HomeMy WebLinkAboutContract 41213••
Improvements to Existing Public Road At Grade Crossing
For L ong Ave (E/B and W/B) streets, DOT 795426R and DOT 796427X
M .P. 749.31 and 749.39 Choctaw Subdivision
FORT WORTH
nus AGREEMENT, executed in duplicate this~../" day o~ 2010, by and between
UNION PACIFIC RAILROAD COMPANY, a Delaware corporation hereinaffer the "Railroad"), and
CITY OF FORT WORTH, a municipal corporation of the State of Texas (hereinafter the "Political
Body"), WITNESSETH:
RECITALS:
The Political Body and the Railroad agree to improve the existing Long Ave. streets crossing,
at grade, along, over and across the Railroad's track and right of way at Mile Post M.P. 749.31
and 749.39 Choctaw Subdivision, DOT No. DOT 795426R and DOT 796427X, in City of
Fort Worth, Tarrant County, Texas to which the Railroad is agreeable, but solely upon terms and
conditions hereinafter set forth.
AGREEMENT:
NOW THEREFORE, in consideration of the premises and of the promises and conditions
hereinafter set forth , the parties hereto agree as follows:
1. The Railroad shall provide it's contract venders, Hulcher Service Inc . and Holland Paving
to (a) remove and dispose of abandoned track, (b) remove and dispose of all roadway approaches, (c)
reinstall all roadway approaches, all at the intersection of the Railroad's main track and siding at Long
Ave street crossings at Mile Post 749.31 and 749.39 in , City of Fort Worth , Tarrant County, Texas as
shown generally on Railroad's print dated July 20, 2010, marked Exhibit A, hereto attached and hereby
made a part hereof.
2. The Political Body agrees to pay the Railroad the final actual costs billed to the Railroad
by Hulcher Services Inc . and Holland Paving. The contract vendor's actual cost billed to the Railroad is
fixed sum of Five Thousand Four Hundred and Twelve Dollars ($5 ,412.72) for the work performed by
the Railroad 's contract venders and materials supplied by the Railroad pursuant to Section 1 above, as
such work and materials are described in the attachment dated July 20 , 2010, marked Exhi bit B , hereto
attached and hereby made a part hereof. Political Body shall pay the Railroad within thirty (30) days of
receipt of any billing from Railroad.
3. The Railroad , at its cost, shall maintain the crossing between the track tie ends . If, in the
future , the Political Body elects to have the surfacing material between the track tie ends replaced with
paving or some surfacing material other than timber planking, the Railroad, at the Political Body's
expense, shall install such replacement surfacing.
4. The Political Body, at its sole cost and expense, shall provide traffic control , barricades,
and all detour signing for the crossing work, provide all labor, material and equ pment to install concre
or asphalt street approaches, and if required, will install advanced warning sign
in compliance and conformance with the Manual on Uniform Traffic Control De
-)r/ -: 1 J I "
FT. WORTH, TX
UNIONPACIFICRAILROAD IO!SouthWaston Arlin g t o n ,T X76 010 )J-11-']') f, 9 :51 IN
5. The Political Body, for itself and for its successors and assigns , hereby waives any right
of assessment against the Railroad , as an adjacent property owner, for any and all improvements made
under this agreement.
6. Covenants herein shall inure to or bind each party's successors and assigns ; provided , no
right of the Political Body shall be transferred or assigned , either voluntarily or involuntarily, except by
express written agreement acceptable to the Railroad.
7. The Political Body shall, when returning this agreement to the Railroad (signed), cause
same to be accompanied by such Order, Resolution , or Ordinance of the governing body of the Political
Body, passed and approved as by Jaw prescribed , and duly certified, evidencing the authority of the
person executing this agreement on behalf of the Political Body with the power so to do , and which also
will certify that funds have been appropriated and are available for the payment of any sums herein
agreed to be paid by Political Body.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date
and year first hereinabove written.
UNION PACIFIC RAILROAD COMPANY
~~~V...'-li:l.1:l_ll. ~ §~i~~!ota~
/::fio0 0o de:~ p OJ °o .'{) ;---;-t-T1H.tt-11;;;;;1t-1"11att-a--.......---------
t! )a8 i~e
~1-o o ~
THE LOCAL GOVERNMENT ~1)\
0
l '+ & ,r---------
CITY OF FORT WORTH ~, *00 i~ f; NO M&C REQUIRED I
'Q~~ 0 00000° ~7.c, _
tth"'· TE~<>-~~ 'l.'4\l.1\.~~~
fflei.ct~v?AAk;p ~-
Marty He~ Fernando Costa
City Secretary • 0 AetiA~ Assistant City Manager
Y"\ t) Y'j\, L , Q. C\ \A,\ r -e cJ.
Contract Auth~riz~ion Date: _s~)~,o~A-~_o ____ _
Date: :6 _\\ Qrz..t)\ U
APPROVED AS TO FORM AND LEGALITY:
Am msey
Assistant City Attorney
Date: ----------------
APPROVAL RECOMMENDED:
William A~kesC~
Director Transportation/
Public Works Department
Date : ____ -t=:::::::::::~,---___..,.I
OFFICIAL RECORD
CITY SECRETARY
FT, WORTH, TX
UNION PACIFIC RAILROAD IOI South Waston Arlington , TX 76 010
Pr int -~ap s ·'
EXI HI BIT "A"
7 /zD/2a\o
File: Crossing: Public
TX., Fort Worth
Long Ave
MP 749 .31 (W/B) & MP 749.39 (E /B)
Choctaw Sub.
Page 2 of2
DOT -795426R & 79 ~=7*---
0FFlCIAL RECORD
Cl SECRF!7AR Y
fl. ,:!c~ ''.f)(
··-,....__ ---·-···j
http ://www.bing.com/map s/print.aspx?mkt=en-us&z=1 9&s=h&cp =32 .809755 ,-97 .2 9760 5... 7/19/2010
'i
DWR -1415368 Page 1 of 3
Contract Administration System 3.0
UP: CAS -Standard Work Report
Applications ~., Requests , , Approvals , , Inquiries -. , Work Queues " Back Office My CAS , , What's Ne
Return To: UP Employees Home > Departments > Supply > CAS 3 .0 Home Logged In As: EENG186 Logo,
Doing Work As: WILLIAM R (BILL) PARKER
DWR # -1415368
Billing Progress Report ( E:
Invoice# 1415368 Work Date: 04/05/2010 Contractor Ref# :
· Invoice Status : SENT TO CU FOR Invoice Date : 04/29/2010 Invoice Recv Date: 04/29/2010 Payment Due Date: 05/2
VERIFICATION
Voucher#: Voucher Date : Voucher Amount :
Project Type : ~ct--li.i Project I ! Number:
Location Information
Subdivision Choctaw Mile Post From 747 .43 Mile Post To 747.43 Gang# 2
Accounting (For Information Only)
Comp 01 Prim Ac Sub Ac/ Cost Sub Sub Work Order/ 3109 Job -Code Code Ac JFAC# # -Remit To Message :
(comments to print on the check stub)
General Comments : OFFICIAL RECORD
Asphalt road crossing signed by Roder ick Parish CITY SECRETARY
214-562-0606 S:T ~.-.=71,1 TY
~ .
W-H<>LLAN l!'AVING
Vendor Phone : 3166488037 Vendor Fax :· 31672291 15
Vendor E-mail : PCL YDE@ABBB .COM
Remit To Address: PO BOX 7711 02 WI CHITA KS -67277
0 Audit # -741833
Contract Audit#: Zil.B.ll
03/09/2012
Compensation Limit (USD) : $200,000.00
Expiration Date :
contract Administrator : NICHOLAS A SM ITH Contract Fulfiller : NI CHO LA S A SMITH
service Desc : prov idi ng all necessary equ i pment, labor, supervision and materials for an "as needed " asp halt paving i n
Dallas/Ft. Worth Texas and surrounding a r eas
Location Desc :
Accounting
.Company Code : ...
!Q! ___ ::i
Dallas/Ft. Worth and Surrounding areas
· ·Prlm·Ac/Cost ·· ·1·Sub ·Ac/CostCode -1···· SubSub ·Ac
Center
. (000~9._J j IQQ.9.Q. __ ., __ _J i joo QQL_J
https ://c02.my . uprr .com/cam _:.admin/secure/standardWorkReporLjas
View My Default Accounting
·· 1 WorkOr~r/JFAC t ........ , .. , Job#
1 I fu_o_oo_o __ J ! looo __ J !
6/21/2010
DWR • 1415368
D Validate Accounting Codes (on submit)
Hourly Service Items
IJ Ln UPRR UPRR Equip Equip Emp
Asset Asset Model # Id
Type #
Emp
Name
Location # 1 Dallas/Fort Worth and Surrounding Area
Start End Meal Down Total Billable
Time Time Time Time Hours Units
Unit
Price
SI # 5630396 Backhoe/Hoeram Case 580 Super E, Ford SSSB, John Deere 310C or equal with operator for pavement
breaking
Page 2 of3
Extn
Amt
[J i 1
!
567-i Octavio
90 -! Garcia
6754 l
I 07:00 i 11 :00 i 00:00 00:00 l 4:0
! i : !
! 1 I f
i 4.0 I ;
$75 .00 I $300 .00 I
I •
I I
SI# 5631764 Truck • Dump • 20 CY min. with operator
0 I 2 : Intl i 2 i 341-i Russell i i i l 60-i Lindberg
! 01:00 I 11:00 1 00:00 00:00 ! 4 :o
i i 1 I $75.00 1 $300.00 I
! I l j ; j 0480 I l l l i
SI # 5631958 Truck -End Dump -10 CY min. -tandem axle • with operator
D ; 3 ; ford 8 : 116-' Thomas i 07:00 11 :00 ; 00 :00
' i 52 · i Gorski 1
i ! 2914 '. j
00:00 ! 4:0
i
!
: !
! 4.0
. I
$65.00 ! $260 .00 I
' I
Amount Due this Invoice
Attached Documents
Document File Name
1415368,pdf
Invoice Actions
0 VERIFY AND ROUTE FOR ACTION
Comments are mandatory.
0 ROUTE FOR ACTION
No Exceptions
I Description
. dally wor.k report attached
No Subcontracted Work Reports attached
Further Routing Sequence should be present. Comments are mandatory
0 PUT INVOICE ON HOLD
Comments are optional
0 REJECT AND SEND TO VENDOR
Comments are mandatory.
0 VERIFY AND RELEASE FOR PAYMENT
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Complete Accounting Information should be present . Invoice will be routed directly to Accounts Payable
comments:
Invoice Verification/ Release For Payment Routing
https ://c02 .my .uprr.corn/cam_admin/secure/standardWorkReport.jas 6/21/2010
DWR-1415368
Name
RONALD f
(RON) BELNAP
RONALD E
(RON) BELNAP
WILLIAM R
(BIW PARKER
I Routing
Status
: COMPLETED
I COMPLETED
CURRENT
Routing Sequence :
Name
Accounts Payable
As~;~ed I ~:i!n
Taken
Invoice Action
04/29/2010 04/29/2010 • REJECT AND SEND TO
VENDOR
05/04/2010 I 05/20/2010 I ROUTE FOR ACTION
05/20/2010 '
Route for Info Only {CC List}
Page 3 of3
I Comments
: no documents attached -please attach,
: update description as needed, and resubmit i thanks I check for WO
Select the CAS representatives to be Included In the E-mail list by clicking "Add
Users to Email 11st" button
·------·----------------~------·----
Top of Page
Home I What's New I Search I Copyright I Privacy I Site Info I Feedback
OFFI IAL RECORD ·
CITY CRETARY
FT.
https://c02.my .uprr.com/cam _ admin/secure/standardWorkReport.jas 6/21/2010
DWR-1415369 Page 1 of3 •.. ·,,
~
' .
"
Contract Administration System 3.0
UP : CAS -Standard Work Report
Applications '·, Requests .. , Approvals '·., Inquiries•., Work Queues ··, Back Office My CAS .. t What's NE
Return To: UP Employees Home > Departments > Supp ly > CAS 3.0 Home Logged [n As: EENG 186 Log 01
Doing Work As : WILLIAM R (BILL) PARKER
DWR # -1415369
Billing Progress Report ( E:
Invoice# 1415369 Work Date: 04/06/2010 Contractor Ref#:
Invoice Status : SENT TO CU FOR · invoice Date : 05/12/2010 Invoice Recv Date: 05/12/2010 Payment Due Date: 06/1
VERIFICATION
Voucher # : Voucher Date : Voucher Amount :
Project Type: l _--_se_le_ct_--___ !if. Project
·Number:
Location Information
Subdivision Choctaw Mile Post From 747 .43 Mile Post To 747.43 Gang#
Accounting (For Information Only)
Comp Code 01 Prim Ac Sub Ac/ Cost Code Sub Work
Order/
JFAC#
3109 Job
#
Remit To Message :
(comments to print on the check stub)
General Comments :
Asphalt road crossing signed by Roderick Parish 214-562-
0606 work report, asp tickets and asp invoice attached
( 0 HOJ..LAND~VING
Vendor Phone: 3166488037
Vendor E-mall: PCLYDE@ABBB .COM
Remit To Address : PO BOX 771102 WICHITA KS -67277
8 Audit# -741833
Contract Audit # :
Expiration Date :
1illD
03/09/2012
contract Administrator : NI CHOLAS A SMIT H
Sub
Ac
Vendor Fax:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3167229115
Compensation Limit (USD) : $200,000.00
Contract Fulfiller : NICHOLAS A SMITH
service Desc : prov iding all necessary equipment, labor, supervis ion and materlals fo r an •as needed" asphalt pav ing in
Dallas/Ft. Worth Texas and surrounding areas
Location Desc : Dallas/Ft. Worth and Surrounding areas
View My Default Accounting
Accounting
. Company. Code.: .
IP_l __ _]
· Prim·Ac/ Cost · · ·· 1 Sub Ac /-Cost Code ·, · ···· · Sub Sub Ac ·
Center
fo p_qQQ__ ___ J ' [oooq __ J ! I.Qoo ~_J
· ·· 1 Work or:er/·JFAC-1
l [ooo o_Q ___ J l
·1 ··
fo'""o_o _____ -_....,J I
2
https://c02.my.uprr.com/cam_admin/secure/standardWorkReport.jas 6/21/2010
DWR-1415369 Page 2 of3
D Validate Accounting Codes (on submit)
Hourly Service Items
0 Ln UPRR UPRR Equip Equip Emp
Asset Asset Model # Id
Type .#
Emp
Name
Location# 1 Dallas/Fort Worth and Surrounding Area
I ,, ·, '" . .
Start End Meal Down Total Billable
Time Time Time Time Hours Units
Unit
Price
Extn
Amt
SI # 5630396 Backhoe/Hoeram Case 580 Super E, Ford 5558, John· Deere 310C or equal with operator for pavement
breaking
' 0 : 1 t
! i
!
567-i Octavio
90· i Garcia
6754 i
SI# 5631764 Truck-Dump -20 CY min. with operator
!2 ' 12 ; 341· ! Russell D Intl
i i 60-i Lindberg ' ; ! i i 0480 I i , . I
8.0 i 08:00 i 16:00 t 00 :00 00 :00 l 8:0
l i j !
i j i
! $75.00 $600.00 j
I <
i Ii ! I
! 08:00 l ! i 8:0 16:00 ; 00 :00 00:00 8.0
i I ! !
' I . i !
i I ' i
: $75.00 1 $600 .00 I
! . !
! I I
SI # 5631958 Truck -End Dump -10 CY min. -tandem axle -with operator
i D 3 I ! i
i !
! : ' >
Other Service Items
D Ln UPRR UPRR
# Asset Asset
Type #
! Ford I I
I I
i
SI#
i i 8 116-Thomas i l : 52-Gorski I
! ~914 i
;
SI Desc
Location# 1
r. i 4
Dallas/Fort Worth and Surrounding Area
L }
D s
0
5650000 ! ** Asphalt -Hot
l Mix -Furnish only
: (markup to be
I applied under
Service Item No. i 5649998)
5647549 i Asphalt -Place &
I Compact -without
i Laydown Paving
i Machine -only
i rollers, saw, broom, i tools, supplies, etc.-
; Includes labor &
I travel
5649998 i Markup -Asphalt -! Hot Mix -i Contractor's
i markup to be
i applied to Service
i Item Number i 5650000
I 08:00 I
I
!
i
!
Cont
Qty
0.0
' I l i 16:00 00:00 00:00 I 8:0 I I i
i
!
Cont
Unit
Price
;
i
!
;
UOM
$0.00 · RECURRING )
WMPSUM
;
!
'
Comments
8.0
Inv
Qty
1.0
!
I $65.00 I
t
I
! I
Inv
Unit
Price
946.8
o.o ! $70,00 NET TON
i
17 .85 70.0
10.0
I
i
i
!
I $0.oo
!
i
I
i
I
. t .. : ...
I
I
OFt
1
ICIAL RECORD
PERCENT 10.0 cn tv SECRETARY
I Ff. WORTH, TX
l
............... 1 ...
i $520.00 I
I
l I
I
Extn Amt
!
!
l
$1,249.50 I
I
I
I
I
I ···············!·.
Amount Due this Invoice : $4,01.0.98
No Exceptions
https ://c02.my .uprr .com/cam _admin/secure/standardWorkReport.jas 6/21/2010
DWR-1415369
Attached Documents
Document File Name
1415369.pdf
I Description
i work report
No Subcontracted Work Reports attached
Invoice Actions
0 VERIFY AND ROUTE FOR ACTION
Comments are mandatory.
0 ROUTE FOR ACTION
Further Routing Sequence should be present. Comments are mandatory
0 PUT INVOICE ON HOLD
Comments are optional
0 REJECT AND SEND TO VENDOR
Comments are mandatory.
0 VERIFY AND RELEASE FOR PAYMENT
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Complete Accounting Information should be present. Invoice wlll be routed directly to Accourt:ts:...:P~a::.y.:.;ab:.:.le:;_ _____ _
Comments:
I
Invoice Verification/ Release For Payment Routing
Name Routing Date Date Invoice Action Comments
Status Assigned Action
Taken
B,ONALD E COMPLETED .· 05/12/2010 ; 05/26/2010 ; ROUTE FOR ACTION · Choctaw work by DWR
(BQ!".:f) 61;LN8P ' !
:WILLIAM B I CURRENT I 05/26/2010 I
HULL) eAB~EB
Routing Sequence : Route for Info Only (CC List)
Page 3 of3
Name I Select the CAS representatives to be Included In the E·mall 11st by clicking "Add
Users to Email list" button
Accounts Payable I I ~11.~·:
,:;~!(,
{/;" i(i
.___ ___ .~ -----~-wi -
Top of Page
Home I What's New I Search I Copyright I Privacy I Site Info I Feedback
https://c02.my. uprr.com/cam _ admin/secure/standardWor.kReport .j as 6/21/2010
DWR -1965635 •···;.
" ' .
I I
~
,' .
Applications '··' Requests ._.,
Contract Administration System 3.0
UP : CAS -Standard Work Report
Page 1 of3
Approvals ,_., Inquiries -., Work Queues · . ., Back Office My CAS " What's NE
Return To: UP Employees Home > Departments > Supply > CAS 3.0 Home Logged In As: EENG186 Log 01
Doing Work As : WILLIAM R (BILL) PARKER
DWR # -1965635
Billing Progress Report ( E:
Invoice # 1965635 Work Date : 05/18/2010 Contractor Ref# :
Invoice Status: SENT TO CU FOR Invoice Date: 05/21/2010 Invoice Recv Date: 05/21/2010 Payment Due Date: 06/2
VERIFICATION
· Voucher# : Voucher Date : Voucher Amount :
P~oject Type : .... 1-_-s_ele_c_t --____ (ij Project
Number:
Location Information
Subdivision CHOCTAW Mile Post From
Accounting (For Information Only)
Comp Code Prim Ac Sub Ac/ Cost
Code
Remit To Message :
(comments to print on the check stub)
INV 074941 -PROJECT #162027
General Comments :
· REMOVED 2 CROSSINGS ON LONG ST -OWR
#1965635
I[-] HUCCRER:.SERVICES..l.NCJ
Vendor Phone : 8006598032
Vendor E-mail: EHORTON@HU LCHER.COM
748 Mile Post To
Sub Sub Work Order/
Ac JFAC#
Vendor Fax:
Remit To Address : PO BOX 7164 ST LOUIS MO -63177
6 Audit # -738620
Edit Locatio
749 Gang# 2186
. . . -. . Job
#
_____ ·
~
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Audit # : Compensation Limit (USD) : $2,000,000.00
Expiration Date : 07/31/2010
Contract Administrator : NICHOLAS A SMITH Contract Fulfiller : NICHOLAS A SMITH
Service Desc: providing fully operated, fueled, and ma intained equipment to assist Railroad forces In performing work on an
as-needed basis
Location Desc : various locations on the Railroad's Ft. Worth Service Un it
Accounting
Company Code : Prim Ac/ Cost
Center
)00000 Jooooo
I Sub Ac/ Cost Code I
I 1
i Joooo I : 1 !
Sub Sub Ac
https://c02.my. uprr .com/cam _admin/secure/standardWorkReport.jas
View My Default Accounting
I Work or:er/ JFAC I
i @p.<iC] i
< I
Job#
6/21/2010
: ...
DWR-1965635 Page 2 of3
D Valldate Accounting Codes (on submit)
. 7. -. . . . . · i "' , .
Hourly Service Items
IJ Ln UPRR UPRR Equip Equip Emp Emp Start End Meal Down Total BIiiabie Unit Extn
Asset Asset Model # Id Name Time Time Time Time Hours Units Price Amt
Type #
Location# 1 Ft Worth Service Unit
SI # 5651513 Labor -Equipment Operator -Straight Time
I ' ! 4.0 ' l C : 1 ! TURNER, 09:30 13:30 00:00 00:00 4:0 ! $38.31 l $153.24 !
i E ; • . i
! : l i i I
I
SI # 5651547 Excavator -Crawler -Medium -2,6 to 4.5 CY Bucket -With Thumb if Required -Without Operator I
!2 i 13-! TURNER, 1 09:30 / 13:30 i 00:00 l 00:00 i 4·0 l 4.0 D I l
i ; i i ? I ,
f l i 039 E l I ! ; ! l
Other Service Items
0 Ln UPRR UPRR SI# SI Desc Cont Cont UOM Comments
# Asset Asset Qty Unit
Type # Price
Location# 1 Ft Worth Service Unit
!3 ;
D '
'
Attached Documents
Document File Name
1965635 PROJ 162027.tlf
Perlormance
Operator(s):
Equipment:
5651596 : Mileage -Transportation ( 0.0 $2.75 \ MILE
;
' ;
: To or From Jobsite -5 ' I ' ' i Axle Trailer or Smaller ;
i ;
'
No Exceptions
I Description
1965635 PROJ 162027.tlf
No Subcontracted Work Reports attached
Worst
OFFICIAL RECORD
CITY SECRETARY
Wo1 st FT. WORTH, TX
https://c02.my. uprr .com/cam_ admin/secure/standardWorkReport.jas
I $84.75 I $339.oo l
!
Inv
Qty
18.0
I I
Inv
Unit
Price
i i 2 .75
j
I
i
01
02
03
04
05
I
Extn
Amt
$49.50 I
i
I
Best
0 1 Best
02
03
04
6/21/2010
.I' ' . ,
DWR-1965635
Comments (If ratings are 1 or 2 comments are required):
Invoice Actions
0 VERIFY AND ROUTE FOR ACTION
Comments are mandatory .
0 ROUTE FOR ACTION
Further Routi ng Sequence should be present. Comments are mandatory
0 PUT INVOICE ON HOLD
Comments are optional
0 REJECT AND SEND TO VENDOR
Comments are mandatory .
0 VERIFY AND RELEASE FOR PAYMENT
l •.
Page 3 of3
05
Complete Accounting Information should be present. Invoice will be routed directly to Accounts Payable
comments:
,___, ________________________________ ]
Invoice Verification/ Release For Payment Routing
Name
WILUAM R
CBILL} PARKER
Routing Sequence :
Name
Accounts Payable
Routing
Status
Date Date
Assigned Action
Taken
Invoice Action I Comments
CURRENT 05/21/2010 .
Route for Info Only (CC List)
Select the CAS representatives to be included in the E-mail list by clicking "Add
Users to Email list" button
€'!:'i "• • ... ·, ..• t ...• -··'''·
Top of Page
Home I What's New I Search I Copyright I Privacy l Site Info I Feedback
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
https://c02.my.uprr.com/cam~admin/secure/standardWorkReport.jas 6/21/2010
INTEROFFICE MEMO
TO: Russ Wiles, Transportation and Public Works
FROM: Sarah Otis, City Secretary's Office
DATE: August 12, 2010
SUBJECT: IMPROVEMENTS TO EXISTING PUBLIC ROAD AT GRADE CROSSING
FOR LONG AVE (E/B AND W/B) STREETS, DOT 795426R AND DOT
796427X M.P. 749.31 AND 749.39 CHOCTAW SUBDIVISION.
These documents are being forwarded to you for original signatures from Union Pacific. All signed
copies of the contract must be returned with original signatures for final processing.
Failure to return the documents will delay the final processing of the contract. Once we have
received all of the documents, we will assign a contract number. Thank you in advance for your
cooperation.
If you have any questions, please call me at 817-392-6090.
Attached: 2 sets of the contract
fORTWORTH
INTEROFFICE MEMO
TO: Mamie Anding, Traffic Services Division
FROM: Allison Tidwell , City Secretary's Office
DATE: December 7, 2010
SUBJECT: CONTRACT COPIES
It is the responsibility of the originating department to provide more than one hard copy of the
contract if they wish to have a copy returned to them. Due to budget constrains, the City
Secretary's Office is no longer providing hard copies for the department after the has been
processed. This is the standard procedure for all departments.
In the future, contracts will be returned only if an additional copy is provided. Thank you in
advance for your cooperation.
If you have any questions , please call me at 817-392-6090.