Loading...
HomeMy WebLinkAboutContract 40653-CO3-FORT WORTH • City of Fort Worth Change Order Request Cml~py 1 CONTRACT No. nOLRS}lOJ Project Name : I Hicks Industrial Park Sanitary Sewer Extension Project No .(s):! P275-7 07170036783 City Sec No .: I 40653 I DOE No . 5580 City Proj . No .: I 00367 I Proje ct Descr iption : Sanitary Sewer Extension to Serve Hicks Industrial Park Contractor:! Wright Construction Co ., Inc . City Project Mgr . ~I _L_ia_m_C_o_nlo_n ____ ~ Phone Number : I 817-392-6824 Original Contract Amount Extras to Date Credits to Date Dept. Pending Change Orders (in M&C Process) Change Order# 3 Date : City Inspector : Michael Collier Phone Number: I 817-223-2273 Sewer Totals $1 ,063 ,674 .60 $1,063,674 .60 Contract Cost to Date $1,063,674.60 $1 ,063,674.60 Amount of Proposed Chan e Order -$49,784.30 -$49,784.30 4/11/2012 Contract Time (Calendar da s) 180 180 Revised Contract Amount $1 ,013 ,890.30 $1,013 ,890.30 180 t--------+--....:........:-..:..---+--------11--_.;.....:..-....:....--+,----... Original Funds Available for Change Orders $32 ,000.00 $32,000.00 --------------------1...-------11 r---'Rl=rinin~<tnds Available for this CO $32,000.00 $32,000.00 Df.dliin~u ding (if necessary) 0 !CC l-g ti z-CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0::: fj t MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 0 \Jl I 0 I • ~ It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment )> in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. z .-FORTWORTH • City of Fort Worth Change Order Additions Project Name Hicks Industrial Park Sanitary Sewer Extension Project No .(s): P275-707170036783 Project Description Sanitary Sewer Extens ion to Serve Hicks Industr ial Park Contractor Wright Construction Co ., Inc . City Project Mgr. Liam Conlon .__....;.__;;_;___;_ ____________ __, ADDITIONS IICM =----.... ·, 1vn 8 8-lnch Sanitary Sewer Pipe 13 Manhole STD 4-ft . Diameter 14 Manhole STD 4-ft . Diameter 20 Collar Manhole 32-lnch Frame and Cover Install 21 Manhole Vacuum Test Services 22 Inspection Post Construction Cleaning and TV Study 23 Trench Safety 36 Core Existing Manhole 6-lnch 37 DIP to Cross the Existing W/L ditch Page 2 of 4 City Sec No .: 40653 DOE No .! 5580 I City Proj . No .: I 00367 I Change Order : CO Date : I 4/11/2012 City Inspector I Michael Collier DEPT Qty Unit Unit Cost SEWER 182 .00 LF $35 .75 SEWER 2.00 EA $1,435 .00 SEWER 2.00 LF $130 .00 SEWER 2.00 EA $930 .00 SEWER 2.00 EA $110 .00 SEWER 182 .00 LF $1 .50 SEWER 182.00 LF $1.00 SEWER 1.00 EA $800.00 SEWER 7.00 EA $1 ,800 .00 ' Sewer Additions Sub Total Total $6 ,506 .50 $2 ,870 .00 $260 .00 $1 ,860 .00 $220 .00 $273 .00 $182 .00 $800 .00 $12 ,600.00 $25 ,571.50 $25 ,571.50 .. 'F cf8T WORTH •• City of Fort Worth Change Order Deletions Project Name .-I -H-ic-ks-l-nd-u-st-ria-1-Pa-rk_S_a_n-ita_ry_S_e_w-er-E-xt-en-s-io-n-----------~ Project No .(s): I P275-707170036783 I DOE No. 5580 Project Description Sanitary Sewer Extension to Serve Hicks Industrial Park City Sec No .: 40653 City Proj . No .: 00367 Contractor Wright Construction Co., Inc . Change Order! 3 Date I 4/11/2012 City Project Mgr . Liam Conlon ~----------------' City Inspector : Michael Collier DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 24 Concrete Type E Install SEWER 10.00 CY $85 .00 25 Driveways 6-lnch Exposed Aggerate Install SEWER $8 ,622 .00 SF $1.40 26 Drives 6-lnch Install SEWER 420.00 SF $8 .00 27 Pavement 2-inch HMAC on 2/27 Concrete Base Material SEWER 819.00 LF $65 .00 29 Rip Rap Grouted Than 18-inch Rock Install SEWER 42 .00 CY $120.00 33 6-lnch Top Soil Install SEWER 75 .00 CY $8 .00 34 Filll Material SEWER 10.00 CY $20 .00 Sewer Page 3 of 4 Deletions Sub Total $850 .00 $12 ,070 .80 $3 ,360 .00 $53,235 .00 $5 ,040 .00 $600.00 $200 .00 $75 ,355 .80 $75,355 .80 M/WBE Breakdown for this Change Order MWBESub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: Hicks Industrial Park SS Extention BuySpeed No (Water): City Project No : Contract No: D.O.E. No: Attachment to Change Order No : Today's Date: Contractor: Original Contract Amount: Extras to Date : Credits to Date : Contract Amount to Date: P0-11-00066639 00367 CS40653 5580 3 --------4/12/12 Wright Construction Amount of Proposed Change Order: Revised Contract Amount: Contingency Funds Avail. for Admin . Change Orders : Remaining Funds Available for Change Orders: Additional Funding (if necessary): NOTE: C0#1 & C0#2 are now null and void. C0#3 replaces both of them. TOTAL $ 1,063,674.60 $ $ $ 1,063,674.60 $ (49,784.30) $ 1,013,890.30 $ $ $ 32,000.00 32,000.00 Prepared By : Christy Ezernack T/PW Construction Services ' ..