Loading...
HomeMy WebLinkAboutContract 40853-CO5. ' .. -l fORTWORTH . City of Fort Worth Change Order Request Project Name ! Village Creek \/IN/T Seconda ry Area & Filler Re habilit atio n/M od ificat io ns City Sec; Client Proi ect #(s)j Fort Worth (0 1289); Caro llo (825 8A.20): Archer Wes tern (.zwt38) 7-Jc, o f,t,. 40853 Proje ct Description :===========================:::;--------;:::::====::::;------;=========: Con trac tor! Arch er Weste rn Con tracto rs Ud Date 5/15/201 2 City Project Mg rj Farida S Goderya, PhD . PE Ch ange Order J 5 ;::====::::::'._--~======~ City Inspecto r Mike Hill L---------------' Dept. Water Se lect Day Totals Or iginal Contr act A1 1ount $8,214 ,000 .00 S8 .214 ,000 .00 Extrns io Date $11 6.71 6.00 $116,71600 Credi ts to Dale Pen din g Cha nge Orders (in M&C Process) Con trac t Cos t to Dat e $8.~'30 ,71 &;00 · .. $8 ,330,71 6.00 !Amou nt of Proposed Change Order ·$'2-7,727.® , f ·$27 ,727.00 Revi sed Con trac t Am oun t $.8,302 ,989.00 . · '"' .. ., ' ll;, ,. ~ S8 302 ,989 .00 Original Funds Avai able for Change Grd er5 Remaini ng Fund s Available for this CO Sb;OO ., Addifonai Funding {i f necessary ) .. ' CHANGE ORDERS to DATE (ENCW DING THI S ONE) AS % OF ORIGINAL CONTRACT MAX ALLO WAB LE CONTRACT AMOUNT {ORIGINA L CONTRACT COS T + 25%) JUS1IF1€ATION (ft9SO Th is Ch ange Order# 5 co vers t e following : CM R 15, CM R 17, CMR 20 , CM R 21 , CMR 22 , CM R 23 GMR 24 an d delete s the Bid Item 8-9 . Second Time exten sicn of 60 Day s is cov ered by CMR 20. SO.DO 1.08 % $10 ,267 ,SOQ .OO OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Type It is understood and ag reed ihat ihe acc ept anc e or !his Ch ang e Order by ~~~~~~:itut es an ac cord and satisf ac ti on and represents payment in full (bo th ti me an d money ) fo r all co sts arising out of, or incide nt al to . U1e above Change Or der. Archer West ern Con tractor s Ltd Mark. Tapera or Clinton Staffo rd M&C Numbe r NIA M&C Dale Approved NI A 06-19-12 A11 :04 I N 455 90 545 60 605 FOJUWORTH ---..,..--City of Fort Worth Change Order Additions Project Name Village Creek WWT Secondary Area & Filter Rehabilitation/Modifications Clie nt Project# Fort Worth (01289); Carollo (8258A.20); Archer Western (210138) Proje ct Description Contractor Archer Western Contractors Ltd Change Order# City Sec# 40853 5 Date 5/15/2012 City Project Mgr. Farida S Goderya , PhD , PE City Inspector Mike Hill ....._ ___________ __. ADDITIUN~ 11tM Ut::SCKlt-' 1 IUN Ut.t-' I Uty Unit Unit cost lotal 1 ICMK lb -Kotate Air Valves at Meter vaults per i-u J Water 1.00 LS :j,5 ,1:18 .00 $0 ,1:18 .00 2 I CMK 1 / -Mill and 1-'ave Nelson Koad Water 1.00 LS $9 ,~a.OO ~~.~a.OD 3 CMR 20 -Second Time Extension Water 4 CMR 21 -Modulating Cards for two Motorized Actuators at RS 1 &2 Waste SIL Water 1.00 LS $4 ,330 .00 $4 ,330.00 5 CMR 22 -Concrete Repair at RS? Water 1.00 LS $3 ,143 .00 $3 ,143 .00 6 CMR 23 -Aluminum Platforms , stairs & handrails at RS 6 Electrical Building 0( Water 1.00 LS $8,785 .00 $8,785.00 7 CMR 24 -Orifice Plates for WS pumps 61 & 62 Water 1.00 LS $955.00 $955 .00 Water $32 ,273 .00 Sub 1 otal Additions $:12 ,L73 .00 Change Order Additions Page 1 of 1 FO RT WORTH ---.---City of Fort Wo rth Change Order Deletions Project Name Village Creek WWT Secondary Area & Filter Rehabilitation/Modifications Cli ent Project# Fort Worth (01289); Carollo (8258A.20); Archer Western (210138) Proje ct Description Contractor Archer Western Contractors Ltd Change Order# City Sec# 40853 5 Date 5/15/2012 Ci ty Project Mgr. Farida S Goderya , PhD , PE City Inspector Mike Hill ,...._ __________ ____. DELETION~ IIEM Ut:.::iCKlt-' 1 IUN DE:.PI Qty Unit Unit Cost lotal 1 Bid Item B-9 : Remove and Repair 2-6" Concrete Water 1,000.00 CF $60 .00 $60 ,000 .00 Water $60 ,000 .00 Sub l otal Deletions $60 ,000.UU Change Order Deletions Page 1 of 1 ,I• C c;,,,.,,,. FORT WORTH ~ Engineers .. .Workiflg Wonders With Water .. Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 15 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: February 24, 2012 Secondary Area and Rehabilitation and Modifications Project No .: P275- 70130 0128980 ------------------- City of Fort Worth AB 12 & 13 Air Valve Rotation Archer Western Contractors, Ltd. Carollo Engineers Contract Mod . No .: CMR 15 ------------- CMR 15 includes the cost of rotating the air release valve , so that the valve actuators are accessible to the plant staff. This is a CMR associated with Field Order 3 (see attached). Detailed cost breakdown for the construction work are attached with this document. Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 15 (CMR 15) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid. The nature of the change is adequately described in the justification provided with the CMR. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is ." The Engineer has therefore recommended to City of Fort Worth to approve the CMR 15 . The need for this work was discovered during construction of related work items. Therefore , consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work , which was included in the orig i nal procurement by public bid . Reviewed By Manish Bhanda ri --------------------Date : February 24, 2012 Approved By _Fa_r_id_a_G_od_e_ry~a _, P_._E_. ___________ Date : Fe bruary 24, 2012 Bid Item OWNER: ENGINEER: CITY OF FORT WORTH TEXAS CARO LLO ENGINEERS 1.4 785 Prestoo Road , Suite 950 DALLAS, TX 75254 CONTRACTOR: ARCH ER WESTERN CONTRACTORS , LTD 2121 AVENUE J , SUITE #103 ARLINGTON , TEXAS 76006 Descri ot1on LABOR Er ect/Dismantle Scaffold1no Dismantle , turn , and reassemb le val ves Turn actuator on valve Touch up paint MATERIAL Gaskets Pa int Bolts 430 Backhoe Scaffoldino SUBCONTRACT FSG Electn c IUIALS : ' •. " ~ Labor Burden@ 4 8% of Labor Small Tools@ 15% of Labor Safetv Sunolies !iiJ 7.5% of Labor , u, AL u1«c:1., 1.,u;:, 1 ;:,: OH&P @ 15% Insurance and Bond @ 1.5% 1 v 11"\L AMO UN I I HI~ i .l 1. i I n..u1 Q.:-,M.1_ :::i l JIVIIVIM.n page 1 I I I I CMR15 VILLAGE CREEK WWTP SECONDARY AREA & FI LT ER REHAB AND MODS Qtv Unit I UniVPnce 32 .00 MH 19 .00 32 .00 MH 19 .00 16.00 MH 19 .00 8.00 MH 19 .00 MH 19.00 MH 19.00 MH 19.00 MH 19.00 MH 19.00 MH $19 .00 MH $19.00 MH $19 .00 MH $19.00 1.00 LS $160 .00 1.00 Dav $333 .00 2.00 Dav $1 00 .00 1.00 ILS I $858.03 I I I I I I I I Subtotal : Labor $608 .00 $608.00 $304 .00 $15?.00 so .oo so .oo 10.00 so .oo $0 .00 $0 .00 0.00 0.00 0.00 0 .00 0 .00 i1 ,no .no $802 .56 WORK DESCRIPTION: Rotate Air valves on AB 12 and 13 so that actuators can be accessed from walkway per FO 3. I Matenal I Eouioment T I I I $160.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 $11,0 .00 $333.00 $200.00 $0 .0 0 $0 .00 $0 .00 T I I I $511.00 Subcootractor 1 '., $858.03 I $0 .00 I I $0 .00 I $0.00 I ' $U .UU Totals $608 .00 $608.00 $304 .00 $15l.OO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 $160 .00 0.00 0.00 0.00 0.00 0.00 0.00 $333 .0 0 $,00.00 $0 .00 $0 .00 $0 .00 $858 .03 $0 .00 $0.00 $0 .00 $0 .00 ~ ·-"1 .03 802 .56 250.80 • 1L5.40 5. $5, 31 . $5 , ". l•G e/ectric PROPOSED CHANGE ORDER Client Address : Archer Western Contractors Contact : Clint Stafford 4500 Wilma Lane Arl ington , TX 76012 Contact : Clint Stafford Work Description CCN# Date: Project Name: Project Number: Contract#: Page Number: 4 11/17/2011 Village Creek WWTI 30J1913 210066$01 1 This change notice includes all labor, material and supervision for the scope of work shown below. We reserve the right to correct this change notice for errors and omissions. This price is good for acceptance within 10 days from the date of recipt. Scope of work: 1. Disconnect and reconnect butterfly valves located at ab12S and 13S for plant staff access . Exclusions: l. Any utility and permit cost. 2 . Any wall or ceiling covering cutting, patching and painting. 3. Any concrete/asphalt cutting and or patching. 4. Roof penetrations or patching of any kind . 5. Overtime unless specifically stated in scope of work above. Itemized Breakdown Descriptio n 3/4" LT FLEX 3/4" LT STRAIGHT CONN 3/4" ARC (AL) #12 XHHW BLACK DEMO Totals Summary General Materials Material Total JOURNEYMAN FOREMAN @ 25% Labor Burden Subtotal Overhead Markup (6 .73 Hrs @$52.00) (1 .68 Hrs @ $55.00) (@42 .000 %) (@ 10.000 %) (@5.000 %) Qty Net PriceU 20 295 .00C 4 538 .12 C 10 180.35 C 96 168.40 M 3 O.OOE ORIG INAL Total Mat . LaborU 59 .00 8 .20C 21 .52 20 .40C 18 .04 6 .80C 16.17 6 .18M 0 .00 1.00E 114.73 Total Hrs. 1 .64 0 .82 0 .68 0 .59 3 .00 6.73 114.73 114.73 349.96 92 .40 185.79 742.88 74.29 40.86 2525 WAl.NJT HU. LANE l'ICD ,D:Al.l.AS , lX 15229. T 214-357-5697 , F 214.357-5794 , lEQ. '11904- PROPOSED CHANGE ORDER Summary (Cont'd) Subtotal Final Amount CLIENT ACCEPTANCE CCN#: 4 Final Amount:$858.03 Name: Date: Signature: Change Order#: Client Address : Archer Western Contractors 4500 Wilma Lane Arlington , TX 76012 I hei eby accapt this quotation and authorize the contractor to complete the above described work. ORIGINAL CCN# Date: Project Name: Project Number: Page Number: 4 11/17/2011 Village Creek WWTF 30J1913 2 858.03 $858.03 C c:,,,.,,.,. fORTWORTH ~ Engine ers .. .Working Wonders With Water · Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 17 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date : February 4, 2012 Secondary Area and Rehabilitation and Modifications Project No.: P275- 70130 0128980 ------------------- City of Fort Worth Resurfacing of Nelson Road Archer Western Contractors, Ltd. Carollo Engineers Contract Mod. No .: CMR 17 ------------ Carollo Engineers and Archer Western Contractors, Ltd. acknowledge that the work shown in the referenced Contract Modification Request 17 (CMR 17) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid . The nature of the change is adequately described in the justification provided with the CMR. CMR 17 includes the cost for milling and repaving Nelson Road from the north end of AB 11 to JR Hendricks . While the original contract called for resurfacing , which is an overlay on top of the existing pavement , the work identified in the CMR will remove the top 2" of the existing pavement and allow a new top layer of pavement which will be more durable than the overlay. Detailed cost breakdown for the construction work are attached with this document. The need for this work was discovered during construction of related work items. Therefore , consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is ." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 17 . Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work, which was included in the orig inal procurement by public bid . Reviewed By _T_ro~y_L_a_m_a_n _______________ Date : February 4 , 2012 Approved By _Fa_r_id_a_G_od_e_ry~a,~P_._E ___________ Date : February 6 , 2012 Bid Item OWNER: ENG INEER : CITY OF FORT WORT H TEXAS CAROLLO ENGI NE ERS 14785 Preston Road , Suite 950 DALLAS , TX 75254 CONTRACTOR : ARCH ER W ESTE RN CO NT RACTORS , LTD 2121 AVE NU E J , SU ITE #103 ARLINGTO N, TEXAS 76006 Descri otion AROR •N JMAIPM•a• .. ,. IEQUIO'IMCNT _,., ,, .. SUtsCONTKACT ., ~- Alltex Pavino MIS•-~• ANP0US1 ICMS ·- TOTA LS : lab()( Bu rden @ 48% of Lab or Small T ools@ 15% of Lab or Safetv Suoolies@ 7.5% of Labor ,u,,.LDIR EC , <.,u;:,1;:,: OH&P@15% In surance and Bond @1 .5% TOTAL AMO UNT THIS COST PROPOSAL SUM M ARY .. page 1 I I I I I CMR 17 VILLAGE CREEK WWTP SECONDARY AREA & FILTER REHAB AND MODS WORK DESCRIPTIO N: Mill App rox 2" of existing asphalt and Remove from site Qtv Un it I UniU Pri ce Lab()( I Material Eau ic ment I Subcontractor I MH 19.00 0 .00 MH 19.00 0 .00 MH ,19.00 0 .0 0 MH 19.00 0 .0 0 MH 19.00 0 .00 MH 19 .00 0 .0 0 MH 19.00 $0 .00 MH '1 9.00 $0 .00 MH $19 .00 $0 .00 MH $19 .00 $0 .00 MH $19.00 $0 .00 MH •19.00 $0 .00 MH $19.00 $0 .00 $0 .00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0 .00 $0 .00 $0.00 $0 .00 $0.00 $0.00 $0 .00 $0.00 1.00 I LS $8 500 .00 I I I $8 500.00 I I I I I $0 .00 I I I I $0 .00 I I I I I $0 .00 I ' $0 .00 $0.00 $0.00 $8 500 .00 $0.00 $0.00 $0.00 Subtotal : $U.UU Totals 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0 .00 ,o.oo $0.00 $0.00 $0 .00 $0.00 $0.00 $0.00 ,o .oo $0 .00 $0 .00 $0.00 $0 .00 $0 .00 $0 .00 $0.00 $0 .00 $8 500 .00 $0 .00 $0 .00 $0 .00 $0 .00 $8 500 .00 $0 .00 $0.00 $0 .00 $8 500 .00 $1 275.00 :11·14h.h :1 $9 ,,, .bJ $9 921 .63 June 6, 2012 Attn: Mrs. Farida Goderya City of Port Worth, Texas 1000 Throckmorton Street Fort Worth, TX 76102 RE: VCWWTP Secondary Area & Filter Rehab & Modifications -Contract Modification Request #20-Time Extension 2 Dear Mrs. Goderya: Archer West em requests a 60 day time extension due to coordinating the pavement work and obtaining the final punch list. If you have any questions , please contact me at (214) 837-8019. Sincerely, Archer Western Contractors, Ltd. Clint Stafford Project Engineer FORT WORTH Engineers ... Working Wonders With Water ·· ~ Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 21 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date: April 26, 2012 Secondary Area and Rehabilitation and Modifications ------------------- City of Fort Worth Project No .: Motorized Actuators for waste sludge service at RS 1 and 2. Archer Western Contractors , Ltd . Carollo Engineers P275- 70130 0128980 Contract Mod. No .: CMR 21 ------------- Carollo Engineers and Archer Western Contractors, Ltd . acknowledge that the work shown in the referenced Contract Modification Request 21 (CMR 21) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid . The nature of the change is adequately described in the justification provided with the CMR. CMR 21 includes the cost for changing the cards in two motorized Rotork actuators from open/close (0/C) service to modulating (mod) service . The original contract included the 0/C cards for the actuators , however the plant requires modulating capability to control waste activated sludge flow rates and solids inventory. CMR 21 includes only the purchase of the cards. Installation of the cards and programming will be completed by Fort Worth VCWRF maintenance and Instrumentation staff. The warranty for the actuators will remain intact in light of plant staff replacing the cards. Detailed cost breakdown for the construction work are attached with this document. The need for this work was discovered during construction of related work items . Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable . The Contractor's contract modification proposal has been reviewed by the Eng ineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is ." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 21 . Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work , which was included in the original procurement by publ ic bi d. Reviewed By _T_ro...Ly_L_a_m_a_n _______________ Date : A pril 26 , 2012 Approv ed By _Fa_r_id_a_G_o_de_ry~a_, P_._E ___________ Date : Ap r il 2 6 , 2 0 12 Bid Item OWNER: ENGINEER: CITY OF FORT WORTH T EXAS CAROLLO ENG INEERS 14785 Preston Road , Su ite 950 DALLAS , TX 75254 CO NTRACTOR : ARC HE R WESTERN CO NTRACTORS, LTD 2121 AVENUE J , SU ITE #103 ARLINGTON , TEXAS 76006 Descri nt i on LABOR --,. ,-"' MATERIAL .. !QT Actuato r Modulatin a Card EQUIPMENT ~ "- SUBCONTRACT ., ~ _, MISCELLANEOUS ITEMS .. ,, T TOTALS : Labor Burden @ 48 % of Lab or Sm all Tools@ 15% of La bor Safetv Sunnlies 1@7.5% of La bor TOTAL DIRE CT COSTS : OH&P@15% Insurance and Bon d @1 .5% TOTAL A MOUNT THIS COS T PROPOSAL SUMMARY.. page 1 I I I I CMR21 VILLAGE CREEK WWTP SECO NDARY AREA & FILTER REHAB AND MODS Qtv Un it I UniVPr ice Labor MH $19.00 $0 .00 MH $19.00 .,o.oo MH $19.00 $0 .00 MH $19.00 $0 .00 MH $1900 $0 .00 MH 19.00 0.00 MH 19.00 0 .00 MH 1900 0 .00 MH 19.00 0 .00 MH 19.00 0 .00 MH 19.00 0 .00 MH $19.00 0 .00 MH $19.00 0 .00 $0.00 $0 .00 2.00 EA $1 855.00 I I I I $0 .00 $0.00 $0.00 $0 .00 Subtotal: I WORK DES CRI PT ION : Cost is to sup ply the cards only. The ca rd s w'ill be turned ov er to the pl an t staff to install and program . Material I Enu inment I Subcontractor $3 710 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 $0 .00 $0 .00 $0.00 $0 .00 $0 .00 I $0.00 I $0.00 I $0.00 I $0.00 ' $3 710.00 $0 .00 $0 .00 $0.00 I Totals $0.00 $0 .00 $0 .00 $0.00 $0 .00 $0 .00 $0 .00 $0.00 $0.00 $0 .00 $0 .00 $0 .00 $0 .00 $0.00 $0 .00 $3 710.00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $0.00 $0.00 $0 .00 $0.00 $3 710.00 $0 .00 $0 .00 $0 .00 $3 710.00 $556.50 $64 .00 $4 330.50 $4 330.50 C c;,,,.."~ FORT WORTH ~ Engineers ... Working Wonders With Water • Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 22 Village Creek Wastewater Treatment Plant Secondary Area Rehabi litation and Modifications City of Fort Worth, Texas Date: May 2, 2012 Secondary Area and Rehabilitation and Modifications -------------------Project No.: P275- 70130 0128980 City of Fort Worth Column repair at RS 7. Archer Western Contractors , Ltd. Carollo Engineers Contract Mod. No .: CMR 22 ------------- Carollo Engineers and Archer Western Contractors , Ltd . acknowledge that the work shown in the referenced Contract Modification Request 22 (CMR 22) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid . The nature of the change is adequately described in the justification provided with the CMR. CMR 22 includes the cost for repairing concrete at an existing column and adding support brackets for the grating support beam. The unit cost for concrete repair of $60/sf is in accordance with the un it price set forth in the bid form as bid item 8-9 . Detailed cost breakdown for the construction work are attached with this document. The need for this work was discovered during construction of related work items. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable . The Contractor's contract modification proposal has been rev iewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as -is ." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 22 . Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work , which was included in the original procurement by public bid . Reviewed By Troy Laman Date : May 2012 -~------------------ Approved By Farida Goderya , P .E Date : May 2 , 201 2 -----~~------------- Bid Ite m OW NER: ENGINEER: CIT Y OF FORT WORTH TEXAS CAROLLO ENG INEERS 14 785 Preston Roa d, Su ite 950 DALLAS , TX 75 254 CONTRACTOR: ARCHER WESTE RN CO NT RACTORS , LT D 2 121 AV EN UE J , SU IT E #103 ARLINGTON , TEXAS 76006 Descrint ion LABOR ·-·· Remove/Reolace Gra tina Install and Remove Sh ori nn to Sunn or t Beam Re mov e Exis tina Ana l es Drill New Holes and Drill Hales in Plat e far Exis tina Baits Install New Plates MATERIAL " ., Plates An chors an d Eo oxv EQUIPMENT -. ' SUBCONTRACT ,., ~ "· W el der MISCELLANEOUS ITEMS '.I Craft Suoer intenden t TOTALS: Labor Bu rden @ 48% of Labor Small Tools @ 15% of Labor Safetv Suoolies (5) 7 .5% of La bor TOTAL DIRECT COS TS: OH&P @ 15% Ins uran ce and Bo nd @1.5% TOTAL AMOU NT THIS COS T PROPO SAL SUMMARY .. page 1 I CMR 22 VI LL AGE CREEK WWTP SECONDARY AREA & FILTER REHAB AND MODS WORK DESCRIPT ION: Extra Work In volved in Repai ri ng the C on crete at PS7 . Does Not ln dude the Actual Concr ete Repa ir. Tha t lis part of Bid Item B-9 . Qtv I Unit Un iU Price I Labor I Materia l I En ui nment I Sub con tractor 4 .00 MH $19.00 $7 6.00 12 .00 MH 19 .00 •228 .00 4 .00 MH 19.00 $76 .00 8.00 MH 19 .00 $152 .00 16 .00 MH 19.00 $304 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0.00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 $0.00 $0 .00 1.00 LS $32 5.00 $325 .00 $0.00 $0.00 $0.00 $0.00 $0 .00 $0.00 "" $0 .00 $0 .0 0 $0 .0 0 $0 .0 0 $0 .00 1.00 LS $260.00 I $260 .00 I I I I $0.00 I I I I $0.00 I I I •0.00 I 8.0 0 MH $50 .00 $4 00 .00 $1 236 .00 $32 5 .00 $0.00 $260.00 $593 .28 $185 .40 $9 2 .70 Subtota l : $0 .00 Totals $76.00 $228 .00 $76 .00 $152 .00 $304 .00 0.00 0 .00 0.00 0 .00 0 .00 0 .00 $0 .00 $0.00 $0.00 $0 .00 $325 .00 0 .00 0.00 0 .00 0 .00 0.00 0 .00 0.00 0.00 0.00 0.00 0 .00 $260 .00 ,o .oo $0 .00 $0 .00 $4 00 .00 $1 821 .00 $593 .28 $185 .40 $92.70 $2 692 .38 $403 .86 $46.44 $3 142 .68 $3 142.68 Tro Laman From: Sent: To: Cc: Subject: Chris Story [cstory@jqeng .com] Thursday , April 26 , 2012 10 :36 AM Troy Laman ; Goderya , Farida Hutch Musallam ; Hill , Mike RE : punch list item ; VC Sec Rehab ; RS7 Column Repai rs (internal) Plates to be p ri med carbon steel to match the existing steel beams. Adhesive anchors shall be 316 stainless . CHRIS STORY, PE PRINCI PAL 2105 COMMERCE STRE ET , DALLAS, T EXAS 75201 21 4 623 .5810 PHONE 972 742.0206 CELL JQENG.COM The information in th is e-mail is con fid ent ial and may be legally priv il eged . It is intended solely for the addressee . Ac cess by any other person to thi s e-mail is not authorized . If yo u are not the intended recipient, please delete this e-mail . Any disclosure of this e-mail or of the parties t o it, any copying, di stribution , or any action taken or omitted in rel iance on it is prohibited , and may be unlawfu l. From: Troy Laman [mailto:TLaman@carollo.com] Sent: Thursday, April 26, 2012 10:27 AM To: Chris Story; Goderya, Farida Cc: Hutch Musallam; Hill, Mike Subject: RE: punch list item; VC Sec Rehab; RS? Column Repairs (internal) Chris , What are the materials for the bent plates ? Sh o uld they be steel , galvanized steel, stainless , aluminu m, etc. From: Chris Story [mailto:cstory@jgenq.com ] Sent: Thursday, April 26, 2012 10:12 AM To: Goderya, Farida; Troy Laman Cc: Hutch Musallam; Hill, Mike Subject: RE: punch list item; VC Sec Rehab; RS? Column Repairs (internal) This was the only deficiency noted from all the stations on the secondary project . CH RIS STORY , PE PRINCIPA L 2105 COMM ER CE STREE T, DALLAS , TE XAS 75201 214 623.581 0 PHONE 972 742.0206 CELL JQENG.COM The information in this e-mail is confid ential and may be legally privileged. It is intended solely for the addressee. Access by any other person to this e-mail is not authorized . If you are not the intend ed recipient, please delete this e-mail. Any disclosure of th is e-ma il or of the parti es to it, any copying, di stri buti on, or any action taken or omitted in relian ce on it is prohibited, and may be unlawful. From: Goderya, Farida [mailto: Farida.Goderya@fortworthtexas.gov ] Sent: Thursday, April 26, 2012 8:41 AM To: Troy Laman; Chris Story Cc: Hutch Musallam; Hill, Mike Subject: RE : punch list item ; VC Sec Rehab; RS? Column Repairs (internal) Importance: High Troy/Chris, Proceed, I am Ok w it h authorizi ng this. I wish we had started this conversation two weeks ago. I would also suggest to take this opportunity and quickly review notes/field conditions and see if any such work is needed at other sta tions (PS 1, 2 or 3; I believe, PS 2 is pretty much taken care of). Call or email with questions .......... Regards ........... Farida +Farida S. Goderya , Ph.D., P .E. +Fort Worth Wate r De pa rtment +Engineering & f isca l Serv ices + I 000 Throckmonon St. Fort Worth. TX 76 102 +8 17 .392.8214 omce +81 7.8 51.4 9 10 Cell +farida 0 oderrn'a fort"orthts;xas ~ov How am I doin g? Pl ease contact my supervisor: Da, id .To,,11 send @ fo1tworth texas.gov From: Troy Laman [mailto:TLaman@carollo.com ] Sent: Thursday, April 26, 2012 7:28 AM To: Chris Story; Goderya, Farida Cc: Hutch Musallam Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Farida , Based on Chris' email below, he feels the repair sho uld be completed now. At your direction, I will get pricing from the Contractor to include in CO 5. Troy Laman, P.E. Associate Carollo Enginee rs, Inc . 100 Ea st 15th Street, Suite 300 Fort Worth , Texas 76102 P: 817-882 -0528 x 227 C: 214-226 -8327 F: 817 -882-9975 www .carollo .com Carollo is ... Focused on Sustainability. Please consider the environment before pri nting this e mail. From: Chris Story [mailto:cstory@jgenq.com ] Sent: Wednesday, April 25, 2012 3:49 PM To: Troy Laman; Goderya, Farida Cc: Hutch Musallam Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) The repair should occur now. If the spall w as not located at the steel beam to concrete connection, I would likely let it slide. However, its at a critical location and sh o uld be addressed now. The deficiency was not observed with the original grati ng system in place but was visible from the top side during o ur walkth rough . It is a relatively minor repa ir that I think will be in the $3k ra nge . We can ask for pricing before authori zing them to proceed. OfRIS STORY, PE PRINCIPAL 2105 COMMERCE STREET, DALLAS, TEXAS 75201 214 623.5810 PHONE 972 742.0206 CEL L JQENG .COM 2 The information in this e-mail is confidential and may be legally privileged. It is intended solely for the addressee. Access by any other person to this e-mai l is not authorized . If you are not the intended recipient, please delete this e-mail. Any disclosure of this e-mail o r of the parties to it, any copying, distribution, or any action taken or omitted in reliance on it is prohibited, and may be unlawful. From: Troy Laman [ma ilto:TLaman @carollo .com ] Sent: Wednesday, April 25, 2012 3:30 PM To: Goderya, Farida; Chris Story Cc: Hutch Musallam Subject: RE: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Farida, During the punchlist walk through , Chris noticed crac kin g/spalling of one of the concrete columns at RS near the connection to the steel beams that support the grating, Photos are attached for your reference . We felt it important to point out so the City can determine whether to repair now or in the future . As a reminder, CO No. 5 is still a substantial credit of bid item B-9 for discretionary concrete repair, and if the City elects to make this repair by using some of the money from that bid item on CO no . 5, I believe there would still be a net credit on the change order. I will leave it to Chris to provide opinion/assessment on how critical or urgent this repair is, but in light of the status of CO 5, the City may consider getting a price from the contractor based on bid item B-9. If it can be completed within the 60-day extension on CO 5, there may be some va l ue there as the City would still net a credit . Troy Laman, P.E. Associate Carollo Eng i neers, Inc. 100 East 15th Street, Suite 300 Fort Worth, Texas 76102 P: 817-882-0528 X 227 C: 214-226 -83 27 F: 817-882-9975 www .ca r ollo .com Carollo is ... Focused on Sustainability. Please consider the environment before prin t ing this emait From: Goderya, Farida [mailto: Farida .Goderya@fortworthtexas.gov ) Sent: Wednesday, April 25, 2012 3:05 PM To: Troy Laman; cstory@iqenq.com Cc: Hutch Musallam Subject: FW: punch list item; VC Sec Rehab; RS7 Column Repairs (internal) Troy/Chris, Can you please fill me in, what is the matter here? I am not sure , w hy/what Clint is asking from me about this ? W hat does our plans and spec say? Rega rds----·····-Fa rida +Farida S. Goderya , Ph.D ., P.E. +Fort Worth \\'ater Dt'parhllellt +i&>f'~ S: Fi..GCal Sen ices t 1000 Throc km orto n St. Fo rt Worih. TX 76!02 + 17 3g~ S11 4 <A01.:ie t 17 85 ! -NIO Cdl t f:uida.,wder\'a :,,fo rt\\ort ht e,as.~o, Ho,, am I doing? Please co nt act my sup en i sor: Da, id.Townsend•il1fort,\'onl1fe.xas 1!0\' 3 From: Stafford, Clinton [mailto:cstafford@walshqroup.com ] Sent: Wednesday, April 25, 2012 1 :07 PM To: Goderya, Farida Cc: Troy Laman; Lisenby, Robert; Tepera, Mark Subject: FW: punch list item Farida, Punch list item N. 1) is in regards to an existing column that is spalling at a beam connection . The punch list items says that it is recommended to repair the concrete if the spalling extends through the beam connection. Attached is JQ's recommendat ion on how to fix the beam. Archer Western can perform the work, but this w ill be a cost change because these are existing conditions. Would you like us to put a price together to do the work? I do not believe you were copied on the origi nal email, so I will forward it along with some photos . Please let me know. Thanks, Clint From: Troy Laman [mailto :T Laman@carollo.com ] Sent: Wednesday, April 25, 2012 11:16 AM To: Stafford, Clinton Cc: Tepera, Mark; Lisenby, Robert; Chris Story Subject: RE: punch list item Clint, See attached. From: Stafford, Clinton [mailto:cstafford@walshqroup. com ] Sent: Tuesday, April 24, 2012 3:19 PM To: Troy Laman Cc: Tepera, Mark; Lisenby, Robert Subject: FW: punch list item Troy, Any word on this? From: Lisenby, Robert Sent: Tuesday, April 10, 2012 12:13 PM To: Troy Laman (TLaman@carollo.com ) Cc: Tepera, Mark; Stafford, Clinton; Chris Story (cstory @jgenq .com ) Subject: punch list item Troy, this is in response to an item on page number 5 , N., 1)= please see photos . This is at RS#7 where we only replaced the grating. Please advise, thanks Bob Lisenby Archer Western Contractors 4 C c:,,,.,,,. FORT WORTH ~ Enginee rs ... Work ing Wonders With Water ' Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 23 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date : June 5, 2012 Secondary Area and Rehabilitation and Modifications -------------------Project No.: P275- 70130 0128980 City of Fort Worth Stair, landing, and handrail at RS6 electrical enclosure. Archer Western Contractors, ltd. Carollo Engineers Contract Mod. No.: CMR 23 ------------ CMR 23 includes the cost for installing aluminum landings, stair and handrail at the RS6 electrical enclosure doors to improve safety. The detailed cost breakdown for the construction work is attached with this document. Carollo Engineers and Archer Western Contractors, ltd . acknowledge that the work shown in the referenced Contract Modification Request 23 (CMR 23) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid . The na t ure of the change is adequately described in the justification provided with the CMR. The need for this work was discovered during construction of related work items . Therefore , consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Eng ineer has certified that there is incremental cost and is reasonable to accept "as -is ." The Eng ineer has therefore recommended to City of Fort Worth to approve the work as CMR 23 . Procurement of this item by Contract Modification to this contract is justified i n that the work is directly related to and intermingled with other work , which was included in the original procurement by public bid . Reviewed By _T_ro~y_L_a_m_a_n--',_P_._E_. _____________ Date : June 5 , 2012 Approved By Farida Goderya , P .E ~ <:::::::) Date : June 5, 2012 -----~~------'~'---l.-=~~-~.,,...~~~- Bid Item OWNER: ENGINEER: CITY OF FORT WORTH T EXAS CAROLLO ENGI NE ERS 14 785 Pre ston Road , Su ite 950 DA LLAS , TX 75254 CO NT RACTOR : ARC HER WESTERN CO NTRACTO RS, LTD 2121 AVENUEJ , SUITE #103 ARLINGTON , TEXAS 76006 De scr iot ion LABOR In sta ll Me tals MATERIAL ,. , ..• ... - Metals EQUIPMENT ~ • t: .. -' SUBCONTRACT .. -... MISCELLANEOUS ITEMS .. ,~~ . ; Craft Sunerin ten den t TOTALS : Lab or Burd en @ 48% of Lab or Sma ll T cols @ 15% of Labor Safetv Sunnli es l1il 7.5% of Labor TOTAL DIRECT COSTS : OH&P @ 15% Insurance an d Bond @ 1.5% TOTAL AMOU NT THIS COST PROPOSAL SUM MARY .. page 1 I CMR 23 V ILLAGE CRE EK WWTP SECONDARY AREA & FILT ER REHAB AND MODS Qtv Unit I Un it/Price I Labor 48 .00 MH 19.00 $9 12 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0.00 MH 19 .00 $0.00 MH 19.00 0 .00 MH 19 .00 0 .00 MH 19.00 0.00 MH 19 .00 0 .00 MH 19.00 0 .00 MH 19.00 0 .00 MH $19.00 $0.00 MH $19.00 $0.00 $0.00 $0 .00 1.00 LS $5 630.00 I I I I I I 4 .00 MH $50.00 $200 .00 $1112.00 $533.76 $1 66.80 $83.40 Subtotal : I WORK DESCRIPT ION : Install Alu minum Platform, St ai rs and Han drai l @ Elect rical Bu ildin g do ors . Mater ial Eo uioment I Subcon tractor $5 630 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 I $0 .00 I ,o .oo I $0.00 I $0 .00 ' $5 630 .00 $0 .00 $0 .00 ,o.oo I Tota ls $9 12 .00 $0.00 $0 .00 $0 .00 $0 .00 0 .00 0 .00 0 .00 0 .00 0.00 o.oo $0 .00 $0 .00 $0.00 $0 .00 $5 630.00 io .oo $0 .00 $0.00 io .oo $0 .00 $0 .00 $0 .00 $0 .00 $0.00 $0 .00 $0.00 $0 .00 $0 .00 $0 .00 $0 .00 $2 00.00 $6 742 .00 '533.76 $166 .80 $83.40 $7 525.96 $1 128.89 $129.82 $8 784.68 $8 784 .68 Bid Item .. ' OWNER: ENGINEER: CITY OF FORT WORTH TEXAS CAROLLO ENGIN EERS 14 785 Preston Road , Su ite 950 DA LLAS , TX 75254 CONTRACTOR : ARC HER WESTERN CO NT RACTORS , LT D 2121 AV EN UEJ, SU ITE #103 ARLINGTON , TEXAS 76006 Descriotion LABOR • Install Metals MATERIAL , ,, - Metals EQUIPMENT . SUBCONTRACT ~ .. MISCELLANEOUS ITEMS Craft Sun erintendent TOTALS : Labor Burden @ 48% of Labor Sma ll T cols @ 15% of Lab or Safetv Suool ies (cj) 7.5% of Labor TOTAL DI RECT COSTS : OH&P@15% Insurance and Bond @1.5% TOTAL AMOUNT THI S COST PROPOSAL SUMMARY .. page 1 I I I I CMR2 3 V ILLAGE CRE EK WWTP SECONDA RY AREA & FILT ER REHAB AND MODS Qtv Un it I Un iV Price I Labor 48.00 MH $19.00 $912 .00 MH $19.00 $0 .00 MH $19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 $0.00 MH 19.00 $0 .00 MH 19.00 $0.00 MH $19.00 $0.00 MH $19.00 $0 .00 $0.00 $0.00 1.00 LS $5 630.00 - I I I I 4 .00 MH $50.00 $200.00 $1 112.00 $533.76 $166 .80 $83.40 Subtotal: I I WORK DESCRIPTION : Install Alu minum Platform, Sta irs and Han dra il @ El ectrical Bu ildi ng doors . Material Enu inment I Subcontractor ' ' $5 630 .00 $0 .00 $0 .00 $0.00 ,o.oo $0.00 $0.00 $0 .00 $0.00 $0 .00 $0 .00 $0 .00 I I $0.00 I I $0.00 I $0 .00 I I $0 .00 $5 630.00 $0 .00 $0 .00 $0 .00 I Tota ls $912 .00 $0.00 $0 .00 $0 .00 $0 .00 0 .00 0.00 0.00 0 .00 0.00 0.00 $0 .00 ,o.oo $0.00 $0.00 $5 630.00 $0 .00 $0.00 $0.00 $0.00 $0 .00 $0.00 $0.00 $0.00 $0 .00 $0 .00 $0.00 $0 .00 $0.00 $0.00 $0 .00 $200.00 $6 742 .0 0 $533 .76 $166 .80 $83.40 $7 525.96 $1 128.89 $129.82 $8 784 .68 $8 784 .68 FORT WORTH Engineers ... Workiflg Wonders With Water • ~ Project: Recipient: Subject: Contractor: Engineer WATER CONTRACT MODIFICATION REQUEST 24 Village Creek Wastewater Treatment Plant Secondary Area Rehabilitation and Modifications City of Fort Worth, Texas Date : June 5, 2012 Secondary Area and Rehabilitation and Modifications Project No .: ------------------- City of Fort Worth Orifice Plates at WS 61 and WS 62. Archer Western Contractors, Ltd. Carollo Engineers P275- 70130 0128980 Contract Mod. No .: CMR 24 ------------ CMR 24 includes the cost for installing 2" orifice plates in each of two waste sludge pump discharge pipes at pump 61 and 62 aluminum landings, stair and handrail at the RS6 electrical enclosure doors to improve safety . The detailed cost breakdown for the construction work is attached with this document. Carollo Engineers and Archer Western Contractors , Ltd. acknowledge that the work shown in the referenced Contract Modification Request 24 (CMR 24) represents work items not included in the original bid and changes the as-bid price of work items that were included in the original bid . The nature of the change is adequately described in the justification provided with the CMR. The need for this work was discovered during construction of related work items . Therefore , consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The Contractor's contract modification proposal has been reviewed by the Engineer, and the Engineer has certified that there is incremental cost and is reasonable to accept "as-is ." The Engineer has therefore recommended to City of Fort Worth to approve the work as CMR 24 . Procurement of this item by Contract Modification to this contract is justified in that the work is directly related to and intermingled with other work , which was included in the original procurement by public bid . Reviewed By _T_ro_,._y_L_a_m_a_n~,_P_._E_. ____________ Date : June 5 , 2012 Approved By _F_a_r_id_a_G_o_d_e~ry~a_,_P_.E ___ ~~--~-...... , ...... 8~---Date: June 5 , 2012 Bid Item OWNER: ENGINEER: CI TY OF FORT WORT H TEXAS CAROL LO EN GI NEERS 14785 Preston Road , Suite 950 DALLAS , TX 75254 CONTRACTOR: ARCHER W ESTERN CONTRACTORS , LTD 2 121 AVENU E J , SUITE #103 ARLINGTON , TEXAS 76006 Descriotion LABOR ,, Install Orfice Plates MATERIAL • Orfice Plates 12 T otall EQUIPMENT . ,, - SUBCONTRACT , ... Dobbs· Renaint Bo hs/FlanQe Area MISCELLANEOUS ITEMS .J TOTALS: Labor Burden @ 48% of Lab Of Small T cols @ 15% of Lab Of Safetv Suoolies l1il 7.5% of Lab or TOT AL DIRECT COS TS: OH&P@15% Insurance and Bond @ 1.5% TOTAL AMOUNT THIS COST PROPOSAL SUMMARY .. page 1 I ( ( CMR24 VILLAGE CRE EK WWTP SECONDARY AREA & FI LTER REHAB AND MODS WORK DESCRI PTI ON : Install Orifice Plates at the Waste Pump [);scharge Qty Unit UniVPrice I Labor I M aterial I Eauioment I Subcontractor 16.00 MH $19.00 $304 .00 MH $19.00 $0 .00 MH $19.00 $0.00 MH $19.00 $0 .00 MH $19 .00 $0 .00 MH 19.00 0.00 MH 19.00 0.00 MH 19.00 0.00 MH 19.00 0.00 MH 19.00 0.00 MH 19.00 0.00 MH $19 .00 $0.00 MH $19 .00 $0.00 $0.00 $0.00 1.00 LS $200.00 $200 .00 $0.00 $0 .00 $0.00 $0.00 $0 .00 ,o.oo 0 .00 0.00 0 .00 0 .00 0 .00 1.00 ILS I $100.00 I $100 .00 I I I $0 .00 I I I $0.00 I I I $0.00 $304.00 $200 .00 $0.00 $100.00 $145 .92 $45.60 $22.80 Subtotal : $0.00 Totals $304 .00 $0.00 $0 .0 0 $0 .00 $0.00 0.00 0.00 0 .00 0.00 0 .00 0 .00 $0 .00 $0 .00 $0 .00 $0 .00 $200.00 $0.00 $0 .00 $0 .00 $0.00 $0 .00 $0 .00 $0.00 $0.00 ,o .oo $0 .00 $0 .00 $100 .00 $0 .00 $0.00 $0.00 $0.00 $604 .00 $145 .92 $45.60 $22.80 $818 .32 $122.75 $14.12 l955.18 l955.18