HomeMy WebLinkAboutContract 40679-CO3fORTWORTH s ~ City of Fort Worth Change Order Request C,2opy 1 oP ~ CITY SECRETARY CONTRACT No. l-/Q(J1 q--lo3 Project Name! Clearfork Main Street Bridge I City Sec # j 40679 I Client Project #(s)! TPW-C221-541200-30323-0010783 ; C295-541200-30323 -0010783 Project Description Bridge , Concrete Pavement , and Storm Drain Construction . 001! SC!f50 Contractor! Concho Construction Co. Change Order # 3 Date 1/8/2013 City Project Mgr . ._j _L_e_on_W_i_lso_n __________ __J City Inspector Martina Salinas Dept. T/PW Totals Select Day Type Original Contract Amount $9 ,711 ,910 .92 $9 ,711 ,910 .92 500 Extras to Date $38 ,862 .50 $38 ,862.50 365 Credits to Date $32 ,725.76 $32 ,725 .76 Pending Change Orders (in M&C Process) Contract Cost to Date $9,718,047 .66 $9,718 ,047.66 865 IAmount of Proposed Change Order $44,494.50 $44,494.50 0 Revised Contract Amount $9 ,762 ,542 .16 $9,762 ,542 .16 865 Original Funds Available for Change Orders $291 ,357 .00 $291 ,357 .00 Remaining Funds Available for th is CO $285 ,220 .26 $285 ,220.26 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT 0.52% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $12 ,139,888.65 JUSTIFICATION (REASONS) FOR CHANGE ORDER TPW-Traffic Management requested the re -construction of all the traffic signals in the Hulen and Clearfork intersection to be added to the project. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor const itutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. M&C Number M&C Date Approved I ~ ' \. I ~ -~RT WORTH ~-City of Fort Worth Change Order Request L1r u -11 -re 3 Project Name! Clearfork Main Street Bridge City Sec# 40679 I Client Project #(s)j TPW-C221-541200-30323-0010783 ; C295-541200-30323 -0010783 I Project Description Bridge , Concrete Pavement , and Storm Drain Construction . Ooc 5950 Change Order# 1/8/2013 Contractor! Concho Construction Co. City Project Mgr.._! _L_eo_n_W_i_ls_on ___________ ....., '~·,.-.,.--~----------, City Inspector Dept. T/PW . .;,.- Original Contract Amount $9 ,711 ,910 .92 ,;:::, Extras to Date $38 ,862.50 Credits to Date $32 ,725 .76 Pending Change Orders (in M&C Process) Contract Cost to Date I $9 ,718 ,047 .66 I !Amount of Proposed Change Order $44,494.50 Revised Contract Amount $9,762 ,542 .16 Original Funds Available for Change Orders $291 ,357 .00 Remaining Funds Available for th is CO $285 ,220 .26 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals Select Day Type $9,711 ,9'10 .92-500 $38 ,862 .50 365 $32,725 .76 $9 ,718 ,047.66 865 $44,494.50 0 $9 ,762 ,542.16 865 $291 ,357.00 $285 ,220 .26 0.52% $12 ,139 ,888 .65 , TPW-Traffic Management requested the re-construction of all the traffic signals in the Hulen and Clearfork intersect ion to be added to the project. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfact ion and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. Contractor's Com an Name Contractor Name M&C Number M&C Date Approved I I ' \ ~J'ORTWORTH. , ~ City of Fort Worth Change Order Request I 1, ( I ' Project Name! Clearfork Main Street Bridge City Sec # 40679 .__ _____ __, Client Project #(s)! TPW-C221-541200-30323-0010783 ; C295-541200-30323 -0010783 Project Description Bridge , Concrete Pavement, and Storm Drain Construction. Contractor! Concho Construction Co . Change Order # 3 Date City Project Mgr . ._! _L_e_on_W_i_ls_on ___________ _, City Inspector Martina Salinas Dept. T/PW . ·- Original Contract Amount $9,711 ,910 .92 ,;.;, Extras to Date $38,862 .50 Credits to Date $32,725 .76 Pending Change Orders (in M&C Process) Contract Cost to Date $9,718 ,047 .66 !Amount of Proposed Change Order $44,494.50 Revised Contract Amount $9 ,762,542.16 Original Funds Available for Change Orders $291 ,357 .00 Remaining Funds Available for this CO $285 ,220 .26 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $9 ,711 ,910 .92 $38 ,862 .50 $32 ,725 .76 $9 ,718 ,047 .66 $44,494.50 $9 ,762 ,542 .16 $291 ,357 .00 $285 ,220 .26 0.52% $12 ,139 ,888 .65 1/8/2013 Select Day Type 500 365 865 0 865 TPW-Traffic Management requested the re-construction of all the traffic signals in the Hulen and Clearfork intersection to be added to the .project. ·· .......... ) l;rl It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. Contractor's Com an Name Contractor Name Contract Si nature · Concho Construction Co. ;r / / / '11 t < ,~ 1<... 1 / f¥ M&C Date Approved \ \0'1, L___~~===-------~~~----=======-------~~~ M&C Number \ ) J fORTWORTH a ~ City of Fort Worth Change Order Request Project Name! Clearfork Main Street Bridge City Sec # 40679 ~--------' Client Project #(s)j TPW-C221-541200-30323-0010783 ; C295-541200-30323 -0010783 Project Description Bridge , Concrete Pavement , and Storm Drain Construction . Contractor! Concho Construction Co . 3 Date City Project Mgr.j.__L_e_on_W_ils_o_n ___________ _. Change Order# City Inspector Martina Salinas Dept. TIPW Original Contract Amount $9 ,711 ,910 .92 ( . Extras to Date $38,862 .50 Credits to Date $32 ,725 .76 Pending Change Orders (in M&C Process) Contract Cost to Date $9,718 ,047 .66 !Amount of Proposed Change Order $44,494.50 Revised Contract Amount $9 ,762 ,542 .16 Original Funds Available for Change Orders $291 ,357 .00 Remaining Funds Available for this CO $285 ,220.26 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $9,711 ,910 .92 $38 ,862 .50 $32 ,725 .76 $9 ,718 ,047 .66 $44,494.50 $9 ,762 ,542 .16 $291 ,357.00 $285 ,220 .26 0.52% $12 ,139 ,888 .65 1/8/2013 Select Day Type 500 365 865 0 865 TPW-Traffic Management requested the re-construction of all the traffic signals in the Hulen and Clearfork intersection to be added to the project. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of , or incidental to , the above Change Order. Contractor's Compan Name Contractor Name Contract Si nature Date Concho Construction Co . Inspector/Inspection Supervisor Date Project Manager/Program Manager Date J , } i.. . ,--/1 Assistant Director (Dept) ( Date Director , Contracting Department (Dept) Date Assistant City Attorney Date Assistant City Manager t Date -I Y,;.,1v1A1c.~,... './ .... ----//.J 'II...! -·----. . Council Action if required) M&C Number I ' -I M&C Date Approved I I > ,, FORT WORTH -------.--- Project Name Clearfork Main Street Bridge City of Fort Worth Change Order Additions Client Project# TPW-C221-541200-30323-0010783 ; C295-541200-30323 -0010783 Project Description Bridge , Concrete Pavement , and Storm Drain Construction . Contractor Concho Construction Co . City Sec# Change Order# 3 Date 1/8/2013 City Project Mgr . Leon Wilson ,....._ ______________ _, City Inspector Martina Salinas ADDITIONS IIEM Ut~t;Klt-' I !UN Utl-'I Uty Unit Unit !.;OS! CONDUIT AND TRAFFIC SINGALS $0 .00 4-I NC Conduit-Install (Schedule 40 2" Open Cut-) T/PW 50 .00 LF $5 .00 5-INC Conduit-Install (Schedule 40 PVC 3" Open Cut-) T/PW 55 .00 LF $7 .00 6-INC Conduit-Install (Schedule 40 PVC 3" Bore) T/PW 290 .00 LF $18.00 11-INC Cable-Num 8 XHHW BLACK -Install Cable-Num 6 XHHW Black-Install) T/PW 285 .00 LF $1 .10 12-INC Cable-Num 8 XHHW WHITE-Install Cable-Num 6 XHHW White-Install) T/PW 105 .00 LF $1 .10 13-INC Cable-Num 8 XHHW BLACK -Install T/PW 30.00 LF $0.90 14-INC Cable-Num 8 XHHW WHITE -Install T/PW 30 .00 LF $0 .90 17-INC Signal-Traffic Signal Pole Assy & Mast Am -Install T/PW 2.00 EA $500 .00 18-INC Sign -Medium-Overhead Mount-Furnish & Install-Install T/PW 5.00 EA $180.00 19-INC Sign -Large-Overhead Mount-Furnish & Install-Install T/PW 2.00 EA $280 .00 21 -INC Signa l-56 Ft Mast Arm-Item provided by City-Install T/PW 1.00 EA $10 ,000 .00 22-INC Signal-8 Ft Street Light Assembly -item prov ided by city-Install T/PW 2.00 EA $200 .00 24-INC Signal-Concrete Foundation Type 5 -Install T/PW 2.00 EA $1 ,100.00 25 -INC Signal-Pedestal Service -Install T/PW 1.00 EA $4 ,000 .00 27-INC Signal-Mast Arm Stabilizer -Install T/PW 2.00 EA $150 .00 30-INC Signal -Salvage Existing Traffic Signal Equipment T/PW 1.00 LS $5 ,000.00 31-INC Signal-S ignal Head 3 Section Type A, Type B -Install T/PW 8.00 EA $200 .00 34-INC Signal -Type 45 Signal Pole -Item provided by City-Install T/PW 2.00 EA $3 ,800.00 NEW-39 Sign -Small-Ground Mount-Install-Install T/PW 6.00 EA $687 .50 NEW-40 Signal-Electrical Ground Box with Lind and Apron-Large -Install T/PW 5.00 EA $770 .00 NEW-41 Signal-52 FT Mast Arm -item ptov ided by City -Install T/PW 3.00 EA $962 .50 NEW-42 Signal-Signal Head 3 Section Type A, Type B -Install T/PW 1.00 LS $2,750 .00 NEW-43 Signal-International Ped Signal Type Countdown -Install T/PW 8.00 EA $800 .00 NEW-44 Signal -Ped Pushbutton & Sign Assembly lype Countdown -Install 1/1-'VV 8.UU EA $440 .UU T/PW Sub Total Add itions Change Order Additions Page 1 of 1 40679 IOtal $0 .00 $250 .00 $385 .00 $5 ,220 .00 $313 .50 $115 .50 $27 .00 $27 .00 $1 ,000 .00 $900.00 $560 .00 $10 ,000.00 $400 .00 $2 ,200 .00 $4 ,000 .00 $300 .00 $5 ,000 .00 $1 ,600.00 $7 ,600 .00 $4,125 .00 $3 ,850 .00 $2 ,887.50 $2 ,750.00 $6,400 .00 :!>J ,blU .UU $63,430 .50 $63 ,4JU .oU FORT WORTH ---.--- Project Name Clearfork Main Street Bridge City of Fort Worth Change Order Deletions Cl ient Project# TPW-C221-541200-30323-0010783 ; C295-541200-30323 -0010783 Project Description Bridge , Concrete Pavement, and Storm Drain Construction . Contractor Concho Construction Co . City Sec# Change Order# 3 Date 1/8/2013 City Project Mgr . Leon Wilson .__ ______________ ___. City Inspector Martina Salinas DELETIONS IIEM Ut:SL;Klt-' I IUN Utt'I l...i.lY unit Unit (.;OSt 9-Dec Cable-Electrical -Install (Cable -20 Conductor #14 Stranded Cable) T/PW 520 .00 LF $3 .00 10-Dec Cable-Electrical -Install (Cable-Num 6 Triplex) T/PW 45 .00 LF $1 .60 15-Dec Cable-Num 8 Bare-Install T/PW 505 .00 LF $0.80 20-Dec Signal-60 FT Mast Arm-Item provided by City -Install T/PW 1.00 EA $4 ,500.00 26-Dec Signal-International Pedestrian Signal Type P -Install T/PW 4.00 EA $400 .00 29-Dec Signal-Pedwstrian Pushbutton & Sign Assembly -Install T/PW 4.00 EA $200 .00 35-Dec Signal-VIVDS-ltem provided by City-Install T/PW 1.00 LS $10 ,000 .00 T/PW SUb Total Deletions Change Order Deletions Page 1 of 1 40679 1ota1 $1 ,560 .00 $72 .00 $404.00 $4 ,500 .00 $1 ,600 .00 $800 .00 $10 ,000.00 $18 ,936 .00 $18 ,!:!Jo .UL M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Lira Electric Electric $44,494 .50 Total $44,494.50 Previous Change Orders CO# DATE AMOUNT 2 11/26/2012 $20 ,625 .00 Total $20,625.00 CONCHO CONSTRUCTION COMPANY, INC . JOB : C-298 City of Forth Worth Clearfork Main Street Bridge No 4 / 0504 1263 5 I 0505 1262 6 I 0506 0382 CHANGE ORDER #3 TRAFFIC SIGNAL ITEMS Description CONDUIT AND TRAFFIC SIGNALS ITEMS REVISED OR DELETED BY CHANGE ORDER Conduit -Install (Schedule 40 2" Open Cut -Install) Conduit-Install {Schedule 40, PVC 3" Open Cut-) Conduit -Install (Schedule 40, PVC 3" Bore) 9 / 0509 1261 Cable-Electrical -Install (Cable-20 Conductor #14 Stranded Cable) 10 / 11 / 12 / 13 / 14 / 15 / 17 / 18 / 19 / 20 I 21 / 22 I 24 / 25 I 26 I 27 I 29 / 30 I 31 / 34 I 35 I 39 40 41 42 43 44 0510 1260 0511 1256 0512 1259 0513 0380 0514 0381 0515 0378 0517 0523 0518 1028 0519 1023 0520 1242 0521 1241 0522 1243 0524 1058 0525 1066 0526 1060 0527 1062 0529 1067 0530 1068 0531 1069 0534 1250 0535 1253 01030 Assembly 01231 Assembly 01240 Steel 01257 Assembly n/a Assembly n/a Assembly Cable-Electrical -Install (Cable-Num 6 Triplex) Cable-Num 8 XHHW BLACK -Install (CABLE -NUM 6 XHHW BLACK - Cable-Num 8 XHHW WHITE -Install (CABLE -NUM 6 XHHW WHITE - Cable-Num 8 XHHW BLACK -Install Cable-Num 8 XHHW WHITE -Install Cable-Num 8 Bare -Install Signal-Traffic Signal Pole Assy & Mast Arm -Install Sign-Medium-Overhead Mount-Furnish & Install -Install Sign-Large-Overhead Mount-Furnish & Install -Install Signal-60 Ft Mast Arm-item provided by City -Install Signal-56 Ft Mast Arm-item provided by City -Install Signal-8 Ft Street Light Assembly-item provided by City-Install Signal-Concrete Foundation Type 5 -Install Signal-Pedestal Service -Install Signal-International Pedestrian Signal Type P -Install Signal-Mast Arm Stabilizer -Install Signal-Pedestrian Pushbutton & Sign Assembly -Install Signal-Salvage Existing Traffic Signal Equipment -Remove Signal-Signal Head 3 Section Type A, Type B -Install Signal-Type 45 Signal Pole-item provided by City-Install Signal-VIVDS-item provided by City-Install NEW ITEMS ADDED BY CHANGE ORDER Sign-Small-Ground Mount-Install-Install Signal-Electrical Ground Box with Lid and Apron-Large-Install Signal-52 Ft Mast Arm-item provided by City -Install Signal-Radar Detection System-Item provided by City-Install Signal-International Pedestrian Signal Type Countdown-Install Signal-Pedestrian Pushbutton & Sign Assembly Type Countdown-Install INSTALL) INSTALL) Unit Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Each Each Each Each Each Each Each Each Each Each Each Lump Sum Each Each Lump Sum Each Each Each Lump Sum Each Each Change In Qty 50.00 55.00 290.00 -520 .00 -45 .00 285 .00 105.00 30 .00 30.00 -505.00 2 .00 5 .00 2 .00 -1.00 1 .00 2 .00 2.00 1.00 -4.00 2 .00 -4.00 1.00 8 .00 2 .00 -1 .00 6 .00 5 .00 3 .00 1 .00 8 .00 8.00 Net change Order Amount 14-Jan-13 09:19AM Bid Price $5 .00 $7 .00 $18 .00 $3 .00 $1 .60 $1 .10 $1 .10 $0.90 $0 .90 $0 .80 $500.00 $180.00 $280 .00 $4,500.00 $10,000.00 $200.00 $1,100.00 $4 ,000.00 $400 .00 $150.00 $200.00 $5 ,000.00 $200 .00 $3,800.00 $10 ,000 .00 $687 .50 $770 .00 $962.50 $2 ,750.00 $800 .00 $440.00 PROJECT NAME : PROJECT LIMITS : BuySpeed No (T/PW): BuySpeed No (Water): City Project No : Contract No: D.O .E. No: Attachment to Change Order No : Today's Date : Original Contract Amount: Extras to Date : Credits to Date : Contract Amount to Date : PROJECT SUMMARY SHEET (Change Order Attachment) CLEARFORK MAIN STREET BRIDGE P0-10-00061952 00107 Original M & C approved 07-13-2010 C24320 CS40679 5950 3 1/14/13 TOTAL $ 9,711,910.92 $ 9 ,711 ,910 .92 $ 38,862.50 $ 38 ,862 .50 $ $ 32,725.76 $ 32 ,725 .76 $ $ 9,718,047.66 $ 9 ,718 ,047 .66 $ Amount of Proposed Change Order: $ 44,494.50 $ 44 ,494.50 Revised Contract Amount: $ 9,762,542.16 $ 9 ,762 ,542 .1 6 $ Contingency Funds Avail. for Admin . Change Orders : $ 291,357.00 $ 291 ,357.00 Remaining Funds Available for Change Orders: $ 285,220.26 $ 285 ,220.26 Additional Funding (if necessary): Prepared By: Etta Bacy T /PW Construct ion Services $ $ $ $