Loading...
HomeMy WebLinkAboutContract 40121-A6' :::0 n, • CITY SECRETARY 11 coNTRACT No. ,c1z1-A t e AMENDMENT No. 6 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and RJN Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 40121, (the CONTRACT) which was authorized by M&C C-24176 on the 13th day of April, 2010 in the amount of $432,396.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $92,009.00 which was authorized by M&C C-24999 on July 12, 2011, Amendment No. 2 in the amount of $21,600.00 which was administratively authorized on August 30, 2011, Amendment No. 3 in the amount of $23,388.50 which was administratively authorized on October 14, 2011, Amendment No.4 in the amount of $237,678.50 which was authorized by M&C C-25433 on February 14, 2012, and Amendment No. 5 in the amount of $45,750.00 which was administratively authorized on April 8, 2013; and WHEREAS, the CONTRACT involves engineering services for the following project: Clear Fork Drainage Basin M-210 Sanitary Sewer Improvements ; and WHEREAS, it has become necessary to execute Amendment No. 6 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. n n, Article I of the CONTRACT is amended to include the additional ~ engineering services specified in a proposal dated April 14, 2014, a copy c:, of which is attached hereto and incorporated herein. The cost to City ~ for the additional design services to be performed by Engineer totals -< ~ $42,445.00 . c.:, N ~ 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $895,297.00. Page -1- OFFICIAL RECORD CIT Y SECRETARY FT. WORTH, TX j 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: ~' S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: ~Black Assistant City Attorney Page -2- ENGINEER RJN9:Inc. Peter Lai, P.E. Vice President DATE: M&C: N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX { • rJn group www.rjn .com Exce lle n ce t h rou gh O w nersh ip Mr. Robert Sauceda, P.E. Project Manager Fort Worth Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Contract Amendment No. 6 April 14, 2014 Clear Fork Drainage Basin -M-210 Sanitary Sewer Relocation City Project No. 010222, City Secretary No. 40121 RJN Group File No. 18242500 ATTN: Mr. Sauceda: Please find attached the Contract Amendment No. 6 request to the M-210 Sanitary Sewer Relocation Project. This amendment request is seeking to recover labor and expenses associated with the significant amount of additional design services on Part 3 and services during construction (SDC) performed on Parts 2 and 3 from August through December 2013. Each of these amendment cost centers will be discussed in greater detail in the amendment summaries shown below. M-210 PART 3 -DESIGN AND CONSTRUCTION PHASE SERVICES -EXTRA WORK During the reporting periods noted above, RJN produced and issued new design drawings associated w ith the construction of a realigned M-210 and Country Club service line to accommodate the new Tennis Center. This also included the need to redesign the plans to account for completely trenchless construction using tunneling and HDD due to site inaccessibility for traditional construction equipment. RJN was also asked by the City to design the realignment of the 8-inch waterline in Country Club Circle (approximately 1,800 LF) to the western side of the street and across the southern Colonial Parkway intersection. The production of these new designs required extensive site and technic al coordination during the design and during the construction of these improvements. More specifically, these amendment item efforts included: l. M-210 and Colonial Clubhouse Service Re -ro ute Preliminary Designs to accommodate the new Tennis Center Building Improvements (Task 3.lF). RJN closely coordinated with the Co lonial staff on moving the existing public and private sewer systems to accommodate their new facilities while conforming to future system improvement plans for the overall private system improvements plan for the Colonial Country Club (CCC). Preliminary design plans were produced for these improvements. RJN's staff hours , labor and expense costs incurred to perform thi s item are shown in the summary cost table below. • ,,. ' "\ rJn group www.rjn.com Exce l lence throug h O wnership 2. M-210 and Colonial Clubhouse Service Re-route Final Designs to accommodate the new Tennis Center Building Improvements (Task 4.2G). RJN closely coordinated with the Colonial staff on final adjustments to the design plans that moved the existing public and private sewer systems . Final design plans and a cost estimate produced for these improvements. RJN also reviewed the Contractor's submitted change order to Part 3 for performing this additional work. RJN's staff hours, labor and expense costs incurred to perform this item are shown in the summary cost table below. 3 . Redesign of the M-210 and Colonial Clubhouse Service Re-route Final Design Plans to accommodate construction of the new Tennis Center Building Improvements by trenchless means using tunneling and HOD. (Task 4.2H). Due to construction equipment inaccessibility to the site (none of their bridges could hold the equipment's weight), the City directed RJN revised the design plans to be constructed completely by trenchless means. RJN again closely coordinated with the Colonial staff on the design plans and construction access. Final REVISED design plans another cost estimate were produced for these improvements. RJN again reviewed the Contractor's revised change order to Part 3 for performing this additional work. RJN' s staff hours, labor and expense costs incurred to perform this item are shown in the summary cost table below. 4. City Staff requested redesign of the M-210 Part 3, Country Club Circle 8-inch water line. (Task 4.21). Due local resident's concerns, City staff directed RJN to realign the proposed water line by moving it to the western side of the street and extending it beyond the Colonial Parkway intersection. RJN closely coordinated with the Colonial staff on these revised design plans and its constructability with limited adverse impacts to the neighborhood and country club activities. Final REVISED design plans another cost estimate were produced for these improvements. RJN's staff hours , labor and expense costs incurred to perform this item are shown in the summary cost table below. 5. M-210 Part 3 -Supplemental Site Visits, Technical Assistance and Additional Record Drawings Production for the new M-210 Re-route design on the Colonial Country Club Property (Task 6.lG): Due to the M-210 and service re-route design being added to the scope of work; the re-design to change to tunneling construction on site; the realignment of the proposed 8-inch water line in Country Club Circle; and traffic control & public event coordination activities along the Part 3 project area, a large number of unbudgeted site visits and coordination time was required to be made. RJN's staff hours, labor and expense costs incurred to perform this item are shown in the summary cost table below. 6701 Brentwood Stair Road , Suite 100W • Fort Worth , TX 76112-3363 • 817.451.3500 • fax 817.451 .3506 .. • rJn gr oup www.rjn .com Excell ence th rough O wnersh ip A summary of RJN's anticipated staff hours, labor and ex penses that are requested for the work items noted above are shown in the table below : Task Description Hours Labor($) Expenses Total Costs No. ($) ($) PRELIMINARY DESIGN SERVICES: 3 .lF M-210 and Colonial 97 $12,670.00 $ 75.00 $12,745.00 Clubhouse Service Re-route - PRELIM. PLANS Subtotals: 97 $12,670.00 $ 75.00 $ 12,745.00 FINAL DESIGN SERVICES: 4.2G M-210 and Colonial 46 $ 5,880.00 $ $ 5,955 .00 Clubhouse Service Re-route -75.00 FINAL PLANS 4.2H M-210 and Colonial 32 $ 4 ,500 .00 $ $ 4 ,555 .00 Clubhouse Service Re-route -55 .00 REDESIGNED FINAL TRENCHLESS PLANS 4.2I M-210 Part 3 -Country Club 120 $14,940 .00 $ $ 14 ,995.00 Circle 8-inch Waterline 55.00 Realignment -REDESIGNED FINAL PLANS Subtotals: 198 $25,320.00 $ 185.00 $25,505.00 CONSTRUCTION PHASE SERVICES: 6.lG Construction Support -Extra 26 $ 4 ,120.00 $ 75 .00 $ 4 ,195.00 Site Visits ; Technical A ssi stance & Public Events Coordination Subtotals: 26 $ 4,120.00 $ 75.00 $ 4,195.00 TOTALS: 321 $ 42,110.00 $ 335.00 $ 42,445.00 Therefore, we are requesting revi sed Contract Amendment No . 6 to the M-210 Sanitary Sewer R elief Main A greement in the amount of $42,445.00. There are no n ew servic es required to b e p erformed by cettified M/WBE firm as soci ated with thi s amendment request. Contract Amendment No. 6 repres ents approximately a five perc ent (4.98 %) increase in the total contract value. 6701 Brentwood Stair Road , Su~e 100W • Fort Worth, TX 76112-3363 • 817.451.3500 • fax 817.451.3506 .. • rJn group www.rjn .com Ex cellence throu g h O w n e rs hip For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 432,396.00 Amendment No. 1 $ 92,009.00 Amendment No. 2 $ 21,600.00 Amendment No . 3 $ 23,388.50 Amendment No . 4 $ 237,678.50 Amendment No. SR $ 45,750.00 Amendment No. 6 $ 42,445.00 Amended Contract Value $ 895,267.00 Please do not hesitate to contact us should you have questions or need any background information concerning this matter. Thank you for your time and consideration. Sincerely , Chris Brooks, P.E., Senior Project Manager ATTACHMENTS CC: Tony Sholola, P.E., FWWD, City ofFort Worth Hugh Kelso , Regional Manager-Vice President, RJN Group Peter Lai, Vice Pre s id ent, RJN Group 6701 Brentwood Stair Road , Suite 100W • Fort Worth , TX 76112-3363 • 817.451 .3500 • fax 817.451 .3506