Loading...
HomeMy WebLinkAboutContract 41045-CO2City of Fort Worth Change Order Request CITY SECRETARY CONTRACT NO . L/JoL./:r -:.£0 ~ ·change O rder No . Date TPW Proj ect No. Fund ing (FAC ) '2(two) 5/31/11 GG04 541200 0246000 Facility and Project Description C ity Secret ary Contract No . Cooling Tower Upgrade Fort Worth Convention Center CS-41045 ORIGINAL CONTRACT AMOUNT ................................................................ $1,063 ,820 EXTRAS TO DATE .................................................................... . $ 57 ,9 10 CREDITS TO DA TE .................................................................. .. $ 0 CONTRACT COST TO DATE ................................................................................................. . $ 1 ,121 ,730 AMOUNT OF PROPOSED CHANGE ORDER .......................................................................... .. $ REVISED CONTRACT ,i!.,MOUNT ........................................................................................... .. $ ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ...................................................... · ..... . $ REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................... : ......................... -... . $ ADDITIONAL FUND ING (IF NECESSARY) ............................................................................... . $ IN ACCORDANCE WITH THIS CHANGE ORDER , THE CONTRACTOR SHALL: Furn ish and install new piping and reducers at cooling tower to replace corroded pip ing encountered during retrofit as per attached PCR ADD $10 ,822 Furnish and install new water meter at cooling tower per Water Department requ irements as per attached PCR OFFICIAL RECORD CITY SECRETARY FT, WORTH, TX ADD $3,100 13 ,922 1 ,135 ,652 90 ,000 18 ,168 0 -------------------------------------------------------------------1:-::-::.:--;:.--;;.:-::;--;;::-.. --;;::-.. --::-=.:--==-=--....... ~------------------------------- Total t his Change ADD $13 ,922 It is un de rstood and agreed that th e acce ptance of thi s Change Ord er by the contractor constitutes an accord and satisfaction an d rep resents pay ment in fu ll (both ti me and mo ney) fo r all costs arising out of, or inci dental to, the above Change Order Contractor's Name Freer Mechanical Contractors , Inc. Original Co ntract Time Ad ditio nal Ap prov ed Ti me To Date Ap proved Contract Ti me To Date Additi onal Time For This Ch ang e Order 140 cd O cd 140 cd O cd Dist ribution: File Con struction Manager Project Manager Con t ractor Date 6/,/t, Date MECHANICAL CONTRACTORS, INC. April 20 , 2011 To: City of Fort Worth Re: FWCC; Cooling Tower Upgrade Sub: Deduct Meter Change Order Proposal Gentlemen, Freer Mechanical Contractors, l nc . will furnish matertal and labor per for this proposed change order per the following scope of work : WORK TO INCLUDE: a Drain existing makeup water pipe from boiler room to roof o Cut 3" copper pipe and install new domestic water meter o Refill system and bleed out air o Additional bond prem ium fees Our price based on this scope of work is... $ Add for remote display (within 75')... $ WORK TO EXCLUDE (for clarification): o Overtime o Priming or pa inti ng o Building automat ion 2,240.00 860.00 Proposal is based upon approved submittals and scope of work . We appreciate the opportunity to submit this quote. If you have any questions , please advise , 1908SAMUELSAVE.• FORTWORTH ,TEXAS 76102 • Fax(817)335-2100 • Phone(817)335-2101 P.O. BOX 4176 • FORT WORTH. TEXAS 76164-0176 MECHANICAL CONTRACTORS, INC. April 29 , 2011 To: City of Fort Worth Re: FWCC; Cooling Tower Upgrade; CDW Header Replacement on Roof Sub: Change Order Proposal Gentlemen, Freer Mechan ical Contractors , Inc. will furnfsh material and labor per for this proposed change order per t he fo ll owing scope of work: WORK TO INCLUDE: o Provide & instafl carbon stee l pi pe header to replace existing condenser water header on roof o Connect new 16" pipe to existrng elbow and install about 20' of p ipe to the east o Install 16" x 14" reducer and extend with 35' of 14" pipe o Install 14" x 12" reducer at the end and tie~in to existing 12" header o Demo pipe to be replaced and lower to ground level with crane · o Install (2) new 10" taps for (2) cooling tower cells o The following items will be installed at no additional costs since they are part of the original bid: Insul ation Pipe fabrica tion Crane for hoisting new pipe on roof Heat trace New clevis hangers Our price based on this scope of work is... $ 10,822.00 WORK TO EXCLUDE (for clarification): o New 16" elbow o Water treatment Proposal is based upon approved submittals and scope of work . We appreciate the opportun ity to submit th is quote . If you have any questions, please advise. Sin9erely, ·~ ~~*.·~ G/~I~ Estimator/ Project Manager 1908 SAMUELS AVE.• FORT WORTH, TEXAS 76102 • Fax (817) 335-2100 • Phone (817) 335-2101 P.O. BOX 4176 • FORT WORTH, TEXAS 76164-0176 PROJECT SUMMARY SHEET PROJECT NAME: Cooling Tower Upgrade Fort Worth Convention Center City Secretary No .: Attachment to Change Order No .: Today's Date: Original Contract Amount Extras to Date: Credits to Date: C o ntract Amount t o Date: Amount of Proposed Change O rder: Revi sed Contract Amount: 41045 2 6/7/11 Contingency Fund s Avail. for Admin . Change O rders : Remaining Funds Availabl e for Change Orde rs : Additionai Funding Of necassar1): $ $ $ $ $ $ $ $ $ TOTAL 1,063,820.00 57,910.00 1,121,730.00 13,922.00 1, 135,652.00 90,000.00 18 ,168.00 Prepared by: Karen StnKer, l !'t-'VV !::iUS!ness Support } ,.J Cifb FORT WORTH ~ Routing & Transmittal SUp To: Department Initials 01 Dalton Murayama TPW &A 02 Glenn F. Balog TPW ~ 03 Karen Stri ker TPW 1/~ 04 Douglas '£'1~\J\{iersig , P.E. I TPW '~v J 05 Doug Blac~J, ((lj._(!l 'J. tl LAW .il ':> G,..< i t( .... , 06 Fernando Costa I ACM ~-. j . 07 Jack Durham TPW Proiect: COOLING TOWER UPGRADES FORT WORTH CONVENTION CENTER Change Order 2 Date 6hlu G/7 /t r / n ~,·-l ( b / J /L o f I G, 1-tl ~/8 Remar "'s: Change Ord e r 2-Miscellaneous changes as requ ired by o n sit~ p iping conditions and Eng inee r's recommendations . · M&C is not required. Action _Approval _ As Requested Circulate Comment Coordination NOTE to CMO: File For Clearance For Correction For Your Information _ Investigate _ Justify Note & Return Per Conversation _ Prepare Reply See Me X Signature Other Please call Jack Durham @ #392-8072 for pickup upon completion. TRANSPORTATION AND PUBLIC WORKS DEPARTMENT ARCHITECTURAL SERVICES S EC TION, F ACILITIES MANAGEMENT D IV ISION 909 Taylor Street, Suite 35 * Fort Worth, TX 7 6 102 Fax 817-871-8488