AMENDMENT NO. 2
STATE OF TEXAS CITY SECRETARY CONTRACT NO. ':f 0{~1--Pr~
(M&C Not Required)
COUNTY OF TARRANT 8
WHEREAS, the City of Fort Worth (City) and RJN Group, Inc.,
(Engineer) made and entered into City Secretary Contract No. 40121, (the
Contract) which was authorized by the City Council by M&C C-23914 on the
17th day of November 2009 and subsequently revised by one am.enchnent ; and
WHEREAS, the Contract involves professional services for the
following project:
Clear Fork Drainage Basin M-210 Sanitary Sewer Improvements .
WHEREAS, it has become necessary to execute Amendment No. 2 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Consultant,
their duly authorized representatives,
agreement which amends the Contract:
1.
acting herein by and through
enter into the following
Article I, of the Contract is amended to include the additional
professional services specified in a proposal letter dated August 15 ,
2011 , a copy of which is attached hereto and incorporated herein. The
cost to City for the additional services to be performed by Engineer
total $21,600.00 .
2 .
Arti cle II , of the Co ntract is amended t o provide for an i ncrease
in the maximum fee t o be paid to Consultant f o r a l l work and s ervic es
performed u n der the Contract, as amended , so that the tota l fee paid b y
the City for all work and services shall not exceed the sum o f
$546,005.00.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
-'\ p o '\:32 I N os -30 -1
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the 3C> day of
Tarrant County, Texas .
Marty Hendrix
City Secretary
AP. P~VAL ~~O~NDE~: / ~~v
S. Frank Crumb, P .E.
Director, Water Department
RJN GROUP, INC.
Engineer
By :~.J M ~
Name:H"ugh M. Kelso, Principal
12160 Abrams Road
Suite 400
Dallas, TX 75243
K ~=
~torney
LEGALITY :
-2 -
~..\--, 2011, in Fort Worth,
l NO M&C REQUIRED ]
APPROVED:
Fernando Costa
Assistant City Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Excellence throug h Ownersh i p
ATTN: Mr. David Cooper, P .E.
Fort Worth Water Department
City of Fort Worth
I 000 Throckmorton Street
Fort Worth, Texas 76102
RE: Contract Amendment No. 2
August 15 , 2011
Clear Fork Drainage Basin -M-210 Sanitary Sewer Improvements
City Project No . 010222 , City Secretary No. 40121
RJN Group File No. 18242500
Mr. Cooper:
~.rjn .c om
Please find attached, Contract Amendment No. 2 to the M-210 Sanitary Sewer Relocation
Project. This second amendment request specifically addresses the project related costs of
addressing the recent Texas Historic Commission 's (THC) request for an archeological
exploration of a portion of our M-210 Sewer Improvements -Part I Project Area.
During the federal permitting of this construction project, which statutorily requires a project
review by the THC, THC records research by THC Staff indicated an existing prehistoric
archeological site was located at the confluence of a tributary and the old Clear Fork channel west
of our project area near the Fort Worth Zoo parking lot. Becau se of this site, THC Staff viewed
that s ufficient justification exis ted for pursuit of this archeological investigation within our
project area under the National Historic Preservation Act (NHPA) and the Antiquities Code of
Texas (ACT).
Since our project includes constructing a new s anitary sewer main across the City 's Fore st Park
and then siphons under the Clear Fork of the Trinity River, an excavation pit for the river crossing
(tunneled) will be required. This tunnel access will be located g enerally in the vicinity of the
o ri g inal Clear Fork Trinity River which has been identified by the THC as an area of interest, thus
requiring the archeological exploration of the ramped "bore pit".
RJ Group, Inc is propos in g to retain Blanton & Ass oci ates, Inc . (B&A) to provide archeol og ic a l
con s ultin g servi ces in s uppo rt o f the C ity o f Fort W o rth 's Sewe r M a in M-2 10 Sewe r
Improvem e nt s -Part I Project in o rd er to address the THC 's arc heolog ical ex pl orati o n
requ iremen t associated w ith th is p roject. B&A is a certified M/WB E fi rm that is hi g hl y qua lifie d
and s pec ia li zes in cu ltura l and environmental pennitting con su lting se rvices .
B lanton & Assoc iates will pe r form the following genera l s ervices:
I. Pre pare a nd fi le fo r a Texas Antiquiti es Permit w hi c h is re quired unde r Ti tl e 13, Part II of
the T exa s Admini strative Code (T AC) pri o r to ini t ia tin g the s ite expl o ration.
www.rjn .com
Excellence through O w ner sh ip
2. Using up to 2 archeologists, B&A will monitor all excavation activities of the southern,
ramped bore pit which is approximately 60-ft by 15-ft in s ize and extends from the
ground to a depth of 26 feet. These investigations will adhere to THC s urvey standards,
as well as the guidelines of the Council of Texas Archeologists and the Secretary of the
Interior's Standards and Guidelines. The archeologists will be looking for thin lenses of
charcoal/carbonaceous matrix containing prehi storic bones and stone tool sa mples and if
found, these sa mples s hall be collected for radiocarbon dating.
3. Any a rcheological s ite discovered during fieldwork will be recorded on a Texas
Archeological Site Data Form, obtain an official State site number, and document the
horizontal and vertical extent of the identified cultural deposit discovered. Sites will be
evaluated for potential significance and eligibility for inclusion to the NRHP and
recommendation s for further archeological inve stigations. Other than radiocarbon
samples, no other collection of artifacts will be collected at this time. If a significant
discovery is made and THC recommends collection, this will be considered as additional
contract se rvices and require another amendment.
4. Following the completion of excavation monitoring, a draft report describing the results
of the inve stigation will be prepared by B&A and submitted to the THC for review and
comment. Review comments will be addressed and a final report submitted to the THC
per the requirements of the Antiquities Permit. Assuming no s ignificant cultural
resources are di scovered during the excavation monitoring, B&A will work to secure
rapid written approval from THC to release the M-210 project for immediate and
unre stricted construction while the archeological report is drafted , reviewed and finalized.
The field work associated with the effort is anticipated to take up to I week to complete. B&A
labor and expenses for the se rvices noted above will be billed both on a time and material and
unit price basis not to exceed, $17,000.00, without prior written a pproval. Radiological testing
associated with thi s exploration effort will be limited by the s ubcontracting budget established
and billed at a rate of $600 .00 per sa mple collected.
Since this matter has arisen , RJN has been actively engaged in the project planning, coordination
and response to the THC, City of Fort Worth , Tarrant Regional Water District (TRWD) and the
U.S. Army Corps of Engi neers (USACE). RJN has incurred other labor and expenses associated
with this matter, including costs for the preparation of a s ubcontracting agreement with B&A . As
such, RJN is seeki ng funds to recover those costs as well as funding for B&A 's contract
administration in the a m ou nt of a ten (10%) percent s ubcontracting mark-up.
Contract Amendment o . 2 costs are as s hown in the table below:
A me11dment Item Descriptio.n Quantities Unit Prices Total Cost
1. Arc lteological Monitoring Services by B&A, Inc. (includes
radiocarbon dating unit costs of $600/sam pie collected)
2. RJN Subcontractor 10% mark-up:
3. RJN costs associated with Archeological Exploration efforts:
(Avg.)
$ 17,000.00
$ l,700.00
$2,900.00
www.rjn .com
Ex cellenc e thro u gh Ownersh ip
labor costs: /6 Hr s
0.5 Hr s
$175/hr
$ 100/hr
$ 2,800.00
$ 50.00
S ubtotal RJN Labor & Ex p ense Cos ts: /6.5 Hrs $ 50.00 $ 2,900.00
Total Amendment No. 2 Fee Request: $21,600.00
Therefore, a s ummary breakdown of Amendment No. 2 compensation is as fo ll ows:
Labor Expenses
RJN Group, [nc .: $4 ,550.00 $50.00
B&A, Inc . (Certifi e d M/WBE):
Amendment No. 2 Total:
TOTAL
$ 4,600 .00
$17,000 .00
$21,600.00
The $17 ,000 .00 in M/WB E services represents approximately a se venty-nine percent (7 8 .70%)
participation level in the project a ss ociated with Amendment No. 2. Overall , Amendment No. 2
represe nts more than a 4 percent ( 4 .12 %) increase in the total contract value to date.
For yo ur convenience, a s ummary o f the total project fees are as follows:
Contract Item Fee
Original Contract Amount $ 432 ,39 6 .00
Amendment No. l $ 92,009.00
Amendment No . 2 $ 21,600.00
Amended Contract Value $ 546,005.00
Please do not he sitate to contact us s hould yo u have ques tions or need any background
information concerning thi s matter. Thank yo u for yo ur time and consideration.
S in cere ly ,
C hris Brooks, P .E.,
Senior Project Manage r
ATTAC HM EN TS
CC: To ny Shol o la , P .E., F WWD, City o f Fo rt Wo rth
Hugh Ke lso , Regiona l Manag er-Vice Pres ident, RJN Group
Peter Lai , Vice President, RJN Group