HomeMy WebLinkAboutContract 40566-CO1City of Fort Worth
Change Order Request
CllY SECRETARY y (e
CONTRACT NO. 0 S (e ..
Project Name! Rolling HiBs WTP -Laboratory Building Dual Electric Power Feed City Sec# .__ ____ __, 40566
Client Project #(s ·::=======================::::::: ~~ ::::==========~------;::::=~----;:=== ConlradDrf TeXSlll Eledrical Contraclcrs, Inc. Chalge Ona# I 1 Dalla 3110'2011
City Project Mgr.I Farida s Goderya. PhD, PE City lnspecu :=I =M=ike=H=il~---=======::::
Original Connet Amount
Exlras lo Dae
Credils lo Date
Dept.
Pending Change Orders (n M&C Process)
Conlract Cost t> Dale
Origilal Funds Available for Change Orders
Remaililg Funds Avalable br this CO
Addiional Funding (If necessay)
Water
CHANGE ORDERS ID OATE (INCLUDING THIS ONE} AS" OF ORIGIHAL CONTRACT
MAX ALLOWABLE COKTRACT AIIOONT (ORIGINAL CONTRACT COST+ 2ftl
Totals
,725.00
4.ri I
$172.500.00
~:; . ' , : , ' . .. , , . . . .·: . . . ,. . . ' . . . . . ' ;. . ·,'
Change Order No. 1 incbfes 1he folowing:
PCM 001 -Medium Voltage Gable Routing; Additional Amount of $6725.00; No Contract Tme Chalge.
The actual site condition is considerably <ifferent than what was desaibed in the site plat (Sheet E2). There is 111 addlllonal 320 LF of
medium voltage cab6e requied m inst.al the new feeder ttm what is shown.
It is understood aid ai,1l8d that the acceptaice of this Change Ona by the COllbacD conslbes Ill accord aid saisfdoll aid rapresl!llls payment
i1 ful (both tine aid money) for al cos1s arising out of, or ilcidental to, the abo¥9 Cha,ge Order.
co ,
I
= ..
Roling HIia Wais Treatment Plal(
PROJECT: LabonllD!l Bulldl~ Dual Elactrlc POWIII' Faed PROJECT NUMBER:
OWNER: C~olFortWortl'I 01454
CONTRACTOR: Texaun Electrical Contrac:tora Inc:. 10
SUB-CONTRACTOR
ARCHITECT/ENGINEER: Muttalach Ena!!!.!!!!!JI Inc l.EW'09188
REFERENCE DATA:
Contractor's Submittal No. PCll-001 Speclficallon Section:·
Plan Sheet No.; Description: Medium Voltage Cable R0Uti!!9
CONTRACTOR'S CERTIFICATION: I hereby ce,tKy thal th/a &UbmJltlll has been rSYlewed by the COlllrBctor
and i. alrlct r:ontonna111» with the Conlract Documents as modJtled by Al/denm, Change Orders and Reid
O'dwa. CERTIFIED BY: Steve MIUer DATE: 1/6/2011
TYPE # DESCRIPTION #SENT #RErI) .. STATUS .
CMR ConlraCIDr'I Modfflcallon Request D Approved
CTR Car1llled Tat Report o ApplDVlld 11a No1ec1
EIR ll=nulnment lnatallaton Renntt D Not Approved
O&M Operation & malntltnance Manual D Rev11e & Reeubm1t
NBC Notllcallon Bv Contractor D Fllad Al Recelwd
PCM 001 Pmnnsed Connel Modllcallon amal D Final D1llrlbut1on
PR Pavment Reauest D Change Order Issued
pp Pmlacl Pllomaraohs 0 Fleld Order Issued
RD RtlCOIIS data D Recommended For Appn,yal
RFI R""'-'IISt For Information D Ra1umed W/0 Review
SAM Samolll D Aden Information Reqwed
SCH Sc:hedule Of PrnmMII D canceled
D See Reviewed Comments
SD Shnn Drawlna
D Pending Change Order
.. FOR ARCHITECT.I ENGINEER USE .ONLY . · ..
DATE RECEIVED I )., I \\ BY E~ L!.,. DATE RETURNED 2-htcl 11 BY ~ j '-c_
COMMENTS: Ann .} -~
~~ \. ( __ ..Ji._ --
"~" 11~ 0 I
.
DISTRIBUTION REVIEW
NO SENTTO. SENTTO. BY DATE SENT' DATERET'O.
= ·-
Submittal PCM-001 Additional Comments
Rolling HNII Walllr Treatment Plant
PROJECT: LabofalD!}'. Bulldl!!i Dual Elactrtc Pow. Feed PROJECT NUMBER:
OWNER: Cl!}: of Foll Worth 014!54
CONTRACTOR: Taxsun Electrtcal Conlrac:lora Inc. 10.1009
SUB-CONTRACTOR 0 0.0000
ARCHITECT/ENGINEER: Mullalech EnginMrt!!II Inc LEW09183
Description: Medium Voltage Cable Routl!:!9
-
NOTE:
The site plan E2 shows the meduim voltage feeder running north from existing
switchgear SGO to PMH-3.
See Attachment #1 . ..
The actual site condition is considerablely diferant than described. The actual routing is
the feeder conduit from SGO runs south to the manhole located south of SGO. The
raceway continues out the west side of this manhole and runs continuous to EMH-22.
See Attachment #2
There is an additional 320' of cable required to install the new feeder than what Is shown.
Attached Is the proposed additional cost associated with the addlUonal cable length.
'•
Thanks, Steve Miller
I I
1' I
~· I
I
I
·I
I
·-......................... _ ... ,, .. _ ..
"
~ Jll'",.vr,¥A'A'WWl'I •WI.' ····--.................. .
I
I.. ....... ·----·-
-.................... .
...,.,.. ----~-"' /
..
1 1 .-/ 1. I .... \ \ • l
I j ·1 ) J
Ii " . ···,. . .J'-
• • J 1
1 '1 ;
I '··" / ......
-.. ···-·-·······--······-······-................ ' ... ! .. -~g~
qQ~
(i} C)
i
~~
Ctn ~ :f rnZ G)
~
'\ ... DNcripllon Tllholf Qly
1IOIO Electrical Material$
11UI IOO Volt Blllldlng WIN • 1/C Cclppel' THHN .. 320.00 Int\ n PdyNlht111" 350.00 lnl
IOI Volt Blllldlng WI,. , .. Laborhaurl
11121 IKY P-r C.ble
4II08 lkv 100% "'4 EPR IN-105 Tapa 980.00 lnft
INd PYC JKT CU
IKY "-Cable
57.IO Labor holn
111M Wn Pulllnt AooNaorm
· 102 YlllkM 77 5 gallon 1.00 EACt-
10I OuctT8f19 1.00 E.:h -PVC Elal:trfcal Tape 1.IIO E:ac:tl
Wife Pullq MONI~
1.-40 Labar houri
Semi~..,.,.,.
8',580 labor houri
UttltColt
Sianaani Estimate Report
RoUing HIiis Lab CO
Amount UnltCO.t
0.24 Anft n 0.90 Anll
0.80 Anft 210 0.05 Anft
ZIT
1.80 llnfl 1.728 2.40 l1nft
1,728
30.00 /EACH 30 40.00 /EACH
e.oo /Each 6 3.50 /Each
6.00 /Each 15 2.60 IEech
42
2,057
AlnOIMt
288
18
306
2.304
2,304
<10 ..
3 ...
2,656
Amount
365
2'l8
5112
4,032
4.032
70
10
e · ..
4,712
Pagez
114/2011 2:32 PM
Standard Esiimate Report
ROUing Hills Lab CO
esumate Totals
''",:'~P.;ffe.r :· ::'1!~~,;l11!:iri,i:.::;m~s~~··:':fl~iif::~'~'··:•.:!.S~'!:!~5111!1!Eii"'~·"'!milt>1l:1:',t,l,l,,~~-'.!:~P .. ~ ....... llf' •• '-•• \" • ,l:i ..... ~ . .;..n .~;;w .. .s .~ ... .ri~INlilt .r . -Illa-JI~~ .. lAWI!~ ,•• I ..
Llbor 2,067 88.680 In 30.98%
..... rial 2,11118 39.49'1(,
Subc:mract
~
Olts
I.A80R BURDEN
1•0VERHEAD
JOB EXPENSE
BOND
TOlal
823
830
191
188
8,725
40.000 %
16.000 %
3.000 ~
C
T
T
B
12.23%
12.35%
2.84%
2.50%
Pag83