HomeMy WebLinkAboutContract 40603-CO2"
CHANGE ORDER N0.2 DATE 4-6-11
CITY OF FORT WORTH
CHANGE ORDER REQUEST D~L
D.O.E. NO 6300 PROJECT NO.C280/541600/806470114483
PROJECT DESCRIPTION Improvements at C.P. Hadley Park CITY SECRETARY CONTRACT NO. 40603
ORIGINAL CONTRACT AMOUNT $ 272 ,742 .90
EXTRAS TO DA TE -650.00-CITY SECRETARY Ljo(, '!) CA
CONmACT NO. C) -d\
CREDITS TO DATE · -0-
CONTRACT COST TO DA TE $ 273 ,392 .9l
AMOUNT OF PROPOSED CHANGE ORDER $13 ,059 .00
REVISED CONTRACT AMOUNT $286,451.90"
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS $ 2,206 .00 ...
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS $ 1,556 .00 I/ ..
ADDITIONAL FUNDING (IF NECE SSARY) $ 11 ,503 .00
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL :
ITEM DESCRIPTION UANTITY UNIT COST TOTAL
ADD Add Armor-tile to ADA curb ramp , complete in 6EA $ 784 .50 $4,707.00
LINE ITEM place
19
ADD Sub-surface drainage for ground water behind LS $6,744 .00 $6,744 .00
LINE ITEM retaining wall and adjacent trail, including pipe,
20 sock, rock, filter fabric, backfill , com lete in lace
ADD Reimbursement for TPW requirement for curb LS $ 75 .00 $ 75 .00
LINE ITEM
21
ramppe~it
ADD Repair irrigation main line, laterals and rotor head LS $ 390 .00 $ 375 .00
LINE ITEM damaged during trail excavation ....__ __
22 \.
ADD LINE Remove and replace accessible ramp at Whispering LS $ 308.00 $ 308.00
ITEM Drive per TPW standards
23
ADD LINE Add fill material and placement at Bridge B LS $ 850 .00 $ 850.00
ITEM
24
OFr RECORD
II is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and r pres
Payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order
CONTRACTOR'S NAME:
Raydon, Inc .
ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME TO DATE ADDITIONAL TIME l'OR TfflS CHA NGE ORDER
<40> Working Days 60 Working Days 10 Working Days
DATE
DATE
O OTHER
NO M&C REQUIRED
PROJECT NAME:
CHANGE ORDER:
INSPECTOR:
PROJECT MANAGER:
REASON (S) FOR CHANGE:
DEPARTMENT OF ENGINEERING
CHANGE ORDER JUSTIFICATION RECORD
Improvements at C.P. Hadley Park
2 I DOENO. 16300 CLIENT PROJECT NO
Randy Horton PHONE NO:
Eric Seebock PHONE NO:
DATE 4-6-10
C280/541600/806470114483
817-392-8306
817-392-5742
TDLR accessible ramp standards changed between the design and construction phases. Additional Armor-tile was required for each accessible
ramp .
During the excavation of soil for the construction of a retaining wall and trail along the south side of the cree~, an underwater stream was
discovered . This water will hinder complete construction of the retaining wall and trail and requires a subsurface trench drain with perforated !'
pipe to help drain to the creek . -('f'k! llf:S'"
The contractor was reguired to submit payment for a )'ii}o 1l 1p11tel1t bepartment curb ramp permit. TAo QQR5raet states the Cit, A'88 19 111ah1 all
~~p~~~-~ .
During excavation of new trail at Summercreek Ranch Park an existing irrigation system was damaged. This irrigation was not shown on
construction plans .
The accessible ramp at Whispering Drive was removed and repllked per TPW inspector direction to accommodate TPW standards.
Additional fill material was required to be imported and placed to adjust grades at Bridge B.
DATE
f· ~S-11
DATE
4-27-"2-01/
"/\ DATE 4\,~L\
PROJECT MANAGER DATE
~~ 4. ~-II :2 OF CONSTVCTION SERVICE DATE
'f-2'-I I
OFF CIAL RECORD
CITY SECRETARY
FT. wORTH, TX
. Oct28 ·1(,)02 :31p Raydonlnc
' :
RAYDONINC.
PO BOX 671
BRECKENRIDGE, TX. 76424
C .P. HADLEY PARK,
PROPOSAL
DRAINAGE FOR RETAINING WALL
1)170 LF 6" N-12 PERFORATED PIPE WITH SOCK
2)40 LF 6" SOLID N-12 PIPE
3)ADDITI0NAL ROCK ADDED TO BASE BID ROCK
4) SLOPED END TREATMENT
5) LABOR
INCLLUES ALL PIPE FITIINGS
TOTAL FOR RETAINING \VALL
DRAINAGE FOR LOW WET AREA
1) 128 LF 6"N -12 PERFORATED PIPE WITH SOCK
2 ) 40 LF 6" SOLID N-12 PlPE
3) BEDDING ROCK
4) FILTER FABRIC
5) SLOPED END TREATMENT
8172464765
TEL 817-773-4601
FAX 817-246-4765
$2544.00
6) EXCA VA Tl ON DIR TWORK TO RAISE S1DEW ALK _..\PPROX 18"
7 ) COMPACTION
8) BACKFILL
INCLUDES ALL PIPE FITTINGS
T OT AL FOR LOW VlET AREA
TOTAL FOR BOTH AREAS
THANK YOU,
BRIAN SMITH
$4200.00
$6744.00
OFF· IAL RZC RD
CITY SECRETARY
FT. WORTH, TX
p .2
· City of Fort Worth Transportation and Public Works Street Use Permit
FORT WORTH
~
CITY OF FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
STREET USE PERMIT
DATE 1/25/2011 PERMIT # 145453 MAPSCO -'10'""'"2R-'---D.O .E.# Building Permit#
STREET BLOCK FROM TO DATE
BEGIN END
1. SUMMER PARK ST 8350--8364 WHISPER DR WHIPPOORWILL DR 1/25/2011 2/8/2011
2. Pallas ST Cedar Brush Southern Prairie 1/25/2011 2/8/2011
3 . Valleyside DR Ocean end of street 1/25/2011 2/8/2011
4 . Ocean DR Valley side Summer Oaks 1/25/2011 2/8/2011
5. Geranium ST . VVildflower Way end of street 1/25/2011 2/8/2011
TYPE OF WORK TO BE PERFORMED : Other.fee
Permit to install handicap ramps at the above locations per attached traffic control plan.
Page I of I
(i f appl icable)
Mon. • Fri. Time TIME TIME
BEGIN END SAT. SUN .
9am 4pm NA NA
9am 4pm NA NA
9am 4pm NA NA
9am 4pm NA NA
9am 4pm NA NA
THIS PERMIT IS GRANTED TO THE CONTRACTOR/APPLICANT UNDER THE FOLLOWING CONDITIONS:
• CONTRACTOR/APPLICANT IS REQUIRED TO HAVE THIS PERMIT AND TRAFFIC CONTROL PLAN AT THE
WORK SITE OR EVENT AT ALL TIMES.
• THIS PERMIT IS ISSUED IN ACCORDANCE WITH AN APPROVED TRAFFIC CONTROL PLAN.
• ALL WORK IS CONSTRUCTED IN ACCORDANCE WITH THE CITY OF FORT WORTH'S "STANDARD
SPECIFICATIONS FOR STREETS AND STORM DRAIN CONSTRUCTION MANUAL".
• ADEQUATE TRAFFIC CONTROL DEVICES ARE INSTALLED AND MAINTAINED AS SHOWN IN THE
ATTACHED TRAFFIC CONTROL PLAN (TCP) SUCH AS SIGNS, STANDARD TYPE I BARRICADES
SAFEGUARD THE PROPERTIES AND PUBLIC.
• CITY TRAFFIC ENGINEER AND/OR INSPECTORS MAY REQUIRE ADDITIONAL TRAFFIC CONTROL
DEVICES.
• ALL DAMAGES TO PUBLIC OR PRIVATE PROPERTY, INCLUDING UNDERGROUND FACILITIES, AND FOR
ALL PERSONAL INJURIES ON WORK PERFORMED UNDER THIS PERMIT WILL BE THE RESPONSIBILITY
OF THE CONTRACTOR.
• A 24-HOUR DECISION-MAKING CONTACT ~EPRESENTATIVE AND PHONE NUMBER IN THE EVENT OF AN
EMERGENCY SHALL BE PROVIDED .
• THIS PERMIT DOES NOT RELIEVE THE CONTRACTOR FROM OBTAINING NECESSARY PERMITS FROM
COUNTY AND STATE ENTITIES WHERE WORK IS ENCROACHING INTO THEIR RIGHT-OF-WAY.
• IT IS UNDERSTOOD THAT VIOLATIONS OF THIS PERMIT MAY RESULT IN THE REVOCATION OF THE
CONTRACTOR'S LICENSE.
• CITY TRAFFIC ENGINEER MAY PROHIBIT LANE/SIDEWALK CLOSURES TO ACCOMMODATE SPECIAL
EVENTS, EMERGENCIES, ETC. j / 7.. ('/I l ~
Raydoo . Inc CHUCK MCLURE
CFW CONTACT CONTRACTOR/APPLICANT
EMERGENCYCONTACTNAME~B-'na~n~S_m~1th'------------
24-HOUR PHONE _____ _ MOBILE ____ _ PGR# _____ _
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
STREET MANAGEMENT SECTION
311 W 10th STREET
FORT WORTH, TX 78102
(8 17)392 -6594 FAX (817 )392-8941
FAX# ____ _
0 ·F' 4L ECORD
CIT CRETA Y
FT. 0 TH, TX
http ://tpwpermit.cfwnet .org/popup_permit.asp '>permit_id= 145453 01 /25 /20 I I
· City of Fort Worth Transportation and Public Works Payment Receipt Page I of I
FORT WORTH TRANSPORTATION AND PUBLIC WORKS RECEIPT FOR PAYMENT 311 WEST 10TH STREET
FORT WORTH , TX 76102
PH : 617-392-6594 F : 617-392 -6941 ~
PAYMENT ID 29634
PAYMENT METHOD Check
APPLICANT Raydon . Inc . DATE 01/25/2011
PAYMENT AMOUNT $75.00 Payment Is Verified
PERMIT: 145453 DATE : 01 /25/201 1 TYPE : Other-Fee LOCATION : 6350 • 6364 SUMMER PARK
ID FEE TYPE FEE AMOUNT AMOUNT APPLIED
66047 Permit $75.00 $75 .00
OFF .,IAL RECORD
CIT ECRETARY
FT. ORTH, TX
h tt p ://tpwpermit.cfwnet.org/popup_rece i pt.as p ?pid =2 9634 0 1/2 5/20 I I
. \
. . '
Seebeck, Eric
From: brian smith [raydon_brian@sbcglobal.net]
Sent: Thursday , March 17, 201111 :57 AM
To: Seebock, Eric
Subject: Hadley Park
Eric,
Here are the prices you asked for for the extra work;
1) irrigation repair
install 3 sleeves under sidewalk
repair and reroute 2 lateral lines
repair 1 main line
replace 1 rotor head
total $375.00
Page 1 of 1
2) remove and replace curb and gutter at ramp on Whisper, would not work do to slope of street.
total $308.00
If you have any questions please call.
Thank You,
Brian Smith
Raydon Inc .
r---------,
AL' EC RD
CITY ETARY
FT. 0. TH, TX
04/07/2011
Oct 28: 1r802 :32p t I '
Raydon Inc
10-20-2010
ERIC.
RAYDONINC.
P.O.B0X67l
BRECKENRIDGE, TX. 76424
PROPOSAL
The fill material and placement at bridge B will run $850 .00
If you have any question please call.
Thank You
Brian Smith
817-773-4601
8172464765 p .3
,.
PROJECT NAME:
BuySpeed No:
Contract No:
City Project Number:
D.O.E. No:
Attachment to Change Order No:
Today's Date:
Original Contract Amount:
Extras to Date:
Credits to Date:
Contract Amount to Date:
PROJECT SUMMARY SHEET
(Change Order Attachment)
CP Hadley Reserve Park Improvements
P0-10-00062413
CS40603
01144
6300
2
4125111 PACs
_'!'_O_~_L---=C.S'DO
$ 272,742.90
$ 650.00 -
$
$ 273,392.90
Amount of Proposed Change Order: $ 13,059.00
Revised Contract Amount:
Contingency Funds Avail. for Admin. Change Orders:
Remaining Funds Available for Change Orders:
Additional Funding (if necessary):
$ 286,451.90
$ 2,206.00
$ 1,556.00
$ (11,503.00)
F" iAl. :c RD
CITY E~RETARY
FT. 0 TH ,TX
Prepared By: Christy Ezernack T/PW Construction