Loading...
HomeMy WebLinkAboutContract 40540-CO4' City of Fort Worth Change Order Request CITY SECRETARY CONTRACT NO . -4{) '64{)-(_0 4- Change Order No . Date TPW Project No . Funding (FAC) C 295 541200 4 (four) 11 /15/11 208110073980-00004868 Facility and Project Description City Secretary Contract No . Fire Station 5 40540 ORIGINAL CONTRACT AMOUNT ................................................................ $2,413,807 EXTRAS TO DATE .................................................................... . $ 69 ,259 CREDITS TO DATE ................................................................... . $ 0 CONTRACT COST TO DATE ................................................................................................. . $2,483,066 $ 17,885 $2,500,951 $ 150,000 $ 62,856 AMOUNT OF PROPOSED CHANGE ORDER ........................................................................... . REVISED CONTRACT AMOUNT ............................................................................................ . ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... . REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ . ADDITIONAL FUNDING (IF NECESSARY)................................................................................ 0 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Provide all labor and materials as per attached: PCR 19 -add brick columns at back patio area with downspouts PCR 21 -delete hydromulch and add sod at grass areas Add Add $13 ,888 $3,997 TOTALADD $ 17,885 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and m oney) for all costs arising out of, or incidental to, the a bove Change Order Contractor's Name Imperial Construction, Inc. Ori ginal Contract Time Additional Approved Time To Date Approved Contract Time To Date Add iti onal Time For This Change Orde r 287cd 130cd 417cd Ocd Distributio n : Fi le Construction Manager P roject Manager Contractor Date _/ J'~$'/II Date Date 11. n.1 Date1/8/08 OFFICIAL_ RECORD CITY SECRETARY P Ft~ R"l'iH, TX TO : City of Fort Worth.t 7 10/12/2011 JOB NAME : Fort Worth F ire Station #5 DATE ATIENT ION : Jack Durham T he foll owing is a detailed cost breakdown , including both mater ia ls & labor, for a ll additions to a nd / or deductions from the contract sum . SCOPE: WPCR to add 4 columns and modify downspou ts CONTRACTOR'S CHANGE PROPOSAL 10-0413 PROJECT NO. 19 CHANGE PROPOSAL NO . .._ ________________________________ _. 1. LABOR NUMBER RATE LABOR CATEGORY SUPERVIS ION CARPENTER LABORER MA N HOURS PER HOUR COST 2. MATER IALS / EQUIPMENT RENTALS DESCRIPTION QUANTITY 0 $ 59 .0 0 0 $ 37 .00 0 $ 24 .00 0 $ LABOR SUB TOT A L LABOR BURDE N TOT AL ITEM 1 : UNIT PRICE TOT AL ITEM 2 : $ - $ - $ - $ - $ - $ - $ - E3 t±:::::d 3. SUBCONTRACTS SUBCONTRACTOR Father and Sons DESCR IPT ION A & S Steel Posado's Paint Columns downspouts Pa i n ting TOT AL ITEM 3 : $ $ $ $ $ $ $ $ 9 ,1 41.14 2,250 .00 340 .00 - - - - 11,731.14 4 . SUBTOT A L W ITHOUT MARKUP (ITEMS 1, 2 , & 3) $ 11,731 .14 5 . G & A OVERHEAD 10% $ 1,1 73.11 6 . SUBTOTAL INCLUDING OVERHEAD $ 12 ,904.25 7 . PROFIT 5% $ 645 .21 8 . SUBTOTAL INCLUD ING OVERHEAD AND PROFIT $ 13 ,549.47 9 . PERFORMANCE AND PAYMENT BOND 2 .50% $ 338.74 10. SALES TAX 0 .00% $ - 11. TOTAL ( ADDITION I DEDUCTION } TO CONTRACT SUM IF ACCEPTED I$ 13,sss.20 I REQUEST IS MADE FOR ADD ITION OF ___ 1_0 ___ CALENDAR DAY S TO THE CONTRACT PER IOD The above proposa l i s s u bbmitted for your consi derat ion . The undersigned contr actor understands and agrees t hat th is p roposal is vali dated on ly by the Owners s i gnature . Jimmy 'Tuley Jimmy Tuley Project Manager ICI (Imper ial Construction, Inc) NAME OF co·NTRACT IN G FIRM Change Order Approval b y Owner I Architect T h is change proposal fo r sub je ct work requires your approv al by ( ASAP ). A deli nquent response will accrue additional cost that is not included in this or igina l change order price. Each day beyond the required date additi onal items will be added to the change proposal to reflect the acrued change. This w ill be determi ned after your authorization is finally received . Accordingly, upon receipt of your approval , all cost r esulting from these additional factors wil l be submitted to correct t he final change order pri ce . Date ' Patfier Sons 9dasonry Stucco Inc. =· -FATHERAND SON S MASONRY 1266 Narrow Ln . Red Oak. TX. 75154 P:972-576-5432 F:971-5765433 WYl W.fatherandsonsmason ry.com Job No. : 5002 Project : _F_ir_e_S_ta_t_io_n_#_5 ____________ _ Descri ption and Location of Work : PR #16 : 4 Masonry Columns Note: La bor Occupation (or employee) Foreman Mason Labor Payroll Taxes & Insurance @ Small Tools @ No. Workers 1 2 2 Hours Total Hours 32.0 32.0 32.0 64.0 32.0 64.0 C.O.R. Pricing Date : 10110111 ------ C .O.R .#:~_5'-"0-'-02;;;...·.;;..;09;....__ Work Date: TBD Rate $22.25 $19.00 $10.00 Subtotal Subtotal Amount ::;712.00 $1 ,216 .00 $640.00 $2,568 .00 $385 .20 $2,953.20 $88.60 Per Diem calc ulation : I 3% I (Total Hours / Bi = ___ o_.o __ ~ Man Days x $40 .00 I $0.00 Total labor, small tools & Per D iem ___ S_3~,0_4_1_.a_o_ Mate rials & Equipment Quantity Descriotion Rate Amount 1 EA 8" & 4" GT White Burn ished CMU , 1 F, 1 S1 F, 2F, 1 s. $2 ,325.000 $2,325.00 2.5 CY Concrete Fill $195.00 $487.50 2 CY Mortar $225.00 $450 .00 2 LS Misc re i n fo rc ing suppl ies $122.26 $244 .52 1 Cast Stone $400.00 $400 00 1 Small block fee -J ewel Concrete $1 ,000.00 $1,000.00 Subtotal $4,907.02 Sa les Tax S0 .00 ====== Authorized and Approved by : Tota l Mate ri al & Sales Tax $4,907.02 Comean~: Imperial Construction Subtotal $7,948.82 Address: 0.00% BIPD $0.00 15.00% Overhead & Profi t $1,192.32 Attention: Jimmy Tule~ Subtotal $9,141 .14 Signature : 0.00%1 Bond $0 .00 Date: Tota l Due! $9,141.14 1 .· ' A & S St eel 170 1 B rennan Aven u e 772 0 F ort W orth, T exa s 76 10 6 0267 11 /11 /2011 Company: Imperial Construction Attn: Fr eddie Vroyl es R eference: FS #5 , Downsp out T el 817-626- Fax 8 17-626- /-"··s&;pe-~fW~-rk:·;~mish labor, equipment, and su pervision for the fo llowing: ·-... -< ··>., ( Option #1: Fabricate and install TS4x4x 1 1ga downspout, as per sketch, galvanized after ' fa b rication . · ,_ Price=$2,250 .00 -~ ;::::::::.-.:-.-_-_•••••••~--• ... ••••••·•--·--·~.--,-·-'•••• ·-·-·•·~•;.,,,_._.,. VHV-'-W·-·-·••••••••••••H•••••• y ., __ _. -·-----.,---------~------------" ---• -------·- O ption #2: Fabricate and iffstaJI J o'ga 'galvanTzed'.do'WIYspout~as ·per :s}cetch ; welded and cb1ct galv?JUzed over vi~Ffa.,_ .... --..... Pric~ri::r2s. oo .. -·-·--··---· --...... _ Exclusions: Taxes, finish paint Lee Bri stow Project Manager 8 17-996-3490 1.~~ASFabri cati on .com N CTRCA CERT IFIED DBE H UB -ST A TE OF TEXAS PNadtt'j PtuHll«g 9027 Quinn St. Dallas , Texas 75217 Phone 214-391-7179 . Fax 214-391-7189 Attn: Freddy Boyles Additional Work# 01 CONTMCT DATE Additional work paint 4 D /spouts ADDITIONAL WORK AUTHORIZATION PHONE •: . • .JOflt"erWorth Fi re Station ADDITIONAL CHARGE FOR ABOVE WORK IS:$~------- AI.Yl.lENTw,u.sn.cADEAsFo u ows: · Total: $340.00 MOVE~ WORK 10 BE PERFORMED UNDER THE SAAIE CONOFT/01/S AS SPECIFIED IN Ofll(i/H,IL COl(T'AACT UNLESS OTkERWISf snPUU. TEO . OWN R SIGNATURE DATE THIS IS CHANGE ORDER NO.-------------- 1/0TE : m,s REVISION BECOMES PART OF ANO IN ACCORDANCE WITH THE EXISTING CONTMCT. tllu111h /l/011 TO: City of Fort Worth 10/12/2011 ... JOB NAME: Fort W rth Fire Station #5 DATE ATTENTION : Jack Durham The fo llowing is a detaiied cost breakdown , including both materials & labor , for all additions to and i or deductions f rom the contrac t sum . SCOPE: lnstali sod in lieu of hydro -mulch install sod at islands in lieu of Asian Jasm ine for a credit of -192 .00 CONTRACTOR'S CHANGE PROPOSAL 10-0413 PROJECT NO. CHANGE PROPOSAL NO . ----------------------------------' 1. LABOR NUMBER RATE LABOR CATEGORY SUPERVISION CARPENTER LABORER MAN HOURS PER HOUR 2'. MATER IALS/ EQUIPMENT RENTALS DESCRIPTION QUANTITY 0 $ 59.00 0 $ 37 .00 0 $ 24 .00 0 $ LABOR SUB TOTAL LABOR BURDEN TOT AL ITEM 1 : ·UNIT PRICE TOTAL ITEM 2 : 3. SUBCONTRACTS SUBCONTRACTOR A 2 Z curb decor DESCR IPTION SOD A 2 Z curb decor SOD at Islands TOT AL ITEM 3 : 4 . SUBTOTAL W ITHOUT MARKUP (ITEMS 1 , 2, & 3) 5. G & A OVERHEAD 6 . SUBTOTAL INCLUD ING OVERHEAD 7. PROFIT 8 . $UBTOTAL INCLUD ING OVERHEAD ,£>.ND PROFIT 9. PERFORMANCE AND PAYMENT BOND 10. SALES TAX 11 . TOTAL (ADDITION/ DEDUCTION) TO CONTRACT SU M IF ACCEPTED 10% 5% 2 .50% 0 .00% COST $ - $ - $ - $ - $ - $ - $ - $ 3 ,568.15 $ (192 .00 ) $ - $ - $ - $ - $ - $ 3 ,376.15 $ 3,376 .15 $ 337.62 $ 3 ,713.77 $ 185 .69 $ 3 ,899.45 $ 97.49 $ - j$ 3,996.94 j REQUEST IS MAD E FOR ADD IT ION OF 2 CALENDAR DAYS TO THE CONTRACT PERIOD ------- The above proposal is subbmitted for your consideratron. The undersigned contractor understands and agrees that th is proposal is val idated only by the Owners signature . I-\~~~~ C.F w l\ . ,s. ,, c..c.~ 4 11 ~ ,C\C\ 1 ~ Th is change proposal for subject wo r k requires your approva l by ( ASAP ). Jimmy 'Tuley Jimmy Tuley Project Manager I C I (Imperia l Construction , Inc) NAME OF CONTRACTING FIRM Change Order Approval by Owner I Architect A delinquent response will accrue additiona l cost that is not included in this origina l change order price . Each day beyond the required date additional items wi!I be added to the change proposa l to reflect the acrued change . Th is will be . determined after your authorization is finally rece ived . Accord ingly, upon rece ipt of your approval, all cost resulting from these additional factors will be submitted to correct the final change order price . Date RE: Fort Worth Fire House #5 Fort Worth, TX Change Order to include the landscaping of the Fort Worth Fire House: New Sod to be inst alled in place of the Asian Jasmine: 5 Pallets T i g 4 19 Bermuda sod to be installed over all turf areas 1,984 Squft Total $600 Asian Jasmine credit Total -$792 Total -19Q.. -11 l. e,~ A-2-Z Curb Decor, LLC Po Box 2074 Weatherford, TX 76086 817-372-2088 ,. RE: Fort Worth Fire House #5 Fort Worth, TX Change Order to include the landscaping of the Fort Worth Fire House: New Sod to be installed in place of the Hydro Mulch: 28 Pallets Tig 419 Bermuda sod to be installed over all turf areas 11,634 Sqft Total $4060 Hydro Mulch credit Total -$491.85 Total 3568.15 A-2-Z Curb Decor, LLC Po Box 2074 Weatherford, TX 76086 817-372-2088 A. I A® ft Document G709™ -2001 Work Changes Proposal Request PROJECT (Name and address j: C ity offort Worth Fire Station #5 850 lrma Street Fort Worth , Texas 76i04 OWNER (Name and addressj : City of Fort Worth 401 W. 13th Street Fort Worth, Texas 76102 FROM ARCHliECT (Name and address): RPGA Design Group , Inc . IO I S. Jennings Avenue, Suite l 00 Fort Worth, Texas 76104 TO CONiRACTOR (Name and address): Imperial Construction, Inc. PO Box 967 Weatherford, Texas 76086 PROPOSAL REQUEST NUMBER: 021 DATE OF ISSUANCE: 1 lilOil 1 CO NTRAC T FOR: General Con&truction CONTRACT DATE: July 15 , 2011 ARCHITECT'S PROJECT NUMBER: OWNER: IZI . ARCHITECT : C8J CONSULTANT: 0 CONTRACTOR: [gJ FIELD:0 OTHER:0 Please submit an i temized proposal for changes in th e Contract Sum and Contract Time for proposed modifications to · the Contract Documents described herein. Within Zero {O). days, the Contractor must submit this proposal or notify the Archi tect, in writing, of the date on which proposal submission is anticipated. THIS IS NOT A CHANG E ORDER, A CONSTR UCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN TH E PROPOSED MODIRC A TIONS, DESCRIPTION (insert a written description o.f rhe Work): Please provide pricing to provide and install bcrmuda turf in the form of sod in lieu of hydromulch as identified in sheet L-1.0 !. Also provide pricing to install bermuda turfin the form of sod in the parkway between the sidewalk and back of curb along Irma Street and Magnolia Avenue. ATTACHMENTS (List attache d documents that si..pport descriptionj: None REQUESf~A!<CHITEC,%/J /:___~(~ (Signat;m) / Javier Lucio, Project Architect (Prinied name and title) AJA Document G709"' -200,. Copyiight ~ 1993 and 2001 by The American Institute of Architects. All rights reserved; WARNING; This AJA" Do::ument is protsQled by U.S. Copyrl9ht Law and lnternatlor-.al Trootles. Unauthorlzed reproouetion or distribution of !ills. NA~ Ooet:mant, or any portion of it, may 1 resull in seven, clvll and c riminal pena!tli,s, and wlll be prosec uted to the maximum er.tent possible under the law. This document was produced by AJA software at 16 ;39 :45 an 11110/2011 under Order No.2518148474_ 1 which expires :>n 02/22/2012, and is not forrasale. User Notes: (12463102 56) PROJECT NAME : BuySpeed No : Contract No: D.O .E. No: Attachment to Change Order No: Today's Date : Original Contract Amount: Extras to Date: Credits to Date: Contract Amount to Date: Amount of Proposed Change Order: Revised Contract Amount: PROJECT SUMMARY SHEET (Change Order Attachment) Fire Station #5 P0-10-00060917 CS40540 N/A 4 11/16/11 TOTAL $ 2,413,807.00 $ 69,259.00 $ $ 2,483,066.00 $ 17,885.00 $ 2,500,951.00 Original Funds Avail. for Admin. Change Orders: $ $ 150,000.00 62,856.00 Remaining Funds Available for Change Orders: Additional Funding (if necessary): Prepared By : Karen Striker T/PW Mgmt Svs.