Loading...
HomeMy WebLinkAboutContract 40921-CO3.. CITY SECRETARY fORT,ORTH . City of Fort Worth Change Order Request CONTRACT NO. Lf 09 a-I-Co 3 Project Name! 2007 Critical Capital Project Dist 9; Part 1 Group 9A City Sec # 40921 _______ __. Client Project #(s~ C295-531200-209400097983 DOE# 5922 Project Descriptio Water Replacement and Paving on Frazier, Orange, Wayside & 5th. Contractor! Stabile and Winn, Inc Change Order # 3 Date 8/4/2011 City Project Mgr.! Gopal Sahu (817) 392-7949 City Inspector Luisa Allbright (817) 223-2259 Original Contract Amount Extras to Date Credits to Date Dept. Pending Change Orders (in M&C Process) Contract Cost to Date Revised ontract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water Sewer TPW 311,931.40 1,267,065.30 $112,919.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE} AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%} (, ' ' . ' .. ~ . ",' ' '. . '' . . ". -' .. Contract Time Totals CD 1,578,996.70 270 $112,919.00 99 369 22 391 8:51% $1,973;745.88, The existing concrete flume at 1225 Orange Street required reconstruction to correct grade to drain into the newly Constructed concrete street Existing Grade of the concrete flume was flat and did not properly drain to the street Reconstruction of the flume included removal of a portion of existing fence sidewalk and driveways transition construction plans and bid item not included these additional items. Items 6, 7 and 44 were associated with this change . Project Name Client Project # City of Fort Worth Change Order Additions 2007 Critical Capital Project Dist. 9; Part 1 Group 9A C295-531200-209400097983 DOE# 5922 Project Description Water Replacement and Paving on Frazier, Orange, Wayside & 5th. Contractor Stabile and Winn, Inc City Sec# Change Order# 3 Date 8/4/2011 City Project Mgr . Gopal Sahu (817) 392-7949 City Inspector Luisa Allbright (817) 223-2259 ADD1T10N5 Water Sewer TPW Change Order Additions Page 1 of 1 _. . . ) 40921 City of Fort Worth Change Order Deletions Project Name Cl ient Project # 2007 Critical Capital Project Dist. 9; Part 1 Group 9A City Sec# 40921 ;:::;c::;:29;::::5-:::;53:;:1::;:20;::::0-:::;20;:;94::;:;o;::::oo~9::::79;::::83;::::::::::::::=D::::o:::::E::# :;59~22;::::::=========================--.:__....::::==:::: ~================================================:::::: Project Description Water Replacement and Paving on Frazier, Orange , Wayside & 5th . Contractor Stabile and Winn, Inc Change Order# 3 Date 8/4/2011 City Project Mgr. Gopal Sahu (817) 392-7949 City Inspector Luisa Allbright (817) 223-2259 DELETIONS llt:M Ut:::>vKII"" I ION Ut:I"" I Qty Unit Unit cost lOtal . -~ 1 ,-HMAC,; OVERLAYllnCIUCllng t:age M1111ng) ll""VV 01u .uu ;:;,r ;).).£0 ~1 .001 .ou - Water $0.00 Sewer $0 .00 TPW $1 ,657 .50 ::iuD I ota1 Deletions ~1 .oot.::>U Change Order Deletions Page 1 of 1 M/WBE Breakdown for this Change Order ; .. MWBESub~ · ,:' Type. of Service., .. ": . Amount for this CO •.·· .. ,; .. •:,~' '· ., Total ~~ · ;]{:tr~-so · I "~ff' J ·1t1Y. ~ .... :: .OOt ,-. '" .~ .~ ·.•' .' Previous Change Orders DATE ·'· ,. Total J . "· PROJECT NAME: PROJECT LIMITS : BuySpeed No (r/PW): BuySpeed No (Water): City Project No : Contract No: D.0.E. No: Attachment to Change Order No: Today's Date: Original Contract Amount: Extras to Date : Credits to Date: Contract Amount to Date: PROJECT SUMMARY SHEET (Change Order Attachment) 2007 CO's CD9 Neighborhood Streets Group 9A 5th, Frazier (2 loc) Orange, Wayside CSC0-11-00064108 CSC0-11-00064017 00979 CS40921 5922 3 9/1/11 TOTAL $ 1,578,998.70 $ 1 ,267,065.30 $ 311,931.40 $ 112,919.00 $ $ 112,919.00 $ $ $ $ 1,691,915.70 $ 1,267,065 .30 $ 424,850.40 Amount of Proposed Change Order: $ 21,529.75 $ 21,529.75 $ Revised Contract Amount: Contingency Funds Avail. for Admin . Change Orders: Remaining Funds Available for Change Orders : Additional Funding (if necessary): $ 1,713,445.45 $ 1,288,595.05 $ 424 ,850.40 $ $ $ 53,609.00 $ 38,012.00 $ $ 38,012 .00 $ 38,012 .00 $ $ 15 ,597 .00 Prepared By: Christy Ezernack T/PW Construction Services ,J\ •• ' ' PROJECT NAME: PROJECT LIMITS: BuySpeed No: Contract No: D.O.E. No: Attachment to Change Order No: Today's Date: Original Contract Amount: Extras to Date: Credits to Date: Contract Amount to Date: Amount of Proposed Change Order: Revised Contract Amount: PROJECT SUMMARY SHEET (Change Order Attachment) 2007 CO's CD9 Neighborhood Streets Group 9A 5th, Frazier & Orange, Wayside CSC0-11-00064101 CS40921 5922 3 9/26111 TOTAL TPW $ 1,578,996.70 $1,267,065.30 $ 112,919.00 $ $ $ $ 1,691,915.70 $1,267,065.30 $ 21,529.75 $ 21,529.75 $ 1,713,445.45 $ 1,288,595.05 Water $311,931 .40 $112 ,919.00 $ $424,850.40 $ $424,850 .40 Contingency Funds Avail. for Admin. Change Orders: Remaining Funds Available for Change Orders: $ $ $ 53,609.00 $ 38,012.00 $ $ 38,012.00 $ 15,597.00 38,012.00 $ Additional Funding (if necessary): $ Prepared By: Karen striker T/PW Business Services