HomeMy WebLinkAboutContract 40124-A1AMENDMENT NO. Amendment No . 1
STATE OF TEXAS
COUNTY OF TARRANT 8
CITY SECRETARY CONTRACT NO. i::0 1 d:-<{-Al
(No M&C Needed)
WHEREAS, the City of Fort Worth (City) and DeOtte, Inc. ,
(Engineer) made and entered into City Secretary Contract No.
40124, (the Contract) which was executed administratively by the
City Manager on the 26th day of April 2010; and
WHEREAS, the Contract involves engineering services for the
following project:
Meadowbrook Golf Course Drainage Improvements, Project No. 01701
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated March 17, 2011, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $8,500.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of 33,466.00.
City of Fort Worth , Texas
Amendment to Engineering Agreement
PMO Official Release Date : 10 .01 .2010
Page 1 of 2
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the
Worth, Tarrant County, Texas .
APPROVAL RECOMMENDED :
d Zavala Director ,
Parks and Community Services
Department
DeOtte, Inc .
ENGINEER
::-e-:----~--1--a_y_t_o .... :-~-T--. -tf--d-i_,n,..g~--e--r-,-w-P-.-E-.-------
Vice President
2553 East Loop 820 North
Fort Worth , Texas 76118
Assistant City Attorney
City of Fort Wort h, Texas
A mendment to Engineering Ag reement
PMO Official Re lease Date : 6.18 .201 O
Page 2 of 2
2011, in Fort
I NO M&C ~EQ UIRED I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
,,
Dn0TTE, I C. CIVIL ENGINEERING
Marc h 17 , 2011
FROM:
Clayton T . Redinger
Vice President
DeOtte, Inc.
2553 E Loop 820 N
Fort Worth, Texas 76051
T O :
Carlos Gonzalez
Fort Worth Parks and Community Services Department
Project Manager
4200 South Freeway, Suite 2200
Fort Worth, Texas 76115-1499
SU BJ E CT: AM ENDMEN T 1; 2010 EROSION CONT ROL IMPROVEMEN T S F OR
MEADOWBROOK GOLF CO U RSE (DOI# 2009115-00)
The following information is provided as supporting documentation for the approval of amendment
1 to the subject project. DeOtte, Inc. was requested to provide cost information for a revision to the
construction plans to convert the design from a Gabion Wall design to the RediRock Wall design.
In order to complete the design revision, a Geotechnical Study and Report will be required to
complete the s tructural design of the proposal wall. Additionally, the plan, profile and cross sections
contained within the civil plans will need to be revised to show the la yout of the proposed wall which
complies with RediRock dimensions . The following is a breakdown of the fees associated with this
amendment:
Geotechnical Study and Report
Engineering Design Revision
TOTAL:
$3 ,500.00
$5,000.00
$8 ,500.00
The geotechnical report and study will be subcontracted to CMJ Engineering. There is no MWBE
work associated with this amendment.
If you have any questions or need additional information, please feel free to contact me.
817 .589.0000 or clanonredinger@deotte.com
Sincerely,
DeOtte, Inc.
67~,z_.
Clayto n T ~ger