more of the �ollowing �vays:
1. A Field Order;
2. City's review of a 5ubmittal (subject to the pravisions of P aragraph 6.18. C); or
3. City's written interpretation or clariEcation.
3.05 Reuse of Documents
A. Contractar and any Subcontractor or SuppJ�er s�all not:
1. have or aequ�re any tii�e to or ownership rights in any of ihe Drawings, Specifications, ar
othe� documenis (or copies of any thereo�} prepared by or bearing the seal of Engineer,
including electxo�nic rnedia editions; or �
2. reuse any such Drawings, Specifications, other documents, or copi�s th�reof on ex�ensions of
the Project or any other project without written ca:asent oF City and specifi� written verificatian
or adaptation by Engineer.
CTI'Ypi'FDRT WORTH
STANDARDCONSTRUCTiQN SPEGIFICAT[4N DOCUNIENTS
Revision: 823�0�1
oa�zoo-i
G�NERAL CON�ITION S
Page 11 of 63
B. The prohibitions of this Paragr�.ph 3.05 wi�Ii su�rvive final payment, or termination of the
Contract. Nothing herein s�ial� preclude Cont�ractor froxn retaining capies of the Cantract
Dacuments for record putposes.
3.06 Electronic Data
A. Unl�ss atherwise stated iu the Supplementary Conditions, the data furnished by City or Engineer
to Contractor, or by Contractor to Ciry or Engi�neer, that may be relied upon are limited to �he
printed copies included in the Cantract Documez�ts (also �cnawn as hard copies} and other
Specifications referenced and Iocated on the City's an-Jine elecixozuc docurrient rnanagement and
collabaration system site. Files in electronic media. �orrnat of text, data, graphics, or other types
are fiu•nished only far the conveniance af the receiving party. Any conclusion ar infa�mation
abtained or derived from suchelectro�c frles will be atthe user's sole ri�k. Ifthere is a discrepancy
between ihe el�ctronic files and the hard copies, fhe ha.rd capies govern.
B. When �ansferring documents in electroruc mec�ia format, the �ransferring party makes no
representatians as to long term corzipatibility, usability, or ��eadability of docum�nts resulting from
the use af saftwaxe app�ication packages, operating sysiems, or comput�r hard�vare dr�ffering from
those used by the data's creatox.
ARTICLE 4— AVAILABILITY OF LANDS; SUS SURFACE AND PHYSICAL, CONDYTIONS;
HAZARDOUS ENVIRONMENTAL CONDITIQNS; REFERENCE POINTS
4.01 AvailabilityafLands
A. Ciiy shall fiu•nish the Site. City shall natify Contractox oi any encumbrances or restrictions not of
general application but specif'ically related ta use a£fi.�e Site with which Cant�aetor must camply
in performing the Work. Cify will obtain in a timely z�.az�raer and pay for easements for permanent
siructures or permanent changes in existing facilities.
1. The Cxty �as obtained or anticipates acquisition of and/or access to right-of way, and/or
ease�ents. Any outstanding xight-of=way and/or easements are at�ticipated ta be acquired in
accordance with the schedule set forth in the Supplementary Conciitions. The Project Schedul�
submitted by the Contractor in accordance with the Cantract Documents must consider any
outstanding right-of �vay, and/or easernents.
2. The City has or anticipates removing and/or relocating utilities, arzd obstructions to the Site.
Any outstanc�ing removal or relocation of utilities or obstructians is anticipated 'zcx accordance
with the schedule setforth in thc Supplementary Canditions. The Praject Schedule su�mitted
by the Contractor in accordance with the Contract Dacurnents must consider any outsfiandang
utilities or obstructions to be rernoved, adjusted, and/or relocated by othexs.
B. Upon reasonable written r�quest, City shall ft�r��.ish Contractor with a curreni statem�ni of record
legal tiile and legal description af the lands upon which the Wark i� to be performed.
CITY OF FORT WORTII
STANDARDCON3TRUCT[ON SPECIFICATION DOCUM�NTS
Revision: 82312Ui1
oo�zoa-i
G�NERALCONDITION 5
Page 12 af 63
C. Contraetor shall prouide for a�l additianal ]ands and access thereio t%at may be required for
construction facilities or ��orage o�materials and equipment.
4.02 SubsurfaceandPhysicalCanditions
A. Repo�ts and D�awings: The 5upplemen#ary Conditions identi�'y:
1, iI105E r�ports lrnown to City of explorations an�. tests o� subsurface condiiions at or
contiguous to the Site; and
2. those drawings known #o City of physical conditions relating to existing sur£ace ar
subsurface structures at the Site {except Underground Facilities).
B. �imited Reliance by Contr�actor on Techniecrl DataAuthorized: Contractor may rely upon the
accuracy of the "technical data" contained in such reports and drawing�, but such reports and
drawings are not Contract Docurnents. Such "tecl�anical data" is identified in the Supplezn�entaxy
Conditions. Contractor may not make any Contract Claim against Ciry, or a.ny of their officers,
directors, rnembers, partners, employees, agents, co;nsultants, or subcontractors with respecf to:
1. the completeness of such reparts and drawings far Can�ractor's purposes, im�clucling, but not
]imited t�, any aspects of the means, methods, techniques, sequences, and procedures o�
construction to be employed tay Go�.tractor, and safety precautions a.nd progra�x�s incident
thereto; or
2. other data, interpretations, opinions, and 'ulformation coniained in such reparts or shown or
indieated ir� such drawir�gs; or
3. any Contractor interpretation of or conclusion drawn fram ax�� "�echnical data" ar any such
�#her data, intezpretatians, apinions, or information.
4.03 DifferingSubsurface a�P�tysical Conditions
A. Notice: If Contracior believes that any �ubsuirface ar ph�sical candition that is uncovered oa•
re�ealed either:
1, i� of such a nature as to establish �t a1ry "technical data" on which Contractor �s ent.�tled to
rely as provided in Paragraph 4.02 zs zxaate�ially �accurate; or
2. is of such a nature as to require a change in �lie Contract Documents; or
3. differs ma.texia�.q from that shown or indicated in the Contract Dacuments; or
�4, is of an unusual nature, and dif%rs materially firom condit�ons ordinar�y encountered and
generally r�cognized as inherent in wark o� the charact�r provided for in the Contract
Documents;
CI'I' Y OF F ORT WORTH
STANDARI]CflNSTI�UC`F10N SPEC[FICATION DOCUMEI�ITS
Revision: 82320Z1
Q07200-I
GENEF�L CONDITION S
Page 13 af 63
then Contractor shall, promptly after becorning awara thereof and befare further disturbing the
subsurface or physical conditions or performing any Work in connection therewith (except in an
emergency as required by Paragraph 6.17.A), notify City in writing about such condition.
B. Possible Price and Tirne Adj ustments
Contractor shall not be enti�led to any adjustment in the Contract Price or Confrac� Time if:
1. Cont�actnr knew af the existea�ce of such condztions at the time Contractor made a�inal
comrr�itment to City vsrith respect to Conlxact Price and Contract Time by �he subrnission of a
Bid or becoming bound under a negotiated cantract; ox
2. ihe exisience of such condition could reasonably l�ave been diseovered or revea�ed as a result
of the examinatiQn of the Contract Docutneilts ar the Site; or
3. Co�tz�actor fai�led to give the written notice as required �y Paragraph 4.03.A.
4.44 Underground Facilitres
A, Shown or Indicated.• The informaiion and data shown or inclicated in the Contract Documents
with respectto existing Undergraund Faciiiiies at or contiguous to t11e �ite is based on information
and data furnished to CiLy or Engineer by fi11e owners of such �]nderground Facilities,
includimg Ciry, or by oihers. Unless it is otherwise e�ressly provided 'm the 5upplementary
Cond�ti�ns;
1. City and Engineer shall not be respansible for the accuracy ar cara�pleteness of any such
information or data provided by others; and
2. �lie cast af alI of the following will be included in the Contract �rice, and Contractar shall
have �ull arespo�sibility for:
a. reviewing and checking all such in#'armatian and data;
b. locatir�g alI Underground Faciliiies shown c�r indicated in the Contract Docum�nts;
c, coordination and adjustment of fhe Work witl� fikae owners of such Undergraund
FaciIi�es, includirig City, L�LIi'1t1� C077S�i'UCfi7DIi; aX1.Cl
d. the safety and protection of alI such Underground Facilities and repairing any daznage
thereto resulting from the Work.
B. NotShown o�-Indicated.�
1. If an Underground Facility whicl� conflicts with the Work is un�avexed ar xevealed at ox
contiguous to the Sit� which was not shown or indicated, or not shown or iudicated with
reasonable accuracy in the Contract Documants, Contractor shall, promptly a�ter becoming
aware thereof and before further disturbuag conditions affected thereby or pex�anning any
CITYOFFORT WC]R'I'H
STAi�ARI]CONSTRUCTION SPCCIPICATIDI� DOCUMENTS
Revision: S/L3i1,�11
oo�aao-�
GENERALCON�ITION S
Page ]A of 63
Work in connection #�e�ewith (except in an emergency as required by Paragraph 6.17.A),
identify the awner of such U�derground Facility and give notice to that owner and to City.
City will review the discover�d Underground Facility and determine the e�ent, i��' any, io
which a change rnay be xequired in the Contract Documents to reflect a�d dacument the
consequences of the existen.ce nr location of the Underground Facili4y. Contractor shall he
responsible for the safely and protection of such discovered Underground Facility.
2. If City concludes fihat a change in the Contract Documents is required, a Change Order may
be i�sued to reflect and docurnent such consequences.
3. Vez�fication of e�isting utilities, structures, and servi�e lin.es shall include notification of aIl
u�iliry co�npaz�ies a rninimum of 48 hours in advance af constz�zction including exploratory
excavation � necessary.
4.Q5 Refe�ence Points
A. City sha�l provide engineering surveys to esta�lish reference points for construction, which in
City's judgment are necessary to enable Cantxactor ta proceed with the Work City will provide
constructian stakes or other customary method of markim.g ta esiablish line and grades for roadway
and ut�.ity construetion, centerluies and benchma.rks for bridgework. Contractor shall protec� and
pxesezve the esta.t�lished referance pair�ts anc� property monuments, and shall make no changes or
relocatians. Co��ractar shall repart to City whenever any re�erence point or property monument is
lost or destroyed ar requires relvcation beca�e of neeessary changes �n grades or locations. The
City shall be xespons�le far the replacement or relocation of reference points or property
monumex�ts not carelessly or willfully destroyed by the Contractor. The Contractor shall notify
City in advance and wzth suff'icient time to avaid dela.ys.
B. Whenever, in fhe opinion of the City, any reference poir�i or manument has been carelessly ox
w�llfully destroyed, disturbed, or removed by �he Contractor ar any of his empl�yees, the full cast
for replaci�g such points plus 2S% will be cha.rged againsi �he Contractor, and the full amount will
be deducted fram payment due the Contractor.
4.06 HazaYdous EnviYannaental Condation atSite
A. Reparts and Drcr�vings: The Supplernenta�ry Conditions ident�y those reports and da•awings knovvn
to Ci�y relating to Haza.rdot� Envaonmental Conditions tlaat hav� been identified at the Siie.
B. Li�raited Reliance by Cont�actar on Technacal DataAuthorized: Contractax may rely upon ihe
accuracy of the "technical data" contained in such reports and drawings, but such reports and
drawings are not Conirac� Docum.ents. Such "technical da�a" is identified in the Supplementary
Conditions. Con�ractor may n.ot make any Contract Claim against City, ox any o£ their offcer�,
directors, mernbers, partners, employees, ag�nts, consultants, or subcontractors with respect to:
1. the completeness of such r�ports and drawings for Contractor's pw�pos�s, includin�, but no�
limited to, an.y aspects of the means, methads, iechniques, sequences and procedures of
C1'TY OF FOR`F WDRTH
ST�I+IDARI�CONS'fRUCTIQN SPECIFICATION DOCl1MEN"i'5
Revisinn: 823iLOZ1
oo�aoa-i
GENERAL CON�ETIOiJ S
Page I S of b3
construction to be employed by Contractor and safety precautions and programs incide�t
thareto; or
2. other data, interpxetations, opinions ancE informatian contained in such repot-ts ar shnwn or
i�ndicated � such dxawings; ar
3, any Contractor interpretat�an of or canclusion drawn from any "technical data" or any such
other c�ata, int�rpretatians, opinions ox iva�ax�atzon..
C. Coniractor shall not be responsible for any Hazardous E�virantnental Conditian uncove�•ed or
xevealed at the Site which was not shown or indicated in Drawings or �pecif'tcations or identifie�.
izi the Gontract Documents to be within the scope of the Work. Contractor shall be responsible for
a Hazardous Envirorunental Conditlon created with any ma�rials brought to tl�e Site by
Con�ractor, Subcontractors, Suppliers, or anyone e�se �'or whom Contractor is respanszble.
D. If Contiractor encoutiiers a Hazardous Enviuoz�tnental Condition or if Contractor or anyone for
�hom Ganlractor is responsible creates a Hazardous Environmenial Condition, Contrac�or shall
imrnediately: (� secure or o-�ierwise isalate such condition; (ii) stop all Work in conriection wiih
such condi�ion and in any area afFected thereby (except iu� an exnergency as required by Paragraph
b.17.A}; and (in} notify City (and pramptly thereafter conf�rzx� such notice in writi�lg). Cit3r may
consider th� necessity to retain a quaIifed expert ta evaluate s�uch conditian or take corrective
ac#ion, if any.
E. Contractor sh,all n.ofi be xequired to resume Work in connection with such condition or in any
af�ected area until after Ci�iy has obtained any requir�d permits related thereio anc�. delivared vcrritt�n
notice to Cant�actox: (i) specifying ihat such condition and any affected area is or has been
rendered surtable for tk�e resumption of Work; or (n} specifying any special co�ditions under which
such Work ma.y be resumed.,
F. If after receipt af such written natice Contractor daes nat agree to resume such Wark based on a
reasonable belief it �s unsafe, or does not agree to resume such Workunder such spec�al conditions,
then Ciiy may order the partion of the Work that is in the area af�ected by such condrt.ian to be
del�ted from the Work. City ma.y have such deleted portian of the Work performed by City's awn
foxces or others.
G. To the fullest extent permitted by Laws and Regulations, Contractap shall indemnify at�d halr�l
ha�mless �ity, from and against all claims, costs, dosses, a�ad ci'amages (including butnot limated
to all fees and cha�gas of enginee�s, architects, attorneys, and other professionals and all court
ar arbitr�ation o� othe� dzspute resolution costs) arising out of o�- pelating to a Hc�zardou,s
Environmentcrl Cartdition created by Coniractoror by anyonefor�vhomCona�actoY isresponsible.
Nothing in this Paragt-aph 4. 06.G shall obligate Contpactor to indemn� any indivadual or entity
frorn and cagafnst t�e cor�sequences of that individ�eal's or entity's awn negligenee.
H. The provisions of Paragrapfis 4,02, 4.03, a�d 4.0� c�o n.ot apply to a Haza.rdous Environmental
Condition uncovered or revealed at�e Srte.
CITYOr PORT WORTH
STAI�F[�11RDCaNSTRUCTION SP�CIFICATION bQCUMENTS
Revision: 8�,3l1021
oo�aao-�
GENERAL CDN� ITIO N S
Yage 1G pf G3
ARTIGLE � — BONDS AND INSURANCE
5.01 �icensed Suretiesandlnsur�ers
All bonds and �surance required by the Contract Documents to be purchas�d and maintained by
Contractar shall be obtaiz�ed from s�arety ar insurance companies tl�at are duly licensed or authorized
in the State of Texas to issue bonds or iunsuz�ance po�.cies �ar tt�e limits and coverages so required.
Such surety az�d iunsurance cozn.panuies sha1l also meet such additianal requirements and qualifications
as may be provided in ihe Supp�ernentazy Condit�az�s.
5.02 PerfoY�nance, Payment, and Maintenance 13ands
A. Contractor shall furnish perforn�ance and payment bonds, in accordance with Texas Governmenfi
Code Chapter 2253 or successar statute, each in an amount equal to the Contract Price as
seciaxxty �ar the farthful perfarTnance and payment of all of Contractar's obligations under the
Cantract Doc�nents.
B. Contractor sl�all furnish maintenance bonds in an amount equal to the Contract �rice as secut�ity
to prot�et #h� Cfty against any defects in any portion of the Work described in. the Goz�tract
Documents. M�.intenance bonds shall remain in efFect far two (2) years after the date of Fu1a1
Accepta�ce by the Ci�iy.
C. All bonds shall b� in the form prescribed by the Contract Documents except as prov�ided otherwise
by Laws or Regulations, and s1�J1 be axecuted by such sureties as are named in the list a�
"Campanies Holding Certificates of Authority as Acceptable Sureties on Fedexal Bonds ar�d as
Acceptable Reinsuring Compatues" as published in Circular 570 {amended) by fihe Finan.cial
Management Service, Surety Bond Branch, U. S. Department of the Treasury. All bonds �igned by
arz agent ox attorney-in �act must be accampanied by a sealed and dated pawer of attorney which
shall show that it is effective on th� dat� the agent ar attorney-in-fact signed each bond,
D. If th� surety on any bond furnished by Cantractar is declared bankru�t or beComes insolvent or its
right to do business is terminated in the State of Texas or it ceases to meet the requ�ements o�
Paragraph S.Q2.C, Contractor slzall promptIy notify City and shall, within 30 days after the event
giviung rise to such not�"icatio�, provide another bond and surety, both of which shaIl comply wi�h
the requirements of Paragraphs 5.01 and 5.02.C.
5.03 Ce�tificates of Irrsurance
Conf,ractor shall deliver to City, with capies to each addit�ional insured and loss pa�e� identif'ied sn the
Supplementazy Conditions, certificates of insurance (other evi.dence of insurance request�d by City or
any oth�r additional insured} in at least the minun�.un azn.ount as spec3f'ied in the Supplemantary
Conditions which Contractor is required to purchase and rnaitrtain.
The certificate of iu�su�rance slxall document the City, and all identified entities named in the
Supplementary Condit�ons as "Additional Insured" on all liability pol�ies.
CITYOF J'ORT WORTH
STAI+]DARDCON5TRUCTIQN SPECI�`ICA7'ION BOCiJME]VTS
Revision: 823f2C111
40 72 OU - I
GENERALCONDITI�NS
Page 17 of 63
2. The Coniractox's general liability insur�nce shall include a, `�er project" •or "�er location",
endorsem�ent, w�ch sha11 be identified in the cert�icate of insurance provided to the City.
3. The certificaie shall be signed by an ag�nt au�thorized to bind co�erage an behalf ofthe ins�xred,
be complete in its eniirety, and show ca�npl�t� insurance carrier names as listed in the current
A.M. Best Property & Casualty Guid�
4. The insurers for all policies rnust be licensed and/or approved to do business in th� State of
Texas. Except fox worlcers' cornpensation, all insurers must have a minunum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasona.laly equivalent financial
strength and solvency to fihe satisfaction of Ri�k Management. If the rating is helow ihat
reqtured, written appraval af C�ity is required.
5. All applicable policies shall include a Waiver of Subrogation (Right� oi Recovezy} in �avor
of the City. In addition, the Contractor agrees to waive aIl rights of subrogatian against the
Engineer (if appIicable), and each additior�al i�s�red ide��ified in the Supplernentary
Conditions
6. Fai�lure o�' tIae City to demand such cert�cates or other evidence af full compliance with the
iz�surance requirennents or failure of the City to identify a defciency fram evidence that is
provided sk�all not be construed as a waiver of Contractor's ol�ligation to maintain such lines
ofinsurance coverage.
7. If insurance policies are not written for specified coverage linlifs, a.n Umbrella or E�c�ss
Liability insurance for any diffe��ences is required. Excess Liability shall �ollow farm of the
primary coverage.
8. Unless other�vise stated, all required insurance shall be written on the "occurrence basis". If
caverage is underwritken on a clai��ns-made basis, the retroactive date shall be coincident with
or prior ta the date af the effective date o�the agreeznent and the certificate of insurance shall
stat� that the coverage is claims-made and -�he retraactive date. The inisura,nce coverage shall
be maintained far the duration of the Coniract a� far three (3} years follo�ving F�al
Acceptance provided und�r t.�e Contract Dacurnents or far the warranty pe�iod, whichever is
longer. An annual certificate of insurat�c� submitted to the City sha.Il evidence such
insurance covera�e.
9. PO�ICI�S shall have no exclusions by endorsements, wluch, neither nullify or amend, the
requared ]iun.es of coverage, nar decrease the limits of said coverage unless such endorsements
are approved iz� writin.g by the City. In the event a Contract has been bid or executed and the
exc�usions axe detez•mir�ed to be unacceptable or ihe City desires additional insurance eoverage,
and the Crt.y desires the cantractor/engineer to obfiai�. such coverage, the contractprice shall
be adjust�d by th� cost of �e premiut�� far such additional coverage plus 10%.
10. Any self-in�ured retention {SIR), in excess of $25,000.00, afFecting required insurance
couerage shall be approved by the City in rega.rds to asset value and stockhold�rs' �quity. In
CITYOF FORT WORTI-1
STANpARpCaPlSTRUCTION SPECIPICATION DOCUNIENI'S
Revision: 8I23f2021
• oo�zao-�
GENERALCON�ITION S
Page ] 8 of 43
lieu of traditional insurance, alternative coverage �naintained through insurance pools or risk
retention graups, must al�o be approved by Crty.
I 1. Any deductible in excess of $5,�00.00, far any po�icy that does not provide coverage on a
first dollar basis, must be acceptak�le to and approved by �he Czty.
12. City, at its sole discretion, reserves the right to review tbe itv�urance requirements and to
make reasona.ble adjustrnents ta insuxance cov�rage's and their limits uvhen deemed necessary
and prudent by the City based upon change� in stafutory law, court decision or the cla.uns
Yvstory of the industry as well as of the con�racting party tp the City. The City shall be reqiaired
to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the
Work by Cl�nge Order.
13. City shall be entitl�d, upon written request and wz�hout expense, to receive copies of policies
and endorsements thereto and may nnake any xeasanable requests for deletian or revision or
modificatic�ns of partieu�ar poliey ierms, conditions, ]iz�z�atzo�as, or exclusions necessary to
conform the policy and endorsements to the requirernents of the Contract. Deletions, revisions,
or mocl�'ications si�all not be required where polic� provi�zo�s are established by la.w or
regulations binding upon erther party or the underwriter on any such policies,
14. City siiall not be responsble %r the darect payment of insurance premiuni costs for
Contractar's ins�anee.
5.(}4 Cont�actor'slnsuYance
A. yYor�keps Compensation and Ernployers' Liability. Contraeior shail purchase and z�aaintain such
insurance coverage with �n�its consistent with statutory benefiis outlined in the Texas Woxkers'
Compensation Act (Texas Labor Code, Ch. 406, as amended}, and minitnum ]imits for Employers'
LiabiIity as is appropriate for fihe Work being performed and as will �rovide prateciion fro�nn claims
set forth helow which may arise out of or result from Contractor's performance of t�e Work and
Contracior's other obliga�ions under the Contract Documents, whether it is to be perforzned by
Coniractor, any Subcontractor ar Supplier, ar �y anyon� dir�ctly ar indirectly emp�oyed by any of
them to perform any of ihe Work, or by anyane �or whose acts any of thern ma.y be liable:
1. cla.uns under workexs' cornpensation, dasability benef�s, and oiher sirnilar employee benefit
acts;
2. c�a.ims for damages because of bod�y injury, occupational sickness or disease, or death of
Contractor's employees.
B. Con-amercial General Lzabilfty. Caverage shall include but not be limited to cavering liability
(bodily injury o�' �roperiy damage) arising from: prernisesloperations, i�dependent contractars,
productslcompleted operations, persona.l injury, and Iiability under an insured contract. Tnsurancs
sha�1 be provided on an occurrence basis, and as comprek�ensive as the cur�rent Tnsurance 5ervices
Office (ISO) po�icy. This insurance shali apply as pxim.ary insurance with respect to any other
CITY �F FORT W�RTH
ST,4NDARDCONSTRUCTEDN SPEC[FICATIOM DOCUMENTS
Revision: 823J2(�ll
ao�2oo-i
GENERAL GONDITIQI� S
Paae 14 of 63
insurance or self-insurance programs afforded to the City. The Commercial General Liability
policy, shall have no exclusions by endorsements that woula alter of nullify pr�misesloperations,
praducts/cozx�pleted operations, cont�acival, personal injury, or advertising injury, �vhich a�
normal�y conta�ed wzth ihe palicy, �.uiless the City approves such excl��sions in writing.
For construction projects tl�at present a substan.tial corz�pleted operation exposure, the Cify rnay
require the contractor to m�intairi cample�ed aperatxons coverage far a minimum of no less than
three {3) years following th� comple�ion af the project {if identifzed in the Supplementary
Con�iiions).
C. Aa�tomobile �,iability. A commercial business auto polic� shall prpvide coverage on "any auto",
defined as autas owned, hireci and non-own�d and provide indernnity for claims for damages
because bodily injury or death of any person and or prop�rty damage ar�sing flut of the wark,
maintenance or use of any motor vehicle by the Contractor, any S�xbcontractor or Supphex, or by
anyone directly or indirect�y employed by any of them to perform any of the Work, or by anyone
fox wh.ose acts any of ihem may be liable.
D. Rr�il�aad Protectave �iabzlity. I� an.y of tk�e work or any warranty work is within the �imits of
railroad right-of-way, the Contractar shall camply with the requirements identif'�ed in ihe
5upplementary Conditions.
E. Nott'ficr�tion of Policy Cancellation: Coniractor shall imm�diately notify Ci�y LYpon cancella.tian
or other loss of insurance coverage. Cantraetor shall stop work until r�placernent insurance has
been procured. There shall be no time credit for days not worked pursuant to thrs section.
S.aS Acceptanee afBand.randlnsuj-ance; �ption to Replr�ce
If City has any objection to the co�erage afforded by or othar provisions of the bonds ox insuraz�ce
requ�ed to be purchased and maintained by tha �ontractor in accardance with Article 5 on the basis
of non-conform.ance with the Conixact Documents, the City shaIl so notify the Contractor in writing
within. X 0 Business Days afterreceipt of the cert�'icates (or other evidence raquested). Contractor shall
provide to the City such additional information in respect of insurance provided as th� City ma.y
reasonably request. ��eo�hactor does nafi purchase or maintain all of the bonds and insuranee required
by the �on�ract Docu�.ents, the City shall notify the Contractor in writing of such failure prior to the
start of �17� Wark, or of such failure to maintain pxior to any change in the required coverage.
ART�CLE 6 — CONTRACTOR'S RESPONSIBILITIES
6.QI Supervisaon andSuperinten�ence
A. Contractor shall superv�se, inspect, and di�rect the Work competently and efficienily, devoting
such attention thar�to and applying such skills a.nd expertise as m�ay be necessary to perform the
Work in accordance with the Contract Documents. Contractor shall l�e solely respo:nsible for th.e
means, methods, iechniques, sequences, and proccdur�s of constru�ction.
c��Yar ro�r wo�TH
STt1NDARDCONSTRUCT[ON SPECErfCATION DOCUIVIEt�iTS
Revisian: $232021
OD720D-1
GENERAL CONOlTION 5
Page 20 oi' 63
B. At al� times diaa•ing the progress of ihe Wark, Co�tractor shall assign a competent, English-
speaking, Superintendent who shal� not be replaced withaut written notice to City. The
Supexintex�dent will be Con�ractor's representative at the Site and shall have authority to act on
behalf of Contracior. All cammunication gi�ven fio ar z�eceived from the Superintendent shall be
binding on Contrac�or.
C. Contractor shall notify flie City 24 haurs prior ta moving ar�as during the sec�uence of co�.struc�ion.
6.�2 Labo�; YYa�kingHoz�s
A. Contractor shall provide competent, suitably qua.lified personnel to perfozm constxuction as
required by the Contract Documents. Contractor shall at all times mainta�ir� good discipline and
order at the 5it�.
B. Except as otherwise required for ihe safety or protec�ion of persons ox the Work or property at
the Site ar adjacent thereta, and except as otherwise stated in the Con.tract Docurnents, all Wtirk
at the Si�e shall be performed during Re�ular Working Ho�rs. Cont�actar will not pern�it the
perforrnance of Work beyond Regular �t7ilQrking Hours or for Weekend Worki�zg Houars wi�thout
City's written consent (wluch wi11 not be unreasonably wi�hheld). Written request (by Iettex ar
electronic commr�nication) to perfarm Work:
1. far beyond Regular Worku�g Hours request must be made by noon af least two {2j Business
Days prior
2. for Weekend Workmg Hours request rrnusfi be made by noon nf �e preceding Thursc�a.y
3. for Iegal holidays request must be made by noon two B�siness Days prior to the legal
haliday.
6.03 Sepvices, MateYials, a�d Equipment
A. Umless otherwise spec'rfed in the Contraci Documents, Contractor shaIl provide and assume full
respor�sibility for all ser�i�es, materials, equipment, labor, transpori�.tion, construction eqtuipment
and machinery, taals, appliancas, fueI, power, ]ight, heat, ielephone, water, saniia.ry faciliti.es,
temporary fac�es, and all oth�r facilities and incidentals necessary for the perfoim�nce,
Contractor required testing, sfart-up, and compl�tion of the Work.
B. All materials and equipment incorparated into tl�e Work sha.11 be as specified or, if not specified,
shal� be of good quality and new, exc�pt as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifcatians shall e�ressly run to the hene�'�
of City. If required by City, Contractor shaIl fiunish satisfactory �vidence (inclurling reports of
xequitared tests) as io the so�xc�, kinc�, and quality of materials and equipment.
CITYOF FORT WORTH
STANDARDCONSTRUCT[4N BPECIFiCATION DOCUMENTS
Revision: $23/�{�LI
oa�zoo-�
GENER/IL CON� ITIO N S
Page 21 of 63
C, All materials and equi.pment to be incorporated into �he Work shalI be storad, appfied, installed,
cor�nected, erected, pxotected, used, clean.ed, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
D. All items of s#andard equipment to be incorporat�d into the Work shalI be the latest znodel at the
tirne of bid, unless atherwise specified,
6.04 P�ojectSchedule
A. Contracfior shall adhere io the Praject Schedule established in accordance with Paragraph 2.07
and the General Requirements as it may b� adjusted from time ta time as provzded below.
Contractor shall suhmrt to City for acceptance (tothe extent indicai�d in Paragraph2.07 and
the GeneraI Requirements) proposed adjustnlents in the Project Schedule that wiil nat result
in� changing the Contract Time. Such adjustments will comply with any pravisions of �he
Genexal Requirements applicable thereto.
2. Contractor shalI submit to City a monthly Praject Schedule with a monthl.y progress paymeni
for the duratian of th� Contract in accordance wzth the scheduIe specification O1 32 16.
3. Proposed adjusfiments in the Praject Schedule that vvill change the C�ntract Time sk�all be
submitied in accordance with ihe requirements of Article 12. Adjustments ira Con�racf Time
rz�ay anly be made by a Change Order.
6.05 Substituies and "Or-Equals"
A. Whenever an item of mat�erial or equipment is specified ar described in the Con#ract Dacuments
by using the narne of a proprietary item or the name of a particular Supplier, the specificatian ar
description is intended to establish the type, function, appearanca, and quality required. Uziless the
specification ox description contains or is followed by words reading that no ]�ce, equivalEnt, or
"or-equal" i�em or no subs#itution is permitted, other items of material or equipment of other
Suppliers may be submitted to City %r re�i.ew under the circumstances described below.
"Or-Egual" Items: Tf in City's sole cliscretion an item of maferial or equipm.ent proposed by
Contractor is functianally equal to that named and suf'ficiently similax so �t no change in
related Wc�rk will be required, it rnay b� cansidered by City as an "or-equal" item, in which
case review and approval of ihe pro�ased item may, in City's sole discre�iozi, be accozn.plishe d
without compliance with some ar all of the requirements for apprpval of praposed subst�.ite
items. For the purposes of ilvs Paragraph 6.05.A.1, a proposed item of material or equipment
wi�l be considered functionally equal to an item so namad if:
a. the City defei�ines that:
1) it is at least equal in materials of construction, qualiry, durability, appearance,
strength, and design characteristic�;
CITYOF FORT WORTH
STAI�bAI2T7CONSTRUCTION SPEC[F[CATION DOCUMEi�1TS
Revis ian: 8�13IJ.OZ1
D07200-I
C�NERAL.CONDITIO�f S
Page 22 of 63
2} it will reliably perform at least equally well the fiuietion and achieve the resulis
impased by the design concept of the completed Project as a fiulctioning whole; and
3) it ha� a proven record of performance and a�ailability af responsive sexvzce; and
b. Contractor cert�fes that, if appraved and incorporated iu�to the Wark:
1) there widl. be no increase im cost to the City ar increase in Cantract Time; a:nd
2} i� will con�orm subst�.nt�ially to �ie detail�d requir�ments of the item named in the
Contract Daeuments.
2. Substiiute Ite�s:
a. If in City's sole discretion an item of material or equipment proposed by Cont�ractor does
not qualify as an "ar-equaP' item under Paragraph 6.OS.A.1, it may be subxnatted as a
proposed subsiiiute item.
b. Contractor shall submit sufficient information a� provided below to al�ow City to detez�au�.e
if the item of ma.terial ar equipmeni proposed is essentia.liy equivalent to t�at nanrzed and
an acceptab�e substitute therefor. Requests for review of pxopased subsMute iter�s of
material or equipn3ent w�l not be accepted �y City from anyane other than Coniractor.
c. Contractor shall make writtea applieation to City far review of a proposed substiture item
of material or equipment that Contractor seeks to furnish or use. T�e application shall
comply with Sect�vn 01 25 QO and:
1) shall eertify that the propased substitute itez�r� will:
a} perfarm adequately the functions and achieve the results called for by the general
desigx�;
b) be siu�ilar in substance to tha.t specifed;
c) be suited to the same use as that �pecified; and
2) will state:
a) �he extent, if any, to which the use of the pxoposed subst�ute rtem wi71 prejudice
Contractor's achi�vemen.t a� final completian an time;
b) whetl�ex use of the proposed substitute item in th� Work will require a change in
any of tlxe Contract Documents (or in the provisions of any other direct contract
wrth City for other work on the Project) to adapt the design to the pro}aosed
�ubstztute i�em;
c�TY o� �a��r woxrx
5TAIVDARDCONSTRUCTION SPEC[F[CATlQN DOCUMEM'S
Re�ision: SI?32021
oo�zoo-i
GENERAL CONUITION 5
Page 23 af 53
c) whether incorporatian or use of the proposed substitufi� item u� cannection with
the Wark is subject i:o payment of any license fee or royalty; and
3) will identify:
a} all varia�ions of the praposed subsfituie item from tl�at specifed;
b} available engineering, sales, mainienance, repair, and replacement services; and
4) shall contain an itemized estunate af all costs ar crediis that will result d�recily or
inc�reetly �arozn use o� s�ch substitute itern, iu�cJud'uag casts o� xedesign. and Dama.ge
Cla.ims of ather contractors affected �y any resu�ting change.
B. Substitute Const�-uciionMethods o�Procedures: If a specific means, method, technique, sequence,
or procedure of consitruction is expressly raquired by the Contract Documents, Contractar may
fi�rnish or utilize a substitute means, method, technique, sequence, or procedure of consiruction
approved by City. Contractor sha31 sulamit sufficient information ta allow Gity, in City's sole
discretion, to determine that the substfixte proposed is equivalent to that e�ressly called for by
the Contract Documents. Cantractor shall make written application to City far review in the same
manner as those provided it� Paragraph �.(}S.A.2.
C. City's Evaluation: City will be allawed a xeasanable time wzthin which to evaluate each
pro�aosal ar submittal made pursuant to Paragraphs 6.OS.A and 6.05,B. City may require Con�ractor
to furnish additional da.ta about the proposed substii�ate. City will be tha sole judg� of accepta.bility.
No "or-�qual" ar substitute will be ordered, installed ar utilized until City's review is complete,
which will be evidenccd by a Change arder in the case of a substitute and an accepied Submittal
For an "or-equal." City wiil advisa Contraetor in wr'rting of its determination.
D. Special Guarcantee: City may reqtaire Contractor to furnish at Contractar's expense a special
per�oxnn:ance guarantee, wazxanty, or other su.rety �it� respect to any subs�tute. Contractor shall
indemnafy and hold �ia�mless Ciiy and anyone directlyor indi�ectly employed by themf�-omand
against any and all clair�zs, damag�s, Zosses and expenses (includang aitorneys fees) arising aut af
the use of substituted materials or equipment.
E. City's CostReimbut�sement: City wilI record City's costs � evaluating a substitute proposed or
submitted by Contrac�or pursua�lt io Paragraphs b.O5.A.2 and 6.O5.B. Whether or not City
approves a substituie so proposed or submitted by Cantxactor, Contractar may be required to
reirnburse City for evaluating each such proposed substitute. Contractor may also be req�ired to
reimburse City for the charges for making cY�anges in the Contract Documents (or in the pro�isions
of any ather direet contract with City} resulting from the acceptance of each proposed subsiitute.
F. Contracior's Experxse: Contractor shall provid� all data in �upport of any proposed substitute or
"or-equal" at Contractar's e�ense.
CITY OF F012T WORTFI
STAI�IDARDCONSTRllCTIdN SPECIFICATIOId DOCUM�NTS
Revision: Rr13lZ{]21
0072flb-1
GENERAL C0�l�ITIdN S
P age 24 of 63
G. City Substitute Reimbursement:Costs (savings or charges) attributable to acceptance ofa subsfiihxt�
shall be iricorporated to the Cor�tract by Change �rder.
H. Time Extensions:Na additional time wiIl be granted �'ox substitutians.
b.06 Cance�ning S�bcontracto�s, Suppliers, and Others
A. Contractor shall perforrn with 1us own orgarii�tion, work of a value not less ti�an 35% of the
value embracad on ihe Contract, unless otherwise approved by the City.
B. Contrac�or shall not employ any Subconiractor, Suppl�er, ar other individual or entiry, whether
irutiaally or as a replaceinent, against whom City may hav� reasonable ob�ection. Contractor sha11
not be required to ernploy any Subcontrac�or, SuppIier, ar other individual or entiiy �o furnish or
perform any of the Work against whom Contractor has reasonable ob�ection {excluding #hose
aeceptable to City as indicat�d in Paragraph 6.Q6.C).
C. The City may from time to time require the use of certain �ubcontraetars, �uppliers, or ather
individuals Qr entities on the project, and wilI provide such requirernents in the �upplementary
Conditions.
D. 11�lino�ity Business Ente�pYise Conapltance: It i� City policy to ensure the full and equi�able
participation by Minority Bu�iness Enierprises (MBE) in the procurement of goods and services
on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is requi�red
to comply with the intent of the City's MBE Ordinance {as amended) by the foIlowing:
1. Contractor sha11, upon request by City, provide complete ax�d accurate information regarding
actual work performed by a MBE on the Contract and payment thexefor.
2. Contractar w�l not make adciictions, de�etions, ar subst�utions of accepted MBE without
written consent of the City. Any unjustified change ox deiefiion shall be a matexial breach af
Contract and ma.y result iri debarment �it�. accoxdance wrth the procedures autlined iri the
Ordinance.
3. Contracior shall, upon req�xestby City, allow an audit and/or e�minaiion of any books, records,
or files in the possession o�'the Contractorthat will substantiate the act�al vvark performed by
an MBE. Material misrepresen.t�tion a� any nature w�l be grounds for tertnination o�' the
Contract u► accordance wit1� Pa�t�agraph 1.5.02,A, Any sueh misrepresentation ma.y be grounds
for clisqualification of Con�ractor to bid on fiiture eont�acts with the City far a pexiod of
not Iess tlian three years.
E. Contractar sha�I be fully responsible to Ciiy for all acts and amissions of the Subcontractors,
Suppliers, and o�er individuals or errti�ies performing or f�arnishing any of the Work just as
Contractor as responsble �or Contractor's own acts and omissions. Nothing in the Contract
Dacuanents:
CITYOF F�RT WQRTH
STANDARDCONSTRUCTION SPECIPICATION DOCl1MENTS
Revision: 8�Z317Az1
007200-1
GENERALCONUITION 5
Page 25 of G3
I. sk�aA create for the benefi� of any such Subcan�ractor, S�applier, or o�her individual or entity
any contractual relationship beiween City and a.ny such Subcont�actar, �upplier or other
individ�.l Qr entity, nor
2. shaIl create any obligation on the part af City to pay or to see to ihe payment af any moneys
due any such Subcontractor, Supplier, or other individual or en�ity except as may otherwise be
required by Laws and Regu�ations.
F. Contractor shall be salely responsible for sehedulirag and caardinaiing the Work of Subcontractors,
SuppIiers, and o�Iier individuals ar enti�ies per�arming or fiunishir�g any of th� Work under a direct
or Yndirect canfraci r�+-ifh Cantractor.
G. AlI Subcaniractars, 5uppliers, and such other individuals or entities perfor171i11g or fixrnishing any
of fhe Wark shall communicate with City through Contractor.
H. All Work perforn�.ed for Contractor by a Subcontractor or Supplier will be pursuant ta an
appropriate agreement between. Contractor an.d il�e Subcontractor ar Supplier which speci�ically
hinds the Subcontractox� oz Supplier to the applicable terms and canditions of the Contract
Docurnents �For the benefit of Ciry.
6.07 Wage R�tes
A. Duty to pay P�evailing Wcrge Rat�,�. The Cont�ractor shall corz�pIy w�h all requirements of
Chapter 2258, Texas Government Code (as arnended), irxcluding �e payment o� nat less tlaan the
rates detez�miu�ed by th.e City Council of the City of Fort VLTarth ta be the prevai�ing wage rates in
accoxdan.ce with Claapter 2258. Such prevailing wage rates are included in these Cont�act
Documents.
B. Penalty for Violatiorx A Contractar or any Subcontractor v�ho does nat pay the prevailing wage
shall, upon demand made by th� City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than tne prevailiz�g wage rates stipulated
in these contraet documents. This penalty shall be retained by the City to offset rts adnninistrative
costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Vioiations and City Dete�mination af Goad Cause. On receipt of infvrm�.tian,
including a campla.int by a work�r, concerning an alleged vioIation of 2258.023, Texas
Governmenf Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31st day after the date the City receives the inforn�ation, as to whefiller
good cause e�sts to believe ihat the violation oceurred. The City shall notify in writing the
Con�ractor or 5ubcontractor and any affected worker of its initial deterinination. Upan the Gity's
d�termination tl�at there is good cause to believe the Contractor or Subcontractor has violate d
Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the
difFerence beiweenwages paid and wages due under the prevailit�g wage rates, such anraaunts be�g
sub#r�.cted from successive progress payments pending a final deterniination. of the vi�olatao�..
C1TY 0� FQR"F WORTH
STEINDARDCONSTRUCTION SPECIPiCATION I30ClTMENTS
Revision: 823/2Q2]
oo�2a�-i
c�N��,�coNo�rio�s
Page 26 of 63
D. Arbitration Required f Violataon Not Resolved. An issue relating �o an alleged violation of Section
2258.023, Texas Government Code, including a p�nalty owed to the City or an afFected worker,
shall he submitted to binding arbitration in aceordance with the Tex�s General Arbitration Act
(Article 224 et sec{., Revised Statutes} if t1�e Cantractor or Subcontractor and any affected worker
does not resolve the issue by agreernentbefore the 15th day afterthe date the City makes its initial
determination pursuant to Paragraph C abov�. If the persons required to arbitrate under this
section do not agree on a.n arbitrator �efore the 11t1� day aft�r the date that ar�itratio� is required,
a district court shall appoint an arbiiratar on the petition of any of the persons. The City is not a
party in the arbitration. The decisi�an and award of �lie arbitrator is final and binding on all parti�s
and naay be enforced in any cau.rt o� cozzzpetenfi j�isd'zctian
E. Rec��ds do be Maantained. The Contt�.ctor and each Subcon�'actor shall, far a period of three (3)
years following the date of acceptance o�'the work, �aintain records that show (i} the name and
occupation of each worker employed by the Contractor in the construciion of the Work provided
for in this Coniraet; and (iij the actual per diem �rag�s paid to each worker. The records shall be
open at all reasonahle hours for inspection by the City. Th� provisions of Paragraph 6.23, Right
to Aud'zt, shall pertain to thi� �it�spection.
F. Progress Paymer�ts. With �ach pY'ogress payment or payroll periad, vvhichever is less, ihe
Cantractor shall su�mit an afficlavit sta�ing that the Contractor has complied with the rec�uirements
o� Chapter 2258, Texas Gavernment Code.
G. Pasting of Y�age Rates. The Cantractor shal� post prevailing wage rates in a con�picuo�s place at
all times.
H, Subcontracio� Compli�anc�. The Contractor shall include in its subcontracts andfor sl�all
ofherwise require all of its Subcontractors io comply with Paragraphs A through G above.
6.08 Patent Fees and �oycalties
A. Contractor shall paq a�i ]icense £ees and z'ayalties and assume all costs incident to the use in the
performance of the Work or tk�.e incorparation ui tlxe Work of any in�vention, d�sign, process,
product, ar device which is the subject of patent rights ar copyrights held by ofhers. If a particular
invention, desig�, process, product, or device :�s specified in the Contraet Documents for use ir� fihe
perforrriance of the Work and if, to the actual l�owledge of City, rts use is subject to patent rights
or copyrights calling for the �ayment of any license fee or royalty to others, the existance of such
rights shall be disclosed by City in the Contract Dacuments. Failure of the City to disclose such
informatian does not relieve the Contractor from its obligations to pay foz� tk�e use af said fees or
roya�ies to others.
B. To the fullest extent permittecl by Laws and I�egulationr, Cont�actor shall indenrn � ancl hdd
harmless City, from and against call claims, costs, lasses, and darnages (incluc�ang butnot linzited
to ald fees and cha�ges af engineers, architects, attorneys, and other p�ofessionccls and all cou�t
or arbatration or other dispute �esolutio�a costs) arising autof or relating to any infringement of
pc�tentrights or capy�ig�its incident to ihe use in the performance ofthe Wo�k or �esultingfrom
CIT1'OF FORT WORTIi
STANDARDC03d5TRilCTION SPECIFICAT[ON DOCUMEI*i'T5
Revision: 8�13l2Q21
DO7200-1
G�NE€zA� coNOITION 5
Page 27 of 63
ihe i�co�pa�atian in the Wa�k af any invention, design, pracess, p�aduct, o�- de�ice notspecified
in the C'ontract Documents.
{.09 Permits and Utilities
A. CantYactar obtained �ermits and licenses. Contxactor shall pbfiain a�d pay �ox aJ� constructian
permit� and licenses except those provided for in f11e Supplemenfary Condi�ions ar Con�ract
Docurnents. City shall assist Con-�ractor, when necessary, in obtaiivng such pernuts and licenses.
Contractor sha�l pay all governmental eharges and inspectian fees n�cessary for the prosecution of
the Work which are applicabl� at 1-he time of ope�ing of Bids, or, �' there ara no Bids, on the
Effective Date of tne Agreern�nt, except for permits provided by the Ci�y as specified in 6.09.B.
City shall pay all charges of utility owners for connectians �or providing p�rmanent service to tl�e
Work.
B. City obtainedpermits and licenses. City will obtain and pay far all permits and licenses asprovided
�or ira the Suppleme�tazy Can.diiio�s ox Contract Daciuxxents. It wi�Il be the Contaractor's
responsibility to cax�ry out th.e provisiox�s o� the pexz�n.it. If the Contractor initi�a.tes cha.nges to the
Contxact and ihe City approves the changes, th.e Conixactor is responsible �or obtainim.g clearances
and caordinating with the app�'opriate regulatory agency. The City will not reimburse the
Cant�actor �ar any cost assaciated �vi�h these requ�ements of any City acq�ired permzt. The
�ollowing are permits the City will obtain if r�quired:
I. Texas Department of Transportation Permits
2. U.S. Arrzry Corps o�Engim.eers Pez-rz�afis
3. Texa.s Cotnlr�ission on Environm�ntal Quality Permits
4. Rai�road Company Permits
C. Qutstanding permits and licenses. The City anticipates acquisition of ancUor access ta permits
and license�. Any outstanding permits and licenses are anticipated fo be acquired in accordance
with the schedul� ��t forth in ihe 5upplementary Conditior�s. Th� Project �ch�dula submitted by
th� Contractor in accordance with the Contract Documents must consider any autstanding permits
and licenses.
6.1Q Lativs and Regulatio�as
A. Cp1�tt'�.GiOT Sil�.11 giVE all notices requ�ed by and shall campl� with all Laws and Regula�ions
appficab�e to the performance of the Work. Except v�rhere atherwise e�pressly required by
appIicable Laws and R�gulations, the City shall not be responsible for �onitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or havi�g reason to know that it is contrary to Laws or
Regulations, Contractor shall bear aIl claims, costs, �osses, and daxnages (including but not linvited
to aIl �ees and charges of engineers, axchitects, attorneys, and otkaear pxo%ssionals az�.� all
CITY OF F�RT WORTH
STANI7AR�CpNSTRUCT1pN SPEC[FICATIQN DQCUIVIkNTS
Revision: SI�I1021
DO7200-]
GENERAL CON�ITION S
Page 28 of 63
caiu-1: ox arbitratian ax other dispute xesolution casts) arising out of ar relating fo such Worlc.
However, it shall not be Contractor's responsibila�ty to �nnake certain �t the Specifications and
Drawings are in. accoxdaz�ce with Laws a�.d Regula�aans, �ut this shall not reli�v� Contractor of
Contrac�or's obligaiions under Paragraph 3.02.
C. Changes in Laws ox Regulat�ons nofi kn:own at the time of opensr�g of Bids having an effect on
the cost or time af perf[�rmar�ce af the Work rnay be the subject of an adju�tment in Contrac� priee
or Contract Tnne.
6.11 �'axes
A. On a contract awarded by the City, an organization which qualifes for exemption pursuant to
Te�as Tax Code, Subchapter H, Seetions 151.301-335 (as amended}, the Contractar may purchase,
rent or lease all materia.ls, s�pplie� and equip�ent used or eonsumed in the performance of this
eon�ract by issuing to 1�is suppli�r an �xemption certif'icate in Iieu of th� tax, said exemption
certif'icate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued
to the Contractor in lieu of the ta� shall b� subject to and shall comply with the pravision of Sfate
Coznptroller's Ruling .Qll, and any other applieable rulings pertaining to the Texas Ta� Code,
Subchapter H.
B. Te�as Ta�permits a.nd information may be obta,ined fram:
1. Comptroller of Public Accounts
Sa1es Tax Div�sion
Capitol Station
Austui, TX 78711; or
2, h�tn�/wwvc-.wimdovv.s�ate.tx.usita�fo/ta�arms/93-for�s.html
6.12 Use ofSite and �therAreas
A. Limitation ar� Use of Site and Othe�A�eas:
1. Contractor shall con�e cons�uction equipment, the storage �of mafierials and equzprnent, and
the operatians of workers �o the Site and other areas pertnitted by Laws and Regu�atians, and
shall not unreasonably encumber the Srte and other areas with construction equipmenfi ox afika.er
materials ar equipment. Contractor sha.11 assume fu�l responsibility for any �age to any such
]and or ar�a, or io the owner or occupant thereaf, or of any adjacent land ar areas resultir�g
from the performance af the Work.
2. At any time when, in the judgment of the Ciry, the Coz��ractor k�as abstructed or closed or is
carrying on operations in a portion af a street, right-of way, ox easemenf greater than �
necessary for proper execution of tb.e Wark, the City may xequire �he Contractor to �h ihe
section on which operations axe in progress be£ore work is eommenced on any additional
area of the Si�e.
CITY OF FORT WORTH
STANDARDCdNSTRUCT[ON SPEClF]CA7[O1V DOCIi[vIETITS
Revision: 8�3C102I
007200-I
GENERAL CQNDlTIO N S
Page 29 af 63
3. Should az�.y Darnage Claim be made by any such owner or occupant because of the perfoxmance
of t1�e Work, Contractor sliall prom.ptl}� atiempt to resolve the Damage Claim.
4. Pursuantto Par�ag�aph 6.21, Contractarshall indenuzifyand holdha�mless City, f�orya and
agaznst all clai�ns, costs, losses, and darnages urising oui of o� �elating- to any �lai�n or action,
leg�rl o� equitable, b�ought by any sa�ch otivrae� or oceupc�nt cagai�st City.
B. Removc�l of Debris During Perfo�mance of the Work.� During the progress of the Work
Contractar shall keep the Srte and other axeas free froz�ri accunr�ula.fiio�s of waste xnateraal�, rubbish,
and ofher debris. Reznoval and disposal of such waste materials, rubbi.sh, and other debxis shall
confarm ta applicable Laws and Regulafiaons.
C. Site tlrlc�intenance Cleaning: 24 hours after vvritten notice is given ta the Contractor fhat fhe
clean-up on the job site is proceedin.g in a rnanner w�satisfactory 1:a the City, if the Contractor faiIs
to carrect the unsatisfaetory procedure, the City may take such direct action a� the City deems
appropria,te to correct the c�ean-up deficiencies cited to the Contxactor in the written notice
(by letter ar electronic communication), and the costs of such di�ect action, plus 25 °/fl of sueh
costs, shall be deducted from fi11e monies due or to become due to the Contractor.
D. Final Site Cleaning: Prior to Fir�al Acceptance o� tl�e Work Contractor shal� clean fl�e Szte az�d
the Work and make it ready for ufili�zafiion by C�ty or adjacent propez�fy ovvner. Atthe complefiion
of the Work Contractor shall rernave fram the Site all tools, appliances, constructian equipment
and ma.chinery, and surplus ma.terial� and shall restore to ariginal condition or better all praperty
disiurbed by the Work.
E. LoadingSt�uctures: Contractor shall not load nor permit any part of any structure to be loaded
in any manrier that will endanger the structure, nor �ha.11 Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
6.13 Record Docu�raents
A. Contractor shall rnaintain in a saf� p�ace at the Site or in a�la.ce designated by the Contractor and
approved by the City, one {1) record copy of all Drawings, ��ecifications, Addenda, Change
Orders, rield Orders, and written interpretations and clarif'ications in good order and annotated to
show changes made during consiruction. These record documents together with all approved
�a�ples and a coux�terpart of all accepted Sub�xuittal� wi�Il. be available to City far reference. Upon
comiplefiion of t�e Work, tk�ese recoard doewnraents, any aperat�on and xnaintenance m.anuals, a�.d
Subma�ttals w�ill be delivered to Ciry prior to Final Inspection. Contractor shall include accurat�
locations for buried and imbedded items.
6.14 Safety an�P�atection
A. Contractor shaTl be solely respaz�szble far inztiating, mazntainirag and supervising �11 sa�ety
pxecautioris and prog�rams i�z� coz�z�.ection wi�ih the Woxk. Such responsbilifiy does nat xelieve
Subcon�raetors o� the�r responsibilii.y far the safety of persons or property in the performance o�
their wo:rk, nor for compliance with applicable safety Laws and Regulations. Contractar shall
CITY OF PQR'1' WORTH
ST�N�ARDCONSTRUCT[ON SFECIFICAT[ON DOCUIvI�NTS
Revision: 8�J32D21
Od724D-1
GENERAL CaND ITa01V S
Page 3D of b3
take all necessary precau#ions for �he safety of, and shall. prowide the necessary pxotection ia
pr�vent damage, IrijUT}' OT' ID55 fA:
�, all persons on the Site ar vwho z�aay be a�'ected by the Work;
2, all tha Work and materia.ls a.nd equipment to be ineorporated ther�in, wh�ther in storage on
or aff th� Site; and
3. other property at the Site ar adjacent thereto, including trees, shrubs, lawns, walk�,
pa�ements, roadways, structur�s, utiliti�s, and Underground Facilities not designated far
rernoval, relocation, ar replacement in the course of construction.
B. Contractor sha11 comply with all appl�cable Laws and Regulations relating to the safety of
persons or �raperiy, or to ihe protection of persons or property from damage, injury, ar loss; and
sha,ll erect and maintain all n�cessary sa%guards for such safety and protection. Contractor shall
noiify owners of adjacent prop�rty and of Unclerground �'acilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them iti the p�rotection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirernents vf Ciry's safety programs, if any.
D. Contractor shall inforn� City of the spec�c requirements of Contractor's safety prograrn, if any,
with which City's employees and representa.trves mus� comply while at the Site.
E. Ali damage, mjury, or ioss to any property referredto m Paragraph6.1�}.A.2 or 6.1�.A.3 caUsed,
di�ectly ox indirectly, in whole or in part, by Coniractox, any Subcantractox, Supp�ier, or an.y o#her
individua.l ar entity directly or inci�ectly employed by any oi them to perfazrzi any of the Work,
or anyone for whose acts any of them may be liable, shall be re�edied by Contractor.
F. Contractar's duties and responsbilities for safety and fox protection oi t1�e Woxk s�]l contiz�ue
ur�ti� such time as all the VVoxl� is completed and City has accepted the Work.
6.15 SafetyRepresentative
Contractor shall inform City rn writing of Contractor's designated safety representativ�e at the Site.
6.16 Hazard Communication Prog�ana�
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communicaiion inform�tion required to be ma.d� avaiiable to or exchanged between or among
employers in accordance with Laws or Regulations.
6.17 Efnergencies �nd/or Rectificaiion
A. In emergez�cies a�fecting tlte safety or proteciion of p�rsons ox the �rVork ar property at the Site or
adjacent the�eto, Con�ractor is obligated to aet to prevent threatened damage, injury, ar loss.
Contractor shall give City prompt written notice � Contractar believes that any significant
CiTYOF FORT WDRTH
STANI7ARDCONSTRUCTION SPECIFICATION DOClIMENTS
Revision: RI13I2021
oo�zoo-i
GENERAL CONDITION 5
Page 31 of 63
changes in the Work or varia.iions from the Coniract Documents have been caused thereby or are
required as a result thereaf. If City determines thai a change in ihe Contract Documents is require d
because of the action iaken by Contractor in response to such an emergenc3�, a Change Order may
be issued.
B. Shauld the Cantractar fail ta respand to a requesi froz�r� tkae Ci�ty to z�ecti�y any di�crepancies,
omissior�s, ar corr�ction necessary to conf'orm with the requirements af the Contract Dacuments,
t�e City shall give th� Confiractor �nrritten notice that such wark or changas are ta be perfarmed.
The written notice shall direct attention to the discrepant conditifln and requ�st the Caniractor to
take remedial action to eorrect tlze condition. In the event the Contractor do�s not take positive
steps to fuIfiil this written request, or does nat show �ust cause for not taking tl�e proper action,
withm 24 hours, the City may take such remedial action with Ci�y forces or by contract. The City
sl�ali deduct an amount equal to the entire cosis far such remedial action, plus 25%, fiom any
funds due or become due the Contractar an the Project.
6.1$ Submittals
A. Contractor shall subrrut required Submittals to City �or review and acceptance m accordar�ee
with the acceptedSchedule of Submittals (asr�quired by Paragraph2.Q7). Eachsubinittal will be
ident�fied as City may require.
1. Subnait number of capies specified in the General Requiremenis.
2. Data shown on the Submitfials will be complete witi� respectto quantities, di�nensions, specified
performance and design criteria, ma��rial�, and simiIar data to show City the services,
materials, and equip�ent Cantractor proposes to pravide and to enable Crt� ta review the
iriformatian �or the limited purpases required by Paragtaph 6.18.C.
3. S�bmuttals submitted as herein provided by Cantractor and reviewed by City for
can#�ormance w�th the design cancept s1�a.11 be executed it� con%��mity with �e Contract
Documents unless otherwise xequired by City.
4. When Submittals are submitted for the putpase of sho•wving tha instaIla.tion in great�r d��ail,
thei�• re�iew shall not EXCLlS� Con�ractar from requirernenfs shown on �he Dt•awings and
�pecifications.
5. For-Information-Only subnn�i,tals upon which ihe City is not expected to conduct review or
take respanszve action z�r�.ay be so ide�tified iu�. t)�e Contract Docurnents.
6. Subrnit required number of Samples s�eci�ed in t�e Specificatiorzs.
7. Clearly identify each Sample as ta rnateria.l, Supp�ier, periinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
sub�mi�ttal for the lznriited pu.rposes xequi.red by Paragraph 6.1S.C.
CITY OF FORT WOI�TH
STANDARDCQNSTRUCTION SPEC[F[CATION DOCLTMENTS
Revision: 823/�f7Q1
Q072p0-1
GENERALCONDITION S
Page 32 of 63
B. Where a Subm�ttal is required by the Conh•act Dacumen�s or the Schedul� of Submittal�, any
rela.ted Work performed prior to City's review and aceeptance of the pertinent submittal wilI be
at the sole e�ense and responsibility of Coz�tract�r.
C. Cfty's Review:
1. City wiil provide lameiy xeview of required Submittals in accordance with fhe Schedule of
Subn�uttals acceptable to City. City's review and acceptance will be oz�y ta determine i#' the
items covered by the sub�x�ittals t7vi�1, after installation or incorporation 'vn. the Work, conform
to the i�o�xnation gi�ven in the Can�ractDacuments and be compatibl� with the design concEpt
of the campleted Project as a�unctioning whole as indicated by the Contract Documents.
2. City's xeview and acceptance will not extend to means, methods, techniques, sequence�, ar
procedUres of construc�ion (except where a particular means, method, techniqt�e, sequence,
or procedure o� �o�truction is specif�ically and expressly called fox by the Contract
Doc�nn.ents) or to safety precautions or prograxns incident thereto. Tb.e review and accEptanca
of a separate i�em as such will not indicate approval of the assembly in which �lie rtem
function�.
3. City's review and acceptance shall not relieve Contractor from respox�sbil�.y for any
variation frorn the requirements of the Contract Documents unless Co�tractorhas compl�ed
with the requiremen�s a�' �eotion O1 33 00 and City has given written. accepfa.nce of each
such �ariatian by specific written notaiion thereof u�corporated 'nr� or accompanying the
SubmittaL City's review and acceptane� shall not reliev� Contractor from r�sponsibility for
complying with the requirezx�ents af the Contract Documents.
6.19 Continuing the YYork
Except as ofherwise provided, Contractor shall carry on the Work and adher� to the Project Schedule
during all dispuies or disagreernents with City. No Wor�C sha.11 be delayed or postponed pending
resolution of any disputes or ciisagreements, except as Cily and Contractor ma.y otherwise agree in
writing.
6.20 Contractor's Generdl Warranty and Guarantee
A. Contractor warrants and gua.rantees to City that alI Work will be in accordance with the Contrract
Documents and will not be defecti�e. City and 'zts o�fcers, directors, members, partners,
emplayees, agents, consultants, and subconixactors shall be entitled ta rely on representa�ion of
Con�ractor's warranty and guarantee.
B. Cantractor's warranty and guarantee hez�eunder excludes d�fects ar damage caused by:
1. abuse, modificatian, or improper maintana.nce or aperation by persons other tY�an Contractor,
Subcontractors, Suppliers, or any other individua.l or entity fax whvm Con�ractor is
responsble; ox
CITY OF FORT 1M1�OltTH
STANDAR�CONSTRUCTION SPECiF]CATION DOCUMENTS
Revision: S/13/1021
oa�2oa-�
GENERAL CONOITION S
Page 33 of G3
2. normal vcrear and tear under norma.I usage.
C. Con.tractor's obligatian to perfarm and complete the Work in accardatice wi�h tk�.e Contract
Documents shali be absolute. None of ihe following will constitute an acceptance af Work that is
not in accoxdance with the Contract Documents or a release of Contractor'� abligatian to parform
the Work iri accordance wiih the Coniract Docwnents:
1. observafions by Czty;
2. recommendation or payment by City of any progr�ss ar fjn,al payment,
3. Y11� issuance af a certificate of Final Acceptance by City or a.ny payment related there�o by
City;
4. use or occupancy of the Work or any part thez�eo� by Czty;
S. any rewiew and acceptance of a Submittal by Ci€y;
6. any inspec�io�a, test, or approval by others; or
7. any correction of defective Wark by City.
D, The Cantractor shall ren:�.edy any defects or damages � the V�ork and pay �or any damage to
other work ar propezfiy resultir�g therefrom which sha.11 appear �ithfn a period of two (2) years
from the date a� Fimal Accept-ance of the Wark unless a longer period is specif'ied and shall fitrnish
a gaod and sufficzent x�rzain.tenance bond, complying with the requirement� of Article
5.02.B. Th� City will give nntice of obse��ved defects with reasonable promptness.
6.21 Indemnification
A. Contractor CpV�IlaIltS and agrees to indemnify, hold harmless and defend, a� its own
expense,the City, ifs afficcrs, servants and empIoyees,fram and agains# any and all clai�us
arising out o� ar alleged to a�rise out of, the work and services to be performed by the
Contractar, its offcers, agez�ts, employees, subcan�ractors, licenses or invitees under thi�
Contract. THifi TNI�FMNTFTC".ATif1N PR(1V��T�1N i� �PF,f'rFTf' AT,� �V TNTF,N11Fi1 T�l
nPFRATF. ANTI.RF, FFFFf`TiVF, FVF,N TF TT T� AT,�,Ff�F,TI r1R PRf1VF,N TAAT AT,T �
(lR S(IMF, ilF THF, n A M A fYF�� RFTNfY ,�(��TfTHT WF�RF f' A CT�F�. �N WHC)T.T nR TN
PART. RV A1�[Y AC''T. f1MiS�iC1N f1R NF,fTT�TfTFNf'F� �1F THF, C'�TV, This indemniiy
provision is intended to include, without limitation, indemnaity for cost�, exgenses and le�al
fees incurred by the City in defending against such c�ainas and causes of actions.
B. Cont�ractorcovenantsandagreestoindemnifyandholdharmless,a�itsownexpense,theCity,
its office�, servanfs and employees, fram and against any and all Ioss, damage ar destruction
afproperty of the Criy, arising out oi, or aueged to arise out o� the work and services ta �re
performed by t�e Cont�-actor, its afficers, agents, employees, subconfractors, licensees ar
invitees undcr thius Contract. THTS iNilT'MNTFIC`ATTnN PR(IV�S�nN T�
CTTYOF FORT WORTI-i
STANDARDCOHSTRUCTiON SPECIfICATIDN I]OCUMENTS
Re�ision: 8�23/2021
007200-1
GENERALCON�ITION 5
Page 34 of 63
�PF,C'iFTCALLY TNTFNDFD O OPERATE AND BE EFFECTIVE E�V�'N TF TT T�,
A ,Li, +,CFD OR PR(}VFNTHAT A + +
WF F CATJSF,D,, iN WFTf1T,F nR iN PART. RY Al� Af".T. f1MT��jnN nR
NF,ri_,IGF,NCF, nF THF, CiTY.
6.22 Delegatian of Pr^ofessional Design Se�vices
A. Contractor will not be required �o provide profes�ional design services ut�less such services a�
specifically required by the ContractDocurr�.ents fox a portion of the Wark ar unless such services
are required to carryout Cantractor's responsibilitie� for constzuctzon mea�ns, methods, techniques,
sequences and proeedures.
B. If pro�essional design services or cextifications by a desig;n professional r�lated to systems,
materials or equipment are spec�cally required of Coniractar by the Contract Docurnents, City
will specify all performance and design criteria tha.t such services must satisfy. Contractor shall
cause such services or certificatior�s to be provided by a pxoperly license�. professronal, whose
s�nature and seal shall appear on aIl drawin.gs, calcuIations, specifica�ions, certif'ications, and
�ubrnittal� �repared by such professionaL �ubmittal� related to the Work designed or certified by
such professional, if prepared by others, shall bear such professional's w�ritten app:roval when
submitted to City.
C. City shall be entitled io rely upon the adequacy, accuracy and carnpleteness of th� services,
cert�ications ar approvals perfarm�d by such deszgn pra%ssiox��s, prc�vicied City has speciiied
to Coniractor performa.nce and design criteria that suc�. services must satisfy.
D. Pursuantto this Paragraph 6.22, City's review and acceptance af design calculations and design
drawings will be only for the limited purpose o� checking for confarn�ance with performance and
design criteri� given and the design. concept e�pressed in the Contract Documents. Citp's review
and acceptance of Submrttals {except desig�ri calculafio�s and design drawings) will be only for
the purpose siated in Paragraph 6.18.C.
6.23 Right to Audit
A. The Con�xactor agrees tl�ai the City s1�ail, until the expiration of three (3) years after final
payment under tYvs Cantract, have access ta an�i the right to examine and photocopy any c�irectly
pertanent books, documents, papers, and records of the Contrac�or involving transactions relating
#a this Coni�ract. Caz�ixactor agrees that the City shall have access during Regular Working Hours
to ali necessary Contractor �acil�ies and shall be provided adequate and appropria.te work space
in order to conduct audits in compliance with the provisions oi thi� Paragraph. T`he City shall
give Coniractor reasonable advar�ce natice o� rntended audits.
B. Cantractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcont�ractor agrees that the City shall, until the expiration of �hree (3) years after i'mai
payment uz�der tivs Cpntract, have access to and the right to examine and photocopy any dnrectly
pexi:inent books, documents, papers, and r�cards of such Subconiractor, involving transactzans to
the subcontract, and further,. tkiat City shall have access during Regular Working Hours ta all
crrY o� �'ox'r wox�rx
STAN�ARDCONSTRllCT[ON SPEC[F[CATION DOCUMENI'S
Revisian: 8+Z312021
Ofl7200-1
GENERAL GON� ITION S
Page 35 ofG3
Subcontractor facilities, and shal� be provided adec�uate and ap�ropriate wark space in ordEr to
conduct audiis in campliance with the provisions of this Paragraph. The City shaIl give
Subcontractor reasonable advan�e notice of intenc�ed auc�iis.
C. Cantractar and �ubcant�actar agree to p�otocopy such doctun.ents as may be requesl;ed by the City.
The City agrees to zeunburse Contractor for the cost o� tl�.e copies as follows at tkze rate publishe d
in the Te�a.s Adtbii�isirative Cade in effect as of the time capyin.g is performed.
6.24 Nondisc�irnination
A. The City rs respnnsible fox operating Publi.c Txan�portation Prog�rarns and 'vmplementing txansit�
relafied p�rojects, which are fut�ded in part with Fec�eraI financial assistailce awarded by the U.S.
Department of Transporta�on and the FederaI TransiC Admin.ist�ation [�TA), without
discrimi�.afiing agaiu�st any person iori the United States on the basis of race,color, or national orzgin.
B. Title VI, Civil RightsAct of 19d4 r�s arnended: Contractor shall comply vvith tb� requirements of
the Act and ihe Regulatians as further defined 'm the Supplementary Conditions for any project
receiving Fed�ral assi�tance.
A�TICLE 7— OTHER WORK AT THE SITE
7.01 Kelated YYo�-k atSiie
A. City may perform other wark related to the PrQjeci at the Site with City's employees, or ather
City contractors, or through other direct cantracts iherefor, or have other work perforrried by ut�lity
awne:rs. If such otb.ex work i� not noted in 1:he Contraci Doeun�enis, then written notice thereof
vviIl be gi�ven fio Contz�acfior prior to starting any such other work; and
B. Contractar s�all afford �ach other contractor who is a party to such a direct contract, eachutility
owner, and City, if Ci1,y is performing other vcrork with Ciiy's emplayees ar o�lier City contractars,
proper and safe access tothe Siie, provide a reasonahle oppartunity for the introduction and storag�
of materials and equipment and the execution of such other work, and properly coordinate the
Work with theirs. Contractor shall do all cutt�ng, ftting, and patching of the Work that may be
required to properly connect or otherwise make its several parts come together and properly
integrate with such other wark. Contractor shall not endanger any work af others by cutting,
excavating, or otherwise aitexing such work; provided, however, tha.t Contractor inay cut or alt�r
others' work with the written consent of City and the others whose work will be affected.
�. Tf the prop�r execution or re�ults of any part of Contractor's Work depends upon work performed
by others undar this Articl� 7, Coniracior shall inspect such pther worl� and pramptly report to
City in writing any delays, d�fects, or deficiencies in such other work that render rt unar�a�7able
or un�uitable for the proper executiQn and results of Contractor's Work. Contractor's �ailure to so
report wiil constitute an acceptance of such other wark as fit and proper for integration with
Contrac�or's Work except for latent defects in the work provided by others.
CITYOPFDRT WORTH
STANDARDCONSTRUCTION SPEC[�[CATiON DOCiTN[EN7'S
Revisian: 8�3/2021
oo�zoo-t
��N�r��. caNa irioN s
Page 3fi oF G3
7.02 Coardination
A. If City intends to contract with others for the performa.nce of other work or� t1�e Project at the
Site, ihe following will be set farth in Supglementary Candiiions:
1. the indavidual or entity who wiIl laave anthori�ty and xesponsbility for coordination of the
acfi�vzti�es among ihe varioti�s coiztraciors will be identified;
2, the specific matters to be cavered by such authority and respansibility will be itemized; and
3. the extent of such authority and respansbiliiies v�rill be provided.
B. UnIess otherwi�e provided in the Supplementary Conditions, City sha11 have authority for such
coardination.
1�RTICLE 8 — CITY'S RESPONSIBYLITIES
S.O1 Comtnunications to Cont�actor�
E�cept as o�erwise provided 'm tbe Supplemeniary Cor�clitians, City sha,ll issue all communications
ta Contractor.
8.02 Furnish Data
City shall timely furni.sh the data requfred under the Contract Documents.
8.03 Pcry Whera Due
City sha.]I make payments ta Contractax in accordaz�ce with Axt�icle 14.
8.04 Lands and Easernents; Reports and Tests
City's duties with respect to pro�viding lands and �asements and providing engineerir�g surveys to
estab�ish reference points are set £orth in Paragraphs 4,p1 and 4.05. Paragraph 4.02 r�f�rs to City's
iGdentifyit�g and malcing availa�le to Cantractor copies of reports of exploratzans and tests of subsurface
COl]C1tti0T1S and drawings af physical condihons rela.ting to e�sting surface or subsurface sk�uctures at
or cantiguaus to �he Site tl�at ha�e $een utiliz,ed b� City in prepa�ing the Contract Documer�ts.
S.OS Chc��age Orders
City shall execute Change Orders in accardance with Paragraph 10.03.
8.Ob Inspections, Tests, and Approvals
City's responsibility wzth respect io oertain inspectians, tests, and approvals is s�t fot�th in Paragraph
13.03.
CTi'Y dF f ORT WORTH
STANDARi]CONSTRUCTION SPECIFICAT[ON pOCUMENTS
Revision: 823/1Q21
oo�zoa-�
G�N�RAL CONDITION S
Page 37 oP 63
$.Q7 Limatation.s on City's Responsihalities
A. The City shall not supervise, direct, or have control Qr authority aver, nor be respor�sible for,
Conhactor's rr�eans, methods, techniques, �ec�uences, or procedures of construction, or the safety
precautions and programs incident ihereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of fihe Work. City will no� be responsible for
Contractor's failure to perforrn the Work in accordance with the �ontract Documents.
B. Ciky will natify the Contracfiox a� appl�cable safety plans pursuant to Paragraph 6.14.
8.0$ U�disclosed Hcxzardous Environmental Condition
City'5 T'�5�?OI151�71I1� with respectto an undisclosed Hazardous Environmental Condition is set forlh.
in P aragraph 4. �6.
8.09 Compliance with Safety Program
While at the Site, Ciiy's employees and representatives shall comply wrt,h the specif'ic applicable
requiremenis of Contraciar's safety programs of wl�ich City has been informed pi�suant to
Paragraph 6.14.
ARTICLE 9— CITY'S OB SERVATION STATUS DURING CONSTRUCTI�N
9.01 City's Pr�ojectManager�
City �vill provide one dr znore Projec# Manager(s) during the construction period. T�e duties and
responsibzl.ii:ies and the limitations of auth.arity of Ciit�'s Projecl: Managex during conslxucfizon are set
forth in the Cantract Dacuments. The City's Pxoject Manager �or this Cantract is identified � the
Supplementary Canditions.
9.02 Visits to Site
A. City's Project Manager will make visits to the Site at intervals appropriate io the various stages
of construction as City deems necessary in order to observe the progress �at has been made and
the quality of the various aspects of Contractor's executed Work. Based on information
obtained during such visits and observatians, City's Project Manager will determine, in general, ii
ihe Worl� is proceeding in accordance with the Contracl; Documents. City's Project Manager will
not be required to make exhaustive or cantinuous inspections an the Site to check the quality or
quantity of the Work. City's Project Manager's efforts will be directed toward providing City a
greater degree of cqnfidence that tl�e completed Woxk will con_Eoxm generally to the Con�iract
Documents.
B. City's Project Manager's visits and observations are subject to all the limitaiions on authoriry and
responsibility in tha Contract Documents inciuding those set forth in Paragrapn
8.07.
CITYOr FORT WQRTH
ST�INDARDCONSTRUCTIOH SPECIFICATiON DOCUM�3V'TS
Rwisian: 8�232UL1
007200-1
GENERA� GON� ITION S
Page 38 of 63
9.03 Autho�-ized VaYiations an YT�a�k
Ciiy's Projeet Manager ma.y authorize minor �ariations in tl�.e Work from �lie requirements of the
Contract Documents which do not involve an adjustrnent in the Contract Pric� or the Contract Time
and are compatible with the design concept of the completed Pxoject as a functioning whole as
inidi�cated by the Con�ract Docurnents. These ma.y be accomplished by a�zeld Order and will be
bi�z�ding on City and also on Contractor, who shall perform the Work im�volved promptly.
9.Q4 RejectingDefective bi�ork
City w�71 have authoriiy to reject Wor� which City's Proj�ct Manager believes to be defective, or will
not praduce a comple�ed Project that cozi%xms io the Con�ract Documents ar that will prejudice the
integrity af the design concept of the coxnpleted Praject as a functioriing whole as indicated by the
Contract Documents. Ciiy will have autiiority to conduct special inspec�ion ar testing of tha Work as
provid�d in Article 13, whether or not the Work is �abricated, installed, ar completed.
9.05 Deternzinations for Work Perfo��rzed
Contractor will determine tbe actual quantities and classifications of Work performed. Ci�ty's Praject
Manager will review with Contractar the prelimit�ary det�rminations an such ma.tters befoxe rendering
a written recommendation. City's written deciszon will be final (Except as modifed to reflect changed
factual conditions or more accuurate data).
9.Ob Deci�ians on Requir�ements ofContractDocuments and Acceptahiliiy of Wark
A. Czty will be the irutial interpret�r of the req�irements of the Contract I]ocuments and judge of the
acce�rtabi]i[ty ofthe Workthereunder.
B. Ci�ty will render a written decision on any issue referred.
C. City's written decision on the issue re�eriredwill be final and binding on the Contractor, subject
to the provisions of Paragraph 10.06.
ARTICLE 10 — CHANGES IN THE WORI�; CLAIMS; EXTRA WORK
10.01 Autharized Charages in the Wo�k
A. Without invalidatit�g the Cantract and without notice to any surety, City may, at any tune ar from
time to time, ordex E�iara Work. Upan notice of such Extra Work, Contractor sha.11 promptly
proceed with fihe �Voxk involved which will be �erformed under �he applicable canditions of the
Contract Documents (except as otherrvise specifically provided}. E�ra Work shall be
memarialized by a Cl�ange Order which may or ma.y not preeede an oxder af E�ra work.
B. For nr�inor changes of Work nflt requiring cha�ges to Contract Tit�e or Contract Price, a Field
Order may be �ssued by the City.
Ci'FYOFFDRT WOftTH
STAi�fDARDCONSTR[1CT30N SPECIF�CATION DOCUNfEN'I'S
Revi�ion; &2�{i21
ao �a oa - i
GE�EERAL CONDITIQN S
Page 39 of 63
10.02 Unautha�ized Changes in the Wo�k
Contractor shaIl not be entitled to ax� in.crease in the Contxact Price or axi extension of �e Contract
Time with respect ta any work perfarmed that is nat required by the Contract Documents as amended,
modified, or supplemented a� pravzded in Pazagraph 3.44, except in t�e case o� ax� exr�exge�cy as
provided ir� Paragraph 6.17.
10.03 Execution of Change Or�ders
A. City an.d Coxztractor shall execute appropriate Change Orders covering:
1. changes in the Work which ar�: (i) ord�red by City pursua.nt to Paragraph 10.O1.A, (u) req�zii•�d
because of acceptance of d�f�ctiv� �+Vork under Paragraph 13.08 or City's correction o�
defeciive Work under Parag:raph 13.09, or (iii) agr�ed to by the parties;
2. changes in ihe Contract Price or Gant�act Time which are agreed to by tile parties, including
any undisputed sum or amount of time for Work actually performed.
10.04 Ext�a Wo�k
A. Should a difFerence arise as to �vhat does ar does not constiiute Extra Work, or as to the paymant
thereof, and the City insists upon its pe��fo��nance, the Gontractar shall proceed with the worlc aftar
making wriiten request for �vritt�n orders and sl�all keep accurate account of the acfiaal reasonable
cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Para�raph 10.D6.
B. The Contractar sha11 fut7�ish the City such installatu�n xecards o£ all deviations fro�:n the original
Contract Docwn�nts as may be n�cessary to enable Y1�e City to prepare �or permanent record a
correctad set of plans shor�ving the actual installatian.
G The compensation agreed upon for E�ra Work wheth�r or not initiated i�y a Change Order shall
be a full, complete and final payment for all costs Contractor incurs as a resuit or relaiing to the
ehange or Ex�xa Work, whether said costs are known, u.nknown, foreseen or unforeseen at that
tune, including withaut limitatzon, any costs frar delay, e�ended overhead, ripple oz• ixn.pact cost,
or ar�y other e�fect on changed or ur�changed vvork as a result of the change or E�ra Worl�.
10.05 Notification to 5u�ety
If the provisions of any bond require notice to be given to a surety of any chan�e affecting the general
scope of the Work or the provisians of the Contract Documents {including, but nat limited to,
Coni�act P�ice or Con�ract Tix�n.e), the givin.g of any such notice will be Contractor's responsbi.lity.
The amount a� each applicable bond wilJ. b� adjusted b3� the Contractor to reflect the effect of any
such change.
CITY OF FORT WORTH
STANDARDC03�STRUCTION SPECIFICATtON DOCUMEirITS
Revision: 8232d21
oo�zao�i
GENERALCON�ITION S
Page 40 of G3
�0.06 Con%actCicrimsProces�
A. City's Decisipn Required: All Cc�ntract Cla.ims, except those waived pursuant to Paragraph
1�.09, shall be referredto the City for decision. A decision by City sl�all be required as a condition
prec�dent to any exercise by Can�ractor of any rights or remedies he may otherwise have under
the Conlract Docume�ts or by Laws and Regulations in respect of such Contract Cla,ir�.
B. Notice:
1. Written notice staiing the general nature of each Cont�ac� Claim sha]I be delivered by the
Coniractor to City no later than 15 days after the start of the event givsng rise thereto. The
respans�bility to substantiate a Coniract Claim shall rest with the party making tlie Co�tract
Claim.
2. Notice af the amourit or extent of the Contract Claim, with supporting data shall be delivered
to the City on or befare 45 da.ys from the start af the event �iving rise thereto (unless the Ciiy
allows additional time for Contractor to subrnit addi�ional or more accurate data in support of
such Contract Claim).
3. A Conlract Claim for an adj�stment ir� Coniract Price shaIl be prepared in accordance with
the provisions of Paragraph 12.01.
�. A Cantrac� Claim for an adjustnrient in Contxact Tizrke shal� be prepared in accordance �viih
ihe provisions of Paragraph 12.02.
5. Each Can�ract Claim sl�a.11 be accampanied by Contractor's �vrit�en statement that the
adjustment clain�ed is the entiure adjustmex�� to which the Can�ractar believes ik is entitled as �.
result oi said event.
6, Tbe City shall submit any response to the Cantracior within 30 days after receipt of the
claimant's last submittal (unless Contrac� allows additional tim�:).
C. City's Action: City will re,view each Contract Claim and, within 30 da�s after receipt of the ]ast
subrnittal af the Contractor, if any, take one o�the following actions in writing
1. deny the Contract Cla.im in whole or in part;
2. approve the Contract Claim; or
3. notify the Contaractor that the City is uz�.ab�e ta resolve tk�e Contract CIaim if, in �lae Citty�'s
sol� discretion, it wouid be inappropriate fox tl�e City to do sa For puz-poses �f finrt�e�
resolution of ihe Cont�act Claim, such no#ice shall be deemed a denial.
C1T Y OP FORT WflRTH
S'I'.4iVDARDCONSTRUGTION 5PECIFIGATION D�C[JMENTS
Revision: 823/2D21
00720D-I
GENERAL CONDITION S
Page 4 L of 63
D. City's written action under Paxagraph 10.06.0 will be final and binding, �anless City or
Contracfior iu�voke the dispute resolution pracedure �et �orth in Artticle 16 witl�iii 30 days of such
action or deniaL
E. No Contract CIaim for an adjustment in Contract Price or Contract Time will be valid if n.ot
submitted in accardance with this Paragraph 10.�6.
ARTICLE 11— COST OF THE WORK; ALLOWANCES; iTNIT PRICE W�RK; PLANS
QUANTITY MEASUREMENT
1 i.Ol Cast of the Work
A. Costs Included: The term Cost af the Warlc means 1he suzn ai all costs, except those excluded in
Paragraph 11.�1.B, necessarily incurxed and paid by Contractor in. the proper pexfoxmance of the
Work. When fihe value of any Work covered by a Change Order, the cosfis to be reimbursed to
Contxactor will be anly those additioxaa.l or i�cxemenfal costs required because afthe c�ange in th�
Work. Such costs shall nat include any o� t1�e costs iteznu�zed i�r� Paragtaph 11.O1.B, and shall
zn�clude but not be lira�ted to the �ollowing itezns:
1. Payroll costs for ernployees in the direct ernploy of Cor�tractor in the gerformance of the
Work und�r schadule� of job classifications agreed upon by Ciiy and Contractor. Such
employees shall include, wiihout limitation, supermtendents, fore7nen, and other personnel
employed fiill time on the �V'ork. payroll costs for employees not employed full time on the
Work s13all be apportianed an the basis of their time spent on the Work. Payro�i �osts s1�aI1
include;
a. sala�ries wzth a 55% markup, or
b. salaries and wages plus the cost Qf fringe benefits, which shall incluc�e social security
contribuiions, unemplayment, exci�e, and �ayrol� taxes, workers' cornpensation, health
and ret�rement benefits, bonuses, sick leave, vaca�ian and holiday pay applicable thereto.
The expenses of performir�g Work outside of Regular Woxkin�g Hours, Weelcend
Working Houxs, or legal holidays, s�all be in.cluded in the above to the extent authorize d
by City.
2. Cast of all rnat�rials and equipm�nt furnisned and incoiporated in tYie Worl� including costs
of transportati�n and storage th�reof, and Suppliars' feld sarvices required in connection
therewith.
3. Rentals of all construction equipment and ma.chinery, and ihe parts tb.eredf whether rented
from Contractor or others in accordance with rental agreements approved by City, and the
costs of transportation, loading, unloading, assembly, di�mantlir�g, and re�oval thereo£ All
sucY� casts shall be in accart�ance � the tern�s of sard rental agreements. The rentaI of any
sucl� equiprr�ent, z�aa.chu�ery, or parts shall cease when ihe use thereof is no langer nec�ssary
f�or the Work.
CITYQF I'pRT VJOATH
5TFINDAFtDCONSTRUCTION SPEC[P[CATION DOCiJMENTS
Revision: 8/13/202i
oonoo-i
GENERAL CONo ITION S
Page 42 of 63
4. Payments mada by Contractar to Subeontractors for Worlc performed by Subcont�•aciors. Yf
required by City, Contzactor shall obtain comp�titive bids from subcontractars acceptable to
City and Cantractar and sha.11 deliver such bids io City, who will then determine, tivhich �bids,
� any, will be acceptable. If any subcontract provides tbat the Subcontractar �s to be paid on
the ba�is of Ca�t of the Work plus a fee, the Subcontractar's Cast of the Work and fee shall
be determined in th� same mann�r as Contractox's Cost of the Wark a�d fee as provided in
this Paragraph 11.Q1.
S. Costs of special consultants (including but not limited to engix�eers, architects, testing
]a.boratories, surveyors, attorneys, and accountants) employed far services specifically related
to the Work.
6. Supplemental costs including the followu�g:
a. The proportian of necessary transportation, travel, and subsi�tence expenses of
Contractor's ernployees incurrec� in discharge of duiies connecied vvith the Work.
b. Cost, imcluding trax�sportation. and annainteziance, of all materaa�s, supplies, equipme�t,
machinery, applia.nces, office, and temporary facilities at the �ite, and ha�d tool� not
owned by the workers, which are eonsumed in the perforxnance of �he Work, and cost, less
rnarket value, of such items used but not consumed which remain the pxoperty of
Contractor.
c. SaXes, consumer, use, a�d other siinilaz� taxes related to the Work, and for which
Contractor is liable not covexed under Paragraph 6.1.1, as irnposed by Laws and
Regulations.
d. D�posits last fox causes other than negligence of Contractar, any Subcontractor, ar
aan.yone di�ectly o�r indirectly employed by any of �.hem or fax whose acts any of them may
be liable, and royalty payzx�ents and %es for pexnaits and lice.nses.
e. Losses a.nd damag�s {a�d r�lat�d expenses) caused by damage to t�►e Work, not
compezasated by insurance ar o�lierwise, sustained by Contractor in cannection with the
perfozmance af the Wor�C, pravided such losses and damages have resulted from causes
other �an the x�egligence of Contractor, any �ubcnnfiractor, or anyone directly or indirectly
employed by any of the�n ox fo;r whose acts any a£ them may be liabie. Such losses shall
include �ett�ements rna.de with the written consent and approval af City. No such losses,
damages, and expenses shall be zncluded in th� Cost of the Work for the purpose af
determining Contractar's fee.
f. The cost of utilitie�, fuel, and sar�itary facilities at the Site.
g. Minor expens�s such as telegrams, long distar�ce telephone calls, telephone and
cornmunication services at tha S�te, e�ress and courier services, and sim�7ar petty cash
items in connectian with the Work.
CITYOP FORT WORTH
STANDARDCONSTRUCTION SPEC[CICATlON 170CUNE�NTS
Revision: 82a/1021
ao�zoo-�
G�NEF2AL CDND ITION 5
Page 43 of 63
h. The costs of prez�iurzas far all bonds and insurance Coniractor a� requio.•ed by the Con.�ract
Documents to purchase arldmaintair�.
B. Costs Excluded: The term Cost of tl�e Work shaIl not incluc�e any of the following iiems:
1. Payroll cost� and otl�er compensation of Contractor's officers, executives, principals (of
partnerships and sole proprietor�lups), general mana.gers, safety managers, engineers,
architects, est�at�xs, attorneys, auditors, accountants, purchasing and contractiu�g agents,
e�p�ditexs, timekeepexs, clerlcs, and othex perso�el employed by Contractor, whethe:r at the
Srte or m Cantractar's principal ar branch affice for gene�•al admIl�istration of the Work and
nat specifically included 'm the agreed upan schedule af job cla.ssificatians referred to in
Paragraph 11.O1.A,1 ar specifcally cavered by Paragraph 11.Q1.A.4, all o�' which are ta be
considered adinmistrative casts covered by the Contractor's �ee.
2. E�enses of Contractor's principal and branch offces other ihan Coniractor's offce at the
Site.
3. Aaray part of Conixac#ox's capztal expenses, iu�cl�diz�g interest an Contractor's capital
enaployed for the Woxk and ckaaxges against Contz�actc�r fax deliz�quent paym�nts.
4. Costs due to the n�gl�g�nce af Contractor, any Subcantractor, or anyone direc�ly or indirectly
emplayed by any of them or for whosa act� any of thern may be liable, includirig bui not
Iimtted to, the correctiQn of defective Work, disposal of materials or equipment wrongly
supplied, and making good any damage to property.
5. Qfiher overhead or general e�ense casts of any kind.
C. Cantr�acto�'s Fee: When all fhe VL�ork i� performed on the basis of cost-plus, Contractor's fee
shall be d�termined as set forth in the Agreement. When the value of any Work covarcd by a
Change Order for an adjustment in Contract Price is determined an ihe bas�s of Cost of the
Work, Contractar's fee �hall be deterrnined as set forth in Paragraph 12.01.C.
D. Dacumentation: Whe�ever the Cost ofthe Work far any purpose is to be deterani�,ed pursuan� ta
Paragrapkis 11.O1.A and 11.01.B, Cantractor wiil establish and a�aintain records thereof in
accordance with generally accepted accaunting practices and submit in a farm acceptable to City
an iternized cost breakdawn together with supporting data.
11.02 Allawances
A. Specified Allo�uance: It i� understood that Contractox has included 'u� the Cont�act Price all
allo�rvances so named in the Contract Documents and shall cause tk�e Work sa covexed to be
per�ormed for such surns and by such persans or entities as ma.y be acceptable to Czty.
B. Pre-bidAllo�uances:
1. Cantractor agxees tlYat:
CIT Y OF FORT WORTF3
STANDARDCONSTRIICT[ON SPEC[F[CATiOM I]OCUME.NTS
Revision: 823lZ021
oo�xao-i
GENERAL CONDi710N S
Page 44 of 63
a. the pre-bid aliow�nces include the costto C�ntractorof materia�s and ec�uipment required
by the aliowances to be delivered at the Site, and all appficable taxes; and
b. Coniractor's costs for unloading and handling on the Site, ]abor, installation, avexhead,
pro�'it, and other expenses contiemplated for the pre-bid allowances have been included in
the allnwances, and no demand far additional payment on account of any of the
forego�g will be valid.
G. Cantinge�cyAllowc�ace: Contractar agrees that a contingency allQwance, if any, is for t�.e sale use
of City.
D. Priar to final payrnent, an appropriate Cha.nge Order will be issued to xeflect acival amounts due
Contractar on account of Work covered by allowances, and the Contract Price shall be
correspondingly adjusted.
11.03 UnitPrice Work
A. Where the Contract Documents provide that all ar part �f the Work is to be Unit Price Work,
initially the Cont�act Price will be deemed to include �or all Unxt Przce Work an amouni equal to
th� sum of the unit price far eachseparately identified item of U� Price Work times the estimated
quantity of each item as indicated in ihe Agreement.
B. The es�im�.ted quantities of items a�' Unit Price Work are not guaranteed and are solely for the
purpose of comparison of Bids and deternam�.�g an u�ailial Cantract Prioe. Dcterminations of the
actual quantities and classifications o� U�zt Price Work performed by Contractor will be made by
City sub�ect to the provisions of Paxagraph 9.Q5.
C. Ea.ch unit price will be deexn.ed ta include an amaunt con�sider�d by Contractor to be adequate to
cover Contractor's overhead and prafrt for each saparately identif'ied item. Work described in the
Contract Docwnents, or reasonab� inferred as required for a functionally complete installa.tion,
hut not identifed in the Iistitxg nf � price i�ems shall be considered incidental to unit price work
listed and the cost af incidental woxk included as part af the unit price.
D. City ma.y xnake an adjustment in the Cantract Price in accordance with Paragraph 12.01 if
1. ihe quantity af any item o� Unit Price Wark performed by Contractor differs materia.11y and
signifcantly from the estamated quantity of such item indicated in the Agreement; and
2. there is na corresponding adjustmant wrth respect to any other item of Work.
E. Increased o� Dec�ease� Quantities: The Gity rese�rves the righf to order Extt�a Work in
accordance wiih Paragraph I0.01.
1. If the changes � quantities or the a�terations do not signif'ican�ly change the character of
work under the Contract Doc�ents, the altered wark will be paid for ai the Contract u�it
price.
CITY OF FDRT WaRTH
STANDAitDCQN9TRUC'CION SPECIF[CATION DOCUIvIENT5
Revision: E��I
D07200-I
G�NERAL CONpiTIDN S
Page 45 of 63
2. Tf the changes in quantities or alteratians sig,ni�icantly change the characte� of work, the
Cantract will be amended by a Change Order.
3. I�' no unit prices e�st, this w�l 1ae considered Extra Work and the Contraet will he amended
by a Change Order in accordance with Article 12.
4. A significa�a.t c�a.nge iza t�e ehaaractex of work acctiurs when:
a. the character of wark for any Item as altered differs rnaterially in kind or nature from tl�at
in the Contract ar
b. a Major Item of wark varies by more than 25% from the origin�l Cantract quaniity.
5. When the quantity of wark to be dane undex a�y Major �texra of tb.e Can.txact is more than
125% of the original quanfity stated in the C�ntract, then either paxty to the Co�tz�act xnay
request an adjustment to th� u�it price on the p�rtion of the wark tha.t is abave 125%.
6. When ihe quantity of work to be done under any Major Ttem of the Contract is less than 75%
of the original quantity stated in the Contract, then either party to the Contract may request
an adjust�x�ent to the unit price.
11.Q4 Plans Quantity Measurement
A. Plans quan�ities may or may not representtha exact quant7ty of work perforrned or material moved,
handled, or p�aced during the execution of the Contt•act. The estimated � bid q�antities are
designated as final payment quantities, unless revised by the governing Section ar tivs article.
B. If the quantity rneasured as outlitied under "Price and Payment Procec�ures" vaxzes by xn.oxe t�an
25% (or as stipulaied under "Price anc� Payment Pracedurea" for spec�c Itex�as) �rozn tlae tatal
estimated quantity for an individual Ttem ariginally shawn in the Cont�act Documents, aza
adjustment may be made to the qua.ntity af autharized wark done far payme�t p�.rposes. The paz�ty
to the Contract requesting the adjustrr�ent will provide fi�ld rneasurernents and calculations
showing the final quantity for which payment will be made. Payment for revised qt�antity will be
made at the unii price bid for that Item, exeept as provided fflr in Articl� 10.
C, When quantikies are xevi�ed by a ck�a.nge in desi�n approved by the City, by Cha.nge Order, or to
correctan error, or to co�rectaner�ox on the plans, the �lans quantity will be increasedor decreased
by th� amount irivolved in the change, and the 25% vari.ax�.ce w:�ll app�y to ihe new plans qu�ntity.
D. If the total Contract quantity muliiplied by the unit price bid for an individual Item is Iess than
$250 and the Item is not originally a plans quantiry Item, then the Itern may be paid as a plans
quaniity Item if the City and Contractar agree in writing to fix the final qUantity as a plans quantity.
C1TY OF FORT WORTH
STANDAItDCONSTRUCTION SPECIFICA7'[QN DOGUM�NTS
Revision: S�S3�10zi
oQ�aaa-i
G�NERa,�corroiTioN s
Page 46 of 63
E. For callout work or non-site spec�c Contracfis, the plans quantity measurement requarem.ents are
not appl�cabie.
ARTICLE 1� — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT T�ME
12.O1. Change ofCant�actPrice
A. The Co�tract Price ma,y only be changed by a Change Order,
B. The value af any Work covered by a Change Order will be detern�ined as follows:
1. where the Work involved is covered by unit prices contained in the Co�tract Documents, by
application of such usut prices to the quantities of the items involved (subject to the provisions
qf Paragraph 11.03); or
2. where the Work involved is not covered by unit prices contained in the Contxact Dacumen#s,
by a mutually agreec� lump sum or uni� price (which may include an allowa.nce fox overhead
and profit not necessarily in accordance with Paragraph 12.O1.C.2), and shali include tbe cosi
of any secondary unpacts that are foreseeable at the �une of pricing tke cost of Extra Work;
ar
3. where the Work invalved is noi covered by unit prices conta�ed iu the Contract Dacuments
and agreement to a lump sum or unit price is not reached tuider Paxagxaph 12.O1.B.2, on the
basis of the Cost of the Work (determined as provided � Paragraph 11.01) plus a Can�ractor's
fee for overhead and prafit (determined as provided in Paragraph 12.O1.C}.
C. Contracio�-'s Fee: Tk�e Contractor's additi�o�.al fee �ar overhead and profit shall b� determitied as
follows:
1. a mutually acceptable £'a�ed fee; or
2, if a fixe�i fee is not agreed upon, then a fee bas�d on the following percentages of the various
poxtions of �lie Cost of the Work:
a. for costs incurr�d under Paragraphs 11.01.A.1, I1.01.A.2. and 11.O1.A.3, the
Contractor's ac�ditional fee shall be 15 percent except for:
i) rental fees for Contractor's own equipment using standard rental rates;
2) bonds and insurance;
b. for costs incurred under Parag�raph 11.O1.A.4 and 11.01.A.5, the Contractor's fee shall be
five percen# (5%);
1) where one or more tiers of subcontracts are on the basis of Cast of the Work plus a
�ee and no �ed fee is agreed upon, the intent of Paragraphs 12.O1.C.2.a and
12.Q1.C.2.b is that the Subcontractar who actually perfortns the VVork, at whatever
C1TY pF rORT WOIiTH
STANDARI7CONSTRUCTION SPE�C]FICATIpN bOCUMEN`I'S
Revision: 823/L0�1
00�200-�
GENERAL CDND ITION S
Page 47 af 63
tier, vvill be paid a fee o� 15 percent of th� costs inc�arred by such Subcontractor ua�der
Paragraphs 11.O1.A.1 and 11.01.A.2 and fhat any higher tieY Subcontractar and
Contracior vvill eacl� be paid a fee of five percent {5%) af the amount paid to the next
Iower iier Subcon�ractor, however in na ca�e shall th� ctunula.tive total of fees paid be
in excess of 25%;
c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and
11.01.B;
d. tt�e amount of credit to be allowed by Contractor to City �or any cha.nge which resulrs in
a net decrease in cost will be the amoiu�t af the actual net d�crease in cast plus a deduction
in Contractor's fee by an amo�nt ec�ual to fv� parcent {5%) of such net decrease,
12.�2 Chrxnge of Cont�act Time
A. The Cantract Time ma.y only be changed by a Change Orde�r.
B. No extension of the Contract Tirrie u�l be aIlowed for Ex�a Work or for elaim�d delay unl�ss th�
Exlra Work contemplated or claimed delay is shown ta be on the critical path of the Project
�chedule or Contractor can show by Critical Path Method analysis ho�v the Extra Work or claime d
delay adversely affects the criiical path.
12.03 Delays
A. Where Contraciar i� reasonably delayed in ihe performance or corrrpletion of any part of the
Work within the Contraci Tirr�e due to dela.y �eyond the cantrol of Cant�actor, the Cant�act Tim�
may be extended in an amount equal to the time lost due to such delay �f a Contract Claim is made
therefar. Dela.ys beyond the control of Contractor shall include, but not be lirnited to, acts ar
n.eglect b� City, acts ax neglect of utility owners or other co�tractors performing other work as
contemplated by Article 7, f�res, floods, epidemics, abnor�nal weather conditions, or acts of Crod.
Such an adjustment shaJl be Ca�t�actox's sole and exclusive remedy for the delays described in
this Paragraph.
B. If Contractor is delayed, City shall not be liable to Cantraetor for any claims, costs, la�sses, or
damages {including but not Iimited io all fees and charges of engineers, architects, attorneys, and
other prQfessionals and aIl court or aabitration or other disput� resalution costs) sustained by
Coniractor on or in connection with any other project or anticipated project.
C. Canfiractor shall not be entrtled to �.n adjustment irz Contract Price or Contract Time for delays
within tl�e control o� Cantractar. Dela.ys attributa.ble to and within the control of a�ubeontxactor
or Supplier shall be deemed to be delays withiu ttze conixol of Contractor.
D. 'The Contractor sha11 receive no compensaiion far deIays ar hindranc�s to the Worlc, except when
direct and unavoidable extra cost to the Contractor is caused by the failure of the City to pro�ide
iriformation or material, if any, whieh is to be furnisheci by the City.
CITY OF FORT WORTH
STANDARDCONS'fRUC'f[qN SPECIPICATION ]]OCUM�N'CS
Revislon: $23i1021
fl0720D-1
GENERAL CONDITIOiV S
P age 48 of 63
ARTYCLE 13 — T�STS AND �NSP�CTIONS; CORRECTION, REMO�AL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice ofDefects
Nofice af all defective Wark af which City has actlzal �owledge will be given to Cox�t�racfiox.
Defect�ive Work may be xejected, corrected, or accepted as provided in ihis Article 13.
13.02 �ccess to Work
City, independent testing ]aboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and testing.
Contractor shaII provide ihem proper �.nd safe conditions far such aceess and advise them of
Contractor's safet� procedures and prograrns so fha� fliey may corrlply fher��cnrith as applicable.
13.03 Tests and 1'nspectians
A. Contractor shall give City timely notice of readiness af the Work for alI required inspections,
tests, or approvals and sha.11 cooperaie with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereofl ta be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtainmg such independent inspections, tests, retests or �.pprovals,
pay aIl costs in canneciian therewith, and furnish City ihe required certificates of inspection or
approval; excep�ing, however, those fees specifically i�entified in the Supplementary Conditions
or any Texas De�artment of Licensurc and R�giilation (TDLR) inspections, which shall be paid as
described 'm the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any �spections, tests, re-tests, or approvals required for City's acceptance of materi�ls or
eq�aipment to be incorporated in the Work; or acceptance of materia.ls, mix desigris, or equipment
submitted for approval prior to Contractor° s purcha.se thereof for incorporation in the Vi7ark.
Such inspections, tests, re-tests, or a�rovals shall be performed �y organiza.tions acceptable to
City.
D. City may arrange for the services of an ir�depende�t tes�ig ]aboraiory ("T`esti�g Lab") to
p�rforrn any inspections or �esis (`�I`esting") for any part of the Work, as deterniined solely by
Ciiy.
1. City will coordinate such Test�g to the extent possble, with Conixactor;
2. Should a�y Testing under this Secrion 13.03 D resixlt in a"fa.il", "did not pass" or ather
sunilar negative result, the Cantractar shall �e responsble far paying �ar any and alI reYest�.
Cont�actox's cancellatzon without cause of City ini�ia.ted Testing shall %e deemed a negati�re
result and require a retest.
CITY OF FORT WORTH
STANDARDC�NSTRUCTION SPECIFICATION I}OCUNfENTS
Revision: 8�1312021
OD7200-1
G�N�RALCON[}ITION S
Page 49 of G3
3. Any �our�.ts owed for any retest under this Seciion 13.03 D shall be paid directly to the
Testitig Lab by Cantractar. Ci�ty wil� farv�rard all invoi�es for retests to Contractor.
4. If Contractar fails to pay the Testing Lab, City will not issue Final Payment unt�l the Testing
Lab is paid.
E. If any Work (or the work of others) that is to be inspected, tested, or approved is cavered by
Contxactox wrthout wri�tte� cancur!rence o� City, Contxactor sha�, i� requested by Gity, uncover
such Woxk foar obse�rvation.
�. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's e�ense.
G. Contractor shall have the riglit to rriake a Con�rac� Claim regarding any retest or invoice issued
under Seciion 13.�3 D.
13.04 Uncovering Wa�k
A. Tf any Work is coverad contrary to the Contract Documents or specific instructions by the Ciry, it
must, if requested by City, be uncovered for City's observaiion and repla.ced at Contractor's
e�ense.
S. If City considers i� necessazy ar advisable that covered Work be observed by Cxty Qr ir�spected or
tested b� oth.ers, Con�ractor, at City's request, shall uncover, expose, or athexwise znake available
for observatior�, inspection, or tes�ing as City may require, fhat portion of the Work in question,
fiu�ishing all necessary labor, material, and equ-�pment.
1. If it is found tYiat the uncovered Work is defective, Con�actor sha.11 pay all clairns, costs,
losses, and dama.ges (including but not limited ta ali fees and charges of engineers, architects,
attorneys, and other professionals and all court or other dispuie resolution cosis) arising out of
or re�ating to such uncovering, exposure, nbservation, inspection, and testin�, and of
satisfactory replacexn.ent or reconstructian (including but noi liznited to all casts af repair or
replacement of warl� of athers); pr City shall be entitled to accept de�eCtive Woz�kit� accordance
with Paragraph 13.Q$ in which case Cantractor shall still be respans.b�e �ar all costs assaciated
with e�pasing, observing, and testing the de%ctive Work.
2. If the uncavered Worlc is noi found to be defective, Contractor shall be allowed an increase
in the Contract Price or an extension of the ContractTune, or both, directly aitributable to such
uncovering, exposure, abs�rvation, inspection, testing, replacernent, and reconstruction,
1.3.OS Ci�y May Stap the Work
If the Work is defective, or Contractor fails to supply sufficient skilled work�r� or suitable materials
ar equipment, ar fails to perform the Work in such a way that ihe campletec� Work �ill conform io
ihe Con�ract Documents, City may order Contractor to stop the Work, or any portion thereof, until the
cause for such order has been e�ated; however, this right of City to stop the �iJork shall not give
rise to any duty on the part of City ta exercise this right for the benefit of Contractor, any
C3�Y OF FORT WORTH
STANiJt�RDCONSTRUCT]OM SPECIFiCATION T30CUMEN'I'S
Revision: 823/1021
oo�aoo-�
GEiVER,4L CONQITION S
Page 50 of 63
Subcor��iactor, any 5upplier, any other individual or entity, or any surety �or, ar emplo�ee or agent of
any of �hem.
13.06 Co�rection orRemoval of Defective Wapk
A. Prampily after receipt of written noti.ce, Cantractor shall correct all defective Work pursuant to
an acceptable scheduie, whether or nat fabricated, insta.11ed, or comp�eted, or, if the Work has been
rejected by City, ramave it from tbe Praject and replace it with Worlc that is not defective.
Contractor shall pay all cla.ims, costs, adc�.itional testing, losses, and damages (ineludit�g but not
limited to all fees and enarges of engineers, architects, attarneys, and other professior�als and all
court or arbitration or other clispute resoiution costs) aris�g aut of or r�lating to such correction
or rerno�al (includ'u�g but not limited to aIl costs of repaiur or xeplacement of wark of others).
Failure to require ihe removal of any defective Work shall nat coz�stittute acceptance of such Work.
B. When correcting defective Work un.der the terms of thi5 Paragraph 13.Q6 or Paragraph 13.07,
Contractor shall talfe no action tha.t would void ar atherwis� impair City's special warranty and
guarantee, i� any, �n said Work.
13.07 Correctian Pe�aod
A. If within two (2} years after the daie af Final Acceptance (ar su�h longer period Qf time as may be
prescribed by the tez�ms of any applicable special guaran�ee required by ihe Contracf Docu�x�e�ts),
any Work is found to be de£ective, or if the repa�r of any darnages to the land or areas made
available far Conixactox's use by City or permitted by Laws and Regulations as coniemplated in
Paragraph 6.10.A is found to be defective, Contractor shaIl promptly, without cost to City and in
accordance with City's vvritten snstructions:
1. repair �uch defeotive land or areas; or
2. correetsuchdefecti�re Work; or
3. if the defeciive Work has been rejected l�y Czty, rernove rt from the Pmjeet and replace it
with Work that is not defec�ive, and
4. satasfactorily correet or repa.ir or remove and replace any damage to oth�r Work, to the work
af athers or other land or areas resulting th�refrom..
B. Tf Contractor does r�ot pramp�iy campl� wi�h the terms of City's written instructions, ar in an
emergancy where delay would eause seric�us risk af loss or darnag�, City may ha.ve ihe defect�ve
Work corrected or repairec� or ma.y have the rejected Wark removed and zeplaceci. All cla.ims,
costs, losses, and da�nages (including b�t nat limited ta all fees and charges of engineers,
architects, attorneys, and other professiona�s and all caurt or other dispute resolution costs) arising
out of or relating to such correction or repai� ar such removal and replacement {incluc�ing but not
limiied to all costs af repair or replacement of wark of oth�rs) will be paid by Contractor.
CITY �F FORT WaRTH
STANDARDCONSTRUCT[ON 5PECIFICATI6N AOCUMENTS
Revision: 82320Z1
0072DO-I
GENER,4LCONDITION S
Page 51 of G3
C. In special ci�cumstances where a particular item af equipment i� placed in caniinuous ser�icc
before Final Acceptance of all the Wark, the correction period far that item may �tart to run from
an ear�ier date if so provided in the Gantract Documents.
D. Where defeetive Work (and da.mage to other Woxl� xesulting therefrom} has been corrected or
remaved and replaced under this Paragraph 13.07, the carrec#ion pexiod hereund.er with re�pect
fio such Vi�ork ma.y be required ta be e�ended far an addit�onal pexiod af one year after the end af
i:he i�nitial correction period. City sl�a.11 pravide 30 days wr�ken notice ta Contractor should such
addrtiona.l warranty coverage be requir�d. Contractiar may dispute this requirement by fil'mg a
Contraci Claim, pursuant to Paragraph 10.06.
E. Contractor's obligations und�r this Paragraph 13.47 are in addition to any other obligation or
warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a
waivex of, the provisions aF any applicable statute of limitation or repose.
13.08 Acceptance afDefective Wa�k
If, instead of requiring correction or removal and replace�nent of defective Vi�ork, City prefers to
accept it, Gity rnay do so. Contractor shall pay a]I claims, eosts, losses, ar�d darnages (including but
not ]imited to alI fees and charges af engineers, architects, attorneys, anc� other professionals and all
court or other dispute resolution cosis) attributab�e ta City's evaluation of and deiermination to accept
such defective Work and for the di�nuvshed value of the Wo71c to the exteni not oth�rwise paid by
Cantractor. I£ any such acceptance occurs pxior to Final Acceptance, a Change Order will be issued
mcorporakit�g the necessary xeva�ions 'vr� the Coniract Documents witn respect to tl�e �+V'ork, and City
shall be entitled to an appropriate c�ecrease in the Contract Price, reflecting the dimiriished value o#'
Work so accepted..
13.09 CityMayCorr�ectDefective T�Tror�k
A. If Contractor �ails wz�hin a reasonable tizne aftex written notice from City to correct defective
Wark, ox to reznove and replace rejected Work as required by City in aceordanee v�ith Paragraph
13.06.A, ar � Con�ractor �azl,s ta perform the Wark in accordance v�rith the Con�raet Documents,
or if Contxactor fails ta comply w�[th any o�er provision of the Contract Documents, City ma.y,
after seven {'7) days written notice to Cpntractor, correct, az• renrzedy an.y such defciency.
B. In exercising the rights arrid remedies under tivs Paragraph 13.09, City sl�a.11 proceed
expeditiously. In connection with such corrective or remedial actian, City may exclude Contractor
from all or part of the Site, take possession of all ar part of the Wark and suspend Contractor's
services related thereto, and incorporate in the Work all materials and equipment incorporated in
the Work, stored at the Site or for which City has paid Con�ractor but which are storad elsewhere.
Contxactor shall allow City, City's representatives, agents, consultants, �mployees, an� City's
pther ca�tractors, access to the Szte to enable City to exercise the rights and remedies under tl�is
P aragraph.
C. All claims, costs, losses, and da�nag�s (including but nat limited to all �ees and charges af
engineers, architects, attorneys, and oth�r profes�ionals and all court ar ather dispute resolution
CITY OF F�RT WORTH
STANDEIRDCOI�STRUCTION SPEC[FICATIOM ❑OCiIMET�l7'S
Revision: SI232021
Oq7200-1
CENEfiAl. COND li'ION S
P age 52 of 63
casts) incurrec� or sustained by City in exercising the rights and remedies under this Faragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
neeessaryrevisions in the ContractDocuments with respecttothe Work; andCity shall be en#itled
to an appropriate decrease in ihe Contract Priee.
D. Contractor sha.11 not be al�owed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
P ara�raph 13.09.
ART�CLE 14 -� PAYMENTS TO CONTRACTOR �iND COMPLETION
14.01 Schedule vf Vc�lues
The Schedule of Valu�s for lurnp sum conl�acts estahlished as provided in Paragrapl� 2.Q7 will se�ve
as the basis for progress payrnents and will be incorporated into a form of Application for Paymerft
acceptable to City. Pragre�s pa.yments on accaunt of Unit Price Work will be based on the number of
units completetl.
14.02 Progress Payr�ents
A. Applications for Payments:
1. Contractor is responsible for providing all infarmation as required to became a vendor of the
City.
2. At least 2Q days befare the date established in the General Requiareme�ts �or each pxog�ress
payment, Contaractor shaIl submut to City far review an Applicafiion �or Payment filled aut and
signed by Contractor c�vering the Work completed as of the date of the Applicatzan a�.d
accornpanied by such supporEing documentation as is required by the Contract Docunr�.ents.
3. If paymen.t is requested on the basis of materiaIs and equipment na� incorporated in the Work
but delivered and suitably stoxed at the Srte or at anothe�r locatinn agreed ta in wri�ing, the
Application for Paymen.t sha.11 a�sa be accampanied �� a bill o� sale, irrvaice, or otlier
doctunentation warrantulg that City has received the xnater�al� and equip�nent free and ciear af
all Liens and evidence that the material� and equipment are covered by appropriate inswrance
or other arrangements ta protect City's interest therein, all of which must be satisfactory to
City.
4. Beoinning with the second Application far Payrnent, each Application sk�ll itaclude an affdavit
of Contractor siating that px�ev:ious pragress payments received on account af the Wark laave
been applied on accouni �o discharge Caz�tractox°s legitinraate obJigations assaciated witli prior
Applications for Payment.
5. The amount of retainage with xespect to progress payments �ril1 be as descrbed in
subsection C. unless otherwise stipulated �in tk�e Contract Docurnerits.
CITY OF FORT WORTH
STANTJAIiDCaNSTRUCT[ON SPECYrICAT[ON DOCUM�AiT'S
Revision: 823J2021
oo7aoa-i
GENERAL GONDITION S
Page 53 ofG3
B. Review afApplication�s:
1. City wiIl, afier r�ceipt of each Applicaiion for Payment, either indicate in writing a
recommendation of payment or return ihe Application to Coniractor indicating reasons for
refusing payment. In th� latter case, Contractar may make the necessary corrections and
resubmit the Applicatian.
2. Ci�y's processing of any payrnent req�ested in an Appfica%i�n for Payment will be bas��l on
City's observa�ions af the e�ecuted Work, and on City's review of the Application for Payment
and th� accompanying c�ata and schadul�s, that to th� hast of City's knowl�dge:
a. the Work has progressed ia the point indicated;
b. the quality of the Wo�•lc is generaJly in accordance with �he Contract Documenfs (subjact
to an evaluation of the Wor�c as a fux�.ciioning whole p�iar ta ox upon Firaal Acceptance, �he
results of any subsequent tests called for in the Cflntract Dacuments, a f�al deternvnation
af qua.ntities and classificatiar�s for Work perf'armed under Paragraph 9.05, and any other
q�alifications stated in the recomm�nda�ion).
3. Processing any such payment will not thereby �e deemed to have represented that:
a. inspecfions made ta check the quality or the quantity of the Work as it has been pexfox�xa.ed
hav� been e�.austive, extended ta every aspect of the Work in progress, ar �nvolved
detai�ed inspections o� the Wark beyond �lie respansibilikies speczfically assigned to City
in the Contract Documen�s; or
b. there anay not be other matters ar i�sues betweenthe parties that might entitle Contractor
to be paid ac�ditionally by City or entitle City to �vi�hhold payment to Contractor; or
c. Con�z•actor has conriplied witk� Laws and Regula.tzoz�s applicable to Contz�actor's per�ormance
�f the Wark.
4. Cily may refuse to process the whole or any part of any payment because o� subsequantly
discovered evidence ar the results of subsequent inspections or tests, and revise or rewoke
any such payment previously rnade, to such extent as may be necessary to protect City from
loss because:
a. the Work is defective or comp�ted Work has been dama.ged by the Contractor ar
subcantractors requiring carrecti�n or replacemen�;
b. discrepancies in quantities contained in previous applicati�ns far payment;
e. the Contract Pz�ice k�a.s be�n reducedby C�nge Orders;
d. City h�s been rer�uired to correct defective Wark or complete Work in accordance with
P aragraph 13.09, or
CITYOF FORT WORTH
ST,4I�FDARDCQN�TI2UCTIQN SPEC[F[CATEON DqCUMENTS
Revision: S123/�21
OD72p0-1
G�NERALCQNRITIONS
Fage 54 of 63
e. City has actual knowledge of the occurrence of any of the e�enis en�axnerated ir1
P aragraph 15. 02. A.
C. Retainage:
1. F`ox canfxacts less t�an $�00,000 at the time of execu�ian, retainage shall be ten percent
(10%).
Z. Fox co�atxacts greater tk�an. $�00,004 at the time of execution, retainage shall be five percent
(5%}.
D. Liquidated Dartaages. Far each calendar day that any work shaIl rema.in uncompleted after the
time speci�Cied in tile Contract Docwnents, the sum per day specified in the Agreement wil� be
assessedagainst the monies due f.he Contractar, not as a penalty, but as damages suffered by the
City.
E. Payment: Con�ractar will be paid pursuant io the requirements of this Article 14 and payment
will become due in accordance with th� �ontract Dacuments.
F. Reduction in Payment:
1. City ma.y refuse to make paymen� of the amount requested because:
a. Liens have been filed in connection wrth the Work, except �rhere Contractor has d�Iivere d
a specific band satisfacfiory to C��ty to secure the satis�action anc� cliscl�arga of such Liens;
b. there are otk�er z�erns entitling City to a set off against the amount recornmended; or
c. City has actual knowledge of the occurrence of any of the events enumerated in
Paragraphs 14,Q2.B.4.a through 14.02.B.4.e ar Paragraph 15.02.A.
2. If City refuses to rnak� payment of tha amount requested, City will give Contractor written
notice stating the reasons for such aciio� and pay Coniractor any amount reznauvng afte�'
deduction af the amount so withheld. City shall pay Contractor the amount so withheld, ox any
adjustmen� thereto agreed to by City and Gonfractor, v�hen Contrac�or remedaes fhe reasons
�or such action.
14.03 Cant�acta�'s Wa��anty af Title
Contractor warrants and guarantees that title to alI Work, rnaterial�, an.d equxpmeni covered by any
Application for Payment, whether incorporated � the Froject or not, will pass ta Cily no later t.�a.n th�
time of payment free and clear of all Liens.
CITYOF P�IiT WORTH
STANDAf2DCONSTRiJCTION SPECIFICATION DOCIJM�NTS
12evision: 8/i311021
OD72D0-1
GENERALGONdITIONS
Page 55 of G3
14.Q4 Pa�tial Utilizaiion
A. Priar to Final Acceptance of alI th� Worl�, City ma.y use or occupy any part ofr the Woxk which
has specid�cally been identif'ied in the Contract Docum�nts, or �+hich City determmes coristitute s
a sepa.rately functioning and usable part of th� Work that can be used for its vztended purpose
without sigrvf'icant interference with Contractor's p�rformanoe af the remainder af the Work. City
at any time may notify Contractor in writing to perrnit City to us� or accupy any such part a� the
Work which City determin�es to be ready far its intended use, subject to the following conditians:
1, Cant�actor at any time may notify Ciry ia� writing ihat Contractor considers any such part of
ti�e Wark readq far its intended use.
2. Wiihin a reasonable time after notification as enumerafed in Paragraph 14.OS.A.1, City and
Contractor shalI make an inspec�ion of tl�at part of fi1�e Work ta detez•mine its status of
compleiion. If City does not consider that part of the Wark to b� substantially complete, City
wiIl natify Contractor in writing givit�g the reasons therefor.
3. PartialUt�izatioz� will not canstit�.te FinaI Acceptance hy City.
14.05 Finallnspection
A. Upon writ�en notic� frorn Contractor that the entire Wark is Substa�tially Complete ixk
accordance with the Contract Documents:
1. Within 10 days, City will schedtz�e a Final Tnspectian with Cvntractor.
2. City will natify Contractor in writing of alI particulars in which thi� inspection reveaIs t�at
�he Wark is incamplete ox de�ective {"Punch List Items"). Contractor sha.Il unmedia.tely take
such measures as are necessary ta complete such Wozk or rezx�edy such deficiencies.
B. No iime charge will be made against the Contractar between said date of notification to the City
of �ubstantial Completion and the date of Final Inspection,
1. Should the City determine tha.t the Work is not ready for Final Tnspection, City will notify the
Contiractor in wrii�ng of the reasons and Contract Time will resume.
2. Shauld tha City concur that Substantial Cample�ion has been achieve�. with �tYze exception of
any Punch List Items, Contract Time will resume �or the durafian it takes for Con�ra�tax to
achieve Final Acceptance.
14.06 Final Acceptance
Upon completion by Confractor to City's satisfactian, af any additioz�al Work identified in the Final
Inspection, City will is�ue to Contractor a letter of Final Acceptance.
CITY OF FORT WORTH
SiANDARDCONSTRUCTION SPE,CIFICATiON DOCUIVIENTS
Revision: 823I1021
na�zao-i
�EN��a�ca�nirioNs
Page 56 nf 63
1�}.07 Fanal Paynzent
A. Application for Payment:
1. Upon. F:it�al Acceptance, and 'm ihe opinion of Gi�ty, Contractar ma.y make an application for
final payment following the procedure for progress� payzxxents iz� accordance with the
Contraci Documents.
2. The final Application �ox Payzn.en.i shall. be accompanied (except as previously delivered) by:
a. a11 docwnen�a�ian called £ar in the Caniract Documents, i�ncluciing but not limited to the
evidence af insurance required b� Paragraph 5.03;
b. consent o� the surety, if any, to final paymeni;
c. a list of all pending or released Damage CIaims against City that Contractor believes are
unseitled; and
d. affidavits of payment� and complete and legally eifective releases ar waivers
(satisfactory to City) of all Lien rights arising out of or Liens fi�ed in cazu�ection with the
Work.
B. PrxymentBecamesDue;
1. After City's acceptance of the Appl�cation fax �ayment and accarnpanying docum�ntation,
requested by C�ntxactox, less pzevious payments ma.de and any sum City is antiil�d,
including but nat lirnited to liquidated damages, w�l becarne due and payable.
2. After all Darna.ge Claims have been resolved:
a. directly by the Contractor or;
b. Confiraciar provid�s evidence fiha.i the Damage Claim has been reported to Contrac#or's
insurance provider for resolution.
3. The rnaking of the final payment by the City shall no# relieve the Cont�actar of any
guaran#ees or other requirements of ihe Conteaet Documents which spec�caIly continue
thereafter.
14.08 Final Completian �elayed and Partir�iRetainage Release
A. If final completion of the Work is sigxvfican�iy delayed, and if City so confirtns, City may, upon
receipt of Contractox's fanaX Applicafiion �or Payment, and without terminating the Contract, make
payxnent of the balance due for that partion of the Work fully completed and acc�pted. Tf tl�e
reznaining ba�ance io be held by City for Work not fi�lly completed ar correctec� is less t�an the
retainage stipulated in Paragraph ]4.02.C, and if bonds have been furrtished as required in
Paragraph S.D2, the writ�en corase�t af #he sureiy to the payment of the bala�ce due for that
CITYOFFOR"i' WORTH
STAATDARDCONSTRUCT[ON SPEC[FICATIDN DOCUMENTS
Revisian: 8113CZ021
007200-I
GENERAL CONDITION S
Page 57 of63
portion of fihe Work fii11y con�pleted and accepted shall be ��bmitted by Contractar to City with
the Appiication �or st�ch payment. Such payment shall be nr�ade under the ternns and conditions
gaverning final payment, except that it shall not cans�itute a waivex of �antract Claims.
B. Pa�tial Retainage Relecrse. For a Coniract that provides for a separate �egetative establishtnent
and maintenance, and test and performa.nce periods following the campletion of alI other
construction in the Contra.ct Documents far al� Work locations, the City may release a portion of
the amount retained provided ihat all other work is completed as detet�mined by the City. Before
the release, aIl submittals and final quaniities must be compieted and acceptedfor all other work.
An amount sufficient to ensure Contract compliance will be retained.
14.09 Waiver af Cdairvrs
The acceptance of fmal payment wi71 constitute a re�ease of the Ciiy fram all claims or liabiliti�s
unc�er the Cantract for anything c�one or furnisheci or relaimg to the work under the Contraci
Documents or any act or neglect of City related to or connecied with the Contract.
ARTICLE 1S — SUSPEN�I4N OF WORK AND TERMINATION
15.01 City May S�cspend YT��rk
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Coni:ractor and which nnay fix the date an which Work will be resumed Contraetor shall
resurne the Woxk an. the date so fi�ed. During temporary suspension of the Work covered by these
Cant�act Dacumex�ts, for any reaso�, the Czty wail ma.lce no e�ra payxnent for sta.nd-by time of
cansf.ruction equipment and/or canst�uctian crews.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence af the Contractor, and should it be determined by
mutual consent of the Contractor and Cii� that a sfllutian to allow construction to proceed i� not
avai�Iable within a reasonable period of time, Cantractor may request an extension in Contract
Tune, direetly attx�utable to any such suspension.
C. If it should becorne necessary to suspend the Wark for an indefr�aite period, the Contxactox sk�all
store all maferials in such a manner f.hat theq vvill not abstruct ox impede the public wru�ecessar�y
nar be�ome damag�d in any way, and h� shall tal�e e�very precaufion to prevent darna.ge ar
deterioxation of the �xrork performed; h� shall pro�ide suitable drainage abaut tl�e waxlc, and erect
iemparary structures where necessary,
D. Contractor may be reimbursed for the cost of moving his equipment aff the job and returning the
necessary equiprnent to the job when it is determined by the Gity that construction ma.y be
resuzned. Such reimbursement shall be based on actual cost to the Contractar of moving the
equipment and no prafrt wi71 be allawed. Reirnbursement may noi be allowed if the equipment i�
moved to anather construction project for the City.
CITY OF FORT WORTH
STANDARbCONSTRl3CTI0N Sl'ECIFICATION I30CUMENTS
Revision: 8r13lL�21
oo�2oa-�
C�NERAI. CONDIiION S
P age 58 of 63
15.02 City.Mcxy Terminate fo�Cause
A. The occuz�rence �f any ane or more of the following event� by way of e�.rnple, but not of �imi.ta.tian,
may justi�y te�atzan for cause:
l. Contractor's persistent failure to per�orm the Work in accardance wzth the Contract Docurnents
(includ'mg, but not ]iax�ited to, failure to suppIy �uffciez�t sldlled woxkez�s ar suitable materials
ar equipment, �aihare to adhexe to the Pxoject Schedule established under Paragraph 2.�7 as
adjusted froxz� fiime to t3me pursuant to Paragraph 6.04, ox failu�re to adhexe ta tl�e City's
Busir�ess D�versity Entexprase OxEiin�ance #20020-12-2011established under Paragraph
6.06.D};
2. Con�actor's disregard o� Laws or Regulations of any pub�ic body having jurisdiction;
3. Contractar's repeated disregard of the authority� of City; or
4. Contractor's violation in any substantial way of any provisions of the Contract Documents;
or
5. Contractor's failure to promp�ly make good any defecf in materials or workmanship, or
defects of any nature, ihe carrection of which has been directed u� writing by the City; or
6. �ubstantia.l indication that the Contractar has made an una.uthorized assigrunent of the
Contract or any funds due therefrom for the benefrt of any creditor or for any other p�.u•pose;
or
7. Substazatial evidence that t�.e Coz�tractax has became insolvent or bankrupt, or atherwise
financiaIly unable to carry on the V+�ork satisfactorily; ar
8. Cantractox commez�ces legal act�nn in a caurt o� competent jurisdict�an against the City.
B. If or�e or rnare of the events identif'ied in Paragraph 15.02A. accur, City wili provide written no�ice
to Confractar and Surety to arrange a conference with Contractor and Slarety to address
Contracto:r's �ailure to per£arm the Wark, Conference shall be held not Iat�r than 15 days, after
recei}�t of �.atice.
L If �he City, the Contractor, and the Suraty do not agree to allaw the Cantractor to proceed to
pe�rfo�m the canstruction Contract, the City ma�, to tl�e extent pertnitted by Laws and
Regulatzans, declare a Cantractor default and formally terminate the Contractor's right to
complefie the Contract. Contractor default shall not b� decl�.red earlier than 20 da.ys after the
Cantractor and Surety hav� received notice of con%rence to address Contractor's failure to
pe�form the Work.
2. Ii Contractar's serviees ar� terminated, �urety sha.11 be obfigated to take over a.nd perform the
Wark. If Sur�ty does not commencs performanc� thereo� within 15 consecutive calendar days
after date of an additional written notice demanc�ing �urety's perfornlance of iis
CITYOFFQRT WORTH
STANDARbCQNS'CI�UCTION SYECIFIGAT[pN 1lpCUMENTS
Revision; 8I1320Z1
oo�aoo-i
�EN�w�� co�oirior� s
Page 59 af G3
obligati�ns, then City, without process or ac�ion at la.w, may take over any partson of ihe
'�h7ork and complete it as de�cribed below.
a, Tf Ciry carnpletes the Work, City ma� exclude Contractor and Surety from th� site and
take possessian af the Work, and all mat�rials and equipment incorparated into th� Work
stared at the �ite ar f�r whzch City Ua.s pai�l Contractor or Surety b�t which are stored
else�where, and fmish the Work as City may deetn e�edieni.
3. Whether City ar Sureiy completes the Work, Cont�actar shall noi be entitled to reeeive any
further payment until the Work is finished. If the unpaid �ala.nce af the Contract Pxice exceeds
all claims, costs, losses and dama.ges sustained by City arising out of or resulting from
completing the Work, such exeess will be paid to Contractor. If such claims, C05�5, losses and
damages exceedsuch �npaid balance, Contractor shall pay the diFference to City. Such claims,
costs, lo,sses and daxn.ages incurred by City vvill be incozporated u� a Ck�ange Oxder, provide d
that when exercising any ri�hts or reznedies under this Paragaraph, City shall not be reguired ta
obtain the Iowest price for the Work performed.
4. Neifller City, nor any of its respcctiv� consultants, agents, offic�rs, directors ar erriployees
shall be iri any way liable or accauntable to Contractor or Surefiy for the method by which the
completion of the said Work, ar any portion thereof, may be accomplished or for the price paici
therefor.
5. City, notwitlistandzng fihe method used in complet�g the Contract, sha.11 not forfeit the right
to xecover c�annages �irorr� Contractor or Suxety far Contractor's �a�ltue ta fiimely complete the
en�iure Contract. Conf�actor sha� not be enfiitled ta any claim ox� account o� tk�e methad used
by City in co�apletiz�.g the Ca�txact.
6. Maintenance of the W�rk shall continue to be Contractor's and Surety's responsibilities as
provided for in the bond requirements of the Contract Documents or any special guarantees
pravided for under the Con�xact Documents or any other obligations otherwi�e prescribed by
law.
C. Notwitbstandix�g Paragraphs 15.02.8, Cantrac�or's services will not be ferrnina.fed if' Conf.ractor
begins w�hin seven days af receipt of natice of intent to ternvnate to correct its failurE to perform
and proceeds diligently to crue such failure vvithin no mor� than 30 days of receipt of said notice.
D. �Jhere Contractor's services have been so te�mina.ted by City, the termir�ation will nat affect any
rights or remedies of City against Goniractor then e�sting or which �nay thereafter accrue. Any
reteniian or payment of moneys due Cont�actor by City will not release Contractor from Ii�bility.
E. I�' and to the extent t�at Co�tractor has pxavided a performance bond under the provisions of
Paragraph 5.�2, the termination pracedures af that bond sha.11 nat sup�r�ede the provisions of this
Article.
CI'�YOFFOIiT WOI2TH
STANDAR�CONSTRUCTION SPECIFICATION DOCUMENTS
lteVision: 8�3/2021
oo�zao-i
GENERAL CONUl710N S
Page 60 oF G3
15.03 City May Te�minate For Conveni�ence
A. City may, without cause and witliout prejudice to any other right or xemedy af Ciky, term.inate the
Contract. Any termination shall b� effected by �na.iling a no�ice of the termu�atzon to tl�.e Contractar
specifying the extent to which performance of �ork under the contract is tezrr�i�ated, and the date
up.on which such terrnination beco�es effective. Rece�ipt of the notice shall be deemed
conclusively �resurned and �sta.blished whentk�e letter is pla.ced in the United Sfiates Postal Service
Mail by the City. Furth�r, rt shall be deemed coz�clusively presumed and established that such
termination is made wi�h just ca�ase as therein stated; and na proof in any clai�x�., dernand or suit
shall be required of the City regarding such discretiona�ry action.
B. After receip� of a notice of termination, at�d except as o�hez'wase d'u•ected by the City, the
Coniractor shall:
1. �top wor�C under the Contract on the date and to the e�ent specif'ied in the not�ce of ternaination;
2, place no fiu-ther orders or subcontracts for materials, servicas or facilities except as may be
r�e�cessa�y for campletion of such portion of the Work under the Contract as is not terminated;
3, terininafe all ordexs and subcontraets to the exient that they relate io the performanca of th�
Woxk terminated by no�ice of termination;
4. tra�nsf�r �iile to the Gity and delivez in the zx�anner, at the �imes, and to the extent, if any,
directed by the City:
a. the fabricated or unfabrzcated parts, Work iu� progtess, completed Work, supplies and
other ma.terial produced as a part of, or acquired in connection with the performance of,
th� Work terminated hy the natice o�the tez-�rzinatian; and
b. the completed, or partially completed plans, drawings, iz�%rnaafizon and other property
which, if th� Contract had been completed, r�ould ha�re been required to be ftulvshed to
the City.
S. eompl�te perforJnance of such Wark as shall not have been terminated by t�e natice of
termination; and
6. take such action as ma.y be necessary, ar as the City ma.y direct, for the pr�tec�ion and
preservation of the property rela.�ed to its contract which is in the possessian af tk�e
Contractor and in which the owner has or may acq�.ire the r�st.
C. At a time not later than 30 days after the ierminaiion date specified in the noiice of terrnination,
the Contractor may submit to the City a list, certifed as to quantity and quality, of any or alI items
af �ernlinaiion inventory not previausly disposed of, exclusive of iiems the disposition of which
has been clirected or authorized by City.
CITY' OF F�RT WORTH
STANDARDCON5TR[1�TION SPECIFICATION DOCUM�NTS
Revision: 823/1021
oo�zoo-�
GENERAL GONDIT]ON 5
Page 6] of 63
D. Not ]afier than 15 days thezeafter, the Ci�y shall accept tztie ta s�ch items provided, that the list
submitted shall be subject to verification. by the City upan z�emov�l ofthe items or, if the items are
storecl, within 45 days froz�za the date ai subrnissian of th� list, and any necessary adjustments to
correci the list as submitted, shall be made prior to fina.I settlem�nt.
E. Nat later �han 6� days after the notic� of termination, ihe Contractor shall submit his fiez�.�n�ation
claim to the City in th� %rm and with the cert�f'ication prescribed by the City. Unless an e�ension
i� made in writing wifihin such 60 day period by the Contractar, and granted by the City, any and
all such claims shall be conclusively deemed waived.
F. In such case, Contracior shall be paid for {without duplication of any items):
1. corrzpleted arid acceptable Work e�ecutec� in accordance with the Contract Dacu�raents prio�
to the ef�ectave date af termination, including fair and reasonable sums for overhead and profit on
such Work;
2. �xpenses sustained prior to the effective date of tez�zx�ination in per�or��air�g services and
furnishing labor, materials, or equipment as required by the Cantrac� Docu�nents in eonnection
with uncomplated Work, plus fair and reasoz�.able su.ms �ar overhead and pYofit on such e�aanses;
and
3. reasonable e�aenses clirectly aitributable to termination.
G. Tn the e�v�nt of the failure of the Contractor and City to agree upon the wh�le amount to be paid
to the Contractor by reason of the terminati.on o� khe Wark, the City sha�l dei;ermine, on the basis
of information available to it, the amoun.t, if any, due to the Contractor by reason of ihe termination
and �ha�l pay to the �ontractor the aax�aunts determined. Contractar shall not be paid on account
of loss of anticipated profits or reven.ue or other econamie lass arising out of or resulting from
such termination.
ARTICLE 16 — DISPUTE RES�LUTION
16.01 Methods an�'Procedures
A. Eithex City ox Contractor may request mediation of any Contract Claim submitted for a deca�zon
under Faxagraph 10.06 be�ore such decision becomes final and binding. The request for znedaation
skzall be subrnitted to the other party to the Contract. Timely submission of tl�e request shall �fiay
�e ef�ect ofParagraph 10.06.E.
B. City and Coniractor shaIl participate in tb.e mediatian pracess in good faith. The process shall be
commenced w�thin 60 days of filir�g of tk�e request.
C. Ifihe Contract Cla.im is not resol�ved by mediation, Ciry's action under Paragraph 10.06.0 Qr a
denial pursuant ta Paragra�hs lO.00.C.3 or 10.Q6.D shall become final and bincling 30 days after
teramination of �h� mediatian unless, within tha� time period, City or Conixactor:
CITYOFFORT WORTH
STANI7ARDCO�iSTRUCTION SPECiFICAT[ON DOCI€M�NTS
Revisian: 823f.�(ill
oa�zao-i
GENEF2ALCONtiIiION S
Page G2 of 63
l, elects in writing fa invoke any other dispute resolution process provided for in the
Supplerne�tary Condi�ions; or
2. agrees with the other party to submit the Contract Claim to another dispute resalution
process; or
3. gives written notiee to the other party of the intent to submi� the Contract Claur� to a cou�rt of
competent jurisdiction.
ARTICLE 1�—MISCELLANEOUS
1.7.01 Giving Notice
A, When�v�r a.ny pravision a�the Coniract Documants requires the giving of written notice, i� will
be deemed to have bee� vaIidly given if:
1, defivered in person to the indi�vidua.I or to a member of the firm or to an offi�er of iha
corporation for whom i� is intend�d; or
2. delivered at or sant by registered ar certified mail, postage prepaid, �o the ]ast �usiness
address known to the giver vf the notice.
B. Business address changes must be promptly ma.de in writing to th� other pa.rty.
C. Whenever the Gontract Doclunents specifies giving n:otice by electronic jneans such electronic
notice shall be dee�ed sufficient upan confi�x�ation of receipt by the receiving party.
17.(}2 Computation ofTimes
When any period o� titne is re�erred to in the Contract Documents by days, it will be computed to
excXude fihe f�rst and include ihe la.st day of such p�riod. If the Iast day of any such period falls on a
Satia�rda.y ar Swaday ar on a day ma.de a legal holida.y the next Working Day shall become the �a.st day
of the period.
I7.03 Cumulative Remedies
The duties and obligations impased by these General Conditians and the rights and remedies availabie
hereunder to the parties hereto ar� in addition ta, and are noi to be construed in any way as a lirnitation
a�', any rights and remedies available to at�y or all of them which are otherwise imposed or ava�abie
by Laws or Regulatians, by special warranty or gn�.rantee, or by o�her provisions of the Contract
Dacuments. The provisions of tlus Paragraph will iae as effective as if repeated specifzcaIly nn the
Contract Documenfs in connection �ith each particular duty, obligation, right, and remedy to which
they apply,
CTTYOF FORT WORTI-I
STANDARDCONSTRUCTION SPECIFICAT[ON DDCllI1�N'TS
�CYI510[t: �i/1{�1
oo�aoo-E
GENEftAL CONDITION S
P age 63 af 63
17.04 Su�vival of Obligatians
All representat�ons, inde�cations, warranties, and guarantees made in, required by, or given in
accordance with the Contract Docuxnents, as wel� as all conti.n.ui�g obli�at�ons indicated in iGhe
Contract Documenis, wiIl suxvive final payrr�ent, cornpletion, and acceptance oi the Work or
termination or completion of the Contract oz• terinination of the serwices of Contractar.
17.05 Headings
Article and paragraph headings are inserted for convenience only and do not constituie parts of these
General Conditions.
CITYOF FORT WORTH
STANI�Al2_T7CflNS7RUCT]OA� SPECII'ECATiON DOCUMBN`CS
Revision: 8�131.�(�.1
00 73 00
SUPPLEiviEI�TARY CQA]DITIONS
Page 1 of 5
SECTIQN 00 73 00
SUPPLEMENTARY CONDITIONS
TO
GENERAL CONDITIONS
Supplementary Conditions
These Supplementary Conditions modify and supplement Sectian 00 72 64 - General Canditions, and other
provisions of the Contract Docurnents as indicated below. All provisions of khe General Conditions that a�re
modified or supplemented remain in full force and effect as so modified or supplemented. All provisions
of the General Conditions which are not so madified or supplemented remain in fulI farce and effect.
Deiined Terms
The terms used in these 5upplecnentary Condikions which are defined in the General Conditzons have the
meaning assigned to thera in the General Conditions, unIess specifically noted hereun.
Modi�cations �nd Supplements
The following are instructions thai modify or supplement speci�ic paragraphs in the General Conditions and
other Contract Doouments.
SC-3.03B.2, "Resolving Discrepancies"
P�ans govern over Specifications.
SC-4.01A
Easement limits shown on the Drawing are approximate and were pro�ided to establish a basis for bidding.
Upon recei�ing the fmaj easements descriptions, Contractor shall compare them to fhe lines shown on fhe
ConYract Drawings.
SC-4.O1A.1., "Availabiliky of Lands"
The following is a list of known ontstandirag right-vf-way, and/or easements to be acquired, if any as of
November 9, 2421:
�utstanding Right-Of-Way, andlor Easements to Be Acquired
PARCEL OWNEA
NUNIBER
None
TARGE�' DAT�
OF POSSESSION
'I'he Contractor understands and agrees that the daies listed ahove are estimates only, are noi guaranteed,
and do not bind the City.
If Contractar considers the fmal easements provided to differ materially from the representations on ihe
Contract Drawings, Con�ractor shall �aviihin five (5) Business Days and before proceeding with the Work,
notify City in writing associated with the differing easemeni line iocations.
CITY aE FORT WORTH 2O22 Bond Year 1—Confract 5
STANDARD CONSTRIICTTflN SPECIFICATION DOC[fMENTS City Pmject No. 102931
Revised Mazch 9, 2020
Q"0 73 QO
SUPPLEMENTARY CONDITIONS
Page 2 of 5
SC-4.01A.2, "Availability of Lands"
Utilities ar obstruction�s to be removed, adjusted, andlor relacated
The follawing is list of utilities and/or o�structians that have not been ��emoved, adj usted, and/or relocated
as of June 14, 2022.
EXPECTED L�TILITY ANI] LOCATION
OWNEA
None
TARGET DATE OF
ADNSTMENT
The Contractor understands ar�d agrees that the dates listed above are estimat�s only, are nat guaranteed,
and do not bind the City.
�C-4.O�A., "Subsurface and Physical Conditipns"
The fnllowing are reports of explorations and tests of subsurface conditions at the site of the Work:
A Laboratory Test for Street Coj•ing Project, Report No. CPN# 102931, dated 09/15/2�21, prepared by the
City of Fort Worth Capital Delivery Division/5oi1 Lab, a consultants to the City, providing additional
infoi7nation on street cot�es and subgrade lab tests.
The following are drawings of physical conditions in or relating to existing surface and subsurface
structures {except LTnderground I'acilities) which are at or contiguous to the site of the Work:
None
5C-4.06A., "Hazardoe�s Environmental Conditinns at Site"
The fallowing are reports and drawings vf existing hazardous environmental conditions known to the City:
None
SC-5.�3A., "Ceirti�cates of Ir�surance"
The entities listed below are "additianal insureds as their int�rest may appear" including their respective
officers, directars, agents and employe�s,
(I) City
(2) Consultaat: None
(3) Other: None
SC-5.04A., "Contractqr's Tnsut�gnce"
The lirnits of liability for the insurance r�quired by Paragraph GC-5.04 �haIl provide the following
coverages for not less than the following amounts or greater where required by laws and reguIations:
5.04A. Workers' Compensation, under Paragraph GC-3.Q4A.
�tatutory limits
Emplayer's liability
$100, 000 each accidentJoecurrence
$100, 000 Disease - each employee
,$500, 000 Disease - podicy limit
CiTY QF FORT WDRTH 2O22 Bond Year 1— Contract 5
STANBARD CONSTRUCTION SPECIPICATION DOCUMENTS Ciry ProjectNo. 1D2931
Revised ivtarch 9, 2020
ao �� ao
5iiPPLEMENTARY CONDITIONS
Page 3 of 5
SC-5.045., "Cantractor's Insurance"
5.04B. Comrnercial General Liability, under Paragraph GC-5,048. Cantractor's Liability Insui�ance
under Paragraph GC-5.04B,, which shalj be on a per project basis covering the Contractar with
minunum lirnits o�
$l,000 aaa each occurrence
$2,000,000 aggregaie limit
The policy musf have an endarsement (Amendment — Aggregate �,imits of Insurance) making the
General Aggregate Limits apply separately tv each job site.
The Commercial General Liahility Insurance polieies shali �rovide "X", "C", and "U" coverage's.
Veri�cation of such coverage must be shown in the R�marks Article of the Certificate of Insurance.
SC 5.04C., "Contractor's Insarance"
5.04C. Automobile Liability, under Paragraph GGS.��C. Contractar's Liability Insurance under
Paragraph GG5.04C., which shaII be in an amount not less than the following amounts:
(1) Automobile Liability - a commercial business policy shall pro�ide coverage on "Any Auto",
deflned �s autps pwtled, hired and non-owned.
�1, 000, 000 each aceident on a combined single limit basis, Split limits are acceptable if limits are at
least:
$250, 000 Bodily Injury per person /
$500, OOQ �odily Injury pe� accidenf f
�IOD, 000 Praperty Damage
SC-SA4D., "Contractor's Insurance"
The Coniractor's canstruction acti�ities will require its employees, agenis, su6contractors, equipment, and
material deliveries to cross railroad properties and tracks. None
The Contraetor shall conduct its operations on railroad properties in such a manner as not to interfere with,
hinder, ar obstruct the railroad company in any mannar whatsoe�er in the use or operation of it�/their trains
or ather property. Such operaiions on railroad pt•operties may require that Contractor to execute a"Right of
Ent�y Agreement" with the particular railroad company or companies involved, an�i to this end the
Cont�•actor should satisfy itself as to t1�e requirements of each railraad company and he prepared to exeeute
the right-of-en#ry (if at�y) required by a rai3road company. The reqnirements specified herein likewise rela�e
ta the Cantractor's use aiprivate andlor constructian access rnads crassing said railroad company's
properties.
The Cantractual Liability coverage r�yuired by Paragraph 5.04D of the Ge�eral Conditions shall provide
coverage far not less than tl�e fal�vwing amounts, issued by companies satisfactory to the Cit�r and ta th�
Railraad Company for a term that cantinues for sfl long as the Contractar's aperations and work cross,
occupy, or touch railroad property:
(1} Gez�eral Aggregat�:
(2} �ach Occurrence:
$Confirm Limits with l�ailroad
$Caniarm Limits with Railroacl
Required for this Contract X Naf required fa� this Contruct
With respect to the above outlinad insurance requirements, the following shall govem:
Cl'I`Y OF FORT Vi�ORTH
5Tr1NDARI3 CQNSTRUCTIOt�i SPECIFICATION DDCUMENTS
Revised Maroh 9, 2020
2D22 Bond Year 1-- Contract 5
City Project No. L02931
00 73 00
SUPFLEMENTARY CONDITIONS
Page 4 of 5
L Where a singIe railrpad company is invoIved, the Cant�actor shall prnvide one insurance policy in
the name af the rai�road company. However, if mare than one grade separation or at-grade
crossing is affected by the Project at entii•ely separate locations an the line or lines of the same
railroad campany, separate co�erage rnay 6e required, each in the a�nQunt stated abo�e.
2. Where m�re Y11an nne railroad company is aperating an f�ae sa�ne right-of-way ar where several
railroad co�npanies a�•e involved and operated an their own separate righ�s-of-way, fhe Confx•actar
may be required to provide separate insurance policies in the narne of each railroad company.
3. If, in addition to a grade separation or an at-grade crossing, othe�• work or activity is proposed on a
railroad company's right-of-way at a location entirely separate from the grade separation or at-
g�•ade crossing, insurance coverage €or this wark must be includeci in the policy covering the grade
separation.
4. Ii no grade separation is invalved but other work is proposed on a railroad company's right-of-
way, all such ather work may be covered ir� a single policy for that railraad, even thaugh the work
may be at two ar more separate locations.
No work or activities on a railroad company's property to be performed by the Contractar shaIl be
co�menced until the Cont�actor has fiarnished the City with an ariginal policy or policies of the insurance
for each railraad company named, as required aho�e. A11 such insurance must be approved by the City and
eaeh affected Railroad Company prior to the Contractor's beginning work.
The insurance specified abave must he carried until all Work to be performed on the railroad right-of-way
has been campleted and the grade crossing, if any, is no Ion�er used by tha Contractor. In addition,
insurance must be carried during alt maintenance and/or repair work performed in the �•ailraad right-o F way.
Such insurance must name the rail.raad coxr�pany as the insured, togather with any tenant or lessee of the
railraad company operating o�er tracks involved in the P�•oject.
SC-6.04., "Project Schedn[e"
Project schedule shall he tier 3 far the project.
SC-G.07., "Wage Rates"
The following is ti►e prevailing wage rate table(s) applicahle to this project and is pro�ided in the
Appendixes:
�OI3 Prevaiiing W�ge Rates {Heavy and Heghway Construct'ron Projects)
A eopy of the table is also available by accessing the Ciry's website at:
httras:Il�DqS.fo rtwaarthtexas.�ovlProi ectResaurcesl
You can access the file by folIawing the di�ectory path:
OZ-Construction Documents/Specifications/Div00 — General Conditions
SG6.09., "Permits and Utilities"
SG6.09A,, "Canttactor obtained permits and licenses"
The following are lcriown permits andlor licenses required by the Contract to be acyuired by the Cont;•actor:
STREET USE PERMIT
SW3P
�C-6.09B. "C�ty obtained permits and licenses"
CITY OF FORT WORTH 2D22 Bond Year 1— Confract 3
STAND.�IRD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjectNo. 102931
Revised Marcla 9, 2020
00 73 00
SUPPLEMENTARY CO3+IDITIONS
Page S of 5
The following are known permits andlor licenses requit�d by the Con�ract io be acquired by the City: None
SC-6.09C. "Dutstanding permits and licenses"
The fallawing is a list of kr►own outstanding permits andlor licenses to be acyuired, if any as of November
I0, 2D2I ]:
Oaistanding Per�nits and/or Liceuses to Be Acquired
OWNER PERMIT OR LICENSE AND LOCATION
None
SC-7.02., "Coordination"
TA1tCiET DA'T'E
OF POSSESSION
The individuals or entities listed below have contrac�s with the City for the perFormance of other work at
the Site:
� Vendor
� Noz�e
�
Scope of Work
SC-�.Ol, "Commanications to Contractor"
None
Coordination Anthority
SC-9.01., "City's Project Maaager"
The City's Proj�ct Manager for khis Coni�-act is Greg Robbins, P.�., or hisll�er successor pursuant to
written notification from the Director of Transportafion and Public Works.
SC-13.03C., "Tests and Inspections"
None
SG1G.O1C.1, "1Vlethods and Procedures"
None
END OF SECTION
Revision Log
DATE NAM �
1/22/2016 F. Gri�n
SUMMARY OF CWANGE
SC-9.01., "Ci#y's Project Representati�e" warding changed to Giiy's Pro�ect
Manager.
3/9/2020 D.V. Magana 5���'Q7, Updated the link such that fiies can be accessed via the City's
website.
CITY OF FORT WORTH 2U22 Sond Year I— Contract 5
STEIND,4RD CONSTRi1CTIQN SPECIFICATIdN DOCiJMENTs City ProjecC No. 102931
Revised March 9, 2020
O111D0-1
SUMMARY OP WQRK
Page 1 of 3
sECTlorr o� ii ao
SUMMARY OF WORI�.
PART 1- G�NEI2AL
f �i �.Ylhi h� I�;�'1
A. Sectio�� Includes:
l. Summary of Work to be performed in accordance witn the Contract Documents
B. Deviatioils from. this City af Fort Worth Standard Specification
1. None.
C. Related 5pecif cation Sections include, but are not necessariIy limited to:
1. Division 0- Bidding Requirements, Contract Forms, and Conditions oftl�e Cantract
2. Division 1- Genez•al Requiremeiits
1.2 PRICE AND PAYMENT PROCEDUR,ES
A. Measurement and Payment
l. Wark associated with this Item is consic�ered subsidiary to the various ite�ns bid.
No separate payment will be aIlowed for this Ite�n.
1.3 REFERENCES [NOT US�D]
�.4 ADMIlVISTRATIVE REQUIl�M�NTS
A. Work Covered by Contract Documents
1. Worlc is to incIude fu�•nishing alI labor, materials, and equiprnent, and performing
all Warlc necessary for this construction projec� as detailed in the Drawvings at�d
Specifieations.
B. Subsidiazy Woz•k
Any and alI Work specifically governed by documentazy requirements far the
project, such as conditions imposad by the Drawizags or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a iypical unit bid item included on the standard bid item Iist, then the itezn sl�all
be considered as a subsidiary item vf Work, the cost of which shall he incIuded in
the price bid in the Proposal for various bid itetns.
C. Use of Premises
1. Coardinate uses of premises under direction of the City.
2. Assume full respansibility for protectian and safekeeping of materials and
equipment stored on the Site.
Use and occupy only portioaas of the public strcets and alleys, or Qther public places
or other rights-of-way as provided ior in the ordinances of the City, as shawn in ti�e
Contract Dacuments, ar as may be speei�cally authorized in writing by the City.
a. A reasonable arnount of #aols, materials, and equipment for canstruction
purposes may be stored in such space, but no nnore than is necessary to avoid
delay in the constructian operatians.
CITY QF FORT WORTH 2O22 Bond Year l— Contract 5
STAND�II2D CONSTRiTCTION SPECIFICATION DOCtlP�IENTS City ProjectNa. 102931
Revised December 2D, 2012
oi t� oo-z
su�n�v aF woxx
1'age 2 of 3
b. Excavated a�1d waste ma#erials shall be stored in such a way as t�ot to interfere
with the use of spacas that may 6e designated to be left free and unobstructed
and so as not ta incoa�veniance occupants of adjacent property.
c. If the street is occupied by railroad tracks, the Work shaIl be carried on in such
manner as not to infierfere with the operation of the raiIroad.
1) All Wark shall be in accordance with railraad requirernents set forth in
Division 0 as we11 as the railroad permit.
D_ �Vork within �asements
1. Do not en�er upon private property for any purpose withn�.it having previously
obtained p�rmission from the owiler of such property.
2. Do not store equipment Qr material on private properly unless and until the
speeified approval of the property owner has been secured in writing by the
Colitractor and a copy furnished to the City.
3. Unless speci�caIly pro�vided otherwisa, clear alI rights-of way or easements of
obstructians which must be removed to make possible proper prosecution of the
Work as a part oithe project construction aperations.
4. Preserve and use every precautian to pre��nt damage to, all trees, shrubbery, planfs,
lawns, fences, eulverts, curbing, and all other types of structures or improvements,
to all water, sewer, and gas lines, ta all conduits, overhead pole lines, ar
appurtenanees thereof, including th� const�uction of temporary fences and to all
other pub�ic or private property adjacent to the Work.
5. Notiiy the proper representatives of the owners or occupants of the public ar private
lands of interest in lands which might 6e af%cted by tlle Work.
a. Such notzce shall be made at least 4$ hours in advance of the beginning ofthe
Work.
b. Notices shall be applicable to both pu�Iic and private utility companies and any
corporation, campany, indir�idual, or other, either as owners or occupants,
whose land or interest in land might be affected by ihe Work.
c. Be responsible for all damage or injury to property of any character resulting
fram any act, omission, n.eglect, or mi5conduct in the manner or r�ethod or
execution of the Work, or at any time due to defective work, material, or
equiprnent.
6. Fence
a. Restore all fences e�countered and removed dwring construction oithe Project
to the original or a be�er than original condition.
b. Erect temporaty fencing in place af the fencing removed w�enever the Work is
not in progress a.nd when the site is vacated overnight, andlor at all times to
provide site security.
c. The cast for al1 fence work within easeznents, including remaval, Eemporary
closures and replacement, shall be subsidiary to the various items bid in tha
pro�ect proposal, unIess a bid item is specifically provided in the proposal.
CITY OF FQRT WORTH 2D22 Sond Year [— Contract 5
STA1VDAitD CONSTRUCi'iON SPECIFICATIQN bOCU1VI�NTS City ProjectNo, 102931
Revised becember 20, 2012
ai u o0-3
SUMMARY OF WORK
Pagc 3 af 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBNIITTALS/INFORMATIONAL SIIBMiTTALS [N�T USED]
1.7 CL05EOUT SUENIITTALS [NQT U�ED]
1.8 MAINTENANCE MATERIAL SUBMTTTALS [NOT USED]
1.9 QUALITY ASSiTRANCE [NOT USED]
110 DELIVERY, STORAGE,IIND AANDLING [NOT USED]
1.11 FIELD [S�TE] CONDITIONS [NOT USED]
11� WARRANTY [NOT USED]
PART � - PRODIICT� [NOT U$EDj
PART 3 - EXECUTION [NOT US�D]
END OF S�CTION
Revision Log I
DATE �[AM� SUMMARY OF CHANGE I
C1TY QF FORT WORTH 2U22 Hond Year 1—Contract 5
STANDAItD COIVSTRUCTIDN SPHCIFIGATION �OCUMENTS City Projeet No. 102931
Revised decam6er 20, 2D12
012500-1
Si1B5TITUT[4N PRDCEDUR�S
I'age 1 of 4
SECTrON Ol �5 00
SLJBSTITUTIQN PROCEDURES
PART 1- GENE�tAi,
L1 SUlV1MARY
A. Sectio� Includes:
The procedure far requesting the approval of substitutioi� of a product that is not
equivaIent to a product which is specified by descriptive or performance criteria or
defined by reference to 1 ar more of the following:
a. Na�ne of manufacturer
b. Name of vendor
c. Trade name
d. Catal�� number
2. Substitutions are not "or-equals".
B. Deviations from �his Gity of Fort Worth Standard 8pecifiEatiox�
1. None.
C. Related Speci�ication Sections include, but are z�ot �aecessa�rily lianited to:
1. Division 0— Sidding Requirements, Contract Forms and Conditivns of t11e Contract
2. Di�isian 1— General Rec�uirements
1.2 PR.ICE A.ND PAYMENT PROCEDURE,S
A. Measurement and Payment
l. Work associated with this �tem is cansidered subsidiary to the variaus items bid.
No separate payment �vill be al3owed for this Item.
1.3 R�FER�NCES [NOT US�D]
1.4 ADMINISTRATIVE REQi]Ilt.EMENTS
A. Request for Substitution - General
1. Witl�in 3a days after arvard of Coniract (nnIess noted otherwise), the City will
consider formal requests from Contractor fc�r substitution of products in place of
those specified.
2. Certain types af equipment and kinds of material are described in Specifications by
rneans of references to names nf rnanufacturers and v�ndors, trade name�, or
catalog num�ers.
a. When �is method of speci�'ying is used, it is not intended to exclude from
consideration oth�r products bearing other cnanufacturer's or vendar's nannes,
trade nannes, or catalog numbers, provided said products are "or-eyuals," as
determined by Ciiy.
3. Other types of equipment aaxd kizads af material may be acceptable substitutians
under the fallowing canditions;
a. Or-equals are unavailable due to strik�, discontinued production of products
meetiz�g speci�ad requirements, or other factors beyond control of Confiractor;
or,
CI'TY pF FQR'� WOKTH 2D22 Bond Year 1— Confract 5
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjectNo. 102931
Revisad July I, 20i 1
a�zson-z
suss��Tv�rrorr �xoc�nuz�Es
Page 2 af 4
b. Contractor proposes a cost and/or time reduction incentive to the City.
1.5 SUBMITTALS
A. Sa� R�quest for Substitution Form (attached)
B. Proced�re %r Requesting Substitution
1. Substitution shall be considered anly;
a. After award of Contract
b. U:nder the conditions siaied herein
2. S�bmit 3 copies of each written request for substitutian, inclnding;
a. Documentation
1) Camplete data substantiating compliance of proposed substitution with
Contract Dacuments
2) Data relating to changes zn coilstruction schedule, when a reductiail is
proposed
3) Data relating to changes in cost
b. For products
1} Product identificati�n
a) Ma33ufachu-er's name
b} Telephone number and representative contact name
c) Speci�cation Saction or Drawing reference Qf ari�inally speci�ed
product, including discrate name or tag number assigned to original
product ii� il�e Co�atract Docu�nents
2) Manufacturer's literat��re clearly i�narked �o show cornpliance of proposed
product with Contract Docun�ants
3) Itemized comparison of original and proposed proc3uct addressing product
cl�aracteristics including, but not necessarily limited ia:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrieal or i�iechanical requirements
4) Produci e�perience
a) Location Qf past prajects utilizing produet
b) Na�e and t�lephonc number o�persons associated wrth r�ferenced
projects knowledgeable concerning proposed product
c) Available field data and reports associated with proposed product
S) ,Samples
a) Provide at request of City.
b) Sarnples become the property ofthe Ciiy.
c. For construction methods:
1) Detaiied description of proposed inethod
2) Illustration drawings
C. Approval or Rejection
1. Writt�n approval or rejection af substitu�ion given by tha City
2. City reserves the right to require proposed product to comply with color and pattern
of specified product if necessary to sec�re design intent.
3. In the evant the substitution is approved, the resulting cos� and/or time reductian
wilI be documented by Change Order in accordance with the General Conditions,
CITYOF FORT WORTH 2O22 Band Year 1—Cantract 5
STANDAI2D GONSTRUGTIQN SPEC3T"ICATIQN DOCUMEPfTS City Project No. 102931
Revised July 1, 2011
012500-3
SUBSTITUTIOt�i PROCEDURES
Page 3 of 4
4. No additional cantract iime will be gi�ven for substit�tion.
S. Substitution will be rejected if:
a. Submittal is not through the Conb•actor witlt his starnp of apprnval
6, Request is not made in accordance with this Specification �ection
c. In the City's opinion, acceptance will require substantial revision ofthe original
design
d. In the City's opinion, substitutian will not perform adequately the function
consistent with the design intent
1.6 ACTION SUBNIITTALS/INFORMATIONAL SUBMITTALS [NOT IISED]
1.i CLOS�OUT SUBMITTALS [NOT 'CTS�D]
1.$ MAINTENANCE MATERIAL SUSNIITTALS [NOT US�D]
1.9 QIIALITY ASSiIR�NCE
A. In making request for substitution or i� using an approved producfi, the Contractor
represen#s that the Contraetor:
1. Has investigated proposad product, and has deterzxzined that it is adequate ar
superior i» alI respeets to ti�at specified, and that it will perform function %r which
it is intended
2. Will provide same guarantee far substitute itern as for product specified
3. Will coordinate installation of accepted substitution into Work, to iucIude building
modifications if necessary, making such changes as may ba required for Work to b�
complete in a�l respects
4, Waives all claims for additional costs related to subs�itution which subsequently
arise
1.10 D�LIVERY, STORAGE, AND IIANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS jNOT USED]
1.12 WARItANTY �NOT USEDI
PART � - PRODUCTS [NOT USED]
PART 3 - EXECiTTION [NOT USED�
END OF SECTION
Revision Log
DATE NAME
CITY OF FORT VVDRTH
STAI�€DARD CONSTRiICTION SPfiCLFICATION DOCUMENTS
Revised July 1, 2D31
SUMMARY OF CHANGE
2022 Bond Year 1— Contract 5
CityProjectlVa, 1D2431
ai z5 00 - a
5l1BSTITUTION PROC�DURES
Page 4 af 4
EXFIIEIT A
REQIT.GST F�R SUBSTITLTTION F�RM:
TO:
1'ROJ�ECT: DATE:
We hereby submit �or your considea•ation the follovving product instaad nfthe specified item for
tl�e above project:
SECTIDN PARA.GRA.PH SPECIFIED ITEM
Proposed Substitu�ion:
Reason for �ubstih�tion:
Include coinplete info�•mation o�� cl�anges to Drawings and/or Speci�cations which proposed
substitution will require for its proper installation.
Fill in Blanks Belaw:
A. Will the undersigned eontractor pay for clzar�ges tc� #h� building desig7�, including engineeri�ig
��d datailing casts caused by the ree�uested substitutiaz�?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. DifFerences in product cost or product delivery time?
E. ManUfacturet`s guarantees of the proposed and specified items are:
Equal Beiter (explain an aitachment)
The undersigned sta.tes that the function, appearance and quality are equivalent ar superior to the
speci�ed ztezn.
Submitted By: For Use by City
Signature
as noted
�'irrn
Address
Dafe
Telephone
For Use by City:
Approved
City
�, Recammended � Recornrriended
Not recommended Received late
By —
Date
Remarks
Date
Rej ected
CITY OF FORT WORTH 2O22 Bond Year 1—Cantract 5
STANbAI2U CQN$TRIiCTIpN SPECIFTCATION T?dCUMCNTS City ProjectNo, 1p2931
Reaised duly l, 2U11
O1 31 19 - I
PR�COi�5TRi7CTI0IV MEETI�IG
Pagc 1 af3
SECTION 0131 l.9
PRECONSTRUCTI4N IVfE�TING
PARTI- GENERAL
Ll SiJMMARY
A. Section Includes:
l. 1'rovisions for ihe preconstructian meeting to he held priar to the start of Work to
clarify constiruction contrac� administration procedures
B. Deviations from this City of Fort Worih Standard Specification
l. None.
C. Related Specification Sections include, but �'e not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Farms and Canditions of the Contract
2, Division I— Ge�eral Requirement,s
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Itexaa is considered subsidiary to fhe various items bid.
No separate payment will be allowed for tius Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Aitend preconsiruction me�ting.
2. Representatives of Contractor, subcontractors and suppli�rs attending meetings
shall be qualified and authrrrized to act on behalf of tlie entity each represents.
3. Meeting administered by City may be tape recorded.
a. Ifracorded, tapes wzll be used to prepare minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A precon�truction meeting wiIl be heId within 14 days after the e�ecution of the
Agreement and before Work is star�ed.
a. The zne�ting will be scheduled and administered by the City.
2. The Project Representative wi11 praside at the meeting, prepare the notes of #he
meeting and distribute copies of same to all participants who so request by fully
completing tha atten.dance farzn to ba circulated at the beginning of the meeting.
3. Attendance shall include:
a. 1'roject Representative
b. Contrac�ar's project manager
c. Contractor's superintendent
d. Any subcontractor ar supplier representati�es whom the Contraetor may desire
to invite or the City may request
CITY OP PpRT WORTH 2O22 Band Year 1— Contract 5
STA�VDARb CON57'KUCTION SPECITICATION DDCiJMENTS City Projectt�o. 142931
Revised August i7, 2D12
D13119-2
PItECONSTRUCTI�N MEETING
Pagc 2 of 3
a. Other City repcesentatives
£ Others as appropriate
4. Construction Sch�dul�
a. Prepaxe baseline constructiatl schedule in accorda�lce wifi.h Section Ql 32 16 anc�
provide at Preconstruction Meeting,
b. Ciiy wi[l notify Contt'actar of any schedule changes upon Notice of
Preconstructiori Meeting.
S. Preliminary Agenda may include:
a. Introductioil of Project Personnel
b. G�neral Descrip�ion of Project
c. Status of right-of way, utility c�earances, easements or other pertinent permits
d. Contractor's work plan and scl�edule
�. Contract Time
£ Notice to Proceed
g. Canstruetion Staking
h. Progress Payments
i. Exta�a Work and Change Order Procedures
j. Fieid Orders
k. Disposal Site Letter far Waste Material
1. Insurance Renewals
m. Payrall Certzfication
ii. Material Certifiications and Quality ControI Testing
o. Public Safet}+ and Can�enience
p. Documentation of Pre-Construction Conditions
q. Weekend Work Notifcation
r. Legal HoIidays
s. Trench �a%ty Plans
t. Canfir�ed Space Entr� Standards
u. Coordination with the City's representati�e for nperatians af �xisting water
systezans
v. Storm �Vater Pollution Prevention Ylan
w. Caardination with ot�ler Contraciors
x. Early Warning System
y. Contractor Evaluation
z. S}aecial Conditions appiieab�e to tlie proJect
aa. Damages Clauns
bb. Submittal Procedures
cc. Substitution Procedures
c�d. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MIWBE or MBE/SBE pracedures
hh. Final Acceptance
ii. Final Pa}nnent
jj. Questians or Comments
CITY OF FpRT WQRTH 2O22 Bond Year I-- Cantract 5
STANDARD CQNSTRUCTION SP�CIPICATION DpCUMENTS City Project No. 102931
Revised August 17, 2012
O1 31 19 -3
PRECONSTItUCTIDN MCETfNG
Page 3 af 3
1..5 SiTBMITTALS [NOT USED]
1.6 ACT�ON SUBM�TTALSIINFORMAT�ONAL SUBNIITTALS [NOT USED]
1.7 CLOSEOUT SUBMTTTALS [NOT USED]
1.8 MAINTENANCE MAT�I2TAT� SUBMITTALS [NUT iTSED]
1.9 QUALITY AS�i]ILANCE [NOT USED]
1,10 DELIVERY, STORAGE, AND IIANDLING [NOT USED]
l.11 FIELD [SITE] CONDI.TIONS [NOT iTSEDj
1.1� WARRANTY [NOT USED]
PART � - PRODUCTS [NUT USED]
PART 3 - EXECUTYON [NOT USED]
END OF SECTION
IRevision Log
I DAT� NAME SUMMARY OF CHANG�
CITY QF' FORT WORTH 2O22 Band Year 1— Confract S
STANDARb CONSTTtl1Ci'ION SPECIFICATI03d DOC[1MENT5 City Ptoject No, 102931
Revised August 17, 2U12
Q13120-1
PRO]ECT MEETINGS
Page 1 of3
SECTION 013120
PROJECT ME�TINGS
PART1- GEN�RAL
1.1 SUIVIMARY
A. Section Includes:
1. Provisions for praject yneetings il�roughout fhe construction period ta enable arderly
review of the progress of the Wark a.nd to provide for systematic discussion of
patential problems
B. Deviations this City of Fort Worth StaMdard Specificatinn
l. Nane.
C. Related Specification Sections include, b�t are not necessarily Limited to:
1. Division 0— Bidding Requirements, Contract Forms and Canditions of the Contr�ct
2. Divisian 1— G�n�ral Requiremenis
1.2 PRYCE ANll PAYMENT PROCEDUI2ES
A. Meas�rement and Payment
1, Wark associated with this Item is considered subsidiary ta the various items bid,
Na separate payment will be allowed %r this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Schedul�, attend and administer as specified, periodic progress inaetings, and
specially called meetings throughout progress of tl�e Work.
2. Representatives oiContractor, subcontractors and suppliers attendingmeetuigs
sl�all be quaiified and authorized to act on behalf ai �e entity eacl� represents,
3. Meetings administered by City may be tape recorded.
a. If recard�d, tapes r�viIl b� used to prapare minutes and reiained by City far
future reference.
4. Meetings, in addition to those specified in this Section, may be held when requested
by the City, Eugineer ar Contractor.
B. Pre-Constructzon Neighbarhaod Meeting
1. After the execution of the Agreernent, but before construction is allowed ta begin,
attend 1 Public M�eting with affected residents to:
a. Present projected schedule, including construction sta��t date
b. Answer any construction related questians
2. Meeting Location
a. Location o�meeting to be determined by the City.
3. Attendees
C1TY OF FORT WORTH 2Q22 Band Year 1— ContracC 5
STANDARb CONST12iJCTION SP�CITICATIO�1 DOCUM�NTS City PrQjecf Na. IU2J31
Rcvised Ju[y 1, 2D11
013120-2
PI2QIBCT MEETINGS
Page 2 oF3
a. Gontractor
b. Project Representative
c. Other City representatives
4. Meeting Schedule
a. In general, the neighborhood meeting will occi�r within the 2 weeks following
the pre-construction conference.
b. In no case wil� construction he allowed to begin until this meeting is held.
C. Progress Meetings
1. Formal project coordination ineetings wi11 be held periodical�y. Meetings will be
scheduled and administered by Project Representative.
2. Additional progress meetings to discuss specific topics wiIl be conducted on an as-
needed basis. Such additionaI �r►eetings shall include, but not be Iimited to:
a. Coordinating shutdowiis
b. Installation o£ piping and equipment
c. Coorciination between ather construction projects
d. Resoiution o�' construction issues
e. Equipment approval
3. The Project Representative will preside at prograss meatirigs, prepare the notes of
the meeting and distribute copies vf the same to al] participants who so request by
fuIly completing the attendance form to be circulated at the beginning of each
meeting.
4. Attendance shall include:
a. Contractor's project manager
b. Contractor's superintendent
c. Any subcontractnr ar suppIzer reprasentatives who�x�. the Contaractax may desire
to invite or the City may request
d. Engineer's representatives
e. City's representatives
f Others, as requested by tlae Project Representative
S. Preliminary Agenda �nay incIude:
a. Review of Work progress since previous meeting
b. FieId observations, proble;ns, conflicts
c. Items which impeda constructian scheduie
d. Re�iew of off-site fabrication, delivery schedul�s
e. Ra�+i�vcr of eonstruction interfacing and sec�uencing requirements with other
construction cantraots
f. Corrective measures and procedures to regain projectcd schedule
g. Re�isions to construction schedule
h. Prog7ress, schedule, during succeeding Work period
i. Coordinatian of schedules
j. Review submittal scl�edUles
k. Maintenance of quality standards
1. Pending changes and substitutions
m. Review proposed changes for:
1} Effect on construction schedule and on completian date
2) Effec� on other contracts ofthe Project
n. Review Reeord Documents
a. Review monthly pay req�est
CITY OF FORT WORTH 2O22 Bond Year l— Conttact 5
STAAIDAILD CONSTRUCTION SFECIFICATIDN DOCl1MENT5 City Project No. 102931
Revised luly 1, 2D1 L
013120-3
PROJECT ME�TIIdC`iS
Page 3 of 3
p. Review status of Requests for Information
6. Meeting Schedule
a. Progress meetings will be held periadically as deterrnined by the Project
Representative.
1) Additianal meeiings nnay be held at the request of the:
a) C ity
b) Engineer
c) Contractor
7. Meeting Location
a. The City will establish a nneeting location.
1) Ta the extent practicable, meetings will be held at the Site.
1.5 SUEMITTALS [NOT USED]
1.6 ACTYON SL]liNIITTALS/INFORMATIONAL SUSMTTTALS [NOT USED]
1.7 CLOSEOUT SUBNIITTALS jNOT USED]
1.8 MATNTENANCE MATERiAi, SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NUT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT U��D]
1.11 FIELD [SITE] CONDTI.'�ONS [NOT USED]
1.1� WARR.ANTY [NOT USED]
PART 2 - PRODUCTS [NaT USED]
PART 3 - EXECUTION [NOT USED]
END OF S�CTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 2a22 Bond Year 1— Conhact 5
STANDARI7 CONSTRUCTION SPE,CIFICATION DOCUMENTS City Projeat Na. 102931
Re�ised 7uty 1, 261 I
0 i 3216 -1
CQiVSTRUC`PION PROGRESS SCHEDULE
Page 1 of 1D
7
SECTION 01 3� 16
CONSTRUCTION SCHEDULE
3 PART 1- GENECtAL
4 1.1 Si]MMARY
5 A. Sectian Includes:
6 I. General requfrements for the preparation, submittai, updating, status reparting and
7 managemeni af the Construction Pragress ScheduIa
H 2. Specific requirements are presented in the City of Fort Worth Schedula Guidance
9 Doct�ment
14
lI
B. Deviatians from this City of Fort Worth Standard �pecification
1, None,
12 C. Rela�e� Specification Sections include, but are not necessariIy limited to:
13 1, Divisian Q— Bidding Requirements, Contract Farms and Condrtions of the Contract
14 2. Divisian 1— General Requirements
15
16
17
1$
I9
20
21
22
23
24
25
26
27
2$
29
30
D. Purpose
The City of Fort Worth (City) is committed to delivering quality, cost-effc;etive
infrastructure to its citizens in a timely manner. Akey tool to achieve this purpose is a
properly siructure� schedule with accurate updates. This s�pports effective manitaring
of progress and is input to critical decision rr�al�ing by the project manager throughout
tha life of the project. Data from #he updated project scheduIe is utilized in stahas
reporting to various �evels of the City arganizatian and the citizenty.
This Document complements the City's StandardAgreement to guide the constaruction
eontractor {Conlractor) in preparing and submitting aceeptable scheciules for use by the
City in project delivery. The expectation is the performance of the work follows the
accEpted schedule and adhere to the contractual timeline.
The Contractor will designate a qualified representative (Project Scheduler) responsible
for developing and updating the schedule and preparing status reporting as required by
the City.
31 1.� PRiCE AND PAYMIIVT PROCIDURE.S
32 A. Measurer►�ent and Payment
33 1. Work associated with this Item is considered subsidiary to the various �tems bid.
34 No separate paym�nt wiIl be allowad far this Item.
35 2. Non-compliance with this specif"ication is grounds for Ciry to withhold paytnent of
36 the Cnntractar's itivoices until Contractar achieves said compliance.
37 1.3 REF'EItINC ES
38 A. Project Schedules
CITY OF FORT WORTH
S'�AN[7ARD CONSTRUGTION SPECIFICATION DOCUMEN�3
Rc•vised August 13, 2021
zaz2 sana Y�� i-- coo��r s
City Projact No. 102431
01 32 16 -2
CONSTRUCTION PROGRE55 SCHEDULE
P age 2 of 10
1 Fach project is represented by City's master project schedule that enconnpasses the
2 entire scape of activities envisioned by the City to properly deliver the work. When the
3 Ciiy contracts with a Contractorto perform construction of the V�ork, the Contracfior
4 will develop and maintain a scheduIe for their scope af work in aIignment with the
5 Cify's standard schedule requirements as dafined herein. The data a�nd informatian of
6 each such schedule will be leveraged and become integral in ihe master praject
7 schedule as deemed appropriate by the City's Project Conirol Specialist and appro�ed
8 by the City's Project Manager.
9
10 1. Master Project Schedule
l 1 The master project schedule is a holistic representation of the scheduled activrties
12 and m�estones for the total project and be Crrtical Path Method (CP1Vn bas�d. The
13 Czty's Project Manager is accountable for oversight ofthe development and
14 maintaining a master pra�ect schedule for each pmject. VVhen the City contracts for
15 the design andlor construction of the project, the master project schedule wiIl
l6 incorporata �lements ofthe Design artd Canstruction scheduIes as deemed
17 appropriate by the City's Praject CnntroI Specialist. The assigned CiYy Project
l8 Control Specialist creates an.d maintain.s the master project schedule in P6 (City's
19 sc�eduling software).
20
21
22
23
24
25
26
27
28
29
3a
31
32
33
34
35
3b
37
38
39
40
41
42
43
�
45
46
47
48
49
2. Construction ScheduIe
The Cozatractor is responsible for developing and maint.�ining a schedule for the
scope of the Contractor's contractual requirements, The Cantractnr will issue an
initial schedul� for reviever and acceptance by the City's Project Controi Specialist
and the City's Project Manager as a�aseline scheduIe for Contractor's scope of
work. Contractorwill issue curren.t, accurate updaies of their schedule (Progress
Schedule} to the City at the end of each month throughout the life of their work.
B. Schedule Tiers
The City has a portfolio of projects that r�ary widely in size, complexity and content
requiring different scheduling to e£fectively deliver each project. The City uses a
"tiered" approach to align the proper schedule with the criteria for each pro�ect. The
City's Proj�ct Manager determines the appropriate schedule tier for each project, and
includes that designation and ihe associated requirements in the Coniractor's scop� of
work. The fallawing is a summary of ti�e "tiers".
1. Tier 1: 5mall Size and Short Duration Project (design not reyuired)
The City develops and maintains a Master Project Schedule for the }�roject. No
sc�edule submittal is required from Contractar. Ci�ty's ProJect Con#rol Specialist
acquires any necessary scheduIe status data or information thraugh discussians with
the respective party on an as-needed basis.
2. Tier 2: �mall Size and Sh.ort to Medium Duration Project
The City develops and maintains a Master Project Schedule for the }aroject. The
Contractor identiiies "start" and "finish" milestone dates on key elements of their
work as agreed vrrith the City's Project Manager at tha kickoff af the�r work effort.
The Contractor issues to the Ciry, updates to the "start" and "finish" dates £or such
miiestones at the snd of each rnanth thraughout the life of their wark an the project.
3. Tier 3: Medium and Large Size and/or Complex Projects Regardl�ss of Duration
CiTY OF FORT WORTH
STANDFIRD CONSTRUGTIDA] SPECIFiCATION DQCi]MENTS
Itevised August 13, 2021
2022 Sond Year l— Contract S
City ProjectNo. 102931
01 3216 -3
CONSTRUCTIONPROGRESS SCHEDULE
Paga 3 of 10
1 The City develo.ps and mairrtains a Master Praject Schec�ule for t1�e project. The
2 Contractor develops a Baselinie Schedule and maitatauns the schedule of their
3 respective scope af work on the project at a level of deta.il (generally Leve13} and in
� aligr�ment with the WBS structure in Section 1.�.H as agreed by the Project
5 Manager. The Contractor issues to the City, updates of their respecti�e schedule
b (Progress Schedule) at the end of each month throughout the Life of their r�r ork on the
7 project.
8 C. Schedule Types
9 Project deli�ery far the City utilizes two types of schedu�es as noted below. The City
10 develops and maintains a Master Pro�ect Schedule as a"baseline" schedule and issue
11 monthly updates to the City Projeet Manager (end of each month} as a"progress"
12 schedule. Tha Contractor prepares and submi�s eaeh schedule type to fulf'ill their
13 cantractual requirements.
14
15
I6
l7
]8
19
2b
21
22
23
24
25
26
27
1. Baseline Schedule
The Contractar deveiops and submits to fhe City, an initial schedule for their scope
of wark in alignmen:t with t�is specification. �nce reviswed and accepted by the
City, rt becomes the "Baseliae" scheduie and is the basis against which ail progress
is measured. The baseline scheduIe wili be updated when there is a change or
addition to the scope of work impacting the duration of the work, and only after
rec�ipt of a duly authorized cha�ge order issued by th� City. In th� event progress i�
significantly bahind schedule, the City's Project Manager may author�ze an update
to the baseline schedule to facilitate a more practical evaluation ofprogress. An
exarnple of a Baseline Schedule is provided iu�a Speci�cation O1 32 l 6.1
Construction Project Schedule Baseline Example.
2. Prog�ress Sched�ale
28 The Contractor updates their schedule at the end oi each month to represent the
29 pragress achieved in t�e wark which includes any impact from authorized changes
30 in the work. The updated schedule must accurately reflect the current status of th�
31 work at that point in titne attd is referred to as the "Progress Scheda�e". The Gity's
32 Project Manag�r and Project Control Specialis�t reviews and accepts each progress
33 schedule. zn the event a pragress schedule is deemed not acceptable, the
34 unacceptahle issues are identified by the City within 5 working days and the
35 Con�ractar must pro�ide an acceptab�e progress schedule wifhin 5 working days
36 after receipt of non-acceptance notification. An exampte of a Progress Schednle is
37 pro�ided in Speci�ication O1 3216.2 Construction Project Schedule Progress
38 E�ample.
39 D. City Standard Schedule requirements
40 The follot�ving is an overview of the methodology for develqping and maintaining a
4l schedule for deli�ery of a project.
CITY QF FORT WORTH 2O2� Bond Year 1— Contract 5
STAND?.IiD CONSTRUCTION SPECIFICATION DOCUMEI�!'TS City ProjectNo. 102931
Revised August 13, 2D21
01 32 lb -4
CONSTRUCTIONPROGR�SS SCHCDULE
Page 4 of lD
1
2
3
4
5
6
7
8
9
ia
11
12
13
14
15
16
17
1$
19
20
21
22
23
24
25
26
27
2$
29
30
31
32
33
34
35
36
37
38
39
�a
41
42
43
44
45
46
47
Sohedul� Framework - The schadule will be basad on the defined scope of rvork
and follow the {Critical Path Methodology) CPM nnethod. The ContractQr's
schedule will align with the reyuiremen�s of this specification and wiIl be cast
loatled to retlect iheir plan for ex�cution. Compliance with cost loading can be
pro�ided with traditional cnst loading of line ite�ns OR a prajected cost �r
month for the project when the initial schedule is submitted, ug�ated on a
quairterly basis is �iguificaut e�auge is a�uticipated. Ovexall sckzec�ule duxatian
w ill align vu ith the contractual rec�uirements for the respective scope of work and be
r�fl�ctad in City's Master Project Schedule. The ProjactNumber andName of the
Proj�ct is required on each schedule and rnust match the City's project data.
E. Scl�edule File Name
All schedul�s submiii�d to the City for a prnject will have a fil� name that begins r�vith
the City's projeca nu�nber followed by the name of theproject followed by baseline {zf
a ba.seline schedule) or the year and montli (if a progress scheduIe}, as shown below.
• Baseline SchedUle File Name
Format: Gity ProjectNumber ProjectNama Baseline
Exam�le: 101376 North Montgomery 5treet IIMAC B�ase�ine
• Progress ScheduleFileName
Format: City Pro�ect Number Project Name I'YYY-MM
Exa�nple: 101376 Nortl� Mantgomery Street HMAC 2018_01
e Project Schedule Progress Narrative File Name
Format: City ProjeciNumber ProjectName PN YYYY-MM
Exampla: 101376 North Montgomery Streat HMAC PN 2018 01
F. Schednle Templates
The Contracfior will utilize the relevant sections fro�n the City's tamplates provided in
Lne City's docuznent management system as the �asis for ereati�g their respective
project schedule. Specif'ically, tk�e Cantractor's schedule will align with the layaut of
the Construction section, The te�nplates are identified by type of proj�ct as noted
below .
• f�l"t0P18�S
e Aviatian
a Neighborhood Streets
� Sidewalks (later)
o Qviet Zanes (later)
� Street Lights (later}
� Iniersection Improvernents {later}
� F'arks
o Storm water
� Street Maintenance
� Traffic '
� Water
48 G. Schedule Calenda.r
CITY OF POR'T WQR'I'EI
STANQARD CONSTRiICI'iON 5PECIFICATION DOCUMENTS
Revised August I3, 2021
2022 Bond Year ]— Contract S
City ProjectNo. 1U2931
Ql 32 i6 -S
CpIdSTRUCTTON PROGRfiSS SCHE17lJLE
Page 5 of 10
1 The City's standard calendar for schedule c�evelopment purposes is based dn a 5-day
2 workweek and accnunts for the City's eight standard halidays (New Years, Martin
3 Ltather King, Mernoriai, Independence, Labor, Thanksgi�ing, day aftier Thanksgiving,
4 Christmas). The Contractorvv� establish a schedule calendar as part of the schedule
5 development process and provide to the Projecf Control SpeciaGst as part af the basis
6 for their schedule. Variations between the City's calendar and the Contractor's
7 calendar must be resolved prior to the City's acceptance of �heir Baseline project
8 schedul�.
9
10 H. WBS & Milestone Standards for Schedule Developrraent
11 The seope of work to be accomplished by the Contractor is represented in the schedule
12 in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the
13 development oithe schedule activities and shall be imbedded and depicted in the
14 schedule.
15
16
17
IS
I9
20
21
22
23
24
25
The follow ing is a summary of the standards to be followed in preparing and
maintainiu�g a schedule for prroject delivery.
Contractor is requited to utilize the City's WBS struc�ure and respeciive
project type template for "Constructian" as shownin Section 1.�4.Hbelow.
Addi�ianal acti`riti�s may be added to Levels 1- 4 to accommodate the needs
of the organization executing the vvork. Specifically the Contractor will add
activities under WBS XX�XXX.Sa.$3 "Construction Execution" that
delineates the activities associated with the various components of the worlc.
26 2. Contractor is required to adhere to the CiEy's Standard Milestones as shown
27 in Section 1.�4.I i�elow. Contractorwill include additianal milestones
28 r�prasenting intermediata deliverables as required to accurately refl�cttheir
29 scope of work.
30
31
32
33
34
35
36
3'i
I. Schedule Activities
Activities are the discrete elemet�ts ot work that rnake up the schedule. They w ill be
organized under the umbrella of the WBS. Activity descriptions sho�ald adequateiy
describc the activity, and in some cases the extent of the acti�ity. A�1 activities are
logically tied wi�h a predecessor and a successor. The only exception to this rule is far
"project start" and "project finish" milestanes.
38 The activity di.u'ation is based on the physical amount of work to be performed %rthe
39 stated activity, with a m�imUm duration of 20 working days OR a continuous activity
�40 in one location. I�thE r�vork for any one activity exceeds 20 days, b�eak that activity
41 down inerement�lly to achieve this duration constrain�. Any exception to this requires
42 re�view and acceptance �y t�ae City's Project Control Specialist.
43
44 J. Change Orders
45 When a Chang� Order is i�sued by the Gity, the impact is incorparated into the
46 previously accepted baseline schedule as an update, to cle�rly show impact to the
47 project timeline. The Contractor submits this updated baseline schedule to the City for
CITY OP FORT WORTH 2O22 Bond Yeat 1— Contract 5
STANDARD CONSTRUGTION SPECIFiCATION DOC�JMEN'E'S City ProjectNo. 102931
Revised August 13, 2021
Q1 3216 -6
CONSTRUCTION PROGRE3S SCI�1]i7LE
Pa$e 6 of 10
1
2
3
4
S
6
7
8
9
1D
ll
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
3S
36
37
38
39
40
41
42
43
44
45
46
47
review and acceptance as described in Section 1.5 below. Updated baseline schedules
adhere tQ the fallowing:
1. Time axtensions associated with approved contract modiiications are limrted to the
actual amaunt oftime the project activrties axe anticipated to be delayed, unless
otherwise approved by the Pragram Manager.
2. The re-baselix�ed schedule is subznitted by the Cantractar withir� te�t workdr�ys after
the date af receipt af the �.ppraved Change Qrder,
3. The cnanges in logic or d�arations approved by the City are [as�d to analyze the impaci
of t�e change and is included in the Change Order. The coding for a new activity{s}
added ta the schedule for the Change Qrder includes the Change Order number in the
Activity ID. Use as many activrties as needed ta accurately show the work of the
Change Order. Revisions ta the baseIine schedule are not effective until accepted by
the City.
K. Cily's Work Breakdov�n Structure
WBS Code WBS Name
XXXXXX Pro,ject Name
XXXXXX,30 Design
XXXXXX.30.10 Design Contractor Agreement
���.30.20 Conceptual Design {30°/a)
XXXXXX.30.30 Preliminary Design (60%)
XXXXXX.30.4U Final Design
�XXX��X.30.50 �nvironmental
XX�XXX30.60 Fermits
XXX�XX.3Q.60,10 Yermits - Identification
XXXX�X.30.60.20 Permits - Review/Approve
XXXXXX.40 ROW & Easements
XXXXXX.40.10 ROW Ne�otiations
XXXXXX.40.20 Condemnation
XXXXXx.90 Utility Relocation
XXXXXX.70.10 Utility Relocation Co-ardination
���XXXX.80 Construction
XXXXXX.80.81 Bid and Award
XXXXXX.80.83 Canstruction Execution
XXXXXX. 80. 85 Inspectinn
XXXXXX.80.86 Landscaping
X�XXX.90 Closeout
XXXXXX.90.10 Consfx-uctian Contract Close-out
XXXXXX.90.�0 Design Contract Closure
L. City's Standard Milestones
The followir�g milestone acti�ities (i,e., impartant events on a project �hat mark crrtical
points in tm�e) are of particular interest to the City and must be reflected in the praject
schedule for all phases oiwork.
CITY OI' FORT WORTH
STANDAftI] COAISTRiTCT1DI3 SFE�IFICATION DOCiIMENTS
Revised Augiist 13, 2021
2022 Bond Year 1— Contract S
City ProjectNa. 102931
Ql 32 16 -7
CONSTRUCTION PROGRESS SCi�EDULE
Page 7 of 1p
1
2
3
4
S
6
7
8
9
1Q
11
12
13
l4
15
16
17
18
19
20
21
22
23
24
25
2b
27
28
29
30
31
32
33
34
35
36
3'7
38
39 1.4
4Q
41
42
43
44
45
45
L�CtIVItY �D .I�CtAVItY Na�AO
Design
3020 Award Design Agreerz�ent
3040 Issue Notice to �roceed - Design Engineer
3100 Design Kick-off Meeting
3120 Subr�ait Conceptual Plans ta Tltilities, ROW, Txaffic, Parks, Storm Water,
Water & Sewer
3150 Peer Review M�eting/Design Review meeting (technical)
3I6� Conduct Design Public Meeting #1 (required}
3170 CanceptualDesignCamplete
3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traf%c,
Parks, Storm Water, Wafer & Sewer
3250 Conduct Desigta Publ�c Meeting #2 (reQuired)
3260 Prelu-rtinary Design Complete
3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water,
Water & Sewer
3330 Conduct Design Public Meeting #3 {if rec�uired}
3360 Final Design Complete
RQW & Easem�ents
400Q Right of Way Start
4230 Right of Way Comple�e
Utilify Relocatiort
700Q Uti3ities Start
'712Q L7tilities ClearedlComplete
Cansfruction
Bid and Award
5110 �tart Advertisement
S 1 SO Conduct Bid Qpening
8240 Award Cons�ruction Cantract
Construction F�recution
$330 Conduct Construction Public Meeting #4 Pre-Construction
8350 Construction Start
8370 Substantial Carr�pletion
85�0 Construction Completion
913� Notice af Completion/Green Sheet
9150 Const�uctton Contract Closed
942a Design Contract Closed
SUBMTTTAL�
A. Schedule Submittal & Review
The City's Project Manager is responsible for reviews and aoceptance o#'fhe Contractor's
schedule. The City's Project Control Specialist is respans ble for ensuring alignment of
ihe Contractor's baseline and progress scheduies with the Master Project SchedUle as
support to the City's Project Manager. The City revievvs azad accepts orrejects the
schedule wiihin ten wark�rays af Cantractor's submittal.
C1TY OF FORT WORTH
STAA€[]ARIa CONSTRUGTIpN SPECIF'ICATIQN DOCifMEN'I'S
Revisad August 13, 2021
2022 Bond Year 1— Contr�ct S
City ProjectNo. I02931
O1 32 16 - 8
C ONST RUCT ION PROGRES S S CHEDUi.E
Page 8 of lU
2
3
4
5
6
7
9
ld
1. Schedule Format
The Contractor wiIl su�mit each schedule in two electronic �orms, one ir� native file
format (.xer, .xml, .tnpx) and the second in a prlf format, in th� City's dc�cument
management syst�m in the location dedicated for this purpnse and id�ntified hy th�
Praject Manager. In the eve�t the Contractor does n.ot use Primavera P6 or MS
Project for scheduI�ng purposes, the schedule ir�formation must be subtnitted in .xls or
.xlsx%rmat in co�npliance with �he sample layout (See �peciiication 01 32 16.1
Construction Project Schedule Baselin� Example}, incIuding ac�ivity predecessors,
successors and to#aI float.
1 i 2. Initial & Baseline Schedule
12 The Contractor will develop their schedul� for their scope of work and su6mit their
13 anztial sck�edule ua� electronic fornn (in the file formats noted above), in the City's
1� document management system in the location dedicated for this purpose r�t Cerrst 5
15 working clays pt�aor to Pre Construction Meeting.
16
17 The City's Project Manager and Project Control Specialist r��iew this initial sched�ale
18 to determine alignment wi�h the City',� Master Projec� Schedula, including farrnal: &
19 WBS structure. Following the City's review, feedback is provided to the Contractor
20 for their use in finalizing their inrtial schedule and issuing {withi�a five workr�r�ys) their
21 Baseline Schedule for final review and acceptance by th� City.
22
23 3. Progress Schedule
24 The Contractor will update and issue theit project schedule (Progress Schedule} by the
25 lrast drey of e�rcl: month thr�ughout the Iife of their work on the project. The Progress
26 ScheduIe i,s submitted in electranic form as no�ed above, in the City's document
27 management system in the location dedicated far this purpose.
28
29 The City's Project Control team reviews each Progress ScheduIs far data and
30 inforrnation that support the assessment of the update to the schedule. In the event
31 data or information is missing or incomplete, the Project Cantrols Specialist
32 commvnicates directIy wrth the Contractor's scheduler for providing same. The
33 Contra�tor re-submits the corrected Progress Schedule within 5 wnrkriays, following
34 the submittal process noted above. The City's ProjeetManagar and Project Control
35 SpeciaGst review the Cantractor's progress schedule for acceptance and to manitQr
36 performance and progress.
37
38
39
40
4I
42
43
44
45
46
�l7
48
49
The following list af itezx�s are required to ensure proper status informatian is
cantained in tk�e Progress ScheduIe,
• Baseline Start date
• Baseline Finish Date
• % Complete
+ F1oat
s Activity Logic (dependencies)
� Critical �ath
e Activities addeci or de�eted
s Expected Ba�seli�e Finish date
• Variance to the Baseline Pinish Date
CITY QF FORT WORTI-I
STANDARD CONSTRIICTION SPECIF[CATIONDOCUMENTS
Kevised August 13, 2021
2022 Bond Year 1— Contract 5
City Pmject No. 1Q2931
fll 3216 -9
CONSTS�IICTIONPROGRESS SCkiEDiULfi
Page 4of 1p
1
2
3
4
5
6
7
S
9
�a
ll
12
13
14
15
B. Monthly Constructian Status Report
The Contractor suhmits a�vritten status repart (referred to as a progress narrative) at the
monthly progress meeting (if monthly meetings are held) or at the end of each month to
accompany the Progress Schedule submitta�, using the standard farmat provided in
Speci£ication O1 32 16.3 Construction Project Schadule Progress Narraftve. The content
of the Construction Project Schedu�e Prc�gress Narrative should be concise and complete
to include only changes, delays, and anticipated problems.
C. S�bmittal Process
� Schedules a�d Manthly Construction Status Reports are submitted in in the City's
document management system in the lacation dedicated for this purpose.
� �nca the project has been completed and Final A.cceptance has been issued hy the
City, no further progress schedules ar consiruction sta�us reports are required from
the Contractor.
1.
16 l.S ACTION �USMITTALSIiNFORM�TIONAL SUBMI'I7'ALS [NOT USID�
17 1.6 CLOSFAUT STIBIVIITTALS [N�T iTSID]
18 1.7 MAINTINANCE MATIItIAL SUBNIITTALS [NOT USF�]
19 1.8 QUALITY ASSURANCE
20 A. The person preparing and revising the constructian Prog�ss ScheduIe shall be
21 experienced in the preparation of schedules of similar compIa�tity.
22
23
24
25
B. ScheduIe and supporting documents addressed in tl�is Specifcation shall be prepared,
updated and reviseci to accurately reflectthe performance of the canstructian.
C. Contractar is respansible for the quality of ali subrr�ittals in this section meeting the
standard of care for the construction industry for similar projects.
26 1.9 DELIVIIZY, STORAGE, AND HANDLING [NOT USID]
27 I.1d FIEGD ��ITE] CONDITIONS [NOT USID]
28
29
30
31
32
33
1.11 WARRANTY �NOT USID]
1.12 ATTACHMENTS
Spec 01 32 16.1 Construction Project Schedule Baseline Example
Spec 41 32 16.2 Construction Project Schedule Progress Example
Spec O1 3216.3 Canstruction Project Schedu�e Progress Narrative
C1TY OFP012'1' WOIZTH
STAN]�ARD CONSTRUCTION SP�CI�'ICA'I'IpN DOCUMENTS
Revised August i3, 2021
2022 Band Year 1— Cantract S
Ciry ProjectNa. 102931
oi 3z i� - io
COIVSTRI]CTION PROGRESS SCHCDLILE
Page ]0 of 10
PART 2 - PRODUCTS [NOT USID]
PART 3- EXECUTION jNOT USID]
4
END OF SECTION
Revision Log
�
DATE NAME
S�TMMARY OF' CHANG�
S/J 3/2Q21 Michael Ov�n Revised to update specification requirements and eliminate duplicate schedule
specifications.
CITY OF F()RT �IORTH
STANDARD CONSTRUGTION SPECIFICATIQN DOCUMENTS
Revised August 13, 2Q21
2fl22 Hond Xear 1— Cpntract S
Gity Project No. 1fl2931
Ol 32 1G.1
CONSTRUCTIONPROGRESS SCHEDULE—BASEI.INE�.XAMPL�
P age l o� 5
2
STC�'ION Q1 3� 16.1
CONSTRUCTION SCHEDiILE — BASELINE EXAMPLE
3 PART 1 - GINER�L
4
5
6
7
8
9
10
lI
!2
13
14
15
16
17
18
19
20
21
22
23
24
2S
2b
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4I
42
43
44
4S
4G
The following is an example of a Contractor's project schedule that illustrates the data and
e�pectation for schedule content depicting the baseline for the project. This version of the
schedule is referred to as a"baseline" schedule. This example is intended #o provide
guidance for the Contractor when developizag and subnnitting a baseline schedule. See CFW
Specification O1 32 1G Construction Schedule for details and requirements regardingthe
Contractar's projectschedule.
C1TY QF FQItT WOR'1"H
STAIVDAR� CONSTRUGTIDN SPEC]FICATiDN IX]CUMENTS
Revised August 13, 2021
202� Sond'Year 1 —Contract 5
City Praject No. 102931
� ��
�.��
N ��
a �
Y `�7
� v �
'�'" � ,�
w � �
N � �
��
°z
�
�7
n
�
n
H
�
t7
O
�
�
�
N
N
N
no
'� R
� �
oC0
�� t
o �-.
z�
o {7
� a
� m
w •*
� U
�
TP11N - �����0 '���mEr��
La�ot� BaseP�'�e i'er�plate
�a•*� Q +'�•� ^an*
't,:L'-i l$ - bl�, li � �sri, � � , � i
I��r��� ��: ���-�'4 �
� c�. I � � .... � -�6�baee�zcr
�.• �� �x...➢�L11A 8 . tr �i � e y � `sE• p.-i R G11 � - ! - i ti
32 �rc-CC�on 3& Stl IJ.,Y,H�2 , . -=�dp•:"^
±}7 ,tiesro ::rrs:t�a� G��Z i. �� �•.c?r-=� •.•
+��� -w:�neaenr:r.,�atiti.yi�rcti�warnsa:�a7rypx�r�'OCuP�h� _ •? m �:;+ur�f.�= <a.�Fr=r.'=_ e-r.a
:?M SIr15e�atr�t - t =±r�pr�G+± Oi��1vr-s ^ 3200
8�3p 'roti�f �F3p��26F�iE-Gpe�5l�Gpnlr2Enm 7 717�,a.pC..s^�,a � f�-j{pF� g• �da
±29.'. �+R=v'_�.iC�`�=P��:Gi8f2T13 ' . i_���.i[.. =#-�.«f.=�•• C^'_i
l��0 L!�'_�UGr ... . .-. .. _ iJ' i'�)�«f-=.1: �iYS},.G+: G�iy
_� , r'4�, rr�
Srree 1
1'fsi� � �F�
!]0' .0�7vC:r=a=
,R..., �„�- ..
,w�.. � .i',� � H�+_ vfU S@C-."',.�5
3::' 'Y_����i��r�'1'•
P9Y�RQ
3•_-1L !.r�f.s�•
�VY -laGuzr_ - - _
iEt60 PaV[fg
�:�'0 fislR�pn
riia� a+z*�,�
::pa � � c��,,.�.
ShFlt �
1�9a#�r � �tde�
i4l'n1 T�J#� W�B
..... .sy s� maver�a se�•.�ees
�31�� Tefl�P&YSr➢+fiepaff
7.4�� :k1 F,` 3 W.*ra� �n•:.f a
3t3-�` Y�'•r Rrr.'Ti tlr]Y'
���= Yyarm�!}.3s�.re�
�l�pY
"nti0 �YSh�dlt
�t7c �ccunc�
ilAst �hl!g
±i9: Fl.�4ran
3�2p7 G".t�ni� -
��C �a7 Ca�p'e1p
s� a
� � ti.ork �
� �Vi�'�1� ��Q�f �
- Cri�scal Vte�ir�ng �fla�c �
�� " n
�
� N�o➢es6�e
♦ �8� P��
v ��d AArie��
K
�
C
G
�
1
*
_�
aY
.y
#*3
�
79
S
i
�
5
5
�
.�
— :`
:
ea
➢�ar# Pri�l [)a�_ Zi�.,��-2�7s
Pat38 '9 4� 3
r -4� - � -- Gtdi
� fi0.x „.,� r ��� : F t
�
a:s� ��� a
�. e
�'_ 3
9iA( #
�': . "' . '
-. . ?i
[
3T#;,_....
�.. __...
3if3Tli
3.�rJ,' =1u:
7!
3::. *1
yri' !1
3P7$.,- -RO Yi
sEC 1�
�a= ,;
ts .. u
�
� ��
3.. �y
's '_6
��._
�,Ev +�_ -
3 `�. E25�
e7�� '
a���
..�� '
3i' %
s": y �
3
�Il7�-�� - ��ig�a�rll��ar� 5�tr��ir fi�ns�i�n����
��5�lli�� S���a�iQ ��D��
:'34 iJ�a},i:'c [.'�ur-:.tE
� G3-�+afi-3,��� �F.�'019
�4 ���ti :�if-..'�S
0 d3�UT'CG'2 d`:G
ra r_.;1�+:.9'a �fiar�,�.4=a aow
z3 '-iN.���l� 27�IulT:vt�-. �:'k
� f_�� ��.• sa�J�sti:'- 3p.a
?�S C�+Ikk.�'11 94��7�:Gw�
5 ^_4iJ-''-=`- `t•,k•:�'-' 3G39
., rew�•.�]" :sl�u•.'ai: 30=0
� ��;-:uzs.s ar-�aua �osu
1q �:,4:�•;�'�t3 37�Ia�q7� a450
lo ::�,y���: F�-��zor+� 3a�.,
a xa�-=a}a Joti
tta ��i�ie 3r-ate-=o,�
� ���s :-s�+o�s
;o :a•.:�-_4�� .._�.. :a�
H ,r,a � � � 3a-w a,an atou
., QB�:1y2.��.+� 10�..�t-.:^f" ]+76
i� 13�5u�-�#4 t:-i��7d? 312a
a :Ss.'d¢:�F: :'-���Ui: 3'3i]
:[a :7-?�F-2.:': � ,^.'-_r.Gs� 77c9
+S �'Fi :": 3�-aBCaQi�
5 �5-CSCta'c7u» ' �-0R-2F718 375a
5 72-dcP2J?�R f$-DCF3�18 3-5E7
2� tii��2f:'6 tS��Ko�t6�� 3y?YJ.3�€G
3i] C3�la+�vi� �&�4c-21:�8 ]'90
�o <v-n.vr-¢oYo is-oeo-ao�s a�s�
� '4,�,a�c-1[7!6 3256
w ao-r,u�aa�� r�aee-�efe
���� �����
�d
S�
�
-�+,
cn
:�
:�
!a
3 .-�
iy�
�' � �
6 �
� � �
�
� � �
.. n .�
o�o
� [ �
�x
�
z
�
�
n
�
C�
�
°z
C7
O
�
�
N
N
N
C� o
`� G.
a '�`
�' �i
� 'r
I
� o
� �
a�
w»
��
N �-`
T�'�qi - �e�p���� I�e�UV�,r�
���' +7G.�GI,�dL�. i G4��ire�i� i
a�n�r w �-�Y �
�?f�` * �fl�
2ii: "'� y➢1�:2�' —
`�_ �g'"',,� a�e F�..�
]�S. _ ��.. P2"_'_°!1 Ri�31��
��� �
]':7.'. �1[;a,_'.L�•
S�C� �il�tar
]rt � aa„"•�4
*z3a �a:wFn.
3�^_ i..w_�
yti5� '_'f�:.".�}'7sB
5�e,5! �
ra� a sa�
3'.�•c 'R�. wa��
37C4 :a�p' :"8 7FP �rG �'r'4Fi
33J0 �7�"C.°�iv.'u�rRo-aYr"—'
33+8 la��'6' 4rP➢!4r �5a E L•.�`1 �:.�?�fia+la Sf7.-sE6
::59 3Z.7i°-"�eNfr.wl4:�:'3ii�395i•NY.a_IY,�3
3�� �4m} F7r.ly� R4a#��
�17�Y�
a�,a �w,�u�
33a�7 �c�a:�:
3�: pan���
3�C-: �a#:7o1
. `:f �r3^.nf
bSil] '.3Y!.tid�}E��4LIfi�:•�4�Ir9L+
`.5 7s,p�a:^
L.�IiIE. �..�aGan µ
$SfQ i'� I'i�-r-
S �G ;o � � �8 �'7P:"��c 1�SIu�:
�79 �Io.+l,�,p7ra{r,n:.;,o^#�r5M �Gi1Ci.JG#7�5�
.'1A C4s��7=rr�'k;riF�;!31
� � �sewe,
��sULec58n Cb1197i3 �iO3�4Y1.
11�2 LtCt 6U1'�r/
3�C�= t�uc_C:i��'6,;w��.Ae':G] ='="p7:A6�'�
�p�ael C6o5e4u!
�y��n rA,'R3:;�1C.Y�:C9'._
� !�[.'L� l� � � �_ �
� �E31iIB1E� ��6'f` �
� c�� F�aeas�:���r� �4fett9c �
�
�
� Ml�:si�a� :�
� �r�ica! t�l�or�
o ��i��d � ��
��'6�� ��: ����-�1'�'�
ISY.T I 7i:1 I � I '�V`.'i]` kFr�RanSs
,: y3 �g-.`aas ,es�r�ial
i �r,r,as•:o;�� �us�.::c�;r, s-ae
'. v :r5-JF7,: �'3 . � �r=-_ C� � 6 3:.-0
° 3 � YFS-�}-;=1'. .' :tI---�7@ .i3.�1�
� 38 13�::"- -a�be.�i6
- 5 - - . ' - �"-- - : �=Q. . - �w
:, iti_ __._ �5-0�."-3: _ isfF�
.. za �,.:�:-__'. -6�•._ -�,_ .:ro -
i.� :D 'i-4;��. _ � vrfriM1la 2�� �
�€ : �., ;., � �a.-ao-irta t:eo
�. 0 'r.Lvr[-2!.!8 ,Y.��i
!'�S ijs :9•3�'l-07'� C[�ipF�.'.c
� i9 i;-3t�i976 : -0=c-7Df�
� -��__�,e ,zs-:=�te��s -.,lo.-_-t
4'. ; j ±}=C 1 t. 2uz.�±".�" F a,,.: 4
? S' =i=r..-� ,_ a-ISn �$'! 3a�v
;e!� 24 J:•C�'-=: : 3B-�v���GIR :'�l
ir� 71 _n-ha.::1F tiy:�s�.0�.a �:�G
x :] ;r[1,!{titi7e i%[=G-it7'= ai-4
� �} �E_�'�";3 E7�Ap7v'?
__ �n s--u--x,sr .,,aM1�;.��ti aaav
�,, to ���-- _. w=..Feo-=��, 3 ,:a-a
2c �u os�wt=-=.�� az•r3r;,.3,•, a��
1[[� � 26•Pt_-`_-1 ` -:.k3r-7: �_ .3qS
�fl ..7�1 75-Ir�•-==1a y'fV�FaC'� .=2C'9—
� R '.1llpr.2G'� ?i19
+�� �,a �t�: z�w�-2��a
��z��
.a�E'i3 R9Gf� �iii �'I[7 I lLN
I� f Fl ����,�=����: ������,�����w����F�
.�:: �� . � , � . .
�2�:
:'r �
;3:
iw3'..
__��
.t}_ �
x�ss
5�±9
��G
a+±^_�
�:�^_.
�+~;�
�� Y
Sn�1..'+
�C: � 7
27e 276 :`}�a}-2i.i8 �3-:;�::._8
...—Yt: `�t :}i+3�::io �r.'sr��719 3CC�-' �`s��l7
�. IC d::-�x-2S-= `:��-w=:m �'1G..`�:�06,.!.�C $tl27
.. 3if 76�J-=�'EP 26•Ff�k-^sd•n 85•� #t3n
] �=Ju'��L7J SkS�:,I1k2�Jh 8S�2rt ��s�
� B ➢5-:=-.�'E g43Q 9"ti,99i:}
,._ .:5 :iti�- .-�9 .:Lr--_ f!
7:� r3S %bl.sF�� . 77.'r`eS•.t'S
: �a OC-�hl�`..'-1 f'�1i�3���
s :i :WJ1ix.^'.= 1'_-.'1'.=:'3 Es16
.� fS5 GS+�`-�.- 7,'deer201c
_ �C J4 ."��u[r=:'3 'E l.f-3S-? .5"J6.i:�Lf
� 517C
�
�+ 3
1"' `----I
{,* !
�
6:
�
5
=
i
� ��
a �k
� E
r
� I
� —Y—_! �
� '
n
�,
� i 7
� = 3
._._j_._._.�.�
:1 �
�-�l�.� - �el:g�����cad Sta�et ��•��s�a�
l�� � el�.m� ��r�� ed�� ��a���Zc
e i
:
1�� �� ��� I��"'�l �
`d
�
W
�
�
��
. a,
,�
�
�
�
�
ua
c
w
N
�
n
�
�C
0
'=i
�
H
�
/7
H
�
�
P
N
N
no
�G 0.
`„U' ^C
ro
�, m
� �.
z�
00
.� �
�m
��
�
�
I�'��i�1- (;a3�3�� �2��V$1'jl
�yat�t �e��ne 7e�rnp�ai�
�;i� ncpnq ra�-
N' d '��t� fah(P�o�ciCOoceolR�Oc�eNala�j
:'-3° 4===�rt(��leilariC�n „'�r.+t --
qif: �•3:�r�aeiCol�uarbtNi:ec���]
Fi : : : vzuu��nn Coa�act CFina�
_ 915� �n Z.ea[1�
� �� ��� �
- Rer�sas�ir� Irii�pk �
� ��1 R�ubaua�ng N;�ric �
Pr¢��e�ct 1�. �CI�-(�'� � �
��
36 38 iB�46Y9 '--., .Se�-2#!i8 � 971R
�i o z3-o�t xv�a i aiz�
i . 1�i4i�lov-$�i9 � 1�-NW-2F1i4�91313
n ' 0 , ; 1�itm-2�7S �Bi{fr
__ � i� i a; aa-�ec�m�s #!�-aeo-adis Istsv
� r��
� C�i� +N��n�e
� �oP�� PRil�e4e
�i2nori F'ri� Date: 2i9�lt�t�-�078
P�3�3
J E � ' .�l ���-
■
'� 9i fl �Q � � i I t
i . _
? 9: A 13 �f !� j —� � -
i 9150 ` �D ---�-- ' � � y
; �:.
� E � . . � . IY . !
��-�lIl� - T��rl���[ S�ne�t �`�,�sf�x���%,�
�as�lii�� ��ea��Il� �:�:es��+1�
���,� �����
f'�
°z
�
�
�
c
n
�
�
�
�
0
�
�
�
�
�
n
�
�
C
r
E7
I
b
�
C�"'
z
r�
b �o
� �N
�
� ��
O1 3216.1
CONSTRUCTIONPROGRE55 SCHEDULE--BASEL�]EE3GAMFLE
Page 5 uf 5
� nvn oF �Ec�oN
z
Rev'rsion Log
DATE
NANIE
SUMMARY O�'CHANG�
July 20, 201$
I May 7, 2021
I
I
I
0
M. Jarrell InitiaiTssue
M Ow�en Reviseci name due to revising tlieschedule speaificafion
GITY DF F'Di2T W012TH 2d22 Sond Year 1— Co�tract S
STANDARD COI�fSTRUCI'ION SPECIFICATIOI�T D�C[7MENTS City ProjectNo. 102931
Rcvised August 13, 202I
oi sz�6.z
CONSTRUCTIONPROGRESS SCHEDULE—PROGIZCSS �KAMPLE
Page 1 of �4
� sEc�oN ai 3� i6.�
2 CONSTRUCTION SC�-�DULE — PROGRESS EXAMI'LE
3 PART l. - GENFa2AL
4 The %llowing is an example of a Goniractor's project schedule that illustz�ates the data and
5 e�pectation for schedule content depzcting the progress for the project. This version oithe
6 schedule is referred to as a"progress" schedule. This example is intended to provide
7 guidance far the Contractor when deveioping and submiCting a progress schedule. See
8 CFW Specification O1 32 I6 Construction 5chedule for details and requireznents rega.rding
9 the Contraetor's project schedule.
10
11
12
I3
14
15
I6
17
1$
19
20
21
22
23
24
2S
26
27
CITY OP FORT WORTH 2O22 Bond Yeaz 1— Cqntract 5
STANDARD CONSTRUCf ION S PECIFIGtITION DdCiJMENTS City ProjecE No. 10293 f
Revised Augusi 13, 2D21
pI 32 16.2
C�NSTRUCTIONPROGRES5 SCHE➢ULE-PROGRESS �XAMPI.E
Page2of4
1
�� :
+�''j � � �•-•--• - -•--••-- -•--••-•• •_
� � � _-::_: � :_ .r:_r = _-:_ :=: �:
.:.�W
� � :-���:_��:_:�::�-_-:�
�, � ...._..__ _.._.. ._
� ...w _
� � �, �... �r�r�-
� �' � � I I
�� � � I
1
4 � �1 4.��4„
e � � ���_
b� �
5 ��
� � ��� � �
. � � �- i
--�K +4 b ,L +C � � �E _
K� �,. i� �o ....a a:
L �: y ir %i i; iv r c� �
� � - �.�#rl�+'����
I�4 iY L� fF��} t" � 1
�D;x �L �u p� I
� r � :
I ¢}I� � � � �1
� � � �'� ���� .
� � -'—'-- � �c_.ef .h j
� � +�� W� w r. 4. r.�it 4
i�
� � � ��������
.. rd _ i:�i �x �: i� __ ka�;y _
� g�' �'.�;rr r�r �'
—, �� ";��;� flb�hi
� .`� - _ �
�y � y : .4 u i.. E..r.:�
4
I�.e
E� � , - ��,�.. �r�� •
��
�
�
� i'r I
�
q �:
G
� ��
� ��
m � � � �'
� �� �� ��
� � � g� ��
���,� �'�;�
� r �. ��
�.__ ������
� � � -
N �'
� �; � ���� ���
��. �'� �'
F� � � _
:=:_-; -:=:::W:=:=::=::.=�= :==:� ��= _=::��-:�::�:�=:�:_=::�=_=:=_=_y =�:=: - .�..�_: =:__:_ �_:::_�� ":I �
------ ------------------. --------�-------.�--------- -------- ---------- ---------�-------------1-- �
---- - :.:::.::_��=: :_�-::=::=� �::� _� :_.. _.=::=.-�.-.:_:�^.�__: ---.---_--:w:::::�� ��
r �=:�_:.______.._.. _ � �- ._..-��_:._ _ ._�� _ - - � . �
. ._; . .._ .... ._ _ .._.. ._. .. _..
________.: _ _
_._ __ _r - _
...._ _.._ _ .... � _ . 1 �.... ,---_.._ �.._.._.� ._...... - . 4.. �
�--- -- �-�--. --.-- f . ..�._._..�. � �
i�'ri si :i .1 N N�'! �+YI.Y fii :I��.�H r, r,i [Y�.V •il.. . :� w �, .� .. ,. rF a� .. .�1
I !
f � �
s,�o �., nn� �� ��� �r. p� ^� �. . �.,� �: ri_t,l�rwi� � � �r��i
R
- - - - - . . ..
E i i
p�� ��I..� u� IM1 �� ..� ���i�� .. _It rt MI �� I�y ���� .� _ ny y�..�_� pF �4 y,� p'
r^. k�;�j�: �,i;'���:i:i �Y� �;��'S'h,���:�sI�I��JJ� �ry{1
?�.� r�;���+=''�I��`�';��']��I���'����������.:"'�
Tf � LY � C��:7 r. � ' I•: G`� �r _ o ry �'�i
�� o r n} �� [. � u tii •t��� �' �' IO �y+a+ ur�1 � �! �� s L i l oy l ipb 1 6 ei �� a rt •�
f`.,}i Fi � 5'i ;' f: iF }� `.� i: IFi ; M: iLL i F lf f; �'.I � j i i �}.1 CY 9A ��i iJi.,. ;�'i �
C ��iE� f ' '� ��� +Jy77�22 � {�6!,� s
o� u i1 R `�i � � i � � ' � . +� iv ii � � �I �. � � � l,� �� ' � � Fi �� � � �
I
�. Yl n y� ��s r� i� +i ui i�i iii ii w .�i •i .. ui �i� �rl W W �. �� ri xr M� al rl x•
F � �; � ,_ {: ._ �u .i :-�t �{� �y f �" i i�i � :F : - �: i�i ,i �.F T .� tt'
i � � I � � f � � { I �; " 1i� �� �8. � r�' �� � .�1, � �i � '�' b ti � � � {;'
�� �JL �nS����,�1�.�..i�� �I����.�y�l���.�g��, �� �rl
�. '� �,i ri . �r� n�K. � � r r_ r L'i ,� � �. } f, r. � r
1.W J} y� •�Iw 4} w� � f4 al il �F r iw
�y y� u ia � Y4 ' �..� • qy y e � � , �} 5}
i+l +4 • � ' �i Y � fl �' ^''r�i 11 �I �fyj �� tl4. � �i ' {y �
�eI'�rI�V'� ��"���� � ' ���� �'�}y[ ��yj � F �I�`'
� �' � LS' L'' i'' � � � � � � i� � � 2� �_ ,�;� �;;.M ,,j N � � N � �� YL �
" .•,
� ��'r� �:'K���'£ u�'���� Wn���� �.�,�
� �
"S'� `I ..� � '�'r v, .� I'ri ;' �,ts � Q ���, 4. "� vi �y � ,.. v L� �Y -�' e� � � � a�
f, � I I y . � � - r �. , �
�i �� :a u � ' is' ��1 f.1 :'! 1n ir t �� li. 1!i �'S� r y W�
r{ �" .'���: '���i'`�. �i '�+r �s�-r �
�� .. �
�r �
ii� � �
I � � �
I���
..r
� I �
�
I
� F 1
� ��� I { "�
�
�
�
�
�
�
� �
P �
� �
� �
K/ �
� �
0
� '�
C Vf
� �
��
�
P� ��
�
�
�
.��♦
�'�
� ��
���
;� �
� � �
� � I
'� � ' y � ���:� � �
�+i L� 4 �I U R � VL
il � T rl �p �I`�,� �4'
�' � � � ' FI. I► :C' � ri � =�r ;S. �� � �# � i* � �
�• l � � r� f' Y "_ LL . LI. �• � � Y '�`�
�����+� ��s.;��� ��a���"��i �� r'��' �'
�r ,3�r, ii rt'� �., � !4
�t ., }, j ., �. '� �.� � 4 •� � � � p g � a r� � + �
'� � � ri k;'F� S'i '��� !� � �d�,+� .i � � .���.I�'�, �: �= .� � m �: x: .F F�?S � � �� bi
I
CITY dF FOAT WORTH
STANI7ARD CONS7RUCI'ION SPECIFICATIpN bOCiiMENTS
Revised Augvsfi 13, 2D21
2D22 Bond Year I- Contract 5
City ProfectNa. 102931
�l 32 16.2
CONSTRU�TIONPROGRESS SCHEDULE—PROGR�SS EXAMPLE
Page 3 nf 4
1
2
��
ac� .._�._.._.. � .._.._.._.� ._.._ �..._.._.._ ..._.. �
�'"� � —• . � •-•—�- •-----�--••—•- —•-••-_�•• —•-••-�•-•--•�----•-•-
� w ' � --a--
a " � E
a � --- -� ------- - ---�-..�...------- i -----..1..._.._.._�---------� -- -
�.
� - - - - - ..�.. ___ -- - --- ---
'� �° ' —•- -�------• - •- -••I------. .I- •-----j•• —•-- -�-----•�-
.
• , --� - -- - . . . .
� ' � _ _. _. _:,�.----- .--�_��:__�: -�:r_.._ - -__�.
.:� ,� ---- ---- -------1
� �T = ' i � '
.,�,� �� N##'N1N N,N [4 ft H 1} fy�H N N ta rr {■ N M�NiN�itllN
� �' � �
� �i
� �}� n� rn ��. �. �+ ��# p rs o ri ., sa ., hf r. ra 5+ ri a� sa
��
�
�
�
M
���--
.�
�
Y' �o W � ni �n xr � ia �ii -i� �i�
� �" ������ ������' ��,� ,.,,_,
* �■ U � '�
�� �5
��, �y ,��� .�. �
� 'rl� r'F'I� ::N��ia�'.y �I�+ uti ��.L
• r �f , r .i .�i .i ri
r—...,� �.���miw �� mromo�^�'' oisa�.n m.
t �:� u o� Fi � �: p{� :� � �'�,'3� ;4 j;�
!• �]yy( � �'�y k
� � � � � 1 � �F �I� +�qy f � ' ��l �ry �
� I � � y � � Y` 5- � [N � i � � � L r:Y FI �
u •�i � � � - � Yli R...f� � r Yi u{4 = wf� Y,li il�
�I u •' �T^ ]� I I � L� � I - ;
p +'� ; ry � � � �Ti 4 i � r� � � a�`.�, � : i � �� � � � � �� ; i i��
�r .y � ;�` � � w � F � ;i �...� Fe ..� � i; F} a' ��� � 7 5
d .
� � �. .� m ?a � � x, � y�, a„ �� � y �. m .�, ,� � w
y �� 'i .� `� �' ��.F;, � � �4 3 � 'i' yi� l ji �,
I� �
�
� �� ����� °��i���;�������'�.
''� t I�I��oflJ�� `��� r�u fi�!�:1��
�y !
i
N M,N N�N N
� � .n .�, rt
, �, ��:�
yi. � � > ;
�
ii F'i £ .j o �
ac d� �� m
���8�hJ
� � �Y I
� w
����:i�:
��������
47 Ed ii� �h.�h
kl Ta �
� ;�.�
o � �* �:�:a
� .- � i�. in !N �1 e as � � �.. }� e�i � ��:�. �: �: :- .a :�1 �'.rs � � o � . :r�
- - rr
d — � 4i 117 �' � F � J F1 �� �I, � , � iif i . � �O . kl 4: �. � Q sa � � r �' �+
r} '
a
•� �
I�
� ���
���
� �
� �a
� � :�
� s � : � �
�
� � I
I g � I�
� � I
� ���
� -: � '-3; �� �
m � � A h L � � �
� � � 9k � ry 45 � � � � � � � �F �
� ������ ��'����� �����:��
F�k i.i���� �,i�4 `I,"t�� �!;;S �Ci�'��'�f�
� ��i-,�:
CPI'Y OF FORT WORTH
STANUAl2D CQNSTRUCI'1pN SPEG�ICA'1'ION 170CIIMENT�
Revised Au�ust 13, 2021
��
I�
If
��
ml� �
�q," �
6 � �' i�
�-���
� � � ��� .
o I
'� � � �i�:�
� i i 3
I 1
�•F� ■1 t� rl lV NiMIH'IN lY
.i:�
.., � �a � � �, �, ., o
i� �F .n n�M1 �� �� �f i� r� Ni
'rs o �' � a .o'o-
;� � � :s � � � �.��� �
a a � a� � �n .r -0. �
� � � �� � � �� �, �
� ' i .� �
L
Tf. �w .w �3 m� m i„Imi[, u�
�� ,�� � Su n, ry�
{ i �
�
2��
:� �: . i' �• a� ,: � ,4 '.
. �..
�� n r� �n .n a� .�� m a�
���,���� � �
FI V 21 O� i'J I] 4
�
' A li� li� ���lil I� lil r
i � Ifl ��1 M1 �{ �Ifl YIP �
�
� �
:� � �
�
r �����
� � �
� � f � L �
� ��'����
� q f.
c� ss � i, ia � n
� �'��a'�����
���
�t � �F ., r�7� J
� 4 � � �;n � ��, �' n
�t !
�
�
�
�
�
�
�
�
�
�
,�l �
V! �
� �
r�� �
YL �
� �
0
� �
�� �
� �
� �
�
L�
�
� �
� �
� � �
�V � �A
� � 9
� � �
�
� �
s �' �
� �� �
� t- V
1 � �
2022 Bond Year 1— Cpntract 5
City Project Na. 1 �2931
ai 3z i6.z
CONSTRIfCTTON PROGIiL�SS SC}i�DIJLE—PROGRESS EXAMPLE
Page 4 of 4
II�ID OF SEC'1�ON
2
3
4
5
DATE NAME
.iuiy 20, 2018
May 7, 2021
0
M, darrell InitialIssue
Revesion Lag
SUMMARY OF CHANGE
M Owen Revised namedue torevisingtheschedule speeification
C1TY OF PORT WORTH 2O22 Bond Year 1— Contract S
STANDARD CONSTRUCTION SPECIFICATION DOCl1MEN'FS Ciry ProjectNo. 102931
Revised August l3, 2021
0132 i6.3
—PRQGRES5 NARRATN�
Page 1 of 1
SECTION Ol 3� 16.3
CONSTRUCTION PROJECT SCHEDULE PR�GRESS NARRATIVE
Reporting Period:
Project Name:
Ciiy Praject IVo:
City Praject Manager:
Datelssued:
Contractar Company Name:
Contractor 5chedule Contact:
A. List of activities changed in the repo�ting period.
� 1. {insert text here)
2. (insert text here)
3. (ins�rt t�xt h�rej
4. (insert text herej
5. (insert text here)
6. (insert text herej
�. �.ist any pote n�ial delays and provide� mitigation actions
1. (insert text here)
2. (insert text herej
3. (insert text herej
C. List any actual delays and provide recovery actions
1. {insert text here)
2. (insert text here}
3. �insert text here)
City of Fort WorYh, Texas
Canstruction Praject Schedule Narrative Repart for CFW Projects
Revised August 1�, 2421
Page 1 of 1
013233-1
PRECONSTRUCTION VIpEO
Page 1 of 2
SECTION U132 33
PREC�N�TRUCTION VIDE�
PARTI- GENERAL
Ll SUN1NiARY
A. Section Includes:
l. Adzninistrative and procedura� reqUiremen�s for:
a. �reconstruction Videos
B. Deviations fram this City of Fort Warth� Standard Specificatian
1. Nane.
C. IZeIated Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract �'orms and Canditions af the Contract
2. Divisian 1— General Requi�ements
1.2 PRICE AND PAYlVI�NT PROCEDIIRES
A. Measurement and Payment
L Wor� associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT U5ED]
i.4 ADMINISTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produce a preconstruction �ideo of the site/alignment, including all areas in the
vicinity o� and to b� affected by construction.
a. Provide digital capy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
periad.
1.� SUSMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBNIITTALS [NOT USED]
1.$ MAIN'i'ENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QiIALITY ASSiIRANCE [NOT US�D]
1.10 DELNERY, STORAGE, AND HANDLING jNOT USED]
111 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCT�S [NUT USED]
CITY OF FORT WORTH 2O22 Bond Year L— Contract 5
STANDARD CONSTRilCTION SPECIFICATION DOCUMENTS City ProjectNo. 102931
Revised July 1, 2011
013233-2
PRECONSTRUCTION VIDCD
Page 2 af 2
PART 3 - EXECUT��N [NOT USED]
�ND OF SECTIOI�T
Revisiou Log
DATE NAME SUIVDVIARY OF CHANGE
CITY OF F�RT WOR'FH 2O22 Bond Year 1— Contract 5
S'TANDARD CDNSTRUCTION SPECIFICATTQN DOCU]�I�N'�5 City PrajectNo. 102931
Revised July 1, 20l 1
01330U-1
3UBMiTTAI.S
Page 1 of 8
SECTION 0133 00
SUBMITTALS
PART1- GENERAL
l.l SUMMARY
A. Section Ineludes:
General methods and requirements of submissions applicable to the fo�lowing
Wark-related submittals:
a. Shap Drawings
b. Product Data (including Star�dard Product List submittals)
c. Samples
d. Mock Ups
B, Deviatians fram this City af Fort Worth Standard 5pacification
1, None.
C. Related Speeif'ication Sections include, but are n4t necessarily Iimited io:
1. Di�ision 0— Bidding Req�irernents, Contract �'orms and Conditions ofi the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measuremeni and Payment
1, Work associated with this Iterri is considered subsidiary to the various items bid,
No separate pa�m�nt wiIl be allawed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMIlVISTRATIVE REQUIREMENTS
A. Coordination
1. Notify tha City in writing, at the time of su6mittal, of any d�viations in the
submittals f'rom the raquireznants of the Contract Documents.
2. Coordrna#ian of Submittal Times
a. Prepare, prioritize and transmit each submitCal sufficiently in advanoe of
performing the related Work or other applicabla actir�ities, or vvithin the time
specifiad in tSae individua� Work Sections, oftke Specif'ications.
b. Contractor is responsibie sucl� that the installation will not be delayed by
proeessing times including, but not Iimited to:
a) Disapproval and resubmittal {if reqvired)
b) Goordination with other submittals
c) Testing
d) Purchasing
e} Fabrication
� Delivery
g) Similar sequenced activities
c. No extension of time wiIl be authorized because of the Contractor's fazlure to
transmit subtn.ittals sufficie�tly in advance of ti�e Work.
CITY OF �'Ol2T WORTH 2O22 Bond Year 1—ContracE 5
STANDARD CON5TRi1CTI0IV SPECIFICATIO� DOCLTMENTS Cify PrajectNo. ]02931
Itevised December 2U, 2012
O 1 33 00 - 2
SUBMITTALS
Page 2 of 8
d. Make submittals promptly in accardance with approved schedule, and in such
sequence as ta cause no delay in the Work or in tlie work o�' any ofiher
contractor,
B. Submittal Numbering
l, When submitting shop drawings or samples, utilize a 9-character submittal cross-
re�erence identiiioation numbering system in the fallowing manner:
a. Use the first 6 digits of the applicable Specification Section Number.
6. For the ne�t 2 digits number use numbers 01-99 ta sequ�ntially number e�ch
initial separate itezn or drawing submitted under each specific Sectian number.
c. Las# use a�etter, A-Z, indieating the resubmission of the same drawing {i.e.
A=2nd submission, B=3rd submissioil, C=4th submission, etc.). A typical
submittal number wouId %e as follows:
o� �o ao-ox-�
1} 03 30 00 is il�e Specifzcation Section for Concr�te
2} OS is the eighth initial submittaI under this �pecification Section
3} B is the third sui�mission (second resubmission) of that partieu�ar shap
drawing
C. Contractor Certification
1. Review shop drawings, product data and samples, including those by
subcontractors, priar to subznission ta c�etermine and ve�•ify tl�e following:
a. Field measurements
6. Fieid constructinn criteria
e. Catalag n�inber� anc� sim'rlar data
d. Conformance witli tl�e Contract Documents
2. Provide each shop drawing, saznple and product data sub�nitted by tl�e Cantractar
with a Certification 5taternent affixed including:
a. The Contractor's Company name
b. Signature of submittal reviewer
c. Cer�ification Statement
1) `By this submittal, I hereby represent that I have determined and verified
field measurements, field construction criieria, tnaterials, dirr�ensinns,
catalog numbers and similar data and I have checked and coordinated each
item with other applicahle approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than &'/2 inches x 11 inches ta 8'/x i�ehes x 11 incl�es.
2. Bind shop drawings and product data sheets together.
Order
a. Caver Sheet
1) Description of Packet
2} Contractor Certi�cation
b. List of items / Table af Contents
c. Praducti Data /S�op Drawings/Sampl�s ICalculations
E. Subrrsittal CQntent
1. The date of submission and the dates af arYy previous submissions
CITY OF FORT WORTH 2O22 Bonrl Year I— Cvntract 5
STANDAIZD CONSTRUCTION SPECII'ICATTON DOCUII+IENTS Ciry Froject No. 102931
Revised December 2Q 2012
D13300-3
SUHMIiTA1,5
Page 3 of 8
2. The Project title and number
3. Contractor identification
4. The names of
a. Contractor
b. Supplier
c. Manufacturer
5, Ic�entificatian of the product, witk► th� Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identi�ed as such
7. Relat'ron to adjacent ar critical Features of the Work or materials
8. Applicable standards, such as ASTM or Fedegal Specification numbers
9. Identification by highlighting of deviatiot�s from Contract Documents
I0. Identification by highlighting of revisions on resubrr�ittals
I l. An 8-inch x 3-inch biank space for Contractor and City stamps
F. Shop Drawings
I. As specified in individual Work 5ections includes, but is not necessarily limited to:
a. Custom-prepared d�ta such as fabrication anci erection/installation (working)
drawings
b. Scheduled information
c. Setting diagrams
d. Actual sh.apwork manufacturing instxuctions
e. Custam templates
£ Special wiring diagrams
g. Caardanation drawings
h. Individual systern or equipment inspection anci test reports including:
1) Perforrnance curr�es and certificatians
i. As applicable ta the Work
2. Details
a. Relation of the various parts to the main members and lines of the structure
b. Where correct fabrication of the Work depands upor� �eld measurements
1} Provide sUch rrieasurements and note on the drawings priar to submitting
for approval.
G. Praduct Data
1. For submittals of product data %r products included on the City's S�andard Produci
List, clearly identify each itenn selected for use an the �roject.
2. Far submittals of produci data for products not included on the City'� Standard
Praduct List, submitta] data may include, i�ut is not necessarily limi�ed to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data)
1) Si�ch as tlie manufacturer's praduct specificatian and installation
instructians
2) A�ailability of colors and patterns
3) ManufacL7urer's printed statements of complianc�s and applicability
4) Roughing-in diagram� and templates
5) Catalog cuts
6) Product phatographs
CITY OF FQRT WORTH 2O22 Band Year 1— Con[ract 5
STANDARI] CONSTILUC'I�dN SPECIFICATIOA[ DOCLIMEI�ITS City Project N�o, 102931
Revised 17ece�nber 20, 2012
013300-4
SUSM[TTALS
Page 4 of 8
7) Standa�d wi�•ing diagrams
8) Printed performance curves and operational-range diagrams
9) Pa•oduction or quaIity eonirol inspac#ion and test reports and certifications
10) Mill reports
11) Praduct operating and maintenance in.structions and recaz�aznended
spare-parts listing and printed product warranties
12} As applicable to ihe Work
H. Samples
A.s specified in individua] Sactions, include, but are nat necessarily limited to:
a. Physical examples of the Work such as:
1) S�ctions of manufacturad or fabricated Work
2) S�nall cuts or containers of inaterials
3) Complete units oirepetitivcly usad products color/textux•e/pattern svvatches
and range sets
4) Specimens for caordination af visual eifect
5) Grapllic symbols and units of Work to be used by the Ciiy for independent
inspection and testing, as applicable to the Work
L Do not start Work reqUiring a shop drawing, sample or product data nor any material to
be fabricated ar installed prio�• to the approval ar qualified approval of such item.
1. Fabrication pe�ormed, materials purchased or on-site construction accomplished
which does not conform to approved shop drawings and data is at the Contractor's
risk.
2. The City will not be liable for any expense or delay due to corrections or remedies
required ta accomplish con%rmity.
3. Ca:nrzplete project Work, materials, fabrication, and installations in conformance
with approved shop drawings, applicable samples, and product data.
J. Submittal Distrib�.rtion
Electronic Distribution
a. Confirm development of Project directory for electronic submittals to be
uploaded io City's Buzzsaw sit�, or another external FTP site approved by the
City.
b. Shop Drawings
1) Upload snbmittal to designated project directory anci notify ap�rapriate
City representatives via einaii of submittal posting.
2) Hard Copies
a} 3 copies for alI submittals
h) If Gantractor requires zx�.ore than 1 hard copy of Shop Drawings
returned, Contractor shall submit more than the number oi copies listed
above.
c. Product Data
1} Upiaad submittal to d�signated project directory and n�tify appropriatie
City representatives via email of submittal posting.
2) Hard Copies
a) � copies for all submiitals
d. Samples
1) Distributed to tha Project Representative
2. Hard Copy Distribution (ifreyuired in lieu of eiectronie distribution)
C1TY OF FORT WORTH 2U22 Sond Year I-- Coi�tract 5
STANDAItD COI�ISTRUCTIQN SPECIFICATI�N DOCUMENTS City ProjectNo. I0293I
Revised December 2Q 2012
013300-5
5UBMITTALS
Page 5 of 8
a. Shop Drawings
1) Distrzbuted to the City
2) Gopies
a) 8 copies far meelianical submittals
b) 7 capies for a11 other submittals
c) If Contractor requires more ihan 3 co�aies of Shop Drawings returned,
CQntracior shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2} Copies
a) 4 copies
c. Sampies
1} Distributed to the Project Representaiive
2} Copies
a) Submit the number stated in �he respective Specif cation Sections.
Distribute repraductions oi approved shop drawings and copies of approved
product data and samples, where r�quired, to the�ob site �le and elsewhere as
direeted by the City.
a. Provide number of copies as directed by' the City but not exceeding the number
previous�y specified.
K. Submitt�] Review
1. The revzew of shop drawings, data and samples wi�l be for general conformance
with the design concept and Contract Docurnents. This is not to be construed as:
a. Permitting any departure from the Contract requirem�nts
b. Rei�eving the Cont7ractor of respa�zsibility for aaay errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, �xcept as otherwise
pro�ided herein
2. The review and approwal of shop drawings, samples or product data by the City
does not relieve the Contractor fram hislher responsibility vvith regard to the
fuliillment af the terms of the Conteact.
a. AIl risks of error and omission are assumed by the Contractor, and the City will
hav� no responsibility iherefore.
3. Th� Contractor remains responsible for d�tails and accuracy, for coordinating the
Work with all other associated work and trades, for selec�ing fabrication processes,
iar techniques oi asssmbly and for per%rming Work in a sa% manner.
4. If the shop drawings, data or sarnples as subrnitted describe variations and show a
departure from the Contract requirements which City finds to be zn the interest of
the City anc� ta be so minor as not to invalve a change in Contract Price or time for
per%rmanee, the City may return the review�d drawings without nating an
exception.
5. Submittals will be returned to the Con#ractor under 1 af the following codes:
a. Code 1
1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or
comments on the su�mittal.
a} When returned under this code the Contractor rnay release the
eyuipment andlor material for �nanufacture.
b. Code 2
C1TY OF F�RT WORTH 2O22 Bond Year 1— Conlract 5
STANDARD CON5TAi1CTION SPECIFICATION DOCUMENTS City Project No. 102931
Revised becember 20, ZDI2
013300-6
SiJ81VI1TTAL5
Page G oF S
i) "EXCEPTIDNS NOTED". This code is assigned when a con%rmation of
the notations and comrnents IS NOT required by the Cantractor.
a) The Contractor may release the equipment or material �ot- manufaeture;
howevar, all notations and commants must be incorporated into the
fznal product.
c. Code 3
1} "E�CEPTIONS NOTED/RESUBMIT". This combination �f codes is
assigned when notations and comments are extensive enou�h to require a
resubmittai aithe pacicag�.
a) The Contractor may reIease the eyuip�nent or material for �nanuiacture;
however, all notations and comments mus� be incorporated into the
final proc3uct.
b) This resubmittal is to address all comrnents, omissions and
nan-conforming items that were noted.
c) Resubmittal is to be recei�ed by the City wi�liin 15 Calendar Days of
the date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED" is assigned when tha subinittal do�s not meet �he
intent of the Cantract Documents.
a) Tl�e Contractor must resubmit the entire package r�vised to bring the
sub�ittal into confarmance.
b) It rnay be necessary to resubmit using a different manuiachuer/vendor
to rr�eet the Contract Documents,
6. R�submittaIs
a. Handled in the same rr�anner as fust submittals
I) Corrections othe�• than requested by the Ciiy
2) Marked with revision triangle or other similar method
a) At Cantractor's risk if not �arked
b. Submittals for each item wiII be reviewed no more than twice at the City's
expense.
1) All subsequent reviews will be perforined at times convenient to the City
and at the Contractar's axpense, bas�d on the City's ar City
Representative's then prevailing rates.
2) Provide Contractor reimbursement to the City �vithin 3� Calendar Days far
all such fees invoiced by the City,
c. The need for more than 1 resubmissian or any other delay in obtaining City's
review af submittals, wilI not entitle Yhe Contractor to an extensian of Contract
Tiz�n.e.
7. Partial Submittals
a. City reserves the right to not reviaw sub�ittals deemed partial, at the City's
discretion.
b. Submittals deemed by the CiLy to be not complete rvill be returnad ta the
Contractor, and will be cansidered "Not Approved" unYil resubmitted.
c. The City may at its opfiion provide a list ar mark th� submittal directing the
Contractar to the areas that are incomplete.
8. If the Con#ractar considers any correction indicated on the shop drawings to
constitute a change to the Contract Documents, then written notice must be
pro�widad thereof tQ the City at least 7 Calenc�ar Days prior to release for
manufacture.
CITY OF FORT 4170RTH 2Oz2 Bond Year 1— Gontracf 5
STANDARD CONSTRUCTION SP�CIFICATION IJOCUMENTS City ProjectNo. 102331
Revised Decemher 2�, 2012
ai33oo-�
SUB�vITTTALS
Page 7 of $
9. When the shop drawings ha�e been completed to the satisfaetion oi the City, the
Contractar may carry out the conslruction in accardance therewith and no further
changes therein except upon written instructions from the City.
10. Each submittal, appropriately eoded, will be returned within 34 Calendar Days
fo�lowing receipt of submittal by t�e City.
L. Mock ups
1, Mock Up units as speci�ed in inciividual Sections, include, but are not necessarily
limited to, complete units of the standard of acceptance for that type of Work to be
used on the Project. Remove at the camptetion of the Woric or �vlten direct�d.
M. Quali�'ications
�, Tf specificalIy required in other Sections of these Specz�cations, subnnit a P.E.
Certif catian for each item reyuired.
N. Request for Informati�n (RF�
Contractor Request far additional information
a. Clarification or in#erpretation of the contract documents
b. When the Contractor belieues there is a conflict between Con�ract Documents
c. Wheai the Contractor belie�es there is a canflict 6etween the Drawings and
Specifications
�) Ide�tify the confl�ct and request clari£'ication
2. Use the Request for lnfoY•mation (RFI) form provided hy the City.
3. Numbering of RFI
a. Pre�i� with "RFI" followed hy series number, "-�cx", beginning with "01" and
increasing sequentially with each additional transnnittal.
4. Suff'icient infQr�nation shall be attached to permit a written response without further
information.
5. The City will log each request and will review the request.
a. If review of the project information request indieates that a change to the
Contract Documents is required, the City will issue a Field Order or Changa
Order, a� appropriate.
1.� SUBNIITTALS [NOT USED�
L6 ACTION SUBMITTALS/INI'ORMATIONAL SUBIVIITTALS [NOT USED]
1..7 CLOSEOUT SUBMITTALS [NOT US�DJ
1.8 MAINTENANCE MATERIAL SUBNIITTALS [NOT U�ED]
1.9 QUALITY ASSURANCE [NOT i75ED]
1.10 DELIVFRY, STORAGE, AND HANDLING [NOT USED]
l.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT U,SED]
CTTY OF FORT WORTI� 2022 Bond Year 1—Cantract 5
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102931
Revised December 24, �O12
Q1330D-S
SUBMITTALS
Page 8 of 8
PA.RT 2 - PRODUCTS �N�T USED]
PART 3 - EXECiTTION [NOT USED]
�ND OF SECTION
Revision Log
DATE NAME
i2izo�aoi2 n. rar�,sfl�
SUMMARY OF CHANG�
1.4.K.8. Working Days modifed to Calendar Days
CITY OF FORT WORTH 2O22 Bond Year 1— ContracF 5
STANDARD CONSTRUCTION SPECiF1CATTON DOC[JMENTS City ProjectNo. 1U2931
Revised becember 2Q, 2012
O1 35 l3 - 1
SP�CIAL FRQJECT PROCEDURE3
Page 1 of 8
2
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6
7
S
9
10
11
12
13
14
15
16
17
18
I9
SECTrON 013� 13
SPECIAL PROJECT PR�CEDURES
1. Tk�e �rocedures f�r special pro�ect circ�mstarices that includes, but is not limited to:
a, Coordination witk� the Texas Depart�ent of Transportation
b. Work near High Voltage Lines
c. Confined Space Entry Program
d. Air PoSlution Watch Days
e. Use of Explosi�+es, Drop Weight, Etc.
f. Water Department Noiiiication
g. Pubiic Notificatian Prior to Beginning Co�astruction
h. Coordination with United States Army Corps of Engineers
i. Coordination withui Railraad permits areas
j. Dust Control
k. Employee Parking
B. Deviatians from this City of Fort Worth �tandard �pecification
1. None.
20 C. Related Specificatinn Sectinns include, but are not necessarily limited to:
2l 1.. Division 0— Bidding Ree�uirements, Cantract Forms and Conditians of the Contract
22 2. Divisian J— Genera! Requirements
23 3. �ection 33 12 25 — Conneetion to Existing Water Main�
24 1.2 PRICE AND PAYMENT PRUCEDURES
25
26
27
28
29
30
3i
32
33
34
35
36
37
38
39
40
41
42
A. Measurerrn.ent and Payment
1. Coardination within Railraad permit areas
a. Measurement
1) Measurement far this Item will be hy lump sum.
b. Payment
1) The work performed and ma�erials fiirvished iu accordance with this Itenr�
will be paid for at the lump sum price bid for Railroad Caordination.
c. The price bid shall include:
1) MobiIization
2) Inspection
3) Safety traznmg
4) Additional Tns�arance
5) Insurance Certificates
6) Other requirements associated with general caordinatian with Railroad,
including additional employees required to protect the right-of-way and
property of tYze Railroad frozn damage arising out of and/ar from the
construction of the Project.
2. Railroad Flagmen
CITY 0�' FORT WORTH
STANDARD CO3VSTRUCTIDN SP�CIFICA770N bOCUMENTS
Revised Decemher 20, 2012
s
2022 Bond Year 1— Contract 5
Cify Project No. 102931
D13513-2
SP�CIAI, PRO]ECT PROCEDURES
Page 2 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
a. Measurement
1} Measurem�nt for this Itein will be per working day.
b. Payme�rt
1) The work performed and materials furnished iz� accordance with this Item
wzll be paid far each working day that Railroad Flagmen are present at th�
Site.
a The price bid shall znclude:
1) Coordination for scheduling flagmen
2) Flagmen
3) Other requirements associated with Railroad
3. Ali ather items
a. Work associated with these Items is considered subsidiaty to the various Items
bid, No saparate payment will6e aIlowed %r this Item.
14 1.3 REFERENCES
15 A. Reference Sta.udards
16 1. Reference standards cited in this Specifcation refer to the current reference
17 standard published at the tirne ofthe latest revision date logged at the end af this
18 Speeification, unless a dat� is speaifically aiied.
19 2. Healtli and Sa%ty Cod�, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
2.0 High Voltage Overhead Lines.
21 3. North Central Texas Council oi Gov�rntnenfs (NCTC�G) — Clean ConstructiQn
22 Specification
23 1.4 AD11uNTSTRATIVE R�QU�REMENTS
24 A. Coordi�ation with the Texas Dapartmen# of Transportation
25
26
27
28
29
30
31
32
1. When worlc in the right-of-way which is unde�• the jurisdiction of the Texas
Department nf Transportatian (TxDOT}:
a. Notify tlie Texas Department of Transportation prinr to corrirnencing aa�y woz•k
therein in accordance with th� provisio:ns of the permit
b. All work performed in the TxDOT right-of-way s1ialI be performed in
complia�ice �vith and subject to appror+al from the Texas Department of
Transportation
B. Wark near High Voltage Lines
33 1. Regulatory Requirements
34 a. All 'Work near H�gt� Voltage L�nes {mai•e than 60b volts measured between
35 conductors or between a conductor and the ground) shall be in accordance with
36 Health and Safety Code, Title 9, Subtitle A, Chapter 752.
37 2. Warning sign
38 a. Pravide sign of sufficient size meeting all OSHA requireznenis.
39 3. Equipment aperating within 10 feet of high v�ltage Iines will require the following
40 safety features
41 a. Tnsulating cage-typ� of guard about the boom ar arm
42 b. Insulatar links on the li$ hoole connections for back hoes or dippers
43 c. Equipment must meet the saf'ety requirements as set forth by OSHA and the
44 safety requirements af the awner of the high voltage lines
45 4. Wark within 6 feet of l�igh voltage eleetric lines
CITY OP' FORT V�ORTH 2O22 Bond Ycar 1— Contract 5
STANDARI� C�NSTRUCTIOI�C SPECI�'ICA'I'iON DOCUMENTS City Prajectt�o. 162931
Revised December 20, 2012
Ql 35 13 - 3
SPECIAL PROJECT FROCEi3URE5
Page 3 of S
1
2
3
�}
S
6
7
8
R
IO
1]
12
13
14
15
16
17
18
l9
20
21
22
23
24
25
2b
27
2$
29
3Q
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
a.
�
c.
Notifcation shall be given to:
1) The power company (example: ONCDR)
a) Maintain az� accurate log of all such ca11s to powar company and record
action taken in each case.
Coardination with power company
1) After �lotification coo�•dinat� with the povver company to:
a} Erect temporary mechanical barriers, de-enargize the Iines, or raise or
lower tha lines
No personneI may work within 6 feet of a Iaigh voltage line befare the above
requirements have been met.
C. Canfined Spa�e Entry Program
1. Provide and fa3low approve� Confined Space Entry Program in accordance with
OSHA requireme��ts.
2. Confined Spaces include:
a. Manholes
b. All otI�er confned spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Air Pollution Watch Days
1. Ganeral
a. Observe the following guidelines relating to wor[cing on City construetion sites
on days ciesignated as "AIR POLLUTION WATCH DAYS".
b. Typical Ozone Season
1) May 1 thrnugh Oci�ber 31.
c. Critical Emission Time
1} 6:OU a.m. ta ID:00 a.m.
2. Watch Days
a. The Texas Commission on Environmental Quality (TCEQ), iu coordinatian
with the National Weather Service, will issue the Air Pallution Watch by 3:d0
p.m. on tlie afternoon prior to the WATCH day.
b. Requirernents
1) Begin work after �0:00 a.m, whenever construction phasing requires the
use of motorized equipment fnr perinds in excess nf 1 haur.
2) However, the Contractor may begin work prior to 10:00 a.m. if:
a) Use of motorized equiprnent is less thae� I hour, or
b) If �quipment is new and certified by EPA as "Low Emitting", or
equipzx�ent barns UIt�a Low Sulfur Diesel (ULSD), diesel ezzlulsions, or
alte�native fuels such as CNG.
E. TCEQ Air Permit
1. Obtain TCEQ Air Permit far constrUction acti�ities per requirements of TCEQ.
F. Use oiExplosives, Drop Aireight, Etc.
1. When Cantract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to connmencing.
2} Minimum 24 hour pubIic notification in accordance with Section O1 31 I3
46 G. Water Department Coordination
CITY OF FORT WORTH
STANDARD CONSTRUCTIOt� SPECIFICATION DOCi1MENT5
Revised TJecember 20, 2012
2022 Bond �'ear ] -- Contract 5
CityProjectt�lo, 1a2931
Ol 35 13 - 4
SP�GIAL, PROJECT PROCEDURES
Page4of8
1 i. During ih� construction a�tl�is project, itwill be ��ecessary to deactivate, for a
2 period of time, existing lines. The Contractor shall be required to coordinate with
3 the Water Depart�ent to determine the best times far deactivating and activating
4 those lines.
5 2. Coordinate any event that will require cannectit�g to o�� the aperation of an exisiing
6 City water Iine system �vith tile City's representative.
7 a. Gaordii�ation shall be in aecordance with Section 33 12 25.
8 h. If needed, obtai�� a hyda�ant water meter fi•om the Water Depariment for use
9 during the life of na�ned project.
10 c. In the event that a water valve o�3 an existing Iiv� system b� turn�d aff az�d on
11 to acconnrnnodata the constructian of the project is required, coordinate this
12 activity through the appropriate City representative.
13 1) Do noti oparate watex line vaIves af existing wate� system.
I4 a) �ailure fo comply will render the Contractor in violaiion of Texas Penal
15 Code Title 7, Chaptar 28.03 {Criminal Mischie fl a�ad t�e Contractor
� 6 vvill be prosecuted to the full extent of the law.
I7 b) Tn addition, the Contractor will assume all liabilities a��d
f 8 responsi�ilities as a result of these aetions.
l9
20
21
22
23
24
25
26
2'1
28
29
30
31
32
33
3 �#
35
36
37
38
39
40
41
42
H. PubIic Notification Prior to Beginning Construction
l, Priar to beginning cons�ruction on any block in the project, on a block by block
basis, prapare and deliver a nafica or flyer of the pending construction to the front
doar af each resic�ence or business that will be i�npacted by construction. The notice
shall ba pr�pared as folIows:
a. Post notice or flyer 7 days prior to beginning any constructian activity on each
biock in the project area.
1) Prepare flyer an the Contrac�or's letterhead and include the follQwing
information:
a) Name af Project
b) City ProjectNn (CPN)
c) Scope of Project (i.e. type c�f construction activity)
d) Actual construction durafiion within the block
e) Nazne of the cozrtractar's fareman and phone nu�nber
f} Name of the City's inspector and phone number
g) City's after-hours phone nu�nn.ber
2) A sample ofthe `pre-construction notification' flyer is attached as Exhibit
A.
3) Submit scheduIe showing the aonstructian start and finish time for each
block oi the project to the insp�ctar.
4) Deliver flyer to the City Inspector for revie�u prior to distribution.
b. No construction will be aIlowed ta begin on any block uiitil the flyer is
d�livered to all residents af the black.
T. Publzc Notificatian af Terr�porary Water S�rvice Ir�terruption during Construction
43 1. In the event it becomes necessary #o tetnporarily shut down water service to
44 residents or businesses during canstruction, prepare and delzver a notice or flyer of
45 the pending interruption to the front door of each affected resident.
46 2. Prepared notice as follows:
�L7 a. The noti�cation Qr flyer shall be posted 24 haur� priar to the temporary
48 interruption.
CITY OF FORT WdRTH 2O22 Bond Year 1— Contract 5
STANDARD CONSTRUCTION SPECIi'ICATION DOCUNIENTS City Project No. 142R31
Revised Decemher 20, 2012
013513-5
SP6CIAL PAO]�CT PROCEDURES
Page 5 of 8
I
2
3
4
5
6
7
8
9
IO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
3S
36
37
38
39
40
41
42
43
44
4S
b. Prepare flyer on the contractar's Ietterhead and include the following
information:
1) Name ofthe project
2) City Project Nu�nber
3) Date of the interruptinn of service
4) Period tha interruption will take place
5) Nana.e of the contractor's foreman and phone number
6} Name o�the City's insp�ctor and pt�one number
c. A sample af the tem.porary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy oi�he temporary interruption nc�tification to the City inspector
fnr review prior to being distributed.
e. No interruption of water service can occur until the �lyer has been deli�ered to
all affecfied resic�ents and businesses.
f Electronic versions of the sample flyers can be obtained from tlie Projecti
Coz�struction Inspector.
J. Coflrdination with United States Army Corps af Engineers ([J�ACE)
l, At locations in the Project where constructian aciivities occur in areas where
iTSACE permits are required, meet ail requiremants set forth in each designated
permit.
K. Coordination within Railraad Permit Areas
2
3
At locations in the project where construction aciivities occur in areas where
railroad permits are required, meet all requirements set forth in each designated
raiiroad permit. This incIudes, but is not limited to, provisions far:
a. Flagmen
h. Inspectars
c. Safety training
d, Additianal insurance
e. Insurance certificates
£ Other employees required ta protect the right-of-way arid prnperty of the
Railroad Company fram damage arising out of azidlor from the construction of
the project. Proper utility clearance procedures shall be used in accnrdance
with the permit guidelines.
�btain any supplementa� information needed to comp�y witt� the railroad's
requirements.
Raijroad Flagmen
a. Submit receipts to City for veri#ication of working days that railroad flagmen
were present on Site.
L. Dust Control
1. Use acceptable tneasures to ca�trol dust at tlie Site.
a. If tvatee is used to control d�as�, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
M. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FO1tT WORTH
STANI?AItD CO2�[STRUCTION SPECIFICATION DOCUME3VTS
Revised becember 2D, 2012
2022 Sond Year 1— Contract 5
City Praject rfo. 102931
013513-6
SPECIAL PRQ,TECT PROCEDURES
Page 6 of &
1 1.5 SUBMITTALS [NOT USED]
2 1.6 ACTION SUBMTI'TAL�IINFORMATIONAL SUBMITTALS [NOT IISED]
3 1.7 CLOSEOUT SUBMITTALS [N�T U�ED]
4 1.8 MAINTENANCE MAT�RIAL SUBMITTALS [NOT LTSED]
5 1.9 QIIALITY ASSiTRANCE [NOT iTSED]
6 1.I0 DELIVERY, STQRAG�, AND HANDLING [NOT USEI3]
7 1.11 FIELD [SITE] CONDITIONS [NOT USED]
8 1.1� WARRANTY [NOT USED]
9 PART � - PRODUCTS [NOT USED]
I D PART 3- EXECUTION [NOT USED]
II
12
DATE N1�ME
8/31/2012 D.Johnsan
13
END OF SECTION
Revisivn Log
SUMMARY OF CHANG�
1.4,B — Added requirement of compliance with Health and Safety Cod�, Title 9.
Safety, 5uhtitle tl. Pub[ic Safety, Chapter 752. High Voltsge Qverhead I,ines.
1.4.� — Added Gontt�ctor responsibility for obiaining a TCEQ Air Permit
CITY OF FORT WORTH 2O22 Bond Year 1— Contract 5
STAI�fDE1RD CaIdSTRUCTIDN SPECIPICATIQN bOCL]MENTS City Project No. 102931
Revisad December 20, 2012
ai3si3-�
SPECIAL PROJECT PROCEDURES
Page 7 of 8
1
2
3
4
5
b
7
8
9
10
it
12
l3
14
IS
I6
»
l8
19
20
21
��
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Date:
CPN No.:
Projecf Name:
Mapsco Location:
Limits of Constr�ction:
EXHIBIT A
(To be printed on Contractor's Letf�rhead)
— �
� '� � '�
� � i �
�
I
i
�
I II 'I
��is �s �o in��o��w You ���,� u���� �► eo����c� uv��b Tb� ci�Y o� �o�-r
1fl101�ib, OUR C��4�IP,�NY l�i�ILL 1�lORK QR! UTILIiY LlhlES Oh� OR AROUhl�l YOUI�
F�ROPERTY.
COP�STRUCiIOR� L�.�ILL BEGIRI �PPROXIf�AiELY SEV�N] DAYS ��O�dY Y!-6G QA��
oF THis worie�.
IF YOU bAVF QU�SilO�lS A�OUi ACC�55, SECURfTY, 5AFEiY OR �iVY OTW��i
ISSU�, PL��ASL� C�eL�:
Mr. <CONTRACTORTS SUAERINTENDENT� 14� C7�LEPFiOIVE NO.>
��
f�C. GCI7Y [NSP�C70Ft> i4� � TELEPHON� NO.�
AFY�R 4:30 �fVdY OR OiV 1N��l�C��l�S, ����4S� G�o�� (�1�) 392 83D6
PLEASF KEEP 7HIS FLYER HANDY WHEN YOU GALL
C1TY OF FORT WDRTH
STA]VDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Reviscd �ecember 2D, 2012
2D22 Bond Year 3— Confract 5
City ProjectNo. I02931
01 35 l3 - 8
SP�CIAL PAO]�GT FROC�D[1A�S
Yage 8 ai 8
1
2
EXHIRIT B
���T V�ORTH
�,:
�� ��. �
�� �:
�07'��� �� �'��p��� v���'��t 5���[��
���`���u�'�o�i
DUE TO UTILI'I'Y iMPROVEMENTB IT�I YQUIi 1rTEIGfIBQRHOOD, YOUR
WATER 5�12'VICE WiI.L BE 71VTEIiRT71'TEIl Ol�
BETVI'EE�i THE SOURS DF' A1�TD .
1F1'bi) HAVE QUESTIONS ABQi77�' T�II5 SHiTT-OUT, PI.�ASE CAI.L:
Mlt. A'P
(COAiTRA,CTORS SUPEHINTEI�FAErT�'} ('1'ELEPFIOTIE NI3NYBEIt)
OR
Mg, AT
(G1TY Ti�SYECTOR) (TEL�PHOI+T� NiIMBER}
'I'HIS INCONVENiE1�TCE'WIE�L HE AS SHOTt'I' AS POSSIBLE.
TFTAI+IK YOU�
, COI�TTRACTOR
3
4
CITY QF FORT WDRTH
STANDARD CONS'I'RUCfION SP�CICICATION DOCUNi�NTS
Revised 7]ecember 20, 2012
2D22 Bond Year I— Contract 5
City Prajecttso. 102931
014523
T�STING AND I3dSY�C1'ION SERVICES
Page 1 oF2
SECTTON O1 4� 23
TESTING AND INSPECTIQN SERVICES
PART I - GENERA.L
11 SiJMMARY
A. Section Inclucies:
1. Testing and inspection services procedures and coordination
B. Deviations ftom tliis City of Fort WorFh Standard Speci�catian
1. None.
C. R�Iated Speci�cation S�ctions includ�, but are not necessarily li�nited ta:
1. Di�+ision 0— Bidding Requirements, Contract Forms anc� Canditians of the Contract
2. Division 1— General Requi�•en�ents
1.� PRICE AND PAYMENT PROCEDITRES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed f�r this Ttem.
a. Contractor is r�sponsibl� for perForming, coordinating, anc� payment af all
Quality Control #estin,g.
b. City is responsible for performing and payment for first set of QualiLy
Assurance testing.
1) If t�.e £'�rst Quality Assurance test performed by ihe City fails, the
Contractar is responsible for payinent of subsequent Quality Assurance
testing until a passing #est occurs.
a) Final acceptance wi�l not be issued by City until all required payments
for t�sting by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQiTIREMENTS
A. Testing
1. Complete testing in accardance with the Contra.ct Dacuments.
2. Caordinatzon
a. When testing is required to 6e performed by the City, notify City, sufficiantly
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, nvtify City,
sufficiently in advance, that testing wilY be perfoz�n�.ed.
3. Disiribution of Testing Reports
a. Electronic Distributian
1) Confirm development of Proj ect dzrectory for el�ctron�ic submittals to be
uploaded to the City's document management systerri, or another externa!
FTP site approved by the City.
CI'I'Y QF F�It7' W4RTH 2p22 Bond Year I—Contract 5
STANDARB CON3TRUCTIQN SPECIFICRTION DOCUIVIENTS City Pro,�ectNo. 102931
Revisad March 9, 202D
O1 �45 23
TESTINCr AND iNSPEGTION SERVIGES
1'age 2 of 2
2} Upioad tast ra�orts to designated project dire�tory and notify appropriat�
City representati�es via email of submitta� posting.
3) Hard Copies
a) 1 copy for all submittals sub�nitted to the Praject Representative
h. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests perfor�ned by the Contracior
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Projeet Representa�ive with ttip tickets %r each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date af delivery
c. Material delivered
B. Inspection
1. Inspectian or lack of inspection daes not relicve the Contractar from obligation to
perform work in accordance with tF�e Contract Documents.
i.� susrnrrTAL,s INOT us�na
�.6 ACTIDN �iTBNIITTALSIIl�TF�RMATIONAL SUBNIITTALS [NOT iTSED]
l.i CLOSEOUT SUSN�TTA.LS 1NOT USED]
]..S MAINTENANC� MATERIAL SiTBMITTALS �N�T LTSED]
1.9 QUALITY ASSURANCE [NOT USED]
1.1U DELIVERY, STORAGE, AND HANDLING [NOT USED]
111 FIELD [STTE] CONDYTrONS [NOT C]'�ED]
1.12 WARRANTY [NOT U��D]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CI3ANGE
3/9/2020 D. V. Maga�3a Removed reference ta Buzzsaw and nnted that electronic suhmittals be uploaded
through the City's document management system.
CITY QF' FpI2T WpitTH 2Q22 Bond Year 1— Cvntract 5
STP.M7ARD CONSTRUCTION SPECIPICATIQN DdCUIVIEMTB City PrQject No. 10293I
Revised March 9, 2020
ox so oa - r
TEMPOR�IRY FACTLITIES AND COI�[TROLS
Page 1 nf4
SECT�ON �1 SQ 00
TEMPORARY FACILITIES AND CONTROLS
PARTI- GENERAL
1.1 SUMMARY
A. Secxion IncIudes:
�ro�ide terr�porary facilities and contro�s neec�ed for the Wark including, but not
necessarily litnited to:
a. Temporary utilities
b. Sa�xitary facilities
c. Storage Sheds a.nd Buildings
d, Dust confrol
e. Temparary fencing of the construction si�e
B. Deviations from this City of Fort Warth Standard Specifcation
1. None.
C. Related Specifcation Sections include, but are not necessarily limited to:
l. Division 0— Bidding Requirements, Contract Fortns aind Conditions of the Contraci
2. Division 1— General Requirernents
1.2 PRICE �ND PAYIVIENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed far this Item.
] .3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQ[7IREMENTS
A. Te�porary Utilities
1. Obtaining Temporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules ar�d regulations of �tility ser�ice cnmpanies or authorzties
having jurisdicti�n.
c. Be responsible for utility service costs until Work is appraved for Final
Aeceptance.
1) Inciuded are fuel, power, light, heat and ather uiility serviees necessary %r
execution, completion, tasting and initiaZ operation of Work.
2. Water
a. Contractor to pravid� vvater required for and in connection with Work to be
per�orrrted and for specified tests of piping, equipment, devices or other use as
reQuired for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnei and City's Projec� Representatives.
c, Coordination
1) Contact City 1 week before water for construction is desired
CITY DF FORT WORT�-1 2D22 Band Year 1— Contract 5
STANDf�RD CONSTRUCTIQN SPECIFICATIC}N BOCUMENTS City l'rojeet No, 102931
Revised July I, 2p11
o i sn oo - z
TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Coniractor Faym�ut for Cnnstxuctian Water
1} Obtain eonstruction water meter from City for payment as billed by City's
established rates.
3. Eleci�ricity and Lighting
a. Provide and pay for eleotric powered service as required for Work, including
testing of Work.
1) Provide power far ligh#ing, operation of equipment, or other use.
b. Elactiric pawer service ittcludes t�mporary po�ver servic� or generatar tn
maintair► operations during scheduled shutdown.
�4. Telephone
a. Provide emergency telephone service at Site far use by Contraotox pez�sonnel
and others performing rvork or furnishing services at Site.
5. Temparary H�a� and Ventilaiion
a. Pravide temporary heat as necessary for pro#ection ar completion af W�rk.
b. Provide temparary heat and ventilation to assure sa% working canditions.
S. �anitary Facilities
1. Provide and maizxtain sanitary facilities for persons on Site.
a. Camply with regulations of State and locaI departments of health.
2. En�orce use of sanitary facilities by construction personneI at job site.
a. Enclose and anclaor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and vvaste so as n.ot to cause nuisance o:r healih
problem.
d. Haul se�sn+age and waste off site at no less than weekly intervals a�1d properly
dispose in accordance with applicable regulaiion.
3. Locate facilities near Work Site and keep clean and maintained throughout Pcoject.
4. Ramove facilities at completion of Proj�ct
C. Storage Sheds and Buildings
l. Pravide adeyuatel�+ ventilated, watet kight, weathez�proaf starage facilities with floor
above ground level �or materials and equipment susceptible to weather damage.
2. Storage o� materials not susceptible to weaiher daznage rmay be orn blocks o�'
ground.
3. Store materials i�� a neat �id orderly manner.
a. Place materials and equipment to permit easy access for xdentification,
inspection and inventory.
4. �quip huilding with iockable daors a�id lighting, and provide electrical service for
equipment space heaters and heaiing or ventilation as necessary to provide starage
envirdnrnents acceptable to specified manuiacturers.
5. Fill and grade site for te�nparary st�uctures to provide drain.age away fronn
temporary and existing buildings.
6. Remave 6ui�ding from site prior ta Pinal Acceptance.
D. Tamporary Fencing
1. Provide aud �naintain far the duration ar constt'uction when required in contract
docLiments
E. Dust Conirol
CITY p�' F012T WOlt1'H 2O22 Bond Year 1— Conlract 5
STANDt1RD CONSTRLTCTION SPECIPICATIO�I DOCUIv1�NTS City Pro�ect No. 102931
Revised .luly 1, 2011
O15D00-3
TEMPORARY FACILITI�S AND COI�fTROLS
Page 3 af 4
1. Contractor is responsible for maintaitting dust control through the duration of the
project.
a. Contractor remains fln-call at all tim�s
b. Must respond 'ui a timely manner
F. T�;mporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUSMITTALS LNOT USEDJ
1.6 ACTION ,�USMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.i CLOSEOUT SUSMITTALS �NOT USED]
1.8 MAINT�NANCE MATERIAL SUI3NIITTALS [NOT USED]
1.9 QUALITY ASSiIRANCE LNOT USEDj
1.].0 DELNERY, STORAGE, AND IIANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT iTSED]
Ll� WA1t1ZANTY [NOT USED]
PART � - PRODUCT� [NOT USED]
PART 3 - EXECIITION [NOT USED�
3.1 INSTALLERS [NOT USED]
3.� EXAMINATYON [NOT USED]
3,3 PREPARATION [NOT U�ED]
3.4 INSTALLATIQN
A. Temporary Facilities
1. Maintain all temporary faeiiities for duration oiconstructian activiti�s as needed.
3.5 [REPAIl2] / [RESTORAT�ON]
3.6 RE-INSTALLATION
3.'� FTELD [oR� SYTE QUALITY CONTROL [NOT USED]
3.8 SYSTEM START[JP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY QF FORT WORTH 2O22 Bond Year 1— Contract S
STANDARD CONSTRUCTION SPEGIFTCATIOM DOCUIvIENTS Giry Project t�o. 1Q2931
Revised July 1, 201 i
0150OD-4
TEMFORARY FACILITIES AND CONTROLS
Page 4 of4
1. Remove all terriporary facilities and restore area after completion of the Woris, to a
co��dition equal to or better than prioa• to start of Work.
3.12 PROTECTION [NOT USED]
3.13 MAINT�NANCE [NOT USED]
3.14 ATTACHMENTS [NOT iTSED]
�ND DF SECT�ON
Itevisian Lpg
DATE NAME SUMI�lARY OF CHANGE
C1TY DF FORT W�RTIi 2022 Bond Year i— Contract 5
STANDARD CONSTRUCTION SPECIFiCATION DOCUMENTS Cify ProjeetNo. 102931
Revised .Tuly 1, 2411
OlSS26-I
STREET US�P�RM1T A1�Ii7IvfODICICATIOTIS TO`I'RAPTIC CdNTIiOL
Page 1 oF3
l
2
SECTION DI S5 26
�TREET USE PERMIT �ND MODIFICATIONS TO TRAFFIC CONTROL
3 PA.RT 1 - GFNERAL
4 1.1 SiJMMARY
S A. Sectionincludes:
G 1. Aclministrative procedures for:
7 a. Street Use Permi�
8 b. Modafication of approved traffic control
9 c. Remaval af Street Signs
10 B. Deviations frorn this City of Fart Worth Standard Specification
11 L None.
12 C. Related Specificatian Sections include, but are not necessarily limited to:
I3 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contiract
14 2. Division 1— General Requirements
IS 3. Section 34 7] 13 — Traffic Control
l6 1.� PRICE Al�ID PAYMII�IT PROCF.DURES
17 A. Measurement and Payment
18 1. Work associated with ti�is Ztem i� considered subsidiary to the various Items bid.
19 Nn separate payment will be allowed for this Item.
20 1.3 REE'ERENCFS
Zl A.Re%rence Standards
22 1, Reference standards cited in this sgecification refer to the currentreference standard
23 published at the time of the latesi revision date logged at the end oi this
24 specification, unIess a date is speeifically cited,
2S 2. Texas Manual on Uniform Traffic ControlDet�ices {TM[.1'I'CD}.
26 1.4 ADNIINISTR.AT'IVE REQUIRE117EnTTS
27
28
29
30
31
32
33
34
35
36
A. Traffic Control
1. General
a. Contractflr shall minimize lane closures and impact to vehicularlpedestrian
traffic .
b. When trafiic control plans are inc Iuded in tha Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
c. Vk�hen traffic controI plans are nQt included iz� the Drawir�gs, prepare traf�c
controlplans in aecordarfce with Sectian 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for revievtir of proposed Traffic ControL
CITY OF PORT WQRTH 2O22 Bond Year 1—Conlract 5
STANDAItD CONSTRUCI'[ON SPECIFICATION DQCiiM�NTS City ProjectNo. 10293I
Revised M�ch 22, 2D21
Ol 55 26 -2
STREET i75EPERM7T Ai+IDMODIFICAT[Ot�IS TQTR�rrIC CONTROL
P �ge 2 of 3
2) A firaffic control"Typical" published by City ofFart Wort11, the Texas
Manual LTnified Traffic ControlDevices (TMi_1'I'CD) or Te�s Department
of Transporiation {TxD01� can be used as an al�ernative to preparing
projectlsite specif�c traffic conl�olplan ifthe typical is applic�able to the
spec�ic project/site.
B. St�eet Use Fermit
10
I1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1. Prior fa installatian of Traffic Conirol, a City Street Use Pernni� is required.
a. To obtain Street Use Permit, submit Traffic Control Plans ta City
Transportatian and Public Wnrl�s Departmeni.
1) Allow a minimum of S wQrking days far perrnit review.
2) It is the Contractor's responsibility to coardinate review of Traffic Cont�rol
pIans for Street Use Permit, such tnat constr�etian is not delayed.
C. Modifieation tn Approved Traffic Conirol
1. Priar to instalIation traific control:
a. Submrt revised traffic control plans to City Department Transportation and
Public Wozks Depaz�tznent.
1) Revi�e Traffic Control plans in accordamce wifh Sectian 34 71 13.
2) AHow minimum 5 working days %r review of revised Traffic Control.
3) It is the Contractor's responsibi�ity to coardinate review of Traf�c ControI
}�lans For Street Use P�rmit, sueh that eonstruction is not dela.yed.
D. RemovaI of S#reet Sign
1, If it is datermined that a street sign must be remo�ed for consi�uetion, th.en cantact
City Transportation and Public Works Department, Signs and Markings Division to
remo�ve �h� sign.
E. Temporary Signage
26 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
27 requirements of the Iatest edition of the Texas Manual on Uniform Traffic Gontrol
28 Devioes (MUTCD).
29
30
31
32
33
3�4
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, ta the extent thatthe permazae�nt sign can be
reinstalled, contact the City Transportation and Puhlic Warlcs Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control S#andards
1. Traffic ControI Standards can he found an the City's website.
35 1.5 SUBMITTALS [NOT iI�ID]
36 A. Submit all rec�u�r�d documentation ta City's Project Representative,
CITY OF PORT WORTH 2O22 Sond Yeaz 1—Gontract 5
STANDAI2D CONSTRUGTION 5PECIFICATION DOC�.TNICI�TS City Project3�lo. 102931
Revised March 22, 2021
O1 5526-3
STREET US E PERMI'I' AND MODIFICAT IONS TO TRAFFIC CONTROL
Page 3 of 3
1 1.6 ACTION SLTSMITTALS/�NFORMATIONAL SUBMITTALS [NOT USID}
2 1.7 CLOSEOUT SUBIVIITTALS [N�T USID]
3 1.8 MAINTINANCE MATIItIAL SUBMITTALS [NOT USID]
4 L9 QUALITY ASSURANCE [NOT USID]
S 1.10 DII,iVERY, �'T�ORAGE, AND HANDLING [NOT iTSIII]
6 I.11 FiELD [S�TEJ �ONDITIQNS [NOT USED]
7 1.1� WARRANTY [NOT USED]
8 PART 2- PRODIICTS [NOT USID]
9 PART 3 - E�ECUTION [NOT �TSID]
10
ll
12
IND OF SECTION
Revision I.og
DATE NAME SUMMARYOF GHANGE
1.4 A. Added language to emphasize minimizing of lane cIosures and impact ro
traffic.
3/22/2021 M Ow�n 1.4 A. 1. c. Added languag� to allowfor use ofpuhlished traf#"iccontrol "Typicals" if
applicable to speci�'ic project/site.
1.4 F. 1) Remo�edreference to Bu�zsaw
1.S r�dded janguage re: s�btnittal of permit
CITY OF FORT WOItTH 2O22 Bond Year 1—Contraci 5
STANDAItD CONSTRUGTIOI*� SPEC�ICATION DqGUMEN'fS City ProjectNa. 102931
Revised March 22, 2�21
015713-1
STOI2M WATER POLLUT�ON PREV�NTION
Page l qf 3
�ECTION O1 �'7 13
STORM WAT�R POLLUTION FR�VENTI(7N
PARTI- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Ptacedures ior Storm Water 1'ollution Prevention 1'lans
B. Deviations from this City oiFort Worth Standard Speciiication
1. Nane.
C. Related Speci�catian $ectiofis include, but are nat necessarily Iimited to:
1. Division 0— Bidding Requzrements, Contract Forms and Conditions of the
Contract
2. Division 1— Genaral Requirements
3. Section 31 25 00 — Erosion and Sediment ControI
l.� PRIC� AND PAYMENT PROCEDUR�S
A. Measurement ar�d Fayment
1. Construction Activities resulting in less tltan 1 acre of disturbance
a. Work associatad with this Item is considered subszdiary to the v�rious Items
bid. No separate payment wiIl be ailowed for this Ttem.
2. Construction Activities resultii�g in greater tha�� l acre of disturbaiace
a. Measurement a�id Payment shall be in accordance with Section 31 25 00.
1..3 REFERENCES
A, Abbreviations anci Acroiiyms
1. Notice of Intent: NOI
2. Notice of Terminatian: NOT
3. Storrri �Vater Pallution Prevention Plan: SVVPPP
�l. Texas Cornmission op En�ironmental Quality: TCEQ
5. Notice of Ghange: NOC
A. R�farence Standards
1. Reference standards cited in ihis �pecification refer io ihe curreni reference
standard puUlished at the time of the latest re�rision date logged at the end of this
Specification, unless a date is specifically cited.
2. lntegrated Storm Management (iSWM} Technical Manual for Canstruction
Controls
1.4 ADMINISTRATTVE REQUII2EMENTS
A. General
1. Contractor is responsible for resolutian and payment of any fines issued associated
with compliance to Stormwater Pollution Pre�ention Plan.
CITY OF FORT WORTH 2D22 Bond Year I— Contract 5
STAI�fI]Al2i7 CONSTitUC'CION SF�CIFICATION DOCUMEI�[TS City ProjeetNo. 1D2931
RevisedJuly i,2Q11
Q15713-2
STORM WATER PDLLUT[ON PREVENTIOA!
Page 2 nf 3
B. Construction Activities resulting in:
I. Less than 1 acre of disturbanee
a. Provide erosion and sediment control in accordance with 5ection 31 25 00 and
Drawings.
2. 1 ta less than S acres of disturba.nce
a. Texas Pollutant Discharge Elimination System (TPDES) General Consiruction
Perrnit is requ�red
b. Complete SWP�P in accardance with TCEQ requirements
1) TCEQ Small Constructian Site Natice Required under general permit
TXR150�D0
a) Sign and post at jab site
b} Prior ta Preconstruction Meeting, send I copy to City DegarF.ment oi
Transportation and Public Works, Environmental Di�ision, {817) 392-
6088.
2) Provide erosion and sediment control in �ccardance with:
a) Section 31 25 00
b) The Drawings
c) TXRi �0440 General Permit
d) SWPPP
e) TCEQ requirements
3. 5 acres or more of Disturbanee
a. Texas Pollutaz�t Discharga EIiminatian �ystezn (TPDES) GeneraI Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI for�nn and subzxzit to TCEQ along with required fee
a} Sign and post at jo� site
b} Se�d copy to City Department of Transportation and Public Works,
Environmental Division, (817} 392-5088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 31 25 QO
b) The Drawings
c) TXRISQOOU General Permit
d) S WP�P
e) TCEQ requirements
4) Once fihe project has been completed and all the cl�seout requirements of
TCEQ have been met a TCEQ Natice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Wor[cs,
En�ironmental Di�ision, (817) 392-608$.
1.� SiJBMITTALS
A. SWPPP
1. Submit in accordance r�ith Section 01 33 00, e�cept as stated herein.
a. Prior to the Preconstruction Meeting, submi� a draft copy of SWPPP ta the City
as follows:
1) l cQpy to the City Project Manager
a} City Project Manager will forward to the City Depar�ment of
Transporta.tion and Public Works, EnvironmentaI Division for r�view
C1TY OF FORT WORTH 2O22 Bond Year 1— Contract S
STA3VISt1IiQ CDNSTI2TJCTIqN SPECIFiCATION DQCUB,i�NTS City Projeci No_ 102931
Revised.Tuly 1, 2q11
D15713-3
STaRM WATER POLLUTION PREVE�+17'ION
Page 3 of 3
B. Modified SWPPP
I. Iithe SWPPP is ravised during construction, resubmit �nodi�ed SVVPPP ta the City
in aeco�•dance witi� Section O1 33 OQ.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.`� CLO�EOi7T SUBM�TTALS [NOT USED]
1.8 MAINTENANCE MATER.�AL SUBMITTALS [NOT USED]
1.9 QiTALITY ASSUYtANCE [NOT U�ED]
110 DELNERY, STORAGE, AND HANDLING [NOT iTSED]
111 FIELD [SITE] CONDITIONS jNOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTTON
Revision Log
DATE NAME SUMMARY OF GHANGE
CITY OF FORT WORTH 2p22 Bond Year 1— Conhaat 5
STANDARD CONSTRUCTION SPEGIFICA`�ION I)OCUIvfENTS Ciry Project No. I0293I
Revised .Tuly 1, 20i1
O158I3-1
7'BMYORARY P1207�CT SIGNAGE
Page 1 of 3
SECTION 01 58 13
TEMPORARY PROJECT SIGNAGE
PART1- GENERAL
f�i ��il r 1�:� 1
A. Section Includes:
1. Temporary Project Signage Requir•ean:�ents
B. D�viatians ftom this Ciiy of �nrt WortI1 Standard Spacification
l. None.
C. Related S�eci�cation Sections inclucie, but are not necessarily limited ta:
1. Division 0— Biddzng Requirements, Contract Forms and Ganditi4ns af tlie Cantract
2, Division 1— General Requirements
1.� PRICE AND PAYlVIENT PR�CEDi]RES
A. Measurement and Payrn.ent
1. Work associated with this Ite�-n is considered subsidiary to the rrarious Items bid.
No separaie payment �vill be allowed for this Item.
l.3 REFERENCES [NOT IISED]
1.4 ADMIl�TISTRATTVE REQUIREMENTS [N�T USED]
1.3 SUSMITTALS [NOT USED]
1.6 ACTION �iJBNIITTALS/INFOTtMAT�ONAL SUBMITTAL� [NOT iTSED]
1.7 CLOSEOUT SUSMiTTAL� [NOT i]SED]
1.8 MAINTENANCE MAT�RiAi. SUBMITTALS [NUT USEDj
1.9 QUALITY ASSURANCE [N�T USEDj
1.1Q DELTVERY, STORAGE, AND HANDLING [NOT iTSED]
l.11 FIELD [SITE] CONDITION� [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS
�1 OWNER-FURNISHED Eax] DWNER-SUPPLIEDPRODUCTS [NOT USED]
�.� EQY7lPMENT, PRODUCT TYPES, AND MATERiALS
A. Design Criteria
1. Prnvide free sYanding Praject Designation Sign in accordance witli City's $tandard
Details far praject signs.
CITY OF FORT WQRTH 2U22 Bond 1'ear 1— Contraet S
STANDARD CONSTRUCTION SPECIFICATION I]OCUMENTS City Project No. 102431
Revised Juiy 1, 2011
o� ss �� -x
TEMPORAKY PR07ECT SIGNAG�
Page 2 of 3
B. Matarials
1. Sign
a. Construc��d af 3/a-inch fir plywaad, grade A-C (exterior} or b�tter
2.3 ACCES50RIES [NOT iTSED]
�.4 SOURCE QUALITY CON'TROL [NOT IISED]
PART 3 - EX�CUTION
3.1 INSTALLERS [NOT USED]
3.� EXANIINATION [NOT USED]
3.3 PREPARATIQN [NOT USED]
3.4 INSTALLATI�N
A. General
1. Provide vertical iustallation at extents of projeet.
2. Relocate sign as needed, Upon request of the City.
B. Mounting options
a. Skids
h. Posts
c. Barricade
3.� REPAIR / RESTORATION [N�T USED]
3.6 RE-INSTALLAT�ON [NOT USED]
3.'� FIEI.�D [oR] SITE QLTALI�Y CONTROL [N�T USED]
3.8 SYSTEM STARTiTP [NOT USED]
3.9 ADJIT�TING [NOT iT�ED]
310 CLEANING [NOT iT�ED]
3.11 CLQSEO'CI�T ACT�VITiES [NOT IISED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE
A. Gene�al
1. Maintenance wiil include painting and repairs as needed or directed by the City.
3.14 ATTACHNIENTS [NOT USED]
�ND OF SECTION
CITY OF FORT WORTH 2O22 Bond Year 1- ConYracf 5
5T�1ND�1FtD CONSTRUCTION SPECIFTC�TION D�CUMENTS City Froject Na. 102931
Revised 7uly 1, 2011
fl15813-3
TEiv[PORARY PR07ECT SIGTIAGE
Page 3 uf 3
Revision Log
DATE NANfE SUMMARY OF CHANGE
Cl'TY OP FpRT WORTH 2O22 Bond Year 1— Contract 5
STANDARD CONSTRUCTION SPECIFICA7'ION DOCUMENTS Ci[y Project Na. 102931
Aeviscd 7uly I, 201 !
p� 6p �0
PROI7UCT REQUIREMENTS
Page 1 of 2
s�cT�oN oi 60 00
PRODL7CT RE�UIREMENTS
PART1- G�N�RAL
1.1 SUMMARY
A. 5eetion Includes:
1. References for Product Requirements and Ciiy Standard Products List
B. Deviations from this City of Foz� VSJorth Standard Speei�cation
1. None.
C. Related Specification 5ections include, bvt are not necessarily limited to:
1. Division Q— Bidding ReqLtiremants, Contract �'orms and Conditions of the Contract
2. Divisian 1-- General Requireinents
1.2 PRCCE AND PAYMENT PROCEDYTRES [NOT USED]
1.3 R�F�RENCES [NOT USED]
1.4 ADMlNISTRA'I'1V�: REQUIIt�GMENTS
A. A list af City approvEd products for use is available thcaugh th� City's website at:
https://a�ps.fortwarihtexas.gov/ProjectReso�r�esl and follovv�ing the directory path;
02 - Constt-uction Dacuments/Standard Products List
B. Only products specifically incIuded on City's Standard Product List in tihase Cont�•act
Docu��ents shall be allowed for use on the Project.
l. Any subsequently approved products will only be aliowed for use upon specifc
approval by the City.
C. Any specific praduct requirements in the Gontract Documents supersede similar
praducts included on the City's Standard Product Li�t.
1. The City reserves the right to not allow praducts to be used for cer�ain projects even
though the product is lisied on the City's Standard Product List.
D. Although a specific product is included on City's Standard Product List, not all
prnducts from �liat tnanufacturar are approved for use, including but not limited to, that
manufacturer's standaa•d product.
E. See Section Ol 33 00 for su6mittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBNIITTALS [NOT U�ED]
1.G ACTION SUBMITTALS/Il�iFORMATIONAL SUBNIITTALS [NOT �CJSED]
1.7 CLO�EOUT SUBMITTALS [NOT iTSED]
1.8 MAINTENANCE MATE�tTAL SUBMY'I"TAL� [NOT i7SED]
i.9 QUALITY ASSIIRANCE jNOT U5ED]
C1TY OI' FOR'1' WORTH 2O22 Sond Year 1-- Contract 5
STANDARD CONSTRiTCTIOi+I SPECIFICATIDN DOCUMENTS City Project Mo. 102931
Revised March 9, 2020
O] 60 00
PRODUCT REQUiR�MENTS
Page Z of 2
1.1U D�LIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDYTTONS [NOT USED]
112 WARRANTY [NOT USED]
PART 2 - PRODUCT5 [NOT IISED]
PART 3 - EXECUTIQN [N�T II�ED]
END OF SECTTON
Revision Log
DATE NA1V�
10/12/12
3191202a
SiJNIMARY OF CHANG�
D. Johnson Madit3ed Location af City's Standard Product List
Removed reference to Buzzsaw �nd noted that the City approved products list is
ll. V. Maga�a accessible througl� the City's website.
C1TY DF FORT W�IiTH 2O22 Bond Year 1— Cqniract 5
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS Ciry Froject No. 102931
Revised March 9, 2020
O1 66 00 - 1
PRODiTCT 5TOR�GE AND HANI)LR�lC� k2�QUIRGMENTS
PAge 1 af �4
SECTION 0166 00
PRODUCT STORA�E AND HANDLI7�IG REQi]IREIV�NTS
PART1- G�NERAL
L 1 SiJMMARY
A. Saction Tncludes:
1. Scheduling of product deIivery
2. Packaging of praducts for delivery
3. Protectinn af produats against damage from:
a. Handling
b. Exposure to elements or harsh e�vironments
B. Deviations fromthis City afFort Wortl� Standard Speciiication
L Noue.
C. Related Specification Sectious include, but are nat necessarily limited to:
]. Division 0— Bidding Requirements, Contract rorms and Conditions af the Cantract
2. Division 1— General Requirements
1.2 PI2ICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Wark associated with this ltem is considered subsidiary to the various Iten�s bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADM�NISTRATIVE REQUIREMENTS [N�T USED]
1.5 SUBNIITTAL� [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT U�ED]
1.'7 CLOSEOUT SiTBNIITTALS [NOT U�SED]
1.8 MAINTENANC� MATERIAi� SUBNIITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.I0 D�LIVERY ANI) HANDLING
A. Delivery Requirements
1. Scnedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment ta receive deliveries.
3. Delivery trucks will not be permitted to wait extended peri�ds of time on the Site
for personnal or equipment to receive the deliv�ry.
CITY OF FORT WORTH 2O22 Bond Year 1— Contract 5
STANDARD CONSTRUCTI0�15PECTFICATION DOCUMENTS City Project No. 102931
Iievised 7uly 1, 2U11
or 66 00 - z
PRODUCT STORAGE AND HANPI,ING REQUIit�Ivl�N'1"S
Page 2 of 4
4. Deliver products or equipment in manufacturer's original unbroken cartans or other
containers designed and constructed io protect the contents from physical or
environmental da.mage.
5. Clearly and fully mark and ic�entify as to manufacturer, item and installation
lncation.
6. Provide manufacturer's instructions for starage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with tliese Contract Document� and
manufacturer's recommendations and inst�•uctions.
C. Storage Requirements
1. Store materials in acoordance with manuiacturer's recnmmendations and
requirements of these Specif cations.
2, Make necessary provisions for safe storage of materials and eyuipment.
a. Place loose soil materials and materials to be incorporated into Work to prev�nt
darnage to any part of Work or existing faciIitie� and ta nnaintain free access at
aIl tinaes to all parts of Wark and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locatians that will
cause minimum incanvenience ta other caniractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide eas� access for inspection.
4. Resirict storage to areas avaiIable on construcfiQn site for sforage of material and
equipment as shown on Drawings, ar appraved by City's Project Representative.
5. Provide off-site storage and protection when on-site storage is not adequate.
a. Provide addresses of and access to off-site storage locations for inspection by
City's Proj ect Repres�ntative.
6. DQ not use lawns, grass plots or ot�er private property for storage purposes withou�
written pernaission of awner or other person in possession or conirol of premise�.
7. Store in rnanufacturers' unapened container•s.
8. Neatly, safe�y and cornpactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property awners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public ar►d �rivate dri�eways and street crassings open.
I�. Repair or replace damaged lawns, sidewalks, streefs or other improvements ta
satisfaction of City's Project Representative,
a. Total iength which materials may be distributed along route of consiruction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Rc:presentative.
C1TY RF FORT WOR'I'H 2O22 Bond Year I— Contract 5
STANDARD CONSTRUCTION SPECIFICATlON DOCUMENTS Cily Project No, 1Q2931
Revised July 1, 2Q1 L
oi �� ao - 3
PRODUCT STORAGE AND HANDLING REQUIREMENTS
Paga 3 of4
l.l.l FIELD [SITE] COND�T��N,S [N�T USED�
l.l � WARR.ANTY [NOT USED]
PART � - PRODUCTS [NOT iTSED]
PART 3 - EXECUTTON
31 INSTALLERS [NUT USED]
3.� EXAMINATION [NOT TTSEDI
3.3 PREPARATION �1V�T USED]
3.4 ER.ECTION [N�T iTSED]
3.S REPAIR / RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT iTSED]
3.7 FLELD [oR] SITE QiTALITY CONTROL
A. Tests and Inspections
1. Inspect aIl pradu�ts or equipment delivered to the site priar to unloading,
B. Non-Coilforrning Work
1. Re�ect all products or equipmenl: that are damaged, used or in any other way
unsatis�actozy far use on the project.
3.8 SYST�M STARTilP [NOT �USED�
3.9 ADJUSTING [NOT �CTSED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED�
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equ'rpment in location to avoid physical damage ta items while in
storage.
C. Protect equipment from exposure ta elements and keep th4roughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHIVV�NTS [NOT USED]
END OF SECTION
CITY OF PORT W�RTI-1 2D22 Hond Year 1— Contract 5
ST�IVDI�RD CONSTRUCTION SPECIFIC�1TiONDOCUMENTS City ProjeckNa, 1fl2931
Revised 7uly l, 2011
016G00-4
PRODUCT STORAGE AN� HANDLIAIG 12�QUIREMENTS
Page 4 of 4
Re�ision Lvg
DATE N1�ME SUMMARY QF CHANGE
CI'FY OF FORT WflRTii 2U22 Band Year 1— Contract 5
STANDARD CONSTAUCTIQN SPECIFICATION DOCiJMENTS City Project No. 102931
Revised 7uly l, 2011
oi �o 00 - i
M�BILIZATION AND 12EMOBILIZATIOAI
Page 1 of 4
2
SECTION 0170 00
MOBII,IZATION AND RElVIOBILIZATION
3 PART1- GEN�RAL
4 1.1 SLTMMARY
5
6
'1
8
9
10
11
12
13
1�
15
16
17
18
19
2D
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
�} 1
42
43
44
4S
A. Section Includes:
1. Mobilizafion and DemobiIizatian
a. Mobilization
1) Transportation of Coa�it'actor's persanneI, equipment, and operatuzg snpplies
to the Site
2) Establishment of necessary general faciIitzes for tl�e Contractor's operatian
at the Site
3) Premiums paid for performance and payment bonds
4) Transpartation af Contractor's personnel, equipment, aud operating supplies
to anotlier Iocation within the designated Site
5) Relacatian of necessa�ry generral facilities for the Cont�•actor's operatian
from i location to anather location an the Site.
b. Demobilization
1) Transporkation of Contractor's persanneI, equipment, and operating supplies
away from the Sit� including disassembly
2) Site Clean-up
3} Removal oiall buildings andlor otlzer faciliti�s assembl�d atthe Siia for this
Cantract
c. Mobilization and Demobiiization do not incl�de activities for specific items of
work that are for which payment is pro�ided elsewhere in the contract.
2. Remobilization
a, Rerr�obilization for Su,spension of Work speci�ically required in the Cantract
Documents or as required by City includes:
1) DernohiIization
a) Transportation of Contractor's personnel, equipment, and opera�ing
supplies from the Site including disassembly or temporariiy securing
equipmeni, supplies, a�id other facilities as designated by the Contract
Documents necessary to suspend the Work.
b) Site Clean-up as desig�.a�ed zn the Contract Documents
2) RemobiIization
a} Transpor�ation af Contractor's personnel, equipment, and operating
suppiies ta the �ite necessary to resume the Work.
b} Establishment of n�cessary g�n�ral facilities for tha Contractor's
Qperation at the 5ite necessary to resume the Work.
3} No Payments will be mad� for:
a) Mobilization and Demobilizatian from one location to another on the
Site in the normal prngress of perForming the Work.
b) Stand-by or idle time
c) Lost profits
3. Mobilizations and Demobilization for Miscellaneous Projects
a. Mabilization and Demobilization
CITY OP FORT WORTH
STANDAIZD C(3NSTRUCTION SPECIFICATiON bpGUMENTS
Itevised Navemher 22, 2016
2022 Bond Year 1— Contract 5
City Project No. 102931
01 7Q 00 - 2
MOBIGIZATiON ANi? RCMdBILIZATION
Page 2 df 4
1
2
3
4
5
6
7
8
9
10
ll
rz
13
14
1S
16
17
18
I9
20
1) Mobilization shall cansist of the activities and co�t on a Work Order basis
necessary for:
a) Transportatian of Contractor's personnel, et�uipment, and operating
supplies to tJie Site for the issued Work Order.
b} Establishment of necessary general �acilities �or the Contractor's
operation at tlie Site for the issued Work Order
2) Demobilization shall consist of the activities and cost necessaty for:
a) Transportatian of Contractor's personnel, equipment, a.r�d operatiitg
supplies from the 5ite including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removai of all buildings or other facilities assembled at the Site for
each Work Oder
b. Mobilizatian and Dem.obiIization do not incIude activities far specific iiems of
wark far which pay�nent is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Miscellaneous Prnjects
a. A Mobilization far Mzscel�aneous Projects when directed by the City and the
mobilization occurs within 24 hours ofthe issuance of the Work Order.
B. Deviations from this City of Fort Warth Standard Specification
1, None.
21 C. Related Specificatian Sections include, but are not necessarily limited to:
22 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
23 2. Division 1— Genera! Requiremenis
24 1.2 PRICE AND PAYlVIENT PROCEDURES
25 A. Measurement and Payment [Consult City Department/I]ivision for directian on if
26 Mobilization pay item ta be included or the itam should be subsidia�y. Include tha
27 appropriate Section 1.2 A. 1.]
28 1. Mobilization and Demobilizatian
29 a. Measure
30 1) This Itein is �onsidered subsidxary to tk�e various Items bid.
31 b. Payment
32 1) The work performed and materials furnished in accordance with this Item
33 are subsidiary to the various Items bid and no other compe�sation will be
34 allowed.
35
36
37
38
39
40
41
42
43
44
45
46
2. Remobilization for suspension of Work as specifically required in th� Contract
Documents
a. Measurement
1) Measurernent for this Item shalI be per each remobilization perfarmed.
b. Payment
I) The work performed and materials furnished in accordance with this Item
and measured as pro�ided unde�� °`Measuremant" wilI be paid for at the unit
price per each "5peeifie� Remobilization" in accorciance with Contract
Documents.
c. The price shall inejude:
1) DemobiIization as deseribed in Section 1.I.A.2.a.1)
2} Remobilization as described in Section 1.1.A.2.a.2)
CITY Qf Pp1tT WQRTH
STAMDARD CONSTRUCTIDN SPECII'ICATION DOCUMEN"['S
Revised Nnvember 22, 2016
2022 Band Year ]— Contra�t 5
City Project Alo. 102931
oi7oao-3
MDBILIZATION AND REMDBILIZATION
Pagc 3 of4
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
]7
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
3�l
3�
36
37
38
d. Na payments wiIl be made for sta�ldby, idle time, ar lqst profts assoeiated this
Ttem.
3. Remobilization for suspension of Work as requzred by City
a. Measurement and Payment
1) Tlus shall be submiited as a Contract CIairn in accordance with ArtzclO 10
of Section 00 72 QQ.
2) No payments will be made for standby, idle tiine, or Iost profits associated
�ith this Item.
�4. Mobilizations and Demobilizatians for MisceIlaneous Projects
a. Measurem�nt
1) Measurement for this Item sl�all be for each Mpbilization and
Demobilization required by the Contract Dacuments
b. Payment
1) The Work performed and materials fuinished in accQrdance with this Item
and meas�ared as provided Lindar "Measurenaeni°' will be paid foa• at the unit
price per each "Work Order Mabilization" in accordance with Contract
Documents. Demobilization shall be considered subsidiary to tx�.obilization
and shall nat be paid for separately.
c. The price sl�all include:
1} MobiIizati�n as described in Section 1.1.A.3.a.1)
2} Demoi�ilization as described in Section 1.1.A3.a,2)
d. Nn payz�.ents wiil be xnade far standby, idle time, or lost profits associated this
Item.
5. Emergency Mobilizations and Deznobilizations for Miscellaneous Projects
a. Measurerr�ent
1} Measurement for this Ttem shall be for each Mobilization and
Demobilization required by the Contract Dacuments
b. Payment
1} Tl�e Work perfarmed and materials furnished ii� accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
prica pez• each "Wark O:rder Emergency MobiIization" in aecardance with
Contract Documents. Demobilization shall be considered subsidiary to
rnobilizatinn and shall no� b� paid for separately.
c. The price shall include
1) Mnbilization as described in Saction 1.1.A.4.a)
2) Demqbilizatian as described in Section 1.1.A.3,a.2}
d. No payments will be inade %r standby, idte time, or lost profits associated this
Itern.
39 1.3 REFERENCES iN�T USED]
40 1,4 ADNIINISTRATIVE REQUIREMENTS [NOT USED]
41 1.� SUBM�TTALS [NOT USED]
42 L6 INFORMATIONAL SUBMITTALS [N�T USED]
43 i.'� CLOS�OUT SiT�MITTALS [N�T USED]
44 1..8 MAINTENANCE MATERIAL SUBNIITTALS [NOT U�ED]
CITY OF FORT WORTH 2O22 Bond Year 1— ConEract 5
STANDARD COI�fSTCtUCT10N 5PEG�FICATtD�I DOCUIvIENTS Ciry Praject No. 1 p2931
Revised Novemhar 22, 20I6
oi �o ao - a
Iv[OBILIZATION AND RE�vfQBTLIZA'T'Iq3�]
Page 4 Af 4
1 I.9 QUALITY ASSC7RANCE [NOT USED]
2 110 DELIV�RY, STORAGE, AND HANDLTNG [NOT USED]
3 1.�1 FIELD jSTTEI CONDTTIONS jNOT iTSED]
4 l..1.2 WARRANTY [NOT USED]
S PART 2- PRODUCTS [NOT U�ED]
6 PART 3- EXECUTIQN [NOT USED]
7
8
9
END OF SECTION
Revision I�og
DATE NA.NIE SLINIMARY O� CHANGB
11/22/16 Michael Owen �•2 Price and Paymen# Procedures - Revised speci�c&[fion, including blue texf, to
make spccificatinn flexible for eitfter sulasidiary or �aid bid item for Mabilization.
CITY OF FORT WORTH 2O22 Bond Year 1— Contr�ct 5
STAIVDARD COI�fSTRUCTIQN SPECIT�[CATION DOCi1MENTS City ProjectNo, 102931
12evised�fovember 22, 2016
017i23-1
CONSTRUCTION STAKING AND SURVEY
Page I af 8
S�CTION �1 `I123
CONSTRUCTiON �TAKING AND SURVEY
PART 1 - G�NERAi.,
1.1 SUMMA1tY
A. Section Includes:
1. Requirements for construction staking and construction survey
B. Deviations from this City of 1� ort Worth Standard �pecification
l. None.
C. Related Specification Sactions utclude, but are not n�c�ssarily limited to:
l. Division 0— Bidding Requirements, Con�ract Forms and Canditions o�the Gontract
2. Division 1— General Requirements
l.� PRICE AND PAYM�NT PRQCEDURES
A. Measurement and Payment
1. Construction Staking
a. Measurement
1) Measurement for fl�is Item shall be by lump sum.
b. Payment
1) T�e work perforrr�ed a�d the materials furnished in accordance with this
Iiem shaIl be paid fot• at th� lump sum price bid for "Const�vction Staking".
2) Payment for "Constt•uction Stalcing" shall be made in partial payments
prorated by work completed compared to total work includsd in the Iump
sum itezn..
c. The price bid shall includa, but not be Iimited to the following:
1} Verification of control data provided by City.
2} Placement, maintenance aud replacement of required stakes and markings
in tlle field.
3} Preparation and submittal of eonstruction staking docuinentation in the
form oi "cut sheets" using tlte eity's standard template.
2. Construction Survey
a. Measurement
1) This Item is considered subsidiary to the various It�ms bid.
b. Payznent
1) The work perFormed and the materials fiarnished in accordance with this
Item are subsidiary ta the various I#ems bid and na other compensation will be
aIlowed.
3. As-BuiIt Survey
a. Measurement
1) Measurement %r this Item shall l� by lump surn.
b. Payment
1) The work p�rfortned and the materials furnished in accordance with this
Item shall be paid for at the lump sum price bid for "As-B�ilt Swvey".
CITY OF FORT WORTH 2O22 Bond Year 1-- Coniract 5
S'fANDARD CONSTRUCTION SPECII�ICATI�N DOCUMGNTS City ProjectNo. 102931
Revised Fe6ruary 14, 2018
D17123-2
CQNST1tUCTIDN STAKiNG AND SURVEY
Page 2 of 8
2) Payment for "Construction Stalsing" shalI be xna�e in partia� payments
prorated by work completed compared to total work included in th� lump sum
item.
c. The prica bid shall include, but n�t be limited to the following::
1) Field meas�.rements and survey shots to ideiitify location of completed
facilities.
2) Documantation and subinittal of as-built survey data onto contractor redline
plans and digital su�-vey files.
1.3 REFERENCES
A. Definitions
1. Construction Survev - The survey measurements made prior ta or while
constructivn is in progress to control ele�ation, horizontal position, dimensions and
canfigura�ion of structures/impravements included in the Project Drawings.
2. As-built Survey The measuremenis made after ihe construction of tlie
improvement fea.tures are complete tn �rovid� position coordinates for the features
of a project.
3. Constructi�n Stakin� — The placement of stakes and markings to pravide offsets
and elevations to cut and fill in order to locate an the graund the desig;ned
structureslimprovements included in tha Project Drawings. Construetion staking
shall include staking ea.sements and/or right af way if indicated on the plans.
4. Survev "Field Checks" — Measurements made after construction staking is
campleted and before construciion �vork begins to ensure that structures mar�Ced on
the ground are acc�rately located per Projeet Drawings.
B. Technical Refarances
1. City af Fort Worth — Consh-uetion 5taking Standards (available an City's Buzzsaw
website) — O1 71 23,16.01 Attachmant A_Survey Staking Standards
2, City of Fort Worth - Standard Sutvey Data CoIlector Libxary {fxl} files (available
on Ciiy's Buzzsaw website).
3. Te�as Department of Transportation (TxDOT) Survey Manual, latesi re�ision
4. Texas Society of �rofessional Land Surveyors (TSPS), Manual o� Practice for Land
,Sutveying in the State of Texas, Category S
1.4 ADMINISTRATIVE REQiTII2EMENTS
A. T�e Contractor's selection of a surveyor must comply with Texas Government
Code ��54 (q�alifcatians based selection} for this projeci.
1.5 SUBMITTALS
A. Submittals, if required, shall be in accordance with Section OX 33 QU.
B. All subtnittals shall be received and reviewed by the City prror to deli�ery of work.
1.6 ACTION SUBNIITTALS/INFOItMATIONAL SUBMITTALS
A. Field Quality Control Submittals
C1TY QF P�RT WORTH 2O22 Bond Year 1-- Contract 5
STANDEIRD CONSTRUCT'IpN SYECIP1CATiON DOCUiv1CI*�TS City PrajectNo. 102931
Itevised Tebruary 14, 20I8
01 71 23 - 3
CpNSTRUCT1pN 3TAKING ANi� SURVEY
Page 3 af 8
1. Documentatian verifying accuracy of field engineering work, u�cluding coordinate
conversions if plans do not indicate grid or ground coordinaies.
2. Submit "Cut-Shaets" canfaril�ing to the standard tern:plate provided by the City
{refer to 01 71 23.15.0 l— Attachment A— Survey Staking Standards).
1.7 CLOSEOUT �iT�NIITTALS
B. As-built Rec�line Drawi�lg Subrnittal
1. Submit As-Built Survey Redline Drawings documenting the locations/elevations of
cQnstr�cted i�nprove�nents signed and sealed by Registered Professioa�al Land
Surveyor {RPLS) responsible for the work (refer to O1 71 23.16.(?1 — Aitachment A
— Survey Staking �tandardsj .
2. Contractor shall submit the proposed as-built and completed redline drawing
submittal one (1) we�k prio�� to scheduling th� prn�ect imal inspection for City
review ar;d comment. Revisions, if necessary, shall be �nade to the as-built redline
drawings arjd resubmitted to the City prior to scheduling the construction finaI
inspection.
1.8 MAINTENANCE MATERIAL �i7SNIITTALS [NOT T7SED]
1.9 QUALI'TY ASSi]RANCE
A. Construction Staking
1. Construction staking wiII be performed hy the Contractor.
2. Coordination
a, Cantact City's Praject Rapresent�tive at least one week in adva�lce notifying
the City of when Canstruction Sfiaking is sched�zled.
b. It is the Cant�•acto�•'s rasponsibiIity to coocdinate staking such that
constructioii activities are not delayed or negatively impacted.
3. General
a. �ontractor is responsible for preserving and maintaining stalces. If City
surveyors are required to re-stake for any reason, the Contractor wiIl be
responsibie for costs to pairform. staking. If in ti�e opznian of'the City, a
sufficient number of stal<es or marlcings l�ave beeu lost, destroyed disturbed ar
ornitted that the contractad Wark cannot take place then th� Gontractor will be
required to stake or re-stake ihe deficient areas.
B. Construction 5urvey
1. Cnnstructian Su�vey will be performed by the Contractor.
2. Coordination
a. Cantractor to verify that horizontal and vertical control data established in �11e
design survey and required for construction surv�y is available and in place.
3. General
a. Construetian survey will be performed in order to construct the wark shown
on fha Construcfion Drawings and specified in the Contract Docurnents.
b. For canstruction methods other th.an o�en cut, the Cantractor shall perform
construction survey and verify control daia including, but not limited tn, ihe
foIlowing:
�) Verifcation that �stablished benchmarks and cnntrol are aecurate.
CITY OF FORT WORTH 2O22 Bond Year 1— Contraci S
STANDARD CONST�iifCTION SPECIF[CATIDN DOCUMENTS City ProjectNo. 102931
lievised �'ebruary 14, 2018
pI7123-4
COI�ISTRIJCTjON STAKING AA€D SURV�Y
Page 4 of 8
2) Use ofBenchtnarks to furnish and nnaintain all refere�ca lines and grades
for tunneling.
3) Use of line and grades ta establish the location of the pipe.
4) Subznit to the City copzas of field notesused to estahlish all lines and
grades, if requested, a.ud allow the City to c�eek guidance system setup prior
ta beginning each tunneling drive.
5) Pravide access �or the City, if requested, ta verify the guidance system auc�
the line and grade of the carrier pipe.
6) The Contractor remains fully responsible for the accuracy of tha r�vork and
correctioil of it, as required.
7} Monitor line and grade continuously during construction.
S} R�c4rd deviation with respect to d�sign 1ii1e and grade once at each pipe
joint and subrz�it rIaily records to t�e Ciiy.
9) If the installation does nat meet the speciiied tolerances (as outlined in
Sectians 33 OS 23 and/ar 33 OS 24), immediately notify tk�e City a��d co�rect
the installatian in accordarnce with the Contract Documents.
C. As-Built Sua'�ay
I, Required As-Built Survey will be perfarmed by the Contractor,
2. Coordinatian
a, Contractor is to coordi�ate with City to eonfrm which features require as-
built surveying.
b. It is the Contractor's responsibility to coordinate the as-built survey and
required measurements fnr items that are tn be buried such that canstruction
activities are not delayed or negatively impacted.
c. For sewer mains and water mains � 2" and under in diameter, i� is acceptable
tn physically meas�r� depth and mark the Iocation dUring ths progress of
construetion and take as-built survey after the facili#y has been buried. The
Contractor is responsible for the quality control needed to ensure accuracy.
3. General
a. The Co�tractor shall pravide as-built survey including the elevation and
lacatian (and provide written docu�nentation to the City) of construction
featuxes during the progress of the construction including tlie following:
1) Water Lines
a) Top of pipe elevations anci coordinates for waterlines at the following
locations:
(1) Minimum every 25� Iinear £eet, including
(2) Harizontal and vertical points of inflection, eurvature,
etc.
(3) Fire lin� tee
(4) Plugs, stub-outs, dead-end 3ines
(5) Casing pipe {each end) and all buried fittings
23 Sanitary Sewer
a) Top of pipe elevations and coordinates fot force mains and siphon
sanitary sewer lines (nnn-gavity faciliti�s} at the fo[lowing locations:
(I) Minimum e�ery 250 linear feet and any buried fittings
(2) Horizontal and vertical points nf infleciion, curvat�re,
etc.
3 ) Stormwater — Not Applicable
CITY OF FORT WORTH 2O22 Bnnd Year l— Contract S
STAAfDARD COi�fSTRUCTION SPECIFICATION DaCUMENTS Cit�r ProjectNo. 102931
Revised February 14, 2018
017123-5
CONSTRUCTION STAKING AND SURV�Y
Page 5 af8
b. �he Coi�t�•actor shall pro�ide as-built sur�ey incIuding t1�e elevation a��d
locatian (and provicie writien documentation to the City) of construction
features after the construction is co�npleted including the �ollowin.g:
1) Manholes
a) Rim and flow�ine �le�atinns and coordinates for each inanhole
2) Water Lines
a) Cathodic pt•otection tesi stations
E�) Sampling stations
c) Meter boxeslvaults (All sizes)
d) Frre hydrants
e) Valves (gate, butterfly, etc.)
f} Air Release valves (Manhole rim and v�nt pipe)
g) Blaw offvalves (Manhole rim and valve lzd)
h) Pressure plane valves
i) Undergraund Vaults
(1) Rim and flowline elevations and coordinat�s for each
Underground Vault.
3) Sanitary Sewer
a) Cleanouts
(1) Rim and flowline elevations and coordinates for each
b) Manholes and runction Structures
(X) Rizn and flowline elevatiaans and caordinates far each
manhole and junction struct�are.
4) Stormwaier — Not Applicable
1.10 DELIVERY, STORAGE, AND HANDLING [NDT USED]
1.11 FTELD �SIT�] CONDITYONS [NOT US�D]
1.12 WARItANTY
PART 2 - PRODUCTS
A. A construction survey wiIl produce, but wiIl nat b� lirnited to:
1. Recovery of relevant control points, points of curvature and points of intersection,
2. Establish temporary horizontal and verlical controI elevations (benchmarks)
sufficiently permanent a�d located in a rrianner to be usad Yhroughout constructioia.
3. The lacation of planr�ed faci�ities, easerrients and improvements.
a. Establishing fnal line and grade stalces for piers, floors, grade beams, parking
areas, utzlities, st�raets, highways, tunnels, a�nd othe:r c�nstruction.
b. A record of revisions or corrections noted in an orderly inanner for reference.
c. A drawing, when requr"red by tl�a client, indicating tha horizontai and verticaI
location of facilities, easements and improvements, as built.
4. Cut sheets shaIl be provided to the Ciiy inspector and Survey 5uperintendent %r all
construction staking projects. These cut s�ieets shalI be on tlxe standard city template
which can be obfiained from the Survey Superintendent ($17-392-7925}.
S. Digital survey files in the follo�uving formats shall be acceptable:
a. AutoCAD (.dwg)
b. ESRI Shapeftle (.shp)
CIT'Y pF i012T WORTI-I 2022 8ond Year 1-- Contract 5
STANDARD CONSTRUCTION SPECIFICATION DOCiTMENTS City Project Na. 142931
Revised Tebruary 14, 2018
Q17123-6
CONSTI�TJCTION STAK�IG ANl7 SURV�Y
F�age 6 af 8
c. CSV file {.csv), farmatted with X and Y coordinates ii� separate calumn� (use
sfiandard temp�ates, if available)
6. Survey files shall include vertical and horizontal data tied to original project
control and benchmarks, and shall include featur� descripiions
PART 3 � EXECCITION
3.1 INSTALLERS
A. Tolerances:
1. The staked loeation of any improvement or facility should be as accurate as
practical and necessary. The degree af pr�cision requir�d is dependent on many
factors all ofwhich must remain judgmentai. The tolerances listed hereafter are
based on generalities and, under certain circumstances, shall yield to specif c
requirem�nts. The surveyor shall assess any situation by review af the overall plans
and thraugh coilsultatian with respansible parties as to #he need for specific
toleranees.
a. Earthwork: Grades for �arthwork or rough cut should not exceed Q.1 ft, verkical
tol�rance. Horizonfal alignrnent for earthwark arid rough cut should nat exceed
1.0 ft. tolerance.
h. Horizontal alignment on a struci�rre shall be within .O.lft tolerance.
a Paving or concrete for si�reets, curbs, gutters, parking areas, drives, alleys anci
walkways shall be located within the eonfines of the site boundasies and,
occasionally, alang a boundary or any other restricti�e line. Away fram any
restrictive line, these facilities should he sfaked with an accuracy producing no
more than O.OSft. to�erance from their specified lncations.
d. Underground and o�erhead utilities, such as sewers, gas, water, telephone and
electric lines, s]�all be located horizontally within their preseribed areas or
easements. Wi�hin assigned areas, these utilities should be staked wifih an
accuracy producing no more than 0.1 ft tolerance frorr� a speci�ed location.
e. The accuracy required for the vertical location of utilities varies wideIy. Many
underground utilities require only a minimum cover and a tolerance nf 0.1 ft.
should be maintained. Underground and overhead utilities on planned profile,
but not depending on gra�ity flow for performance, should not exceed 0.1 ft.
tolerance.
B. Surveying instruments shail be kept in close adjustmen� accarding ta manufactur�r's
specifications or in compliance to standards. The City r�serves the �gh:t to request a
calibration repart at any time and recommands regular maintenance schedule be
perf'oz�zaed by a certifed techniciau every 6 months.
1. Field measurements of angles and distances sha11 be dQne in such fa�hion as ta
satisfy the closures and tolerances e�cpressed in Part 3.1.A.
2. V�rtical locations shall be established fram a pre-established benchmark and
checked by closing to a different bench mark nn th� sam� datum.
3. Construction sur�+ey iield work sha11 correspond to the client's plans. Irregularities
ar conflicts found shall be reported promptly to the City.
4. Revisions, corrections aud other pertinent data shall be logged for future reference.
CITY Or I�dRT WQ12TH 2O�2 Bond Year 1—Confract 5
STANDARD CONSTRUCTION SPECIFICATION DOCiJ[WfENTS City Project No. 102931
Iievised February 14,2028
017]23-7
CONSTRUCTIOIr} STAKING AND Sl3RVEY
Page 7 of 8
3.2 �XAMINATION [NOT IISED]
�.3 PREPARATTON [NOT USED]
3.� APPLTCATION
3.5 REPATR 1 RESTORATYON
A. If the Contractor's work damages or destroys one or cnore of the contral
znonuments/points set by the City, ihe monuments shall be adequately referenced for
expedient restoration.
1. Notify City if any control data needs to be restored or replaced dL�e to damage
caused during aonstructian operations.
a. Contractor shall perform replacements and/or restorations.
b. Th� City �nay require at any tim�e a survey "Field Check" of any mnnument
or benohmarks that are set be verif'ied by the City surveyors befare further
asspciated work can �nove forward.
3.6 RE-INSTALLATION [NOT USED]
3.7 F�ELD [oR] SIT� QUALITY CONTROL
A. It is fha Con�ractoi's respansibility ta maintain all stakes and contral data placed by the
City in accardance with tkiis Speciftcation. This includes �asements and rig�Zt of vvay, if
noted on fihe plans.
B. Do not cliange or r�locata stak�s or cantrol data without approvaI irom the City.
3.S �YSTEM STARTUP
A. Survey Checks
1. The Ciiy reserves tl�e right to parform a Survey Check at any time deemed
necessary.
2. Checks by City persannel or 3'� party contracted surveyor are not intended to
reliave the confractac of his/her responsibility far accuracy.
3.9 ADJUSTING [NOT US�D]
3.10 CL�AN7NG [NOT U��Dj
3.11. CLOSEOLTT ACTiVITIES jNOT iTS�D]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTTON
CZevision Log
CITY OF FORT WORTH 2O22 Bond Year 1— Con#ract 5
S'E'ANDARD CONSTRUCTION SP�CII�TCATION dQCt1MENTS Gity ProjecENa. 102931
Revised i�ebruary 14, 2018
ni�i2�-a
CONSTR[iCTION ST11KlNG AND SURVG'Y
Page 8 of &
DATE NAME
8/31/2012 D.7ohnson
SUMMARY OF CHANGE
Added instruction and modff'ied measurement & payment under 1.2; added
813 1120 1 7 M, Owen def�nitions and references under 1.3; madifted I.6; added 1.7 closeout subtnitia�
requirements; modiiied 19 Quality Assurance; added P�iRT 2— PR�DUCTS ;
Added 3.1 Installers; added 3.5 Repair/lZestoration; and added 3.8 System Startup.
LZemoved "biue text"; revised measurement and payment sectians for Construotion
Staking and As-Built Survey; added reference to selection camplianc� with TGC
2l1412018 M Owen 2254; revised actian and Closeout submittai requirements; added acceptable depth
measurement �riteria; re�ised list of icems requiring as-built survey "during" and
"after" conslruction; and revised acceptable digiCa] survey �ile fprmat
CITY OF FORT WORTH 2O22 Bond Year 1— Contract 5
STANDARD CONSTRUCTION SP�C1PiCATiON DOCiJMENTS Giiy Project No. 102931
Revised February 1q, 2015
�
Se�tion 0� 7� �3.0� -�►ttachrn�nto�
Sur�ey S�aking S�and�rds
February 2017
O:�Specs-5tds Gouernance Process�7emporary Spec Files�Capital Delivery�Ca� Delivery Ri� 01.1p�. 71.
23.16.p1 Attachment A_Survey Staking Standards.docx
Page 1 of 22
These prac�dures are intende�d to provide a standard method for eonstruction staking ser�ices
associated with the City of Fort Worth projects. These are not to be cansidered all inclusive, but only as
a general guideline. For projec#s an TXDOT right-of-way ar through joint iXDOi pprticipation,
adherence to i'he TXDOT Survey Manua! shaN be followed and if a discrepancy arises, the TXDOT
manualshall prevall. {httn://onfinerr�anuals.txdot.�av/txdotrraanuals/ess/ess.pdfj
If you have a unique circumstance, please cansult with the project manager, inspector, or sur�ey
department at $17-392-7925.
iab�e o� Confen�s
I. City of Fort Worth Contact Infnrmation
II. Canstruction Colors
Ill. Standard 5taking Supp[ies
IV. Sur�ey Equipment, Control, and bafium Standards
V. Water 5taking
VI. Sanitary 5ewer Staking
VII. Starm Staking
Vlll. CurbandGutterStaking
IK. Cut S�eets
X. As-built 5urvey
O:�Specs-5tds Governance Process\Ternporary Spec Files\Capital pelive�y\Cap pelivery bi� Q1\Q171
23.16.01_AttachmEnt A_Sur�ey Stalcing Standards.dntx
Paga 2 of 22
�
�
Survee� �epar�men� �onfac� In�orma�ion
Physical and mailing address:
8851 Camp Bowie West Boulevard
Suit� 300
Fort Worth, Texas 751Z6
Office: (817j 392-7925
Sur�ey Superintendent, direct line: (8�.7) 392-8971
�onstruction Colors
7he follawing colors shall be used far staking or identifying features in the field. This �
includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags
if necessary.
Utility
PROP05ED EXCAVATION
ALL ELECTRIC AND CONDUIT5
POTABLE WAT�R
GAS OR OIL
TELEPHONE/FIBER OPTIC
SURVEY CONTROL POINTS, BENCHMARKS,
PROP�RTY CORNERS, RIGHT-��-WAYS, ANo
ALL PAVING INCLUDING CURB, 51DEWALK, BUILDING CORNERS
5ANlTARY SEWER
IRRIGATION AN� RECLAIME� WAT�R
�
S�andard S�akin� 5upplies
Item
Lath/Stai�e
Wooden Hub (2"x2" min. square preferred)
Pin �lags (2.5" x 3.5" Preferred)
Guard Stakes
PK ar Mag nails
Iron Rods (1/2" or greater diarrtet�rj
Survey Marking Paint
Flag�ing
Marking Whiskers (feathersj
Tacks (for marking hubs}
Cofor
WHITE
�4
�_;-`, -
YF�I.�'N
ORANC�E
Pli�![C
��lJ�i�l:�° -
IVlir�imum siae
36" tall
6" ta1E
21"lang
Not require�
1" long
18" long
Water-based
1° wide
6" long
3/4" long
O:�Specs-Stds Covernance Pracess�Temparary Spe� Files�Capital pelivery�Ca� pelivery Di� 0�.�0171
�3.1�6.01_Attachment A_5urvey Staking Standards.docx
Page 3 of 22
11/. 5ur�e� �quipmen�, Confrol, and Da�um 5�andards
A. City Benchmar�Cs
All city benchmarks can be found here: htt : fartworthtexas.�av/itsolutions/G15
Loolc far `Zoning Maps'. Under'Layers' , expand 'Basemap Layers', and check on
'Benchmarks'.
B. Conventianal or Robatic Tatal Station Equipment
I. A minimum of a 10 arc-second instrument is required.
Il. A copy of the latest calibrativn reporf may be requested by th� City at any time.
ft is recotnmended that an instrument be calibrated I�y certified technician at
least 1 occurrence every 6 months.
C. Network/V.R.S. and static GP5 Equipment
I. It is critical thatthe sur�eyor�erify t�e correct horizontaf and vertical datum
prior commencing work, A site cali�Oration may be required and shall cansist of
at least 4 control points spaced e�enly apart and in �arying quadrants.
Additional field checks of t�re horizontal and vertical accuracies shall be
complet�d and the City may ask for a copy of fh� calibratian report at any time.
II. �letwork GPS such as the Weste�n Data Systems or Srr�artNet systems may be
used for staking of praperty/R.O.W, forced-main water lines, and rough-grade
only. Nn GPS stafcin� fnr cnncrete, sanitary sewer. storm drain, final �rade, ar
an�thin� that needs �ertical �radin� with a tolerance of U.2S' or less is
allawed.
D. Cant�ol Points Set
All contral points set shalf be accompanied by a lath with the appropriafe
Nort�ing, Easting, and Elevation (if applicable� of the point set. Control points
can be set rebar, `X' in concrete, or any other appropriate item with a sta6le
base and of a semi-perman�nt nature. A rebar cap is optianal, but preferred ifi
the cap is marked 'control point' or similar worcfing.
Datasheets are required for a!I control paints set.
batasheet should include:
A. Horizontal and Vertical Datum us�d, Example: N.A.D.83, North Central Zone
4202, iVAVD 8S Elevations
B. Grid or ground �istance.-- If ground, pro�ide scale factor used and base
point caordinate, Example: C,S.F.=Q.999125, Base point=North: 0, East=0
C. Geoid model used, Example: GEOIDI2A
O:\Specs-5tds Governance Process�Temporary 5pec Files�Capital Delivery\Cap Deli�ery Dir► 01�0171
23.16.01�Attaehment A_Sur�ey Staking 5tandards,docx
Page 4 of 22
E. Preferred Grid Datum
Although many plan sets can be in surface eoordinates, the City's prefierred grid datum
is listed below. Carefu[ consideration must be taken ta verify what datum each praject is
in prior to beginning worlc. It is ess�ntial the surveyor be familiar with coordinate
transformations and how a grid/surface/assumed coordinate system affect a project.
Proiected Coardinate
System: NAb_1983_S#atePlane T'exas_IVorth_Central_FIPS_42Q2_Feet
Projection: Lambert_Canformal�Conic
False_Easting: 1968500.0OOOOD00
Fa Ise_N o rt h i ng: 6561566.66666567
Central Meridian: -98.50Q00000
Standard Para�lel �: 32.�,3333333
Standard Parallel 2: 33.96666667
Latitude_Of_Origi n: 31.66666667
Lin�ar Unit: Foat US
Geographic Coardinate 5yst�m: GC5_Narth_Am�rican_1953
Datum: b North American 1983
Prime Meridian: Greenwich
Angular Unit: Degree
f�ote: Regard4ess of what datum each part�: ular �roject �s Fn, deliverables E� tMe Gty
must be converted�translated into this preferred gr�d datum. 1 copy of the d�liverahle
should be in the project datum (whatever it rt�ay be) and 1 copy shouid be i�t the NAD83,
TX North Central 4ZD2 zone. See Preferred Flie 1Vamina Conver�tlon,below
F. Preferred Deliuerable Format
txt .esv .dwg .job
G. Preferred Data Format
P,N,�,z,D,N
Point Number, Narthing, Easting, Ele�ation, Description, �[ates (if applicable)
H. Preferred File Naming Con►►ention
This is the preferred format: City Project Number Description_Datum.cs�
Example for a prolect that has surface coordinates which must be translated;
File 1: C1234 As-built of Water on Main Street Grid �[AD83 7XSP 4202.csv
O:\5pecs-Stds Go�ernance Process\Temparary Spec Files\Capital delivery�Cap �eli�ery Div 01\0171
23.15.01_Attachment A_Survey Staking Standards.docx
Page 5 of 22
File 2; C12�4_As-built of Water on Main Stre�t_Project Speci�c Datum.csv
�xarnple �ontrol Stakes
0:�5pecs-Stds Go�emance Process�Temparary Spec Fi�es\Capital Delivery�Cap Delivery Div 01\0171
23.16.01 Attachm�nt A 5urvey Staking 5tandards.dacx
Page 6 af 22
�
�
�
W
�
�
�
�
�
0
�
w
m
�
�
�
F-
�
7
2
1 C� 16
L__1 -
W _
� � --1
— W
_3 �-
L3 �
�� _�
�� �
i �}
�� -
;�n
� ,,
;, L'�I
I�
.
=`i W
�
�
GP
�
W
CL3
�
Z
F---
Z
�
J
.�
�'
k---
Z
�
',
`�
�
Q
�
_
(!3
�f
J
�
w
�
m
�
�
a
Y
�
�
2
L17
Q
J
{!J
W
J
m
�
�
❑
r
f
�� i
�
Z
Q
�
�
�
w
�
w
EL.= 10�.aa'
�
W
H
�
�
C�
C'
�
�
C)
U
�=��oa.�o E=�oao.oa
_�
1
�
r
��r �
L I.I
� �
d �
� �
C� �
2 �
H �
� —
2 �
� W
� _
� �
� W
�C �
Cli �
w
� �
O
�
V. 11Va�er ��akin� S�andards
O:�Specs-5tds Governance Process�Temporary Spec Files�Capital Delivery\Cap Defivery Div 01\01 71
23.16.41 Attachment A Sur�ey 5taking Standards.docx
Page 7 of 22
A. Cenierline Staking—Straight Line Tangents
I. Offset lath/stakes e�ery �.0{}' on even stations
II. Painted blue lath/stake only, no hub is required
III. Grade is to top of pipe (T/P) for 1.2" diameter pipes or smaller
IV. Grade ta flow line �F/Lj for 1fi" and larger diameter pipes
V. Grade should be 3.50' below the propased top of curb line for 10" and smaller
diameter pipes
VI. Grade should be 4.�0' below the propos�d top of curb line for 12" and larger
diar�eter pipes
Vll. Cut SheetS are require� on all staking an� a co�y can �e r�c�ivEd frorn th�
survey su�erintendent .
Optrqn�l: Actupl stpkes sha11 consist of a 60D naN or hu6 set with a whisker
B. Centerline Sta�Cing - Cur�es
I. If arc lengti� is greater than 1D0', POC �Point of Curvature) offset stakes should
b� s�t at a 25' interva!
II. Same gr�ading guidelines as abo�e
III. Staking of radius points ofgreaterthan 100' may �e omitted
C. Water Meter Boxes
I. i.Q' perpendicular affset is preferred to the center of the box
II. Center af the meter should he 3.d' behind the praposed face of curb
lll. Meter shauld be staked a minimum of 4.5' away from the edge of a dri�eway
iV. Grade is to top af foax and should be +0.06' higher than the propased top af
curb unless shown otherwise an #he plans
D. Fire Hydrants
I. Center of Hydrant should be 3.0' behind proposed face a# curb
II. Survey offset stake should be 7.0' from the center and perpendicular to the curb
line or water main
III. Gracfe of hydrants should be +0.30 higher than the adjacent top of cur�
E. Water Val�es & Vaults
I. O�fS�ts shauld be perpendicular to the proposed water main
II. RIM grades should only be providec� if on plans
��ample�l�lafer S�ak�s
O:�Specs-Stds Go�ernance Process�Tempprary Spet Files\Capital Delivery�Cap Defi�ery Div Q1�p171
Z3.7.6.01_Attachment A_Survey 5taking Standards.docx
Page 8 of 22
$�
��
'��
��
���
��
'%n
�
� �
� �
C� "
�
� �
� w
�
u7
�
�
�7' OfS ��JfL I�+ sr�=2+oo i^ � c-�.s2
�
�
�
�
LL
f�
! 7�.�
f�
� •
t �
� �
� -�� �
U ,�r;��� �
� � 1 � ,�. �
�, --- � - ��-
� �7� �%5 � S1V�L II�� 57A=1+72.81 �� C-3_81 �1�"
��
W � � �
o � �
`'' � � �,o,� � �- yui.is� -
m� �
�
r
�
� J�
W L
��
C� ��
��
�
���
�
J
C.�.? m
�
o���
�
� J
�
_�
�
�
� �
��
�' �
� .i
� � „�
� � '
�
� �,.
a � � � �i�
� �, �, � �' � �e
� � �� � � � � �.
� � �.
�-- � � �'� � � ��
p � �
� z ` y_'. ' �
� "
� � �"� W��K sra=o+oa � o-�.�s �
� � �
L� � � �
� �� �
� � � ,a� = lo[}.o �
� � ~ � �
� � �
a
a
VI. Sanitary Se�►er S�akin�
� r
�
�
�
�
,�..�
w�
����
����
�����
� `� �
O:�Specs-Stds Governance Process�Temporary 5pec Files�Capital Deli�ery\Cap Delivery Div 01\0171
23.16.01�Attachmer�t A Survey 5taking Standards.docx
Page 9 of 22
A. Centerlin� 5taking— 5traig�t Line 7angents
1. lnverts shall be field �eri#ied and compared against the plans before staking
11. Painted green lath/stake WITH hub and tack or marker dat, no flagging required
Ill. 1 offset stake between manholes if manhofes ar� 4D0' or less apari
IV. Offset stalces should be located at even distances and perpendicular to the
cenzerfine
V. Grades will be per plan and the date of the plans used should be noted
VL If multiple lines are at one manhole, each line shall have a cut/fill and direction
noted
VII. 5takes at e�ery grade break
VIII. Cut sheets are required on all staking
Qptional: Actua! stakes sha1l consist of a 60D nail or hub set with a whisker
B. Centerline Staking — Cur�es
l. If arc length is greater than 10d', POC (Point of Curvature) offset stakes should
be set at a 25' interval
II. Staking of radius points of greater than 100' may be ornitt�d
C. Sanitary 5ewer Manholes
I. 2 ofFset stakes per manhale for the purpose of pro�iding alignm�nt to the
contractor
il. Flowline grade should be on the lath/stake for each flowline and direction note�
III. RIM grade should only be on the stake when provided in the plans
O:\Specs-Stds Governance Process�Temporary Spec Files�Capital Delivery�Cap Delivery Di� �1\p171
23.16.Q1_Attachment A 5urvey Staking Standards.docx
Page 10 of 22
�xample Sanitar� Sevver Stakes
���
��
��
��
�
�
'-���s a
�•� � ��
�� ��� �
� ��' � � � ��
� �, r`
� � � - �� �
� � �� ��� � �� �� �� �T�=���,� II�� C-�� I��� �-4�II � �-4� �;
�� �� �
0
�
� � �/ � � �
�-�-- � � � �� ..
�� � �
s �_
� � � ��� o/s � ss�� II sr��f�t°���� c-a� �L�z e-a�IL� �a� � �''� � ���� ,�/
� � � � ��� I �
� � �— �, 4 ���� a%� �
; �� m�w.... ���
r� � —� �
� � � w 7' �3lS � �� I���In=�-�as� �I�a-a°L a
{��J� �� � � 1
��,Vf d� �� � I � �
�^,� �. � �% t5
� � ! �
Q ! l
� � 5
�� � � � 1
�� � � �
Q - �� � �*$ �� ' � �� �� � �� I �
� T
�L i � � �� �y �� � ���
� � s � '� �� � � �+ � �+ � ���
� � � � a � P � u_ �� � ��� h� '� �m
ii� S � �� �� �� �, �
� � _ I _ : �r s. / .,���
� d 7' �?%a' � SS �� �rh=n-�on ih+E �'C�'S�I+��,�c-5�� Ftq�'�, � �`� �
� I
� w ' "� �
�L � �,� { a W
� � q��� � ���
� � ti �� ,,
� ..�
� � �.
(,� � ��� o/s � 55 � � II ' srn-a+�o�� c--b� ��� o--s$�� �-a� � �
� �
� � 6; '� �� J ��
�N r �Y
� � � � I �
i-�
i�! �� r
[ �� ��
��
0:�5pecs-Stds Governance Process\Temporary 5pec Fi1es\Capital Delivery�Cap Deli�ery Div 41�0171
23.16.01 Attachment A_Sur�ey 5taking Standerds.docx
Page 11 of 22
VII. Storm Sewer � Inlet �takin�
A. Centerline 5taking— Straight l.ine iangents
L 1 offset stake e�ery 200' on e�en stations
II. Grades are ta flowlin� of pipe unl�ss otherwise shown on plans
III. Stakes at every grade break
IV. Cut sheets are required on all sCaking
Optional: Actual st�akes shall consist of a 60D nai! or hub set with a whisker
6. Centerline5taksng—Cur�es
I. If arc length is greater than 100', P�C (Point of Curvature) offset stakes should
be set at a 25' interval
II. 5taking of radius points of greater than �.00' may be omitted
C. Storrn Drain Inlets
l. 5ta[cing distances shauld be measured from end of wing
II, Standard 10' lnlet = 16.OD' total length
III. ReceSsed 10' lnlet = 2�A0' total length
IV. 5tandard dauble 3.0' inlet = 26.67' total length
V. Recessed double 10' inlet = 3D.67' tatal length
D. Storm Drain Manholes
I. 2 offset stakes per manhvle for the purpose of pro�iding alignment to the
contractor
II. Flawline grade shauld be an the lath/stake for each flowline and direction notecE
III. RIM grade should only be an the stake when pro�ided in the plans
O:�SpecS-StdS Go�ernance Process\Temporary 5pec Files�Capital Delivery�Cap D�li��ry qi� 0�.\0�.71
23.16.01 Attachment A Survey Staking 5tandards.docx
Page 12 of Z2
�xamp[e S��orm inle� S�akes
����
(gos p�r� R,aw.j
I�'a' # .� �S'
�
Hus ne�,�� ,„�
m
,��.
+
0
�
�� I �7}._ ,. .c
��. "�.i�i'�
C?
I
.a
�
ca
a
�
D
h
m
0
�
�
�
i
p!.
:c r
e . '1�- •,
� � �EINfl �YArc,.. '--
� �rxlrah
� �� t�a c��s)
T��� , i1P� i:Pll�7E
1 � nF cu�a
����
{�oE F,+ww� A.aw}
i�D'•n p �?� :
�Y
F!'_'e FL �.._.- �
�
r
0
�
�A '
�
�
��
�_
z�
p
JU7fEA 11AiICW
� r 'UG tlF 7NE VARKi
i _ ��JN[3 STKIFEa
���
1
��
+
��
�
�I
+�
��
�'
{7
�
�;
_ n�creNr.�a �rea iN� �r+� !
� — STANbARb 'Ib' — 16' - —�
RE�CFSSE6 1(i � 2�
STANQrsRO d4UBLE 14' � 2fi.Bi
HU8 wlnd T+CY ------- FECESSED DOUEilE 10��''J4.�67 `---
�— ------�
� �
� 9ki�C L�' INI.ST �
�� .:�•;"'�:+�:• :.�� ..:_:. .: .-.... ° .. •.�s: ��:�• . .:' • � ~f
�� �r. �"�4 ��
,�I .�. k�ANFlC74E 'r* ci
R�r� w I
4� :: '�.; �
I .i d � ` I
�nac t� cur� � � , ; • •;,
----^—^--��:_�1HNG"�..�:� ��k�"jY'�.�•4.: . � :�5:� �� :°���• .!�r .. .. . _ .•� , �f° ��� �'i�l�M�!1�i!,
F�Q1�,i.INE FAGE pF kHLET' FACE OF INIET +
EB6£ t�F Pr1V61EHT EDGE OF PR+fEbiF}+kT I E�t� t1F PA'M�MENT
FI��NT
�SIDE F�kCING �)
FR�NT
(SIDE FAGII�� �.j
� �.c� aF cu�e�� �
� � FL214+LINE — — —
�Eqp� S7F PA1+EM�NT..._. J.
0:�5pecs-Stds Governance Process\Temporary Spec Files�CapiYai belivery�Cap belivery biv 01�0171
23.S6.Q1_Attachment A_Survey Staking 5tandards.docx
Page 13 of 22
l/lll. Curb and Gu��er S�akin�
A. Centerline Staking — Straight Line Tangents
V. 1 o�Fset stak� e�ery 50' on e�en stations
VL Grades are ta tap of cur� unless otherwise shown on plans
VII. Stakes at �very grade break
VIII. Cut sheets are required on a11 staking
Optiona�l: Actual si-akes shall consrst of a 60D nai! or hub set with a whrsker
8. Centerline Staking — Cur�es
III. [f arc length is greater than 100', POC (Point of Curvature) ofFset stakes should
be set at a 25' interval
IV, Staking of radius paints of greater than 1QD' may be omitted
O:\5pecs-5tds Go�ernance Process�Temporary Spec Files�Capital Deli�ery\Cap DeEi�ery Di� 01�0171
23.16.01_Attachrnent A_Survey Staking Standards.docx
Page 14 of 22
�xample Curb � �u���r S�akes
F��NT
(s�a� F�ac��vc �)
� ���
(SIDE F'ACING R.0.4'1.
i ' ; �
��,
HU6 c�'"dAll�hu g
FRONT
(si�� ���cir�c �.)
F"
0
� FR01�7
�ui CsoE Fbotl7o �y !
a�� FRDNT �
� ��
� {�1DE. FAClNt� �) �
_ _ -nF �
L � � 9f- � �
� 1 Pl`' �
� � �
rt -- Fr— � � rjq i�
� �� F �A" �t � ro a
a__ �� O a �
� + �, .u- 1[I 1
} � a�� � Ifl l
�� I[Il
1�: i_ ._. _. �`._ ` - p I l I 1
''� 4 rrwoiu'a �vAu._ - i �
� ��i _ - ���tti
t! � �
s 7�1 . � � � � y
r.= 'rcl_... � � �
� �� '� # /�� 1 � I
��b� ! � I 1 +f
�-'1_�� �c"�f � / f �
\ rq� � I! ! f �
�� r I f
� ��� � �� �� f�' f
I �� �� �.•r r i f f
� y �' 1
� � !
�- —' T�P aF cuRs � ��.�' f�-� f r� .�' �
•<, F��- y �r xr /
�..��� �^' �,,,.��r �r"'k,' �'I. /
D ` .�''�"'� 'w '� I r' `�
� ��� � _ ��..'
�� ��� r�{r
F j„.� r �Xy-
B�IGK QF �URB -�'�� Y�.�-- ��,...� ���� �~''�
�� ��-��
I �� �"""� �'' �� r ����
�� ���� ����� �
��c� �� cu�� i i � ___—r—�� �� D
�- ----� ��
��o+�i��
EQGE 4F PRVEI�AEN`E'
�xample Curb �c �u�er S�a��s a� In�ersec�ion
O:\5pecs-Stds Governance Process\Temporary 5pec Files�Capital Deli�ery�Cap Deli�ery Div D1�0171
2�.16.01_Attaehment A_Survey Staking Standards.docx
Page 7.5 of ��
�-•�' I
1.�!'
� �
��z
}— C� �;� a� aIs � m Q srn=s+sol� F F+n�
� � w `
�. �
�
�
R
�
F" r
a----
�
�2
{
a.��w
�
-
r �
a� _ _ _ p
� �
p � _ _
�:1
4
�
m F �
Ka �
�i- ,�� * ;�
.
� � �
m
�
E
I
i
z ���',
�
����
h��� ��
// p
f
4
r �
�' f
!
� i�
�.$
ti
t '�
r ; �
- � F4-
N
Y
4
�n
--- -- I o
i
ean� �o �ave —
9NRa d0 �AV9
r �y I
� I _ _ 9 .•- � O
, � I I r
�y` A 8
� �
� � e
• ' ��
��p� � 4;�
� >.
' � `°� �
,0 i. �
� � — � , 9
a --- �
� � ` ���
� � � ��
�
:' �Q 4 �
i
��
m ��
�=���
� ,ol �� 3 �
Rw
O:�Specs-Stds Go�err�ance Pra[ess\Temporary Spec Files�Capital Deli�ery\Cap Deli�ery Div 01\0171
23.16.D� Attachment A_Survey 5taking 5tandards.docx
Page 16 of 22
IX. �u� Shee�s
A. Date of field wark
8. Stakir�g Method (GPS, totaf stationj
C. �raject Name
D. City Project Number (Example: C01234j
E. Location (Address, crass streets, GPS caordinatej
�. Survey company name
G. Crew chief name
N. 4 blan� temp�at� r.a,. ��rained fr•�m th� s:�r�Py ��.•a��:n*PR:s�+r.i is•� :t�,:i l �b�+v��
5�andard Ci�b Cu� Shee�
pate:
❑ TOTAL
Staking M�fhod: ❑ GPS STATION
LOCATIOfd;
City Project
Number:
Project Name:
❑ OTHER
CONSIJLTANTICONTRACTOR
SURV�Y CR�W INITIAI.S
ALL GRAD�S AR� TO FL.OW�.IN� OR TOP O� CURB UINLESS �7HERWlS� NOT�D.
PT # STATION OFFSET DESCRIPTIO�J pROP. STAKED _ CUT + FILL
-LT/+RT GRA�E ELEV.
O:\Specs-5tds Governance Prvicess�Temporary 5pec Files�Capital Deli�ery�Cap Delivery aiu 01�0171
23.15.01_Attachment A_5urvey Staking 5tandards.docx
Page 17 pf 22
�. As-buil� Surwe�+
A. Definitian and Purpase
The purpose of an as-built survey is to �erify the asset was installed in the proper iocatian
and grade. �urthermare, the informat�on gathered will be used to supplement the City's GIS
data and must be in the proper formaf when submitted. See section IV.
As-built survey should include the following (additional items may be requested}:
Manholes
Top of pipe elevations every 250 feet
Horizontal and vertrca! points of inflect�ion, curvature, etc. (All FitiingsJ
CathadicprotecCion teststatians
Sampling st�ations
Meter $oxes/vaults (AII sizesj
Fire lines
�'rre hydrants
Gate valves (rim anr� tap af nutJ
Plugs, stub-outs, dead-end Iines
Air Release valves (Manhole rim and vent pipeJ
Blow off valves (Manhole rim and valve 1rdJ
Pressure plane valves
Cleaning wyes
Clean outs
Casing pipe (each endJ
Inverts of prpes
Turbo Meters
O:�Specs-5tds Governance Proce5s�7emporary Spec Files�Capital belivery�Cap Delivery Div 01�Oi 71
23.16.D1_Attathmen� A_Survey 5taking 5tandards.do�x
Page 18 of 22
B. Example Deliverable
A hand written red line by �he field surveyor is acceptable in most cases. This should be
a copy of the plans with the point humber noted hy each asset, If the asset is missing,
then the surv�yor should writ� "A�R" FCUP��" to natify the City.
O:�SpeGs-Stds Governante Process�Temporary Spec Files�Capital Delivery�Cap belivery bi� �1�p171
23.16.01_Attachment A_Sur�ey Staking Standards.docx
Page 19 of 2z
S 9tG2'X yulYeWmaY 9 Kdl' OfSOrok 173nWsf Atn �.Ff�'Sns�rna 1,:rd1wX1 �I13n3.7Yh1�11 L3MM35 knre75 yX 1 dlvM
�� � � �� t� 8 �� � �" � e
��� w� 6� $ . � q � Y� ' � a'�y��g �� �
s &� � $�° � �.� � $$k �� � �"f
� ��� � � b � � "� � � � � �� ���a�'$:� a� ��
d
��� �� � � � � � � �� _ � � �������� �� � � � s �=
��� � � �,� � � e �,, � � ' � ������� �� � �
3�a ��� � � �,�������'� i�e� �� '� -`-.� ���°�"R��
�� 9il���
" �-� � � � � � 1
�
F �. ��
�, — •6q 31�n kJ� �r _ �..e� _ : :::---::� �- � .,} �°=-;---; _]..1:.�
� ��T � � �f�i�di�'�'C"?r�i � •_-.
�� --r.��� �f� �: � �
��:_ .: ��1
� �---.� iC3 � -- -� '; � Ty o-.--f r-- I i� � n H.r
r
'""„""'�""
� �', �?. ' �',
� Y�i ��ii�
� ���� � ; t,� ,.��;; , , ._.. . �
3i� �`_�'s.;%q,�+;s'. f�- , '� .... _ -r_�,�_� ,
, _ ; .-_i.
� � , , ._�_- , �� -.. (-
� � � � I . . . � 4�� - . �'� 1
_L - . 'j _l..._
_ _"_' " � �. . I !{'_—_ _ `" I
.�_ ___ I I� �i -y � M i
' __ _____ —_!'I :��I " i__�_ _ { ,F� —
~ � � ---' �- � � � � --- - � ' . . ,
���� -���- —=a=� -�.
:.�;T,_,...:_..; ����---- aGl;.-_.�
�;�1.y-_:-:��._.:� __— ��,:�' ��:"__—
�_� "_- - - -- �-�=�
' •.� f _��i,js_I..�=:J .,.._:��.. _°� ___.--:�;�:� �
ili� . � �"+�.:. ..i. � -�r F� ��.I' ��fL""'_
� ;��;;���•----�--����...�:5;;-�= -:i=_� .
� �'.� :�� � ��?� � �-';,�_�..:;,;.�::'_�
,
w__ ._�,.__:� .-� ..v�,=����—. �.i�..... i,.[�=..
�_.._,,: -.--- � , :- , -��� ,r�-;�.,.
� �. : _ .. . . , -�: +�.�..!�.�:
� ':i �_. ::_- _... �.:___-= ��-_.-- . � , .
.� ��--�- , �.:.i
�� - r - ; -��� � � _,^_';
g" J .:�.� .. '�L1' i—i '. ��� — �.5!'.' ��'-n41i�
� ' �� ' i—__ .... � F " � � .41__ '�.r��ir�
i ' k �' ��I' � � �
�..., . _;I..=-��:{"�1.,;�.:i�,--f--- ..
� :. _. � ��'_�.L:: --.: :, .;_�
-- � -- � i ; ' J�1�.:, ..- -: a
_�-r��.: .. F�� _' � �".:�. ..J.+ . _""" v"
� �:1.�� . . - - '. �' ,{., �'��+' -�`�r-
5 `J��� -i._I.= �� F .. , ,..... _�.'.. �!j� ��::����+I
�1 L "' � '4---`ti1r[:�i
� � .: �+I � ?k'r�iA��;�_ ---��� i�-_ _`
"��f: s�'.i �
� I�,�� �.I_s}�..[7:J��.,i`._:.� � �.���:+��.:_:
�I�• �i�Y .'I _"' _.'iL��..L'1'. �' � . {-����'�'{� i:,ijr"r"1
�� � I i.: i., +��f'. �' `���.}r:- !��
�- � �� .
� }...�--r i� —f.I�?4---, r- �'"�il�,'�F .
� � =',".4�.�."L '' .� I!_ 1 LI �
M �yr�+re'Si�" =�f -i�, � I�..
��� ���G % :-r-u ��a::�:r_.:: �: !3'�:� ,-:.�._'__1,LP
, �� i�' � „ +�� �� ':.i�' - i.i..
` �� :�i%� ' k ' .} d.,_.. .yry � .---" ' -
; t{, ��,ti�� _�d5�.�d�ls--�." �� ' -'kllb��
� I `+4: . _����_�-''1� _If.f "- . ;__ .
f� � •---- `���I��i:`--- i �-��--.�. .
.�: - �.'I . _-- - -ii�T.E.L, . - .
!� L-- , ' ��'"I�'��_�_��_.�.�i a )a=` �
'4.—_ "'' —_"_'l�i ,.�;�s.��` r'f
�1 � � � � � � R µ�
.i :�� -_ ., i '' �
O:\5pecs-5tds Go�ernance Process\Temporary Spec Files\Capital Deli�ery\Cap Deli�ery qiv Q1�Q171
23.16.01_Attachment A_Survey Staking 5tandards.docx
Page 2a of 22
._�, . u_.�� �
� _
- � , : �,
� !E'WL N!'.C1N'I'LW R1N
R
� � 1�'�1LlFtoIA OMtJ
, iz�r�a
' +� ' l
k ��. ��
STAU5lm — L2't�LlFlm'p pR7
AENPJ� p Sfll<Mi� E7(IST.
� v�s+� e ,�R
aar,�' �n �rsr.ew��
r+vsr�u. r-rxs�ra sc�ve
F7P.-�X e'REDl�CFA . �
����� �.
Fa2a�tr.as4 �. .
- . . - • .. - �.R....,.
un �a � �,
{'� T�wr M15 uF 'Y /
xR+F.r �t' •
�
� "w�.°���"Fa�s, C > .4 '$L.
. � � 4,�
sl�?YM-'AVfa�/aifafMYN w
lR����i LR1
kN.• 02F�7t
�av� �xisi.
rau�,p�e � �
Qj: �13 b5
•.1`C(!l �� 4.
E��"t4� �
�c�. � O � �
a
�t� � � #}
r
�' f' , ��t���,�
rau •r � .� t�� ��Y'//
rrz�-vExr.eEvo
ua9tinersrz�
�•�n.sno
1N;
�
�
�l�i! � ��t .
rlcx a�rNrxt r�e �' : {� ,
rssar� vaev�� -' "
�rL� rrrCRM'r�.
NCF �i#7kTA7 if.�0
# 1�rz�,v� vw1YE
�h'otiU154�i}_'N9
�x.Y!> �!$B
/ mlf
CP.'Y3 xnt�+en w x.Fwn��
71"'Cili Na+•.m» e t,nur dsn n
A�AO.idBlLll �.• Am+�9m,e
��
ElEY. 7P3.'�1
s�v
�
r s� /
1
� _
TBdf •P " i
���r ..,� , ' .-�-.%�� �%
�:,a, 1� G'JAT�'R
� _
6 —�� ��.���
���� � ��
„Y,� �YA7.RA'E Y11YE
—lPIY� L7f A
• �p asu � mr.. rt!�xrw�a+
iq � ���
I8`edE�fj �
F.4k., � iC�Y.....`
�� ii� � �
�x. c ss----
=- � �"P
PR�PpS,Ep �
sar,rr�ttr st
s�� sy��r
/ /�r // � fkST �lJO � lFDML fF1D!'El LF47 �� 39 - I@ SYI.� S7'A fkG0.5B —!2W \ I
v
/ / �rrati+.aa�rose�y� rrz+�v�:aF-nn� r-�'�'vr�rr.e�xv ,
�r tF n� az�tr.v�,z arrs A�s� i �.,,� ,
oa�,v��crcr �o Frnsr.le�or,�R ��a�� i �a2as�a.e3m
s=sss�r� �
��
�------ ., _... ...�... PI
-� ._.__ �
_ r . F..- ..__�__�__.__..�, -� - . . .
= -i--r=-=--• . ..... , � �- _ .— '= --F � — —�
1 ; .I ..`_-. . J—�"� �� _ T _ — — � - — _ _ —��
. ��
_. _ :. .� . " "
.
' �,m — ' ' -- _ _ _
� . . . . .� :. -� . _.����_r � - '.-.r---, _
O:�Specs-Stds Governance Process�7emparary Spec Files\Capital belivery�Cap �elivery piv 01�0171
23.16.01 Attachment A_Sur�ey Staking 5tandards.docx
Page 21 oF 22
. sz51a•x •ov�svw�sv R x�
d
� g�� ��� . ��� �� H
� � &y� e � ��- � p�
� � i� � $ � � � � `� �b
��� �s 6 �
���� ���@ � ��k� � � �
��� ���4 � g�� � � � e��, � g
��-- ��� � � �� � �� �� �� SE '
�
��
�
�
��
��
��
��
�
�
, � �� . y� �
� �� �i
� � 'i
� ,� �Q �
� �� f ����
� � �, .
��- �o
�' I �� � ��
� � �§��
u�
OF6Y) vN 1J71'Ndd ALJ �}7YSRi !k]Z l: it7.ff'DJ /JI31C:V7d321 113M?5 y/'lIfNVS O'N !l31VN�
� �� ,� �I q 1 �6
�� � � � � ��� �
���a�� � � ,� �
4a '' � ��������.� �+�a � a�
� � �� ��A��4A� ��i 4�
�$ ��� �� �� ��� �'�� ���
� _ �g ��S���i�� ��� � iii—,
�� p� � � � ������� �
���` g� y � � � �y�
� B �E�! n � � � � 8�$
�� �� �1 �.. � � .� � �
� � � -�.�:�;� : : . � . � � ��. . ' �, . : _.:: ;. -: �;;...'.�: �; ; �: :.,�;.=:=,r-;-i
� f ��4 %/1'1� ����:5'�•r�l4r�.�� '�II "�� l�
� � � � i' ''r r 1 ] J
�� � i � ' ., �;. , "�. !�,�.. � ,1,�.�,��'I.,. ��, ;i.l� ` 1,'��
� �il_ I � �����-::I-.� ���� �� ���� �� .�"�
a:t _ r.�.�.. . .:.: � . .. .
. .: . .....:....i� i
- " ' � ..I_ ._ �..f� ' ' # ' . '-L=,-i.
_ �.I.., � � , ;-;.i., � - � �
�.:, I,;
, _.�...' :�.
� �� ��•�I�_:_:..;; : .i; �:I�;' I..'�;, s.,,li;�i--i
� i �- ;i_�..;;:.:�; � . �:I '"i.!;�:,_, ;, �� � '..� i3-.. � i + ...�:�: „7:�r�} �
_I . _JJ.L' : .. . L.__..�_ �
_ I_T'_f.ii
i i� I�.. i � � I � . �{ ....�_.i�"+'....�-:' �.'
�. _ ��i',I.(.i,ii'.,.'I° � ��, _._����,.
-'I"- '.! ._ ':�...�I.�.. , , ;'�'.!
o-��([i���:ri . . � . w'� i.l } .. . '.r. . LL . � .
�I��" lii�l i� �:+�.i�'�—�I�"j� 'I'��I'
��
_;-- G
. ``..
�;__�_.;i._.__;_i,'''.�;:"� :-i .1�...._.�;,.,,_,i,,,
I.;� .�j:�::� �': �.i .. _ � �r :. _ � r_r.��4
�i . .:I i.. �.: „'' ... .;�,.+: - { :::T':
' I.ii_i . .. . . . i . .I� ... �'
� �..ii:ki::.:ai�:.'k�4. _i_.'..r . '��f � .::�.��.�:�..�
�'-'�-''—.�� ..+' . _:��.._�i.r'o1.f.j..-
��.,.4;,��s.ak`�� -��---�_."r�1 . ..,-�",;�':;��:`
�' -'. i— ! i-.. , ;!. . i , . il , L �l.:.'�`� . .
` ' � I : . i... ' r _ . —��r+=y�
y ���� ..I:".'�.:
�-i'I'.1 ;i.y",�,�� �:��:; .��.'��P�''I;�;..'_ _:.__.."�':
�__ _ :..:, �`ly..,"..' . I __}.-;i-'.�':_'.�'.:��;
� .....' �'_�.'�.�.' .' !�n�' '- ' --� I
._.
� .. ' . .
� .� .,.. .:.�i��..�1 -- .._. , ,
.. �..: .. .
�I �'��f�'�:�Id�1 u� �, 1_....._.:+��.....t s1 L.. I. ...!-_�;;
,J ' i '�.►t�` ' '��.i. �-� JJ '� i._'__'—':.
_� Y'F _IIM�'.: s�i1 �.��_ � iL,�ri..i�r� j. �
�: . �— . _..:._�__..� .��..�� �I �_�'.::���: � �: �-r�._-:;.'��.� .i
-I--� � �� . ..-: -'��. ;:-i-'; .—..;=;- _,;,� ! _... :'
.�.:..�c._:-i.� :._f.i_�� �,�'I i.._;._ � I �� ��i--i:���
a i' �- , -� 'P_ t: :. � �'�, ll1�t �.� J
'I ��--..-: I
'�-}�-�:; ' i:�'�i� : r� �.,4r,�p .�.�.:},���..J
-'--� ..�I�.:�;'"���a..:..�" _ _. iA�..:__�_w _ 1_ .�sY.l � .
'� � 4 � �, � � � � �
{� ',5�._.!-".I:;:�_.. �� �
�� .� i�� � -. i � _ k
����� � I u�.,� J
i.l . ia�_.�.'z�l,.:..�}I.:_ I'li.:
5..."h':ii:,l T
� '�. ��'�
"�„'
.. .:�: �;==��: :�,.;1-��,.:,:1
�� —�;, v�',� ,, .� �'''r''•} — ; �' '� � .
...,..N........._., ..,,....,.�,.,,... ,.,_,...�,......r...... � �r,..,. ,._..,..�r...., .._,..�. r ,.....r _....,..., r .... .,_l„� . _
23.16.01 Attachment A_5urvey Staking Standards.docx
Page 22 of 22
s� �
1frT E
S7L5 4'a� + 7i! x,ForetlBnn
fSIIRlIARY SLYJfR
SE'�V�CE W/ tlEN.i'C!f
•6' IMRYn
��.ArroN Ro w. � �
�
�
��� � j
�'
�
k;��
!D� J y
7�P700'/aRFEM.GMN'Mn •�� I t
� ��R3 �,fJ' �+„r
� ;� N��
6
I � �� �
W�i
._._. .�-______"4', �
• ���`' - '� �
,� w,� �, rx wnr�'R `�`�-
mv � m�ren 3554
�:..�s�� ; � �������� -��'
�. , 1 ���
� � `: � `- r -.__ ___�----
�,
� �� �
�� - -
; . `_`_'�--- �
�'
n
ea�n� 7 � N
� �r
� � � O
z��v � '' Q
_ .i �. .❑
`-�:"� �� �
_ d
�
��
��
i�
i!�
!
�
. /' �.J �' ����
r
f m� �a, fiL15xE fJ'eiF,
� p`-�k�LsAEII �
�� faww' II �N
����
STAFR+V ^ �SS !!NE A • � f
EXIST.57'APi0qL31I!- �' w�•� �' nr'•'•"
EXfST. SIAH7QL-365! „++'� �
�Ed1W� �X/ST.SS�lH •
LbIY'i/d�C'!' S LF OF S'SS lLYE -
OQY�^G10[IAR & dRf! � � � �i
�r oav�srar P�orecrx�
� �-� �' ��' `' `
00.YNECf FA7P.8S5 lh1Y1 -
OO.YA�ECI' fM�d:B'SS fNE'�5717
TO FAUP.SS.+f}!.
N�6'J�68I��ss
e•�az�r LTI'�' Ad.AF F40, 7.1Y1R--38i1, 2[}18-3:
Mi�P5C0 F1o1GP i�1{] 7d�. S� 7.', W
; ,` � � ;' ��.,�. — —�._ . � � � . _ . .-. ... , . .. . — _ �— _
. ..
�� - � r .i � .
. . .._i .._
. � . 1—. . , � � —, ,.: . . . �.��;T, , .
--- =- �-� .--. .i�r_ . , ._a
_� , , ._. ., � � : . � � . . . �� i-- --- - 7
�� �._=_.� y - - - - - - �
�.� � I:" � F-" -LCr�--r� • ' ..l_l I+.J• . 1 I l � " ' '" _ _"Z-1 � ---•---�--•-- �
' _}�..k...l — � '-""=_"J''—.1--i
_i� . . , � , i . 1=:-- . � . . - �. _ y_ - i_.a��.--rT� . i� � -
��� � I-� . .� r. . � . � ��=r'' ` -- -- - ---. _� �--
.`�--'-..,_ � , � ._�.�..,. � ;� � ,�a'- -----.-.-. . .-__,
�. � -. .. ,.���s�.i,_ t i .i-�-�--
��- •�: -- - -----� ` �� T
Ft. .,.. . '— r � ��y� `- �`��i� __ —L� —� �..... "
x �_� . � i .. . . . ����
� f.—�—� � ��[YL � . ' . � Tw���_iv-:-.:�" ;_1- '•1' � ..�
'L�a:-r-r � i_ r i r i i i��'!["y� _���y-�Y-�_.,�,�;r-�.
�..... ��_.-i 1 i i I I : �i'Yyao ----��_- .� - -- -- _ ;�
A�,-r-��. t ..�_�:�°-p�.l�l�'::-'�� � � = '���_'� �v, �-_f ��-�-��.:L'�`� 7
�- . -�� li�:�_.r ,�,. 1 � � F = i- ��- � � � -_ ^ .. _
� , �.. ,��.-��.i � :_ ` .•. . _ _.,--�-.�_-���.
� ��.N. L �w r F-�.i � r .y�y'"y"
� '� ' ' I ___ � �F-:— i'� 'I � r=IJ F — ' ' _-' .'_-
�T�= . .—� -r -
��s`w� F " i� i i i I ! ',�� . --��;'_—,4:.Jr-�,_-,—..� � - �' = T
� { - - . _.. �., . � _ , . : -=-
='i'� f�' � � � ' - :. . ..II = I ; � . -id — ' • �. J'� I���'
:_-- . F�;�„� _�� -_- - : — —�-=' ;�- . _: j==��:: I: � �-�� � �-
- �+Qr � •� - ��� � " � ' �� _ - - -
�� ��..��, '�+�ti � _' r ' ' "' -
( ." _`F�l T..� -- — �-
'-� =1�.�-� ��:=I.° _1 ���L_.!_
, , , , , � .__ —
�lr � " �,.r `. _ ; _' -, .. . . . _—__� _ _ ��: ' ' ' .: =�-, � 71
fi�� ��: +,.++; • �=t . �=_-�"4�ir} �.--��"� ��: i i �
r� ,...,_ . � - � __ � . �� 1 - `�:_�"'�c-_ . � ��'_
�c �'' '-- - =�z_1 ='_-- =q` I-� �•.;g��� .
`�� ��'�_-�:�� - �.' _ _ ' �L � _ _
�.�,-� �...� x �L� � . r_ �
.�. 7' j �I�_�i'=:_ �. ���1�f'
L.L.. I .� . � J�, - - _ - _ _, _ ._. . :_ C-l1 J -�- r ..,L _ .
TY�^'1 �_ ..._ _. ., t1".1T1�7 "r'_�_�=—] �I_I�=1 =.I_ i ' I _'_�� __�- '
��� . —�
~'� ��- - _i—_. —.."_�— �,� ��.
� t_�:: - ' '_' - -� � �I ��_—�- . —._.� �1- ;_ s_ � _, , ,
��- -, . . ,-
.,.���, �+� �� i - i i _�' _ =�;- � �;_�:-�!��i— -=----
,*-. ��. 4=�-.r: ..ti !��.l����.�i--1..— ,_.:� ' i-j-= yl��'
7'r - - - � �.. _ . _ _ • � �, _.�'_ n -�" �1�� r�-� _T' �-� T_ ,�
. y �_' _�' j ' _ . � ;�
-�'�F ^ � _r . s � ���T=t_r� i=-_�r -i i := :-��..,=_ : �-
�' .-'�� �� �. . . . ��1..�...4- , . ' -� ' __-_ _�-�-���"- --
� �- ---- _..i�.)'.� �.ls � � --i '�_;. �i==�-� �. .. , ._ .
. ' .x � - - " _ -
. - -...:. - - � - �j_
. _.._ .; �—�-r�-��...__ _ _ _ . . - -�-
��-1�: _ - --- �- - ��._��—� � ' .��_;�, `I
- .- — _.�:. ; --fa . � �-; --'�
�1� =- _--'T�'T... � ___
O:�Spec� � ' �'�
23.16.01_Attachment A_Sunrey Staking Standards.docx
Page 23 of 23
G
71��01 71
Obviously the .csv or .txt file cannot be signed/sealed by a surveyor in the farmat
requested. This is just an exam�le and a{f this information should be noted when
delivered to tE�e City sa it is clear to what coordinate systerri the data is in.
POINT N0.
1
2
3
4
5
6
7
8
9
1U
11
12
13
14
�s
16
17
18
19
24
21
zz
23
za
zs
Zfi
27
28
29
ao
31
32
33
34
35
36
37
38
34
40
41
42
a3
44
45
4fi
NORi'H1NG
6946257.i89
69afiZ60,893
6946307.399
fi44fi220.582
6946195.23
6946190,528
6946136.012
6446UO2.257
6946DD3.056
6945984,677
694548b.473
6945845.077
fi945896.591
69h5934,28fi
694593fi,727
6445835.678
6945817.468
6945759.776
69457G8.563
&945743,318
6445723.219
s9assaz.z�
6945623.902
6945643.407
69ass�i.osg
6945535.498
69�45519.834
6945417.875
6945456.557
6945387.356
6945370.G88
6945383.53
6945321.2z8
6995319.365
6945242.Z89
69A5233.62a
6945206.463
6945142.015
G945113.445
6945fl49.Uz
59A5041.U24
694503$.87$
6945006337
6944994.782
fi444943.A32
694486�.416
EASTING ELEV.
2296079.165
2296062.Z41
zz�eo�s.sos
229b011.025
2Z96015,116
2296022.721
2295492.1i5
229541J.133
2295933,418
2295880.52
2295869.892
2295860.962
2295862.7.68
22958a1.925
azsssso.aaz
2295799.707
2295827.011
2295758.543
2295778.429
2295788.392
2295754.394
zzss�aa.zz
2295659.471
2295736.�3
2295655.195
2295667.8R3
22955i9.49
ZZ95SB0.27
2295643.145
zzssss7.iai
2295606.793
229561U.554
2295551,105
2295539.728
2295570.715
22955R4.6Z5
2295529.305
2295557,66fi
2295520.335
2295527,345
2245552.675
2245552.147
2235518.135
�Z9S520.6�5
2295556.479
2295534,397
OESCRIPT40N
72&.09 SSMM RIM
725.668 GU RIM
72fi.85 GV RIM
723,358 SSMH RIf1fE
722.123 GV RIM
722.325 FH
719.448 WM RIM
713.331 WM RIM
713.652 CO RIM
711.65Z 55MH RIM
71p.Qqfi WM RIM
707.72 WNE RIM
708.205 WMi RIM
709,A57 WM RIM
71Q.084 Cq RIM
707.774 SSMH RIM
708.392 SSMH RIM
'Ti1.218 SSMH R3M
710.086 GVRIM
710.631 C�VRIM
712.843 GV RIM
716.686 WM HIM
723.76 WNE RliVl
719.737 Cn #iIM
727.514 SSMH R]M
729.123 WM RIM
732.684 WM RIM
740.521 WM RIM
735.451 CO RIM
740.756 GV RIM
740.976 GV RIM
740.A08 FH
746.34 WM RIM
74b.777 CO RIM
748.454 Wi41 RIM
749.59 SSMFi RIM
751.058 WM RIM
750.853 Wi1A RIM
751.871 WihA RIM
752.257 55MH RIM
751J9 WM R4Mk
751.$8 WM RlM
752.615 WlVI REM
752.8D1 WM RINE
752.156 VJM RIM
752.986 SSMH RIM
" .� w..� �- . � i .
� 7� f71r.-+ l�l E 5
�
�t_L
� ��
s (�-�� t �-f� � S
� 1�..1
�- .�a.r.� , S$
�
F .-�I PJQri�i-�-�
.�
y�..s i f.(� L��, tit{-S
� � s-r�8 � �
�'� t� L fid-� 5
�E �
/
�,� �f
T
�� S�Y
���
�
,� '° ��`rr� .` �-'-I� ,� :
O:�Specs-Stds Go�ernance Process�Temporary Spec Files�Capital Deli�ery\Cap Delivery Di� 01\D171
23.16.01 Attachment A�Survey 5taking 5tandards.docx
Page 24 of 24
C. Other preferred as-built deli�erable
Some vendors have indicated thafi it is easier to deli�er this information in a different
format. Below is an example spreadsh�et that is also acceptable and can be abtained by
request from the survey superintendent.
0:\5pecs-Stds Governance Process�Temporary Spec Files�Capital Delivery�Cap Delivery �iv �i\0171
23.16.01rAttachment A_Survey Staking Standards.docx
Page 25 of 25
I� roll �I.. �.r . . . �
�� : � � � q �
� � � �
�� - �; ��` �
�
� �
� � -, ������ ���
� � � � �
� �' ����= W =
.�
,� � � �
� � � � �
� � g � - �
� -�� _ V� �� � � � � � � �
� ����� ���
. s� �
z z � x �
� � � � �' �
� � �
�
._ .'-"-....____..._--' -- -- "--'--'-- -----' --- ----' �—
� g
} � �� � � � � � � � � � � �
��� � �g � � � � � � � � � � �
� � � � � � � � � � � � � �
�� � � _ i� = z
�� � $ � � � � � �
�'` a � a
. �,
;'� �
. , i I �' �
� N � 7 � �
�. � ��
i i� �
w � � �
'; � �
i�� i�l � - -----.. __ __. ___ W._. —__-- ----
. � - "' �
f� P� -
� � �
4 f �I
. � � n
ti
�. . � � .
y; .. � �
f � � � � � � �
�. " � � � � �
�I ; �
;' , � I��� � ,
� � . �i �� � � � � � � � � � � �
s� � * � ��� ������ ��
hz 1� z x .�. a a �
' o f '
r u � A .j � �
T��' J����I y "� S � � � � � �
� e�� V� + :, � .
� �. ., -. � r, ., i ..� � �. �I 'I �. Z :I �� .�
0:�5pecs-Stds Go�ernance Process\Temporary 5pec Files\Capitaf Delivery�Cap Delivery Div Di\0171
23.�fi.01_Attachment A�Survey Staking Standards.docx
Page 26 of 25
017423-1
CLCANING
Page 1 of 4
s�cTa�oN a� �4 ��
CLEANING
PART1- GENERAL
1.1 SUMMARY
A. Section I�cIudes:
l. Intermediate and finaI cleaning for Work noi including spacial claaning of closed
systems specified eIsewhere
B. Deviafions from this City of Fart Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited tn:
1. Division D— Bidding Requirements, Cantraet Forms and Canditions of tlie Cont�•act
Z. Division I— General Requirements
3. Sectian 32 92 13 --Hydro-Mulching, Seeding aud Sodding
1.2 PRICE AND PAYM�NT PROCEDYJlt�,S
A. Measurement aa�d Payment
1. Work assaciated with tl�is �tem is considered subsidiary to the vaz•ious Items bid.
No separate payment will be aIlowed for this Item.
1.3 REFEItENCES [NOT i7SED]
1.4 ADMIl�IISTRATIVE REQiJIREMENTS
A. 5cheduling
1, Schedule cleaning operations so that dus� and other contaminants disturbed by
cleaning pracess will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion o� Work and immediately prior to final
inspection.
1.S SUBNIITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATION�L SUS1ViITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTAL� [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
i.10 STORAGE, AND FIANDLING
A. Starage and Handling Require�nents
1. Stora cleaning proc�ucts and cleaning wastes in containers spacificaIly designed for
tl�ose ma#erials.
CITY OF FORT WORTH 2O22 Bond Year 1— Contract 5
STANDARD CQNSTRUCTION SPECIFICATION DOCUMENTS City Pra_jecf No. L02931
Revised July 1, 2011
oz �a z� - 2
GLEl�ING
Page 2 of 4
1.11 FrELD [SITEI CONDITIONS [NOT USED]
1.12 WARRANTY [NOT iTSED]
PART�- PR�DUCTS
2.1 O�VNER�I`[IRNISHED [o�] aWNER-SUPPLTGDPRODUCTS [NOT iTSED]
�.� MATERIAI,S
A. Cleaning Agents
1. Compatible with surFace being cleaned
2. New and uncaj�taminated
3. For manufactured suriaces
a. Material recomxx�ended by manufacturer
2.3 ACCESSORTES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXEGUTION
3.1 INSTALLERS [NOT USED]
3.� EXAMTNATION [NOT USED]
3.3 PREPARATYON [NOT USED]
3.4 �i,PPL�CATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.b RE-INSTALLATION [NOT iTSED�
3.7 FIELD [or�] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANiNG
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to eo�ply with lavvs and safety orders of
governing atathorities.
3. Do not dispnse of �olatile wastes such as mineral spirits, oil or paint thinner in
storrn or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid vvaste disposal site.
S. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate mannar approved by City and regulatory agencies.
CITY OF FORT WORTH 2D22 Bond Year I— Contract 5
STANDAItD CONSTRUCTION SPECIFIGA'['ION DOC[7MENT5 City Project No. 102931
Kevised ]uiy l, 201 l
O 1 74 23 - 3
CLI'sANING
Page 3 of 4
6. I�andle materials in a cont�olled manner wit� as few handlii�gs as possihle.
7. Thoroughly cleat�, svveep, vvash and polish alI Work aild equipment associated with
this project.
8. Remove �ll signs of temporary construction and activities incidental 1:fl constrUction
of requiz•ed permanent Wark.
9. If project is not cleaned to the satisfactior� of the City, the City reserves #he right to
liave the cleaning completed at the expense of the Contractor.
1�. Do z�ot burn an-sita.
B. Intermediate Cleaning during ConStruction
1. Keep Work areas clean so as not to hinder heatth, safety or convenience of
personnel in existing facility operatiQns.
2. At maxinnum. weekly intervals, dispose afwaste materials, debris and rubbish.
3. Confine construction debris daily in strategically located container(s):
a. Cover to prevent blowittg by wind
b. Store del�ris away from constructi4n or operatio�lal activities
e. Haul from site at a miniinum oi once per week
4. Vacuum olean interior ar�as when ready to receive �nisl� painting.
a. Continue vacuum cleaning on an as-needed basis, until Fiiial Acceptance.
5. Prior to storm events, thoroughly clean site of all Ioose or unsecured items, which
may become airborne or transported by �owing vvater durii�g t11e stornl.
C. Interior Final Cleaniilg
1. Remave grease, mastic, adhesives, dust, dirt, stains, fingerprints, labeIs and other
foreign materials from sight-expased surfaces.
2. Wipe all lighting fixture reflectars, Ieiises, lamps and trims clean.
3. Wash and shine glazing and mirrors.
4. Polish glossy surfaces to a clear shine.
5. Vei�tilating systems
a. Cleau permanent filters and replace disposable f lters if units were operated
during constructibn.
b. Clean ducts, blowers and cails if units wei=e operated witha��t filters duri�ng
aonstruction.
6. Replaca all burned out la�nps.
7. Broom clean proaess area floors.
8. Mop office and contro! room floors.
D. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers fram site.
a. Re-seed areas distur�ed by location of �rasl� and debris cantainers in accordance
with Section 32 92 13.
2. Sweep roadway to rennove all rocks, pieces of aspl�alt, concrete or a�ty other object
that may hinder or disrupt the flow of traffic along tl�e roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junctian baxes and inlets.
CITY OF FORT WORTH 2O22 Bond Year 1— Costcact 5
STP.NF)ARD CONSTRUCTION SPEGIFICATIqN DOCUMENTS City Project Na. 1 Q2931
Revised July 1, 2011
O17423-q
CL�AN[NG
Page 4 oi4
4. If no longer reqLiired far maintenance of erosion facilities, and upnn approval by
City, remove erosion control irom site.
5. Clean signs, lights, signals, etc.
311 CLOSEQUT ACTN�T�ES [N�T USED]
3.12 PR�TECTION [NOT USED�
3.13 MAINTENANCE [NOT US�D]
314 ATTACHMENTS [NOT U�EDj
END OF SECTION
Revision Log
DATE NAME SUIVIlVIARY OF CHANGE
G1TY Or FORT WORTH 2O22 Bond Year I— Contract 5
STANI?ARD CQNSTRUCTION SFECIFI�ATIOI�I DOCUMEI�fTS Gity ProjectNo. 102931
Revised July 1, 201 I
Ol 77 19 -1
CLOS�OU1' F2�QUfItCM�NT5
Page 1 af 3
]
2
SECTiON 01 7`7 19
CLOSEOUT REQiJIREMENTS
3 PART 1- G+ � L
4 l.l. SiJMMr1,RY
5 A. SactianIncludes:
6 1. The procedure for closirsg nut a contract
7 B. Deviations from tk�is City of Fort Worth Standard Speci�ication
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limi�ed to:
10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1. — General Requirements
12 1.� PRICE ANQ PAYIVI�IT PROCIDURES
13 A. Measurement and Payment
14 1, Work assaciated wztk� this Itenn is conszdered subszdiary to the various Items bid.
15 No separate payment will be ailowed for ihis Itern.
16 1.3 REE'ERIIVCFS [NOT 17SID]
17 1.4 ADMINISTRATIVE ItEQT.TIREMEI�TTS
] 8 A. Guarantees, Bonds and Affidavi�s
19 1. No application fnr final payment wiIl be accepted until all guarantees, bonds,
20 certificates, ]zcenses and affidavits required far Work or equipment as sp�cified are
21 satisfactorily filed with the City.
22 B. Release oiLiens or Claims
23 1. No application %r iinal payment wi�l be accepted until satisfactory evidence of
24 release of liens has been submit��d to the City.
25 1.5 SUEMITTALS
26
27
28
29
30
3!
32
A. Subrnit all requireci documentation ta City's Project Representative.
1..6 INFURMATIONAL SUBNIITTALS [NOT USIDI
i.7 CLOSEOUT SUBNIITTALS [NOT USID�
PART 2 - PRODUCTS [NOT i1SID]
CITY OF FORT WORTEi
5TANDARD CONSTRUCfION SPECIF'ICA7'IaN T]OC[1M�N'I'S
x�;S�a a��G�, zz, aozz
2022 Bond Yeaz 1— Gantract 5
City Projeet No, 1 p2931
01 77 19 -2
CLOSCOUT REQUIRPMENTS
Page 2 af 3
PART 3 - �XTCUTION
2 3.l INSTALLER� [NOT USIDJ
3 3.2 EXAMINAT��N [NOT USIDJ
4 3.3 PREPARATION [NOT U�ID]
5 3.�# CLOSFAUT PROCIDLTRE
6 A. Prior to requesting Final Inspection, submit:
7 1. Project Record Documents in aocordance with Section Q1 78 39
8 2. Operation an.d Maintenance Data, if reyuired, in accordance with Section O I 78 23
9
10
11
12
13
14
15
16
1'7
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
3�
35
36
3'7
B. Prior fo requesting Final Inspection, perform final cleaning in accordance with Sectian
a 1 74 23.
C. FinalInspection
1. After final cleaning, provide notice to the Ci€y Project Representativ� that the Work
is cornpleted.
a. T�e City will make an initial Firial Inspection wi� the Contractor present.
b. Upon completion ofthis mspectian, the City will notify the Contz�actor, in
wrrtmg within 10 business days, af any particulars in which this inspection
reveals that the Wark is defecti�e or incomplete.
2. Upon receiving written notice from the City, immadiately undertake the Work
required to remedy deficiencies an.d completethe Wor1� to the satisfaction of the
City.
3. The Right-of-way shall be cleared of all construction tnaterials, barricades, and
temparary signage.
4. Upon camplation of Work associated with the i�ems listed in the City's wrztten
notic e, inform the City that the required Wor�C has been c omp�eted. Upan rec eipt of
this notice, the Ciity, in the presence of the Cantractor, will make a subsequent Final
Inspection of the project.
5. Provide all special accessories required to place each item of equipment in full
operation. These special accessary items include, but are not limiled io:
a. Speeified spare parts
b. Adequate oiI and grease as required for the first lubrication of the equiprnent
c. Initial fili up of all cherr�ical tanks and fu�l tanks
d. Light bulbs
e. Fuses
f Vault keys
g. Handwheels
h. Other expendable iCems as required for initial star�-up and operation of all
eyuipment
38 D. Notiae of Froject Completion
39 I. Once the City Project Representativ� finds t�ie Work subsequent to Final Inspeetion
40 to b� satisfactory, the City will issue a Notice of Praject Comple�ian (Graen Sheet).
�l E. Supparting Documentation
CTPY OF FORT 1VORTH
STANDARD CONSTRUCTIDI�! SPECIEICATION DDCU�ENTS
ReVised March 22, 2D21
2022 Bond Year 1— Contract 5
Ci[y Project No. 102931
Ol 77 19 -3
CLDSEpUT R�QUIR�Mk,7VTS
Page 3 oi3
1
2
3
�
5
6
7
8
9
10
11
1�
13
14
15
16
17
18
19
20
21
22
23
1. Coordinate with the City Project Representative to eom�lete the %llowing
additional forrns:
a. Final Payment IZeqvest
b. Staterrient of Contract Tune
c. Affidavit ofPayment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (i�required)
f. Contractar's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter ofFinal Acceptance
1. Upon review and accepiance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for �ayment.
3.5 REPAIR / RFSTORATION [NOT USID]
3.6 R�INSTALLATION jNOT iTSID]
3.'� FIELD [on] SITE QUALITS� CONTROL [NOT USID]
3.S SYSTEM STARTUP [NOT LTSID]
3.9 ADJUSTING [NOT LTSID�
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVI'ITFS [NOT iTSID]
3.12 PROTECTION [NOT USID]
3.13 MAIN'TEI�TANCE [NOT iTSID]
3.1� ATTAC�N'I5 [NOT USIDI
�4
25
DAT�
3/22/2021
26
Revision I.og
SUMMARYOF CHANGE
M Qwen 3.4 C. Added language to clarify and empk�asize requirement to "Clearing ROW"
I
CITY OF FORT WORTH
STA7�[DAKD GON3TRUCI'IQN SPECIFICATIOI�7 DOCLTMEN'I'S
Revised Mazch 22, 2021
NAME
IND OF SECTION
2022 Iiond Year 1-- Contract 5
City Project No. l D2431
07 7823-1
OP�RATIpN At�lD MAINT�,TTANCE �ATA
Page 1 of 5
SECTION Ol. 78 23
OPERATION AND MAINTENANCE DATA
PART � - GENERAI,
1.1 SUMMAItY
A. Section I��cl�des:
1. Produci data and related infornaation appropriate for City's mau�tenance and
aperation of products fi�rnished under Cor�tzact
2. Such products may incIude, but are nat limited to:
a. Traffic Controllers
b. Irrigation Cantrollers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1 _ None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditiflns of the CQntract
2. Division 1-- General Requirements
1.2 PRTCE AND PAYlVIENT PROCEDURES
A. Measureme�t and Payment •
1. Work associatad with this Itern is considered subsidiary to the various Items bid.
No separata payment will be allowed for this Item.
1.3 REFERENCES jNOT USED]
1.4 ADMINISTRATIVE REQUII2EMENTS
A. Schedule
1. Submit manuals in final form ta the City vsrithin 30 calendar days of product
shipment to Yhe projsct szte.
1.5 �USMITTALS
A. Submittals shall b� in accordance with Section O1 33 00 . All submiitals shall be
approved by the Gity prior to delivery.
1.G INFORMATIONAL SUBNIITTALS
A. Submittal Form
1. Prapaa'e data iza form of an instrr�ctional manual for use by Ciiy personnel.
2. Format
a. Size: 8%z inc�es x 1 I inches
b. Paper
I) 4Q pound minimum, white, for typed pages
2) Holes reinfarced with plastic, cloth ar metal
a Text: Manufacturer's printed data, or neatly typewritten
CITY DF FORT tVORTH 2D22 Sond Year 1— Contract 5
STA]VDARD CONSTRUCTION SPECIFiCATION DOCUMENTS Ciry ProjectNo. 1U2931
Revised T]ecember 2Q 2012
oi�sz3-z
QYERATION .4I�D MAINTENANC� bATA
Page 2 of 5
d. Drawi�gs
1} Provide rei�'orced punched binder tab, bind in with fiext
2} Reduce larger drawings and fold to size of text pages.
e. Yrovide fly-leaf for eaeh separate product, or each piece of operating
equipment.
1) 1'rovide typed description of product, and major component parts of
equipmcnt.
2) Provide indexed tabs.
f: Cover
1) Identify each volume with typed or printed title "�PER.A.TING .AND
MAINTENANCE 1NSTRUCTIONS".
2} List:
a} Title of Praject
b) Identity of separate structii�•e as applicable
c} Identity of general subject inatter cavered ii1 the manua]
3. Binders
a. Commercial quaIiiy 3-ring bindars with durable and cleanabie pIxstic covers
b. When r�ultiple binders are used, correlate the data into related coilsistent
groupiazgs.
4. If availahle, provide an electronie form of the O&M Manual.
B. Manual Content
Neatly typewritten table of eontents for each volume, arranged i�x systamatic order
a. Contractar, na�ne af respon�ible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the vohime
c. List, with each produ�t:
1) The name, address and telephone number of the subcvntraafior or installer
2) A list of each product required to be includad, indexed to content of the
uolume
3) Identify area of responsibility of each
4) Lacal source ofsupp�y for parts and r�plac�ment
d. Icientify each product by product name and other identifying sy�bols as set
forth in Contract I?ocuments.
2. Praduct Data
a. Tnclude only those sheets which are pertinent to the specific product.
b. Annotate each si�eet to:
1} Clearly identify specific product or part installed
2} Clearly identify data applicahle to installation
3} Delete references to inapplicable informatian
3. Drawings
a. Supplem�nt product data with drawings as n�cessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate c�rawings with infQrmatioi� in Project Record Document� to assure
aorrect illustratian of campleted installation.
c. Do nat use Project Record Drawings as mazntenance drawings.
�4. Written text, as required to supplement product data for the particular installation:
a. Organize in cdnsistent format under separate headings for different procedures.
b, Provide lagical sequence of instructions af each proced�zre,
CITY OF PORT WORTH 2O22 Bond Year 1—ConUaclS
STAi�]f3AIiD CQN5'tRUCT10N SYECIf'ICA'I'IOI�I DOCUMENTS Ciry Projact No. 102931
Revised becember 20, 2012
017823-3
QP�RATIQN AI�D MIAIN'CCNANCE l�ATA
Page 3 of 5
5. Copy of each vvarranty, bond and service coiitract issued
a. Provide inforrnation sheet �or City personnel giving:
1) Proper procedures in even# af failure
2) Instances which might affect validity of wva.rranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copi�s of complete manual in final form.
2. Content, for arcllitectural products, applied materials and iinishes:
a. Manufacturer's data, giving full information on products
1) CaCalog nu��ber, size, coinposition
2} Color and texture designations
3} Information required far reordering special manufactured products
b. Instructions for care and mainteiiance
x} Manufacturer`s reconnmerndation for types of cleaning agents and methods
2} Cautions against cleauing agenta and metlzods which are detrimental to
�iLDCIUC�
3) Recommended schadule for cleaning and maintenance
Content, for moisiux•e protection and weather exposure products:
a. Manufacturer's data, giviug full information on products
1) Applicable standards
2) Cheimical coza�position
3) Details of installation
b. Instructions for inspection, maintenance and repaii�
D. Manual for Eqnipment and Systems
1. Submit 5 copies af carnpl�e manual in final fortn.
2. Contezat, for each unit of aquiprnent and systecn, as appropriate:
a. Description of unit and component parts
1} Function, normal operating characteristics and limiting oonditions
2} Perfarmance cur�u�s, engir�earin� data and tests
3} Camplete nomenclature and colnmercial number of replaceable parts
b. Operating procedures
1} Sfart-up, break-in, routine a�id norrnal operating instructions
2) Regulation, control, stopping, shut-dawn and emergency instructions
3} Summer and winter operating instructions
4) Special operating instructions
c. Mainte�lance procedures
1) Routine opera�ions
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
�-) Alignment, adjusiing and checking
d. Servicing and lubricatian schedule
J) List of luhricanfs required
e. Manufacturer's printed operating and maintenance instructions
f. Deseription of seq�aenee of operation by control manufacturer
I) Predicted life of parts subject to wear
2) Items recommended to be stocleed as spare parts
g. As insta11ec3 contral diagrams by controls manufacturer
li. Each contractor's coordination drawings
1} As installEd color coded piping diagrams
CITY OF F012T WORTH 2O22 Bond Year l-- Contract 5
STANDARD CQNSTI2UCTION SPECIFICAT[ON DOCUMENTS Cily ProjectNo. 102931
Revised Decemher 20, 2012
O 1 78 23 - 4
Ol'�RATfON ANb �v1AINT�I�IANCE DATA
Page 4 of S
i. Charts of val�e tag nuzx�.bers, with Iocaiion and function of each valve
j. List of original manufacturer's spare parts., manufacturer's current prices, and
reaomme��ded quantities to be �naizltained in storage
k. Other data as required under gertinent Sections of �pecifcations
3. Content, iar each eleci�'ic and electronic syst�m, as appropriate:
a. Description o�fsystenn azad compo��.ent pa�ts
1) Function, normaI operating cliaracteristics, and limiting conditions
2} Perfar�nance curves, e�lgineering data and tesis
3) Complete nomenclature and comrnercial number of replaceable parts
b. Circuit directories of panel�snards
1) Electrical service
2} Cantrols
3} Carnmunieatians
c. As installed color coded wiring diagrams
d. Operating proeedures
1} Routine and narmal operating instructians
2} Saquences r�quired
3} �pecial aperatiz�g instructions
e. Maintenaa�ce procedures
1 } Rovtine operations
2} Guide to "trouble shooting"
3} Disassembly, repair and reassembly
4} Adjustment aud cllecking
f. Manufaciurer's printed operating and maiutenat�ce instructions
g. List af originaI manufacturer's spare parts, manufacturer's current prices, and
recominended quantifiies to be maintained in storage
h. �ther data as required under pertir�ent Sections of Specificatians
4. Prepare an�1 incl�ade additional data when the need far such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUSMITTALS [NOT IISED]
1.8 MAINTENANCE MATERIAL SUBNIlTTALS [NQT i7SED]
1.9 QUALITY ASSURANCE
A. Pr�ovide n}�eration and mai�ztenayyce data by personnel with the following criteria:
1. Trained a.nd experie�lced in maintenan�e and aparation af described products
2. Skilled as technical writer to tl�e extent required ta communicate essential data
3. Skilled as draft�man competent to prepaxe required drawings
CITY OF FORT WORTH 2O22 Bond Year 1--Contraet 5
STANDAAD CONSTRUCTION SPECIFICAT[�N DOCUMENTS City Projaet Na. 102931
Revised December 2�, �012
01 78 23 - 5
OPERATI03d AiV!] MAINTEi1ANiCE DA7'A
Page 5 of 5
1.10 DELIVERY, STORA.GE, AND IiANDLING [NOT i1SED]
1.11 FIELD [SITE] CONDITIONS [NOT US�D]
1.1� WARRANTY [NOT iTSED]
PART � - PRODUCTS �NOT U�ED�
PART 3 - EXCCUTION [NOT USED]
END OF SECTION
Revision Log
I DAT� NAME
813II2Q12 D.7ohnson
SL]MMAIZY OF CHANGE
1.5.A.1--title of section removed
CTI'Y OF FORT WbRTIi
STAIIDARD CONS`I'RUCTIQN SPECIFIGATION DOCUMENTS
Revised December 20, 2012
2022 Bond Year 1— Conhact 5
City Pro,{ect No. 102931
01 78 39 - 1
PIiOIHCT RECORD DOCUMENTS
Page 1 of 4
�ECTION d1 78 39
PROJECT RECORD DOC[TMENTS
PART 1- GENERAi�
1. ]. SUMMARY
A, Sectial� Includes:
Work associated with the documenting the praject and recording changes to project
docum�nts, inoluding:
a. Record Drawings
b. Water Meter Setvice Reports
c. Sanitary Sewer Service Reports
d. Large Water Ma�er Raports
B. Deviations from this Ciiy of Fort Worth Standard Specification
1. None.
�. Related Speci�catian Sec�ions include, but are not necessarily limited to:
1. Division 0— Bidding Reyuirements, Contract Forms and Conditions af the Contz•act
2. Division 1— GeneraI Requirements
1.2 PRICE ANI? PAYMENT PROCEDiJRES
A. Measurement and I'ayment
1. Work associated with this Item is considered subsidiary to the variaus Items bid.
No se�arate payment will be allowed for this Itern.
1.3 R�F�RENCES [NOT USED�
1.4 ADMINI�TRATIVE REQIIIREM�NTS �NOT US�D]
1.5 SUBMITTALS
A. PriQr to subinitti�ag a request far Final Inspection, deliver Project Recard Documeilts to
City's Pt-oj�ct Representatiu�.
I.G ACTTON SUBMITTALS/INFORMATIONAL 5U]3MITTALS [NOT USED]
1.7 CLO�EOLTT SUBMITTALS [NOT USED�
1.8 MAINTENANCE MATERIAL SUSNIITTALS [NOT IISED]
1.9 QIIALITY ASSilRANCE
A. Accuracy of Records
1. Thoraug�ly coardinate claanges vvithin tlae Reeard Documents, making ad�quate
and praper entries on each page of Specifications and each sheet of Drawings and
oth�r pocuments where such enhy is r�quired to shaw the change properIy.
2. Accu:racy of records shaII be such t�af future searcn for items shown in th� Contract
Docurnents may rely reasonably on information obtained from the approved Project
Reeord Docu�x�ents.
CTTY OF FORT WORTTI 2022 Bond Year 1— Contract 5
STANDARS] CONSTRUCTIQN SPECIFICATION DOCUM�NT5 City PcajectNo. 102931
Revised July 1, 2U11
017839-2
PROJECT R�CORI? DOCIIIIrIEidTS
1'age 2 of 4
3. To facilifatie accuracy of records, make entries within 2�- hours after receipt of
information that the cliange has occurred.
4. Provide iactuaI in%rmation regarding all aspacts of the Work, both concealed and
visible, to enable future nnodi�catian of th.e Work to proceed without Iengihy and
expensive site measurement, investigation and e�aminatio�.
1.10 STOR.A.GE AND HANDLING
A. Storage and Handling Reqnirements
1. Maintain the job set of Record Dacuments completely protected from tieterioration
and from lass and damage until campletian oithe Work and transFer of all recorded
data to tha �tial Project Record Documents.
2. In the event of loss of recorded data, use means necessary to again sect�re the data
ta tl�e Cifiy's approval.
a. In such case, provid� replacements to the standards origin�ally required by the
Contract Documents.
111 FIELD jSITE] CONDITIONS LNOT USED]
I.lti WAR1tANTY [NOT USED]
PART � - PRODUCTS
2.1 UWN�R-FURNISHED [oR] UWNER SUPPLIED PRODUCTS [NOT USED]
�.�. RECORD DOCUMENTS
A. Job set
1. Promptly following receipt of the Notiee to Proceed, secure from #he City, at nc�
charge to the Contractor, 1 camplete set of al� Documents comprising the Contra�t.
B. FinaS RecQrd Dacumen#s
1. At a time nearing the completion of the Wor� and prior to Final Inspection, provide
the City 1 complete s�t af aIl Final Record Drawings in the Cantract.
2.3 ACCESSORIES [NOT USED]
�.4 SOLTRCE QUAL�TY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTEN.ANCE DOCiJMENTS
A. Maintenance of 7ob Set
1. Imrnediately upon receipt of the joh set, identify each of the Doct�ments with the
title, "RECORD DOCCTMENTS - JOB SET".
CITY OF FORT WORTH 2O22 Bond Year 1-- Contraei 5
STEIN�AIiD CONSTRUCTION SP�CIFICATTpN TJOCi)MEi�'TS Ciry Project I�4o. 102431
Revised luly l, 2fJ11
01 78 39 - 3
PR07ECT 1tECORD DOCiJMEIdTS
Page 3 of 4
2. Preservation
a. Cansidering the Contract completion time, t11e probable nuznbez• of occasions
upon which the�ob set must be taken out for new entries and for examination,
and tltie aonditinns under which �l�ese activities will ba performed, devise a
suitable method for proteeting the job set.
6. Do not use the job set for any purpose except entry of new data and far review
by t��e City, until start of transfer af data to final Project Record Documants.
c. Maintain the job set at the site of work.
3. Coordination with C�nstructian Survey
a. At a minimum, in accordance with the intervals set forth in Section Q1 7l 23,
clearly mark any deviations from Contract Docu�nents associated with
installatian of the infrastructure.
4. Making entries an Drawings
a. Racdrd any d�viations from Contract Dacuments.
b. Use an erasahle colored pencil(not ink or indelible pencil}, clearly describe the
change by graphic liiie and note as required.
c. Date all enfi�•ies.
d. Call attention to the entry by a"cloud" drawn around t11e area or areas afFected.
e. In t11e event of overlappi�lg changes, use differ�nt colors for tlie dv�rlapping
changes.
5. Conversion of schematic layouts
a. ln some cases on the Drawings, arrangementis of conduits, circuits, piping,
ducts, and sirr�iIar items, are shown schematicaIly and are nat intended ta
po:rt�ay precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject ta the
City's appro�al.
2) However, design af future modifications of the facility �nay require
accurate information as to the final physical layout of iterns which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
incli, th� centerline o� eacii run oi iteins.
1) Final physiaal arrangement is determined by the Contractor, subject ta the
City's approval.
2) Show, by symbol ar nota, the vertical Iocation of the Item ("under slab", "in
ceiling plenum", "exposed", and the like}.
3j Ma�e all identi�cation suffzcie��tly descriptive that it may be related
reliably to the Specifications,
c. The City n�ay waive the requirernents fnr conversion �ischematic layouts
�vhere, in the City's judgment, eonversion serves no useful purpase. Hawevar,
do not rely upon waivers being issued e�cept as specificaIly issued in writing
by the City.
B. Final Project Record Documents
Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Dra�+ings to the
corresponding final documents, caordinating the changes as required,
b. Clearly indicate at each affectad detail and �ther Drawing a iull description of
changes made during construction, and the ac#uaI �ocation of items.
CITY OF FORT WORTH 2a22 Bond Year 1— Contract 5
STANBARD CONSTRUCTIOI�# SPECIFICA'I70N DOCUIVIENTS Ciry Project iVo. 102931
Revised July l, 2011
01 78 39 - 4
PROJECT RECORD DOCUIVI�NTS
Page 4 of 4
e. Call attention to each ei�try by drawi��g a"cloud" ara�.�nd the area or areas
affected.
d. Make changes neatly, co�isistently and witla the proper media to assure
lo��gevity aii� clear reproduction.
2. Transfer of data to other pocuments
a. If the Documents, other than Drawings, have been k�pt clean during progress of
the Work, and if entries thereon have bee� arderly to the approva.l of tlie City,
the job set af those Documents, other than Drawings, will be accepted as final
Recard Documents.
b, If arjy suc� Document is not so approved by the City, secu�'e a new copy of that
Documen� from the City at ihe City's usual charge for repi•oduction and
handling, and carefully transfer the chang� data to the new copy to the approvaI
of the City.
3.5 REPAIl� 1 RESTORATIUN [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.'� FIELD �c�n] SITE QUALITY CONTROL [NOT iTSED]
3.8 SYSTEM STARTUP [NDT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT US�D]
3.12 PROTECTION [NOT IIS�D]
3.13 MAINTENANCE [N�T USED]
3.14 ATTACHNI�NTS [NOT USED]
END OF SECTZUN
Revision Log
DATE NAME SUMMARY �F CHANGE
CITY OF FORT WORTH 2O22 Bond I'ear 1— Contxact S
STAI�iDARD CONSTRUCTTOid SY�CIFICATTON DOCUMENTS CiEy Project No. 102931
Revised Juiy 1, 2DI 1
31 1000 -1
SITE CLEAItING
I'age 1 oi 6
2
3 PARTl- GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
A. 5eation Tncludes:
S�CT�ON 31 10 00
S�TE CLEARING
l. 1'reparation of right-of way and other designated areas for canstruction operations
by removing and disposing of all obstructions inclUding,clearing and grubbing and
t�ees, when cemoval af such obstiuctions is not speci#"ically sk�own on the Drawirzgs
to be paid by other Sections.
B. Deviatians fi�om this City of Fort V�orth Standard Specification
11 1. Sectioa 1.2.A.�.b is replaced with the following: 1) The work performed and the
z�aterials furnished for "Tree Protection" in accordance with this Item are subsidiary
to the project cost.
!2 C. Related Speciiication Sectior�s include but are not necessarily limited to
13 1. Division 0— B idding Requirerrzents, Contract Forms and Conditions of the Contrac�
1�4 2. Division 1— GeneraI Requirements
I S 3. Section 02 4I I3 — Selective Site Demoli�ion
16 4. Sec�ian 02 41 14 — Utility RemovallAbandonment
17 1.2 PRICE AND PAI'MENT PROCEDURES
IS
I9
20
21
22
2;
24
25
26
27
2$
29
30
31
32
33
34
35
36
37
38
39
�40
41
A. Measureenent and Payment
] . �ite Clearing
a. Measurament
1) Measurement for this Ttem shall be by lump sum, square yard, ar per acre.
b. Payment
I) The worlc perfoenr�ed and the mate�•ials furnished in accordance with this
It�m shall be paid for at th� lump sum, square yard, or per acre price bid far
"Site Clearing".
a The price bid shall include:
1) Pruning of desiguated trees and shrubs
2) Ramoval and disposal of structur�s and nbstructions (unl�ss separate bid
item is provided under 02 41 13 "Selective Site Dernolition or Q2 41 14
"Utility Remova�/Abandonment").
3) Removal and disposal o�'trees undet• 6-inch in diameter when bidding by
lum� sum or squar� yard
4) Removal of ALL trees when bidding by acre.
5) Backfilling ofhales
b) Cl�;an-up
2. Tree Removal (for trees 6-inch or lai•ger in diameter when Site Clearing is bid by
lump sum or square yard)
a, Measurement
1) Measurement far this Item shall be pee each.
2) Measurement of diametei• for tree removal shall be at standard "Diarr�eter at
Breast Height" or DBH, where Bt•east Height shall be 54" above grade.
CITY OF FORT WORTH 2O22 Bond Year 1— Contract 5
STANDAIiI7 CQNSTRUCTIDN SPECiFICAT10N bQCUMENTS City ProjectNo. 1p2931
Revisad March 22, 2021
3i iaoa -2
SITli CL�ARING
Page 2 of 6
I �)
2 b. Payment
3 1) The worlc performed and the materials fUrnished in accocdance with this
�4 Item shall be paid for a� the unit pi•ice bid pei• each "Tr�e R�mo�al" fo�•:
5 a) Various diaitneter rangcs
6 c. The price i�id shall include:
7 1} Removal and disposal of t� ee, including remaval of root ta a depth at least 2
S foat belaw grade
9 2} Grading and bacicfilling of hales
10 3) Excavation
1] 4) Clean-up
12 3. Tree RemovaS and TransplantatiQn
13 a. Measurement
14 1) M�asurement for this Item sha�l6e pet� each.
15 b. Payment
16 L) The work performed and the materials fvrnished in accordance with this
I 7 Item shall be paid for at the unit price bid per each "Tree Transplant" for:
18 a) Various diameter ranges
19 e. The price bid sliall include:
20 1) Pruning of designated t�•ees and shrubs
21 2) Moving tree with trucic mounted tree spade
22 3) Gradingandbackfilling ofholes
23 4) Replanting tree at temporary Xocation (deter�ined by Contractor}
24 5) Maintaining tree until Worlc is completed
25 6) Replanting tree into original o�• designated location
26 7} Exca�ation
27 8) Fertilization
28 9} Mulching
29 10) Watering
3Q 1 I) Clean-up
31 12) Warraniy period
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
4. Tree Protection
a. Measurement
1) Measuremenf for this Item shall be per each as des�gnated on Construction
D�•awings %r protection
b. Payment
1) The work performed and the materials furnished in accordance with
this Item shall be subsidiary fin the praject cast.
a The price bid shall include:
I) Protection of tree utilizing measures designated Qn Construction Drawings
2) Installatian oiwork of bai•riers as designated on Construction Drawings
3) Maintenance of protection measures throughautconstruction comple�ed
4) Replanting tree int� ariginal or designated locat�on
5) Excavation
6) Fertilization
7} Mulching
8} Clean-up including rerno�al on const�•iction completion of protection
measures
CTTY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFIGATIQN DOCUMENTS
Revised March 22, 2021
2022 Bond Yea�• I-- Contract 5
CityProjectNo. L02931
31 1000 -3
3ITE CL,�AR]NG
Yage 3 of 6
1 S,
2 1.3 REFERENCES [NOT USED]
3 1.�4 ADMINSTRATIVE REQLTIREMENTS
4 A. Permits
5 1. Contractor shall obtain Tree Removal P�rmits and Ut-ban Fot•estry Permits as
6 tequired by the City's Tree Ordi�ance. PARD�Forestry details can be found here:
7 Fore�try — Welco�ne to the C rtv c�f Foi�t W arth f fortwortht�xas.eov�. U��ban Fo�•estry
8 Compliance's ordinance and requirements are within Zoning and can be found here:
9 ZoninE — Welcome to the Citv of �ort Worth �fortworthtexas.�ov].
10 B. Preins�allation Meetings
11 1. Hold a preli�ninary site clearing mee�ing and include the Contractar, City Forester
12 (if City owned t��ee} or representati�e of Urban Forestry if private�y owned trees�,
13 City In�pector, and the Praject Manager far the puz•pose of reviewing the
14 Contractor's tree removal plan. Clearly marlc all �•ees to rernain on the project si�e
15 prior to the meeting.
16 2. The Coni�actor will provid� the City with a Dispasal Letter in accordance to
17 Division Ol.
1$ 1.� SUEM7TTALS [NOT US�D]
I9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUSMITTALS [NOT USED]
20 L'� CLOSEOUT SIIBMITTALS [NOT iTSED]
21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
22 1.9 QUALITY ASSURANCE �1�TOT USED]
23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT U�ED]
24 L11 F��LD COND�T�ONS [NOT USED]
2S 1.1� WARRANTY [NOT USED]
26 PART �- PRODUCT5 jNOT USED]
27 PART 3 � EXECUTION
28 3.1 INSTALLERS [NOT US�D]
29 3.2 EXANIINATION [NOT US�D]
30 3.3 PREPAR.ATION
31 A. AlI trees identiiied to be protected and/or preserved should be clearly flaggecl with
32 survey tape as per Cons�uction Drawings.
CITY OF FDRT WORTH 2O22 8ond Year 1—�ontract S
STANDARD COAIS'FR[JCTION SPECIF�CATION DDCUMENTS City Froject Na. 102931
Revised March 22, 202I
31 lODO -4
SlTS CLEP321NG
Page 4 of 6
1 B. �ollowing taping and prioi• td any removals or site cle�ing, the Contcacto�• shall t�neet
2 with the City, the Engineet� and tl�e Landowner, if necessary, to conf rm trees to be
3 sa�ved.
4 3.4 Wi STALLAT�ON
5
6
7
8
9
10
11
12
13
14
15
16
17
18
I9
20
21
22
23
24
25
2b
27
28
29
JO
aI
a2
33
34
35
36
37
38
39
40
41
42
43
44
45
A. P�•otection of Trees
1. Protect designated trees and prnne �reas and shrubs as shown on the Dx•awings.
Refer to the D�•awings fo�• tree pratection details.
2. If the Drawings do not provide tree protection details, protected trees shajl be
fenced by placing b-foot tall nnetal T-pasts in a sqUare araund the t�•ee trunlc with
the cocners located on the canapy drip iine, unless instructed otherwise.
3. When site conditians do nni all�w For ihe T-posts to be installed at the drip Iine, ihe
T-posts may 6e installed no less than 8 feet from the tree trunk. 4-foot high 12'/2
gauge stock fancing or ox•ange plastic snow fence shall be attached to the T-posts to
farm the enclasure.
4. Far city-owned trees, P�-Forest�y per�x�ission required to install protective
fencing inside of canopy dripline (Critical Root Zone).
5, Additional trunlc proteciinn (cfadding) is required when protective fencing is
approved witL�in the Ccitical Root Zone.
6. Do not park eqLiipment, service equipment, stare materials, or disturb the raot area
under the branches of trees designated for preservation.
7. When shown on fihe Drawings, trext cuts on trees with an approved tree wound
dressing within 3U minutes of maIcing a pruning cut or atherwise causin�g daunage ta
the tree.
8. Trees and brush shall be mu�ched on-site.
a. B�ning as a method nf disposal is not allowed.
B. Hazardous Materials
I. The Contractor will notify the Engineer iminediately if any hazairdous or
questionable materials not shown on the Drawings are encountered. This includes;
butnotli�ited ta:
a. �'loortiles
b. Roof tiles
c, Shingles
d. Siding
e. Utility piping
2. The testing, rernoval, and disposal af hazardr�us materials will be in acco�dance
with Division 1.
C. Site Clearin�
1. Ciear areas shown on the Drawings of all obst�uctions, except thase landscape
features that are to be preserved. Such abstructions include, but are not limrted to:
a. Rernains of buiidings and other structures
b. Foundations
c. Floor slabs
d. Concrete
e, Srick
f. Lumber
CITY QF FORT WORT H
STAI�iDARD CONSTIZUCTI03V SP�CIFICATION DOCUMEhiTS
Revised Marcli 22, 2021
2022 Bond Year 1-- Contract 5
City Project AIo. 1 U2931
31 1006-5
SITE CLEARIIwiG
Page S oP 6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3b
2.
3
4.
5.
6.
7.
g. Plaster
h. Septic tank di•ain fields
i. Abandoned utility pipes o�• conduits
j. Equipment
lc. Trees
l. Fencas
m. Retaining walls
n. Other items as specified on the Drawings
Remove vegetation and ot�er landscape features not designated far preservatian,
whether above or below ground, including, but not Iimited to:
a. Curb and gutter
b. Dr�veways
c. Paved parIcing areas
d. Miscellaneous stone
e. Sidewallcs
f. Drainage stiuctures
g. Mariholes
h. Inlets
i. Abandoned railroad traclss
j. Scrap iron
k, Other debris
Remove cuIverts, stoi•m sewers, manholes, and in�ets in proper sequence to
maintain traffic and drainage in accordance rvith �ection 02 �41 14.
In areas receiving embankment, remove ohstructions not designated for
preservation to 2%et below natural gE•ound.
In areas to be excavated, remove obsh�uctions to 2 feet below the excavation level.
In all other areas, remove obstt�uctians to 1 foot below natural ground.
When allowed by the Drawings or directed by the Engineer, cut t�•ees and stumps
off to ground leve[.
a. Removal oiexisting st��uctures shall be as per Section 02 41 13.
D. Disposa.l
1. Disposa of all trees within 24 hours of remo�+al at an appi•oved off-site facility.
2. All materials and d�bris t•�moved becames t�e property of th� Contractor, unless
otherwise �tated on tk�� Drawi�ags.
3. The Contractar wzll dispose of material and debris off site in accordance vuith Iocal,
state, and federallaw� a��d regulati�ns.
37 3.5 REPAIR �1�TOT USED]
38 3.6 R�-INSTALLATION [NOT USED]
39 3.7 FIELD QUALITY CONTROL [NOT USED]
40 3.8 SYSTEM �TARTUP [NOT U�ED]
41 3.9 ADJUSTING [NOT USED]
42
3.10 CLEANING [NOT USED�
43 3.11 CLOSEOUT ACTIVITIES [NOT USED]
CiTY OF FORT WDRTH
STANDAI2I3 CONSTRUCTI�N SPECEFIGATION DOCiIM�:i�'I'S
Revised Marcli 22, 2021
2022 Band Year 1— Contract S
City Project No. 102931
31 1D00 -6
SITE CLEAItiNG
Pa�e 6 of 6
1 3.1� PROTECTION [NOT U5ED]
2 3.13 MAINTENANCE [NOT USED]
3 3.14 ATTACHMENTS [NOT US�D]
4
S
DATE
I I2/20/2012
I3/22/2021
6
END OF SECTION
Re�ision Lag
NAN� SUMMARY OF CHANGE
D, 7ahnsoa 1.4.A Permits: Remo�ed w•dinance number and added City's website address
114 Owen ��2 Clariited measurement and payment. 1.4. Clarified administra#ive i�equirements.
3.4 Clarified additional installation requu•ements for tree protec#ion and disposal.
C[TY OF FORT WORTH 2Q22 Bond Year E—Contract 5
STAI�f➢ARD CONSTRUCTION SPECIFICATION DOCl.1MENT5 Cit3+ project No, 102931
Revised March 22, 2021
5P 34 71 13.01
TRAFFIC CONTRqL
Pa�e 1 of4
SPECIAL PROVISION TO STANDARD SPECTFICATTON 34 71 13
TRAFFIC CONTROL
Far this Projeet, the Standard Specification 34 7l l3 for Traffic Control (dated 11/22f20I3} is
amended with respeot to the clauses cited b�low. No otli�r clauses or requirements of this
Standard 5pecif cation are waived or changed.
Delete section 1.1. frorr�, 5taudard Specification 34 71 13 and replace with:
1.1 SUMMARY
B. Installation of Traffic Con�rol Devices and preparation of Traff'ic Conirol �Ians,
i�acIuding moving, replacir�g, maintainiilg, cleaning and removing upon completion of
the work, aIl temporary or permanent street closure barrieades, signs, canes, lights or
other devices required to haadla traffic in conforma��ce wit11 the current edition of tha
T�xas Manual ofUniform Traffic CQntrol Devices and as indicated on the Drawings or
directed by the Engineer ar designated City representative.
C. Deviatians from this City af Fort Worth Sta�ldard Speci�cation
1. As autlined in this Special Pro�ision to �tandard Specification 3A� 71 13.
D. Related Specifications Sections include, but �.re nat limited to:
Di�ision 0— Bidding Aequirements, Contract Forms and Conditions oithe
Contract
2. Division 1— General Requirements
D�lete paragraph 1.2. from Siandard Specification 34 71 13 and r�place with:
1.� PRICE AND PAYMENT PROCEDURES
A. Measurerr�ent and Payment
. Installation of TrafF'ic Control Devices
a. Measurement
1) Traffic Control Devzces fot• the project will be measured per manth
throughout the project duration regarc�less of the numb�r of set-ups,
locations or streets under constructian.
b. Payment
1} The work perfor�n:�d at�.d materials furnished in accordance wi�h this
Item and measured, as provided under "Measurement," s�all be paid
for at th� unit price bid for "Traffic ContraI" under each iTnit of Work
(Water, Sewer, Paving, etc). No additional compensation is made far
materials, equipment or labor required far this Item.
2022 Bond Year 1— Contract 5
CIT� OF FORT WORTH CityPrajectNo. I02931
DATE: 08/23/2622
SP 34 71 13.01
TRATPIC CONTROL
Page � of 4
SPECIAL PROVISION TO STANDARD SPECIFICATION 34 71 13
TRAFFIC CONTROL
C.
d.
2) No mare than one manth may be charged d�aring the sam� 30 day
period of a contract. Pro�ects with multiple crews pex�ortning concurre��t
Units of Work (Wa�er, Sevsrer, Paving, etc) will be paid for 1(one} monih
total, under ilte contractar's selected unit. The seIectet� unit must have had
active work during that period.
3) The months for each Unit of Work will be approximated for bidding
and can be adjusted during consiructian as the work progressas according
to the Contractvr's schedule. The Contractor's schadule shall reflect the
proj�ct being complete within the project duration set by the contract.
The work per%rmed under this Item shall include, but not be limited to:
1) TrafFic Contral impletnentation
2) Installation
3) Maintenance
4) Adjustments
5) Repiacements
6) Remava]
7) Police assistanee during peak liours
Traffic Conirol Plan Changes:
1) Contractor driven changes ta the sEquencing, resourc�es, ar locatian of
traff'ic control activities do not warrant additional eost for traffic
controI.
2} City requested changes to the scope or sequancin:g can be submitted
as a change order wi#h supporting documentation for reWiew by the
C1i�.
3) During perriods of inactivii}r the contractar must provide su�porting
documentation tliat additional traffic control was required based on
curr�nt site canditions and was presenf at the site.
2. 1'ortable Changeable Messag� Board Signs
a. Measurernent
1) Portable Changeable Message Bnard Signs for the praject shall he
measured per week regardless of the numher of set-ups, [ocations or
streets under construction.
b. Payment
1) The wark performed and materials furn.ished in acco�dance to this
Item and measured as provided under "Measurement" shall be paid
far a# ihe unit price bid p�r vve�k for "Portable M�ssage Sign".
c. The �rice bid and work perform.ed unc�er this Itezn shall include, but not be
limited to:
I) DeIivery of Portable Message Sign to Site
2) Message updating
3) Sign tnovement throughout constructian
4) Return of the Portabla Message Sign post-construction
3. Preparation of Traffic Control Plans or details if not pro�ided on the Drawings
and applicable City Standard Traffic Control Detail is available at:
2622 Bond Yeaz 1— Contract 5
CITY OF FORT WORTH City Projcct No. 102931
DATE: 08/23/2422
SP 34 71 13.01
TRAFFIC CONTROL
Page 3 of4
SPECIAL PROVISION TO STANDARD SPECIFICATION 34 �1 13
TRAFFIC CONTROL
http://fortworthtexas.govfuploadedFiles/Transportatioii and�PubIic Wo�
ks/Permits/TrafficCout�•olPlans.pdf
a. Measurement
1) Traffic Control PIans for the project shall be measured tl�roughout
the contract time periad and furnished by the Cantractor.
b. Paynnent
1) The work perfarmed and materials fiirnished in accordance with this
3tem �hall be subsidiary t�o the unit price laid for "Traf�c Contral".
c. The work performed under this itein sl�all include, but not be limited to:
1) Preparing the Traffic Cnntrol Plans
2) Adlierenae to City and Te�as Manual on Unifarr� Traffic Coi�tral
Devices (`1`MUTCD)
3) Obtait�ing the signature and seal of a Iicensed Texas Professional
Engineer for all Traffic Control 1'lans su6mitted to the City.
4) Incorporation of City com�nents
Delete paragraph 1.S.B, D, E and G frorn. Standard Specificatian 34 71 13 and replace with:
1.� SUBMITTALS
B. Obtain a Street C1se Permit from the Street Management Section ofthe Traffic
Engineer�ing Division, 311 W, lOtl� Sireet. Tlie Traif'tc Control Plan (TCP) far �ha
Project s�all be as detailed on the Traf�'ic Cantrol Plan sheets of the Drawing set if
pi•ovided. A copy of the Traffic Control Plan shaIl he submitted with the Street Clse
Parznit and upon approval upIoaded to the City's BIM36Q project page as a submittal.
D. Contxactor shall prapac�e Traffc Control Plans if required by the Drawings or
Specifications. The Contractor �vill he responsib3e for hauing a lic�nsed Texas
Professional Engineer sign and seal the Traffic Control Plan sheets. Cantractor, at his
or her expense, shalI prepare and submit fbr approval Trafiic ControI Plans where
Contractor wishes to deviate from the approved set of Traffic Control plans if pravided
in the construction documents.
E. Lane closures {including mo�ing operations) that require a lane to be closed to
through traffic for 24 hours or longer sl�all require a site-speciftc traffic control plan.
G. Design Engineer �vill fuz•nish standard details for trafFic control. These are
guidance and are not svfficient for a site specifc traffic control plan for lane closures
over 24 hours.
Delete paragraph 1.S.G from Standard Speci�cation 34 71 13.
Delete paragraph 3.3.K from Standard Specific�tion 34 7I 13 and replace with:
2fl22 IIand Year 1— Contract 5
CITY OF FORT WORTH City ProjecENo. 102931
L3A'I'�: 08123I2022
SP3471 I3.01
TRAFFTC CONTI2OL
Page 4 of 4
SPECIAL PROVISION TO STANDARD SPECIFICATION 34 ql 13
TRAFFIC CONTROL
3.3 rNSTALLATION
K. Cantractor shall make at•rat�ge�nents, at his or he�� expense, for poIiee assistance ta d�rect
traffic if tz�a�'fic signa! turn-ons, slreet light pole installation, or ather cons�ructian will be
done during peak iraf�ic times (AM: 7 atn — 9 arn, PM: 4 pm - 6 pm).
2022 Bond Yeaz 1-- Contract 5
C1TY QF FORT WQRTH City Project No. 10293!
DATE: 0&123/2U22
APPENDIX
GC-4.D2.5ubsurface a�id Physical Conditians
GC-6.06.D Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
GR-Q1 6Q 00 Pi•oduct Requiremeiits
CITY OF FORT WORTH 2O22 8and Year 1— Contract 5
STANDAR� CONSTRUCTION SPECIFICAT[ON DQCUMENTS City Project Na, 102931
Revised .Tuly l, 201 I
�C-��o�� Sr���u��°�ace ��d. ���s�c�� ��m��liti��s
'�'I�[IS ]PAGE ]LE]�T �l�'�']CllTT�OI\TAI1]L� �]LAllTI�
CITY O�' FQRT WflRTH 2O22 Bond Year 7.—Contract 5
5TtLNDARD COI�iSTRUCTIDN SPECIFICATION �OCIJMEI�ITS City Project No. 10�931
Revised July 1, 20I 1
� l! �� �� �� � c�t
[lity ot 1+ort wortn
Capital Delivery DivisionlSoil L�b
$$Sl Camp Bowie Blvd #300
Fort Warth, TX 7G116
Phone: 817-392-7920
Laboratary Te�t Results for
Ash Cresent St., Ave. B, Av�. C, Ave. D, Elmwood Ave., Uvalde St., Belzise Ter., and A�u1 St. Street Coring
Pxoj ect
09/15/2021
Project: CPN# 102931
Date Tested: 09/02/2021 -- 9/15/2021
Requested by: Gregory Robbins
This re�ort presents the results of a street coring project for CPN #102931. Mr. Siephen Overton and Daniel
'4Nrighl: perfor�ned the cores, and Mr. Zelalem Axega reviewed and approved the results.
A�€!ti {:'resenf �frc�.#
(��:�� 1��icic����� QI����. ��, :�3•�. k�
HOLE # 1
LOCATION: 50' North of Ave. E/ Ash Cresent St. Intersectivn (N/4)
4.00" HMAC
5.40" Red brown sandy clay with rock
7.40" Da�rk xed brown sandy clay u�tk� rock (LL- 46, PL- 24, PI- 22} Shrinkage%: 13.75
HOLE # 2
LOCATION: 10�4 Ash Cresent (S14)
4.50" HMAC
11.50" Red brown sandy clay wi#h rock
HOLE # 3
LOCATTON: 916 Ash Cresent (N14)
9.75" HMAC
6.25" Grey limestone base material (Non-plastic)
HOL� #4
L�CATION: �0' Narth oi Ave. S/ Ash Cre�ent St. Intersection (S/4)
3.00" HMAC
5.00" Base material
8.Od" Brown sandp clay (LL- 47, PL- 23, PI- 24) Shrinkage%: 12.5
Paqe 1 of �4
���� ������ ' 1;�� of �'art Worth
Ca ital Deliver Division/Soil Lab Phone: 817-392-7920
— $851 Camp Bowie Blvd #30Q
Fort Wortli, TX 76115
— — �
`HOLE #S
LOCATION: ].00' South o� East Vickery B1vd.I Asi� Cresent St. In�ersection {N/4)
8.00" HMAC
8.00" Light brown sandy clay with roek (LL- �}0, pL- 18, PI- 22) �hrinkage%: 1Q
— — r1���nu� F3
[���i�� I�i��+��'�ick� E}ri�•�: It� �sh {:r��r��i �trc;et)
HOLE #1
LOCATION: ].50' West of Ash Cresent 5t1 Ave. B Tntersection (El�l)
3.00" HMAC
6.00" Base rnaterial
7.0�" Light brown sandy clay with some shaley elay (LL- 56, PL- 24, PT- 32) Shrinkage%: 15
I+�In��vc���l A��e�t��e
{�3cl�i�e'I'ei•�•�yce �c� ��1LI� IF�•ceway}
HOLE #I
LOCAT�ON: '��' East of E�mwood Ave.l Belzise Ter. Intersection {E14)
3.50" HMAC
12.50" Base materia! (rock and gra�el with brown clayey sand)
HOLE #2
LOCATION: 200' West of Elmwaod/ McCurdy St. Tntersection (W14)
2.25" HMAC
7.75" Base material (rock and gravei with brown clayey sand)
6.00" Broum clayey sand (LL- �9, PL- 24, P�- 25) Shrinkage%: 15
11����1�c �t���ee�
(N�l�l� �r�;e3vs�y f�� 1±::��f k�ielt�iansJ ���eiti�e�
HOLE #1
LOCATION: 191G Uvalde Street (S14)
4S0" III�I�AC
5.50" Brown clay with gravel
6.00" Dark brawn shaley clay (LL- 55, PL- 26, PI- 29) Shrinkage%: 12.5
Paqe 2 of 4
���� �����c�_
C,'ity o� �'art W orth
Capital Deli�very Division/Sorl Lab
8851 Camp Bovvie Blvd #300
Fart Worth, TX 76116
Phone: 817-392-7920
t1v�r�uc C
(A�� C'r-e�c�t �I�. Ec� a�7I.� F��ew��y�
HOLE #1
LOCATION: 19Q� Ave. C (E14}
4.54" HMAC
11.50" Light brown clay with rack (LL- 43, PL- 17, PI- 26) Shrinkage%: 11.25
HOL� #2
L�DCATION: 2Q01 Ave. C (W/4)
1.75" HMAC
1 �.25" Red brown/ Darlc brown clay wi1;h rock (LL- 66, PL- 28, PI- 38) �hrinkage°1o: 15
�.00" Red brown clay with rocks
Ar��t ��t'cr�[
{l1vc�Muc �' t� �4►��r���e D)
HOLE #1
LOCATI4N: 7�' Sauth of Ann St./ Ave. C Inter�ection (N14)
2.50" HMAC
S.SQ" Rock with brown sandy clay
$.QO" Red brovvn sanr��r clay (LL- 45, PL- 22, PI- 23) Shrinlcage%: 12.5
HOLE #1
LOCATION: �Op� Ave, D (W/4)
1.75" HMA.0
S.QO" Concret� (Braken)
9.25" Aggregate/ Rock fill
HOLE #2
LOCATION: 1916 Ave, D (El�l)
}�l���n�4� N)
{Atl� C'i�e��5�t �i, t�, I��l.K I{ r�evva,y)
1.SD" IIMAC
14.50" Base znatexiaJ. {xed bxown sand with rock)
Paqe 3 of 4
�'� �� �� �� � �:
C;ity ot 1+'ort wortn
Capital Delivery Divzsion/Soil Lab
8551 Camp Bowie Blvd #300
Fort Worth, TX 761 ] 6
13�.�-r_i:�c '1'cr�'��ct
(Ar�c���e� G tc� A1��111i� �}�
HULE #1 � �
LOCATION: 1.064 Belzise Ter. (N/4}
Phone: $17-392-7920
1.25" HMAC
6.75" Base material (Rock and sand)
5.00" Red broum sandy clay wiih rock (LL� 40, PL� 1 S, PI- 22) Shrinkage%: 11.25
Paq� � of 4
�C-6o�60� 1�����i�y ��ncl �V��e� ��m��l ]�usimess
��.tex��°�se C'o��]l�.a�rnce
�]E�IS 7P��]E I,�F'� II�T�]EI�TT`��IOT��LL� �]LAT�TI�
CITY OP FORT WORTH
STAt�Fi]ARD CONSTRUCTION SPECIFiCAT10N T70CUMLNTS Zp22 Boi�d Year 1— Contract 5
Aevised July 1, 2011 City Projeet Na. 102931
��D�7� ����` � ��ty o� �o� l�I��h ATTACHM�R�g �G
�ea��n��� �q��� �i�i���r� ���� � a� �
�c�oc� ��e�ni �ffo� I�orm
P%fM�IOFPL�RAF� � Check �tppllc�tsle bax to d�scrilsa
ca�p�an�vwa�u�: ��(;��11�C�t`� �.+�i���C�°�,I��E�C1 �� �il� p�►r�al�rer'�Gertificeticn
Busln�ss Equfiy I�an-Husf�es�
��3�.II�GT R1A11A�: - - - — Flrm � � � Eclu�tiR �irm
CPf� 1 D�9�� � �0�2 ���d Ye�r 1 � �v����c� 5 ���� �A� -�-
09129/�0��
�u�fne��� a�ty Go��% I B�pore�1 � tne� �q�i�Cos� GoltlrlittnRsr� PRaJ�BY POul���I�
G�f�: � 0�93'�
i� fih� ��foror dld aofi r,�E op ex�eari fhe �usin� �q�ity �oal fo �ct� th� �rlrr�eJOf�poe usg aampl�te �
itrE� form. _ . _,,,,,., .,_ „ ,
If ti�e f�rimel�fr'erar'� r�n�tl�od of �ompli�n�� r�lfi�r �i��a ��sifl��� ���ai� �aa�l i� ����"
�pae� c��rr�a���r�tian of � "`�cr�d ��i�Fi �ff��r�", �[�� ��1r��i����pt w111 ha�+� ��� bu��e� �f
carr�c�ly �rrd a���ar�ly ��p�r�ir�g �nd ���rmiitit�� t�� ���um�n�itien r�qui�d by the
�iiy. C�mpli���� ►�+lt�i €���h i�m, °� �I�r� °�� ��I�v�, �F�ail a��i�fy ttr� ���d �'�I��i EffA�fi
�q����rr��r�� ���n� �r�eof o� ���d, int�r�tl�r��l aradlor� F�no�+in� mE�r�p��H��lo� of the �a�ts
o� inf�i�ia�n�� di��riml�a�ti�n by tlre ��im�l����r.
��tiur� Ys r��rr�� � fii�[� f�n�, t�ti � �t� ��tir�ty �eitF� �u���r�iH� o��rn�n���n, ��r� ���e�v��y �h�
�u�l�a�ir�� 9�ral�lvh n@ l�te� ��� 2:Q0 �.rr�. �� fFr� ���nt1 �i� ��a�ir�� ��y �fi�r �1�T vp��i��, ��+�I��iv� '
� i�l� ��S�t�in� d�fi�� wlll r��uf� 1r� 4F�� i�l�1 �ing e�n�t��r�d �a������lds g� iaid �p��li���ti�r�s.
�x����f�n: ��A, IC�, ��� �D�� �r�j���, d���rm�� *.�ill f�� e[a�irv�if�d to �� �It�+ ��j��g ��r���r if
�uE�li�ly bi� c�rt� ti�e� ��v�l�p�p ff �r�d�t�1y l�I�.
q.) P[���e list �a�f� anrd ����,+ �auE��n�t�c�ng a�dlar se�p�li�� �►��+�r����� for th� �arr�pl��i�r� �f fhi�
proj�fi, r��aE�[�s� �fi wF���i��� i� is f� be �r�mids�! by ��u�f�� q�ify firrr� er n���usi�€��
�ryuif�+�ie�. ip� �lAi t�l�� f�A�N�� �� �f �� {�r� �II �r�jec�, th� �rim�l�ff��ar m���i li�� ����
�u�Ar�tr�o�fi�og a��d OP �#������� ��7�9F�LIli9� �AI'�IBffiS Oi�I�P.
{u�� �t��'i£�on�f �h�ta, ff �e����
l�I�t �4 ��b�vnt��i�g ���rr�ur�fi".i�� Ll�t �r �u#��li�r� Opporri�ni�e�
1fV�fer �nd Sewer �r�qua�i�i�d ��� R�ady fl�ix �oncrete
H�ulo�r �'ruckin�g
Conc �av�m�nt ,��infi ���ling ,
�o�ding
�ro�ion Con#r�i Ser�+ices
�onsfru�ici�n �ur�+�y
S�e��fi �ign Ins�allafi��
Hf��1� P�ving
�'re� ��t�ov�1
Reb��
� Fu�l
�99��g�t�l�o�soil
�herni�l Lir��
�ifecBve 01f0912021
e�►r�iA���4P1��71�
��g� � �� 4
2.) Ob4afr� a�urr�ni (n�t m�re thar� t++vA ��) �a�Q�� a!d �rorn #he bid op�r� da��) E��� c�f �usine�s �c�ul�y
subCan4r��4o�s $ndl���c�p�Ei�� �r�� �he City'� ��gines$ ���1Qy Diei�ier�.
�] ves
� ➢d�
�at� �� E.is�t�� 09J13120�2 �
�.} Did y�w soli�i4 �iids %orn �usfne�a �qu�ty flr�, e�uithin ihe su[�contrac�ing endlarsw�pll�p �r��s
p�ei�t��ly lisied, �t lea�# ier� �ale�daP d�yg ��ior 4� �iid opening by 4eIg�F�ort�, �x�iusid� af 4�e c1�y 4h�
bld� �re �pened?
� YB� (!f ye�, attach iist to inelt�de � of 8u�ine�a ��ul�y firrn, p�Cson contaated, nhona numbgP aretl date and tim� of contack.)
� �G
�4.) Dic1 yrsu solicii blds f�om ��sines� E��i�y fii�m�, dvitF�in th� sub��n4�ae�ing �r�dJ�r s���1ieP aPe�s
previn��ly �iated, at leas� #en calr�r���r days pri�r t� bld �����ng by �ax, �xalusiv� �f i�rs ��y ihe bid$ r�re
npened7
���� {if y�as, atta�h Iist to include n�er�e uf Business Equif.y firnn, fax nurnb�r aqd date and time o�f contac#. 1n additEon, if the fax is
raturrasd as undel3vera�Re, then #hat "undellverab�e �anflrrnativn" receierad �nust be �r�Nted direstiy f�om the #acsImife for
proper dvcument�#ten. Fa➢l�re to suf�mit con#irmattan andlor stun�elivaraWe conflrm�tion" documeistatian may render th�
� ql�� GF� non-responsive.)
6.) �icf you ��li6ii bid� �rorn �usiness Equi� f�n�, ����in the �����r�grac�i�g �e�d1oF �u�pli� a�as
prevlv�sfy fi�#ed, a�� 1e��t �en c�1�:ndA� day� ��i��r �a �I� apenl�� my �m�il, ��c�lu�ibe nf t�e day �he bids a�re
open�d?
� 1(�g {li' yes, atta�ch em6ril conflrmaiion to Include t�an of �usinass �qu��l �irm, at and time. In addition, if an
emaiE i� returned as �ndeiluerabl�, iF�er��th�t KundeEiver��le mss��ge" �Qcelpi must he prin#eri dlrecUy frum t3ie
��perr�ail systsm f4r pra�aer dQsumentation. �'ailure ia sut�rftit con#irma�an pndlcr "undeliverabta rro�ssagan
d��urRer�tation �y ra�da� the G�� non-reaapsnstve.j
�1���: ihe thn� m���ds Id��tifi�xl a���� a�� �cs���4abi� #�r �ollci�ing �id�, �n� e$c!� s�le�tmd
rr+s�t�t�d m�� i�� appli�� 4� ��e �p�lics�bie �n��i. i�t� Pr��el�?�7�ror mu�t ���urn��►4 4��� �i�Jhe� �t
le��t gter� �itempis wt��a mad� u�lfl� �we �� i�� �hee� �ve��h��� o� �F��� �g fa��t ��� ��c���4u1 c�� vems
m�sl� t��in� on�a �� 4�re ���� ��thr��� ir� �r��r t� d�err�ed �pofl�ia� io f�h� ��e�d �aith l�#or� r�quir�rrr�n�.
�d�`�: '��e �r��elt��ror mu��t ee��at��fr 4h� n�iir� ��,�in�a� Eq�i� !i�$ �p�c�i1C i� e�h
���c�r�i�icti�� r�nd �u��lier �p��rtunity tc� 6� �r� ��rr�gli�n�� an►14� qu�s�4i��� 3 thPu 5.
�.j I�id ygu p,r�bi�� �luri� a�t� �p��ific��iar�� �� pc���nil�l �u,�in��� @c�u«y �irm�?
� v��
� �lo
7.y L�ld you pP�eri�e ��� lr��o�m�4i�n reg�rc�in8 ihe R���i�i�n �� plafls �r�� t���lficaiioe� in eFde� �a a�s���4
ihe �u��n��� E��liy �irms`T
� v�
� �o
�fiF�lCiive 01l0912�27
Ai%��R1{4+I�MT °� C
Pag� 3 of 4
8.� f�id you �anp�r� � quota�io� �ar �he ��a��ne�€ �qui�y fl�s ao f�id an g��d�l�etwi��� ����i�i� to ��ir
s�sill seat�"
� Yeg (If yes� atisch �11 co�iss �4 quotak�ans.j
� REO
�.) V11�s 4H� �n��� lr�#arm�fl�n en �ny �f th� Ii��iH�� r�o4 ��[i�i7
� Y� {If ygs, �ch tlra infar�8tlmn tttat .;ras not v�lid f� orcier for ti�a �usir�ems �qulty t3imislon to �ddre�
kt�e core�stions n��dad.)
� No
9Q.) Sul��+i� cl�um�nt��ior� I� ���in�s Fcqulty �irm� qu�t� vver� rr���eg�rd. Th� d���meni��iort �ubmitted
�hc��ld b� in �h� �irrn� �'�m�s �f �n ��ilri�vi�, incl�de a defi�i��� �x�[�n�iian sf vvhy fh� ��e�in�� �eq�it�► �rm�
tia�a r�j��f�d ��d ��y ��p�c�riir�g d����er�f�tE�n f�ie F�Hm�IOfFar�rvrei�te�� �C► b� c�r��i�le�ed by fh� Ciiy. I� fh�
��+en� vff � brrn� fid� df�put� �sn�errrifn� puo4e�, fc�g Prirr�gl�ff��r will p�ovl[ie for� con�ic���tii�l in-c�mer��
����� F� �n in����fiion of �Hy �I���n� do�r�m�nicaa4iarz by �tty per��r�r�el.
(Please �s� at�dlff�r��l s1��#�, i€necassary, �nd a�ch.1
Cot��r�y P��ma i�iepbo�� ^ G����c� ��rs�n ���p� �f V4I��1� R�as�n foe ��j���on
Ca��ia �.and �lata 214l98%0149 Ernest Ga�cia construct�on Sunaey Provider was not
dete�rnined fo be th�
most highly qualified
� J 5eed�ng LI�C 8971426-8284
�C?l�IOAIAL IA1P�t�1��I�N:
��yl� Juras�hef� S�rldFng
based qn Sec 2254,U04a1
of thg 7exas Government
code.
Mot Low �id: used at�er MB�
�iea�� pro�sir�� addi�ion�l i��aein�fi�r� you ��� r�eill fur�h�r �xplain y�up ���� ��d F�gnesi �ife� tc► aHf�ir�
Bu�fr�ass Eq�ify firm p�r�lcip�ti�r� o�r fihl� �r�j�v�.
A€I listed Ni�E's w�re �i�st contactec! by emaif with ar� a�t��t�ment iisting specific it�ms o�i work or
mate�iais needed. If emai# contact was unsucr.es�fial, faxes were s�n#. If #he M�� had no email and a fax was
�ansucc�ssful, a I�t#er was sent by postal mail. All per��nent AA��'s were contacted succ€s�fu�ly by
at le�st one af th�sv m�#hQds.
il�c� �rirm�l€�ff�ror fu�ti��� �gf��� � prdvi��, cli���ily �iv �H� Gi�y ��vn r�qu���y
��rr�pl��� �nd ��c�r�a� inforr�nation p��a�di�g �����f v�+e�k p��For���1 �n �hi� ��n�ra�f,
tH� ��y+r���� th�r���� �nd �n� prapo��d �����e� t� tF�� ar�igin�l �rr�r�g�rm�r�� ��C�m�f�d
wi�H �nii� �i�. ih� �r°�m�l����°vr �[�� �g�� to �Il�w �n �udi� �ndl�r �a��rrrjin�fi�n af ar�y
book�, r�e�pd� ��d fii�� i��ld �� �h�lr �omp�r�y �i��t u�a�ll �uE����$i��� ��� a�#�aal v�+vrk
perr�o�rr�ed �n �i� �anfir�cfi, by ar� aut�e�iz�� ��i��� er �mplo�+e� caf th�� �i�.
�#�rim�lOfF�par u�rh� Int���i�r��lly �ndlc�r f�no�a�ngly r�i�re�r���r�t� rm���ri�F �ac% sH�ll b�
����rr�� �r � ��r�i�d caf �irr�� �ff ��� le�� fhar� fihr�� (�) yea�.
���ve n�ra�r�a��
�Yi'AC��9l��di' °iB
��e4afi�
The und�r�ign�al c�etf�i� �I��� �h� inf��ena�i�r� p�vic�ed �n� #h� B��in�s� ��uit� fiem�
li��d v��i�lr��re ��r���ted in goe�d ��i4h. !� i� �anderst��� �hat �ny ��s�n�� �q�ai� �frr��
la��d ie� a�#tachm�n� R� �r1N b� c�nta�c��d �r�d �he �e�sp�� fe� tt�� t��ing #h�m e�ill be
�reri t�� �I�I'� ��ate��s� ��u1� �i�i�ion.
� � ` Dan McClendon
e�� '��gfl ure ��i��sd SRgn�►�u��
���Sid���
T'i�l�
�i�Cl�ndon Const �o I��
eom�r�y Pf�me
�� �ox 999
Atk€�r�e�s
�urle��n, TX �609�
��r�sgar+��gi� -
Susiness �quity �ivision
�rr�ail: DVIN B�OfFic��#r�rtworthtexas.gou
Pho��: {8� 7} 39�-2��4
con4ac� �lar�e s�d �'It�� (�fi ��fferent�
� � ������oas6
Pi�o�� Numb+e� --
dan c.��ncclendonconstruc��vn.cx�m
�m�iit Adat�s _ _
a�/301�022
o��� - -
�ifectiue �11�4f�D�9
�C-��07 ��.�e ���es
'�`�I�S �P.�.�-E I��E�'�I' �I�7['�N'�`I�I�T.A.�L�Y ��LAl�I�
CITY OP FpRT WORTH
STANDARD CONSTRUCTION SPECIFiCAT1flN DOCiIMEhITS 2022 Bond Year 1--Contract 5
Itevised .Tuly I, 2011 City Praject I�o. 1 Q2931
20Z3 PREVAfLING WAGE RATES
(Heavy and Highway Construction Projectsj
CLASSIFICATION DE5CRIPTION
Asphalt Distributar �perator
Asphalt Paving Machine Operator
Asphalt Raker
Broam or Sweeper Op�rator
Concrete Finisher, Pa�ing and Structures
Concrete �avement Finishing Machine Operatar
Concrete Saw 0}�erator
Crane Operator, Hydraulic 8� tons or less
Crane Operaior, Lattice Boom 80 i'ons or Less
Crane Qperator, l.attice Boom Over SQ Tans
Crawler 7ractor �Perator
ElecYrician
Excavator Operator, 50,000 pouncfs or less
Excavatar Operator, D�er 50,000 pounds
Fiagger
Form Builder/Setter, Structures
Forrn S�tter, Paving & Curb
Foundation Drill Operator, Craw�er Mounted
Foundation Drill Operator, Truck Mounted
Front End Loader Operator, 3 CY or Less
Front End LQader Qperator, Over 3 CY
I.al�orer, Common
Laborer, Utility
Loader/Backhne Operator
Mechanic
Milling Machine Operator
Motor Grader Operator, Fine Grade
Motor Grader aperator, Rou�h
Off Raad Hauler
Pavement fVlarking Machine Operator
pipeiayer
Reclaimer/Pulverizer Operator
Reinforcing 5teel Warker
Raller Operator, Asphalt
Raller Operator, Qther
Scraper Operator
Servicer
Sma[I Sl�pform Machine Dperator
5preader Box Operator
Truck Driver Lowboy-Float
Truck briveriransit-Mix
Truck Driver, S9ngle Axle
Truck Driver, 5ingle or Tandem Axle Dump Truck
Truck Driver, Tandem Axle Tractor wfth Semi Trailer
Welder
Work Zone Barricade Servicer
Wage Rate
$
$
$
$
$
5
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1532
13.99
�2.59
3.�..74
�a.�z
16.aS
14.48
18.12
17.27
20.52
7.�4.07
19.80
17.19
16.99
10.06
13.84
13.16
1.7.99
21.p7
Z3.69
14.72
10.72
12.32
�.5.�.8
17.68
14.32
17.19
16.02
12. �5
13.63
13.24
11.01
16.18
13.08
1.1..51.
12.96
14.58
15.96
14.73
16.24
1A�.14
12.31
12.62
12.86
14.84
11.68
The Davis-Bacon Act prevailing wage rates shown for Hea�y and Hlghway construction proJects were dete�mined by
the United States Department of I.a�or and current as of 5epterrEber 2013. The titles and descriptions forthe
classifications listed are detailed in the AGC ofTexas' Standard Job Classifications and �escriptlons for Nighway,
Heavy, Utilities, and lndustrial Constructlon in 1"exas.
Page 1 of 1
C�T"Y O�' �'�it� ��DR'd'�I
1['�)�� ���'��I_ ']CR�NS���TA 1�ON & IPiJBlL�C �'�1�5 D�FAR7�'NI�NT upa�cea: io�isr�x
S�1 �]�FM�'A�L�� NIANAG�NIDENT Il��I�N
S'�ANII��� �R��AJ�T LIS�
=1���ir.,�rj-1 .fi����i 4ar. C`I1�a,ti`i�l�ir�tti��r� k1'1-iri�r�t�ct�R�=« i��,l�,c�i��4,'��n. ?1��i#�IN�I�� �i��
�Starm Sev�er- €n�e# &���-13 t7�;• i01�3J�AZ�
141D8120
14108Y14
1p/48120
10/08120
ioiasrao
101O8f20
iaos«o
10/06/2D
(DlDB120
10I08/2D
3l19/2p21
3 1 1 912 42 1
3l19/2421
3119/2021
3l1912421
3/19/2021
3119124321
3119l2fl21
3/19/2D21
3119/2021
3/19l2021
3/19/2421
3119/2D21
3119l2021
3/19/2021
3119l202 [
3/1912021
31L9f2D2 i
31I912D2t
3lS9l202 S
3/1912�2I
33 49 20
33 49 2fl
33 49 20
33 49 20
33 34 20
33 34 2D
33 34 20
33 3S 2D
33 34 20
33 34 2Q
33 49 2D
33 49 20
33 49 20
33 99 2D
33 39 20
33 39 2Q
33 39 24
33 39 20
33 39 24
33 39 20
33 39 24
33 39 24
33 39 2q
33 39 20
33 39 20
33 39 2D
33 39 2fl
33 39 20
33 49 20
33 49 20
33 49 20
Clirb INets
Curb 3nlets
�.ili�0 JIS�£IS
G1irb Inlets
Msahple
Maahole
Manhole
Maahole
Maatwle
Ma�holc
G1irb Tnlcts
Carh Inlets
Qlt�] �11�Ci
Manhole
Mnnhole
Manhole
Nfanhole
Manhole
Manha3e
Manhn3e
Manhole
Manho3e
Manhole
Manhnle
Mmnhole
Manholc
Mantrole
Manhale
Drop Inlet
Drop Lilet
Dmp Inlet
Fonema
Fortcaca
�brtCTPfB
FortcQra
Forterrta
ForteRra
Eort�nxa
For[errra
For[eara
Fortezan
Thompson Pipe C}roup
Thorupson Yipe Group
TI1DID�750R PIjK G�h�1
Thompson Pipc C,roup
Thpmpson Pipe Csroup
Tho�pson Pipe Csnup
Thompson Pipe Group
Thompson Pipe Groap
Thompsoa Pipe Group
1'ttompsan Pipc Gmup
Tkompsoa Pipe Group
Thompson Pipe Gmup
Tlxompsnn Pipe Graup
Thompson Pipe Group
Thompson Pipe Group
Tt:ompsan Pipe C�oup
Thumpsau Pipe Group
'I'kaompson Pipe Group
Thpmpson Pipc Grotrp
Tt�ampson Pipe Gxoap
Thompson i'ipe Group
FRT-f 6�c3�Q4-PRECAST"�
FRT-Ipr.3-4QG-PRECAST'� x
PRT-1 D x4 S-4 07- PRECA S T•�`
FRT-1 Ox4.5�f2Q-PRECAST*'�
FRT�X4449-PRECAST-TOP
PiLT-4X4--099-PRECAST-$ASE
FRT-SXS� [ 0-PRECAS T-TOP
FRT-SXS-4ID-PRECAST S,AS�
FRT-6Xb4 21-PI2ECAST-TOP
FRT-5Xfi-411-PRP.GAST-B A5E
TPG-lOX3�D5-P12ECAST INLEI'�*
TPG-15X3J4D5-PRECAS'1' INLETs:
TPG-20X3-405-PRECAST IIdL.ET""*
TPGdX4409-PRECAST TOF
TPG��4-009-PRECAST BASS
TPG-4X4-�I2-PRECAST 4-FI' RISER
TPG-57C5�1Q-PRECAST T()P
TPG-SX5�14-PRfiCAST BASB
TPG-SX5�12-PRECAST 5-FT RISER
TPG-6X6-4I1-PILECAST TOP
7'PC-GXb-411-PRECAST SASE
TPGfi7C6-412-PRF.CAST 6-F1' it�SER
TPG-7X7�11-PRECAST TOP
TPl3-7X7�1 L-PRECASl' Bi#5E
TPCr7i:7�12-PR&CA,S1' �-FI' RISSR
'iPG-BX8-011-PRECAST TOP
TPG-BX6�11-PRECAST BASE
TPG-BXB-412-PR�CASF 5-FI' RI5Eit
TPCr47Z4�08-PRECAST SM.ET
TPG-SXSfiO$-P[�CAST IIYLET
TPC4-6X�4f38-PRECAST �fLEI'
ASTM C9 [3
A5TM C9 L3
A5TM C913
ASTM C9t3
ASTM C9 i3
ASTM C913
ASTM C9 i3
ASTM C9 S 3
AS'I7vI C513
ASTNIC9i3
ASSM 615
ASTM 615
ASTIV� 615
pSTM 615
�.ST'N! 615
ASTM 615
ASTth 61S
ASTN! 615
ASTM 615
ASTM 615
A31`M 615
AS'fM 615
ASTM 615
ASTM fi15
AS'f'M fi15
ASTM 615
ASTM 615
A.S'TM 615
ASTM 615
ASTM 6 L5
f+STM 615
e*Note: Pre-cast inlers are appoved Eor the atage I parRon of ihe structure (basin) only. Stage FI portion of the struct�ae are reqnired to required tu be cast im-p[aee. No eseep�io� to this ret��irement sBall he allowed.
i0'X3'
i4'X3'
10' X 45'
10' X 4S'
4'X4'
4'X4'
5' X 5'
5'XS'
b'X6'
5' % 6'
10' K 3'
15' z 3'
2�' z 3'
4'X4'
4' % 4'
4' X 4'
5' X 5'
5' ?C 5'
5' X 5'
6' X G'
6' x fi'
6' ZC 6'
7'KT
7'X7'
7' X 7'
$' X S'
8' X B'
8' X 8'
4'X4'
5' X 5'
6' X 6'
* From Original Standard Producu List
G��-01 60 0� ��r�dn�c� l���u���e�en�s
'�'�IS 1�AG-E ]�El�� 1��T'I`1��T'�'I��T.A]L�Y ]�]L�I�T][�
CITY OF FQRT WORTH
S'i'ANI]ARD CONSTRiICTION SPECIFICATION T3QCU[VIENTS 2p22 Bond Year 1— Confract 5
Revised July 1, 20i 1 City FrajectNo. 102931
�
��� ��i.���
I..JL 1 � �� ���� �'F �� �L �
�L� !L �JL� JI�JL`�������lr �
S JL 1-�l�l���� �����W� 1��� JL
�Jpdated: Apri109, �0�1
The Fort �Uorth Water Department'� S�andard Products List has been dev�loped to
minimize the submittal review o�products which meet the Fort Worth Waier
Department's Standard Specifica�ions during utility construction projects. When
Technical Specif cations for specific praducts, are included as part ofih�
Construction Cantract Documents, the requirements of the Technical Specification
will override the Fori Worth Water Department's ��andard Specifications and the
Fort Worth Water Department's Standard Products List and app�oval o�the
specific products wi1l be based on the requirements o�the Technical Specification
vahefher or not the specific product meets the Fo�rt Worth Water Department's
Standard Specifications or is on the Fo�t Worth Wat�r Department's Standard
Products L'zst.
7[`a��e of �onten�
(Click an items to go directly to the page)
Items
A. Water & Sewer
Page
1. Manholes & BaseslCo�ponent� ........................................................... 1
2. Ma�aholes & Bases/Fibergiass ............................................................... 2
3. Manhales & Bases/Frames & CoverslRectangular ............................... 3
4. Manholes & Bases/Frames & Covez•slRound ....................................... 4
5. Manholes & Bases/Frarnes & Covers/Water Tight & Pressure Tight .. 5
6. Manholes & Bases/Precast Concrete .................................................... 6
7. Maz�h.oles & Ba�es/Rehab Systems/Camentitious ................................ 7
S. Manhales & Bases/Rehab Systems/NonCernentitious ......................... 8
9. Manhale Insert {Field Opexations Use Only) ........................................ 9
10. Pipe Casing Spac�r ............................................................................... 10
11. Pipes/Ductile Iron ................................................................................. 11
12. Utiliry Line Marker ............................................................................... 12
B. Sewer
13. Coatzngs/Epoxy ..................................................................................... 13
14. Coatings/Polyurethane .......................................................................... 14
15. Combi.na�ion Air Valv�s ....................................................................... I S
16. Pipes/Concrete ...................................................................................... 16
17. Pipe Eniargement System (M�thod) ..................................................... 17
18. Pipes/Fibexglass Rein.foreed Pipe ......................................................... 18
19. Pipes/HDPE .......................................................................................... 19
20. Pipes/PVC {Pressure Sewer) ................................................................. 20
21.. Pipes/�'VC* ........................................................................................... 21
22. Pipes/Rehab/CIPP ................................................................................. 22
23. PipeslRehablFald & Farm .................................................................... 23
24. Pipes/Open Profile Large Diameter ...................................................... 24
C. Water
25. Appurtenances ....................................................................................... 25
26. Bolts, Nuts, and Gaskets ....................................................................... 2b
27. Combiz�ation Air Release Va1ve ........................................................... 27
28. Dty Barrel Fire Hydrar�ts ...................................................................... 28
29. Meters ................................................................................................... 29
30. Pipes/PVC (Pressure Water) ................................................................. 30
31. Pipes/Valves & FittingslDuctile Iron Fittings .........................,............. 31
32. Pipes/Valve� 8i FittingsJRe,�ilient Seated Gate Valve .......................... 32
33. Pipes/Valves & Fittings/Rubber Seated Butterfly Valve ...................... 33
34. PoIyethylene Encasement ..................................................................... 34
35. �arnpling Stations ................................................................................. 35
36. Auiomatic Flusher ................................................................................. 3b
CTFY OF FORT VVOIiTH TRANSPORTATION/PUELIC WOT2K5 DEYARTI�IEFIT
STa�NDAI2D PRODUCd'S LTST AS OF 9/9/2D22
9�9r�a2z U3 30 00
9/91202Z 03 36 00
9/9/2022 03 iQ 00
9/9/2022 03 34 00
9/9/2a22. D3 30 00
9/9/202� Q3 36 OD
9/9/2022 63 30 00
4/9/2022 ff3 30 00
9/912022 fli 3413
9/9/2022 43 30 OQ
9/9/2022 a3 30 00
9J9/2022 03 3a DO
9/9/2022 D3 3D 00
91912022� 03 30 00
9/9124 03 30 410
9/912�� 03 34 fl0
91912di2 03 30 00
9/4/2�22 03 36 fl0
9/9l202� OS "aQ 90
9191202Z 03 30 40
9/9/2022 03 30 D�
9/9/2022 �3 30 60
4l9/202z 03 30 40
9�9�za2z o� so oa
9l9/2Q22 03'a000
9191262� 03 30 00
9i9/2022 03 30 60
9/912Q22 03 30 00
919/202Z 03 30 0�
9/9/2D22 03 30 00
9/9/2022 03 30 00
9/9CZ022 0"a 30 OD
9I9I2fl22 �3 30 QO
9/9/2022 03 30 00
9/9/2022 03 30 00
9/91202Z 03 30 QO
9/9l2022 03 30 00
9I912022 03 30 00
9/9l2023,, 03 30 00
9/5/2022 03 30 00
9l9I2�22 03 30 00
9l9/2022 03 30 00
9I9I2022 P3 3Q 00
9/9/2022 03 30 00
9/9I2022 03 30 00
9!4l2022 D3 30 DO
9l9/2022 �3 30 00
9/9C2022 03 34 13
9/9I2022 03 34 I3
91912022, 03 34 [3
9/9l2022 03 34 i3
9I9l202Z D3 30 00
914I2022 03 30 00
9/912022 �3 30 00
9I9YL022 O5 30 Op
9/9/2022 03 30 00
9/9/2022 03 30 00
Mix Des�y�
Mix Desi�n
M�: Desit�a.
Mix Desip,n
Mix Llesifi,a
Mix �esi�
Mix De;�
Mix De��n
Mix Des�
Mi�c L7eStRR
�+Iix Desi&n
M'ix Desi�a
MiX De�i1�t
Iv(ir, ilesign
Mix Des�
Mix Des�
Mix Des�PA
]4f'v: lles�
Mix I]es3�
Mix Desi�n
14fi�c Desi�,n
Mix Des��n
N#ix DesiRn
n� n�s��
Mi�c nssae.n
l�uc Des�
14fix Des��n
Mix ne�n
Mi�c Des��n
Mix Desibm
Mix Des�
Mi�c Des��n
Mix Des��a
Mix Desi�u
Mix De5�
Mix Des��n
Nlix DesiP�
Mix Desika
Mix Desiep
Nlic Desiqa
�x Dcsi�.n
Mix Desit,n
Mix Des�e,�
Mix Desi�
Ivfix Desi�n
Nfix Desip,a
Mix Dec��n
Mi�c T]esre,n
Mix Dcs�
Mix Dest�n
Mu Des�pp
Iylie Desi�a
Mix Acsz�a
Mix nesi�n
Mix Des�
Mix Desa�n
Mix Desi�
AYdCG:.anCOriaie[e Compgts'y
American Concrete Comnanv
Ametican Concreie Company
Ameritan Coaczefie CompEny
Ar�os
Argos
AcRas
Ar�os
Ar�os
Azgos
Areos
Ar�ns
F1rF,06
Ax�os
Axqos
Areos
.4rGos
.4xgos
Hi� D Concrc#c
B�mco Teuas
Btmmcp iexas
Bcunco Texas
Bumco Texas
Btmmco Te�cas
Bnmco Texas
B�unoo Texas
BFuaco Tacas
BEanco Texas
Burnco Teuas
Gnarley's Concrete
Ch�le�s Conczete
Charle�s Concretc
Charlcy�s Concrete
C�ley's Coacrete
Chaz 's Concretc
CLar ey�s Concete
Charlcy's Cancrete
C3�azlcys Concrete
City Coaccete Comp�ny
CiN Concrete Camoanv
Cify Cnnerete Company
Cit� Consznte Companv
Cily Concrete Companv
Ciry Concsete Comaanv
Carnerstane Ontime Concrete
Cow 7'ovm Redi Mix
CoN Tovm Redi Mix
Cpw Tocvn Redi Iv1ix
Cow Town Itedi Mix
Cow Town Redi M'rx
Caw Toav Redi Mix
Cow Town Redi Mix
Cow Town Stedi Mix
Cow Town Kedi Mix
Cow Town Ftedi Mix
Cow Tmun 3tedi Mix
Cow Town Redi Mix
30CAF029 300G psi (�oncree�#ur SadeW,u4� &.'+i3� Tto�hps
017AF382 L0�0 psi £,'oncrete Base Material for TrencU Repair
40CNF065 4000 Dsi Cqncrere for Manholes & Utility Strt�ctures
45GAF076 4500 psi Conctete for Hend Placed Pavinj
D10000QD 173745ff0 asi Concrete for Hand Plac�d Pavm�
D10�00r)131791 4540 psi Concrete for Hanci Placed Paving .
Di000�OQ1793 45ff0 psi Concrete for H�d Pl�ced Pavink
IJ1p000001103 950Q psi Concrete for Hsnd Placed Pavin.q
� 10000049857 50y�i�lorvahle Fill - CLSM
D10400�(31055 3600 psi Concrete fox inlets, ]�mcaen Bexes, Menholes, CFiannel Liners, Sidewalks, Driveways, G�rh & Gutt«
p1000001�435 3000�si Concrcte for Sidewal&s. G�rLs
D1000fl01 19S 3500 psi Coaciete for Velley Gutters
?]10001i015655 3000 psi Concrete for G�ubs, G�rb & Gutters, Sidewalks, Driveways, ADA Ramps
�10400�16155 3b04 psi Conciete far Lilcts, Boxes, Encasemen� Blocking
D100000ff1D613660 ps� Concrete far Inlets, Baxes, fincas�meut, BEoc[cin
�me
D1000fl001Q$3 400� psi Concrete foi Valvt Pada, Inlets, Struccures. He walls, Tlin�sF Blockin�
D 100DOOal b85 4000 psi Cancrara for Valve Pads
D1000C)061681 A400 psi Concrete iar Headvvalls, Retalnin6 Wglls, Box L�ilverts, Valley Crirttus
i4500AE 4500 psi Cencrete for Hi,�h Early Strenyth Pavinn
45CISO�BG 4504 vsi Concrete Mix for Hand Placed Pa� �Stor� Sa�stnres
AOU553BG 4flOD psi Cancrote Mia: £ar Machiae Placed Pavru�
55LT126AG 4000 psi Concrete N3ix for Hi:h Ear[V Siren�th Paving
30CIIOQAG 3�00 �si Cobtrete N{uc for Pipe Cailsrs, Inlets, T'hrust Blocks, SidewsIks, ADA Ramps
3aU101AG 3000 nsi Concrete Mix for Fietwocic
30i7500BG 3600 nsi Concrete Mix for Slockm�, DrivewaYs, Ctab & Gutiers. Sidewallcs, ADA Ram9s
4flU5pOBG 4400 psi Concrete A/fnc for Stoxm Drain Striictvres, Amveways, Srseen Walls
35t7500�G �&00 psi Couczete ltd'v: %r Li�ten� and Traffic Signal Foundations
08Y4S0 A 00 ps't Concrete Mix £ar Hase foz Tzencl� Repair
O1Y696BP 106 psi Conctete Mix far Flowabte Fill
4142 3600 psi Concreta Mir for Carh Inlets, 3uncuon Boxes
b143 36fl0 osi Concrete Mix for M&cbine Placed Pevin�
5167 3660 psi Concrete Mix For Maehine Placed Par+inq
4609 45U0 psi Cancrete Mi�c for Fiand Placed Pevinq, Maohol�s
6103 45DD oai Coneretc Mix fox Fiand Placed Peving, Manhnlcs
4502 30D0 psi Concrete ivTcr for Sidcwalks
3759 3�00 psi Concrete Mis for 5idevral3cs
6595 5000 psi Conccete Mix for Hiph Early Sheu Pavin�
6�&9 45b0 psi Concrete ivi6c for Ai�h Far3y S� PavinQ
30fiA201I 3000 psi Canerete Mi�c Par Blocldng, Sidewalks, Flahvo�, Pads
43NG251 i 3600 p&i Concreie Mix for Dtilled ShaBs
45NA2Q1I 45Q0 psi Concrete Mix for Fland Pleced PavinQ
36LA20113600 nsi Concrete Mix far Machme Piaced Pavinq
�fi7A0Qll 36A0 nsi Concrete Mix for Iviachine Placed Pavzn�
40LA20114000 psi Caucrete PJFix far Stoan Drain Siructlrres
COC 4000 - 4000 psi Concxtte Mix for Lif�hrin¢ and Txa�c Si€psl Foondations
250 300p Asi Conctete Mix fw Sidewallcs, Driveways, ADA �s
350 30Q� si Canerett Mix foi Sidewalks, Driveways, P17A ps
9 70 rosi �owa6le Fill - CLSM
9-5-2 70 psi Flowable Fill - C1SM
220-8 50 psi Concrete Iv�vc for Flowahle Fill - CISM
320-5 50 psi Concrete Mix far Flowable Fill - CLSM
230-8 7S0 psi CpncreYe Base Material for Treneh ��ypair
330$8 756 psi Concrete Base Materisl for TrencS i�evsir
353 3000 nsi Concrete Mix foi Sidewalks, ADA Rainps, Driveways, Cur6 & Crutter, Safely End 1'reatments, No�-r�aT Retaiun�g W alLs
253-W 300a psi Concrete Mix Sidewaass, ADA Ran�gs, Arivew s, Ciab & Gutser, 5afety�'cnd Trea�enis. Non-TxDOT Retaming WalIs
360 4DOp psi Concrete M'v� for �3ridqc Slabs, Box L`ulverts, He�Nails, LiP,htin� and Tzaffic 3ignal Fo�dafinns
260-i 3d00 psi Concce#e Mix for Headwails
��R�' �f�A'I'&1f.
�
CITY O�' F012T'�4'OT2TT�'�'12ANSPOIYI'A'1'ION/PUB7 IC'tiS'O12KS D�YAI2Tl17�1�'I"
STANDARD PRODUCT5ISST .A�S OF 9/9l2022
Conerete(Continued}
9/9/24122 63 30 00 Mix Desi,qn Caw Tovm Redi Mi;c
9/9/2022 63 30 00 Mix Desi� Cow iown Redi Mi�c
9/9/2022 03 30 00 Mx Desi,�n Cow Town Redi Mix
9/4/2622 03 30 00 Mix Design Cow Town Redi Mix
9/9/2022 03 30 0� Mix I}esi�n Cow Town Aedi Mix
9/9/2422 03 30 0� Mix DesiQn Caw Town Redi Mix
9f9l2022 63 39 00 Mix DeBi� Caw'Inwn Redi Mix
91912fl22 03 3fl 00 Mix Besign Cow Town Redi Mix
9/9/2022 03 30 00 Mix Desi�n Caw Town Redi Mi�t
9/9/2022 D3 30 00 Mix Design Cow 'iown Redi Mix
9l9/2022 03 30 00 Mix Desi�n Caw Town Redi Mis
4/9/2fl22 03 3Q 00 Mix Desi�n Cow Town Redi Mix
9/9/2922 03 30 0� Nfix Desi�p Cow Town I2� Mix
9/9/�fl22 D3 30 00 Mix Desi� Cow iown Redi Mix
9/5/2022 03 34 00 Mix aesigi Co� Town Redi Mix
91g12{122 6� 34 00 3vfix Drsign Cow Tov✓n Rerli Mix
9/9/2622 Q3 30 00 Mix Deslgt Cow Tovm Reds Mix
9l912422 03 34 00 kiix Desiqn Cow Tawn Redi Mizc
9i912422 03 3{} OQ Mix Design Cow Tovm Redi Mix
9/9/2022 63 30 00 Mix Brsign Cqw Tocvn Redi Mix
9/9/2022 Q"a 3� 00 Mix Design Cow Town itedi Mix
919�022 0� 34 00 Mix Dcsign Cuw Town Redi Mix
91912L122 03 30 Ob 4vlix Besign In�razn Concrete & A�gra�ates
919l2422 D3 30 00 Mix Design In4am Conerete & A�egates
9/9/2922 43 30 00 Mix Besign Ingram Concrete & Aggregates
9/9/2022 03 30 OQ Mix Design Ingrnm Caaerete & egat�s
9J912022 6S 39 0� Ivlix Aesipa LMC ' orc �}cna Corp.}
9/9l2022 0� 30 00 Mix Besign I.MC attimarc Corp.S
9/9/2022 03 30 �6 Mix Desi�t LL4fC ttimore Materials Corp.}
9/9/2022 US 30 pp Mix Design LMC �ttunare �Corv.)
9/9120Z2 ff3 30 00 Mix IIesign LMC ttimasc �eriels Corp.}
9J912o22 p3 30 00 Mix Design LNlC ],attimace Mateaals CarpJ
9l9/2022 03 30 00 Mix DEsip,n LMC attimare terials Corp.)
9/9/2022 03 30 00 Mix Design T.MG �iatlimore �tcriaLs Corp.}
4/9/2022 Q3 30 06 Mix Desigt Liqvid Stoue
9/9l2022 63 30 00 Muc Besign Martin�`{anetta
9/9/2022 63 30 00 Mix Design Maztiu Marietta
9/9/2022 03 30 OQ Mix ➢esign � Marieft8
919l2022 D3 30 00 Mix Design Marietta
9/9/2422 U3 30 00 � Desi�n Maztin Marietta
9/4/2022 @3 34 13 Design Mar�n Marietta
9/9/2022 OS 30 06 Mix Desi� MeQtin Aladetta
9l912422 03 30 0� Mix Besiqi Maz�n Marietta
9/9/3022 Oi 30 OQ Mix T}esign ]trI&rlin Fvlarietta
919I2022 03 30 00 Mix Desi�a Mact� Madetta
4/9/2022 03 30 00 A2ix Desi}� artin Marietta
9/4l2422 43 30 �Q Mix Design artin Marietta
9/912fl22 03 30 00 Mix }}esi�n Mactin Marietta
9/9l2022 fl3 30 pQ Mix I3esi� Marmi Marietta
9/9/2022 a3 30 00 Mix Besign Msrtin Marietm
9/9/2022 03 30 00 Mix DCsign 1vlartin I�Iarietta
9/9/2022 43 30 06 Mix Desim Marfin Mariet4a
9/4/2622 03 30 00 Mix Design Mutia Marietta
9191?�22 43 30 OQ 2vfifc Desi�,m Mmtin Mazietta
4/9/2023 03 SO 06 Mix Desi&n Marrin Msrietta
9/9l202 03 30 00 Mix Design NCS Redi Mix
9/9/2022 93 30 OD Mix Design NCS Redi Mix
9J912022 a3 30 06 Mix DesiRp NCS Radi Mix
9/9/2022 fl3 30 Ofi Mix ➢esign Redi-lv[ix
9/9I2022 43 30 OQ iv1'ix Desisa Redi-lvfix
9/9/�D22 03 34 13 Mix Desigsi Redi-Mix
250-2 3600 psi Concrete Nfoc for Box Cvlv� Headwalls, Lirhting�and Txaffic S�al Foundatians
360 4Q00 psi Cnncret� Mix for Bridge SlabS, ox CnlveRs, Heaaw9ljs, Lightin� Tr�c Sigaal Fouadations
"a60-1360� psi C J}crete � fql �GY})y�� ljeadwalls, GVin�walls
264-N A500 ps� Goncrete x�`or �fice isa�ving
36fi 450p Asi Coacrete Ivfix f� r H Plp�e P ving
265 4500 psi Concrete Mix for �� Place �avut�
365 4500 psi Conctete M'vc far an$ Placed Paving
370-NC 4500 p,y Conc�epe Njjx �pr �jgS Farjv Sueneth PavaiQ
267 420o psi L`nncrete tv(ix for lvlanho1gs and Draina e Suuctures
270 5606 psi Cancrete Mix fflr Cast-ia-Place &ox C�verts
370 5000 psi Corscrete M'vc for Cashia-Plece Box Cuiverts
255-2 3000 p�] Concrete Mix fqJ Inlets, Thrust BlockinQ, Cancrete Eacasement
257 360o psi Concrete Mix far Li�tinq and Traffic Signai Fovndatians, Valiey G¢tters
257-3d13600 psi Conarete Mix for Machine Placed Paviag
?6fl-N] 4�00 psi Coaccete Mi�c �or Machine Plac� Paviag
36b-M 4000 psi Caucxete Mix or Machine Place Pavin„a
255-LP 3000 psi Concre[e Mix £or C� & G�tter
a"SS-LP 3PQ0 pu Concrete Mix for CcQb & Gutter
255 350� psi C� ncrete Mix far FlatworkI Inle� Thiust Bloclang Concrete Encasement
355 36�0 psi Concrete Mix for Inlets, '1'hrast Bloclang, Conerete Encasemeat
357-M 5600 psi Cpa�retR Mix fpr tvlaphin8 Placed Pavm�
357 3600}�si Concreu Mix for Lig,hting and Traffic Sig,nal Foundations, Valiey Gutters
151PXSDM 3600 psi Concre[e Mix for i.ig64n� aud T� c Sigcal Fo� rions
7pK7'SO4 36D0 psi Concrete Mix fpr Lighting aad Tzaffic Sig�l Fp�datic�as
C47PV3E5 3000 psi Conerete Miz fox Sidewallcs, ADA Ramgs
161PSSEM 4�00 psi Concrete � for FIand Alaced Paving
S I77 30Q0 asi �anerete ��Qr �rwaZlcs
126I 3000 psi oncrete or i ewa3ks
5449 4060 psi Concrete N!'v: for idewaiks, Lilets
155I 50�0 psi oncrete Mix pr }oc �
170 E 4000 psi oncretc Mix or �mrm� 5truct�es, SaniYazy Sewer Msnl:oles
5507 45�(1 ps� Concrete Mix �oi H�. d��a�ed Pavin�
9600 3600 psi Concrete Mix uc S�iaits
185I 4560 psi Conerete 14ii�c For Storm Drain S4uetuces, Hand Placed Paving
C4000G - 40fl0 psi Conraete Mir. fQr Lia tin� and Tzaffic Sigpal Pole Foandation�
R2I3I� S4 300p psi Cancrete Mix for Si ew�, ADA Ramps
ii2I322I4 i000 psi Concrete Mix for Sidcwalks, Af]A Ttampg
T79490SC 3(30(3 psi Canerpte Mix f r Sidow3lks, ADA Ramps
Ft2I"a6224 "a606 psi Canc ar InleEs
Tt2I4 L2�3 3G0� psi Concre� ar Smrm Drain Strucnues, Inlat�, Sloeldn�, Conerata Eneasemeat
FLOW2SA 54 psi Flowa6le fiil] - CLSM
it2I422;; ;60p psi GoncreFe Mac for Nlanholas,�Alcts\Headwalls
R21412.i0 4600 psi Concsete Mi�c for Manholes, Inleis, Headwallg, 'VaIve Pads
Q214223140Q0 psi Coacrete Mix €or Meehine Placed Paving
D94925FC 49�0 p� Conc�te Mis £ar Machine Placed Pavin�
Q214225 400a psi Concrete Mix for Mae�ine P3eced Pavin
R2 i46238 4504 psi Concrete Ms�c for Hand Placed Favin�, �ets, Starm Lksin Strucnaes
R2I46335 4500 psi ConcreFe Mnc for Hand Piaced Pavinfi
R2146058 450Fi psi Concrete Mix for Inle , Storm Drain Structures
R2i46035 4500 psi Concrete Mis for Han� AIaced PaVing
It2i46442 4506 psi Concrete Mix for Hand Piaeed Paving
R2i46242 A��a psi Conerete Mix �r Hand Placad Paving
R214236 4�L}0 psi Concrete Mix for Hand Placed PavinR
D9493SC 45�0 psi Concrete Mix for Hand Placed Paving
�22147241450l5 psi Concrete M� for HanB Aisced Paving
NCS5020A 300D pSi CoucietC Mix�� �nrb &: �7 Arive�rays, Sid�walks
NC55520AMP 3600 psi C� crete or Mac ' e Pleced Zsavin
NCS6020AHP 4500 p5i (:ontrete Mix for Valley Cnmers, Smmd P�aced Pa�;
DCA2E554 3000 psi Concrete Mix foi �ip R�4
VO.F L 1�24 3000 psi Concrete ]Vfix for (.iisS & Gutter
4'�6C1b021215 psi Flovrahle Fill - CL.SM
CITY OF FORT WORTH TRANSPORTATIOYIPUBLIC WO�tKS DEPA.IiTMENT
STAIlDARA PRQDUCTS LTST' AS OF 9/9/2022,
I
�oncrete(Coo6ouedJ
9/9/2622 03 3� 60 Mix besipp
9/9/2022 03 30 00 Mix Desip,n
9/9/2022 03 30 00 Mix DesiQn
9/912422, 03 30 00 Mix Desia�
9l9I2022 03 34 i3 tvlix Desi�p
9!9l202� 03 34 13 Mix Desiqn
9/9/2022 03 30 00 Mi�c IIesi�n
919l2022 03 30 04 Mix Desi�n
919/207�� 03 30 00 Mix 13esiQn
9/9120 D3 30 00 Ma Desi�n
914I2022 43 30 00 Mix Desisn
9/912�22 4"a 34 00 Miz Desi;Gn
919/?022 03 3� 00 Mix I7esiep
919126� 03 30 0� Mix Des�
9/9/2022 03 30 QO Mi�c Des��n
919l2D2z 03 30 00 Mix Desam
9/9/2022 03 30 00 Mix De��p
9/912D22 03 30 00 Mix Des��t
9l912022 03 30 OD Mix De�
9l9120,� D3 34 13 Mix De�
914h2022 03 34 13 Mi�c Be��p
919/2022 43 30 0� Mix Dcs�en
9/9/2023 U3 30 00 Mix Des�l
9/912022 63 30 �0 Mix Des�p,n
919/2Q22, 03 3Q 00 Mix pea�n
9/9/2022 03 36 00 Mix �eskm
9/9/202� �3 "s6 00 Mix Desipt
919/2422 03 30 40 M'v: Dea�
9/9l2022 03 30 00 Mix Des��n
9/9/2022 03 30 00 N{ix DeG��{1
9/9/262� 03 30 00 Mix Des��n
919l2022 03 30 00 Mix Desi¢n
4/9/2022 03 30 00 Mix Desi�
Asphslt Parin
919120`_2 32 12 16 �;.;x Bwi�r
4l91202� 32 E216 MixBesiqn
9141z�22 32T216 MixDesign
9/9/2022 32 12 16 34�ix Dcsian
9/9/2022 32 12 16 Miz Desi�n
DetectableWa nioBSurEerc
9/91202� 321520 �WS-P�v:cs
91912Q22, 32 Li 20 D4JS - Pavers
9/9/2022 32 13 20 C)WS - Compo�te
9l9/2022 3� 13 ZO DWS - Camposite
Silicone Joint Sr.s�a�k
9!9l2022 32 l3 73 7oint 5ea!aar
91�9l2022 32 t3 73 3oiat Sealant
9/912422 32 I3 73 7oint 5ealent
9/912022 32 13 73 7o'vrt Sealant
IIfility Trench Emtredment Sand
9/9/2422 33 OS LO EmbedmeM Sand
91912Q22 33 OS 10 Em6edment Sand
9/9/2422 33 OS 10 Embetlment Sas�d
919/2U�� ,� OS LO Embedment Sand
9I9/2D22 33 OS LO Embedment 5and
Redi-iv]ix
Redi-Mis
Redi-Mix
Redi..Mix
Redi-Mix
Rcdi-Mix
Retli-Mix
Redi-Mix
Redi-Mix
liedi-Mix
Redi-Mix
liedi Mix
Redi-Mnt
Redi-Mix
Redi-Msx
Redi-M'sx
Tarrant Concrete
Tarrant Concrete
Tarrant Concrcte
Tarrartt Corterete
Tarrant Concrete
Tactant Concrefe
Taxxant ConcreYe
Tanant Concrcte
Tarant Coaetete
Tarrant Coaciete
True Grit Redi Mir.c
True Ctit Redi Mix
True Cttit Redi Mix
True Grit Redi Mix
True Crpt ltsdi iVli�c
Trae Gat Redi Mis
Wise Redi Mix
AasGn AsPlvli
A�stin Aspha3t
TXi3€T
T'XBiT
TXSIT
1;�J S 1524 3060 ps, Concrctt Nux for Dr.✓eury�s, �idc�a�lcs, ADA `-2�mps
1 QL11524 36D0 psi Cornrete Moc far Valley Gsmers. Manholes, InIels,limction Bmcas, Headwalls
1RJ1 [524 3500 psi Concrete Mix For T7uust Blacks, Valve Pads, Li�ht Pole Foundalions
156I152+14000 psi Concrete Mi�c fos Cast-iu-P4ace Storm Dtxin Skncmres
F3523 BVN IOp psi F7owehle Fill - CLSM
FOD136VM 1fl0 psi Flowahle Fill - CISM
P4Cz136K9 100� psi Conctete Mix for Trench Re�pflir Base Maierial
1OK115Q4 364p As� Canctete Mix for Lip.6ting and T�c Si�nal Founda[ions
I OK11524 3600 psi Conciete Mix for Li�rting and Tiraffic Si�si Poundations
1ON11507 4500 �i {2600 psi a 24 hcsJ Concrete Qdix For H}�h EadY Stsength Pavin�
IONl i564 5000 �st �3600 qsi rr 2 days} Concrete Mix for i3�fih Eady S�sn�th Pavinq
SOK11524 3600 psi onceete Mkx for Machine Placed Pavmg
IpM115I?4 450F5 nsi Cancrete Mix £Or I;and Placed PavinR
1OM1152d 45D4 nsi Concrete Mix For Haad Placed Pavinr
16M1I5D4 45G0 psi Coaciete Mix for Hand Placed Pavui�
145CDSP4 4500 psi Conerete Mix far Hand Plaeed Pavim�
F9V6D20AHP 4500 �si Cancrete Nfis: foi Hand Plaeed Paving
FW60A�FP 450D �} Couraete �tix for Hand Placed Pavia�
FSV5320A 300� ps� Conerete Mnc for B3ocicia�
FWFF]SOCI.CM 5Q-150 psi F3owable Flll - CLSiiI
FWFF275 Sd-150 9si Flawah[e Fill - CLSM
FVJ6620A2 4000 osi Concreu Mix for Stoffi Drem St,mctures
FW6020A 360fl vsi Goncrete Ivirrc for I.ig�pn� and Tnffic Sip,aal Foundations
FWSO75A 300{i psi Coa:crctc NIix fpr Ll� 8c Guiter. DrivcwaY& Sidewal(c8, t1DA Ramps
CPS02QA 3000 ysi Concrate Mix far Ceah and Ceuaer
FW5525A2 3E0� �si Conereee Mix far Vatlev Gutters
0254.230 3900 q�Si Coucrete Mix for Flatwad� Curh & Cutter. ArivewsYs. Sidewalks, ADA Rsmps
0254,2302 3008 psi ConcreL M�c for G�rb & Crutter, �riveways, Sidewaiks, AI7A Ramps
0264.23Q2 4000 psi Conerete Mix far Maehiae Plaeed Paving
0255 2341 3 60{7 psi Concrete Mix for Maclune Placed Pavin�
0264.2301450a psi Concrete Mix for Aand Placed Paving
0265.2"sD1450� psi Coucrete Mix for Vall Gurters. T�and Placed Paving
3678 3600 psi Conccete M'vc for Lighting xn� Tra�c Si�sal Fo�ndarians
FTSD 137965 PGB4�::2 Typt D Fint Suriacc
F'f1B117.2 PG64-22 T�{e-B Fine Base
44-211305-17 PG64-12 Type B Fme Base
64-224125-IS PG70 22 Type D Firte &vr�sce
12-222475-]9 PC64-22 Typa D Fine S�sface
Pine H+� I Bsicr �r.ston Salem 'YC7 Tac¢le Pavers
Westcrn Brick Ca. (Houseon, TX) Detecteble Warning Pavers
Engsneercd Plastics, Inc. Armor Tile
ADA ��lliamsville, NX)
tians {Wilmin¢,son, MA) Heritage Sricl: C� ComPosih F'aver
Dow I8945S.-Cold?.ppliedSmKleCc��po�eni,5ilicone.SointSeatant
Tremca 90ffSL - Cold Apolied, 5' y C��mponmx, Silicone Jo�t SeaFant
Pecoia ��OQSL - Co1d Apolied, S��?e Comvonen� Silieone ]oint Sealant
Crafco �RoadSaver S�licoae - Coid Applied, Single Componw; Silieoae Ioint Sealaat
6iiver Cr.+� ivlatssisls Cltiuri Eau3�edm� Sand
Crouch P�haterials Utiliiy fimhedmeut Sand
F and L i)irt Movcrs Utilitv Emhedment 5and
F and L 1}irt Movers Utilijy Emhedmcnt Sand
Tin Top Ivlaztin MarieEta iItii�ty �hedment Samd
IASTIVTD�893 - —
ASTN[ D5843
ASTM DS$43
ASTM D589�
: �'w'Pi�; C�3
AS'PM Ci3
ASTM C33
ASTM C35
ASSM C'a3
CITY OF FORT WORTH TRAn'SPOI2TA'rION/PCTBLIC �+O12K517EPARTMENT
RTANh4Rn PRlli]iT�'j'S I.I$T 1� �F 9/9/2�22
Rramq C4ov�r. and Gride Iiings - Cast Irou **f^;- SY: rr^YwTa 5'f: � c'v��
4I4I2022 33 AS i3 Manhole Fraa=es m�d Cpvus Neena Faundry 32" ➢iameter L�natr VJ�ater Msnhale Gssketed Frame and Cover wlLpnghaia Logo, Mpdel Np, ?VF-1743LTb6
4l912022 33 45 i3 Msnhofe Frames and Covera Neane Foundry 32" Diamctcr Liftmazc Sanitary Sewer Manhok� Framc and Co�er w/Lon�om Logo, Modcl AIo. NF-1743LT69
4/912�22 33 OS I3 Manhole Siarsies and Covers 5IP Industries 32" Dismeter PoR Wprth 5anitary ewer Manhole �'ramC and Cover, Irem ND. NF-2280
91912022 3S OS L"a ManhoieFrarnes and Covers E7C0 F7,-� a� As�°`bl 2" Biame]�r��uitary S� M�'�jo}e rame and Cover Model Alo. 001480211A I0
91972022 33 OS l3 Manhole Fra�nes and Covers Neena Foundry 32" Diame[er L� e Storm Sewer IunctsQn Box and M�o2e �rame and �over w/C.on�+Lorn L.ogo, Mode] No. NF-1743LTXX
9l9/2022 33 OS I3 Manhok Framea and Covers Neena Faundry 24" Diameter L'dhaate Storm Sewer Lilet Maahole Frame aad Cover w/Longhom Logo, Model Np, I�F-1fi50LTG1
9J912022 3� OS 13 MsnhmleFrames and Covers AccuCas[ {Govind Steel Company, Ltd.j z4" I]Sameter NkI1tC #2?66p5'� AS1M AA8 AASHIO M3a6
9/9/2422 33 OS 13 T�fanhole Cover Neena Foundry 32" Diemeter NF-1274-T9 ] A$TM A48 p..45IiT6 M3d5
9/9/2022 33 Oi 13 h9enhole Frames and Covers Meena Foundry 32" �iameter �TF-1743-LM {Hinged) ASTM A48 Ae15i£iD M30b
9l9/2022 33 OS 13 9vlanhnle Frama Neena Foundry a2.25" Aiameter NF-193Q-"a0 ASTM AA8 AP SFF!'D Nf306
9/9/2022 33 OS li Manhnle Frames and Covers Neena FaunrFry 32" Diameter NP-S743-fiV fy$TM A48 AAS13T6 M3d6
9/9/2022 i3 OS li Manhole Fsames and Covers SIP Industries 24" 1']iemeter 22743T ""' ASTM A48 AASF3T0 M30b
91912D22 33 OS li ManholeFrames and Covers S� Industries i.�" l7iemster 2280$T A$TM A48 AASF£CO NP45
919/2Q22 33 03 13 ManholeFrames end Covers ESCO 32.25" Diametes EfID3� X2lA ASTIv] A48 AASFiTD Mi05
"`Nate: Al! esw a'evefopi�aa! and 7rew enata!latiar nuurLoFe lida aGa!! nue,t tlre ntrrsin�un:30" apening reqrdreixenl ru apecifud in GrySpecfficafion 33 031.� Aay srrra!!rr aperrtqg si-.er rni!! anly de a!lmved far eciatiao n:rs�Jioles fh� rrqrrirc repfrtcenmet fran¢s artd rnvers
' lteinforced Coaceete Storm Arain Pipe9Culvertx
9/9/2�22 3"a 4I 10 Precasi Box Culverts Forterra
9/9/2022 33 bl 10 Concrete Pipe Wyes and Sends Forteaa
9/9/2022 33 49 10 Precast Hox Csdvetts Rinker Nttterals
91912Q22 33 44 10 Concrete Pipe Rinker Materials
9/9/2Q2? 33 41 10 CoecretaPipe Forterra
l PoiyprOpylene Storm Drein Pipc
� 9/9/20221 i3 41 13 �Po3ypropylene Pipn I Advs�need Drassiage Systems, Inc.
Preca5i Box Culverts _ _
RCP Wye and Bends
Rinl:er 1vlaterials lteinforced Concrete Bax Culvert ASTM C789, C850
Rink� Maierials Reinfarced Connrete Pip� 'foug¢e snd Groo+re roiai Pipe ASTM C7b, C655
Reinf"orced Concrete Pipe - Tongne and (iroov�+D48
AS'L'M C7B9, C350
ASTIvf C7Q Cfi55
SW rm Aram Aianhnles and Ja�clian Hazrs
9191T022 53 49 10 Stacked Manhole
9/9/2{322 3i 49 10 ?vnotion8ox
9/9/2422 33 49 1Q 7unction Sox
Jl912422 53 49 10 7uncrion Box
919/2fl22 33 d9 10 7uncvon Soz
9/9!?023 33 49 ] 0 7unctlon 8ox
9/9/2U23 ii 49 10 Ivnctibn Box
919l2022 33 49 10 fvnction Bex
919l2022 33 49 10 Manhole
9/4/2022 3� 49 10 MaaSole Connector
9/9/2422 33 49 16 7unovo¢ Box
919/2p22 33 49 10 7unC#ion Box
9/9/2022 33 49 10 7unction 8ox
9/4/2022 33 +d9 16 7unction Box
9/9I2022 33491Q functionBox
9/9/2022 33491p 7unctionBox
9/9/2022 33 49 la 7unction Boz
919I2D22 33 49 ]U 7unctian 8mc
9/9/2022 33 49 1 p 7unction Bax
919/2022 33 49 ] 0 7unction Box
9/9/2022 33 49 10 7unctian 8ax
9/412022 33 49 ]0 Junc[ion Box
919/2022 33 49 10 Iunction Bmc
9I912022 33 49 10 7�xnctian Box
91912022 3� 49 f0 JuactianHwc
91912022 33 49 34 tuaction Bou
419/2022 33 49 20 7unction Box
4141202? 33 49 d0 Junction $nx
91912022 33 49 ]0 I�nction Box
9/9/2022 :xi 49 10 ]vnccion Box
Oldcaatie
Oldcastla
Oldcastle
Oldcastle
RldcasHe
Oldcastle
Oldcsstle
Cowtown Redi NLx
�yI ��� �
Trelleborg �ngineere Systems
Fprzcma
FO]S¢Ti&
Forterra
Farierra
Forterra
Thompson P'spe Crraup
Thompson Pipe Group
Thompsan Pipe Group
'Ihompsoa PSpe Csroup
Thompson Pipe Group
Thompson Pipe Group
ihompson Pipe Gmvp
Tifompson Pipe Cnovp
Thompson k'ipe Group
_'Ihompson Pipe Crsoup
Thnmpwn Pipe C�rCvp
Thpmpson Pipo Gronp
_Thompson Pipe Grovp ,
Tiiampsoa Pipe Grovp
Thompson Pipe Group
�FiP Polypropylene Storm Drain Pipe
Preeast 4' x 4' Citacked Nfaahole
p:eaast 5' x$' Seorm lunerion Sox
Precast 4' x 4' Sio� Iimcripn Box
Precast i' x 5' Storm 3uncrion Box
PrecLst 6' x 6' Srorm Iunttion Sax
Precast 8' x$' Storm Sunction Box Base
Precast 5' x 8' Stocm dimction Box BaSa
No. 2fi0-2 b Sack 3660 psi Cqncrete for CWscrete Collars _
Rinker Materia4s Reinforced 48" Diazueter Spread Faorino Manhoie
tia
Kor-N-Seal lOfi1405 Scriss Pipe to Manhole Coimector
4' x 4' FRT-4x4-409-PRECAST-BASE
5' x 5' FRT-5ac5-409-pRECqS'i'-TOP
5' x 5' FRT-Sx5-409-PRECAST-BASE
6' x b' FRT-6x6�04-ARECA57-TQP
b' x fi' FRT-6xb-409-PRECAST-BASE
ri 'x 4' TPG-4x44Q9-PRECAST TQP
4'x 4' TPG�x4-409-PRECAST BASE
4'x4' TPCr-4x4-413-PRECA5T 4-FT RISER
5 'x 5' TPG-Sx5-4I0-PItECAST TQP
s 'x s' TPCrs�cS�lo-PRECA51' BASE
5 'x 5"£PGSr.S-412-PRECAST 5-Fi I�ISER
6'x 6' TPG-Gx5-411-PRECAST TOP
6'x 6' TPC:-bxb-411-PRECASi BASE
6'x fi' TPCi-6xb-412-PRECA5T 6-FT RISER
7'x 7' TPCr7x7-411-PRECAST TOY
7'x 7' TACr7x7�11-PRECAST BASE
7'x T i'PG7x7-412-FRECAST 4-FT RISER
S 'x 8' TPG-8r.6-411-PRECAST TOP
8'x S' TPCr8x8�11-PRECAST BASE
8'x 8' TPCrBx61412-PRECAST 5-F1' it1S�K
C1TY Ok' FORT WORTH'FRANSPOitTATIO�i/PUBT�TC W�RKS DEPARTMENT
STANDARD PRODTJCTS LIST AS OR 9l912022
Storm Dr�in Curb and Drap Inlers
9/412022 3"a 49 29 Cvr6lnlets I
919/2022 "a"a 49 20 Curh Inlets
91412022 33 49 20 Cvrb Inlets �
919f2022 33 49 2p Curh I�lets �
9/9l2Q22 33 4R 20 ]unction Sox �
9/9/2022 33 49 20 �r6 Ialet �
9l9/2022 33 d9 20 C�rb Ialec �
919l2Q22 33 49 20 Curb Inlet �
919l2fl22 33 49 26 Drop Inlet I
9/9/2022 33 A9 2Q Drop Wet I
4/4/2422 33 49 20 Dro➢ Inlet �
Concrete Foundatiqas for Signals and L�ii r,s
9/972022 33 +3] IO Mne Dpsign
9I9l2022 33�210 1�GcDesign
9/9/2022 33 4I IO �x Design
0
Forterrn 1Q x S' FR'I'-]Ox3�405-PRE��;AST
Forterta 14' s 3' FRT-lOxi-40G-PRE.CtLST
Forterra la' x 4.5' FRT-IOx4-d07-PRECAST
Fonena 10' x 4.5' FAT-lOx4-420.PRECAST
Forterra 4' x 4' FRT-4xA-<109-ARECAS?-iOP
Thamoson Pioe Graup [0' x:i TPG-]Ox;-465-PRECAST II3[,ET
Tnompsan P�oe Group 15' z 3' TPG-I5x31405-PRECtLST INLET
Thomuson I'ine Group 20' x 3' TPG-20X3-405-PREC,qST INLET
7'hompsGn Pipe Grpvu 4' x 4' TPG-4X4-408-PI2�CAST INLET
3'Bornpsoa Rpo Grouo 5' x 5' TPCr57C5-0OB-PI2ECASi' INI.ET
Thomnson Pinc C,roun �6' x b` TFG-6JC6-4d6-PRECAST �1LET
I
Hurnco 36U0�50flBG 3000 psi 1'' LS w/ai. ::eeTetete Mix .'a_ Traffie S� �ol :mci EIe+:iz:e 3ersnec Foundaton
Cowtown kedi-Mix 1Vp. 254 3000 p�i Concrete tbr L�� Pole, Metered Pedestai, enc� Si�al Cabinei'r'oundations
Charley's Concrete Mix No. �159 360Q psi ConcYefi br Light Poles and S�gnal Cahine oundations
I
:'�`a"CI�', C913
ASTM C913
ASTM C413
AS'iM C923
ASTM C913
IASTM C6I5
�P.SI'M Cb l5
�ASTM C615
ASI"M C615
A512v! Cb15
ASTM Cfi 15
CI 3 [8-I»
ACI 318-14
ACI;1&14