HomeMy WebLinkAboutContract 40169-CO3,
'
z
N
'::t
0
a..
N
I
00
I
'<j-
0
---...
FORT WORTH • City of Fort Wor ... -______ _
Change Order Request
Project Name! Medical District Water Distribution System Improvements , Part 4 I City /APRol ._~_4_b~_6_9 ____ ....... I -.
Project No .(s)jP265-60910024787 and P275-709170024787 DOE No . .-I -6-2-88----.
Project Description Installation of a 30/42 inch water main from South Holly Water Treatment Plant to the
main from IH30/15th Street intersection souther! 1,580 ft .
0 inch sewer
Contractor! Oscar Renda Contracting , Inc. Change Order# 1~_3_~ Date: !4/11/2012
City Project Mgr.,_! _L_ia_m_C_o_n_lon ___________ _,
Phone Number: I 817 -392-6824
City Inspector I Raymond Brice
Phone Number : I 817 -392-8452
Dept. Water Sewer
Original Contract Amount $4 ,433 ,920 .00 $1 ,006 ,385 .00
Extras to Date $155 ,000.00 $226 ,988 .10
Credits to Date $5 ,977.30
Pending Change Orders (in M&C Process)
Contract Cost to Date $4,582,942.70 $1,233,373.10
IAmount of Proposed Change Order $210,124.22
Revised Contract Amount $4 ,582,942.70 $1,443,497.32
Original Funds Available for Change Orders $133 ,000 .00 $31 ,000 .00
Remaining Funds Available for this CO
Additional Funding (if necessary) $210,124.22
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
Change Order No. 3 will provide compensation for the following:
Totals
$5,440,305.00
$381,988 .10
$5,977.30
$5,816,315.80
$210,124.22
$6,026,440.02
$164,000.00
$210,124.22
Contract Time
(Calendar days)
540
540
035
575
• Additional effort expended to install a project sewer main 30 feet deep (instead of 10 feet) in order
to connect to an existing sewer main that was encountered at a different elevation thi n depicted
~
on existing City records .
FORT WORTH City of Fort Worth
Change Order Additions • Medical District Water Distribution System Improvements , Part 4
P265-60910024787 and P275-709170024787
City Sec No . 40169
DOE No I 6288 I City Pro . No. 00247
Project Name
Project No .(s)
Project
Description
Installation of a 30/42 inch water ma in from South Holly Water Treatment Plant to the Medical District and 30 inch sewer main from
IH30 /15th Street intersection southerly 1,580 ft.
Contractor Oscar Renda Contracting , Inc . Change Order# [TI Date : I 4/11 /2012
City Project Mgr . Liam Conlon ~-----------------' City Inspector Raymond Brice
ADDITIONS
II ~Ill ·11UN Ot:t'I UIV Unit Unit Cost Total
1 t-'1pe-~ewer jU-mcn ((jy upen c.;ut) Sewer 449 .00 LF $200 .00 $89 ,800 .00
55 Sewer Line H Extension Additional Cost Sewer 1.00 LS $79 ,085 .22 $79 ,085.22
56 30" Sewer Remove and Replace w/bypass pumping on 15th St. Sewer 1.00 LS $25 ,685 .00 $25 ,685 .00
57 18" Sanitary Sewer Pipe w/Cement Stabilized Backfill Sewer 213.00 LF $296.00 $63 ,048.00
Water
Sewer $257 ,618 .22
Additions Sub Total $257 ,618 .22
Page 2 of 4
"' FORTVVORTH • City of Fort Worth
Change Order Deletions
Project Name!' -M-e-di-ca-1 -Di-st-ric_t _W-at-er-D-is-tr-ib-ut-io-n -Sy-s-te-m-lm-p-ro-v-em_e_n-ts-, P_a_rt_4 ______ __, City Sec No. 40169
00247 Project No.(s) I P265-60910024787 and P275-709170024787 I DOE No . 6288 City Pro . No . :===============================-------======--.....:......------===:::;----'
Project Description Installation of a 30/42 inch water main from South Holly Water Treatment Plant to the Medical District and 30 inch
sewer main from IH30/15th Street intersection souther! 1 580 ft .
Contractor Oscar Renda Contracting , Inc. Change Order #j 3 I Date I 4/11/2012
City Project Mgr. Liam Conlon .__ ___________ ___. City Inspector Raymond Brice
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
4 Pipe-Sewer-12 lnch(Vitrified Clay) Sewer 50.00 LF $390 .00
5 Pipe -Sewer-18 Inch SDR-26(AII Depth) Sewer 5.00 LF $180 .00
6 Pipe-Sewer-10 Inch SDR-26(AII Depth) Sewer 30 .00 LF $70 .00
10 Pipe-Sewer-6 Inch SDR-26(AII Depth) Sewer 8.00 LF $57 .00
12 Concrete-Encasement(Concrete Stabilized) Sewer 34.00 LF $25 .00
13 Manhole-Std 4-foot Diam . -0-6 foot Sewer 1.00 EA $1 ,500 .00
14 Manhole-Std 4-foot Diam . -0-6 foot Added Depth Sewer 12 .00 VF $100.00
16 Manhole-Drop-Std 4-foot Diam. Added Depth Sewer 5.00 VF $100 .00
26 Collar-Manhole(Per Item D-27) Sewer 8.00 EA $200 .00
28 Manhole-Vacuum Test( Sanitary Sewer) Sewer 6.00 EA $200.00
33 Curb and Gutter-Replacement Sewer 30 .00 LF $30 .00
35 Driveway( Sidewalk, or Parking lot) Sewer 2966 .00 SF $3 .00
38 Concrete-Type B for Miscellaneous Sewer 10.00 CY $40.00
39 Concrete-Type E for Miscellaneous Sewer 10.00 CY $45.00
43 Pipe -Pressure-Abandon( Existing) Sewer 1020.00 LF $2.00
49 Structure( Retaining Wall near Line) Sewer 1.00 LS $5 ,000 .00
Water
Sewer
Page 3 of 4 Deletions Sub Total
$19 ,500.00
$900.00
$2 ,100 .00
$456 .00
$850 .00
$1 ,500 .00
$1 ,200.00
$500 .00
$1 ,600 .00
$1 ,200 .00
$900 .00
$8 ,898 .00
$400 .00
$450 .00
$2 ,040 .00
$5 ,000 .00
$47,494 .00
$47,494.00
M/WBE Breakdown for this Change Order
MWBESub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
M&CReview Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA FORT WORTH
~
COUNCIL ACTION: Approved on 4/10/2012
DATE:
CODE:
4/10/2012
C
REFERENCE NO.: **C-25552
TYPE: CONSENT
LOG NAME:
PUBLIC
HEARING:
60MEDP4C03-RENDA
NO
SUBJECT: Authorize Execution of Change Order No . 3 to City Secretary Contract No . 40169 with
Oscar Renda Contracting , Inc., in the Amount of $210 ,124.22 for a Total Contract
Amount of $6 ,026 ,440.02 for Medical District Water Distribution System Improvements ,
Part 4 from South Holly Water Treatment Plant to the Medical District (COUNCIL
DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No . 3 to City Secretary
Contract No . 40169 with Oscar Renda Contracting, Inc., in the amount of $210,124 .22 for Medical
District Water Distribution System Improvements, Part 4 from South Holly Water Treatment Plant to
the Medical District, thereby increasing the contract amount to $6 ,026 ,440.02 .
DISCUSSION:
On April 6, 2010 , (M&C C-24164) the City Council authorized a contract in the amount of
$5,440 ,305.00 with Oscar Renda Contracting , Inc., for Medical District Water Distribution System
Improvements, Part 4 from South Holly Water Treatment Plant to the Medical District.
The contract was subsequently revised by two change orders with a net total of $376,010 .80 that are
further described as follows :
Change Order No. 1 (M&C C-24735), February 15, 2011, in the amount of $381,988.10.
Change Order No. 2 with a credit of $5,977.30 administratively approved by the City Manager on
February 22, 2012.
This Mayor and Council Communication will authorize the execution of Change Order No . 3 to
provide compensation for the following :
Additional effort expended to install a project sewer main 30 feet deep (instead of 10 feet) in order
to connect to an existing sewer main that was encountered at a different elevation than depicted
on existing City records.
The removal and replacement of a segment of an existing 30 inch sewer main that was
encountered in direct conflict with a project 36 inch water main on 15th Street.
The replacement of a segment of the existing 18 inch sewer main located on Peter Smith Road in
order to eliminate a swag and provide positive sewage flow.
Increased pay item quantity of 30 inch sewer p i pe that was necessary to complete the project.
M/WBE -Oscar Renda Contracting , Inc ., is in compliance with the City's M/WBE Ordinance by
committing to an additional 19 percent M/WBE participation on the Change Order No. 3.
This project is located in COUNCIL DISTRICT 9.
http://apps.cfwnet.org/council_packet/mc _review.asp?ID= 1665 5&councildate=4/10/2012 4/11/2012
,. , , -M&C Review Page 2 of2
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget , as appropriated , of the Sewer Capital Projects Fund.
TO Fund/Account/Centers
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
60MEDP4C03-RENDA MAP 1.pdf
60MEDP4C03-RENDA MAP 2.pdf
FROM Fund/Account/Centers
P265 541200 609140024787 $210,124.22
Fernando Costa (6122)
S. Frank Crumb (8207)
Liam Conlon (6824)
http://apps.cfwnet.org/council _packet/me _re v iew.asp?ID = 1665 5&councildate=4/10/2012 4/11 /2012