HomeMy WebLinkAboutContract 40850-A1STATE OF TEXAS COUNTY OF TARRANT o CITY SECRETARY CONTRACT NO. 4 D<o5C)-A \ AMENDMENT NO. 1 CITY SECRETARY CONTRACT NO. (M&C Needed) WHEREAS, the City of Fort Worth (City) and Jacobs Engineering Group , Inc., (Engineer) made and entered into City Secretary Contract No . 40850, (the Contract) which was authorized by the City Council by M&C C-24294 on the 6th day of June 201 O; and WHEREAS, the Contract involves engineering services for the following project: Eastern Hills Drainage Improvements, Project No . 01363 WHEREAS, it has become necessary to execute Amendment No . 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: Article I Article I of the Contract is amended to include the additional engineering services specified in M&C C-25346,adopted by the City Council on the 13th day of December 2011 and further amplified in a proposal letter dated August 24 , 2011 , copies of which are attached hereto and incorporated herein . The cost to City for the additional design services to be performed by Engineer total $158 ,030 .00 . Article II Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract , as amended , so that the total fee paid by the City for all work and services shall not exceed the sum of $651 ,667.00 . City of Fo rt Wo rth , Texas Ame ndment to Engineering A greeme nt PM O Official Release Da te. 1 1/29/2011 Pag e 1 of 2 ('l _"lJ -~._ OFFICIAL RECORD CITY SECRETARY FT. WO TH, TX Article Ill All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. M&C No .: C -2-0 'i & M&C Date : / '2. · 1'3 -11 City of Fort Worth , Texas Amendment to Engineering Agreement PMO Official Release Date : 11 /29 /2011 Page 2 of 2 4 Gi.r sy:_...=....~"---..;;...w____;_. _u_<...,e; _ ....... _~;....._- Doug1 W. Wiersig , P.E. Director, Transportation Works Jacobs Engineering Group , Inc . and Public By 1lSJ-'J~ Brad Davis Operations Mgr. -Southern Reg ion OFFICIAL RECOR D CITY SECRE TAR Y FT. WORTH, TX Attachment "A" Amendment No. 1 City of Fort Worth Storm Water Utility Eastern Hills Storm System Improvements Scope of Work SECTION I -PROJECT DEFINITION The objective of the original scope is to design new facilities for the Eastern Hills Watershed. Services also include bidding and construction services, and permitting and ROW/easement assistance. The project is separated in to three phases, with the Phase 1 being on a fast track because of the availability of funding. Phases 2 and 3 were to be on a normal design track. In the process of performing the Phase 1 work, several additional scope items have been identified which are addressed in this amendment. These items are summarized i n the following table: Item Item Descri ption Justification Fee Impact Number ($) Update Requested by city staff to 1 InfoWorks modeling for provide consistency in design $59,330 Modeling basin features and to update to most recent design conditions . Initial Separate package created from Phase 2 drawings for selected Phase 2 features per 2 Early Meadowbrook request -cost increase due to $4,800 Package /Putnam lost efficiency and resou rce Inlets adjustments to meet early schedule. Phase 1 Bid package Sheet count increase from 3 Bid significantly scoped amount due to new $80 ,000 Package larger than project elements by 20 sheets; Size scoped $4,000 per sheet Open Map and 4 Board City request $2,000 House Graphics 5 CUDE Develop 30 City re quest $2,9 00 Aw ard Renderinqs Maintenance Needed to define maintenance manual to items for detention and filtration 6 O&M support facilities with items to be Manual discussed with FWISD and FWISD incorporated in maintenance agreement a rra nqements TOTAL These items are explained in more detail in Section II. SECTION II -BASIC SCOPE OF SERVICES Item 1 -InfoWorks Modeling Background $9,000 $158,030 The proposed solutions report for the Eastern Hills Watershed Planning Study was developed in 2007 and the existing conditions and proposed improvements were originally modeled using EPA-SWMM5. The proposed improvements generally consist of the new FWISD multi-use detention basin , replacement of existing pipes with larger ones , addition of new pipes and systems to the existing network, and spillway improvements to the neighborhood pond. At the end of the study, the City of Fort Worth made a decision to move away from using EPA-SWMM5 for complex drainage studies and chose the Info Works program to replace it. Near the end of the study , the City requested that Jacobs (then Carter & Burgess) transition the SWMM5 model to the l nfoWorks format , and that work was done in 2008. With the budget available at that time only the existing conditions model was converted , in a limited way , with an understanding that the proposed conditions model would be converted later and that the converted models would also need to be upgraded to a more robust model with a greater level of detail , under a separate scope and budget. These proposed improvements will be refined during the design phase , which is currently underway, and it is the City's desire that those improvements be incorporated into the model for the Eastern Hills watershed for necessary refinements and upgrades t o the ongoing design effort. Dur ing the study phase modeling effort , certain simplifying assumptions were made (by all C ity watershed study consultants) in order to reduce the effort required to model inlets , since the focus of the study was to analyze the capacity of the pipes. Instead of modeling inlets individually , they were "lumped " or grouped ; for example , an intersection with two 10-foot inlets was modeled using one node coded as a 20-foot inlet , and the individual drainage areas flowing to each inlet were also combined into one. Moreover, SWMM5 did not have the capabil ity to model inlets directly using standard C ity of Fort Worth inlet capacity criteria . To work around this , inlets (or inlet groups) had to be simplified as either a weir or an or ifice. The initial conversion of the model was to lnfoWorks CS , and when lnfoWorks SO became available the model was converted again , to the initial release vers ion of SO that did not yet have the capab ili ty of directly m odeling inlets. The i nlet groups , combined drainage areas , and inlet modeling a pproach were left the same as they were in the SWMM5 model. A ddit ionally , t he ini ti a l modeling of overland flows in SWMM5 cons isted of parall el links from "inlets " to downstream nodes using cross-sectional data from the roads as the shape of the links . When the model was initially converted to lnfoWorks these cross section nodes were replaced with a terrain 'mesh ' for two-dimensional modeling , but this mesh was created from the now-outdated 2001 LiDAR data and no breaklines were incorporated due to budget constraints . Proposed Work The purpose of this item is to update the previously prepared existing conditions lnfoWorks SD model to a more robust model with a much greater level of detail so that it can be used to assist with the design of the proposed improvements described in the scope of work for the Eastern Hills Storm System Improvements project. The inlet groups will be separated into individual nodes , and watersheds will be divided to model runoff to each inlet. Since lnfoWorks SD now has the ability to model inlets directly, this functionality will be used for inlet capacity modeling , replacing the weir/orifice method . The inlets at Meadowbrook and Putnam and the proposed FWISD Multi-Use Detention Basin will also be added . The overland flow modeling approach will be adjusted in lnfoWorks SD by incorporating breaklines developed from available data obtained during the construction survey to better define the two-dimensional flow characteristics and modeling . Data Collection 1. Collect most recent contour data (2009) for the watershed . 2. Incorporate ground survey obtained during construction phase into a new terrain mesh for overland flow modeling . Update Existing Conditions Hydrology 1. Hydrology developed during the watershed study (SCS method) will be used as a starting point for this modeling effort . 2. Update drainage area boundaries as required using new (2009) topo , construction survey , and site visits as necessary . 3. Divide subwatersheds as necessary to model individual inlet locations or other proposed drainage features . 4 . Divide flows and/or subwatersheds between individual inlets at existing inlet locations or other existing drainage features , as necessary . Update Existing Conditions Hydraulics 1. Separate inlet groups (as currently configured in the model) into individual inlets . 2 . Modify any pipe elements as necessary to accommodate the changes to inlets or for other modeling considerations . 3 . Add new pipe systems as necessary to reflect the proposed design conditions . 4. Incorporate the storm system improvements at Meadowbrook and Putnam . 5. Incorporate the proposed FWISD multi-use detention basin, inflow channel, and sedimenUfilter basin . 6. Develop overland flow geometry for the multi-link network. 7. Map limits of inundation for the 10-year and 100-year events using the model results and 2-D mesh . 8. Develop a boundary condition for the model using readily available data for Woodhaven Creek (assumed to be a watershed study being performed for the City by another consultant). Create Proposed Conditions Hydrology • Divide subwatersheds and modify hydrologic parameters as necessary to incorporate new (proposed) inlet locations or other proposed drainage features. Create Proposed Conditions Hydraulics • Modify inlets in the existing conditions model to reflect the proposed design conditions (i.e ., replace a 10-foot inlet with a 15-foot inlet). • Add new inlets as necessary to reflect the proposed design conditions. • Modify any pipe elements as necessary to reflect the proposed design conditions . • Add new pipe systems as necessary to reflect the proposed design conditions . • Incorporate the proposed improvements to the spillway and discharge channel of the existing neighborhood pond. • Incorporate the proposed open channel that is to carry flows from the Shadow Creek box culverts downstream to the receiving watercourse (Woodhaven Creek). The confluence and/or receiving watercourse will not be modeled as a part of this scope . • Develop/modify overland flow geometry for the multi-link network . • Map limits of inundation for the 10-year and 100-year events using the model results and terrain mesh. Report Prepare a design report to describe the modeling effort , methodology, short description of proposed improvements , and a summary discussion of the results . This design report will include any assumptions that were made when developing the model , as well as standard hydrologic and hydraulic results in tabular format. The report will also include a hydrologic work map , inundation maps for the 10-year and 100-year events , and stage- time graphs for critical nodes . Deliverables 1 . Provide one Info Works SD model reflecting the proposed 100% design configuration for the storm drain improvements . 2 . Provide a memo to describe the hydrologic and hydraulic analysis and summary of the flood study . The memo will provide the effective peak discharges, water surface elevations and summary of the proposed development conditions and impacts . Assumptions 1 . Hydrologic and hydraulic modeling will be performed only on existing and proposed storm drain infrastructure within the Eastern Hills watershed as discussed in the original scope . Should additional modeling be required on other waterways or within other watersheds that will be accomplished as Add itional Services , after approval by the City . 2 . Any additional work not specifically included in the above scope of services will be accomplished as Additional Services , after approval by the City . 3 . Hydrology developed during the watershed planning study (SCS method) will be used as a starting point for this modeling effort. 4 . This scope assumes that no street grades will change due to any proposed improvements . 5. This scope does not include any submittal to FEMA such as a LOMR or CLOMR , or any fees associated with such a submittal. Item 2 -Phase 2 Early Package Provide accelerated design of Phase 3 improvements by moving Putnam and Meadowbrook inlet design into a preliminary package for direct construction by city's on- call contractor. This item represents an out of sequence production activity which i mpacts the assumed economies of scale and resource scheduling anticipated for the Phase 1 design production. Item 3 -Phase 1 Bid Package Size Provide a bid package for the Phase 1 improvements with a significantly larger sheet count than contemplated in the original scope of work. After d iscussions w ith City staff, it was agreed that the City would provide compensation for 20 additional sheets. a. Utility relocations b. Filtration/sedimentation features c. Inlet/outlet special features d . FWISD safety feature enhancements e. Landscape/access ibility features Item 4 -Open House Meeting Assistance Provide mapping and a graphics board to support the city's open house meeting with the community. Item 5 -CUDE Award Application Support Support the city's CUDE award application by provide 3D renderings of the sports field, including landscaping features. Review and comment on the CUDE application . Item 6 -Operations and Maintenance Manual Develop an O&M manual for the detention basin to include the following components: • Maintenance and operation of sedimentation and filtration features • Maintenance of landscape items, primarily trees and grass • Maintenance of underdrain system • Operational considerations for filter features and detention basin during dry weather and flooding conditions • Definition of maintenance responsibilities between Fort Worth TPW staff and FWISD maintenance. Develop the manual for review by TPW staff and FWISD. Level of effort includes two review drafts followed by production of a final manual. Attendance at one meeting with FWISD staff is included. Item Description 1 lnfoWorks 2 Phase 2 Early Pkg 3 Phase 1 Pkg Size 4 Open House 5 CUDE Award 6 O&M Manual TOTAL Summary of Work Items Amendment #1 Fee Notes $ 59 ,330 Includes $600 for expenses -reproduction , etc . $ 4 ,800 $ 80 ,000 Sheet count basis at $4000 per sheet $ 2 ,000 $ 2 ,900 I$ 9 ,000 I : $ 158 ,030 PROJECT NAME: PROJECT N UMBER: Dj\TE : PROJEC T MA NAGEMENT ~ . ~ " e f . g f . a. i § 15 " u " . E ~ "' ? ~ ~ E . e C 0 0 WBS ID was ID DE SCRIPTION ;I a. ~ a. /; ,;: Hourly R ate S/h r ,.1..,., ,, \',y• ' \~:~rif I ;'J 1FS DATA COLLEC TIO N Co llect new (2009) contours Incorporate ne w sur.,cy data Crea1e new tenain mesh 1FS HYDROLOGY Update D A OOund.Jr1e s \for ne w l opo) Divide subwatershcds for new in lets R,1tio fluws draina ge fealures OWO C 1FS HYD RA ULICS 12 ,o 16 Separa1e in let gr oups 11110 individual in lets M odify e x:1!:>hng in lel s t o proposed cond ition s Add ne w {proposed1 inlets Modify pi pes Add ne w (proposedJ pipes l ncorporal e F\J\II SD basin l nc..>rpor ate neighborhood pond unprovemen1 s 12 Incorporate proposed discha rg e channel 2 Develop overland tlow geometry fo r multi-link Crea 1e mun dat1on mnps OeJclop boundary cond1 1ion O A.QC 16 1FS DESI GN R EPORT ,. De'.elop re pon 12 Incorporate stage-11me graphs QA_I QC Meetings tUP to 2 at 2hr duratt0ns) Pro}ect A dnum stra u o n B illab ~ Ho u rs 16 32 59 18 PRICING TEMPLATE MANHOUR ESTIMATE WIP ENGINEERING PRODUCTION GIS :l ~ . ,a E C ~ g> ·~ ,= ~ w e u < ~ ~ ~ C '<-. u, "" :,: N " " "' " < ,,! ... !,: 1,1 " . u, .~ ;;, .~ Is .~ ei ., ;a, -'.H'i 12 b{; ~ Q:i ,; 24 16 26 24 16 24 6 12 10 36 8 20 2 10 70 20.i 32 6 32 6 32 20 12 24 12 24 12 12 12 12 16 32 8 36 26 12 24 16 12 6 124 10 290 24 74 SURVEYING • i ~ ~ a. u ¥ " 0: :: .~ u u: u.. 0 ~ C C ~ ~ i i u, ei .~ .~ 60 168 •c 13. 10, 0 0 . 1i 0: j ~ "C g :,: i . r " ~ < 78 H1.Z9 85 S94.a.t 366 $1 2.13 100 $96.34' l2 SHi5.GO 661 SubtoQI (Labor Cost) "ii L) .8 ."l $6,341 $1 ,01 9 $30,061 $9,6:34 $5,280 59,334 2 0 16 Pnntecl 8/312011 5 02 PM PRICING TEMPLATE PR O JECT NAME : PROJECT NUMBER: DATE· MANHOUR ESTIMATE PROJECT MANAG EMENT VI/IP ENGINEERING PR ODUCTIO N n . ~ ~ O> i . . ~ . . 1' . a: C C C § 0 :1 g, ·gi g, ~ :1 ti u w w ~ . . ~ ~ g ~ n g ~ :; 0 . t 8' ~ N " " "' ·e ·e .... .... " " E <( a. ~ a: 0: a. ~ ii, w w '~ ~ 0 WBS ID WBS ID DESC RIP TIO N Hour1y R ale S/h1 " ,.,. 'IJ"s '" ~i 117 ,, 10C 72 ,o EARLY PACKAGE 12 25 Ex1 ra Design Time 12 25 Billabk! Hours 12 25 G IS SURVEYING ~ ~ '.'.l ~ .. a. ~ ¥ .I: a: ~ ti .... u: 0 "' .I: ~ ~ f C a ~ :; "' "' vi 15 15 cil cil l(lS 71 60 168 GO 131 ~ j ¥ u: :; C .. :; ~ ,o. 44 44 . ~ Q'. -c el r . O> E ~ <( $1 09.09 Subtotal (Labor Cost ) 0 u 2 j $4 ,100 4,100 3 of6 Pnntcd 8/3/2011 5 02 PM PRICING TEMPLATE P ROJECT NAME : ;_ PROJECT NUMBER : •• .,.., .. ,.i DATE· MANHOUR ESTIMATE PROJECT MANAGE MENT 'MP ENGINEERING PR ODUCTION WBSID g i ~ i "' £ . ;; 2 ~ . E C § 0 :1 :1 g, g, -~ ti <.) t ~ w w e ~ ~ g ~ g .~ 1l. . " g> I N " " " ~ B e e t-t-" " 5 a: :1 a: ~ uj w w m .~ ll. ll. <.) WBS ID DESCRIPTION Hour ly Rate S/hr Hi< SC ~1 ,. ~t" 10, ,. 60 OPE N HOUSE Graphics Billable Hours GIS SURVEYING • 1 (/) ~ a'. ~ i 0: tj ¥ < ti ~ t-u:: (/) ~ ~ C " < ~ ~ :1 (/) (/) uj ;;; ;;; .~ .~ HJ:'i 72 so ... 60 13" 0 16 16 16 ! ¥ u:: C :1 ~ ~ :1 " ~ '°" 24 24 . " 0: ~ ~ a I ~ ~ < H 1 .i7 Subtotal (Labor Cost) ~ <.) ~ $1,960 2,000 • of 6 Pnnte<I : 8/3/20 11 5 02 PM PRICING TEMPLATE PROJECT NAME : , .:~. u, ~· • PR OJECT NUMBER: ,., , DATE · MANHOUR ESTIMATE PROJEC T MANAGEMENT IMP ENG IN EERING PRODUCTION ii . J e "' t . . " ~ . . ~ Q. ~ ·~ C f 0 i g> Q> £ u E UJ UJ ~ /!; . C ~ C tl "' e g ii . ~ ~ ~ -~ I N 'C 'C ., C e e ·e I-I-'C 'C 5 <( Q. i Q. Q. Q. ~ ii, w w ,1 ,1 WBSID WBS ID DESCRIPTION H ou r1y Rate Slhr , .. l(· ~= l~ / ,, 10C. " ,o CUDE AWARD AP PLICATION SUPPORT l-D renderings (2} 24 Billab6e Hours 24 GIS SURVEYING • i ~ ~ ~ Q. ~ " ,;; Cl'. ~ <( f £ 0 I- "' . ~ ~ C a <( I-~ 2 ~ "' "' iii " " "' ~ 1()3 12 60 163 GO 1J: ~ j " ~ ... i C ~ • 0 I- 108 28 21 . " Cl'. ~ ~ " 0 I il . u ~ .8 ~ .5 <( $2,9ll Subtotal (Labor Cost) 2,900 5 of6 Pnnted . 8/3/20 11 5.02 PM PRICING TEMPLATE PROJECT NAME: PR OJE CT NUMBER : DATE · MANHOUR ESTIMATE PROJECT MANAGEMENT WP ENGINEERING LANDSCAPE ~ . :l 0 C, . . e a: . C, . ;;; . C . C ·~ g . C -~ g, -~ 0 ::. . TI 0 . E ::. UJ UJ e .,; ~ t3 O> ~ ~ ~ ~ ~ . E ·5' . I "' u u "' ~ B 0 f--f--u u /5 ~ ii ii ii n .,; ii, w w /~ ~ WBS ID W B S ID DESCRIPTION Hou ,ly Rate S/hr ')';" •o 'C S6 S1 &1 Jt 10i> ,2 60 O&M MANUAL ,. 43 F11tration fa cihW maintenan ce 14 30 Lanelscape maintenanc e R oad maintenance 1l Production Billa bie Hours 43 GIS SU RVEYING • ~ V) ~ ~ ~ " I ¥ ~ 0: ~ TI ~ f--.r: "' ~ ~ C " <( ~ ~ i V) "' ii, " " J J 10& " 60 16£ •b I J2 • ~ ¥ il: C i ~ I ::. " ~ I/lo •9 •• . li "' ~ "' 5 ~ I . ~ 0 ~ ~ <( $100.60 U ,953 Subtotal (labor Cost) 9,000 6 of6 Prmted . 8/3/20 11 5.02 PM M&C R ev iew Page 1 of 2 Official site of the City of Fort Worth, Texas CITY COUNCIL .AGENDA COUNCIL ACTION: Approved on 12/13/2011 DATE: 12/13/2011 REFERENCE **C-25346 LOG NAME: 20AMEND2_EASTERN_HILLS NO.: CODE: C TYPE: PUBLIC CONSENT HEARING: NO SUBJECT: Authorize Execution of Amendment No . 1 in the Amount of $158 ,030 .00 to City Secretary Contract No . 40850 , an Engineering Agreement with Jacobs Engineering Group , Inc ., for the Stormwater Utility Project-Eastern Hills Drainage Improvements, for a Total Contract Amount of $651 ,667 .00 (COUNCIL DISTRICTS 4 and 5) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 1 in the amount of $158,030 .00 to City Secretary Contract No . 40850 , an Engineering Agreement with Jacobs Engineering Group , Inc ., for the Stormwater Utility Project-Eastern Hills Drainage Improvements thereby , revising the total contract cost to $651 ,667 .00. DISCUSSION: This engineering design amendment will provide for the following services which are beyond the scope of the original Agreement: additional hydraulic modeling for follow-on phases of work which were defined as a part of the initial design effort ; an accelerated design package for the initial stages of this construction project to meet construction execution commitments; and design of stormwater quality enhancements and an associated operations and maintenance manual to meet new design standards . The necessity for each of these additional services was unknown at the time the initial design scope was developed . Jacobs Engineering Group, Inc ., (Jacobs) was selected to design this project based on a Request for Qualifications (RFQ) process . The City Council authorized the City Manager to execute an Engineering Agreement with Jacobs on June 22, 2010, (M&C C-24294) in the amount of $493 ,637 .00 for the design of the Eastern Hills Drainage Improvements. Jacobs proposes to perform the additional design services for a lump sum fee of $158 ,030.00. City Staff considers the fee to be fair and reasonable for the scope of services proposed . Funding for this project is being provided from revenue bonds in the Storm Water Capital Projects Bond 2009 Fund . A waiver of the goal for M/WBE subcontracting requirements was requested by the Transportation and Public Works Department and approved by the M/WBE office because the purchase of goods is from sources where subcontracting or supplier opportunities are negligible . This project is located in COUNCIL DISTRICTS 4 and 5, Mapsco 79C . FISCAL INFORMATION/CERTIFICATION: httn -//www fortw orth o o v .oro-/c rnm c il n~c k e t /m c r f':v if':w .~s n ?TD =l fiORO&c.rnm r.il,fat P.=1? 1 ?/?()/')() 11 M&C R ev iew Page 2 of 2 The Financial Management Services Director certifies that funds are available in the c urrent capital budget , as appropriated , of the Storm Water Cap ital Projects Bond 2009 F und. TO Fund/Account/Centers Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS 20AMEND2 EASTERN HILLS Map.pdf FROM Fund/Account/Centers P227 531200 204280136330 $158,030 .00 Fernando Costa (6122) Douglas W . Wiersig (7801) Chad Simmons (8179008346) httn://www .fortworth s:rovon:r /r,o nn r.il mir.h~t /m r. n~viP.w ::i•m?TD =l 60RO~rn11 n ri l r'h,t P=l '"> 1 ')/')(\/')f\11