HomeMy WebLinkAboutContract 40540-CO1CITY SECRETARY
CONTRACT NO._ 4()S4-0-cc\ ..
City of Fort Worth
Change Order Request Po-10-0()0 !oof 17
Cha ng e Orde r No . Date TPW Project No . Fu nd ing (FAC )
C 295 541200 1 (one) 2/10/11 208110073980-00004868
Facility and Proje ct Descrip ti on City Sec retary Co ntract No .
Fire Station 5 40540
ORIGINAL CONTRACT AMOUNT................................................................ $2,413 ,807
EXTRAS TO DATE .................................................................... .
CREDITS TO DATE ................................................................... .
$ 0
$ 0
CONTRACT COST TO DATE ................................................................................................. .
AMOUNT OF PROPOSED CHANGE ORDER ........................................................................... .
REVISED CONTRACT AMOUNT.. .......................................................................................... .
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... .
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ .
$2,413 ,807
$ 14,166
$2,427,973
$ 150 ,000
$ 135,834
ADDITIONAL FUNDING (IF NECESSARY)................................................................................ 0
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL :
Provide all labor and materials as per attached PCR 's : 1, 2 , 3 , 4 , 5 , 6 , and 7 as per the
attached Proposed Change Requests .
ADD $14 ,166
TOTAL ADD $ 14 ,166
65 day Contract Extens ion as per attached letter
It is unders tood and agreed that th e acceptance of thi s Change Order by th e contractor constitutes an accord and sa ti sfaction and represents pa ym ent in full (both t im e
and money) for a ll costs arising out o f, or in c id enta l to, th e above Change Order
Cont racto r's Na me
Imperial Construction , Inc.
Original Contract Time Add itio nal Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order
287cd O cd 287 cd 65 cd
onstruction , Inc Da te
Date
:ZP,8/i
Attested by:
Co unci A ctio n (If Required )
D Approved D Di sapp ro ved
D Other
CD~~ Marty Hendrix,tySecretary
Date
2/1~{,,
Da te
~ ' (. ll
Date 1/8/08
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
IMPERIAL
construction inc.
Jack Durham
Senior Construction Manager
T/PW Architectural Services
Mr. Durham
..
Imperial would like to request a time extension for the Fire Station #5 project. Oncor was unable to remove
power lines off the property in a timely manner which delayed my ability to start the project. The original NTP
was to be on July 26, 2010 and Imperial was unable to start until September 28, 2010. This is a total of 65
calendar days. At this time Imperial would like to request that the contract time be extended by 65 calendar days.
Respectfully,
POST OFFICE BO X 967 * WEATHERFORD, TX 76086 * 817-341-8886 * FAX (817) 341-0191
·-TO:-City of Fort Worth 11/5/2010
JOB NAME: Fort Worth Fire Statiort#5 DATE
ATIENTION : Jack Durham
The following is a detailed cost breakdown , including both materials & labor ,
for all additions to and / or deductions from the contract sum .
CONTRACTOR'S
CHANGE PROPOSAL
10-0413
PROJECT NO.
SCOPE: ) install 1 juction box with 1" conduit to telco room . One duplex receptical at east wall 1
of apparatus bay Install 2 telephone outlets with 1" conduit. All phone conduits will be CHANGE
changed to 1" in entire building as well PROPOSAL NO . -------------------------------------
1. LABOR
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
NUMBER RATE
MAN HOURS PER HOUR
0 $ 59.00
0 $ 37 .00
0 $ 24.00
0 $
LABOR SUB TOT AL
LABOR BURDEN
TOT AL ITEM 1 :
2. MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY
3. SUBCONTRACTS
SUBCONTRACTOR
JRB electric
DESCRIPTION
work as per CPR #1
4 . SUBTOTAL WITHOUT MARKUP (ITEMS 1, 2, & 3)
5 . G & A OVERHEAD
6 . SUBTOTAL INCLUDING OVERHEAD
7. PROFIT
8. SUBTOTAL INCLUDING OVERHEAD AND PROFIT
9 .PERFORMANCEANDPAYMENTBOND
10. SALES TAX
UNIT PRICE
TOTAL ITEM 2 :
TOTAL ITEM 3 :
11. TOTAL (ADDITION/ DEDUCTION ) TO CONTRACT SUM IF ACCEPTED
10%
5%
2.50%
0.00%
COST
$ -
$ -
$ -
$ -
$ -
$ -
$ -
~
cr::::=d
$ 3,372.00
$ -
$ -
$ -
$ -
$ -
$ 3,372.00
$ 3,372 .00
$ 337 .20
$ 3,709.20
$ 185.46
$ 3,894.66
$ 97 .37
$ -
I$ 3,992.00 I
REQUEST IS MADE FOR ADDITION OF 0 CALENDAR DAYS TO THE CONTRACT PERIOD -------
The above proposal is subbmitted for your consideration. The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature.
Jimmy 'Tufey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
This change proposal for subject work requires your approval by ( ).
A delinquent response will accrue additional cost that is not included
in this original change order price . Each day beyond the required date additional
items will be added to the change proposal to reflect the acrued change . This will be
determined after your authorization is finally received. Accordingly , upon receipt of
your approval , all cost resulting from these additional factors will be submitted to
correct the final change order price .
Change Order Approval by Owner I Architect Date
.. -
JRB ELECTRIC, INC.
Corporate Office
PO Box 2429
Pottsboro, Texas 75076
PH : 903-786-5840
FX : 903-786-5842
August 17, 2010
Jimmy Tuley
Imperial Construction
Weatherford, Texas
PH: 817-341-8886
Reference: City of Ft Worth Fire Station #5
850 Irma Street
Fort Worth, Texas 76104
Work Change proposal request #001
Inclusions:
One junction box with 1 " conduit to the telecom room
One duplex receptacle at east wall of the apparatus bay
Sales Office
3611 W. Pioneer Pkwy, Suite H
Pantego, Texas 76013
PH : 817-538-8954
Email : Jack@JRBElectric.net
Two telephone outlets with 1 " conduit at east wall of the apparatus bay
Per sheet SE3, changes the conduit at ALL telephone outlets from ~" to 1 "
Total Cost:
Price is valid for 30 days
Jack Burcie
Estimator
817-538-8954
Email: Jack@JRBElectric.net
$3,372.00
.,.
1 .__,: City of Fort Worth 12/7/2010
JOB NAME: Fort Worth Fire Station #5 DATE
ATIENTION : Jack Durham
The following is a detailed cost breakdown , including both materials & labor,
for all additions to and / or deductions from the contract sum .
I SCOPE :il add 2 return air grills
CONTRACTOR'S
CHANGE PROPOSAL
10-0413
PROJECT NO .
2
-----------------------------------'
CHANGE
PROPOSAL NO.
1. LABOR
NUMBER RATE
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
MAN HOURS PER HOUR COST
2. MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY
0 $ 59.00
0 $ 37 .00
0 $ 24.00
0 $
LABOR SUB TOTAL
LABOR BURDEN
TOT AL ITEM 1 :
UNIT PRICE
TOTAL ITEM 2:
$ -
$ -
$ -
$ -
$ -
$ -
$ -
E===3
n:::=:d
3. SUBCONTRACTS
SUBCONTRACTOR
Suburban
DESCRIPTION
work as per CPR #2 $ 272 .25
$ -
$ -
$ -
$ -
$ -
TOT AL ITEM 3 : $ 272.25
4. SUBTOTAL WITHOUT MARKUP (ITEMS 1, 2 , & 3) $ 272 .25
5. G & A OVERHEAD 10% $ 27 .23
6 . SUBTOTAL INCLUDING OVERHEAD $ 299.48
7. PROFIT 5% $ 14.97
8 . SUBTOTAL INCLUDING OVERHEAD AND PROFIT $ 314.45
9 . PERFORMANCE AND PAYMENT BOND 2.50% $ 7 .86
10 . SALES TAX 0.00% $ -
11 . TOTAL (ADDITION/ DEDUCTION) TO CONTRACT SUM IF ACCEPTED I$ 322.00 I
REQUEST IS MADE FOR ADDITION OF 0 CALENDAR DAYS TO THE CONTRACT PERIOD -------
The above proposal is subbmitted for your consideration . The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature.
Jimmy 'l'u (ey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
Change Order Approval by Owner I Architect
This change proposal for subject work requires your approval by ( ).
A delinquent response will accrue add itional cost that is not included
in this original change order price . Each day beyond the required date add itiona l
items will be added to the change proposal to reflect the acrued change . Th is will be
determined after your authorization is finally received . Accordingly , upon rece ipt of
your approval , all cost resulting from these add itional factors will be submitted to
correct the final change order price .
Date
--. -~
,;
Heating & Air Conditioning Company
3918 Peachtree Street• Dallas, Texas 7522.7
(214) 381-1127 • answered 24 hours
FAX (214) 381-1184
August 9, 2010
Imperial Construction Inc
193 Coy Road
Weatherford, TX 76087
Attn: Freddie Voyles
Re: FW: FS-5-PR2
Dated July 20, 201 O
,,,,,,,.
Per your request Suburban Heating & Air Conditioning Co. proposes to provide and install the
following per proposal request #002.
1. 1 -Supply air grille 6" round
2. 1 -Return air grille
3 . 1 -Dryer vent duct connection as detailed sheet M2-.01 revised 4/26/10
Equipment
Material
Labor
10% Overhead
10% Profit
Cost for PR#003
85 .00
60.00
80.00
22.50
24.75
$272.25
TACLA 001637C, Regulated by The Texas Department of Licensing & Regulation P.O. Box 12157. Aust in, Texas 78711, 1-800-803-9202, 512-463-6599
TO: City of Fort Worth 8/10/2010
JOB NAME: Fort Worth Fire Station'#5 DATE
ATIENTION: Jack Durham
The following is a detailed cost breakdown , including both materials & labor ,
for all additions to and I or deductions from the contract sum.
SCOPE:l Pay cost associated with moving Charter's cable lines off of property
CONTRACTOR'S
CHANGE PROPOSAL
10-0413
PROJECT NO.
3
CHANGE
PROPOSAL NO .
..._ ________________________________ ___.
1. LABOR
NUMBER RATE
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
MAN HOURS PER HOUR
2. MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY
0 $ 59 .00
0 $ 37 .00
0 $ 24.00
0 $
LABOR SUB TOTAL
LABOR BURDEN
TOTAL ITEM 1 :
UNIT PRICE
TOTAL ITEM 2 :
3. SUBCONTRACTS
SUBCONTRACTOR
Charter
DESCRIPTION
relocater cable
TOT AL ITEM 3 :
4. SUBTOTAL WITHOUT MARKUP {ITEMS 1, 2 , & 3)
5 . G & A OVERHEAD
6 . SUBTOTAL INCLUDING OVERHEAD
7 . PROFIT
8. SUBTOTAL INCLUDING OVERHEAD AND PROFIT
9 . PERFORMANCE AND PAYMENT BOND
10 . SALES TAX
11. TOTAL (ADDITION/ DEDUCTION ) TO CONTRACT SUM IF ACCEPTED
COST
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ 1,030.60
$ -
$ -
$ -
$ -
$ -
$ 1,030.60
$ 1,030.60
10% $ 103.06
$ 1,133.66
5% $ 56.68
$ 1,190 .34
2 .50% $ 29.76
0.00% $ -
I$ 1,220.00 I
REQUEST IS MADE FOR ADDITION OF CALENDAR DAYS TO THE CONTRACT PERIOD -------
The above proposal is subbmitted for your consideration . The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature.
Jimmy 'Tufey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
This change proposal for subject work requires your approval by ( ).
A delinquent response will accrue additional cost that is not included
in this original change order price . Each day beyond the required date additional
items will be added to the change proposal to reflect the acrued change . This will be
determined after your authorization is finally received . Accordingly , upon receipt of
your approval , all cost resulting from these additional factors will be submitted to
correct the final change order price.
Change Order Approval by Owner I Architect Date
.... ' ...
Charter Communications
15100 Trinity Blvd. Suite 500
Fort Worth, TX . 76155
817.298.3632 fax 817 358.7500
Customer
Name City Of Fort Worth Fire Dept
Address 850 Irma St
Invoice No.
INVOICE ~
3/10/2010
Project 454
City Fort Worth State TX ZIP ____ _
Date
Order No.
Rep
Phone Freddie Royles Contractor 817-781-7013 FOB
Qty Description Unit Price TOTAL
1 Wreck out 80' of Cable and strand and 1 anchor $1,030.60 $1 ,030 .60
Set 1 new anchor
* Please send check to above address
* Attention : Construction Dept. -Greg Piatt
Received Payment:
Check Number:
Subtotal $1,030.60
Payment Details Sh ipping & Handling
0 Cash Taxes State
@ Check
0 Credit Card TOTAL $1,030.60
Name -------------CC#~~~~~~~~~~-
Expires _____ _
IOffice Use Only
TO: City of Fort Worth
JOB NAME : Fort Worth Fire Statiort #5
ATIENTION : Jack Durham
2/10/2011
DATE
The following is a detailed cost breakdown , including both materials & labor,
for all additions to and / or deductions from the contract sum .
SCOPE: install transitional slab between paving and suspended apparatus bay .
1. LABOR
NUMBER RATE
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
MAN HOURS PER HOUR
2. MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY
0 $ 59 .00
0 $ 37 .00
0 $ 24 .00
0 $
LABOR SUB TOTAL
LABOR BURDEN
TOT AL ITEM 1 :
UNIT PRICE
TOT AL ITEM 2 :
3. SUBCONTRACTS
SUBCONTRACTOR
Consys
DESCRIPTION
transitional slab per CPR 4
TOTALITEM 3 :
4 . SUBTOTAL WITHOUT MARKUP (ITEMS 1, 2 , & 3)
5 . G & A OVERHEAD
6 . SUBTOTAL INCLUDING OVERHEAD
7. PROFIT
8 . SUBTOTAL INCLUDING OVERHEAD AND PROFIT
9 . PERFORMANCE AND PAYMENT BOND
10 . SALES TAX
11. TOTAL (ADDITION/ DEDUCTION ) TO CONTRACT SUM IF ACCEPTED
CONTRACTOR'S
CHANGE PROPOSAL
10%
5%
2.50%
0.00%
10-0413
PROJECT NO.
4 Revised-2
CHANGE
PROPOSAL NO.
COST
$ -
$ -
$ -
$ -
$ -
$ -
$ -
E===3
c:::d
$ 4,714.07
$ -
$ -
$ -
$ -
$ -
$ 4,714.07
$ 4 ,714.07
$ 471.41
$ 5,185.48
$ 259 .27
$ 5,444.75
$ 136.12
$ -
I$ s,sa1.oo I
REQUEST IS MADE FOR ADDITION OF 0 CALENDAR DAYS TO THE CONTRACT PERIOD -------
The above proposal is subbmitted for your consideration. The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature .
Jimmy 'Tufey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
Change Order Approval by Owner/ Architect
This change proposal for subject work requires your approval by ( ).
A delinquent response will accrue additional cost that is not included
in this original change order price. Each day beyond the required date additional
items will be added to the change proposal to reflect the acrued change . This will be
determined after your authorization is finally received . Accordingly, upon receipt of
your approval , all cost resulting from these additional factors will be submitted to
correct the final change order price.
Date
11010Switzer A venue, Suite 104
Dallas, Texas 75238
Work performed by :
( ) General Cont ractor (X) Subcontractor
ConSys Concrete Corp.'s Proposal Number P-001
T ime Extension (I f an.v.>.: _______ n.o.ne ____ _
phone 214 • 349 • 3782 fax 214 • 349 • 4084
www.consysconcrete.com
PROPOSAL
PROJECT : Fire Station No . 5
CONT RACT OR : Imperial construction
PCO #
PR #
AS I#
Description of Change : Addiitional slab and rade be am er PR 4 -All rebar fro m ori ianl bid is alrea d on site and there will not be a crei dt for
an re ar .
ADDITIONS AND/OR [CREDITS] ~A I 1;1•~,n .. .JN
A B C D IE
1uescr1pt1on uuant1tv unit iota Matena1 Laoor i::aUID . :SUDCOn. :storaae
,1.mermtenaent 1 IS :li/0,l.ut
i raae Beams
o rmmo 1:.-• so ft l·IH
,.,ace ana i-m1sn 11 II ~ ·"'
t:xcavaung ana isacKrn11ng 11:, II ~-1'14 .Ul
1,;oncrete ;:, yuS ~11 .:>u
Pumc 1 s 5161.uu
,::aUIDment , s ~~I .UL
,..,ab
1:, mil permmator 1 roll 11.uu
vo1a isoxes ana 1,;over ::meet fj~ san. ...
1"1ace ana F1ms11 n, san "'""' .IH
Concrete 1 ~ns :Ii( .!>l
l'UmD , s .. .,, ...
t-nUIDment , s 5117.u t
Rebar .11r1r1
Add1t1onal Rebar tor enti re cnanae 1 ..... IDS S0 .4U
.. uunona, Lacor ,or reaa r ""''" IDS :i,u.ut
ueauct t'avmg
... oncrete •ID •aS "'°°·"" l"1ace ana i-m1sn -u .. , sqn ·Sl5ti.uu
i-ormma •D,,_ san ... :,J.UU
cau1pment l s -~!f"~.uu
::,uat ota1s
Line En ter total of Columns A+B +C+D+E
Line II En ter% o f Col B for Workman's Comp.,
Social Security, and like t axes
Line Ill Benefits and Vacat ion/Holiday
Line IV Overhead
Line V Total Line I t hru IV
Line VI Fee /Profit
Line VII Bond Cost s
Line VIII Total
SIGNATURE : :Me(issa 'We stmore(aruf
ConSys Concrete Co rp .
3t1~.lJI
"'"'"'·:,u
i.:..i ·:,.1u
lto'I ,',l0 Ul
~1 fb.l.ft
s· ,,._ ....
S6n ....
-~l ,:>!t.>.U\J
"ill' ,.uu
~,,.,.,,.o~
Rates%
40.98
0.00
5.00
5.00
0 .00
DATE:
:,,o,ru ...
:li~l2.IH
S l 9U.u,
:jil<t4.U\J
~::,J.Ul
51131
S lJ9.
5109.lH
:Ii i"·"'
~I US • .x,
·SlZ"J.uu
... ,,.uu
-~:>:J.lAJ
~,,..,,u • .,., ~l:),l.U\J
J anuary 2 1, 20 11
Slbl.uu
5 185.lH.
......... uu
$3 ,632.18
$643.62
$0.00
$213.79
$4.489.59
$224.48
$0.00
$4,714.07
:i,u.uu
• TO : City of Fort Worth
JOB NAME : Fort Worth Fire Station #5
ATIENTION : Jack Durham
12/1/2010
DATE
The following is a deta iled cost breakdown , inclu ding bot h mater ials & labor ,
fo r all add it ions to and / or deductions from the contract sum .
SCOPE:J Credit to Owne r for TVSS Substitution
CONTRACTOR'S
CHANGE PROPOSAL
10-0413
PROJECT NO.
5
CHANGE
PROPOSAL NO . ---------------------------------
1 . LABOR
NUMBER RATE
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
MAN HOURS PER HOUR COST
2 . MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY
0 $ 59.00
0 $ 37.00
0 $ 24.00
0 $
LABOR SUB TOT AL
LABOR BURDE N
TOT AL ITEM 1 :
UN IT PRICE
TOT AL ITEM 2 :
$ -
$ -
$ -
$ .
$ -
$ -
$ .
~
rr::::::=]
3. SUBCONTRACTS
SUBCONTRACTOR
JRB Electric
DESCRIPTION
Credit to Owner for TVSS Substitutio n $ (1 ,800 .00'
$ -
$ -
$ -
$ -
$ -
TOTAL ITEM 3: $ (1 ,800 .00)
4 . SUBTOTAL WITHOUT MARKUP (ITEMS 1, 2 , & 3) $ (1,800 .00'
5 . G & A OVERHEAD 10% $ -
6 . SUBTOTAL INCLUDING OVERHEAD $ · (1 ,800.00
7 . PROFIT 5% $ -
8 . SUBTOTAL INCLUDING OVERHEAD AND PROFIT $ (1 ,800 .00'
9 . PERFORMANCE AND PAYMENT BOND 2 .50% $ .
10 . SALES TAX 0 .00% $ .
11 . T OTAL (ADDITION/ DEDUCTION) TO CONTRACT SUM IF ACCEPTED IS (1,soo.oo)I
REQUEST IS MADE FOR ADDITION OF 0 CALENDAR DAYS TO THE CONTRACT PERIOD -------
The above proposa l is subbmitted for your consideration . The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature .
Jimmy 'Tufey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
Change Order Approval by Owner/ Architect
This change proposa l for subject work requires your approva l by ( ).
A del inquent response will accrue add iti onal cos t that is not included
in this or igina l change order price . Each day beyond the required date add itional
items will be added to the change proposa l to reflect the acrued change . This wi ll be
determ ined after your authorization is fin ally rece ived . Accord in gly , upon receipt of
you r approval , all cost resulting from these addit iona l factors will be subm itted to
correct the fina l change order price .
Date
TO: City of Fort Worth
JOB NAME: Fort Worth Fire Station #5
ATIENTION: Jack Durham
12/7/2010
DATE
The following is a detailed cost breakdown , including both materials & labor ,
for all additions to and / or deductions from the contract sum .
st:OF>E:) Pay Oncor to relocate power pole in drive
CONTRACTOR'S
CHANGE PROPOSAL
10-0413
PROJECT NO .
6
CHANGE
PROPOSAL NO .
_________________________________ _..
1. LABOR
NUMBER RATE
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
MAN HOURS PER HOUR
2. MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY
0 $ 59 .00
0 $ 37 .00
0 $ 24.00
0 $
LABOR SUB TOTAL
LABOR BURDEN
TOTAL ITEM 1 :
UNIT PRICE
TOTAL ITEM 2 :
3. SUBCONTRACTS
SUBCONTRACTOR
Oncor
DESCRIPTION
Relocate power pole
TOTAL ITEM 3 :
4. SUBTOTAL WITHOUT MARKUP (ITEMS 1, 2 , & 3)
5. G & A OVERHEAD
6. SUBTOTAL INCLUDING OVERHEAD
7. PROFIT
8 . SUBTOTAL INCLUDING OVERHEAD AND PROFIT
9 . PERFORMANCE AND PAYMENT BOND
10. SALES TAX
11. TOTAL (ADDITION/ DEDUCTION) TO CONTRACT SUM IF ACCEPTED
COST
$ .
$ .
$ .
$ -
$ -
$ -
$ .
$ 6,146.74
$ -
$ -
$ -
$ -
$ -
$ 6,146.74
$ 6,146.74
10% $ 614.67
$ 6,761.41
5% $ 338.07
$ 7 ,099.48
2 .50% $ 177.49
0.00% $ -
I$ 1,211.00 I
REQUEST IS MADE FOR ADDITION OF CALENDAR DAYS TO THE CONTRACT PERIOD
The above proposal is subbmitted for your consideration . The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature .
Jimmy 'Tufey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
This change proposal for subject work requires your approval by ( ).
A delinquent response will accrue additional cost that is not included
in this original change order price . Each day beyond the required date additional
items will be added to the change proposal to reflect the acrued change . This will be
determined after your authorization is finally received . Accordingly , upon receipt of
your approval , all cost resulting from these additional factors will be submitted to
correct the final change order price .
Change Order Approval by Owner/ Architect Date
...
6.3 Agreements and Forms
Applicable : Entire Certified Service Area
Effective Date : January 1. 2002
Tarriff for Retail Delivery Service
Oncor Electric Delivery Company
6.3.4 Discretionary Service Agreement
Reyjsjon : Original
WR Number 3114088
Transaction ID 23628
This Discretionary Service Agreement ("Agreement") is made and entered into this 1st day of December. 2010.
by Oncor Electric Delivery Company LLC. a Delaware limited liability company . and Imperial Construction ("Customer"), a
Corporation , each hereinafter sometimes referred to individually as "Party" or both referred to collectively as the
"Parties". In consideration of the mutual covenants set forth here in. the Parties agree as follows :
1 . Discretionary Services to be Provided -Company agrees to provide , and Customer agrees to pay
for , the following discretionary services in accordance with this Agreement.
DD2 -FACILIIIES REl;OCATIONlREMOVAL CHARGE relocation of exiting pole to tlje east at 850
Irma st ft Worth Texas as requested by customer. Total cost for request : s 6 146.74 . Cost is good for 30 days from this
agrtrement date
2 . Nature of Service and Company's Retail Delivery Service Tariff -Any discretionary services
covered by this Agreement wi ll be provided by Company, and accepted by Customer, in accordance w ith applicable
Public Utility Commission of Texas ("PUCT ") Substantive Rules and Company's Tariff fo r Retail Delivery Service
(including the Service Regu lations contained therein), as it may from time to time be fixed and approved by the PUCT
("Company's Retail Delivery Ta riff'). During the term of this Agreement , Company is entitled to discontinue serv ice ,
interrupt service, or refuse service initiation requests under this Agreement in accordance with applicable PUCT
Substantive Rules and Company 's Retail Delivery Tariff. Company 's Retail Delivery Tariff is part of this Agreement to the
same extent as if fully set out herein . Unless otherwise expressly stated in this Agreement , the terms used herein have
the meanings ascribed thereto in Company's Retail Delivery Tariff.
3. Discretionary Service Charges -Charges for any discretionary services covered by this Agreement
are determined in accordance with Company's Retail Delivery Tariff. Company and Customer agree to comply with
PUCT or court orders concerning discretionary service charges .
4 . Term and Termination --Th is Agreement becomes effective upon Agreement excutjon with payment
and continues in effect until completion of construtjon .
Termination of this Agreement does not relieve Company or Customer of any obligation accrued or accru ing prior to
termination .
5 . No Other Obligations --This Agreement does not obligate Company to provide , or entitle Customer to
receive, any service not expressly provided for herein . Customer is respons ible for making the arrangements necessary
for it to receive any further services that it may desire from Company or any third party .
6 . Governing Law and Regulatory Authority -This Agreement was executed in the State of Texas and
must in all respects be governed by, interpreted, construed, and enforced in accordance with the laws thereof. This
Agreement is subject to all valid, appl icable federal , state, and local laws . ordinances , and rules and regulations of duly
constituted regulatory authorities having jurisdiction .
7. Amendment -This Agreement may be amended only upon mutual agreement of the Parties , which
amendment wil l not be effective until reduced to writing and executed by the Parties . But changes to applicable PUCT
Substantive Rules and Company 's Retail Delivery Tariff are applicable to this Agreement upon their effective date and do
not require an amendment of this Agreement.
8 . Entirety of Agreement and Prior Agreements Superseded --This Agreement, including all attached
Exhibits , which are expressly made a part hereof for all purposes . constitutes the entire agreement and understanding
between the Parties with regard to the service(s) expressly provided for in this Agreement. The Parties are not bound by
or liable for any statement. representation. promise , inducement, understand i ng . or undertaking of any kind or nature
(whether written or oral) with regard to the subject matter hereof not set forth or provided for herein . This Agreement
replaces all prior agreements and undertakings, oral or written. between the Parties with regard to the subject matter
hereof, including w ithout lim itation any previous cost , and all such agreements and undertakings are agreed by the
Parties to no longer be of any force or effect. It is expressly acknowledged that the Parties may have other agreements
covering other services not expressly provided for herein . which agreements are unaffected by this Agreement.
9 . Notices -Notices given under this Agreement are deemed to have been duly delivered if hand
delivered or sent by United States certified mail, return receipt requested . postage prepaid . to :
(a) lfto Company:
Oncor Electric Delivery
Attn: Chad Dyer
7860 Winbrook Dr ive
Benbrook . Texas 76126
(b) If to Customer:
Imperial Construction
P.O . Box 967
Weatherford, Texas 76086
The above-listed names, titles , and addresses of either Party may be changed by written notification to the other.
10 . Invoicing and Payment -Invoices for any discretionary services covered by this Agreement will be
mailed by Company to the following address (or such other address directed in writing by Customer), unless Customer is
capable of receiving electron ic invoi cing from Company , in wh ich case Company is entitled to transm it electronic invoices
to Customer.
Imperial Construction
P.O . Box 967
Weatherford , Texas 76086
If Company transmits electron ic invoices to Customer, Customer must make payment to Company by electronic funds
transfer . Electronic invoicing and payment by electronic funds transfer w ill be conducted in accordance with Company's
standard procedures . Company must receive payment by the due date specified on the invoice . If payment is not
received by the Company by the due date shown on the invoice, a late fee will be calculated and added to the unpaid
balance until the entire invoice is paid . The late fee will be 5% of the unpaid balance per invoice period .
11 . No Waiver --The failure of a Party to this Agreement to insist, on any occasion , upon strict performance
of any provis ion of this Agreement will not be considered to waive the obligations , rights , or duties imposed upon the
Parties .
12. Taxes --All present or future federal , state , mun icipal, or other lawful taxes (other than federal income
taxes) appli cable by reason of any service performed by Company , or any compensat ion pa id to Company , hereunder
must be paid by Customer .
13 . Headings --The descriptive headings of the various articles and sections of this Agreement have been
inserted for convenience of reference only and are to be afforded no significance in the interpretation or construction of
this Agreement.
14 . Multiple Counterparts -This Agreement may be executed in two or more counterparts, each of which
is deemed an original but all constitute one and the same instrument.
15 . Other Terms and Conditions -
(i) Customer has disclosed to Company all underground fac ilities owned by Customer or any other
party that is not a publ ic utility or governmental entity, that are located within real property owned by Customer. In the
event that Customer has failed to do so , or in the event of the existence of such facilities of which customer has no
knowledge , Company, its agents and contractors, shall have no liability, of any nature, whatsoever, to Customer, or
Customer's agents or assignees , for any actual or consequential damages resulting from damage to such undisclosed or
unknown facilities .
(ii)
IN WITNESS WHEREOF, the Parties have caused this Agreement to be sign by their respective duly authorized
representatives .
Oncer Electric Delivery Imperial Construction
Printed Name Printed Name
Signature Signature
Title Title
Date Date
Page 1 of2
Jimmy Tuley
-------·-----------·---------------·---------
From :
Sent:
To:
Cc :
Subject:
Fredd ie Voyles
Wednesday, December 01 , 2010 11 :16 AM
Jimmy Tuley
Holly Donaldson
FW: F .S. #5 Power pole relocate
Attachments: 850 Irma relocate.pdf
Jimmy,
Here is the cost for power pole relocate .
From: Chad.Dyer@oncor.com [Chad.Dyer@oncor.com]
Sent: Wednesday, December 01, 2010 10:49 AM
To: Freddie Voyles
Subject: RE: F.S. #5 Power pole relocate
P lease sign and return to me with Check. Thanks
THE M OST EFFECTIVE
SAFETY TOOL
IS ORGANIZATION HA~
Chad Dyer
7860 Winbrook Dr
Benbrook, TX, 76126
Office (817) 443-3425
Fax (817) 443-3451 ________ ,_ -----------------------------
From: Freddie Voyles [mailto:FVoyles@imperial-construction.com]
Sent: Wednesday, December 01, 2010 7:45 AM
To: Dyer, Chad
Subject: RE: F.S. #5 Power pole relocate
Imperial Construction
PO Box 967
Weatherford, TX . 76086
From: Chad.Dyer@oncor.com [Chad.Dyer@oncor.com]
12/7/2010
Sent: Tuesday, November 30, 2010 4:00 PM
To: Freddie Voyles
Subject: RE: F.S. #5 Power pole relocate
I need the address and title and so on. Please
Chad Dyer
7860 Winbrook Dr
Benbrook, TX, 76126
Office (817) 443-3425
Fax (817) 443-3451
Page 2 of2
---· ---------------------------------------
From: Freddie Voyles [mailto:FVoyles@imperial-construction.com]
Sent: Tuesday, November 30, 2010 3:59 PM
To: Dyer, Chad
Subject: F.S. #5 Power pole relocate
Chad,
Send CPR to
jtuley@imperial-construction.com
Thanks
Confidentiality Notice: This email message, including any attachments, contains or may contain
confidential information intended only for the addressee. If you are not an intended recipient of this
message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this
message or its attachments is strictly prohibited. If you have received this message in error, please notify
the sender immediately by reply message and delete this email message and any attachments from your
system.
Confidentiality Notice: This email message, including any attachments, contains or may contain
confidential information intended only for the addressee. If you are not an intended recipient of this
message, be advised that any reading, dissemination , forwarding, printing, copying or other use of this
message or its attachments is strictly prohibited. If you have received this message in error, please notify
the sender immediately by reply message and delete this email message and any attachments from your
system .
12/7/2010
TO : City of Fort Worth 1/17/2011
JOB NAME: Fort Worth Fire Station ·#S DATE
ATTENTION: Jack Durham
The following is a detailed cost breakdown , including both materials & labor,
for all additions to and I or deductions from the contract sum .
SCOPE:1 Pier Reconciliation
CONTRACTOR'S
CHANGE PROPOSAL
10-0413
PROJECT NO.
7
CHANGE
PROPOSAL NO. ------------------------------------
1. LABOR
LABOR CATEGORY
SUPERVISION
CARPENTER
LABORER
NUMBER RATE
MAN HOURS PER HOUR
0 $ 59.00
0 $ 37.00
0 $ 24.00
0 $
LABOR SUB TOTAL
LABOR BURDEN
TOT AL ITEM 1 :
2. MATERIALS/ EQUIPMENT RENTALS
DESCRIPTION QUANTITY UNIT PRICE
TOTAL ITEM 2 :
DESCRIPTION
3. SUBCONTRACTS
SUBCONTRACTOR
ICI / Consys 17 .00 LF credit back to owner for piers not
drilled to bid depth . 142 .7 LF not drilled
TOTAL ITEM 3:
4 . SUBTOTAL WITHOUT MARKUP (ITEMS 1, 2 , & 3)
5. G & A OVERHEAD
6. SUBTOTAL INCLUDING OVERHEAD
7. PROFIT
8. SUBTOTAL INCLUDING OVERHEAD AND PROFIT
9 . PERFORMANCE AND PAYMENT BOND
10 . SALES TAX
11 . TOTAL (ADDITION/ DEDUCTION) TO CONTRACT SUM IF ACCEPTED
0%
0%
0 .00%
0.00%
COST
$ -
$ -
$ -
$ -
$ -
$ -
$ -
E====3 ~
$ (2,425.90)
$ -
$ -
$ -
$ -
$ -
$ (2,425.90)
$ (2,425 .90
$ -
$ (2,425 .90'
$ -
$ (2 ,425 .90
$ -
$ -
I$ 2,42s.oo I
REQUEST IS MADE FOR ADDITION OF 0 CALENDAR DAYS TO THE CONTRACT PERIOD -------
The above proposal is subbmitted for your consideration . The undersigned contractor understands and agrees
that this proposal is validated only by the Owners signature .
Jimmy'I'u{ey
Jimmy Tuley Project Manager
ICI (Imperial Construction, Inc)
NAME OF CONTRACTING FIRM
Change Order Approval by Owner/ Architect
This change proposal for subject work requires your approval by ( ).
A delinquent response will accrue additional cost that is not included
in this original change order price. Each day beyond the required date additional
items will be added to the change proposal to reflect the acrued change . This will be
determined after your authorization is finally received . Accordingly, upon receipt of
your approval , all cost resulting from these additional factors will be submitted to
correct the final change order price.
Date
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECT ION REPORT
CLIENT : C ity of Ft. Wo rth, T PW
PROJECT: F ir e Stati o n #5 INSPECTOR:
REPORT NO.: 17-09 7-002 DRILLING COMPA NY:
REPORT DA T E: 10/19/10
P ie r Location (col umn Lin e) M .1 / 19 C.2 I 18 F.2 / 18
Mas -Tek Pi er# 66 57 58
Design Shaft Di ameter (i nches) 18" 18" 18"
Design Penetrati on (feet) 6' 6' 6 '
Des ign E levat ion o f T o p of P ie r (feet) 96 .33' 96 .92 ' 96 .92 '
Actua l Shaft Diam eter (in ches) 18" 22 " 18"
Depth to Bearing Stratu m -( Hard Gray
unweath ered Limestone (feet) 15.0 14 .67' 14 .59 '
Req u ired Pi er Depth d ue to Bea r in g Stratum
(feet) 21 .0 20.67' 20.59 '
Actual De pth to P ier Bottom (feet) 22 .08 ' 21 .0 20 .75 '
Act ua l Pi er P enetration (fee t) 7.08' 6 .33 ' 6.17'
Pier Plum b wi th in Spec ifi cation
(Yes/No) Yes Yes Yes
Casing Requ ired (Yes/No) No No No
Wate r P rese nt in Bottom of P ier Hole at T ime
of Concrete P lacement (Yes/N o) No No No
Pier Bottom C lean (Yes/No) Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7
Horizontal Ties (S ize & Sp ac in g) #3 (@ 12's #3 (@ 12's #3 (@ 12's
Reb ar Cage D ia meter (i nch es) 12" 12 " 12 "
Len gth of Re bar Cage 20 .75' 20 .25' 19 .67'
Concr ete Pl aced with a Tremie? (Yes/No) Yes Yes Yes
REMARK S:
Page I of2
D . Cotton
E.P . Drill ing
M.1 / 18 H.1 / 19
61 64
18 " 18"
6' 6 '
96 .92 ' 96 .33 '
18" 18"
15 .33' 15.50'
21 .33' 21 .50 '
21 .59' 22 .33 '
6 .25 ' 6 .83'
Yes Yes
No No
No No
Yes Yes
6#7 6#7
#3(@ 12's #3@ 12's
12 " 12"
20.50' 20 .0'
Yes Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth , TPW
PROJECT: Fire Station #5 INSPECTOR:
REPORT NO.: 17-097-002 DRILLING COMPANY:
REPORT DA TE: 10/19/10
Pier Location (column Line) J .9/19 H .1 / 18
Mas-Tek Pier# 65 59
Design Shaft Diameter (inches) 18" 18"
Design Penetration (feet) 6' 6'
Design Elevation of Top of Pier (feet) 96.33' 96.92'
Actual Shaft Diameter (inches) 18" 18"
Depth to Bearing Stratum -( Hard Gray
unweathered Limestone (feet) 15 .33' 16.0'
Required Pier Depth due to Bearing Stratum
(feet) 21 .33' 22 .0'
Actual Depth to Pier Bottom (feet) 22.25' 22.17'
Actual Pier Penetration (feet) 6.92' 6 .17'
Pier Plumb within Specification
(Yes/No) Yes Yes
Casing Required (Yes/No) No No
Water Presen t in Bottom of Pier Hole at Time of
Concrete Placement (Yes/No) No No
Pier Bottom Clean (Yes/No) Yes Yes
Vertical Bars (No . & Size) 6#7 6#7
Horizontal Ties (Size & Spacing) #3@ 12's #3@ 12's
Rebar Cage Diameter (inches) 12" 12"
Length of Rebar Cage 21.01' 20 .0'
Concrete Placed with a Tremie? (Yes/No) Yes Yes
REMARKS:
D. Cotton
E.P. Drilling
Aaron Cotton, Jr. Project Manager
Page 2 of2
A
B
C
D
MAS-TEK E NGINEERING & A SSOCIATES
DRILLED PIER IN S PECTION REPORT
CLI ENT : Ci ty of Ft. Worth, T PW
PROJ ECT: Fire Stat ion #5 IN S P ECTOR:
REPORT NO.: 17-097 -004 DRILLI NG CO M PAN Y:
REPORT DAT E: 10/20/10
Pier Location (co lumn L ine) H-4 H-8 H-12
Mas -Tek Pi er# 10 24 36
Design Shaft D iameter (i nches) 18" 18 " 18 "
Design Penetration (feet) 6' 6 ' 6 '
Design Elevation of To p of P ier (feet) 99 .0' 99 .0 ' 99 .0'
Actu al Shaft Diameter (i nches) 18 " 18" 18 "
Depth to Bear ing Strat um -( Hard G ray
unweathered Limestone (feet) 13 .67' 14 .25' 15.33'
Required Pier Depth due to Bearing Stratum
(feet) 19.67' 20 .25 ' 21 .33'
Act ual Depth to Pier Bottom (feet) 20 .42 ' 21 .83 ' 22.42'
Act ual Pier Penetration (feet) 6 .59 ' 7 .59 ' 7.08 '
Pier P lu mb withi n Specifi cation
(Yes/No) Yes Yes Yes
Casi ng Requ ired (Yes/No) No No No
Water Present in Bottom of Pier Hole at Time
of Concrete Pl acement (Yes/No) No No No
Pi er Bottom Clean (Yes/No) Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7
Horizontal Ties (Size & Spac ing) #3 (@. 12's #3 (@. 12's #3 2 12's
Re bar Cage Diameter (inches) 12" 12" 12 "
Length of Re bar Cage (Ft) 21.25 ' 22 .50' 22 .67'
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
REMARK S:
Page 1 of2
G . G ree n
E .P. Drilling
M .1 / 17 J .9 I 18
56 60
18" 18"
6' 6'
96 .92 ' 96 .92 '
18" 18"
16 .17' 18.17'
22 .1 7' 24 .17'
23 .0' 25 .0'
6 .67' 6 .67'
Yes Yes
No No
No No
Yes Yes
6#7 6#7
#3(@. 12's #3 (@. 12 's
12 " 12 "
21 .17' 23 .42'
Yes Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth, TPW
PROJECT: Fire Station #5 INSP ECTOR :
REPORT NO.: 17-097-004 DRILLING COMPANY:
REPORT DATE: I 0/20/10
Pier Location (column Line) C .5 I 17 F.1 / 17 H.1 /17
Mas-Tek Pier # 52 53 54
Design Shaft Diameter (inches) 18 " 18" 18"
Design Penetration (feet) 6' 6' 6'
De sign Elevation of Top orPier (feet) 96 .92' 96 .92 ' 96 .92 '
Actual Shaft Diameter (inches) 18" 18 " 18 "
Depth to Bearing Stratum -( Hard Gray
unweathered Limestone (feet) 15 .0' 17 .59 ' 17 .08 '
Required Pier Depth due to Bearing Stratum
(feet) 21 .0' 23 .59' 23 .08 '
Actual Depth to Pier Bottom (feet) 22 .0' 24 .33 ' 24 .7 5'
Actua l Pier Penetration (feet) 7.0' 6 .59' 6 .75 '
Pier Plumb within Specification
(Yes/No) Yes Yes Yes
Casing Required (Yes/No) No No No
Water Present in Bottom of Pier Hole at Time of
Concrete Placement (Yes/No) No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes
Vertical Bars (No . & Size) 6#7 6#7 6#7
Horizontal Ties (Size & Spacing) #3@ 12's #3@ 12's #3@ 12's
Rebar Cage Diameter (inches) 12" 12 " 12"
Le ngth of Rebar Cage 21 .17' 23 .0' 23 .25 '
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
REMARKS:
D. Cotton
E.P . Drilling
Aaron Cotton, Jr. Project Manager
Page 2 of2
A
B
C
D
MAS-TEK ENGINEERING & A S SOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: Ci ty of Ft. Worth, TPW
PROJ E CT : F ire Station #5 IN S PECTOR:
REPORT NO.: 17-09 7-006 DRILLING COMPANY :
REPORT DAT E: 10/2 1/10
Pie r Locati on (co lu mn Li ne) C .5 I 15 C .5 I 19 F.1 / 19
Mas -T ek P ie r # 46 62 63
Des ign Shaft D iameter (inc hes) 18" 18" 18"
Design Penetrat ion (feet) 6' 6 ' 6 '
Design Elevatio n of Top of P ie r (feet) 96 .92 ' 96 .33 ' 96 .33'
Actual Shaft D ia meter (inches) 18" 18" 18"
Depth to Bearing Stratum -( Ha rd Gray
unweathered Li mestone (feet) 17 .67' 17 .0' 18 .0'
Req ui red Pier Dep th due to Bear ing Stratum
(feet) 23 .67' 23 .0' 24 .0'
A ctu a l D epth to P ie r Bottom (feet) 24 .33 ' 24.42' 24 .17'
Actua l P ier Penetratio n (feet) 6 .67' 7.45' 6.17'
P ier Plu mb with in Specifi cation
(Yes/No) Yes Yes Yes
Cas in g Requi red (Yes/No) No No No
Water Present in Bottom of Pier Hole at Time
of Concrete Pl acement (Yes/No) No No No
P ie r Bottom Cl ean (Yes/No) Yes Yes Yes
Vert ica l Bars (No . & Size) 6#7 6#7 6#7
Hor izontal Ti es (Size & Spacing) #3 la) 12's #3 la) 12 's #3 2 12 's
Rebar C age D ia meter (i nches) 12" 12 " 12"
Length of Rebar Cage (Ft) 22 .83' 22 .75 ' 22 .25'
Co ncrete Pl aced w ith a Tremie? (Yes/No) Yes Yes Yes
REMARK S :
G . Gree n
E.P. D rill ing
J .9/17
55
18"
6 '
96 .92'
18"
18 .50 '
24 .50 '
24 .75'
6.25'
Yes
No
No
Yes
6#7
#3(a) 12's
12"
23 .25 '
Yes
Aaron Cotton , firoJect Manager
Page 1 of 1
M.1 / 15
50
18"
6'
96 .92 '
18"
17 .25 '
23 .25 '
24 .0'
6.42 '
Yes
No
No
Yes
6#7
#3 la) 12's
12"
22 .59 '
Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth , TPW
PROJECT: Fire Station #5 INSPECTOR:
REPORT NO.: 17-097-008 DRILLI NG COMPANY:
REPORT DA T E: 10/22/10
Pier Location (column Line) F .5-9 M .5 / 16 J.9 / 15
Mas-Tek Pier # 23 51 49
Design Shaft Diameter (inches) 18" 18" 18"
Design Penetration (feet) 6' 6' 6'
Design Elevation of Top of Pier (feet) 97 .08 ' 97 .08 ' 96 .92'
Actual Shaft Diameter (inches) 18" 18" 18"
Depth to Bearing Stratum -( Hard Gray
unweathered Limestone (feet) 14.33' 18 .0' 17 .67'
Required Pier Depth due to Bearing Stratum
(feet) 20 .33' 24 .0 ' 23.67'
Actual Depth to Pier Bottom (feet) 21 .0' 24.42 ' 24.42'
Actual Pier Penetration (feet) 6.50' 6 .62 ' 6 .59'
Pier Plumb within Specification
(Yes/No) Yes Yes Yes
Casing Required (Yes/No) No No No
Water Present in Bottom of Pier Hole at Time
of Concrete Placement (Yes/No) No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7
Horizontal Ties (Size & Spacing) #3@ 12's #3 (@, 12's #3 2 12's
Rebar Cage Diameter (inches) 12" 12" 12"
Length of Rebar Cage (Ft) 20.0 ' 23 .0' 22 .50'
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
REMARKS:
G . Green
E.P. Drilling
H .1 / 15
48
18"
6'
96 .92 '
18"
18 .0'
24 .0'
24.50'
6 .58'
Yes
No
No
Yes
6#7
#3(@, 12's
12"
23.0'
Yes
Aaron Cotton, Jr. Project Manager ·
Page I of I
A
B
C
D
MA S-TE K ENGI NEE RING & A SS OCIATES
DRILLE D PI ER INSPECTION REPORT
CLIENT: City of Ft. Worth, TPW
PROJ EC T : Fire Station #5 IN SP ECTOR :
REPORT N O.: 17-097-010 DRILLIN G COMP ANY :
REPORT DATE : I 0/23/10
P ier Location (co lu mn Line) F.1/15 M.5 / 14 D / 14
Mas-Tek P ier# 47 45 40
Des ign Shaft D iameter (inch es) 18 " 18" 18"
Des ign Penet rat ion (feet) 6' 6' 6'
Design Elevat io n of Top of P ier (feet) 96 .92 ' 97 .08 ' 96 .92 '
Actu a l S haft D iam eter (i n ch es) 18" 18" 18 "
Dept h t o Bear ing Stratum -( H a rd Gray
unweat hered L imeston e (feet) 17.42 ' 17 .25' 17 .50 '
Required P ier Depth due to Bear ing St ratum
(feet) 23.42' 23 .25 ' 23.50'
Actua l D epth t o P ier Bottom (feet) 24 .0' 24 .0 ' 23 .50 '
Actual Pier P enetration (feet) 6.42' 6 .75' 6 .0'
P ier P lumb within Sp ecification
(Yes/No) Yes Yes Yes
Casi ng R eq u ired (Yes/No) No No No
Water P resent in Bottom of Pier Ho le at Time
of Concrete Pl acement (Yes/No) No No No
P ie r B ottom C lean (Yes/No) Yes Yes Yes
Vertica l Bar s (No . & Size) 6#7 6#7 6#7
Horizont al Ties (Size & Spaci ng) #3 (a). 12 's #3 (a). 12 's #3 2 12's
Rebar Cage D iameter (i n c hes) 12 " 12" 12"
Length of Rebar C age (Ft) 23.0 ' 23 .0 ' 23 .33 '
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
REMARK S:
,,,
G . Green
E .P . Drilling
L.5/14
44
18 "
6'
96 .92 '
18"
17 .25 '
23 .25 '
24 .0'
6 .75 '
Yes
No
No
Yes
6#7
#3(a). 12's
12 "
23 .0'
Yes
Aaron Cotton, Jr. P roject Manager·
Page 1 of I
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth , TPW
PROJECT: Fi re Station #5 INSPECTOR:
REPORT NO.: 17-097-01 2 DRILLING COMPANY: ----------REPORT DA TE: 10 /25/10
Pier Location (column Line) J .9 -14 H .1-14 F-1 -14
Mas-Tek Pier # 43 42 41
Des ign Shaft Diameter (inches) 18 " 18" 18"
Design Penetration (feet) 6' 6 ' 6'
Design Elevation of Top of Pier (feet) 96 .92' 96.92 ' 96 .92'
Act ual Shaft Diameter (inches) 18" 18 " 18"
Depth to Bearing Stratum -( Hard Gray
unweathered Limestone (feet ) 17 .33' 17 .59 ' 17 .67'
Required Pier Depth due to Bearing Stratum
(feet) 23 .33 ' 23 .59 ' 23 .67'
Actual Depth to Pier Bottom (feet) 24 .0' 24 .59 ' 24 .42'
Actual Pier Penetration (feet) 6 .67' 7.0 ' 6 .75'
Pier Plumb within Spec ification
(Yes/No) Yes Yes Yes
Casing Required (Yes/No) No No No
Water Present in Bottom of Pier Hole at Time
of Concrete Placement (Yes/No) No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7
Horizontal Ties (Size & Spacing) #3 (@ 12's #3 (@ 12 's #3 2 12's
Rebar Cage Diameter (inches) 12" 12" 12"
Length of Rebar Cage (Ft) 22 .0' 23 .0' 23 .0'
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
Page I of 5
G. Green
E.P. Drilling
A-13 A-11
33 27
18 " 18"
6 ' 6'
97 .08' 97 .08'
18" 18"
17 .75 ' 17 .0'
23 .75 ' 23 .0'
25.50' 24.25'
7 .50 ' 7.25'
Yes Yes
No No
No No
Yes Yes
6#7 6#7
#3(@ 12's #3 (@ 12's
12" 12"
20.0' 20 .0'
Yes Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth, TPW
PROJECT: Fire Station #5 I NS PECTOR:
REPORT NO.: l 7-097-012 DRILLING COMPANY: --------------REPORT DATE: 10/25 / 10
Pier Location (column Line) L -11 E -11 M.5 -12 .5
Mas-Tek Pier# 31 28 34
Design Shaft Diameter (i nches) 18" 18 " 18"
Design Penetration (feet) 6 ' 6' 6'
Design E levation of Top of Pier (feet) 97 .08' 97 .08 ' 97 .08 '
Actual Shaft Diameter (inches) 18" 18" 18 "
Depth to Bearing Stratum - ( Hard Gray unweathered
Limestone (feet) 17 .59' 17 .0' 17 .33'
Required Pier Depth due to Bearing Stratum (feet) 23 .59' 23 .0' 23 .33'
Actual Depth to Pier Bottom (feet) 23 .67' 23 .08' 23 .33'
Actual Pier Penetration (feet) 6 .08' 6 .08 ' 6 .0'
Pier Plumb within Specification
(Yes/No) Yes Yes Yes
Casing Required (Yes/No) No No No
Water Present in Bottom of Pier Ho le at Time of
Concrete Placement (Yes/No) No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes
Vertica l Bars (No. & Size) 6#7 6#7 6#7
Hori zontal Ties (Size & Spacing) #3@ 12's #3@ 12's #3 2 12's
Rebar Cage Diameter (inches) 12" 12" 12"
Length of Rebar Cage (Ft) 21 .0' 22 .0' 22 .0'
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
Page 2 of 5
G . Green
E .P. Drilling
M.5 -10 .5 L -9
32 26
18" 18"
6' 6'
97 .08' 97 .08'
18" 18 "
18 .0' 18.0'
24 .0' 24 .0'
24 .0' 24 .0'
6 .0' 6 .0'
Yes Yes
No No
No No
Yes Yes
6#7 6#7
#3@ 12 's #3@ 12 's
12" 12 "
21 .0 ' 22 .0
Yes Yes
A
B
C
D
MAS-TEK ENGI NEER IN G & ASSO C IA T ES
DRILLED P IE R INSP E CTION RE PORT
C LI EN T : City ofFt. Worth, TPW
PROJ ECT: Fire Station #5 INS P ECTO R: G . Green
R EPORT NO.: 17 -097-012 DR IL LI NG C O M PANY: E.P. Drilling
REPORT DA T E: 10/25 /10
Pier Location (co lumn Line) J .1 -13 L -13 E -13 A -9
Mas-Tek Pier# 37 38 34 20
Design Shaft Diameter (inches) 18 " 18 " 18 " 18 "
Design Penetration (feet) 6 ' 6' 6 ' 6'
Design Elevation of Top of Pier (fee 97 .1' 97 .1' 97 .1' 97 .1'
Actual Shaft Diameter (inches) 18" 24' 18" 18 "
Depth to Bearing Stratum -( Hard
Gray unweathered Limestone (feet) 17 .0' 17 .08 ' 15 .6 7' 16 .17'
Required Pier Depth due to Bearing
Stratum (feet) 23 .0 ' 23 .08' 2 1.67' 22 .17'
Actual Depth to Pier Bottom (feet) 23 .0' 23 .08 ' 2 3.25 ' 22 .33'
Actual Pier Penetration (feet) 6 .0' 6.0' 6 .0' 6 .17'
Pier Plumb within Specification
(Yes/No) Yes Yes Yes Yes
Casing Required (Yes/No) No No No No .. --
Hole at Time of Concrete
Placement (Yes/No) No No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6 #7 6#7
Horizontal Ties (Size & Spacing) #3@ 12 's #3@ 12 's #3 2 12 's #3@ 12 's
Rebar Cage Diameter (inches) 12" 12 " 12 " 12 "
Length of Rebar Cage (Ft) 2 .0 .5' 2 1' 2 1' 21 '
Concrete Placed with a Tremie?
(Yes/No) Yes Yes Yes Yes
Page 3 of 5
C -10
21
18 "
6'
97 .1'
18"
17 .0'
23.0 '
23 .33'
6 .33 '
Yes
No
No
Yes
6#7
#3@ 12's
12 "
21 '
Yes
A
B
C
D
·MAS-TEK ENGINEERING & ASSOC IATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth , TPW
PROJECT : Fire Station #5 IN S PECTOR: G . Green
REPORT NO.: 17-097-012 DRILLING COMPANY: E.P. Dril li ng ---------R EPORT DATE: ! 0/25/10
Pi er Location (column Line) J .1 -11 D-9 M-7 M.5-7
Mas-Tek Pier# 30 22 18 19
Design Shaft Diam eter (inches) 18" 18" 18" 18 "
Design Penetration (feet) 6' 6' 6' 6'
Design Elevation of To p of Pier (feet) 97 .08 ' 97 .08' 97.08 ' 97 .08'
Actual Shaft Diameter (inches) 18" 18" 18 " 18"
Depth to Bearing Stratum -( Hard
Gray unweathered Limestone (feet) 17.50 ' 17 .33' 17 .0' 17.42'
Required Pier Depth due to Bearing
Stratum (feet) 23 .50' 23.33 ' 23 .0' 23.42 '
Actual Depth to Pier Bottom (feet) 24 .53 ' 24 .17' 23.42' 23 .59 '
Actual Pier Penetration (feet) 6 .67' 6 .67' 6.42 ' 6 .7'
Pier Plumb within Specification
(Yes/No) Yes Yes Yes Yes
Casing Required (Yes/No) No No No No . ... -. -· -·-
at Time of Concrete Placement
(Y es/No) No No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7 6#7
Horizontal Ties (Size & Spacing) #3 l@ 12's #3 l@ 12 's #3 2 12's #3l@ 12's
Rebar Cage Diameter (inches) 12" 12" 12" 12"
Length of Rebar Cage (Ft) 23 .0' 23 .0' 23 .0' 23 .0'
Concrete Placed with a Tremie?
(Yes/No) Yes Yes Yes Yes
Page 4 of 5
J .1 -9
25
18"
6'
97 .08 '
18"
17.42'
23.42 '
24 .08'
6.59 '
Yes
No
No
Yes
6#7
#3 l@ 12's
12"
23 .0'
Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City ofFt. Worth, TPW
PROJECT: Fire Station #5 INSPECTOR: G. Green
REPORT NO.: 17-097-01 2 DRILLING COMPANY: E.P . Drilling
REPORT DATE: 10/25 /10
Pier Locat ion (column Line) F.5 -7
Ma s-Tek Pier fl 15
Design Shaft Diameter (inches) 18"
Design Penetration (feet) 6'
Design Elevation of Top of Pi er (feet) 97 .08'
Actual Shaft Diameter (in ches) 18"
Depth to Bearing Stratum -( Hard
Gray unweat hered Lime stone (feet) 17 .33'
Required Pier Dep th due to Bearing
Stratum (feet) 23.33'
Actu a l Depth to Pi er Bottom (fee t) 24 .0'
Actual P ier Penetration (feet) 6 .67'
Pier Plumb within Specification
(Ye s/No) Yes
Cas in g Req uir ed (Yes/No) No
at Time of Concrete Placement
'Yes/No) No
Pier Bottom C lean (Yes/No) Yes
Vertical Bars (No . & Size) 6#7
Ho ri zonta l Ties (Size & Soacinl!.) #3 (@ 12's
Rebar Cage Di ameter (inches) 12"
Le ngth of Rebar Cage (Ft) 22 .0'
Concrete Pl aced with a Tremie?
(Yes/No) Yes
REMARKS:
Aaron Cotton, Jr . Project Manager
Page 5 of 5
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth, TPW
PROJECT : Fire Station #5 INSPECTOR:
R EPORT NO.: I 7-097-014 DRILLING COMPANY: ----------REPORT DA TE: 10/26 /IO
P ier Location (co lumn Line) F - 1 F-2 F.5 -13
Mas-Tek Pier# 1 6 35
Design Shaft Diameter (inches) 18 " 18" 18"
Design Penetration (feet) 6' 6' 6'
Design Elevation of Top of Pier (feet) 97 .08' 97 .08' 97 .08'
Actua l Shaft Di ameter (inches) 18 " 18" 18"
Depth to Bearing Stratum -( Hard Gray
unweathered Limestone (feet) 17 .33' 17 .17' 17 .33 '
Required Pier Depth due to Bearing Stratum
(feet) 23 .33' 23 .17' 24.42'
Actual Depth to Pier Bottom (feet) 24.0 ' 24 .17' 24.42'
Actual Pier Penetration (feet) 6.67' 7.0' 7.08 '
Pier Plumb within Specification
(Yes/No) Yes Yes Yes
Casing Required (Yes/No) No No No
Water Present in Bottom of Pier Hole at Time
of Concrete Placement (Yes/No) No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7
Horizontal Ties (Size & Spacing) #3@ 12" #3@. 12" #3@. 12"
Rebar Cage Diameter (inches ) 12" 12 " 12 "
Length of Rebar Cage (Ft) 22' 22' 23'
Concrete Placed with a Tremie? (Yes/No) Yes Yes Yes
Page I of 4
G. Green
E.P . Drilling
F.5 -11 K-3
29 67
18" 18"
6' 6'
97 .08' 97.08'
18 " 18"
18 .0' 17.08'
24 .0 ' 23 .08'
24 .08 ' 23 .33'
6 .08 ' 6.25'
Yes Yes
No No
No No
Yes Yes
6#7 6#7
#3@ 12" #3@ 12"
12" 12"
23' 23'
Yes Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT : City of Ft. Worth, T PW
PROJECT : Fire Stat ion #5 IN S PECTOR:
RE PORT NO.: 17-097 -0 14 DRILLI NG COMPAN Y:
REPORT DAT E: 10 /26/10
Pier Location (co lumn Line) K-7 H.8-7 H.8 -4 .2
Mas-Tek P ier # 17 16 11
Design Shaft Diameter (inches) 18" 18" 18"
Design Penetration (feet) 6' 6 ' 6 '
Des ign Elevation of Top of P ier (feet) 97 .08 ' 97 .08 ' 97 .08'
Actua l Shaft D iameter (in ches) 18" 18" 18"
Depth to Bearing Stratum -( Hard Gray unweathered
Limestone (feet) 17 .0' 17.08 ' 17 .17'
Requ ired P ier Depth due to Bea r ing Stratum (feet) 23 .0' 23 .08 ' 23.17'
Actua l Depth to Pier Bottom (feet) 23 .0' 23 .08 ' 23 .25 '
Actual Pier Penetration (feet) 6 .0' 6 .0 ' 6 .08 '
Pier Pl umb within Specification
(Yes/No) Yes Yes Yes
Casing Requ ire d (Yes/No) No No No
Water Presen t in Bottom of Pier Ho le at T ime of
Conc rete Pl acement (Yes/No) No No No
P ier Botto m Clean (Yes/No) Yes Yes Yes
Vertical Bars (No. & Size) 6#7 6#7 6#7
Horizontal Ties (S ize & Spacing) #3@ 12" #3 (@ 12 " #3@ 12"
Rebar Cage Diameter (inches) 12" 12" 12"
Length of Re bar Cage (Ft) 21 ' 21 ' 21'
Co ncrete Placed wi th a Tremie? (Yes/No) Yes Yes Yes
Page 2 of 4
G . Green
E .P. Drilli ng
K-5 G - 1
12 2
18 " 18"
6' 6 '
97 .08' 97 .08'
18 " 18"
17 .17' 18 .0'
23 .27' 24 .0'
23 .50 ' 24 .25 '
6 .33 ' 6 .25 '
Yes Yes
No No
No No
Yes Yes
6#7 6#7
#3@ 12 " #3@ 12 "
12 " 12"
21' 22 '
Yes Yes
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION REPORT
CLIENT: City of Ft. Worth, TPW
PROJECT : Fire Station #5 INSPECTOR: G . Green
REPORT NO.: 17-097-014 DRI LLING COMPANY: E .P . Drilling
REPORT DA TE: 10/26/2 010
Pier Location (column Line) H.8 -1 K-1 F.4 - 2.9 0-6
Mas-Tek Pier # 3 4 68 13
Design Shaft Diameter (inches) 18" 18" 18" 18"
Des ign Penetration (feet) 6' 6' 6' 6 '
Design Elevation of Too of Pier (feet) 97 .08' 97 .08' 97 .08' 97 .08'
Actual Shaft Diameter (inches) 18" 18" 18" 18"
Depth to Bearing Stratum -( Hard Gray
unweathered Limestone (feet) 17.08' 16.42' 17.0' 18.25'
Required Pier Depth due to Bearing
Stratum (feet) 23 .08' 22.42' 23 .0' 24 .25'
Actual Depth to Pier Bottom (feet) 23.42' 22 .83' 23 .0' 24 .25'
Actual Pier Penetration (feet ) 6.17' 6.42' 6 .0' 6.0'
Pi er Plumb with in Specification
(Yes/No ) Yes Yes Yes Yes
Casin g Req uired (Yes/No) No No No No
Water Present in Bottom of Pier Hole at
Time of Concrete Placement (Yes/No) No No No No
Pier Bottom Clean (Yes/No) Yes Yes Yes Yes
Ye1tica l Bars (No. & Size) 6#7 6#7 6#7 6#7
Horizonta l Ties (S ize & Spacin g) #3 {@ 12" #3 {@ 12" #3 {@ 12" #3 {@ 12"
Rebar Cage Diameter (inches) 12" 12" 12" 12"
Len gt h of Rebar Cage (Ft) 21 ' 21 ' 21' 23'
Co ncrete Placed w ith a Tre mi e?
(Yes/No) Yes Yes Yes Yes
Page 3 of4
F-6
14
18"
6'
97 .08'
18"
17 .0'
23.0'
23 .50'
6.50'
Yes
No
No
Yes
6#7
#3 {@ 12"
12"
23'
Yes
•
A
B
C
D
MAS-TEK ENGINEERING & ASSOCIATES
DRILLED PIER INSPECTION R EPORT
CLIENT: Ci ty o f Ft. Worth, T PW
PROJECT: F ire Station #5 INSPECTOR: G . Gree n
REPORT NO.: 17 -097-014 DRILLING COMPANY: E.P . Drill ing ----------REPORT DATE: 10/2 6/2 010
P ier Location (colu mn Li ne) D-4 F-4 F.4-4.1 D-2
Mas-Tek P ier# 7 8 9 5
Design Shaft Diameter (inches) 18" 18 " 18" 18"
Design Penetration (feet) 6' 6' 6' 6'
Design Elevation of Top of Pier (feet) 97.08 ' 97 .08' 97 .08' 97 .08'
Actual Shaft Dia meter (in ches) 18" 18" 18" 18"
Depth to Bearing Stratum - ( Hard Gray
un weathered Li mestone (feet) 17 .33 ' 17 .59' 17 .59' 17.33'
Required Pier De pth due to Beari ng
Stratum (feet) 23 .33 ' 23 .59' 23 .59' 23 .33'
Actual Dept h to Pier Bottom (feet) 23 .59' 24 .33' 23 .59 ' 23 .33'
Actua l Pie r Penetration (feet) 6.25' 6.75' 6 .0' 6.0'
Pier P lum b w ithin Specification
(Yes/No) Yes Yes Yes Yes
Cas ing Re quired (Yes/No) No No No No
Water Present in Bottom of P ier Ho le
at Time of Conc rete Placement No No No No
Pier Bottom C lean (Yes/No) Yes Yes Yes Yes
Vetiica l Ba rs (No. & Size) 6#7 6#7 6#7 6#7
Horizontal Ties (Size & Spaci ng) #3@ 12 " #3@ 12 " #3 (cf) 12" #3@ 12 "
Rebar Cage Diameter (inches) 12 " 12" 12" 12 "
Lengt h of Reba r Cage (Ft) 23' 22' 23' 23'
Concrete Placed with a Trem ie ?
(Yes/No) Yes Yes Yes Yes
REMA RKS :
/) r1
I
. j --0.dln
Aaron Cotton , J r. Proj ect Manager
Page 4 of 4
H.8 - 2.8
69
18"
6'
97 .08'
18"
17 .59'
23 .59'
23 .59'
6.0'
Yes
No
No
Yes
6#7
#3@ 12"
12"
23 '
Yes
PROJECT NAME:
BuySpeed No :
Contract No :
D.O .E. No :
Attachment to Change Order No:
Today's Date :
Original Contract Amount:
Extras to Date:
Credits to Date :
Contract Amount to Date :
Amount of Proposed Change Order:
Revised Contract Amount:
PROJECT SUMMARY SHEET
(Change Order Attachment)
Fire Station #5
P0-10-00060917
CS40540
N/A
1
2/23/11
TOTAL
$ 2,413,807.00
$
$
$ 2,413,807.00
$ 14,166.00
$ 2,427,973.00
Original Funds Avail. for Admin. Change Orders : $ 150,000.00
Remaining Funds Available for Change Orders : $
Additional Fund ing (if necessary): $ 135,834.00
Prepared By : Brandy Crane T/PW Mgmt Svs .
.. . .
I jj • l
....
I\
V
..,
.,