Loading...
HomeMy WebLinkAboutContract 40540-CO7Change Order No. 7 (seven) Facility and Project Descripti on Fire Station 5 Date 05/29/2012 City of Fort Worth Change Order Request TPW Project No . ORIGINAL CONTRACT AMOUNT ............................................................... . EXTRAS TO DATE .................................................................... . CREDITS TO DATE. .................................................................. . CITY SECRETARYJJ0\uo-to1 CONTRACT NO . ..;..-::j..µ._~J~l:;.;_..j-..... Funding (FAC) C 295 541200 208110073980-00004868 City Secretary Contract No. 40540 $2 ,413 ,807 $ 130 ,139 $ 0 CONTRACT COST TO DATE ................................................................................................. . $2 ,543 ,946 $ 3060.48 2 ,547 ,006 .48 $150,000 AMOUNT OF PROPOSED CHANGE ORDER. .......................................................................... . REVISED CONTRACT AMOUNT.. .......................................................................................... . ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... . REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ . ADDITIONAL FUNDING (IF NECESSARY) ............................................................................... . IN ACCORDANCE WITH THIS CHANGE ORDER , THE CONTRACTOR SHALL: Provide all labor and materials as per the attached Proposed Change Request $ 16 ,800 .52 0 PCR 34-Remove metal lathe on art wall and install paper backed lathe as per attached $ (o45.oo /? $ ~z.~ -~ 9t:, Contractor's Name Imperial Construction , Inc. Original Contract Time Additi ona l App roved Time To Date Approved Contract Time To Date Add it ional Ti me For Th is Change Order 287cd 130cd 417cd Ocd Distribution : 06-06-12 P03 :32 IN TPW Facilities Management Division Change Order Form (12/19/01 ) Date Date,.1-/-8ffi6 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ,; TO : City of Fort Worth . 4/12/2012 JOB NAME : Fort Worth F i r e S tati o n #5 DAT E ATIENTION : Jack Durham T he fo llowing is a deta iled cost brea kdow n, includ ing both materia ls & labor, for all add iti ons to and / or deducti ons from the contract s um . SCOPE: Remove ex is iting Metal La th and install paper-backed metal lath as per the scanned product sent out in Mike M ila m's ema il dated 4-9-12. CO NTRAC TOR'S CHANG E PROPOSAL 10 -0413 PROJECT NO . 34 CHANGE PROPOSAL NO . ---------------------------------- 1. LABOR LABOR CATEGORY SUPERVIS ION CARPENTER LABORER NUMBER RATE MA N HO U RS PER HOUR 0 $ 59.00 0 $ 37 .00 0 $ 24 .00 0 $ LABOR SUB TOTAL LABOR BURDEN TOT AL lTEM 1 : 2 . MATER IA LS / EQUI PM E NT RENTALS DESCR IPTION QUANTITY 3. S UBCONTRACTS SUBCONTRACTOR Lakeside Plaster DESCRIPT ION See attached email 4 . SU BT OTAL W ITHOUT MARKUP (ITEMS 1, 2, & 3) 5 . G & A OVERHEAD 6. S UBTOTAL INCLUD IN G OVERHEAD 7. PROFIT 8 . SUBTOTAL INCLUD IN G OVERHEAD AND PROFIT 9 .PERFORMANC E ANDPAYMENT BOND 10 . SALES TAX UN IT PR.ICE T OTAL ITEM 2 : TOT AL ITEM 3 : 11 . T OT AL ( ADDITION / DEDUCTION ) TO CONTRACT SUM IF ACCEPTED COST $ - $ . $ - $ . $ - $ - $ - $ 545 0 0 $ 545 .00 $ 545 .0 0 10% $ 54.50 $ 599.50 5% $ 29.98 $ 629.48 2 .50% $ 15 .74 0 .00% $ - Is 645.21 I REQU EST IS MAD E FOR ADDIT ION OF 0 CALENDAR DAYS TO THE CONTRACT PER IOD ------- The above proposal is subbm itted for your cons ideration . The undersigned co n tract or unders tands a n d ag rees t hat this proposal is v alidated only by t he Own ers s ignat ure. ~~ &J.,5.,~ CF=w ~~ C..t::i., J{o [g er 'l(d[ey This change proposa l for subj ect wor k requ ires yo ur approv al by ( 4-13-12 ). A deli nquent response w ill accrue add itional cost th a t is not includ ed Helger Kelley -Project Ma nager ICI (Imperial Co nstru c tion, In c) N AME OF CONTRACT ING F IRM in this or igina l c hange order pr ice . Each day beyond the required da te add iti ona l ite ms wii l be added to t he c hange proposal to reflect the acrued c hange. T his w ill be determined .after your authorization is fi na ll y rece ived . According ly , upon rece ipt oi your approva l, all cost resu lting from these additiona l facto rs will be s ubmitted to correct the fina l change o rder price. Change Order Approva l by Owner/ Arch itect Date 'l , ( Holger Kelley From: Howard Lin dsay <h lindsaylakesidep lasterino@yahoo.com> Sent: Wed nesday, April 11, 2012 8:46 AM To: Holger Ke ll ey Subject: Ft Worth Fire Station #5 Art Wall Helger, Price to remove metal l ath from emu @ art wall & install paper-backed metal lath: $545 .00 Thanks, Howard 1 • I T O: Ci ty o f Fo rt W o rth 4/1 2 /2012 JOB NAME: Fo rt W o rth Fire Stati o n #5 DATE ATTENTION: Ja ck Durham The following is a detailed cost breakdown , including both materia ls & labor, for all additions to and / or deductions from the contract su m . SCOPE : A s requested, cost to install blackout shade at Watch Station window to Vestibu le. CON TRAC TOR 'S CHANGE PROPO SAL 10-04 13 PROJ ECT NO . 35 CHANGE PROPOSAL NO . _________________________________ _. 1. LAB OR NUMBER RATE LABOR CATEGORY SUPERVISION CARPENTER LABORER MAN HOURS PER HOUR 2 . MATERIALS/ EQUIPMENT RENTALS DESCRIPTION QUANTITY 0 $ 59.00 0 $ 37.00 0 $ 24.00 0 $ LABOR SUB TOTAL LABOR BURDEN TOT AL ITEM 1 : UNIT PR ICE TOT AL IT EM 2 : 3 . S UBCO NTRAC TS SUBCONTRACTOR Tex-Sun DESCR IPTION See attached ema il TOTAL ITEM 3 : 4. SUBTOTAL WI T HOUT MARKUP (ITEMS 1, 2 , & 3) 5 . G & A OVERHEAD 6 . SUBTOT AL INCLUDING OVERHEAD 7 . PROFIT 8. S UBTOTAL INCLUDING OVERHEAD AND PROFIT 9 . PERFORMANCE AND PAYMENT BOND 10 . SALES TAX 11. TOTAL (ADDITION/ DEDUCTION ) TO CONTRACT SUM IF ACCEPTED 10% 5% 2 .50% 0 .00% COST $ - $ - $ - $ - $ - s - $ . $ 278 .00 $ 2 78.00 s 278.00 $ 27 .80 $ 305 .80 $ 15.29 $ 321 .09 , $ 8 .03 s - I$ 329.12 I REQUEST IS MADE FOR ADDIT ION OF 0 CALENDAR DAYS TO THE CONTRACT PERIOD ------- The above proposal is subbmitted for your cons iderati on . The unders ign ed contractor understa nd s and agrees that this proposal is val idated on ly by the Owners s ign ature . ~~ ,.,s,,~ er=.\.u ~r-C...o.-, Jfo(qer 'l(e[[ey This change proposa l for subject wo rk requires your approva l by ( 4-13-12 ). A delinquent response wil l accru e add itional cost that is not included He lger Kelley -Project Manager ICI (Imperial Co nstru ct io n, Inc) NAM E OF CONTRACTING FIRM Change Order Approval by Owner I A rchi tect in this original change order price. Each day beyond the required date add itiona l it ems will be added to the change proposa l to reflect the acrued cha nge. Th is will be determined a fter your authorization is finally rece iv ed. Accordingly , upon receipt of you r approval, all cost resulting from these additional factors wi ll be submitted to correct the final change order price . Date Holger Kelley From: Sent: To: Subject: Mi chae l Wiethorn <mike@te x-sun.com> Wednesday, Ap ril 11, 20 12 3:56 PM Holg er Ke l ley RE : FS 5 Wa rr anty Request Mini Blinds All fixed. The cost for the new blackout cell shade would be $278.00. Did you want to go ahead and o r der it now? Tex-Sun Shade , Bl ind & Specialti es Co. Mi chael Wiethorn 12640 E. Northwest Hwy #413 Da lla s , TX 75228 972-279-0132, (fax) 972-279-0611 From: Holger Kelley [maillp:HKelJ ev@i mperial -construction.com] Sent: Wednesday, April 11 , 2012 7:32 AM To: Mic hael Wl etho rn Cc: Holly Donaldson S ubj ect: FW: FS 5 Warranty Request Mini Bl inds Impo rtance: High Mike, Plea se attached warranty request and below information on accessing the facility. You might be ab l e to kill two bi rds with one stone here since you need to measure for the added window in the Night Watch are a. Please fill out the warranty request form when your work is completed with this warranty item. Thanks, Holg er Kelley VP/Ope rations Manager Imp eri al Constr uction, Inc. 817-341 -8886 Ext. 319 817-3 41-0191 F From: Milam, Mi ke [mailto:Mike.Milam@fortvvorthtexas.gov] Sent: Wednesday , Apr il 11, 2012 7:28 AM To: Ho lger Kelley; Holly Dona ldso n Cc: Gar rett, Gary; Brunson, James W. Subject: FS 5 Warranty Request Mini Bli nds Importance: High Holger/Holly, Stat i on 5 reported to me yesterday that the two m i ni bl ind s i n the ex ercise room wi ll not lower. I verified the operation a nd you have to manua ll y pu ll these dow n. 1 l'Vi\l HV!\ l n PO-Box 870 . ~ Fort Worth, Texas 76101-0870 www .fortworthtexas .gov/water Water/Sewer/Storm Water (24 hr) (817) 392-4477 Sanitation/Recycling (8 17) 392,3279 Online Payment/Billing History www.fortworth\exas.gov/h2online Automated Payments/Account Info (817) 392-4477 CUSTOMER NAME ACCOUNT NUMBER SERVICE ADDRESS ACCOUNT TYPE CONSTRUCTION IMPERIAL 1273499-125898 850 JRMA ST COMMERCIAL Main Office : 908 Monroe M-F (7:30 am -5:30 pm) Satel!ite Offices: 3741 SW Loop 820 M-F (8:00 am-5:00 pm) Fiesta: 4245 E Berry St Carnival : 102 NW 28th St Mon -Sat (9 am -7 pm) Sun (noon -5 pm) METER INFORMATION Cycle -Route: 07-04 Service Period: 04/02/2012-0S/03/2012 Metor# Service Previous Read Current Read Consumption 840295217 I 6984955 68644 19 30 15 0 FL WA YD 0 .00 19.30 405.00 0 .00 40.70 445.80 M J J A 5 0 N D J F M A M 0 ,00 21.40 39 .80 2011 2012 1 CCF = 100 Cubic Feet= 748., <>.,Dons :. IMPORTANT .MESSAGE Save money by conserving water. Water your lawn early in the morning or late in the evening when less water is lost to evaporation . Water deeply ( 1 inch of water) and infrequen ly to obtain a deep root system . Grass with a healthy root system can better tolerate hot temperatu re s. Repa ir any leaks. For more info visit, www.savefortwortvvater.org ACCOUNT ACTIVITY LAST BILL PAYMENTS (CREDITS) ADJUSTMENTS BALANCE FORWARD CURRENT CHARGES WA SERVICE CHARGE WA21.4 CCF@$223 YD SERVICE CH ARGE YD 39 .8 CCF@ $2.80 FL SERVICE C HARGE WATER SUBTOTAL WW SERVICE CHARGE WW 21.4 CCF@ $3.56 WASTEWATER SUBTOTAL EP ENVIR. PROTECT. FEE E NVIRO NMENT AL SUBTOTAL CONS UMPTION 2 1.40 39.80 21.40 TOTAL CURRENT CHARGES ACCOUNT BALANCE (DUE 0512 4/20 12) Due date applies to current charges only. 1B6.03 -186.03 0.00 o.oo 1 AMOUNT 28.50 47.72 28.50 111.44 25.50 241.66 9.30 76.18 85.48 10.00 10.00 337.14 j 337.14] Return bottom portion with your payment. FORT WORTH City of Fort Worth Water Department ~P0Box870 -S -Fort Worth, Texas 76101-0870 PLEASE DO NOT STAPLE OR TAPE YOUR PAYMENT TO THIS STUB. MAKE CHECKS PAYABLE TO: FORT WORTH WATER DEPARTMENT ~•AUTOss3 -}IGIT 760 45 PS3 7~25lCAOq-A-l 10!~1 1 AT o.37q 1,, 111 ,.p«il• 111 I IIJlr• 11' .. 11, ,11 1,1.1,11111111111, 11,11,1 .. 111 CONSTRUCTION IMPERIAL PO BOX 967 WEATHERFORD TX 76086-0967 CUSTOMER NAME ACCOUNT NUMBER SERVICE ADDRESS CONSTRUCTION IMPERIAL 127 3499-125898 850 IRMA ST AMOUNT DUE IF PAID BY 05/24/201 2 337.14 ,--------- DON AT 10 N TO UTILrTY ASSISTANCE ::=========::::::: AMOUNT ENCLOSED Please a.liow 7 days when mailing your payment. 111 pl•hll• I 111 lu !JI, 11 !1 111 J1111 l•1lllh•1l•nll ll1IJl 111 1Jl h CITY OF FORT WORTH WATER DEPARTMENT PO BOX 961003 FORT WORTH TX 76161-0003 001273499000125898000000337~4000000337142 TXU energy Account Summary Customer Name: Account Number: Invoice Number: Invoice Date: i MPERIAL CONSTRUCTION 100019155411 054975828995 05/09/2012 Previous Balance Credits/Payments Balance Forward Total Current Charges iota! Amount Due Due Date $1,395.23 $1,395.23 CR $0.00 $1,749.34 $1,749.34 05/25/2012 See remaining pages for invoice details. Customer Communications View your invoices real time and take action immediately. Avoid delay, sign up for Paperless Billing today! Good for you and good for the environment. Simply log onto TXU Energy My Account and click on the Paperless Billing Quick Link to sign up to receive your month ly bills electronically. How to Contact Us Customer Service: 972-791-2897 or 1-800-711-9112 (8AM-530PM M-F) Power Outage Notification: Oncor Electric Delivery-1-888-313-4747 REP Certificate: #10004 Please return this po,1ion with your payment in the enclosed envelope. Make checks payable to TXU Energy. Do not !~elude correspondence wilh your payment. The TXU Energy Aids.,,, program helps famflies In critical situations with bill payment assistance. For Donations Only One-time gift to $ TXU Energy Aid&t. program Recurring monthly don;,tlon $ to TXU Energy Aids1.1 program AT 01 003112 55789 B 9 A"'*3DGT ,11 h' "' J, '"nld 1.1 • !11• 1'1!111 111 1' 11111111 h 1• 11' • !1•11 11111 IMPERIAL CONSTRUCTION PO B0X967 WEATHERFORD TX 76086-0967 Account Number: 100019155411 Total Amount Due $1,749.34 Due Date 05/25/2012 To ensure proper payment posting, please provide this number {100019155411) on all payments and send to the address directly below. I 1 1111, 1ll 111 'l'l I 'I i'l l11!JJl 1 II 111 II lll ,1 I Jl1lll11l•11 1l ll)l 11I TXU ENERGY PO BOX 650638 DALLAS, TX 75265-0638 21100019155411000017493400000000007 ·l TXU energy ESI 10 Detail; 10443720009327448 Service Addr1:1ss: 850 IRMAST FORT WORTH, TX 76i04-5110 Plan: Bus iness Advantage5M The average p ri ce you pa id for electric service !his month was 16.0 cents per kWn excluding taxes and non-recurring charges or credits. Customer Name: Account Number: I nvoice Number: Invo ice Date: fMPERIAL CONSTRUCTION 1000 19 155411 054975828995 05 /09 /2012 Electric Service Commercial Electric Serv ice D istribution Page 3 of3 Service Period: 04/05/2012 to 05/06/2012 Service Period: 04/05/2012 to 05/06/2012 M eter: 111276654LG Mutt: 80.00000 Advanced Meter Charge $ Read Type: Actual Days in Reading: 32 Subtotal $ Current Meter Read -kW h {05/06/2012) Previous Meter Read -kWh (04/04/2012) Curre nt kWh with Multiplier Current Meter Read -kW (05/06/2012) kW with Mu ltlplier Billi ng kW TXU Energy Business Advantages..., Energy Charge $ Delivery Charge $ Subtotal $ Sales Tax Commercia l Charges for Peri od jrotal Cu rrent Charges $ $ $ 6B 7 Sal es Tax 561 10080 0 .35 28 .00 1,379.75 232.29 1 ,612.04 132.99 1,745.03 1,749.34 32 Di stri bution Charges for Period $ $ 3 .98 3.98 0.33 4.31 ----;;; --- -- •1I d TO: City of Fort Worth 4/18/2012 J OB NAME : Fort Worth Fire Station #5 D AT E A TTENTION : Jack Durham T he following is a deta iled co st br ea kdown, includ ing bo th ma teri a ls & labor , for a ll add itions to and / or d edu ct ion s from the co ntrac t sum. SCOPE : As requested , cos t to add spr ing return damper actuators pe r th e attache d propos al. 1 . LABOR N U MBER RATE L A BOR CA T E GORY SUPERV ISION CARPENT E R LABORE R MAN H OU RS PER HO U R 2. MATERIALS/ EQUIPMENT RENTALS D ES CR IP T ION QU ANT ITY 0 $ 59 .0 0 0 $ 37 .00 0 $ 24 .00 0 $ LABOR SUB T OTAL LA B O R BURD E N TOTAL ITEM 1 : UN IT PRIC E TOTAL ITEM 2 : 3. SUBCONTRACTS S UBCONTRACTOR McMil lan -J ames D ES CRIPTION See attached pro pos al TOT AL ITEM 3 : 4 . S U BTOT A L W ITH OU T MAR KUP (I T EMS 1, 2 , & 3 ) 5 . G & A OVER H EAD 6. S U BTOTAL IN C LU D ING OVERHEAD 7 . PROFIT 8 . S U BTOT AL INCLUD ING OVE RHEA D AND P ROFI T 9. PE RFORMANCE AND PAYM E NT B OND 1 0. SAL E S TAX 1 1. TOTA L (ADDITION / DEDUCTION ) TO CONTRACT SUM IF A CC EPTED ~\~ ~~ \ ~ \\I'-~ -,~~ <.c~. ~ ~\.- CONTRACTOR'S CHAN GE PROPOSAL 10% 5 % 2 .50% 0 .00 % 10-0413 PR OJECT NO. 36 C HANG E P R OPOSAL NO . COST $ . $ . $ . $ . $ . $ . $ . ~ ~ $ 4 ,346 .0 0 $ 4 ,346 .00 $ 4 ,346 .00 $ 434 .60 $ 4 ,780 .60 $ 239 .03 $ 5 ,019 .63 $ 125.49 $ . I $ 5 ,145.12 1 ~ S -\b·\'Z.. Nb\.. (\IQ~dtQ d ~w P5 R E QU EST IS MADE FO R A DD ITION OF 0 CALE N D AR DAYS T O TH E CON TRAC T PE R IOD ------- The above propo sal is subbm itted for your conside ration . T he undersigned contrac tor underst ands and agrees tha t this proposal is va li da ted on ly by the Owne rs sig nature . Jfo[ge r 'l(J[Cey He lger Kell ey -Proj ect Ma nager ICI (Imperial Construction , Inc) NAM E OF CO NTRACT IN G F IRM Cha nge Orde r Approval by Owner / Arch itect This chan g e propos al fo r subject work re qu ires yo ur approval by ( 4-19 -12 ). A delin q uent re sponse wil l accrue add itio na l co st th at is not in cluded in this o r igina l cha ng e ord er pr ice . Each da y beyo nd the req u ired d ate additi o na l items will be added to the cha ng e proposa l to refl ect the acrue d ch ange . T hi s wi ll be determined after you r author ization is fina lly receiv ed . Accord ing ly, upon r ece ipt of your appro va l, all cos t resul ti ng fro m thes e add itiona l fa ctors will be su bm itted to correc t the fin al change order price . Date '1' TO : Ho lger Kelley 1010 MUS T ANG D RIV E . SUITE 100 GRA PE VIN E , TX 76051 817 .912.0800 (PHONE), 817 .912 .0888 (FAX ) www.mjec.com PROPOSAL FRO M : Jay Su lli van CO M P A NY : DATE : RE : Imperia l Constructi o n Fort Worth Fire Station -Outside Air Damper Interlock Proposal 4/17/2012 McMillan James Equipment Company is pl ea sed to provide the following equipment an d services for your considera tion on the subject proj ect. T he scope of work belo w de scri bes changes to the origi nal contro l syste m design . T he chang e order price reflects all labor and ma teria ls in order to implemen t the des ign chan ges desc ribed in thi s scope . Scope of Work: • Modify existing Trend Co ntrol System in order to interlock the outsid e air dampe r on each w ate r-source heat pump to open when the unit is runni ng . Th e damp er w ill ope n wh en the fan in each un it is comma nded on . T he modification includes: o Six (6) 2 posi tion, 24 V , sp ring-re turn damper actuato rs (one for each WS HP ). o Installa tion and interlock w ir ing from the fan co ntrol re lay to the dampe r actua tor o The control sy stem itself will not ne ed to be modifi ed. T he damper actuator will be in terlocked to the fan relay to en sure that th e damper ope ns to a pre -determined position whenever the unit fan is operating. o Conduit is included in ex posed are as . o The outside air co ntrol damper will be provided and ins talled by others. o Commissioning and tes ting ac tu ato r operation. TOTAL NET PRICE {Excluding Sales Tax) ........................................................... $4,346.00 Clarifications and Exclusions : 1 . T his propo sa l does NOT include any appli ca ble taxes . 2. T his scope co ntains only th e specific scope of work d esc ri bed above . No other work is impl ied or included. 3 . This proposal d oes N OT include the control da mpe r or in stal lation of the control damper . T he proposal includes only the as so ci ated interlock control wirin g m aterials. 4. This proposal ass umes that all work wi ll be perform e d d uring norm al busine ss hou rs. Any item not specifica ll y lis ted and detailed above is hereby excluded from this quotati o n. This quote is va lid for 30 days. Sh ipment is F.O .B. factory . Standard manufacturers warranty applies . Regards, Jay Sullivan McMi ll an Jame s Equ ipment Company , L.P Page 1 ofl PROJECT NAME: BuySpeed No : Contract No : D.O .E. No: Attachment to Change Order No: Today's Date: Original Contract Amount: Extras to Date: Credits to Date: Contract Amount to Date : Amount of Proposed Change Order: Revised Contract Amount: PROJECT SUMMARY SHEET (Change Order Attachment) Fire Station #5 P0-10-00060917 CS40540 N/A 7 6/4/12 TOTAL $ 2,413,807.00 $ 130, 139.00 $ $ 2,543,946.00 $ 3,060.48 $ 2,547,006.48 Original Funds Avail. for Admin. Change Orders: $ 150,000.00 Remaining Funds Available for Change Orders : $ 16,800.52 Additional Funding (if necessary): Prepared By : Karen Striker T/PW Mgmt Svs . ,. 1: