HomeMy WebLinkAboutContract 40853-CO3FORT WORTH .
~
City of Fort Worth clTV SECRETARYi rJ6 63. -CD3
Ch O d R CONTRACT NO.:! -ange r er equest
Project Name! Village Creek WWT Secondary Area & Filter Rehabilitation/Modifications City Sec # 40853 .__ _____ _,
Client Project #(s)! Fort Worth (01289); Carollo (8258A.20); Archer Western (210138)
Project Description
Contractor! Archer Western Contractors Ltd
City Project Mgr.! Farida S Goderya , PhD , PE
Dept Water .
Change Order #
City Inspector
3 Date 8/26/2011
Mike HiN
Totals Select Day Type
$8,214,000.00 · 455
$43,650.00
Original Contract Amount ......_,;$:.....8:.....,21_4.:...,0....;..00:......00_+------+-------+--'-'-,_.,..;--,,....,..,.....-+---___;~
Extras to Date $43,650 .00 0 ......_,;___;-.:...--+------+-------+--;......;---+----~
Credits to Dale
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Pro ed Chan e Order
Revised Contract Amount
Original Funds Available for Change Orders
Remailing Funds Available for Ulis CO
Additional Funding (if necessary)
$8,257,650.00
$23,689.00 ·
$8,281,339.00
$0.00
$23,689.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS" OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25"}
. ' ~ -
--. : 1: ~ ..:. ! 7 "' . ' 1 .-• • -. ' -• ~ • \ • ' - , ...
This Change Order #3 covers the following :
CMR 07 -24" RCCP to DIP Pipe Adapters at RS Pipe Area
CMR OS-Concrete Blocks Demo at Meter Vault .13
CMR 10 -Rotation of Two 16" Plug Valves at AB 12N RS Piping Area
Per Change Order # 3:
Amount Requested $23,689.00
Contract Time extension for 00 days.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Attested by: m
0 9 -0 8 -1 1 AO 9 : 4 0 0 U T
455
0
455
Engineers ... Working Wonders With Water ..
Project:
Recipient:
Subject:
Contractor:
Engineer
WATER
CONTRACT MODIFICATION REQUEST 7
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: August 12, 2011
P275-
Secondary Area and Rehabilitation and 70130
Modifications Project No.: 0128980 ------------------
City of Fort Worth
24" RCCP to DIP Pipe Adapter at RS Piping Area.
Archer Western Contractors, Ltd.
Carollo Engineers
Contract Mod. No.: CMR 1.' ------------
Carollo Engineers and Archer Western Contractors, Ltd . acknowledge that the work shown in the referenced
Contract Mod ification Request 7 (CMR 7) represents work items not included in the original bid and changes
the as-bid price of work items that were included in the original bid. The nature of the change is adequately
described in the justification provided with the CMR.
The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has
certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore
recommended to City of Fort Worth to approve the CMR 7.
The need for this work was discovered during construction of related work items. Therefore, consideration of
procuring this work by any means other than by Contract Modification was neither practical nor desirable.
CMR 7 includes the cost related to the pipe adapter at RS piping area . During the construction it was found
that the existing 24" RS which is called out as CIP is actually 24• RCCP. The RCCP has a bigger OD than
Ductile Iron Pipe and will not allow a flexible coupling connection. Contractor will provide an adapter to
connect the new 24• DIP and existing 24• RCCP. Contractor's request for change and detailed cost
breakdown is attached with this document.
Procurement of this item by Contract Modification to this contract is justified in that the work is directly related
to and intermingled with other work , which was included in the original procurement by public bid.
Reviewed By
Approved By
_M_a_ni_sh_B_h_a_nd_a_n_· ------------Date: August 12 , 2011
_F_a_n_·d_a_G_od_e_ry~a,_P_._E. ___ ~-----~---Date: August 12 , 2011
09 -08 -11 A09 :4 0 OU T
O\MIIER:
ENGINEER:
CrTY OF FORT WORTH TEXAS
CAROLLO ENGINEERS
14785 Pn>ston Roed, Suite 950
DALLAS, TX 75254
CONTRACTOR: ARCHER 'McSTERN CONTRACTORS, LTD
2121 AVENUE J, SUITE #103
ARLINGTON, TEXAS 76006
Labor Boo:len O 48'11, c:1 Labor
Smal Tools O 15% c:A Labor
7 .5%c:Alabor
OH&P015%
ln9lnnce all! Bond 01 .5% . , ,,, .. ·~ ... , ............ , ... , .. ,~.
page l
VILLAGE CREEK VWVTP
SECONDARY AREA & FILTER REHAB AND MODS
Subl<Jlal:
WORK DESCRIPTION:
1) lnstall/Pmvide 27" adapter to oonnect 24" RCCP Pipe to Ductile
at the RS Pipe Al88
~RR24
Engineers ... Working Wonders With Water '"
Project:
Recipient:
Subject:
Contractor:
Engineer
WATER
CONTRACT MODIFICATION REQUEST 8
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: August 12, 2011
P275-
Secondary Area and Rehabilitation and 70130
Modifications Project No.: 0128980 ------------------
City of Fort Worth
Concrete Encasement Demolition @ Meter Vault 13
Archer Western Contractors, Ltd.
Carollo Engineers
Contract Mod. No .: -eMR"tt ----------------
Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced
Contract Modification Request 8 (CMR 8) represents work items not included in the original bid and changes
the as-bid price of work items that were included in the original bid. The nature of the change is adequately
described in the justification provided with the CMR.
The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has
certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore
recommended to City of Fort Worth to approve the CMR 8.
The need for this work was discovered during construction of related work items. Therefore, consideration of
procuring this work by any means other than by Contract Modification was neither practical nor desirable.
CMR 8 includes the cost demolition of concrete thrust blocks around the primary effluent piping , which were
uncovered during the excavation for the new meter vault for Aeration Basin 13. Contractor's request for
change and detailed cost breakdown is attached with this document.
Procurement of this item by Contract Modification to this contract is justified in that the work is directly related
to and intermingled with other work, which was included in the original procurement by public bid.
Reviewed By
Approved By
_M_a_ni_s_h_B_h_a_nd_a_n_· ------------Date: August 12, 2011
_Fa_n_;·d=a_G:;_od;;__;.e_.ry"-'a_,_, _P_.E_. __ ~-~-----1'-"""'==-Date: August 12, 2011
0 9-08 -11 A09 :4 0 OUT
.. '
O'MIIER :
ENGINEER :
CITY OF FORT OORTii TEXAS
CAROLLO ENGINEERS
14785 Presllon Road, Suite 950
DALLAS, l)( 7525,4
CONTRACTOR : ARCHER WESTERN CONTRACTORS, LTD
2121 AVENUE J , SUITE 1103
ARLINGTON , TEXAS 76006
Labor Eu'dln O <48'lo of Labor
Small Tools O 15% of Labor
. 7.5% of Labor
OH&P015%
in.nn. and Bond 01.5%
I ~ Pel~ •I..,'; I ••'e•t ..;,J' ... ,,•n•
page l
VILLAGE CREEK WWTP
SECONDARY AREA & FILTER REHAB AND MODS
OORK DESCRIPTION :
Demoi Remove Concrate Encasements at M_. Vault 13
.. .
,-
Engineers ... Working Wonders With Water ..
Project:
Recipient:
Subject:
Contractor:
Engineer
WATER
CONTRACT MODIFICATION REQUEST 10
Village Creek Wastewater Treatment Plant Secondary Area
Rehabilitation and Modifications
City of Fort Worth, Texas
Date: September 1, 2011
P275-
Secondary Area and Rehabilitation and 70130
Modifications Project No.: 0128980 ------------------
City of Fort Worth
Rotate 16" Plug Valves
Archer Western Contractors, Ltd.
Carollo Engineers
Contract Mod. No.: CMR to_ ------------
CMR 1 O includes the cost of rotating the two plug valves and actuators installed in the meter vaults located in
the RS piping area outside RS 6. Detailed cost breakdown for the construction work are attached with this
document
Carollo Engineers and Archer Western Contractors, Ltd . acknowledge that the work shown in the referenced
Contract Modification Request 10 (CMR 10) represents work items not included in the original bid and
changes the as-bid price of work items that were included in the original bid. The nature of the change is
adequately described in the justification provided with the CMR.
The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has
certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore
recommended to City of Fort Worth to approve the CMR 10 .
The need for this work was discovered during construction of related work items. Therefore, consideration of
procuring th is work by any means other than by Contract Modification was neither practical nor desirable.
Procurement of this item by Contract Modification to this contract is justified in that the work is directly related
to and intermingled with other work , which was included in the original procurement by public bid .
Reviewed By Manish Bhandari Date: September 1, 2011
Approved By Farida Goderya, P.E. ~> Date: September 1, 2011
0 9-0 8 -11 A09 :40 OUT
,-OMIER: ENGINEER: Cl1Y OF FORT OORlli TEXAS CAROUO ENGINEERS 14785 Prasllln Road, SiMl8 950 DALLAS, TX 75254 CONTRACTOR: ARCHER 'NESTERN CONTRACTORS, L TU 2121 AVENUEJ, SU1TE'103 ARLINGTON, TEXAS 76008 OH&PQ1~ Labor Blrclan O 48'llo of Labor Smal Tools O 15~ of Labor , __ -7.5~ of Labor ,_ and Bond 01-~ . , ,, .. . . . . ............ , ... , ',,, .. page 1 CMR10 VILLAGE CREEK WWTP SECONDARY AREA & FILTER REHAB AND MODS OORK DESCRIPTION: Rotate two 1 s" Ptug Va1ves SublDIII: