HomeMy WebLinkAboutContract 40610-CO4f" • CITYSECR!TARV '4
CONTRACT NO. L.\ Ola_\ 0 -co
FORT VVORTH f H . -City of Fort Worth
Change Order Request
Project Name! Water and San itary Sewer Re locations for SH 121T Cross ing West of Hu len Bridge
Project No.(s)! P265-603170133287 and P275 -70 317013328 7 DOE No . I 6338
City Sec No. 40610 .__ ______ _.
City Pro. No. 01332 .__ ______ _.
Project Des cripti on Water and Sanitary Sewer Relocations for SH121 Crossing West of the Hulen Street Bridge within the UPRR Davidson Rail
Yard , Part 2-Hulen Street Brid e and Water Main Extension to Como Pum Station , Part 2
Con trac tor! S.J. Lou is Constructi on ofTx , Ltd . Chan ge Order# I 4 Da te: !2121 /2012
City Pro ject Mgr .! Liam Conlon City Inspecto r !.__R_a..:...ym_o_n_d_H_. B_r_ic_e ______ ____,
Phone Number :I 817-392-6824 Phone Number :I 817-319-7943
Dept. Water A1 WaterA2 Sewer Totals Contract Time
(Calendar days)
Original Contra ct Amount $1 ,958 ,606.73 $2 ,352 ,962 .50 $1 ,595 ,105 .60 $5 ,906,674 .83 410
Extras to Date $98 ,134.51 $834 ,289 .33 $224,436.54 $1 ,156 ,860.38 44
Credit s to Date
Pending Change Orders (in M&C Process)
Cont ract Cost to Date $2 ,056,741.24 $3 ,187,251.83 $1,819 ,542.14 $7 ,063,535 .21 454
!Amount of Proposed Change Order $17,001.97 -S5.341.00 $3,525.75 $15,186.72 014
Rev ised Contract Amoun t $2,073,743.21 $3,181,910.83 $1 ,823 ,067.89 $7 ,078 ,721.93 468
Original Funds Availab le for Change Orders $50 ,000 .00 $80 ,000 .00 $48 ,000.00 $178 ,000.00
Remaining Funds Available for this CO
Add itio nal Fund ing (i f necessary ) $17,001 .97 $3 ,525.75 $20,527.72
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 19.84%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $7 ,383 ,343 .54
The change order will provide additional pay items for the following:
• The removal and reinstallation of a project sewer tunnel across Vickery Boulevard due to survey
error by City forces that placed the tunnel 15 feet off the intended location .
• The removal of a previously unknown abandoned 36-inch steel pipe that was encountered in direct
conflict with a project sewer tunnel across Union Pacific Railroad.
• Emergency repair of a recently installed project ma i n that broke apart due to excessive pressure on
the line and necessitated the replacement of a 12-inch gate valve and related appurtenances. The
water main had passed City tests ~~{r service .
~~ORT l.l.~
Staff concurs with the contractor's ~1bcf ~~~~pnal calendar days on this change order.
by: f:/,O.:ot oo .ft qA ~ ,~, ~~~
'-"------i g ~ %.
0
j-
RY
FORT WORTH •= City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Relocations for SH121T Crossing West of Hulen Bridge City Sec No .
Project No .(s) P265-603170133287 and P275-703170133287 DOE No .! 6338 ! City Pro . No.
40610
01332
Project
Description
Water and Sanitary Sewer Relocations for SH121 Crossing West of the Hulen Street Bridge with in the UPRR Davidson Rail
Yard , Part 2-Hulen Street Bridge and Water Main Extension to Como Pump Station , Part 2
Contractor S.J. Louis Construction of Tx , Ltd . Change Order# [}] Date :! 2/21 /2012
City Project Mgr. Liam Conlon 1....,;;;;.;;;;.;.;....;...;;.;.;;.:;.;.;...._ ___________ ___. City Inspector Raymond H. Brice
ADDITIONS
ITl:M --'IIUl't DEPT Qty Unit Unit Cost Total
43 Remove and Re-Install the SS-1 Tunnel Under Vickery Sewer 1.00 LS $8,745 .75 $8,745 .75
44 Remove Existing 36" Steel Pipe in Proposed :s:s-1 42" Tunnel Sewer 1.00 LS $15 ,180 .00 $15 ,180 .00
55 tmergency Leak Repair Water A1 1.00 LS $34 ,206.47 $34 ,206.47
Water A1 $34 ,206.47
Water A2
Sewer $23 ,925.75
Additions Sub Total $58 ,132 .22
Page 2 of 4
FORT WORTH • City of Fort Worth
Change Order Deletions
Project Name ..... , -W-a-te_r_a-nd_S_a_n-ita_ry_S_e_w_er_R_e_lo-ca-t1-·on_s_fo_r_S_H_12_1_T_C_ro_s_si-ng_W_e_s_t o_f_H_u-len-Br-id-ge---. City Sec No . 40610
01332 Project No .(s) I P265-603170133287 and P275-703170133287 DOE No . I 6338 City Pro . No . :===============================-----===:::::=..-__:_ __ ___:==:::::;----' Water and Sanitary Sewer Relocations for SH121 Crossing West of the Hulen Street Bridge within the UPRR
Davidson Rail Yard Part 2-Hulen Street Brid e and Water Main Extension to Como Pum Station Part 2
Project Description
Contractor
City Project Mgr .
S.J . Louis Construction of Tx , Ltd . Change Order #0 Date! 2/21/2012
Liam Conlon City Inspector I Raymond H. Brice
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
20 Pipe-Pressure-Extra Depth Greater Water A1 300 .00 VF $10.00
26 Inspection-Post Construction Clean and TV Water A1 2803 .00 LF $1 .50
13 Pipe-Pressure-Extra Depth Greater Water A2 250 .00 VF $10 .00
23 Inspection-Post Construction Clean and TV Water A2 1894 .00 LF $1 .50
12 Remove and Salvage Gate Valve Water A1 2.00 EA $5 ,000 .00
14 Manhole-Std 4-foot Diameter(to 6 foot) Sewer 6.00 EA $3,400.00
Water A1
Water A2
Sewer
Page 3 of 4 Deletions Sub Total
$3 ,000 .00
$4 ,204.50
$2 ,500.00
$2 ,841 .00
$10 ,000 .00
$20 ,400 .00
$17 ,204 .50
$5 ,341 .00
$20 ,400 .00
$42 ,945 .50
l • .Jt,• •
M/WBE Breakdown for this Change Order
MWBESub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00