Loading...
HomeMy WebLinkAboutContract 40853-CO3FORT WORTH . ~ City of Fort Worth clTV SECRETARYi rJ6 63. -CD3 Ch O d R CONTRACT NO.:! -ange r er equest Project Name! Village Creek WWT Secondary Area & Filter Rehabilitation/Modifications City Sec # 40853 .__ _____ _, Client Project #(s)! Fort Worth (01289); Carollo (8258A.20); Archer Western (210138) Project Description Contractor! Archer Western Contractors Ltd City Project Mgr.! Farida S Goderya , PhD , PE Dept Water . Change Order # City Inspector 3 Date 8/26/2011 Mike HiN Totals Select Day Type $8,214,000.00 · 455 $43,650.00 Original Contract Amount ......_,;$:.....8:.....,21_4.:...,0....;..00:......00_+------+-------+--'-'-,_.,..;--,,....,..,.....-+---___;~ Extras to Date $43,650 .00 0 ......_,;___;-.:...--+------+-------+--;......;---+----~ Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Pro ed Chan e Order Revised Contract Amount Original Funds Available for Change Orders Remailing Funds Available for Ulis CO Additional Funding (if necessary) $8,257,650.00 $23,689.00 · $8,281,339.00 $0.00 $23,689.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS" OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25"} . ' ~ - --. : 1: ~ ..:. ! 7 "' . ' 1 .-• • -. ' -• ~ • \ • ' - , ... This Change Order #3 covers the following : CMR 07 -24" RCCP to DIP Pipe Adapters at RS Pipe Area CMR OS-Concrete Blocks Demo at Meter Vault .13 CMR 10 -Rotation of Two 16" Plug Valves at AB 12N RS Piping Area Per Change Order # 3: Amount Requested $23,689.00 Contract Time extension for 00 days. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Attested by: m 0 9 -0 8 -1 1 AO 9 : 4 0 0 U T 455 0 455 Engineers ... Working Wonders With Water .. Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 7 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: August 12, 2011 P275- Secondary Area and Rehabilitation and 70130 Modifications Project No.: 0128980 ------------------ City of Fort Worth 24" RCCP to DIP Pipe Adapter at RS Piping Area. Archer Western Contractors, Ltd. Carollo Engineers Contract Mod. No.: CMR 1.' ------------ Carollo Engineers and Archer Western Contractors, Ltd . acknowledge that the work shown in the referenced Contract Mod ification Request 7 (CMR 7) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 7. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. CMR 7 includes the cost related to the pipe adapter at RS piping area . During the construction it was found that the existing 24" RS which is called out as CIP is actually 24• RCCP. The RCCP has a bigger OD than Ductile Iron Pipe and will not allow a flexible coupling connection. Contractor will provide an adapter to connect the new 24• DIP and existing 24• RCCP. Contractor's request for change and detailed cost breakdown is attached with this document. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work , which was included in the original procurement by public bid. Reviewed By Approved By _M_a_ni_sh_B_h_a_nd_a_n_· ------------Date: August 12 , 2011 _F_a_n_·d_a_G_od_e_ry~a,_P_._E. ___ ~-----~---Date: August 12 , 2011 09 -08 -11 A09 :4 0 OU T O\MIIER: ENGINEER: CrTY OF FORT WORTH TEXAS CAROLLO ENGINEERS 14785 Pn>ston Roed, Suite 950 DALLAS, TX 75254 CONTRACTOR: ARCHER 'McSTERN CONTRACTORS, LTD 2121 AVENUE J, SUITE #103 ARLINGTON, TEXAS 76006 Labor Boo:len O 48'11, c:1 Labor Smal Tools O 15% c:A Labor 7 .5%c:Alabor OH&P015% ln9lnnce all! Bond 01 .5% . , ,,, .. ·~ ... , ............ , ... , .. ,~. page l VILLAGE CREEK VWVTP SECONDARY AREA & FILTER REHAB AND MODS Subl<Jlal: WORK DESCRIPTION: 1) lnstall/Pmvide 27" adapter to oonnect 24" RCCP Pipe to Ductile at the RS Pipe Al88 ~RR24 Engineers ... Working Wonders With Water '" Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 8 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: August 12, 2011 P275- Secondary Area and Rehabilitation and 70130 Modifications Project No.: 0128980 ------------------ City of Fort Worth Concrete Encasement Demolition @ Meter Vault 13 Archer Western Contractors, Ltd. Carollo Engineers Contract Mod. No .: -eMR"tt ---------------- Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 8 (CMR 8) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 8. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. CMR 8 includes the cost demolition of concrete thrust blocks around the primary effluent piping , which were uncovered during the excavation for the new meter vault for Aeration Basin 13. Contractor's request for change and detailed cost breakdown is attached with this document. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the original procurement by public bid. Reviewed By Approved By _M_a_ni_s_h_B_h_a_nd_a_n_· ------------Date: August 12, 2011 _Fa_n_;·d=a_G:;_od;;__;.e_.ry"-'a_,_, _P_.E_. __ ~-~-----1'-"""'==-Date: August 12, 2011 0 9-08 -11 A09 :4 0 OUT .. ' O'MIIER : ENGINEER : CITY OF FORT OORTii TEXAS CAROLLO ENGINEERS 14785 Presllon Road, Suite 950 DALLAS, l)( 7525,4 CONTRACTOR : ARCHER WESTERN CONTRACTORS, LTD 2121 AVENUE J , SUITE 1103 ARLINGTON , TEXAS 76006 Labor Eu'dln O <48'lo of Labor Small Tools O 15% of Labor . 7.5% of Labor OH&P015% in.nn. and Bond 01.5% I ~ Pel~ •I..,'; I ••'e•t ..;,J' ... ,,•n• page l VILLAGE CREEK WWTP SECONDARY AREA & FILTER REHAB AND MODS OORK DESCRIPTION : Demoi Remove Concrate Encasements at M_. Vault 13 .. . ,- Engineers ... Working Wonders With Water .. Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 10 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: September 1, 2011 P275- Secondary Area and Rehabilitation and 70130 Modifications Project No.: 0128980 ------------------ City of Fort Worth Rotate 16" Plug Valves Archer Western Contractors, Ltd. Carollo Engineers Contract Mod. No.: CMR to_ ------------ CMR 1 O includes the cost of rotating the two plug valves and actuators installed in the meter vaults located in the RS piping area outside RS 6. Detailed cost breakdown for the construction work are attached with this document Carollo Engineers and Archer Western Contractors, Ltd . acknowledge that the work shown in the referenced Contract Modification Request 10 (CMR 10) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 10 . The need for this work was discovered during construction of related work items. Therefore, consideration of procuring th is work by any means other than by Contract Modification was neither practical nor desirable. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work , which was included in the original procurement by public bid . Reviewed By Manish Bhandari Date: September 1, 2011 Approved By Farida Goderya, P.E. ~> Date: September 1, 2011 0 9-0 8 -11 A09 :40 OUT ,-OMIER: ENGINEER: Cl1Y OF FORT OORlli TEXAS CAROUO ENGINEERS 14785 Prasllln Road, SiMl8 950 DALLAS, TX 75254 CONTRACTOR: ARCHER 'NESTERN CONTRACTORS, L TU 2121 AVENUEJ, SU1TE'103 ARLINGTON, TEXAS 76008 OH&PQ1~ Labor Blrclan O 48'llo of Labor Smal Tools O 15~ of Labor , __ -7.5~ of Labor ,_ and Bond 01-~ . , ,, .. . . . . ............ , ... , ',,, .. page 1 CMR10 VILLAGE CREEK WWTP SECONDARY AREA & FILTER REHAB AND MODS OORK DESCRIPTION: Rotate two 1 s" Ptug Va1ves SublDIII: