City of Fort Worth
Change Order Request CITY SECRETARY!':~!1/' CONTRACT NO . Q.L 1 (LV3z CJ 2 ,
Project Name,...! -2-00_7_C_r-itic_a_l C-a-p-ita_l _P_ro-je-ct_s _W-tr-, S-S-, -Pa_v_&_D_r-ng-lm_p_rv_D_is-tr-ict_8_G_r-ou_p_D_~, City Sec# I 39700 I
Client Project #(s) #00923 ~--------------------------------------'
Project Description Water , Sanitary Sewer , Paving & Drainage Improvements --DOE# 6237
Contractor! McClendon Construction Change Order# 2 Date
City Project Mgr. ~I _K_a_hl_J_aa_fa_r_i __________ ____, City Inspector Edward D'avila
Dept. TPW Water Sewer
Original Contract Amount $1 ,512 ,099 .20 $505 ,084 .00 $89 ,024 .00
Extras to Date $9 ,135 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1 ,512 ,099 .20 $505 ,084 .00 $98 ,159 .00
!Amount of Proposed Change Order $4,802.97 $60,011.56 ·$2,452.92
Revised Contract Amount $1 ,516 ,902 .17 $565 ,095 .56 $95 ,706 .08
Original Funds Available for Change Orders $45 ,363.00 $25,000 .00 $6 ,000 .00
Remaining Funds Available for this CO $45 ,363 .00 $25 ,000.00 $0.00
Add itional Funding (if necessary) $35 ,01 1.56
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals
$2 ,106 ,207 .20
$9 ,135.00
$2 ,115 ,342 .20
$62,361.61
$2 ,177 ,703 .81
$76 ,363.00
$70 ,363 .00
$35 ,011 .56
3.39%
$2 ,632 ,759 .00
4/10/2012
Select Day Type
370
26
396
30
426
Items added but not in contract but required by TXDOT and inspected by State Inspector: Flowab le fill and permanen t asphalt with reinforced
concrete based placed in TXDOT section at Riverside Dr off Irma St. Other non State additions to the contract: No line item provided to
relocate water services that were in conflict with driveways , walks & curb ; Staking conflict encountered that required relocation of installed
hydrant in Irma St & Argyle ; Also added the following items : no line item provided in contract for Manhole extra depth adjustment located in
Montague STA 9+ 72 & Ash Crescent STA 31 +65 Montague Street ; there was no line item for 4" SOR 26 sewer used to bi-pass under water
main ; No line item for Temporary pavement for Storm Drain. Extra width permanent HMAC pavement for Storm Drain in Mon tague & Erath St.
due to existing HMAC and base in terrible shape ; No pay item for water service Meter/Box relocations & footage for installation of hand dug %"
copper ; No line item for Class C Meter Box & U Br~~~~ijis are measured quantities to complete the project. Other contract
quantities were deleted that were not used . #,()io1)~9a~1'-~ ~Q
.ct~ o"o oo~O¢..\
;:1,-00 O ~ « of }'a! OFFICIAL RECORD
~~~~~~~~-k-.:.J~~~~~~~eL---+-~~~~
\'
~~~Uf==i.__ ____ ..l..±.l.~!::::....L~~~~~:::.__----1.~~~«
1
Ql~~
M&C Number I L---Z.. 5J 1 ~ I
... • f • Cop,1 J_ or 2
FORT WORTH . ~ City of Fort Worth
Change Order Request
Project Name! 2007 Critical Capital Projects Wtr , SS , Pav & Drng lmprv District 8 Group D
-Cli e'nt Project #(s) #00923
397tJO-< tJ 2...
City Sec# 39700 1
.__ ___________________________________ _.
_,,..Project Description Water , Sanitary Sewer , Paving & Drainage Improvements --DOE# 6237
Contractor! McClendon Construction 2 Date
City Project Mgr._j _K_a_h_l J_a_af_ar_i ___________ _,
Change Order#
City Inspector Edward D'avila
Dept. TPW Water Sewer
Original Contract Amount $1 ,512 ,099 .20 $505 ,084 .00 $89 ,024 .00
Extras to Date $9 ,135 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1 ,512 ,099 .20 $505 ,084 .00 $98 ,159 .00
!Amount of Proposed Change Order ~.802.97 $60,011 .56 ·$2,452 .92
Revised Contract Amount $1 ,516 ,902 .17 $565 ,095.56 $95 ,706 .08
Original Funds Available for Change Orders $45 ,363 .00 $25 ,000 .00 $6 ,000 .00
Remaining Funds Available for this CO $45 ,363 .00 $25 ,000 .00 $0 .00
Additional Funding (if necessary) $35 ,011 .56
CHANGE ORDERS to DA TE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals
$2 ,106 ,207.20
$9 ,135 .00
$2 ,115 ,342 .20
$62,361.61
$2 ,177 ,703 .81
$76 ,363 .00
$70 ,363.00
$35 ,011 .56
3.39%
$2 ,632 ,759 .00
4/10/2012
Select Day Type
370
26
396
30
426
Items added but not in contract but required by TXDOT and inspected by State Inspector: Flowable fill and permanent asphalt with reinforced
concrete based placed in TXDOT section at Riverside Dr off Irma St. Other non State additions to the contract: No line item provided to
relocate water services that were in conflict with driveways , walks & curb ; Staking conflict encountered that required relocation of installed
hydrant in Irma St & Argyle ; Also added the following items : no line item provided in contract for Manhole extra depth adjustment located in
Montague STA 9+72 & Ash Crescent STA 31+65 Montague Street ; there was no line item for 4" SOR 26 sewer used to bi-pass under water
main ; No line item for Temporary pavement for Storm Drain . Extra width permanent HMAC pavement for Storm Drain in Montague & Erath St.
due to existing HMAC and base in terrible shape ; No pay item for water service Meter/Box relocati6ns & footage for installation of hand dug :Y."
copper ; No line item for Class C Meter Box & U Branch . All quantities are measured quantities to complete the project. Other contract
quantities were deleted that were not used .
...)
I . It is un erstood and a r !}· that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order.
Contractor's Com an Name , Date
McClendon Construction ,.. 12 / 2.
Date
1/1 'Ii/ 7..u IZ.
\
~~~~=-.._ ____ _.l_::jb.bJ..~.l..L~~~~~~-___LLµ!.~~«
().1
x~\ \)\). ~'
M&C Number I (... -z_ e(H '{ I
•
FORT WORTH .
~
City of Fort Worth
Change Order Request 317t {;-( l 2....
Project Namel 200 7 Cr itical Cap ital Projects Wtr , SS , Pav & Drng lmprv District 8 Group D
Client Project #(s) #00923
City Sec # 39700 1
,...._ ___________________________________ _.
,,..Project Description Water , Sanitary Sewer , Paving & Dra inage Improvements --DOE# 6237
Contractor! McClendon Construction 2 Date
City Project Mgr ..... l _K_a_h_l J_a_af_ar_i ___________ __,
Change Order #
City Inspecto r Edward D'avila
Dept. TPW Water Sewer
Original Contract Amount $1 ,512 ,099 .20 $505 ,084 .00 $89 ,024 .00
Extras to Date $9 ,135 .00
Cred its to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1 ,512 ,099 .20 $505 ,084 .00 $98 ,159 .00
!Amount of Proposed Change Order $4,802.97 $60 ,011.56 -$2 ,452 .92
Revised Contract Amount $1 ,516 ,902 .17 $565 ,095.56 $95,706.08
Original Funds Available for Change Orders $45 ,363.00 $25 ,000 .00 $6 ,000 .00
Remain ing Funds Available for this CO $45 ,363.00 $25 ,000 .00 $0 .00
Additional Funding (if necessary) $35 ,011 .56
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals
$2 ,106 ,207 .20
$9,1 35 .00
$2 ,115 ,342.2 0
$62 ,361.61
$2 ,177 ,703 .81
$76 ,363.00
$70 ,363.00
$35 ,011 .56
3.39 %
$2 ,632 ,759 .00
4/10/2012
Select Day Type
370
26
396
30
426
Items added but not in contract but required by TXDOT and inspected by State Inspecto r: Flowable fi ll and permanent asphalt with reinforced
concrete based placed in TXDOT section at Rive rside Dr off Irma St. Othe r non State additions to the contract: No li ne item prov ided to
relocate water services that were in conflict with driveways , walks & curb ; Staking conflict encountered that required relocation of installed
hydrant in Irma St & Argyle ; Also added the following items : no line item provided in contract for Manho le extra depth adjustmen t located in
Mon tague STA 9+ 72 & Ash Crescent STA 31 +65 Montague Street ; there was no line item for 4" SOR 26 sewer used to bi-pass under water
ma in; No line item for Temporary pavement for Storm Dra in. Extra width permanent HMAC pavement for Storm Drain in Montague & Erath St.
due to existing HMAC and base in te rrible shape ; No pay ite m for water serv ice Mete r/Bo x relo cati ons & footage for ins talla ti on of hand dug Y."
copper ; No line item for Class C Meter Box & U Branch . All quantities are measured quantities to complete the project. Other contract
quantities were deleted that were not used .
) I , .,
I
I t
It is un erstood and agreed that the acceptance of this Change Order by the con tractor const itutes an accord and satisfaction and represents payment
/ l ( '--
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Contractor's Com an Name Contractor Name Contr-act Si nature Date
Mcclendon Construction f -I< <;,,,.., j
I -
Date
7
Date
M&C Number L ... z., .. 1~ 11 ,:i 1t..
Qx
''(j '\ \; '
'./
t
., . FORT WORTH .,
~
City of Fort Worth
Change Order Request
Project Name! 2007 Critical Capital Projects Wtr , SS, Pav & Drng lmprv District 8 Group D
Client Project #(s) #00923
City Sec#
{' ;, -
39700
~-------------------------------------'
Project Description Water , Sanitary Sewer , Paving & Drainage Improvements --DOE# 6237
Contractor! McClendon Construction 2 Date
City Project Mgr. l~_K_a_hl_J_aa_f_ar_i ___________ _.
Change Order#
City Inspector Edward D'avila
Dept. TPW Water Sewer Totals
Original Contract Amount $1 ,512 ,099.20 $505 ,084.00 $89 ,024 .00 $2 ,106 ,207.20
Extras to Date $9 ,135 .00 $9 ,135 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1,512 ,099.20 $505,084 .00 $98 ,159.00 $2 ,115 ,342 .20
4/10/2012
Select Day Type
370
26
396
IAmount of Proposed Change Order $4,802.97 $60,011.56 ·$2,452.92 $62,361.61 30
Revised Contract Amount $1 ,516 ,902 .17 $565,095 .56 $95 ,706 .08
Original Funds Available for Change Orders $45 ,363 .00 $25 ,000 .00 $6 ,000 .00
Rema ining Funds Available for this CO $45 ,363 .00 $25,000 .00 $0 .00
Additional Funding (if necessary) $35 ,011 .56
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
$2 ,177,703 .81 426
$76 ,363 .00
$70 ,363 .00
$35 ,011 .56
3.39%
$2 ,632,759 .00
Items added but not in contract but required by TXDOT and inspected by State Inspector : Flowable fill and permanent asphalt with reinforced
concrete based placed in TXDOT section at Riverside Dr off Irma St. Other non State additions to the contract: No line item provided to
relocate water services that were in conflict with driveways, walks & curb ; Staking conflict encountered that required relocation of installed
hydrant in Irma St & Argyle ; Also added the following items : no line item provided in contract for Manhole extra depth adjustment located in
Montague ST A 9+ 72 & Ash Crescent ST A 31 +65 Montague Street ; there was no line item for 4" SOR 26 sewer used to bi-pass under water
main ; No line item for Temporary pavement for Storm Drain. Extra width permanent HMAC pavement for Storm Drain in Montague & Erath St.
due to existing HMAC and base in terrible shape ; No pay item for water service Meter/Box relocations & footage for installation of hand dug %"
copper ; No line item for Class C Meter Box & U Branch . All quantities are measured quantities to complete the project. Other contract
quantities were deleted that were not used .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Contractor's Compan Name Contractor Name Contract Si nature Date
McClendon Construction
Inspector/Inspection Supervisor . 1Date Project Manager/Program Manager Date
,,-, ..._ .. " ,I ·t./ ' ,'f ••-L • .,;;J...... ur ir,r,n,.. I/ j,,J, · '(.,.
Assistant Director (Dept) ' Date Director , Contracting Department (Dept) Date
Assistant City Attorney Date Ass istant Cfty ManaQer Date -,/ ~ , .... ~, ...: .. / ........-I .,_ ,,
Council Action if required)
M&C Number I ' -I I M&C Date Approved I '· I
\
:,.
'
\
\
FORT WORT H -----w---
Project Name
Client Project#
City of Fort Worth
Change Order Additions
2007 Critical Capital Projects Wtr , SS , Pav & Drng lmprv Distr ict 8 Group D
#00923
Project Description Water , San itary Sewer , Paving & Drainage Improvements --DOE# 6237
Contractor
City Project Mgr .
McClendon Construction
Kahl Jaafari
Change Order# 2
City Inspector Edward D'av ila
ADDITIONS
Change Order Additions Page 1 of 2
City Sec# 39700
Date 4/10/2012
TPW $21 ,976 .30
Water $64 ,834 .50
Sewer $3 ,759 .00
Sub l ota Add1t1ons ~~U ,ob~.tlU
Change Order Additions Page 2 of 2
FORT WORTH -----.--City of Fort Worth
Change Order Deletions
Project Name 2007 Critical Capital Projects Wtr , SS , Pav & Drng lmprv District 8 Group D City Sec# 39700
Client Project# #00923 ~----------------------------------------
Project Description
Contractor
City Project Mgr.
Water, Sanitary Sewer , Paving & Drainage Improvements --DOE# 6237
McClendon Construction Change Order# 2
Kahl Jaafari City Inspector Edward D'avila
DELETIONS
Change Order Deletions Page 1 of 2
Date 4/10/2012
1 8-1nch Sanitary Sewer (1-'Vli) Open Cut Sewer 43 .00 LF :j;Jo .UC :i;1 ,ouo.uu
b 4-inch PVC (::iUK-Jo) Sanitary Sewer I Sewer 74 .00 LF $13 .UC ;r>~OL .UU
!3 Concrete Manhole Collar ::;ewer 7.UU t:A :jib .UL ;f>JO .UU
9 iClass "B " (LOUU psi) t,;oncrete for M1 ::;ewer 10.00 \.,Y $1.UL :i;1u .uu
1U Class "E' (1ouu psi) Concrete for M1 Sewer 10.00 L;Y $1.UL :i;1u.uu
11 Washed Rock (1/2" to 1-1/l") for Mis Sewer 10.00 t.;Y $1 .UL :ji1U .UL
1L Crushed Limestone tor Misc . Placemen ::;ewer 10.UU vY $1 .UL :ji1U .UL
1J 12-inch I emp . HMAL; 1-'avement Repair ::;ewer 115 .uu Lt-$8.uu ;f>~LU .UU
10 HMAC Permanent Pavement Repair Sewer J8 .66 ::;y $12 .uu :ji4/0.~L
11:i Pre-Construction TV Inspection of Sa Sewer OU .UL LF $3 .UL :i;1ou .uu
1/ Post-Construction I v 1nspect1on of S '::iewer 49 .UU Lt· $2 .UU :ji8tl .UU
18 Exploratory t:xcavat1on (LJ-Hole) 1::;ewer 2.uu t:A :iiLUU.UU $4UU .uu
LU Cement Stao111zed Backfill of Sewer Sewer 1UU .UU LF $10 .00 :i;1 ,uuu .uu
L1 I Trench Safety System for ::;ewer Trenc !Sewer 158 .UU LF $1 .uu :ji1otl .UU
LL tl "LJIP Sewer Line 1::;ewer 6.UU u-$ /tl .UI,; $4btl .UU
TPW $17 ,173 .33
Water $4 ,822 .94
Sewer $6 ,211.92
Sub Total Deletions ;r>LO ,LU!:l .18
Change Order Deletions Page 2 of 2
' ...
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
PROJECT NAME :
PROJECT LIMITS:
BuySpeed No (T/PW):
Bu ySpeed No (Water):
City Project No :
Contra ct No :
D.O .E. No :
Attachm ent to Change Order No :
T od ay's Date :
Original Contract Amount:
Extra s to Date :
Credi ts to Date:
Contract Amount to Date :
PROJECT SUMMARY SHEET
(Change Order Attachment)
2007' CO's CD#8 Ne ighborhood Streets Group D
Morningside / Irma I Ash Crescent I Montague
CSC0-10-00060234
CSC0-10-00059813
009 23 ----CS3 97 00
6237 -------2 ----4/1 1/12
TOT AL T/PW
$ 2,106,20 7 .20 $ 1,512,09 9 .2 0
$ 9 ,135.00 $
$ $
$
$
$
Amount of Proposed Change Order:
$ 2, 115,342.20 $ 1 ,512,099 .20 $
$ 62,36 1.61 $ 4 ,802 .97 $
$ 2 ,177,703.81 $ 1,516 ,902.17 $ Revised Contract Amount:
Water
505 ,084 .00 $
$
$
505 ,084 .00 $
60 ,011 .56 $
565 ,095 .56 $
Sewer
89 ,024 .00
9 ,135.00
98 ,159.00
(2 ,452 .92)
95,706 .08
Contingency Funds Ava ll. for Admin . Change Orders : $
$
$
76,363.00 $
70,363.00 $
(35,01 1.56) $
45 ,36 3.00 $ 25 ,000 .00 $ 6 ,000.00
Remaining Funds Available for Change Orders : 45 ,36 3 .00 $ 25 ,000 .00 $
Additional Funding (if necessary): $ (35 ,011.56) $
Prepared By : Christy Ezernack T/PW Construction Services
" ....
. ,
PROJECT NAME:
PROJECT LIMITS :
BuySpeed No :
Contract No:
D.O .E . No:
Attachment to Change Order No :
Today's Date :
Original Contract Amount:
Extras to Date:
Credits to Date :
Contract Amount to Date:
Amount of Proposed Change Order:
Revised Contract Amount:
PROJECT SUMMARY SHEET
(Change Order Attachment)
2007 CO's CDS Neighborhood Streets Group D
Morningside, Irma, Ash, Cresent, Montague
CSC0-10-00060234
CS39700
6237
2
7/19/12
TOTAL TPW
$ 2,017,183.20 $1,512,099.20
$ $
$ $
$ 2,017,183.20 $ 1,512,099.20
$ 64,814.53 $ 4,802 .97
$ 2,081,997.73 $1 ,516 ,902.17
Water Sewer
$505,084.00 $89 ,024.00
$ $ 9 ,135.00
$ $
$505 ,084.00 $98 ,159 .00
$ 60,011 .56 $ (2,452 .92)
$565,095.56 $95 ,706 .08
Contingency Funds Avail. for Admin . Chang e Orders: $
$
$
70,363.00 $
70,363.00 $
35,011.56 $
45 ,363 .00 $ 25,000.00 $ 6 ,000 .00
45 ,363 .00 $ 25 ,000.00 $ Remaining Funds Available for Change Orders:
Additional Funding (if necessary): $ 35 ,011 .56 $
Prepared By : Karen Striker T/PW Business Services
)
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 7/17/2012
DATE: Tuesday, July 17, 2012 REFERENCE NO.: **C-25719
LOG NAME: 202007CO_DIST8_GRP 0_00923 CO2
SUBJECT:
Authorize Execution of Change Order No . 2 to City Secretary Contract No. 39700 with McClendon
Construction Company, Inc., in the Amount of $62 ,361 .61 for Pavement Reconstruction , Water and Sewer
Replacement on Portions of Ash Crescent Street, Irma Street, Montague Street and Morningside Drive for
a Total Revised Contract in the Amount of $2,177 ,703 .81 (COUNCIL DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No . 2 in the amount of
$62,361 .61 to City Secretary Contract No . 39700 with McClendon Construction Company, Inc ., revising
the total contract in the amount of $2,177,703 .81 for pavement reconstruction, water and sewer
replacement on portions of Ash Crescent Street, Irma Street, Montague Street and Morningside Drive .
DISCUSSION:
This project consists of pavement reconstruction, as well as water and sanitary sewer replacement in
portions of Ash Crescent Street, Irma Street, Montague Street and Morningside Drive.
This Change Order is due to the need to relocate several of the existing water meters . On Morningside
Drive, many of the existing water meters were designed to serve two customers . The Water Department
prefers that in those instances that instead of relocating the existing meter, two new meters be installed so
that each customer has their own meter. That type of replacement also requires changes to the water
service lines and the addition of new meter boxes. This work was not included in the original contract. ·
Funds for this change order are being paid from the Water Department funds and the 2007 Critical Capital
Program . This Street reconstruction results in the need to relocate several of the existing water meters.
The amount of $35,011 .56 in additional Water funds is all that is needed to cover this Change Order No . 2
due to other funds currently retained in the contract.
The net effect of the proposed Change Order is as follows :
TPW WATER SEWER TOTAL
Original Contract Amount $1,512,099 .20 $505,084 .00 $89,024 .00 $2,106 ,207 .20
Change Order No. 1 $ 0 .00 $ 0 .00 $ 9,135 .00 $ 9 ,135.00
Change Order No. 2 $ 4 ,802 .97 $ 60 ,011 .56 -$ 2.452 .92 $ 62 ,361 .61
Revised Contract Amount $1 ,516 ,902 .17 $565 ,095 .56 $95,706 .08 $2 ,177,703 .81
•
McClendon Construction Company , Inc ., agrees to maintain its in itial M/WBE commitment of 14 percent
that it made on the original contract and extend and maintain that same M/WBE commitment of 14 percent
to all prior change orders up to and inclusive of this Change Order No. 2 . Therefore , McClendon
Construction Company, Inc ., remains in compliance with the City 's M/WBE ordinance and attests to its
commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an
authorized representative of its company .
This project is located in COUNCIL DISTRICT 8, Mapsco 77M , 77R , 77T , 77U and 78X .
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, in the Water Capital Projects Fund and the 2007 Critical Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATIACHMENTS
FROM Fund/Account/Centers
P253 541200 608170092389
C295 541200 208400092389
Fernando Costa (6122)
Douglas W . Wiersig (7801)
Najib Fares (7802)
Khal Jaafari (7872)
1. 11. 202007CO Dist8 GRP D 00923 CO2 .PDF (CFW Internal)
2. 202007CO Dist8 Grp D 00923 CO2 Water FAR.pdf (CFW Internal)
3. C295 00923 Available funds .pdf (CFW Internal)
4 . Grp D Dist 8 Change Order#2 {00923)-McClendon Const MWBE APCF.pdf (CFW Internal)
5 . Map 202007CO DIST8 GRP D 00923 C02.pdf (Public)
6. P253-476045-601159990100 .doc (CFW Internal)
$35,011 .56
$4,802 .97