HomeMy WebLinkAboutContract 41043-CO2.-'i fORTWORTH. ~ City of Fort Worth Change Order Request Project Name I 2007 Critical Capital Project Council District 6 -Part 1 Client Project #(s) 00966 City Sec # 41043 ....._ _____ __, ,....__ _________________________________ __, DOE: 5921/ 5920/ 6599 Jennie Drive , Peggy Drive , Indio Drive & Nachez Trace . Project Description Water , Sewer & Paving Reconstruction . Contractor! McClendon Construction Change Order # 2 Date City Project Mgr.._j _s_a_hu_G_o_..:.p_a_l __________ __, City Inspector Edward Davila Dept. TPW Water Sewer Original Contract Amount $738 ,972.90 $141,733 .20 $309 ,532 .25 Extras to Date $9 ,289 .00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $738,972.90 $141,733 .20 $318,821 .25 IAmount of Proposed Change Order $11,277.00 $2,065.00 $3,900.00 Revised Contract Amount $750,249 .90 $143,798.20 $322 ,721 .25 Original Funds Available for Change Orders $22 ,169 .00 $7 ,441 .00 $16 ,250 .00 Remaining Funds Available for this CO $22,169.00 $7 ,441 .00 $6,961 .00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1,190 ,238 .35 $9,289 .00 $1 ,199,527 .35 $17,242.00 $1 ,216,769.35 $45 ,860 .00 $36 ,571 .00 2.23% $1,487,797.94 2/10/2012 Contract Time (CD)_ 180 10 190 18 208 At the time of bid Natchez Trace , and the other streets on the project, were to be built with a crown in the roadway. After construction activities were underway on Natchez Trace cross sections showing a straight grade were produced ; McClendon Construction was directed to build a portion of Natchez Trace with straight grade rather than a crown in the pavement. Due to this modification there was additional time required to reshape the subgrade to achieve the straight grade . 2" HMAC on concrete base was added to the paving section for transtions . There were not pay items for manhole collars in the HMAC transtions . Pipe fitting quantities were increased due to contract estimated quantities being insu 03 -15 -12 by : r .,.. -.... . _, ....· \ 1 •• 4,1, l .. ,, r.,,.,, J" A~ .. ~ .- FORT WORTH -----..,---City of Fort Worth Change Order Additions Project Name Client Project# 2007 Critical Capital Project Council District 6 -Part 1 City Sec # 41043 :==oo==9=66============================================='.,__:___~==:::::; Project Description DOE : 5921/ 5920/ 6599 Jennie Drive , Peggy Drive , Indio Drive & Nachez Trace. Water , Sewer & Paving Reconstruction . Contractor McClendon Construction Change Order # 2 City Project Mgr . Sahu Gopal City Inspecto r Edward Davila ADDITIONS 11 t:M Ut:::iCKII-' I !UN UE:1-'T Uty Unit ZU l\lt:W ::ian1tary ::iewer Manhole Collars Sewer 6 .UU EA 9 INC Pipe F1tt1ngs -Install Water 0.5!:J TN 33 Nt::W '2 HMAC on 2 :27 Conrete for HMAC Transitions rPW JZO .l:!C u- 34 Nt::W Natchez Trace Grade Modif1cat1on rPW 1.UU LS Change Order Additions Page 1 of 2 Date 2/10/2012 Unit c.;ost l otal ;i,oou.uc $3 ,l:!UU .UU :t,J ,OUU.UU $2 ,UOO.UU :t,JU .UL $9,f r r .uu $1 ,0UU .UL $1 ,0UU.UU TPW $11 ,277.00 Water $2 ,065 .00 Sewer $3 ,900.00 Sub l ota Additions $11 ,£4£.UU Change Order Additions Page 2 of 2 FORT WORTH ----,.....--City of Fort Worth Change Order Deletions Project Name 2007 Critical Capital Project Council District 6 -Part 1 City Sec# 41043 Client Project # 00966 ..._ ____________________________________ __. Project Description DOE : 5921/ 5920/ 6599 Jennie Drive , Peggy Drive , Indio Drive & Nachez Trace . Water , Sewer & Paving Reconstruction . Contractor Mcclendon Construction Change Order# 2 City Project Mgr. Sahu Gopal City Inspector Edward Davila DELETIONS IIEM Ut~L-~lt"" I IUN Utl-'I Qty Unit Change Order Deletions Page 1 of 2 Date 2/10/2012 unit cost Total TPW $0.00 Wate r $0.00 Sewe r $0 .00 :suo Iota uelet1ons Change Order Deletions Page 2 of 2 :i.' f ,.., M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 PROJECT SUMMARY SHEET (C ha nge Order Attachment) PROJECT NAME : PROJECT LIMITS: 2007 CO 's CD 6 Neighborhood Streets, Groups 6C & 68, Part 1 Natc he z T race Street/ Indio Street/ Jennie Drive / Peggy Drive BuySpeed No (T/PW): BuySpeed No (Water): City Project No: Contract No : D.O .E. No : Attachment to Change Order No : Today's Date : Original Contract Amount: Extras to Date: Credits to Date : Contract Amount to Date : Amount of Proposed Change Order: Revised Contract Amount: P0 -11-0 0064772 P0-11-00064806 00966 I 00978 CS41043 6599 / 5920 2 2/13/12 Contingency Funds Avail. for Admin . Change Orders: Remaining Funds Available for Change Orders : Additional Funding (if necessary): Natchez Trace Street (6C) DOE 6599 / CPN 00966 TOTAL TPW Water Sewer $ 1, 190,238.35 $220 ,684.44 $ 71 ,947 .70 $ 86 ,055.25 $ 9,289.00 $ $ 9 ,289 .00 $ $ $ $1,199,527.35 $220 ,684 .44 $ 71 ,947 .70 $ 95 ,344.25 $ 17,242.00 $ 11 ,277 .00 $ 2 ,065 .00 $ 3 ,900 .00 $ 1,216,769.35 $231,961 .44 $ 74 ,012.70 $ 99,244 .25 $ 45,860.00 $ 6 ,620 .00 $ 3,795 .00 $ 4 ,550.00 $ 41,310.00 $ 6,620.00 $ 3 ,795 .00 $ $ (3,900.00) $ $ (3 ,900.00) J Indi o St. / Jennie Dr. / Peggy Dr. (68) DOE 5920 / CPN 00978 TPW Water Sewer $518,288.46 $ 69,785 .50 $223 ,477 .00 $ $ $ $ $ $ $ 518,288 .46 $ 69,785.50 $223,477.00 $ $ $ $ 518,288.46 $ 69 ,785 .50 $223,477 .00 $ 15 ,549 .00 $ 3 ,646 .00 $ 11,700 .00 $ 15 ,549 .00 $ 3 ,646 .00 $ 11 ,700 .00 $ $ $ Allocated f or In spection Charges $ $ 85,478 .00 $ 29 ,040 .00 $ 4 ,317.00 $ 5 ,164 .00 $ 29,370 .00 $ 4,178 .00 $ 13,409.00 698.00 $ 2 ,234 .00 Allocated for Material Testing Charges (Labor only) 9 ,380.00 $ 2,420 .00 $ 720 .00 $ 860.00 $ 2,448.00 $ Prepared By : Christy Ezernack T/PW Construction Services M" � d r/ •, FORT WORTH . ~ City of Fort Worth Change Order Request Project Name! 2007 Critical Capital Project Council District 6 -Part 1 Client Project #(s) 00966 City Sec# 41043 ....._ ______ ~ ....._ ___________________________________ ....., DOE: 5921/ 5920/ 6599 Jennie Drive , Peggy Drive, Indio Drive & Nachez Trace . Project Description Water , Sewer & Paving Reconstruction. Contractor! McClendon Construction Change Order# 2 Date City Project Mgr.._j _s_a_h_u _G"""'op"--a_l ___________ __. City Inspector Edward Davila Dept. TPW Water Sewer Original Contract Amount $738 ,972.90 $141,733 .20 $309 ,532 .25 Extras to Date $9,289 .00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $738 ,972.90 $141,733 .20 $318 ,821 .25 IAmount of Proposed Change Order $11,277.00 $2,065.00 $3,900.00 Revised Contract Amount $750,249 .90 $143 ,798.20 $322,721 .25 Original Funds Available for Change Orders $22,169.00 $7 ,441 .00 $16 ,250 .00 Remaining Funds Available for this CO $22,169.00 $7,441 .00 $6 ,961.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1 ,190 ,238 .35 $9 ,289 .00 $1 ,199 ,527 .35 $17,242.00 $1,216,769.35 $45 ,860.00 $36 ,571 .00 2.23% $1,487,797 .94 2/10/2012 Contract Time (CD) 180 10 190 18 208 At the time of bid Natchez Trace , and the other streets on the project, were to be built with a crown in the roadway. After construction activities were underway on Natchez Trace cross sections showing a straight grade were produced ; McClendon Construction was directed to build a portion of Natchez Trace with straight grade rather than a crown in the pavement. Due to this modification there was additional time required to reshape the subgrade to achieve the straight grade . 2" HMAC on concrete base was added to the paving section for transtions. There were not pay items for manhole collars in the HMAC transtions . Pipe fitting quantities were increased due to contract estimated quantities being insufficient. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Com an Name Contractor Name Contract Si nature Date McClendon Construction lnsoector/lnsoection Suoervisor Date Project Manager/Program Manager Date Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Assistant City Attorney Date Assistant City Manager Date Council Action if reQuired) M&C Number I I M&C Date Approved I I >' ·-" -, ..J .. I I ( i C 1~ \ t', - ·-- I ,. • 7 .:( .• 't"\ / FORT WORTH . ~ City of Fort Worth Change Order Request Project Name! 2007 Critical Capital Project Council District 6 -Part 1 Client Project #(s) 00966 City Sec # 41043 ______ ____, .__ _________________________________ __, DOE : 5921/ 5920/ 6599 Jennie Drive , Peggy Drive , Indio Drive & Nachez Trace. Project Description Water , Sewer & Paving Reconstruction . Contractor! McClendon Construction Change Order # 2 Date City Project Mgr ..... ! _S_a_hu_G_o""'"p_a_l __________ __. City Inspector Edward Davila Dept. TPW Water Sewer Original Contract Amount $738 ,972.90 $141,733 .20 $309 ,532 .25 Extras to Date $9 ,289.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $738 ,972.90 $141,733 .20 $318 ,821 .25 IAmount of Proposed Change Order $11,277.00 $2 ,065.00 $3,900.00 Revised Contract Amount $750 ,249.90 $143,798.20 $322 ,721.25 Original Funds Available for Change Orders $22 ,169 .00 $7 ,441 .00 $16 ,250 .00 Remaining Funds Available for this CO $22,169.00 $7 ,441 .00 $6 ,961 .00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1 ,190 ,238.35 $9 ,289.00 $1 ,199,527 .35 $17,242.00 $1 ,216,769 .35 $45 ,860 .00 $36 ,571 .00 2.23% $1 ,487 ,797 .94 2/10/2012 Contract Time (CD) 180 10 190 18 208 At the time of bid Natchez Trace , and the other streets on the project, were to be built with a crown in the roadway. After construction activities were underway on Natchez Trace cross sections showing a straight grade were produced ; McClendon Construction was directed to build a portion of Natchez Trace with straight grade rather than a crown in the pavement. Due to this modification there was additional time required to reshape the subgrade to achieve the straight grade . 2" HMAC on concrete base was added to the paving section for transtions . There were not pay items for manhole collars in the HMAC transtions. Pipe fitting quantities were increased due to contract estimated quantities being insufficient. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. Contractor's Com Name Contractor Name Contract · nature Date Mcclendon Construction Inspector/Inspection Suoervisor Date Proiect Manaaer/Proaram Manager Date Assistant Director lDeot) ~--~~ ...... ~---Date Director , Contracting Deoartment <Deot) Date Assistant City Attorney Date Ass istant City Manaaer Date ~ ~ -Council Action if reauired) M&C Number I I M&C Date Approved I I FORT WORTH ~ City of Fort Worth Change Order Request Project Name! 2007 Critical Capital Project Council District 6 -Part 1 Client Project #(s) 00966 City Sec# 41043 -------------------------------------' DOE : 5921 / 5920/ 6599 Jennie Drive , Peggy Drive , Ind io Drive & Nachez Trace. Project Description Water , Sewer & Paving Reconstruction . Contractor! McClendon Construction 2 Date City Project Mgr.!_S_a_hu_G __ op_a_l ___________ _. Change Order# City Inspector Edward Dav ila Dept. TPW Water Sewer Original Contract Amount $738 ,972.90 $141 ,733.20 $309 ,532 .25 Extras to Date $9 ,289 .00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $738,972 .90 $141 ,733 .20 $318 ,821 .25 !Amount of Proposed Change Order $11,277.00 $2,065.00 $3,900.00 Revised Contract Amount $750 ,249.90 $143 ,798 .20 $322 ,721.25 Original Funds Available for Change Orders $22 ,169 .00 $7 ,441.00 $16 ,250.00 Remaining Funds Available for this CO $22 ,169.00 $7 ,441 .00 $6 ,961 .00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1 ,190,238 .35 $9 ,289.00 $1 ,199,527 .35 $17,242.00 $1 ,216 ,769 .35 $45 ,860 .00 $36 ,571.00 2.23% $1 ,487,797 .94 2/10/2012 Contract Time (CD) 180 10 190 18 208 At the time of bid Natchez Trace , and the other streets on the project, were to be built with a crown in the roadway . After construction activ ities were underway on Natchez Trace cross sections showing a straight grade were produced ; McClendon Construction was directed to build a portion of Natchez Trace with straight grade rather than a crown in the pavement. Due to this modification there was additional time required to reshape the subgrade to achieve the straight grade . 2" HMAC on concrete base was added to the paving section for transtions. There were not pay items for manhole collars in the HMAC transtions . Pipe fitting quantities were increased due to contract estimated quantities being insufficient. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. Contractor's Com an Name Contractor Name Contract · nature Date Mcclendon Construction lnsoector/lnsoection Supervisor Date Project Manaaer/Program Manaaer Date Assistant Director {Dept} Date Director, ContractinQ Department {Dept} Date Assistant City Attorney Date Assistant City Manager Date Council Action if required) M&C Number I I M&C Date Approved I I