Loading...
HomeMy WebLinkAboutContract 40241-CO2#,, OlSffl18UTION· WkiTE-FILE CITY SECRETARY , JO'Z '-i I/ (01- CITY OF FORT WORTH CONTRACT NO. _JW!.::~---- CHANGE ORDER REQUEST CANARY -CONSTRUCTION SERVICES PINK -PRO.IEC]" MANAGER GO<.OENROO . CONTRACTOR l CHANGE ORDER NI I DATE 2 02 I 08 I 2011 PROJECT DE;:,1.,RIPTION I PROJECT Ni GR76-541200-006302393830 HYDE PARK TRANSIT PLAZA & NINTH STREET IMPROVEMENTS D.0 .E. N!I 5285 <.;ITV :;EC NI 40241 HYDE PARK TRAFFIC SIGNAL NINTH STREET $ 1 ,127,031 .90 $ TOTALS $ 2,611,672.61 $ 62 ,778 .50 ORIGINAL CONTRACT AMOUNT ................................................................... . $ 1,380,468.60 $ EXTRAS TO DATE .......................................................................... . $ 62,778 .50 $ CREDITS TO DATE ......................................................................... . $ $ CONTRACT COST TO DATE ........................................................................... . $ 1,443,247.10 $ AMOUNT OF PROPOSED CHANGE ORDER ................................................. . $ 80 ,885.93 $ REVISED CONTRACT AMOUNT ..................................................................... . $ 1 ,524,133 .03 $ ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS .............................. . $ 148,464.00 $ REMAINING FUNDS AVAILABLE FOR THIS CHANGE ORDER .................... . $ 85,685.50 $ ADDITIONAL FUNDING (IF NECESSARY) ...................................................... . $ $ CHANGE ORDERS TO DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT COST MAX. ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) ITEM DESCRIPTION -ADDITIONS DEPARTMENT QTY 130 . STORM DRAIN JUNCTION BOX-4' X 4' REMOVE & REPLAC NINTH STREET 1.00 131. 12" X 12" AREA DRAINS IN WALK (5) INSTALLED NINTH STREET 1.00 132. SOLAR POWERED IRRIGATION CONTROLLER-UPGRADE NINTH STREET 1.00 133. 12" X 12" AREA DRAINS IN WALK (3) INSTALLED (PARK) HYDE PARK 1.00 134. MARBLE BENCHES-REMOVE , STORE & REINSTALL HYDE PARK 1.00 135. FOUNTA IN ELECTRICAL & PLUMBING REPAIR-HYDE PARI HYDE PARK 1.00 136 . UPGRADE FROM S INGLE PHASE TO 3 PHASE IN PARK HYDE PARK 1.00 137 . GFCI RECEPTICALES (4 ) INSTALL-CONDUIT REPAIR30' HYDE PARK 1.00 138. CONVENTION CENTER ADDITIONAL SIDEWALK REMOVAL NINTH STREET 243 .3 139. ADDITIONAL PAVEMENT DEMO IN STREET NINTH STREET 267.3 140. ADDITIONAL 4" S IDEWALK REMOVAL NINTH STREET 133.4 3 141 . DEMO & BACKFILL NORTH SIDE OF LIBRARY BASEMENT HYDE PARK 1.00 142 . EMON DMON METER FOR BUS SHELTERS-INSTALLED HYDE PARK 1.00 14 3. TEMPORARY TRAFFIC TABS-YELLOW-I NSTALLED NINTH STREET 1.00 144. MAMBO'S SIGN FOOTING REMOVAL-CONCRETE & P IPE HYDE PARK 1.00 . . ITEM DESCRIPTION -DELETIONS Q!Y A CONTR ACTOR'S NAME: THE FAIN GROUP ORIGINAL CONTRACT TIME 104,172.11 104,172.11 104,172.11 UNIT LS $ LS $ LS $ LS $ LS $ LS $ LS $ LS $ IJ..q SY$ ~ SY $ SY$ LS $ LS $ LS $ LS $ $ $ s $ $ $ s $ $ 1,127,031.90 33,044.72 1,160,076 .62 112,703.00 112,703.00 UNIT COST 4 ,825.40 $ 8 ,325 .31 $ 1,532.97 $ 3,629.63 $ 1,000.00 $ 4 ,953.00 $ 964 .07 $ 3,320.12 $ 25.00 $ 32 .00 $ 21 .00 $ 65 ,424.00 $ 1,095.11 $ 920.00 $ 500 .00 $ . $ . $ HYDE PARK $ TRAFFIC SIGNAL $ NINTH STREET $ SUBTOTAL A $ UNIT UNIT COST $ $ HYDE PARK $ TRAFFIC SIGNAL $ NINTH STREET $ SUBTOTAL B $ s $ $ $ 2,674 ,451 .11 113,930.65 2,788 ,381 .76 % 2.40 $ 3,264,590.76 TOTAL 4 ,825.40 8 ,325 .31 1,532 .97 3,629.63 1,000 .00 4 ,953.00 964 .07 3,320 .12 6 ,084 .23 8 ,554.72 2 ,802 .09 65,424 .00 1,095 .1 1 920 .00 500 .00 . . 80,885.93 . 33,044.72 113,930.65 TOTAL OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX DATE: 02/08/2011 TRANSPORTATION AND PUBLIC WORKS CHANGE ORDER JUSTIFICATION RECORD AND PROJECT SUMMARY SHEET PROJECT NAME: HYDE PARK TRANSIT PLAZA & NINTH STREET IMPROVEMENTS CHANGE ORDER N2 : 2 INSPECTOR: MIKE MYERS D.O .E. NQ : 5285/5276 CLIENT PROJECT N2 : GR76-541200-006302393830 PROJECT MANAGER: BECKY PILS ORIG INAL CONTRACT AMOUNT EXTRAS TO DATE CREDITS TO DATE ORIGINAL AMOUNT TO DATE AMOUNT OF PROPOSED CHANGE ORDER REVISED CONTRACT AMOUNT ORIG . CONTINGENCY FUNDS AVAILABLE FOR CHANGE ORDERS REMA INING FUNDS AVAILABLE FOR THIS CHANGE ORDER ADDITIONAL FUNDING (IF NECESSARY) REASON(S) FOR CHANGE ORDER: Please see attached sheet $ $ $ $ $ $ $ $ $ PHONE N!!: 817-480-4451 PHONE N2 : 817-392-7645 COMBINED HYDE PARK 2 ,611 ,672.61 $ 1,380 ,468.60 62 ,778 .50 $ 62 ,778.50 $ 2 ,674 ,451.11 $ 1,443 ,247 .10 113 ,930 .65 $ 80,885 .93 2,788 ,381 .76 $ 1,524 ,133 .03 261 ,167.00 $ 148,464.00 198 ,388 .50 $ 85,685 .50 $ CITY SECRET ARY N2 : 40241 TRAFFIC SIGNAL NINTH STREET $ 104 ,172 .11 $ 1,127 ,031 .90 $ $ $ $ $ 104 ,172 .11 $ 1,127,031 .90 $ $ 33 ,044 .72 $ 104 ,172 .11 $ 1 ,160,076 .62 $ $ 112,703.00 $ $ 112 ,703 .00 $ $ Hyde Park Transit Plaza DOE 5285/Ninth Street Improvements DOE 5276 Justifications for Change Order 2 Item 130 -In September 2010 the condition of the storm drain junction box in the intersection of Ninth Street and Commerce Street after it was excavated was so poor that it could not be tied to a new drain line. The existing junction box had to be demolished and a new reinforced concrete box reconstructed in place at a cost of $4,825.40. Item 131 -After curbs were moved in on Ninth Street to increase the walkway widths, field surveys found that storm water would not fully drain from adjacent property and flood the walkway in two locations . One additional storm drop inlet is needed to drain the alley between Houston and Main Streets, and four more inlets will drain the sidewalk area adjacent to the parking lot on the north side of Ninth between Commerce and Calhoun. The total cost for this work is $8,325 .31. Item 132 -The proposed irrigation controller at Ninth and Main Streets was designed to be powered by connecting to an existing electrical box in General Worth Square. The box did not contain the proper electrical qualities, and the nearest alternative connection point is several hundred feet across the square . To avoid the long run of wiring traveling under several paved areas, a solar power controller is recommended . The cost to exchange the controllers and modify some irrigation valves to accommodate the solar controller is $1,532.57 . Item 133 -In November 2010 it was found that new walkways built to existing elevations in Hyde Park near the Flatiron Building wou ld have resulted in water being directed toward the building doorway and basement openings during rainfall events. Grading the walkways away from the building and placing three drop storm inlets in low spots are required to avoid possible water damage to the building and standing water on the walkway. The total cost for the new storm drain inlets is $3,629.63 . Item 134 -Two existing marble benches that were constructed with the Panther Fountain were not shown on the contract documents. In order to preserve the benches and integrate them into the new improvements, the benches and bases require moving to a secure location on site and replaced into the new Hyde Park layout. The total cost for this work is $1,000.00. Item 135 -The contractor was directed by the plans to demolish the existing concrete walkways in Hyde Park in preparation for the new architectural walkway construction . As demolition progressed in June 2010 the Panther Fountain plumbing and electrical circuits were found to be cast i nto the concrete that was demol is hed . Replacement piping, conduit and electrical circuits are needed to restore the operation of the fountain . The total cost for this work is $4 ,9 53 .00 . Item 136 -The electrical power service to the Hyde Park area was designed to handle single phase 100 amp power. Oncor only delivers three phase power to the downtown area . The total cost to substitute the service hardware, increase the conduit size and provide additional wiring is $994.07. Item 137 -All of the existing planters on Throckmorton have electrical receptacles for maintenance and tree ligh ting purposes. A receptacle in each of the four new plan ters on Throckmorton is required, but not included in the plans. Also a pavement embedded street lighting circuit was damaged during demolition . A new 1-1/4 inch conduit is required to replace the damaged one . The total cost for this work is $3 ,320 .12 . Item 138 -An additional 243 square yards of walkway pavement in front of the Convention Center is required to be removed due to excessive cracking and displacement . The removal operation at that location requires special equipment because of its large distance from the curb . The total cost of the work is $6 ,084 .23 . Item 139 -After Ninth Street was milled in December 2010, an assessment of the hidden underlying pavement was made . Approximately 267 square yards of pavement in several locations in Ninth Street are deemed unsound and is required to be demolished and removed before replacement. The cost for this demolition and removal is $8,554.72 . Item 140 -At a number of locations along Ninth and Throckmorton Streets sidewalk grades adjacent to the project limits have to be modified to comply with the Americans with Disabilities Act and storm drainage needs . Slopes on pathways are required to be constructed within maximum and minimum standards . Demolition of 133 square yards of sidewalk pavement is necessary for compliance . The total cost of this work is $2 ,802 .09 . Item 141-In Change Order No . 1 one thousand cubic yards of former library basement rubble was excavated and backfilled to allow construction of the Ninth Street/Throckmorton intersection . When work resumed in Hyde Park north of Ninth Street in November 2010, the north portion of the basement was discovered after the remainder of parking lot was demolished . Excavation of 1600 cubic yards of rubble, partial wall demolition and backfilling with common fill soil are required to construct planting areas, place walkways and plant trees . The total cost of the excavation and wall removal is $65,424.00 . Item 142 -The two bus passenger shelters are served with electrical power through the Hyde Park service connection. To determine The T's share of power costs, a sub-meter is needed to be installed in the park electrical circuitry . The cost for furnishing and installing this meter is $1,095 .11. Item 143 -In January 2011 during an inspection after traffic was restored on Ninth Street, the bus turning paths were found to cross over pavement markings at Jones Street, Houston Street and Throckmorton Street intersections. Prior to applying permanent pavement markings, placement of temporary pavement marking tabs to widen the bus paths is requ i red for uninterrupted traffic to operate safely . The total cost of this work is $920 .00 . Item 144 -In July 2010 during pavement demolition the base of a large pole mounted sign was discovered in a planting bed adjacent to the Throckmorton Street east sidewalk . To eliminate the six foot deep safety hazard the top foot of the twelve-inch diameter pipe requires removal and the hole backfilled to the surface of the ground. The total cost of this work is $500 .00. ,' . . . M&C Re view Page I of2 Officia l site of th e Ci ty of Fort Wo rth, Te xas C ITY COUNCIL A GENDA DATE: CODE: 4/19/2011 C COUNCIL ACTION: Approved on 4/19/2011 REFERENCE NO.: **C-24866 TYPE: CONSENT LOG NAME: PUBLIC HEARING: FORT WORTH --....,...--- 06HPNINTHC02-FAIN NO SUBJECT: Authorize Change Order No. 2 in the Amount of $113 ,930 .65 to City Secretary Contract No . 40241 w ith The Fain Group, Inc ., for Hyde Park Transit Plaza and Ninth Street Improvements (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Change Order No. 2 in the amount of $113,930.65 to City Secretary Contract No. 40241 with The Fain Group, Inc ., for Hyde Park Transit Plaza and Ninth Street Improvements, thereby increasing the contract amount to $2 ,788 ,381.76 . DISCUSSION: On May 4, 2010, (M&C C-24203) the City Council authorized the City Manager to execute a contract in the amount of $2,611 ,672.61 with The Fain Group , Inc., for the Hyde Park Transit Plaza and Ninth Street Improvements . On September 14, 2010, (M&C C-24438) the City Council authorized Change Order No . 1 totaling $62,778.50 to compensate the contractor for additional materials not included in the contract for backfilling the former library basement at Ninth and Throckmorton and waterproofing material for the Public Safety Building basement. Change Order No. 2 consists of the following materials not included in the original contract: additional storm drop inlets, storm drain junction box , solar powered controller for tree irrigation , additional conduit and electrical wire , additional sidewalk demolition, additional pavement , temporary pavement markings, electrical receptacles, pipe removal , additional backfill for former library basement, electrical sub-meter for passenger shelters, Panther Fountain plumbing and electrical replacement , and existing Hyde Park marble bench storage and relocation within plaza. The total amount of Change Order No. 2 is $113,930.65 . . Amount Original Contract Amount $ 2,611 ,672 .61 Change Order No . 1 $ 62,778.50 Change Order No. 2 $ 113.930.65 Revised Contract Amount $ 2,788,381 .76 Staff considers the Change Order No. 2 amount to be fair and reasonable. The costs associated with this change order will be funded with the project's contingency funds. The Fain Group, Inc. is in compliance with the City's DBE Program by committing to an overall 28 percent DBE participation on this contract, inclusive of the work performed on this Change Order No. 2. Construction on the project was substantially complete on January 24, 2011 . The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budgets , as appropriated, of the Grants Fund and the Critical Projects Improvements Fund. http://apps.cfwnet.org/council_packet'mc _review.asp?ID=l 5028&councildate=4/l 9/20 l l 04 /20 /2011 . , M&C Review TO Fund/AccQ_1,mt/Centers Submitted for City_Manager's Offi\:e Q~ Originating Department Head: Additional lnformatiol'!_Contac_t ----------------- ATTACHMENTS Page 2 of2 E_ROM___fµnd/Account/Centers GR76 541200 006302393830 $AQ~A2.91 GR76 541600 _006302393830 H.OA42.fil C116 541200 _022116021220 ~_,__Q~,83 Fernando Costa (6122) Randle Harwood (6101) Becky Pils (7645) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=l5028&councildate=4/19 /20l l 04/20 /2011 Item 130 -In September 2010 the condition of the storm drain junction box in the intersection of Ninth Street and Commerce Street after it was excavated was so poor that it could not be tied to a new drain line . The existing junction box had to be demolished and a new reinforced concrete box reconstructed in place at a cost of $4,825.40 . Item 131 -After curbs were moved in on Ninth Street to increase the walkway widths, field surveys found that storm water would not fully drain from adjacent property and flood the walkway in two locations. One additional storm drop inlet is needed to drain the alley between Houston and Main Streets, and four more inlets will drain the sidewalk area adjacent to the parking lot on the north side of Ninth between Commerce and Calhoun. The total cost for this work is $8 ,325 .31. Item 132 -The proposed irrigation controller at Ninth and Main Streets was designed to be powered by connecting to an existing electrical box in General Worth Square. The box did not contain the proper electrical qualities, and the nearest alternative connection point is several hundred feet across the square . To avoid the long run of wiring traveling under several paved areas, a solar power controller is recommended . The cost to exchange the controllers and modify some irrigation valves to accommodate the solar controller is $1,532 .57 . Item 133 -In November 2010 it was found that new walkways built to existing elevations in Hyde Park near the Flatiron Building would have resulted in water being directed toward the building doorway and basement openings during rainfall events. Grading the walkways away from the building and placing three drop storm inlets in low spots are required to avoid possible water damage to the building and standing water on the walkway. The total cost for the new storm drain inlets is $3,629.63 . Item 134 -Two existing marble benches that were constructed with the Panther Fountain were not shown on the contract documents. In order to preserve the benches and integrate them into the new improvements, the benches and bases require moving to a secure location on site and replaced into the new Hyde Park layout. The total cost for this work is $1,000.00. Item 135 -The contractor was directed by the plans to demolish the existing concrete walkways in Hyde Park in preparation for the new architectural walkway construction . As demolition progressed in June 2010 the Panther Fountain plumbing and electrical circuits were found to be cast into the concrete that was demolished . Replacement piping, conduit and electrical circuits are needed to restore the operation of the fountain . The total cost for this work is $4,953.00 . Item 136 -The electrical power service to the Hyde Park area was designed to handle single phase 100 amp power. Oncor only delivers three phase power to the downtown area . The total cost to substitute the service hardware, increase the conduit size and provide additional wiring is $994 .07 . Item 137 -All of the existing planters on Throckmorton have electrical receptacles for maintenance and tree lighting purposes. A receptacle in each of the four new planters on Throckmorton is required, but not included in the plans . Also a pavement embedded street lighting circuit was damaged during demolition. A new 1-1/4 inch conduit is required to replace the damaged one. The total cost for this work is $3 ,3 20 .1 2 . Item 138-An additional 243 square yards of walkway pavement in front of the Convention Center is required to be removed due to excessive cracking and displacement. The removal operation at that location requires special equipment because of its large distance from the curb . The total cost of the work is $6 ,084 .23 . Item 139 -After Ninth Street was milled in December 2010, an assessment of the hidden underlying pavement was made . Approximately 267 square yards of pavement i n several locations in Ninth Street are deemed unsound and is required to be demolished and removed before replacement . The cost for this demolition and removal is $8,554.72 . Item 140-At a number of locations along Ninth and Throckmorton Streets sidewalk grades ad j acent to the project lim its have to be modified to comply with the Americans with Disabilities Act and storm drainage needs . Slopes on pathways are required to be constructed within maximum and min imum standards . Demolition of 133 square yards of sidewalk pavement is necessary for compliance. The total cost of this work is $2 ,802.09 . Item 141-In Change Order No. 1 one thousand cubic yards of former library basement rubble was excavated and backfilled to allow construction of the Ninth Street/Throckmorton intersect ion . When work resumed i n Hyde Park north of Ninth Street in November 2010, the north portion of the basement was discovered after the remainder of parking lot was demolished. Excavation of 1600 cubic yards of rubble , partial wall demolition and backfilling w ith common fill soil are requ i red to construct planting areas , place walkways and plan t trees. The total cost of the excavation and wall removal is $65,424 .00 . Item 142 -The two bus passenger shelters are served with electrical power through the Hyde Park service connection . To determine The T's share of power costs, a sub-meter is needed to be installed in the park electrical circuitry. The cost for furn ishing and installing this meter is $1,095.11. Item 143 -In January 2011 during an inspection after traffic was restored on Ninth Street, the bus turning paths were found to cross over pavement markings at Jones Street, Houston Street and Throckmorton Street intersections. Pr ior to applying permanent pavement markings, placement of temporary pavement marking tabs to widen the bus paths is required for uninterrupted traffic to operate safely. The total cost of this work is $920 .00. Item 144-In July 2010 during pavement demolition the base of a large pole mounted sign was discovered in a planting bed adjacent to the Throckmorton Street east sidewalk. To eliminate t he six foot deep safety hazard the top foot of the twelve-inch diameter pipe requires removal and the hole bac kfilled to the surface of the ground. The total cost of th is work is $500 .00 .