HomeMy WebLinkAboutContract 41332-CO7City of Fort Worth
Change Order Request
CITY SECRETARY
CONTRACT NO. L\ l 3 3~ -Co I
Change Order No . Date TPW Project No . Funding (FAC )
7 (seven) 3/27/12 C 234 541200
207060162780
Facil ity and Project Description City Secretary Contract No.
East Multi-Purpose Facility WRMC
ORIGINAL CONTRACT AMOUNT ............................................................... .
EXTRAS TO DATE .................................................................... .
CREDITS TO DATE ................................................................... .
CS-41332
$15,443,305
$ 2 ,856:974
$ 0
CONTRACT COST TO DATE ......................................... : ....................................................... .
AMOUNT OF PROPOSED CHANGE ORDER ........................................................................... .
REVISED CONTRACT AMOUNT ............................................................................................ .
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... .
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ .
ADDITIONAL FUNDING (IF NE:CESSARY) ............................................................................... .
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL;
Furnish all labor and material as per the attached Propose Change Requests
PCR 57 (revised), 65 , 94 , 100, 101 , 102 , 105, 108, 109, 110 and PCR 113
ADD $45,44 0
$18 ,300 ,279
$ 45,440 ,
$18 ,345 ,719
$ 436 ,000
$ 390 ,560
$
It is un derstood and agreed that the acceptance of this Change Order by the co ntractor constitutes an accord and satisfaction and rep resents payment in full (both t im e
and m oney) fo r a ll costs ari sing out of, or in ci denta l to , the above Change Order
Con t ractor's Name
Rogers - O 'Brien Construct ion Company, Ltd .
Orig ina l Contract Ti me Additiona l Ap proved Tim e To Dat e Approved Contract Time To Date Additional Ti me For Th is Change Order
590 cd O cd 590 cd O cd
Date :vz~z
Date
~J;.e/,,-
~a ~ Y7.a
Date Council Action {If Required } , 11
11 l( 0 Approved O Disapproved N ft -1,.., / 7-D Other
Date
~Ufe-
Date
V30/ZtJ, ~ GR'/
Date
~/1%
Change Order 7 East Multi-Purpose Facility WRMC
PCR 57-pricing correction to amount listed on CO 6 ADD $ 1,399
PCR 65-Building A duct relocation ADD $ 3 ,114
PCR 94 -add waterproofing @ Building A Ramp columns ADD $ 4 ,058
PCR 100-add CO monitoring @ Buidling B ADD $ 12 ,303
PCR 101-add concrete footing for emu wall @ stair B ADD $ 1,134
PCR 102-revise headers @ doors RD-6 and RD 7 ADD $ 3 ,294
PCR 105-paint exposed emu @ roof Building A ADD $ 1,505
PCR 108-Install power boxes in Watt Drive ADD $ 7 ,311
PCR 109-add power for temporary cell tower ADD $ 3 ,224
PCR 110-add heater and door louver to elevator
equipment room ADD $ 2 ,427
PCR 113-add stamped concrete @ Bass Building sidewalk ADD $ 5,671
Total This Change ADD $ 45 ,440
Page 1 of 1
Durham, Jack
From: Trey Carroll [tcarroll@rogers-obrien .com]
Serit: Fr iday , March 23 , 2012 3 :51 PM
To: Durham, Jack
Subject: WRMC ~CR# 57 Price Discrepancy
Jack,
For CR# 57 the difference in the $9,086 you showed on Change Order# 6 and the CR amount of $10,485 .00 is
the (4) roof drain frames provided by NASCO . I am sure at one time I had this put together w ith out t hat number
and then rev ised the change request to include it. I don 't think the change request was ever subm itt ed for
approval at the $9 ,086 number. I would have kept a copy of it and had it in my files. Anyway, that is where the
difference comes from in the (2) numbers .
Thanks ,
Trey Carroll
Senior Project Manager
Rogers-O'Brien Construction
1901 Regal Row I Da llas , TX 75235
T 214 .962.3000 IF 214 .962 .3075 IC 214 .212.1318
tcarroll@r-o .com I www.roge rs-obrien.com
03 /27/2012
Rogers-O'Brien Construction
December 31, 2011
City of Forth Worth
401 West 13th Street
Fort Worth, TX 76102
Ph : (817)392-7913 Fax : (817)392-8488
ATIN : J ack Durham
RE:RFI # 85 -(4) Roof Drains Added@ Canopy 'C'
10022 Will Rogers Memorial Cntr East
Cha nge Request# 57 ~
Dear Jack:
Per RF I # 85 response , added roof drains at Canopy 'C' between grid lines CG/ CH and CJ /CK at high
flat roof areas that were not previously shown. Total of (4) roof drains added including roof dra ii n frames
with drainage pipe connections added to exi sting roof drains . Dra inage piping extended below existing
stee l beams to make tie-ins .
Attached please find our pricing for the above referenced revision item.
1901 Regal Ro w
Dallas, Texas 7523 51-he total amount to provide this work is :
Main 214.962.3000
Fa x 214.962.30 01
Please note the attached exclus io ns/qualifications.
39 01 S. Lamar Blvd. #200
$10,485 .00
Austin, Texas 78704
Ma in 512 .4 85.3sod f you have any questions or need further clarification , please contact me at (214)962-3000.
Fax 512.486.3701
www.rogers -obrien .co m
Trey Carroll
Rog ers-O'Brien Constructio n Co
OW NER AUTHORIZED SIGNATURE
ATIA CHMENT
Dallas J Austin
Change Request 57 Price Breakdown
J ob Name: Will Rogers Memorial Cntr East Date: 12/31/2011
Description: RFI # 85 -(4) Roof Dra in s Added @ Canopy 'C' Change Request #:57
Labo r Material
N o Description QTY Unit Unit Total Unit Total Equipment S ubcontra ct Other Price
1 Added (4) Roof Drains 7,86 7.11 $7,867 .11
2 Roof Drain Frames -F & I 1,211 .14 $1,211 .14
****EX CLUS IO NS AND QUALIFICATION S**** Subtotal: $9,078.25
See attached backu p for labor, material and subcontractor and Overhead 10.00% $907.83
supplier detail. Fee 5.00% $498.92
Price excludes all federal, state and local fees .
Price does include sales and/ or remodel taxes .
Written authorization and/ or signat ure on this PC required prior to
performing the above described work.
Total : $10,485.00
Project;
Number:
10:
From:
Subject:
Sent Vic!:
RFI ID:
Discipline:
Received:
Question:
Hahn1eld
Hoffet'
Stanford
RFI Response
Transmittal IO:
Date Sent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent r.1acDonald
Rogers-O'Brien Construction Co .
1901 Regal Row
Dal las, TX 75235
214-962-3000 (Phone)
214-962-3001 (Fax)
Gary Ryan
Hahnfeld Hoffer Stanford
200 Bailey Avenue, Suite 200
Fort Worth, Te x as 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fax)
Unit 'C' Roof Drain Coordination
Info Exchange
00085
8/8/2011
00579
8/29/2011
A.C6 depicts 4 roof drains cind 4 overf/c,v., scuppers at the roof between grid
lines CG/ CH and CJ/ 0(, hovvever, detail 2/P.Cl. l only depicts roof drains
serving column fine CF and South of CF as well as CL and r..Jorth of CL. Please
confirm additional roof drains will be required and provide detai'ls. for routing
drainage lines thro-ugh beams at grid lines CG and CK and c;.onfirm :sizing of
current roof drainage system is adequate for the additional /'oad.
Suggestion:
Answer:
CC:
Cont~nts
QU3ntity
1
Four additional roof drains have been added -refer to attached sketch
XP .Cl.1.
It appears there is space to route the pip ing from the new roof drain with out
intersecting a beam.
Sean Rath (Baird, Hampton & Brown)
Jeff Westhoff(Hahnfeld Hoffer Stanford)
Tommy Deeds (Hahnfe:ld Hoffer Stanford)
D3ted Description
8/25/2011 XP .Cl.1.pdf
C on
EB z
@
EAS T MULTI-PUR PO SE FA CI LI TY
WILL ROGERS MEMORIAL CENTER
CI TY OF FOR T WORTH
FORT WO RTH, TEXAS
~~ -ic
0 ~ ~ CJJ · -"'z
G)
C
iJ
iJ m
JJ
r
~ m .r .
"[J
~ z
(')
)> z
0
~
C z
=i
(')
s
D
Hahnfeld architects
Hoffer planners
Stanford interiors
JJ m
(J)
iJ
0 z
(J'J
m
-i
0
:0 ,,
'il:
OJ
Ul
200 Bail e y Ave., Suite 200
Fort Worth, Texas 76107
817 .921 .5928
fax 817 .302.0692
HIDALGO
IN DUSTRIAL SERVICES, INC.
Hidalgo Industrial -Change Order Reques t
Date: 16-Dec-11 Hidalgo Job No .: _0_3_-3_2_1_02_0_-_0 ____ _
Change Order Req. No .: #21 Customer PO/Contract#: 10022-15-01 S
Owner/ Contractor Rogers O'Brien Contact _T_re~y_C_a_r_ro_ll ____ _
Description: RF! 85 Additional Roof Drains for Area C
LABOR
Descri ption Hou~ Ra~ Total
Operator ! X I $ 26.00 I $
Sheet Metal Journeyman ! X I $ 24 .00 I $
Plumber Apprentice ,--X---,-$---1-9-.0-0-1-$'---------
Plumber Journeyman 80 I X I $ 24.00 I $ 1,920.00
Supervision I X I $ 28.00 I $
-P-ro-'-j-ec_t_M_a_n_a_g-er---------+--·-1-_-0--r-x I $ 35.00 I $ 35.00
MATERIAL
Description
see attached
SUBCONTRACTORS
Contr actor
RENTALS
Description
boom lift rental
diesel charge
I
I
I
Qty
X
X
X
X
X
Contractors Name
Rate Qty
$750 .00 1
$20.00 5 ..
Subtotal: [___ $1,955.00
Labor Burden: (3"5% $684.25 =========== T otal Labor Cost: $2,639.25
Unit Price
3289.84 [
Subtotal:
Subtotal :
Period
WE E K
DAY
Rental Tax 8.25 %
Subtotal:
Total
$3,289.84
$3,289 .84
Total
$0.00
Total
$750.00
$100.00
$61 .88
$911.88
Labor $2,639 .25 RECA=P=================================================:============~
Schedule Impact:
Number of Days Impacted:
Remarks :
None
0
Materials
Subcontractors
Rentals
Subtotal
Subcontractors
Overhead
Margin
Sales Tax
T otal Cost
$3,289.84
$0 .00
$911.88
$6,840 .97
0% $0.00
10% $684.10
5% $342.05
0.00% $0.00
$7 ,86 7.11
Takeoff Sheets RFI 85
Quanity Describtion of Material Unit Price Extended Price
4 5x4 NH wye $42.80 $171.20
30 4" NH 1 /4 bend $14 .00 $420.00
140 4" NH Pipe $8.23 $1,152.20
16 6" Clevis Hangers $5.50 $87.96
8 4" riser clamps $5.51 $44.10
68 4" HD NH Couplings $9.95 $676.26
8 5" HD NH Couplings $20 .52 $164.16
4 4" roof drains $143.49 $573.96
G rand Total $3,289.84
MORRISON SUPPLY COMPANY -04
Quoted 12 /16 /11
Quoted by 1875
Customer Bid Date
Customer Numb er 04HIDI
Customer:
HIDALGO INDUSTRIAL SERVICES
2535 BRENNAN AVE.
FT. WORTH
Comments:
LI QTY
10 4
20 30
3 0 140
40 16
5 0 8
60 68
70 8
TX 76106
PART NO. VENDOR P/N
NH 133 0 NH20
NH0194 NH4
NH0162 NH2
GR721 0 260 6 BL
GR7680 261 4 BL
GK6114 2010
GK6115 20 12
**** FORMAL QUOTATION****
Expiration date 01 /15/12
Phone 817-336-0451
J ob Numbe r
Job:
WILL ROGERS
DESCRIPTION U/M
5X4 NO -HUB WYE EA
411 NO -H UB 1/4 BEND EA
4X 10 FT NO-HUB SOIL PIPE FT
6 BLACK CLEVIS HANGER HVY DUTY EA
4 BLACK RISER CLAMP EA
4" HUSKY HD-200 0 NO HUB COUPLING EA
5" HUSKY HD -2000 NO HUB COUPLING EA
* * ** FORMAL QUOTATION *-* **
12/16/2011
Quote # Q0489495
Salesp e rson 0418
UNIT PRICE TOTAL PRICE
42.8000 171. 20
14.0000 420 .00
8.2300 1152. 20
5 .4973 87 .96
5.5131 44.10
9.9450 676.26
20 .5 200 164. 16
2715 .8 8
FOB SHIP POINT
TERMS ST ANDARD
Page 1
City of Fort Worth
Will Rogers Equestrian Multi-Purpose Facility
Sub Contractor's Summary
Scope of Work Desert tlon:
Trade : Steel Fabrication & ErecUon
Sub's Name: NASCO Steel
Project: WIii Rogers Multi-Purpose Facility
Date: 1/23/12
~"M I
AdO.' Rool Dales ~ c.,,., 'C ·:::::::::==::::::==:::: . :::: : :: :: : : : : : : :: = ::::::: : : :::: =:: :::::::::::::::::::::::::::::::::::::::::::::::=::::::::::::::::::::::::::::::::::::::::: = : : : = = == : : = . : ~ : : ~ ---~:
Scope of Work Description I Materials I Units I Labor I Equipment l Total Cost I Item DBScr1ptlon I UOM I Qty I Cost Per Unitl Tot al I per MH I MHRS I Rate I Tota! I Eq. Type I# Hra. I Rate I Toi.Bl
Subtotals --------------... --L------..... ------------.. ---~-------i------------!--------!-s1 .o~.11_J_ ___ .. __ .. __ j _____ .............. -!. .. --.... --!.-..... so.~------................... -~---o.o J ...................... .!.. ........ ro.oo i .......... $1,053.1,?
I t I I I • I I I I I I I I _______ .. _ ................................... + ...................................................... C"' .............. ~ .......... -.... -.,-·-----.... J ...................... + ....................... .,t ..... ----------~------k.. ...,:....{------------------r------i-------. -~~--------------
• • I I I I I I 4 :::11....::: I I I ~ .. c:.;:,-~
----------------------------f------·---------------~---f---1 -----· 1= ·-1 ··-l---~ -· + -__ -~i~ub-Contract ors Protl f & Ove~head ----1 ..,,. 15.00%t ·--·--$157.98
Total CO No . I I I I I i1,053.11 I I I I so .00 1 I 0.01 I $0.1SI S1,211.14
Page _1_ of _1_
~~~
Cfl•l
Rogers-O'Brien Construction
February 23, 2012
City of Forth Worth
401 West 13th Street
Fort Worth, TX 76102
Ph: (817)392-7913 Fa x : (817)392 -8488
ATTN: Jack Durham
RE :RFI # 95 -Unit 'A' 1st Floor Exhaust Duct I Structure Conflict
10022 Will Rogers Memorial Cntr East
Change Request# 65
Dear Jack :
Per RFI # 95 response , modify the (4) exhaust ducts serving the first floor of unit 'A' per revised ductwork
layout drawing "XM.A 1.1" dated 9/14/2011. The dry-type sprinkler system piping was manufactured prior
to the change being issued and required demolition, cost includes these additional modifications to
accommodate the revised ductwork layout which now requires sprinkler coverage ·to be routed below the
ductwork.
90 R l R Attached please find our pricing for the above referenced revision item . 1 1 ega ow
Dall as, Texas 75235
Main 214 .962.300 °The total amount to provide this work is : $3,114 .00
Fax 214.962.3001
3901 s. Lamar Blv d. #200 Please note the attached exclusions/qualifications.
Austin, Texas 78704
Ma in 512 .486.3800
Fax 5l 2.486.3701 lf you have any questions or need further clar ification, please contact me at (214)962-3000 .
www.roge rs -ob ri en.com
Sincerely,
#2~
Trey Carroll
Rogers-O 'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATTACHMENT
Dallas I Austin
Change Request 65 Price Breakdown
Job Name: Will Rogers Memorial Cntr East Date: 2 /23 /2012
Description: RFI # 95 -Unit 'A' 1st Floor Exhaust Duct/ Structure Conflict Change Request #:65
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price
1 Fi re Protec tio n Subc on tra ctor 2,696.00 $2 ,696 .00
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $2 ,696.00
See attached backup for labor, material and subcontractor and Overhead 10 .00% $269.60
supplier deta il. Fee 5.00% $14 8.40
Price excludes all federal , state and local fees .
Price does include sales and / or remodel ta xes.
Written authorization and/ or signa t ure on th is PC req uired prior to
perform ing the above described wo rk.
Tota!: $3,114.00
----+~--Ha:hnfeld---------------·· ····-------------------'if.ffl Hoff et' -~tY Stanford
-:: .... ..,:-:1 ·: -·:-··isr'.:t::~:.:,j .:~·: E::11 -:: -··-=..,1-'= .=1 .. t-: ~.: F:-t · .. :i""t·, T-=-·.=.~ :,,:~:,:
Project:
Number:
To:
From:
Subject:
Sent Via:
RFI IO:
Discipline:
Received:
Qu~stion:
Suggestion:
Answer:
CC:
Contents
RFI Response
Transmittal IO:
Date Sent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent MacDonald
Rogers-O 'Brie n Constructio n Co.
1901 Regal Row
Dallas, TX 75235
214-962-3000 (Phone )
214-962-3001 (Fax)
Gary Ryan
Hahnfefd Hoffer Stanford
200 Ba iley Avenue, Suite 200
Fort Worth, Texas 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fax)
Unit 'A' First Floor Exhaust Duch'v'ork / Structure Conflict
Info Exchange
00095
8/30/2011
00602
9/14/2011
Detail 1/M.Al.1 depicts the 34-" x 34" ductwork with (4) 48" x 30'1 grilles for
fans VF-lA thru 1D ruming tight to the bottom of the pan deck structure.
Detail 1/S.Al.2 depicts disbibution joi sts running North to South halfway
between column lines 2 &. 3 which conflicts with the ductwork. See attached
screenshot and provide direction .
Please proceed as indicated in the attached sketch.
Sean Rath (Baird, Hampton & Brown)
Jeff Westhoff (Hahnfeld Hoffer Stanford)
Tommy Deeds (Hahnfeld Hoff er Stanford)
!Qu3ntity /oated !Description
1-1~-~--j 8i30/2011 I RF! -95.jpg
-----------------------------------~
C)/\
I E8N (i) ~.E_C;,~~NICAL FLOOR PLAN !-LEVEL 1 -UNIT A
I
I
I
I
I
I
-------~-
REVISION TO RFI #~)5 RESPONSE
1ru L_ __ \ ___ ....1..... _________ ~
--'''O?''f ,,, --01; ......... <_/-,, .:c;: .. · ,,.A = ··.;'.r ,,
:*,' t ~ ',* 11 :!'.: ................... :·.~-~
~ .. ~.~~-~1.~ .. ~)~~.?:'!~ .. :
I • •• ,?, 60 17 1 " :c,_.: ··tcv.~5'-)W -~s~{jt!l-h~
o?-N-11
r;;;-i D 1=J 811lrd, Hampton & Brown, Inc.
l=:J D l...:::J Engineering & S u rveying
t») • .,, .. , ''-''• f ..,t, 1M h •~I". to 1~11, 1,1 [tiJ)IU •U U lo, (lll)Jli•Ud (•1'-I .,_.._,._.,,..
BMB PROJ(CT I 2009. 1 !,,t.000 !f)IJ.S R(GIS1nA 110N llO. r-0000 ·1'1
I
JOB l,'O 010 11 0 1
OAI E· 14SEP2<!11
~,m , XM .A1.1
----------------------------------------------------------'--'
Feb. 9,2012
Mr. Brent Macdonald
Rogers O'Brien
1901 Regal Row
Dallas, Texas 75235
Re: Will Rogers
RFI #95
Brent:
--·T -EXA-s
SPRINKLER
We are requesting a change order in the amount of $2,696.00 (two thousand, six hundred
ninety-six dollars and no/100). To demo two branch lines, return to jobsite once duct is
installed and then refabricating lines to accommodate new duct layout which will include 4
new upright heads, two gang drains and two new drum drip assemblies ...
Design 2 hours@ $95.00 ea .
Demo Labor 8 hours @ $ 28.00 /hour
Trip Charge
Equipment 2 days @ $40.00 ea.
Installation Labor 32 hours@ $28.00 ea.
Material (Break-out below)
(Tax exempt)
Sub Total
OH&P 1510
Total
$
$
$
$
$
$
i
$
i
$
190.00
224.00
175.00
80.00
896.00
779.00
0.00
2,344.00
352.00
2,696 .00
Please -si-gn-and -fax-hack for dire-chons to pro-ceed. If you h-ave any-qoestrons,-please do ·
not hesitate to contact me
Sincerely,
~~
Project Manager
Brent Macdonald
Rogers O'Brien
Date
TEXAS SPRINKLER
609 INDUSTRIAL BLVD• GRAPEVINE , TEXAS 76051
(817) 416-0160 • FAX : (817) 416-0862
Rogers-O'Brien Construction
February 23, 2012
City of Forth Worth
401 West 13th Street
Fort Worth, TX 76102
Ph: (817)392-7913 Fax : (817)392-8488
ATIN: Jack Durham
RE:RFI # 145 -Bldg . 'A' Waterproofing@ Ramp Brick Columns
10022 Will Rogers Memorial Cntr Ea st
Change Request # 94
Dear Jack:
Per RF!# 145 response , added WR Meadows liquid membrane to the sheathing at the 5 brick columns
along grid line 'U' in building 'A'.
Attached please find our pricing for the above referenced revision item.
The total amount to provide this work is :
1901 Regal Row
Dallas, Texas 75235
Main 21 4 _9623000 Please note the attached exclusions/qualifications .
Fax 214.962.3001
$4 ,058 .00
3901 s. Lama r Blvd. #200 1fyou have any questions or need further clarification, please contact me at (214)962-3000.
Austin, Texas 78704
Main 512.486.3800
Fax 512.486.3701
www.roge rs -obrien .com
Trey Carroll
Rogers-O'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATIACHMENT
Dallas I Austin
----------------------------------------------------
Change R..fil)uest 94 Price Breakdown ______________________________ -______________ _
Job Name: Will Rogers Memorial Cntr East Date: 2/23/2012
Description: RFI # 145 -Bldg. 'A' Waterproofing@ Ramp Brick Columns Change Request #:94
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price
1 Waterproofing Subcontractor 3,514 .00 $3,514 .00
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $3,514.00
See attached backup for labor, material and subcontractor and Overhead 10.00% $351.40
supplier detail. Fee 4.98% $192 .60
Price excludes all federal, state and local fees.
Price does include sales and / or remodel taxes.
Written authorizatio n and / or signature on this PC required prior to
performing the above described work.
Total: $4,058.00
---~i!i ----Hahnf e I <f
-;;:-· .~· --Hof-fe-i'----------'-
·~ Stanfon:f
Proje-ct:
Number:
To:
From:
S ubj ect:
Sent Via:
Rfl ID:
Discipline:
Recei'ved:
Question:
~~s1gestion:
Answe r:
cc:
RFI Response
Transmittal ID:
Date Sent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent l\·la cDon aid
Rogers-O 'Brien Construction Co.
1901 Regal Row
Dallas, TX 75235
214-962 -3000 (P ho ne)
214-962-3001 (Fax)
Gary R·ran
Hahnfeld Hoffer St anford
200 Bailey Avenue, Suite 200
Fort Worth, Texas 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fa x)
Unit 'A' Waterproofin,;:i at ~Jorth Columns alon,;i Grid Line 'U'
Info Exchange
00145
11/14/2011
00845
11/16/2011
Details 8/A.AS .6 depicts thru -1Nall flashing at the base of the brick columns
along grid lin e 'U .. ' Pfease confirm liquid 111embr.3ne 'Nill extend from the concrete
plynth to the underside of the deck on all four sides of these 5 brick columns.
Confirmed
Jeff VJesthoff(Hahnfeld Hoffer Stanford)
Tommv Deeds (Hahnfeld Hoffer Stanford)
()/1
ROOFING & SH EET M ETAL
Modified Bitumen
BUR
EPDM
TPO/PVC
Metal
W ATE RPROOFI NG &
CAULKJNG
Join t Sealants
Expans ion Jo ints
Membrane Waterproofing
Elasto meric Coati ngs
Wate r Repellents
Waterblasting
Concrete/Masonry Repair
Damproofing
Flashing
Traffic Coati ngs
ROOF MAINTE NAN CE &
LE AK RE PAI R
Building Surveys
Leak Repair
Roof Maintenance
DALLAS / FT. WORTH LO CATIO N
2346 Glenda l ane
Dallas, TX 75229
214.273. 9110 / 81 7.237 .1927
214.273.9 120 / 817.237 .2676 fax
OTHER LOCATIO NS
Houston
A ustin
San Antonio
Oklahoma Ci ty
February 13, 20 12
Rogers O' Brien
Attention : Brent McDonald
Will Rogers Memo ria l Coliseum Project
RE: WRMC -RFI 145 W aterproofi ng
Dea r Brent:
-~~"
·CHAMBERLIN
Roofing & Waterproofing
Pl ease see the cost be low to furnish all labo r, materials, tools, equipment, and insurance necessary to fully perfo rm and
complete the following scope of work:
Install WR Meadows Airshie ld LM P at interio r sheathi ng at brick columns located along grid U per RFI 145 .
• Approx 1340 SF
To t al __ .. _. ____ ._. __ ..... __ . _______________________ .... ________________________________ . __________ ..... __________ _. ___________ $3 ,514 .00
We propose to comp lete the waterproofing as described above, for the sum listed ab ove; excl ud ing 8.25% sales tax.
In co rporated Notes:
This offer is good for lhirty (30) days
All work to be performed during no rmal business hou rs
Owner/Contractor ag rees to f urnis h: complete access to work areas, dumpster, toilet facilities, potable water, and all electrical power, as requi re d, at no
addilional cost to Chamberlin
All surfaces .to be given to Chamberlin in a sm ooth, broom clean condition, free of contaminants, form oils, release agents, voids , fins, and projections
Chamberlin is not responsible fo r recogn iz in g, locating, or removing asbestos, PCB's, or other hazardous materials.
Chamberlin is licensed, certified or approved to install the systems described above
Unforeseen conditions or circumstances are not assumed nor anticipated in the scope of work proposed above and will be brought to your attention
immediately upon discovery by Chamberlin personnel for a prompt resolution
Chamberlin's standard warra nty excl udes: failures caused by fai lure of the substrate, moisture vapor transm ission or hydrostatic pressure, abuse , conditions
that exceed the limitations of the materials, sufficie nc y of the design; removal and replacement of overburden materials: incide ntal and consequential damages
All colors are to be selected fro m the manufacturer's standard col ors
Pricing is contingent on mutually agreeable contract terms , conditions, and proper coo rdination of the work
Time and material work will be comp le ted at $48.00/ man-hour with 20% mark-up on materials
Samples of products or systems presented for review are intended only to pro vide a general representation and not necessarily an exact replica of the
products or systems to be furnished or installed
Please be advised that the products and methods outlined in th is proposal are based on our visu al survey, plans, specifications, or ou r practical experience in
resolving similar problems for ou r customers: we are not design professionals, architects, or registered engineers. and are not responsibl e for determining
bu il ding code compliance and do not perform design services
For C IP, not withstanding anything to the con trary the CIP deduction, contract reduction, is lim iled to the amount or insurance premium that will be saved by
Chamberlin due to the provi sion of insurance by Genera l Contractor to Owner. Specifically, but not limited to. excess-umbrella coverage, on which Chamberlin
has a flat fixed premium where there will be no deduct provide as there is no savings to benefit Chamberlin.
The proposal is not fo r the sale of goods, but rather a service contract for the installation or application of products, sys te ms or materials. Therefore , T H E
IMPLIED WARRA NTI ES OR MERCH ANTIBILITY AND FITNESS FO R A PARTI CUL AR PURPOSE A RE HE REB Y EXC LUDED.
Excl udes building permit, P & P Bonds, overtime, window cleaning, accelerated schedules, field or laboratory testing, mockup s, liq uidated damages, temporary
facilities or utility hook-ups or nigh t or weekend work.
This propos al EXCLUDES any reference !hat Chamberlin has fully examined and analyzed all site conditions that may affect performance and to affirm no
conditions exist that may affect the progress, performance or pr ice of the work. lf physical conditions are of an unusual nature that differ materially from those
ordinarily found to ex ist and generally recognized as inherent in construction activities of thal lype, Chamberlin will immediately stop working in the area and
provide written notice promptly and before the conditions are disturbed, in addition Chamberlin may be entitled to an equitab le adjustment in the contract sum,
contract time or both.
We appreciate the opportunily to submil our proposal for this project. Chamberlin has been in business over 100 years. We would like to be your "Si n g le Sourc e"
contraclor fo r everything from waterproofing to caulking lo traffic coatings to roofing . We are financially sound and professionall y capable and will perform !he work
right-the first time. We would like the opportunity to review the scope of thi s proposal wi th you soon. Please call if you have any questions.
Sincerely,
CHAMBERLIN ROOFING & WATERPROOFING
Rya n Grigsby
Project Manager
Accepted by (signature): __________________________________ _
Printed Name & Title : Date _________ _
-YOUR FAXED SIGNATURE ABOVE WILL BE TREATED AS A FULLY EXECUTED ORIGINAL CONTRACT-
' \ '
PENDING CHANGE ORDER ESTIMATE SHEET
IOBNAME: Will Rogers Memorial
-OCAT!ON: Fort Worth, TX
~ST.:
)ESCR1PT: RF! 145
FOOTAG E DESCRJPTION (LAB OR)-PRODUCT NAME
1320 WR Meadow s Airshield LMP
0
MlSC. JOB EXPENSES
EQU1PMENTffOOLS-RENTAL OR PURCHASE
HOTEL
PER DIEM
fRAVEL
PRODUCTION
RATE
400
CONTRACTOR:
ARCHITECT:
CHECKED BY :
BURl)EN RATE:
PAGE NO:
RO BONDED:
Hahnfeld DATE:
RG BID DATE:
58% TAX ON MATERIALS:
NO
13-Feb-12
13-Feb-12
NO
Rogers-O'Brien Construction
February 23 , 2012
City of Forth Worth
401 West 13th Street
Fort Worth , TX 76102
Ph : (817)392-7913 Fax: (817)392-8488
ATTN : Jack Durham
RE:RFI # 169 -Add ition of CO2 Mon itoring @ Garage 'B '
10022 Will Rogers Memorial Cntr Ea st
Change Request# 100
Dear Jack:
Per RFI #169 response , provided (6) CO2 monitoring stations in unit 'B' per owner's request for minimal
stations required to adequately monitor emissions and commun icate to fans V F-3A , VF-3B and VF-4 to
turn on in the event that emissions levels exceed acceptab le level. Price includes additional co ntrol panel
and controller.
Attached please find our pric ing for the above referenced revision item.
1901 Regal Row
Dallas , Texas 75235 The total amount to provide th is wo r k is : $12 ,303.00
Main 214.962.3000
Fax 214.962.3001
Please note the attached exclusions/qualifications .
3901 S. Lamar Blvd. #200
Austin, Texas 78704
Ma in 512 .4 863800 If you have any questions or need further clarification, please contact me at (214)962-3000 .
Fax 512.486.3701
www.rogers-ob rie n.co m
Sincerely, ~er
Trey Carroll
Rogers -O'Brien Const ruction Co
OWNER AUTHOR IZED S IGNATURE
ATTACHMENT
Dallas I Austin
Change Request 100 Price Breakdown
Job Name: Will Rogers Memorial Cntr East
Description: RFI # 169 -Add it ion of CO2 Mon itoring @ Garage 'B'
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment
1 CO2 Moni to rs
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal:
See attached backup for labor, material and subcontractor and Overhead
supplier detail. Fee
Price excludes all federal , state and local fees .
Price does include sales and / or remodel taxes .
Written authorization and / or signature on this PC required prior to
performing the above described work .
Total:
Subcontract
10,652 .34
Date: 2/23/2012
Change Request #:100
Other Price
$10,652.34
$10,652.34
10.00% $1 065 .23
5.00% $585.43
$12,303.00
Project:
Numb e r:
To :
Fro m:
S ubject!
S e nt V i a:
R H ID:
Hahn1eld
Hoffer
Stanford
RFI Response
Transmittal ID:
Date Sent:
070 15 -0 1 WRMC East Multi-Purp ose Buildi ng
070 1 5 -0 1
Br ent MacDonald
Ro g e rs-O 'Brie n Co n structio n Co .
1 901 Reg a l Row
Da llas, TX 75235
2 14 -962 -3000 (Pl1one)
21 4 -962-3 00 1 (Fax)
Ga,,f Rya n
Hah nfe ld Hoffer Stan ford
200 Bailey Avenue, Su ite 200
Fo rt Wo rtl11 Tex a s 76107
(8 1 7) 921 -5928 (P hone)
(8 1 7) 302 -0692 (Fa x )
00955
2/7/2012
Un it 'B' CO2 Sensor Contro l fo r Fans VF-3A .. VF-38 and \JF-4 Cldrification
Discip lin e :
-a~g;r: I~'\
Recei've d:
Q u estio n :
Suggesti o n :
A.nswer;
CC:
Co ntents
Q U ,311 t it'{
1
1/12/2012
A t the ov,mei-'s requestr Johnson Controls ini t i.~l ly provided .:::i CO2 monitoring
system proposa l for unit 'B' that mirrored the system in unit 'A'. In an effo r t to
min i mize cost in providing CO2 monitm-ing for the lov,ter level of the garage, w e
'NO u l d like to r edu c e the number of CO2 sens ors requ ired a n d only locate
sensors in the areas V•ihere CO2 levels are pote n t ially h i ghes t . Please provide
a layout proposa l for the m i nimum number of CO2 sensors required t o mo n itor
CO2 emiss io n s for the first l eve l of unit 18 1 (i.e. the South w est and Northeas t
corne rs of u nit 'B '), Si n ce Bldg, 'A ' CO2 se n sor lo ca ti ons wern provi de d by tl1e
eng ineer, Johnso n Controls will n eed the eng i neer to pro v id e layou t for se n sors
for the lower level of Garage 18 1•
See attached.
S..e.an Ratl -t (Ba ird , H.arnptc,n fa Brnwn)
Jeff Westhoff (Hahnfel d H offer Stanfot·d)
Tom m y Deeds (H a hnfeld H off er-Sta nford)
Alan Ba game ry (City of Fort wo,t ll)
I Dated Description
I 2/7/20 1 2 Respon s e to RFI 1 6 9 - M.Bl.1 .p d f
Se(}+ /,, f});rk rash / ~cl-/i,,A-t I i3/1rM_
:}"1-Ck pul ll-'7 on (;< / } ); ;;)_
0 0
HJ§li2tlt~1-r-----r-,,1-,-,---i1-,1-----r---,1~'li.WP. .__,,~--{
,, ......................... ,..,. .. .... ,o.,n,...a,s1>•.:n•1.,:en,.,
v110t1<1lt,;,,,,;,,~1tn1s
a
a
C
a
u:;u,·.,o.•""'"-.-:t,n1110 ,1 •,oncvo,io•,,:""·11.-11,1
"'IOl»n ... ll'uo..JU>tttU
@J
@J .
C
a
a
C
ffiJ a a a
"''ff;;'fj~
a a C a C
a C a a C
EB H G) .~.E.';'.)/NICAL FLOOR PLAN • LEVEL 1 • U NIT B
a a a a
C C a C
C a C a
a
a
•wc-,,-,01....c:1
"""''-"'"· vv,._ ... ,o:o1,11 " ............ ..
.... -....................... ..... 111..-,nwor,r,u;llO(:RtrfHI ""'ru,,om .. oru,c.o,ut1111.
a
a
(illfill
c;.i Of'-) Bair d, H1 mp l on & Bro wn, In c. ~ [J ~ .. Englnearlng,~ & Surveying
..., -..:u 1 ~.•->•--,u..s n.osto.,_ "° •--·
NOTES ,.~u0••·-Hahnfeld
Hoffer
Stanford
KE.Y~
m
200 Balley Ave .. Suile 200
Forl Worth. Toxos 76107
8 1 7.921.5920
IOJc. 817.302.0692
CONSl.l..lAN TS
O.,.M'iAY.\SSOOllfl,L"
11 \-SP!C.C,l"'IO'fl,(IOn u
c, .... [....,..<([l\V,~ :.:., ... rr,.,,..._c rc,;,.,....,,.,,cu.,11 ,.,
Ul 111.)\l, ··~· , ... , .... i»:, ..
urri,111VC1u.,,,,..r,11,,,H~.ut
l tMSll!(:.ST>UT'Olt,,1 r-UU s,,-,,,;,,.,.""r";.,,:1•
JJl,lt[l~l....,S>Jl'llo»
,.,..Sl <OA.ilfC!.I
11uo:... .... •
a:
LI.I ... z
LI.I
i'!: (.) _,
:::; ex:
c.:, a: c:i: 0 u.
w :E ::c: Cl) LI.I I-Cl)
0 :E cc: ~ ll.. 0 cc: Cl) ~ w
:::::, I-
ll.. c::: I-:i: I LI.I cc: .:: Cl ..... 0 cc: --' 0 u. :::::, c::: 0 :: u. 3:: ...I 0
I-::::! ~ I-
Cl) cc:
c:i: == c3
0 w u.
REVISIONS 111(1111 11 & MECHANICAL FLOOR PLAN
& .. 11c11,,. _._, • ..,, •• """' LEVEL l
UNITB
SI IEET
M.81 .1
Of 7/1.1 SI-IEETS
HIDALGO
. INDUSTRIAL SERVICES, INC.
Hidalgo Industrial -Change Order Request
Date : 6-Dec-11 Hidalgo Job No .: 03-321020-0 ---------Ch an g e Ord er Req. No .: #15 re v ised Customer PO /Con t ract #: 10022-15-01 S
Owner/ Contractor Rogers O'Brien Co ntact _T_re_.y_C_a_r_ro_l_l ____ _
Description: RFI 169 -Area B Carbon Mono x ide System -Per att ached
LABOR
Description
Plumber Apprentice
Plumber
Supervision
Project Manager
MATERIAL
Description
SUBCONTRACTORS
Contractor
1. Controls
RENTALS
Description
RECAP
Schedule Impact:
Number of Days Impacted :
Remarks :
None
0
Hours
I I X
I I
X
X
I I
X
8.0 X
I 2.0 I X
Qty
X
X
X
X
X
Contractors Name
Johnson Controls
Rate Qty
Rate
$ 21 .00
$ 28 .00
$ 19.00
$ 24.00
$ 28 .00
$ 35 .00
Subtotal :
Labor Burden :
Total Labor Cost:
Unit Price
Subtotal:
Subtotal:
Period
Rental Tax
Subtotal:
Labor
Materials
Subcontractors
Rentals
Subtotal
Subcontractors
Overhead
Margin
Sales Ta x
Total Cost
Total
$ -
$ -
$ -
$ -
$ 224 .00
$ 70.00
$294 .00
35 % $102.90
$396.90
Total
$0 .00
$0.00
Total
$8 ,8 66 .00
$8,866.00
Total
8 .25 %
$0 '.00
$396.90
$0 .00
$8,866 .00
$0 .00
$9 ,262 .90
0% $0 .00
10 % $926 .29
5% $463 .15
0.00 % $0 .00
$10,652.34
Mr B lain Morgan
Hidalgo Industrial
2535 Brennan Avenue
Fort Worth Texas 76106
Date : February 16 , 2012
Subject. Will Rogers Parking Garage
Blain ,
Johnson Controls, Inc.
Control s Gro up
Texas A rea Offi ce
3021 We st Be nd Driv e
Irving , T X 75063 -3116
T el. 972 /868 -4900
Fax: 972/869/94 21
This letter is per yo ur request fo r Johnson Controls to add the follow ing w ork to th is project.
Add 6 carbon mono xi de sensors to the Metasys System
Material $3120.00
6 carbon monxide sensors
One control pane l
1 ddc controllers
Electrical Labor
Technical Checkout
Overhead & Profit
T his work will be
Scott McCollam
$3200 .00
$1740 .00
$806 .00
$8866 .00
Rogers-O'Brien Construction
Fe bruary 23, 2012
City of Forth Worth
401 West 13th Street
Fort Worth , TX 76102
Ph: (817)392-7913 Fax: (817)392-8488
ATIN: Jack Durham
RE :RFI # 158 -Concrete Footing For CMU Walls Under Stairs
10022 Will Rogers Memorial Cntr East
Change Request# 101
Dear Jack :
Per RFI #158 response , provide 12" deep by 1 '-4" wide concrete footings for 8" CMU walls depicted in
detail 2/A.C9. Price includes dowels for CMU .
Attached please find our pricing for the above referenced revision item .
The total amount to provide this work is:
1901 Regal Row
Dallas, Texas 75235
Main 214.962.3000 Please note the attached exclusions/qualifications .
Fax 214.962.3001
$1,134 .00
3901 s. Lamar Blvd. #200 If you have any questions or need further clarification, please contact me at (214 )962-3000 .
Austin , Texas 78704
Main 512.486.3800
Fax 512.486.3701
www.rogers-obrie n .com
Sincerely,
~~
Trey Carroll
Roge rs-O'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATIACHMENT
Dallas I Austin
Change Request 101 Price Breakdown
Job Name: Will Rogers Memorial Cn tr East Date: 2/23/2012
Description : RFI # 158 -Concrete Footing For CMU Walls Under Sta irs Change Request #:101
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price
1 CMU Wall Cone. Footings 982.00 $982.00
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $982.00
See attached backup for labor, material and subcontractor and Overhead 10.00% $98.20
supplier detail. Fee 4.98% $53.80
Price excludes all federal, state and local fees.
Price does include sales and / or remodel taxes.
Written authorization and / or signature on this PC required prior to
performing the above described work.
Total: $1,134.00
Hahn1eld
Hoffer
Stanford
Project:
Number:
To:
From:
Subject:
Sent Via:
RH ID:
Discipline:
Recei'ved:
Question:
Jestion:
Answer:
CC:
Contents
RFI Response
. Transmitta l ID:
Date S ent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent MacDonald
Roa;iers-O 'Brien Construction Co.
1901 Regat Row
Da !l as, TX 7 5235
214 -962-3000 (Phone)
214-962-3001 (Fax)
Garf Ryan
H3hnfeld Hoffer St anford
200 Bailey Averiue, Suite 200
Fort Worth, Texas 76107
(817) 921-5928 (Phone)
(8li7) 302-0692 (Fa x)
John Justin CMU Fo oting Underneath Stair Clarification
Info Exch ange
00 158
12/1/20 11
00897
12/12/2011
Detail 2/A .C9 depicts c r·'1 U walls under-the stairs behind doors RD-6 ti-<. RD-7.
Please provide foundation deta il s and elevation to top of footing.
Ref: attached supp lementary sketch "SECTIO~J R.FI #158" by TD (Tommy
Deeds) for requested detail.
Jeff Westhoff (Hahnfeld Hoffer Stanford)
Tommy Deeds (H ahnf.eld Hoff er Stanfo rd)
Ma hendra Yaj n ik (MYD Structural Eng ineers)
_Qc_u_a_n_tit>y---'-·-' __ ]Dc!_t_e_d ___ ---,Descrip_t_ic_,n __________________________ ~
1 I 12/12/20T1 -15Ss.tYdf _j
[rne.st-C/4 y f-o,'l )
(51\_ 1z./,z,3
I
I
i
I
Ir ; )
. J/ : i
. j
e,l~M~
\.tl j i Y"Vf L,.. L.., ,-...:.---'---'-.:,,a
, i I I ;
! .
I ;
I
i
0
l i
l __ _
I
i
l I
; l~(
I
I
--.:....-'--~·
j
I
i.
'
l;
:..;
I
. I
!
i
I ;
i
' i
I
I
I
i
I
I
I
I
I
I
I
I
I
j
I
I
I
Grace Construction Co ..
Concrete Construction
11325 Tantor Rd . Ste 200
Dallas , Texas 75229
CHANGE ORDER REQUEST
To: Rogers -O'Brian Construction
1901 Regal Row
Daiias, TX 75235
Attn: Trey Carroll
Project: Will Rogers Memorial Center
1401 W.R. Watt Drive
Fort Worth, TX 76107
Thursday, February 16, 2012
Subject: See attached for additional cost to add spread
footings per the response to RFI #158
Change Order Request 11007-018
Labor $ 427 .00
Material $ 245.00
Equipment $ 82.00
Subcontract $ 100.00
Subtotal $ 854.00
Ov erhead & Profit 15% $ 128.00
Total Cost: $ 982.00
This work has been performed. We request that the Change Order to our contract be issued as soon
as possible. Should you have any questions, feel free to contact me.
Sincerely,
Bud Vore
Grace Construction Company
Phone : (972) 432 -0800 Fax: (972) 432 -0810
1 of 1
' ' ....
# rT
1
1
2
1
1
1
1
1
Grace Construction Co .
Concrete Construction
11325 Tanfo Rd . Ste 200
Dallas, TX 75229
DETAILED BREAKDOWN OF COSTS FOR RFI 00158
Labor
Burden
Category T:--Rate @20% ,...._,....,,
I 1111 t: vU::>l
Forema n 0 .0 Hrs $28 .00 $5 .60 $0 .00
Carpenter 5.5 Hrs $22.50 $4 .50 $148 .50
Laborer 5.5 Hrs $17.30 $4 .32 $237 .82
Iron Worker 1.0 Hrs $22.50 $4.50 $27 .00
Cement Finisher 0 .5 Hrs $22 .50 $4.50 $13 .50
$427.00
Material
Item QTY Price Cost
Formwork 53 SF $1.80 $95.40
Concrete 1 CY $60 .00 $60.00
Reinforcing 2 CWT $45.00 $90 .00
$245.00
Equipment
Item QTY Price Cost
Mini Excavator 0.34 DAY $240 .00 $81 .60
$0.00
$0.00
$82.00
Subcontract
Item QTY Price Cost
Concrete Pump 0 CY $ 30.00 $
Spoils Haul Off 1 Minimum $ 100 .00 $ 100.00
$
$
$
$
$
$ 100.00
$854.00
I
Rogers-O'Brien Construction
February 23, 2012
City of Forth Worth
401 West 13th Street
Fort Worth , TX 76102
Ph : (817)392-7913 Fax: (817)392-8488
ATIN : Jack Durham
RE:RFI # 159 -RD-6 & RD-7 Header Requirements
10022 Will Rogers Memorial Cntr East
Change Request# 102
Dear Jack:
Per RFI #159 response, provide fire rated header enclosures for doors RD-6 & RD-7 at the east side of
the John Justin Arena . Price includes fire caulking of penetrations, insulation as well as taping, bedding
and painting of the interior and exterior surfaces of the header.
Attached please find our pricing for the above referenced revision item.
1901 Regal Row The total amount to provide this work is:
Dallas, Texas 75235
$3 ,294.00
Main 214.962.3000
Fax 214.962.3001 Please note the attached exclusions/qualifications.
3901 S. Lama r Blvd. #200
Austin, Texas 73704 If you have any questions or need further clarification , please contact me at (214 )962-3000.
Main 512.486.3800
Fax 512.486.3701
www.rogers -obrien .co m
Sin~ll~
~ez
Trey Carroll
Rogers-O'Brien Construction Co
ATIACHMENT
OWNER AUTHORIZED SIGNATURE
Dallas I Austin
Change Request 102 Price Breakdown
Job Name: Will Rogers Memo rial Cntr East
Descripti on : RFI # 159 -RD-6 & RD -7 Header Requirements
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment
1 Fire-R ated Heade rs
2 Paint in g & Wall Coverings
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal:
See attached backup for labor, material and subcontracto r and Overhe ad
supplier detail. Fee
Price ex cludes all federal, sta t e and local fees.
Price does include sales and"/ or remodel taxes.
Written authorization and / or signature on th is PC requ ired prior to
performing the above described work .
Total :
Subcontract
2,318 .66
534 .00
Date: 2/23 /20 12
Change Request #:102
Other Price
$2 ,318.66
$534.00
$2,852 .66
10 .00% $28 5.27
4.97% $156 .07
$3,294 .00
0 Hahn1eld
Hoffer
Stanford
Project:
Number:
To:
From:
Subject:
Sent Via;
RHID:
Discipline:
Recei've.d:
Question:
Suggestion:
A.nswer:
CC:
Contents
Quan tit~,
1
1
YA\-
RFI Response
Transmittal ID:
Date Sent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent MacDonald
Ro,gers-O'Brien Construction Co.
1901 Regal Row
Dallas, TX 75235
214-962-3000 (Phone)
214-962-3001 (Fax)
Gary Ryan
Hahnfeld Hoffer Stanford
200 Bailey Avenue, Suite 200
Fort Worth ., Texas 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fax)
RD-6 & RD-7 Header Requirements
Info Exchange
00159
12)13/2011
00905
12/14/2011
RD-6 & RD-7 are scl1eduled to be full height doors. There cJre several utilities
such as sprinkler lines and se·Nage drain lines that run through the header of
the door. Please confirm the doors will be lowered to accommodate a maximum
opening' height of 11'-6." ;:md provide details for a fire rated header enclosure.
Please note that the support structure for the d'oor is an i ndependent system
from the header.
Install; the doors as high as possible and still be able to accommodate the
existing overhead utilities passing through tf1e header. The clear opening
hei:ght shall be as close to the scheduled height as possible (14'-0" + or-).
Install a 2 hour r:ated partition for the header equal to Underwriters
Laboratories (U.L.) Des ign No. U412 or U419 (attached).The outer fayer of tile
public side of assembly shall be water resistant and painted. Provide the
appropriate firestopping as specified for penetrati ons th r ough fire-resistance-
rated wall's.
Jeff Westhoff(Hahnfeld Hoffer Stanford)
Tommy Deeds (Hahnfeld Hoffer Stanford)
l oated Description
12/14/2011 ul412.pdf
12/14/2011 ul419.pdf
~ ~YIM GJ N? 5 b:J-, lJ.t viJ L ti-1-Le £r.1-J
I &yµr/-,
0.i \. 17-/2-3
J./o/-zoi-Z
~D Cf (}J'\~ c.. i tY1 !YU,' e.. r of\
S,R-v1-
-@ONLINE CERTIFICATIONS D IRECTORY
Page Bottom
Design No. U412
BXUV.U412
Fire Resistance Ratings -ANSI/UL 263
Design/System/Construction/ Assembly Usage Disclaimer
• Authorities Having Jurisdict ion should be consulted in all cases as to the particular requirements covering the installation and use of UL
Listed or Classified products, equipment, system, devices, and materials.
• Authorities Having Jurisdi ction should be consulted before construction.
• Fire resistance assemblies and products are developed by the design submitter and have been investigated by UL for compliance with
applicable requirements. The published information cannot always address every construction nuance encountered in the field.
• When field is sues arise, it is recommended the first contact for assistance be the technical service staff provided by the product
manufacturer noted for the design. Users of fire resistance assemblies are advised to consult the general Guide Information for each
product category and each group of assemblies. The Guide Information includes specifics concerning alternate materials and alternate
methods of constructio n .
• Only products which bear UL's Mark are considered as Classified, Listed, or Recognized.
Fire Resistance Ratings -ANSI/UL 263
See General Informatio n for Fire Resistance Ratings -ANSI/UL 263
Design No. U412
December 09, 2011
Nonbearing Wall Rating -2 HR.
1. Floor and Ce iling Runner -(Not Shown) -25 MSG (min) galv steel 1 in. high, return legs 1 -5/8 in. wide (m in ),
attached to floor and ceiling with fasteners 24 in. OC max.
lA. Framing Members*-Floor and Ceil ing Runners -(Not shown) -As an alternate to Item 1 -For use with Item
2A, channel shaped, min 1 -5/8 in. wide, attached to floor and ceiling with fasteners 24 in. OC. max.
ALLSTEEL & GYPSUM PRODUCTS INC -Type SUPREME Framing System
CONSOLIDATED FABRICATORS CORP,
BUILDING PRODUCTS DIV -Type SUPREME Framing System
~~O~N~L~l~N-E~C~E~B~I~l~E~I ~O~AI~l~O~N~S~P~/ B~EC~I~O~B~Y _______________________ _
Design No. U419
BXUV.U419
Fire Resistance Ratings -ANSI/UL 263
p~,H~ Rnttom
Design/System/Construction/ Assembly Usage Disclaimer
• Authorities Having Jurisdiction should be consulted in all cases as to the particular requirements covering the installation and use of UL
Listed or Classified products, equipment, system, devices, an d materials.
• Authorities Having Jurisdiction should be consulted before construction.
• Fire r esistance assemblies and products are developed by the design submitter and have been investigated by UL for compliance with
applicab l e requirements . The published information cannot always address every construction nuance encountered in the field .
• When field issues arise, ·it is recommended the first contact for assistance be the technical service staff provided by the product
manufacturer noted for the des ign. Users of fire resistance assemblies are advised to consult the genera l Guide Information for each
product category and each group of assemblies. The Guide Information includes specifics concerning alternate materials and alternate
methods of construction.
• Only products which bear UL's Mark are considered as Classified, Listed, or Recogn ized.
Fire Resistance Ratings -ANSI/UL 263
See General Information for Fire Resistance Ratings -ANSI/UL 263
Design No. U419
December 09, 2011
N o n bea r i ng W a ll Ra t i ngs -1, 2, 3 o r 4 Hr (Se e Items 4 & 5)
l~,.:··~ . .r· \.' ;':. "\., ···: ·"' ,,._ •,;, ·• ·-. "•-: ·~ .:~, t·,. ................ -;--
\ •,
.:.~~·-... _;··.:-·.··... . -::;•-. ·:· . . -.~. ~--...:_··-=-i· ... .,. ... ~ .... ···.:o.· ....... ·-.• ·.~-·,,:.·· ··. ,· ....... _ .•.•... ·.···• '•'.''.-<-:-· .. ····:·_ ..... ··:~~-~~--·-..-:·~-...... -
b:~-~~-~~~;~-·~~~e~~~:·1--;~~s~ -~ -... _:• ·; · ... · _.:· ... '-., .. ··,:•:"._-··: :., .•; ~ ':··.: ........ ~. -~ .;;-·: · ..... ·.
/
1. Floor and Ceiling Runn e rs -(Not shown) -For use with Item 2 -Channel shaped, fab r icated from min 25 MSG
corrosion-protected steel, min depth to accommodate stud size, with min 1 -1/4 in. long legs , attached to floo r and ceiling
with fasteners 24 in. OC max.
lA. Framing Members* -Floor and Ce iling Runners -Not shown -In lieu of Item 1 -For use with Item 2A ,
prop r ietary channel shaped, min. 3-5/8 in . deep, fabricated fro m min. 0.015 in. (min bare metal thickness) galvanized
steel, attached to floor and ceiling with fasteners 24 in. QC max. Effective thickness is 0.034 in .
CLARKDIETRICH BUILDING SYSTEMS -UltraSTEE L®.
lB. Fram i ng Membe rs * -Fl o or a nd Cei ling Runn e rs -(Not shown -In lieu of Item 1) - For use with Item 2A,
proprieta ry t han nel shaped, min. 2 -1 /2 in. deep, fabricated from min. 0 .015 in. (mi n bare metal thickness) galvanize d
steel, attached to floo r and ceilin g fasten ers 24 in. OC. max. Effective thickness is 0.034 in.
:ity of Fort Worth
Nill Rogers Equestrian Multi-Purpose Facility
5ub Contractor's Summary
>Cope of Work Description:
Trade: Drywall & Plaster
Sub's Name: Trinity Drywall & Plastering Systems
Project: Will Rogers Multi-Purpose Facility
Date: 2/8/12
I Materials I Units I Labor I Equipment I
Scope of Work Description I Item Description I UOM I Qty I Cost Per Unit I Total I p e r MH I MHRS I Rate I Total I Eq. Type I # Hr s . I Rate I Total I ~otal Cost
Labor only . . . . . $0.oo! . 52.00 ! 32.00! $1,664 .oo! . . . $0 .00! $1,664.00
................... Metal.Stu ds .................... \ ................................................... ! If ............. ! ..................... 72 ! ............... $0 .6( ............. $4824 l ......................... ! ........................... ! ....................... ! ............... $0.oo! .......................................... ! .............. ! ..................... ! ........... $0.00! .................. $48.24
Metal Tra ck ! !If ! 50! $0.59! $29.70! ! ! ! $0.00! ! ! ! $0.00! $29 .70
In su la tio n i jsf j 96l $0.22 j $2150! ! ! j $0 .00! j ! l $0.00j $21 .50
.................. ___Fastene rs ...................... j ................................................... ( 101 .......•... ( ........................ 1.! ............. $45.00 ! ............. $45 .00! ......................... ! .......................... .! ....................... ! ............... $0 .oo! .......................................... ( .............. ! ..................... ! ........... $0.0~.! .................. $4~.~q
Fire Caulk ! !tube ! 6! $15.75! $94.50! i i i $0.00! ! i ! $0.00! $94.50
.................... W•llboa,d ...................... 1 .............................. !''. i 3641 ...... $0301 .. '''''"!........... f . ! . 1 ........... $0 .ao(....... [ ....... 1 ............. 1 ........... $0.00! $113 .28
i l 1 ! I r i i 1 l l i r 1 r -•
iubtotals : : : : I $352 .22 1 : : : $1,664 .00i : o.o: : $0.001 $2,016.22 ·-----------------------------,-------------------------,--------,-------------r-------------,------------r-------------r------------r-----------r------------,--------------------T-------,-----------,-----------T--------------
1 I I I I I I I I I I I I I ·-----------------------------~------------------------~-------i-------------~------------i------------~------------t------------~-----------1-....... -----_ .... 1--------------------f------+---------~ ........ --__ ..:...+--------------
' I I I I I I I I :.~: I I I I .,::.~ ...... I
·----------------------------+-----------------------1------+------------r-----------+----------+----------{-----------+----------r ·· ___ ··1 S ub -Contractors Profi f & Ove~ead ----+"-_ 15.00'-9-------$302.43
·otal CO No . I I I I I $352221 I I I $1 ,66400 1 I 0.0 1 I $0.15 1 $2,318 .66
Page _1_ of _1_
1225 W. College Ave., Suik '-108
Carrollton. TX 75006
February 16, 2012
Rogers O'Brien
1901 Regal Row
Dallas, TX 75235
Attn: Brent
Re: \Vill Rogers ivlemorial Center
RFI #159
·---------··------
(972) 323-6899 Pl1onc
(972) 245-5794 Fa"
Proposed Change
Dear Brent,
Per your request we have the following:
Tape, bed, and painting of new gyp furrdown above 2 overhead doors.
Labor 17 Hours x 18 .75
Labor Burden 17 Hours X 4.40
IVIaterials
Overhead and Profit
TOTAL ADD:
Yours· 'ruly
~----·----..•. __
~-.... y2,'S~_,_-::::.:,
,. ohn Zimmere{'
Willrogm2-16-2012
= $319.00
= $75.00
= $69.00
= $71.00
S534.00
• J
Rogers-O'Brien Construction
February 23 , 2012
City of Forth Worth
401 West 13th Street
Fort Worth , TX 76102
Ph : (817)392-7913 Fax : (817)392-8488
ATIN: Jack Durham
RE :ASI # 34 -Revised Ext . CMU Fin ish Exposed To Weather
10022 Will Rogers Memorial Cntr East
Change Request# 105
Dear Jack:
Per ASI #34 documents, apply paint to ex posed CMU surfaces at the clerestory and west intermediate
roof parapet walls of unit 'A'.
Attached please find our pricing for the above referenced revis ion item.
The total amount to provide th is work is :
1901 Regal Row
Dallas, Te xa s 75235 . . .
Main 214 _962.3000 Please note the attached exclus1ons/qual1ficat1ons .
Fax 214 .962.3001
$1,505 .00
3901 s. Lamar Blvd. #200 If you have any questions or need further clarification , ple a se contact me at (214)962-3000 .
Austin, Texas 78704
Main 512.486.3800
Fax 512.486.3701
www.r oge r s-ob r ien.co m
Sincerely ,
~
Trey Carroll
Rogers-O'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATIACHMENT
Dallas I Austin
Change Request 105 Price Breakdown
Job Name: W ill Rogers Memorial Cntr East
Description: ASI # 34 -Revised Ext . CMU Finish Exposed To Weather
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment
1 Painti ng & Wall Cov erings
****EXCLUSiONS AND QUALiFiCATiONS**** Subtotal:
See attached backup for labor, material and subcontractor and Overhea d
supplier detail. Fee
Price excludes all federal , state and local fees .
Price does include sales and / or remodel ta x es .
Written authorization and / or signat ure on this PC required prior to
perform in g the above described work.
Total:
Subcontract
1,30 3.00
Date : 2/23/2012
Change Request #:105
Other Price
$1,303.00
$1,303 .00
10.00% $130.30
5.00% $71.70
$1 ,505 .00
!
Hahnfeld
Hoffer
Stanford
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
Proj e ct Nam e :
EAS T MU LT I-PURPOS E FACILITY AT
WI LL ROG ERS MEM EORIAL CENTER
CITY O F FOR T WORTH
FORT WORTH, TE XAS
O w ner:
City of Fort Worth
40 1 West 131h Street
Fort Worth, Texas 76102
Contract or:
ROGERS-O'BR IEN CONST RUCTION
190 1 Regal Row
Dallas, Texas 75235
ASI No.: 34
Is s ue Date : 12/30/1 1
Proj ect No .: 07015 -01
Contra ct Fo r : General Construction
Con t r act Date : January 6, 2011
Owner: [X ]
A r chitect: [X ]
Co n sultant: [ ]
Contracto r : (X]
Field: [X]
Othe r : [ ]
File: [X]
T he Wo r k shall be carr ied out in accordance with the following supplemental instructions issued in accordance
with the Contract Documents without change in Contract Sum or Contract T ime . Proceeding with the Wo r k in
accordance with these instructions indicates the Contractor's ackno w ledgement that there will be no change in
the Contract Sum or Contract Time.
Description:
1.Reference the attached partia l specification section describing the finish material intended to be used o n al l
the exposed CM U exposed to the weather including but not limited to the exposed CM U on the north and west
of Unit A high roof terminating the clerestory, and any portion of the parapets where CM U is exposed abo ve the
counterflashing (terminating the roof membrane).
2. Reference the attached supplementary drawing from Dunaway for modifications to the east sidewalk.
Attachments:
1. Partia l specification section 09900 , page4, parag raph 2.5 "SCHEDUL E OF FIN ISH ES FOR NEW SUR FACES"
2. "WRMC -MU LTI-PURPOSE SID EWA LK drawing issued by DUNAWAY 12.29.11 .
Issued by Hahnfe ld Hoffer Stanford:
\)J llW William Westhoff/ PA
(Signature) (Printed Name I Title)
2.2 MASONRY BLOCK FILLER
A. High-Performance Block Filler: B!ock fillers used for f illing open textured i nterior
concrete masonry units before application of acrylic/latex top coats:
1. SW: Heavy-Duty Block Filler B42W46.
2. BM: Moorcraft0 Super Craft™ Latex Block Fil!er 285
3. PPG: Speedh i de Masonry Block Filler Latex 6-7.
4. ICI: Bloxfil 4000 Heavy Duty Acrylic Block Filler.
2.3 GYPSUM BOARD WALL TREATMENT MATERIAL
A. Laminating Adhesive:
c o mpound.
United States Gypsum, or equal, Perf-A-Tape joint
B. Tape: Perf-A-Tape joint system.
C. Te x ture: Perf-A-Tape gyps um texture.
2.4 SEALANTS
A. One-Part, Non-Sag, Acrylic Latex Caulking Compound: Pecora Corporation AC-20 +
Silicone.
2.5 SCHEDULE OF FINISHES FOR NEW SURFACES
A. General: All materials shall be products and manufacturers as scheduled, no equal.
Where more than one product is listed, it is the Contractor's option as to w hich
product to use.
B. Ex terior Surfaces
07073-00
1. All Ex posed Ferrous Metal Shall be Given:
1 coat primer by others. Spot prime as req uired, or if unprimed, prime wit h
1 coat SW Kem Kromik® Metal Primer 850Z,
BM Ironclad Alkyd Low Lustre Metal & Wood Enamel C 163,
PPG Interior/Exterior Rust Inhibitive Steel Primer 6-208, or
!Cl Devguard Multi-Purpose Tank & Structural Primer 4160, and
2 or more coats SW Industrial Enamel 854,
BM lmpervo Alkyd High Gloss Metal & Wood Enamel C133,
PPG Pro Siding Plus Exterior Alkyd/Oil 58-110, or
ICI Devguard Alkyd Industrial Gloss Enamel 4308.
All Exposed CConcrete Masonry Units Shall Be Given:,fBornpsterEnch::mureT:
l::;XT~~
1 coat block filler, and
2 or more coats SW SuperPaint® Flat Latex Enamel A80,
BM Moorcraft Super Spec 100% Acrylic Ex terior Flat Finish 180,
PPG Speedhide Exterior Flat Latex 6 -610, or
ICI Dufux Professional Exterior 100% Acrylic Flat Finish 2200.
09900 -4
I g
~
I
i
l
i
I ;
Y/,,' ~~=t==============lriti#."~/ ~ /_.~·
< D ~~mrmmrmmrmmrmrrmrrmrm4
\ ~Tl-568.09 ,,-,,-_/ \ / \ MATCH [XIST. / Tl-568. /2
\ ; -__ -_ " / MATCH [XIST.
/ 5 '2---.J , I ' /
ALL [XISTING SURV[Y DA TA WAS
PROVIDED BY ROG[RS-O'BRl[N, INC.
LEGEND
Tl -400.00
SW-400.00
CT-400.00
TC-400.00
-BR-400.00
/ -'J1'-TR -400.00
TOP OF INLET
5/0[WALK
CUTT[R
TOP OF CURB
BOTTOM OF RAMP
TOP OF RAMP
/
~:ROPOSCO WAL L
/
/ .....
/ ..... ..... ..... ..... .....
j ~
I
I
I
I : -· --1::-_-:::~--
..... ..... .....
..... .....
..... .....
' ,,-/ ---------------------
--_.,,,....,,,,. ----
/, _____ /..... //
/ /
/ ..........
/ .......... . __ ....... --. ..... --• • ..... .,....,-,o..... ..... ............... -s;,,. -
_____ s,_v--510.32\ _:_W-510.13~-_.... ~SW-570.09 ~5;-J6!:9.!-_.... _.... _.... r.PROPER T: L:[ _.... .......... _.... ...-
----------------=--~., + ------;:;-"'-1 I -~ ., ---
I ~SW-570.55 TR-570-2 1~ ... /T:SlO.ll '. / I I ~SW-569.92 //
_.I MATCH [XIST. ,1--1---k ln _ -• J(. .... --l " MATCH [XIST. .<>( /
/'
/ \ ---
PROPOSED S AWCUT ______......... ! / -~ ~~ ~ /y,-~ I l ~PROPOSED SAWt(UT
~I ""-.......TC-569. 76
GT-569.18
MATCH [XIST. TC-510.56
CT-569.97
MATCH [XIST.
/TC-570.41 ~ CT-569 78
MATCH [XIST CT-569.91
MATCH [X!ST.
TC-570.4 1 BR-569 82
TC-5J9.97
GT-5~9.46
MA TC!'/ [XIST.
I
j L \ ~TC-57026
CT-569.9 1 MATCH [XIST.
MATCH [XIST. ----------- ---------~ -----------------' -:.»~-I
----------------
~
~DUNAWAY
550 Bailey Avenue • Sul la -400 • Fort Wort h. Texos 76107
Tel: 6 17.335.11 2 1 • f ax: 617 .335.7437
IIX REG. F·l 1141
~ :-;. ~ i 9::, ST. UNIV ERS ITY DRIV E
[I)
CJ
WRMC -MULTI-PURPOSE SIDEWALK
I l'\,"J L-,,,,,,,
I '(\, .:-1£ CF Tc. \\'
I f "'!:~···1.r······"··~ 11
I ii'•/ \•tl ,, • . . . l I ~ .......................... · ... ~
I ~-··:~~?.?.~.~ .. ( .. ~~ -~: ~~
I 1\\ 9558 0 ,: ~
''1 "'/·,.~IC~N5( ,' ~ I ,,ss ········ "' ;: \\~.ONAL ,,,...: \
\
~I
GRAP HIC SCALE
0 5 10 20
( IN FEET )
1 inc h = 10 f t.
! .. ' •
1225 W. College Avt:., Suite 408
Carrollton. TX 75006
February 8, 2012
Rogers O'Brien
1901 Regal Row
Dallas , TX 75235
Attn: Brent
Re: Will Rogers Memorial Center
ASI 34
Proposed Change
Painting of exposed CMU above Parapet and Clerestory.
Labor Hours 32 Hours x 18.75
Labor Burden 32 I-lours X 4.40
Ivlaler ials
Overhead and Profit
TOTAL ADD:
=
=
=
=
$600.00
$140.00
$389.00
Sl 74 .00
Sl ,303.00
(972) 323-6899
(972) 245-5794
Phone
Fax
I
Rogers-O'Brien Construction
February 23, 2012
City of Forth Worth
401 West 13th Street
Fort Worth, TX 76102
Ph : (817)392-7913 Fax: (817)392-8488
ATIN : Jack Durham
RE:RFI # 170 -Hand Hole Pwr For Street Boxes In Watt Drive
10022 Will Rogers Memorial Cntr East
Change Request# 108
Dear Jack:
Per RF! #170 response, provide power to street hand hole boxes at WR Watt Drive and Burnett-Tandy
Road. Cost of work includes trenching and installation of street box as well as (1 ) 20 amp circuit and (2)
50 amp c ircuits with required breakers , conduit and feeders.
Attached please find our pricing for the above referenced revision item .
1901 Regal Row The total amount to provide this work is:
Dall as, Texas 75235
Main 214.96 2 .3000
$7,311 .00
Fax 214.962.3001 Please note the attached exclusions/qualifications.
3 901 S. Lam ar Blvd. #200
Austin, Te xas 78704 If you have any questions or need further clarification, please contact me at (214)962-3000 .
Main 512.486.3800
Fax 512 .486.3701
www.r oge rs-obrien .co m
Sincerely ,
~@
Trey Carroll
Rogers-O 'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATIACHMENT
Dallas I Austin
Change Request 108 Price Breakdown
Job Name: Will Ro gers Memorial Cntr East
Description : RFI # 170 -Hand Hole Pwr For Street Bo xe s In Watt Drive
Labor Material
No Description QTY Unit Unit j Total Unit Total Equ i pment
1 Electrical Subcontractor I
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal :
See attached backup for labo r , material and subcontractor and Overhead
suppli er detail. Fee
Pr ice excludes all federal, state and local fees.
Price do es include sales and / or remodel taxes.
Written authorization and/ or sig nat ure on this PC required prior to
performing the above described w ork.
Total:
Subcontract
6,330 .41
Date: 2 /23/2012
Change Request #:108
Other Price
$6 ,330.4 1
$6 ,330.41
10 .00% $633 .0 4
4.99% $347.55
$7,311.00
Project:
Number:
To:
From:
Subject:
Sent Via:
RFI ID:
Hahn1eld
Hoffet'
Stanford
RFI Response
Transmittal ID:
Date Sent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent MacDon aid
Ro,gers-O 'Brien Constructi on Co.
1901 Regal Row
Dallas, TX 75235
214-962-3000 (Phone )
214-962-3001 (Fax)
Gary Ryan
Hahnfeld Hoffer Stanford
200 Bailey Avenue, Suite 200
Fort Worth, Texas 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fax)
Hand Hole Power for Street Bo x es in Watt Drive
Info Exchange
00170
00941
1/16/2012
Discipline:
Recei'ved:
Que.stion:
Suggestion:
Answer:
CC:
1/12/2012
Per Al:c::in Bag;amery, Rogers-Obrien Construction is to provide powo2r to the
street boxes at the intersection of Burnett-Tandy and Watt Drive, and Harley
Avenue and Watt Drive for the temporary guard booths. that the Stock Show
u ti l izes. Please provi de a location to terminate power for one 20 AMP c ircu it
and two 50 AMP circuits. Please note that detail 2/El.1 states that the power
for the guard booth at Watt Drive and Harl ey Avenue will be fed from DBB.
Connect the 20 amp, 120 volt circuit to spare breaker in Panel 11 P2 11
, circuit 33.
Provide #8 AWG conductors for this circuit.
Provide two 50 amp,. 2 pole circuit breakers in Distribution Board "D88" for the
two 50 amp, 208 volt, single pt1ase circuits. Provide .;:-4 A\VG conductors for
this circuit.
Tommy Deeds (Hahnfeld Hoffer Stanford)
Ken Randal! (BHB, Inc.)
Alan Bagamery(City of Fort Worth)
Basecom Inc
Request For Change
5209 Vesta Farley Rd
Fort Worth, TX 76119
Status: Pending
Rogers-0' Br ien
1901 Regal Row
Dallas, TX 7523 5
Attn:
Owner Doc No : RFI 170
Date : 01 /25/12
Respond By Date : 02/01/12
Internal RFC No : 17
Internal Job No : 11-001
Customer Job No : 10022
Will Rogers Multi Purpose Cntr
1901 Regal Row
Dallas, TX 75235
Ins tall str eet boxes at Burnett Tandy and W att Drive. Terminate in Panel DBB w ith 2·2po le 50 amp breakers and
1-1 po le 20 amp breaker in Panel P2 . Per RF! 170 .
Labor
Materials
Quoted Materials
Overhead 10%
Profit 5%
SEE A TI ACHED LAB OR, MATERIAL, and QUOTED MATERIAL SUMMARY .
Approved Change Order No:
Accepted Date: Accepted By:
Please sign and re t urn a copy as soon as possible
Total RFC:
0 .00
0.00
1,645 .05
2 ,879 .1 3
956.69
548 .09
301.45
0.00
6 ,33 0.41
1 of 1
Labor Type
FOREMAN
JOURNEYMAN
APPRENTICE
Tota ls
LABOR
Crew Hours Rate$ SubTotal Brdn % Frng $ Brdn Tot. Frng Tot. Total Full Rate
0 .25 3 .73 25 93 .25 40 1 .5 37 .3 5 .6 136 .15 36 .5
1 14.91 23 342 .93 40 1 .5 137 .17 22 .37 502.47 33 .7
3 44 .73 15 670 .95 40 1 .5 268 .38 67.1 1,006.43 22.5
4 .25 6 3 .37 17.47 1 ,107.13 40 1 .5 442.85 9 5 .07 1,645 .05 25 .96
MATERIAL SUMMARY
Description Qty Price Net Price Labor Total Mat($) Total Hours
1" CONDUIT -.sMJ 405 111.88 111 .88 4.48 453 .11 18 .14
1 1 /2" LOCKNUT -STEEL 4 82 .33 82 .33 6 .3 3.29 0.25
1 1/2" CONDUIT -PVC40 300 279 .71 279 .71 6 .5 839 .13 19 .5
1 1 /2" ELBOW 90 DEG -PVC40 4 363 363 34 14.52 1.36
1 1/2" COUPLING -PVC 4 104 104 0 4 .16 0
1 1 /2" ADAPTER MALE -PVC 4 135.46 135.46 16 5.4 2 0.64
# 8 THHN BLACK 735 553.82 553 .82 7 407 .06 5 .14
# 4 THHN BLACK 415 1484.22 1484 .22 10 .2 615 .95 4 .23
CONDUIT MEASURING TAPE 300 25.89 25 .89 3 7 .77 0.9
24x 12x 12" WP FLNG J-BOX WI SI[ 2 264.36 264 .36 6.6 528 .72 13 .2
Totals 2879 .13 63 .37
Quotation/Purchase Agreement
c BAS ECO M Inc u s 5209 Vesta Farley
T FORT WORTH TX 76119-6529 0
M
E
R
Thank you for the opportunity to earn your
business! Please find the requested quotation
and up on yo ur signed approval o r purchase order,
we will process your order.
REFERENCE
RFI 170
REQUESTED BY
MARK TOSH
SHIP TO
BASECOM Inc
5209 Vesta Farley
FORT WORTH TX 76119 -6529
ffl SUMIVIIT®
iilELECTRIC SUPPLY
www.summit.com
ACCOUNT NUMBER QUOTATION NUMBER
1005108 2000745341
VALID FROM VALID UNTIL
01/10/2012 02/09/2012
SUMMIT SERVICE CE NTER
Fort Worth Service Center
500 North Beach St
FORT WORTH T X 76111
Te lep ho ne : 8 17-831-4500
Fax: 8 17-222-9200
Contact: Robert Fincher
Printed: 1/24/2012 3 :40:35 PM rfi ncher@summ it.com
LINE QUANTITY
20 1
30 1
40 1
MANUFACTURER, PART NUMBER AND DESCRIPTION
FD2100
CHDIS FD2100 100A 2P CKT BRKR
Fits panel type DBB
*****we do not ha ve in stock******
*****stock in Duncan SC**********
BAB1020
C-H/WEST BAB1020 TYPE BAB BREAKER, 20A 1-POLE, 120/240 VOLT
FD2050
CHDIS FD2050 SOA 2 P CKT BRKR
Cus tomer Acceptance/Order Commitment
BASECOM Inc accepts yo ur proposal to supply the above material at price(s) shown.
Please deliver _ brochures to be submitted for approval.
Please use our Purchase Order number --------for processi ng th is order
AUTHORIZED BY:
PLEASE PRINT YOUR NAME
Returned goods are subject to restocking cha r ges and approva l is requi red for cred it on all returns. Return
of non-stock material ma y also be subject to cancellation and /or return freight charg.es or could be
non·r eturnable. Non -stock material will not be taken back until all cha rges and contingencies are
explained and accepted.
UNIT PRICE UOM EXTENSION TAX
552.00 E 552.00 Y
-L--<, ---
( E 7.37
474.66 E 474 .66
r---..... ~
SUBTOTAL 1,034.03
TAX 85.31
TOTAL 1,119.34
Total May Not Include Additional
Shipping and Hand ling Charges
Quotation is subject to cred it approval and ou r standard terms and
conditions of sale. Prices are valid until the da te noted except for
conduit, wire, and cable products which are valid for the day of
quote only unless noted otherwise. PAGE 1 OF 1
' y
y
./
~
j
Rogers-O'Brien Construction
February 23 , 2012
City of Forth Worth
401 West 13th Street
Fort Worth, TX 76102
Ph : (817)392-7913 Fax: (817)392-8488
ATIN : Jack Durham
RE :RFI # 171 -Mobile Cell Tower Power Requirements
10022 Will Rogers Memorial Cntr East
Change Request # 109
Dear Jack:
Per RFI #171 response, provide 1 ODA service to a 12x12 pull box mounted on the southwest corner of
unit A for power to the mobile cell tower. Price includes 2" empty conduit to room A 108, connection to
100A breaker, and 1" empty conduit from 12x12 pull box to AV room A203A.
Attached please find our pricing for the above referenced revision item .
1901 Regal Row The total amount to provide this work is:
Dallas, Texas 752 35
Main 214.962.3000
Fax 214 .962.3001 Please note the attached exclus ions/qualifications .
3901 S. La mar Blvd. #200
$3 ,224 .00
Austin, Texas 78704 1f you have any questions or need further clarification, please contact me at (214)962-3000 .
Main 512.486.3800
Fax 512.486.3701
www.ro gers-obr ie n.co m
Trey Carroll
Rogers-O'Brien Constru ction Co
OWNER AUTHORIZED SIGNATURE
ATIACHMENT
Dallas I Austin
Change Request 109 Price Breakdown
Job Name: Will Rogers Memorial Cntr East
Description: RFI # 171 -Mobile Cell Tower Power Requirements
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment
1 Electrical Subcontractor
****EXCLUSIONS AND QUALIFICATIONS**** Subtotal:
See attached backup for labor, material and subcontractor and Overhead
supplier detail. Fee
Price excludes all federal, state and local fees .
Price does include sales and I or remodel taxes.
Written authorization and I or signature on this PC required prior to
performing the above described work .
Total:
Subcontract
2,791 .82
Date: 2/23/2012
Change Request #:109
Other Price
$2,791.82
$2 ,791.82
10.00% $279 .18
4.98% $153 .00
$3 ,224.00
0 Hahn1eld
Ho.ffet'
Stanforcf
Project:
Number:
To:
From:
Subject:
Sent Via:
RFIID:
Discipline:
Recei'ved:
Question:
Suggestion:
A.nsvrer:
cc
RFI Response
Transmittal ID:
Date Sent:
07015-01 WR MC East Multi-Purpose Building
07015-01
Brent MacDonald
Rogers-O 'Bri en Constructi on Co.
1901 Regal Row
Dallas, TX 75235
214-962-30 00 (Phone)
214-962-3001 (Fax)
Gar"r Ryan
Haflnfelcf Hoffer Stanford
200 Ba iley Avenue , Suite 200
Fort Worth, Te x as 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fax)
Mob ile Cell To w er Power Coord inati on
Info Exchange
00171
1/12/2012
0 0942
1/16/2012
Per Chris Ha rmon, R-0 is to provide a 2·'1 con duit from Electrical room A108 t o
a new 12" x 12'' pull box at the South west corner of unit '8' near the
telephone-pedestal. Additionally, per i-evised di r ection from Ke v in Kemp, R-0 is
to term inate 1Nire provided by AT&T into DBA to a nev,,. 100· AMP breaker.
Please confirm.
Distributi on Board "DBA" has space a add the requested 100 amp , 3 po l e
circu it breaker. Provide breaker: and connections as requested by Owner .
Addition3l ly, provide tetephone service conduit as requested by Owner.
Ken Randall (BHB, Inc.)
Tommy Deeds (Hahnfeld Hoffer Stanford)
Alan Bag a mery (City of Fort Worth)
Basecom Inc Request For Change
5209 Vesta Farley Rd
Fort Worth, TX 76119
Status: Pending
Rogers-o· Brien
1901 Regal Row
Dallas, TX 75235
Attn:
Owner Doc No: RFI 171
Date: 01/25/12
Respond By Date: 02/01/12
Internal RFC No: 16
Internal Job No: 11-001
Customer Job No: 10022
Will Rogers Multi Purpose Cntr
1901 Regal Row
Da!las, TX 75235
Provide 2" conduit per direction from Kevin Kem p for mobile cell phone tower. Conduit to be run in to electrical room and
terminate in Panel DBB
Labor
Materials
Quoted Materials
Overhead
Profit
SEE ATIACHED LABOR, MATERIAL, AN D QUOTED MATERIAL SUMMARY.
Approved Change Order No:
Accepted Date: Accepted By:
Please sign and return a copy as soon as possible
Total RFC:
0 .00
0 .00
697.14
1,168.02
552.00
241.72
132.94
0.00
2,791.82
1 of 1
Labor Type
FOREMAN
JOURNEYMAN
APPRENTICE
Tota ls
Labor
Crew Hours Rate $ SubTotal Brdn % Frng $ Brdn Tot. Frng Tot. Total Full Rate
0 .25 1 .76 25 44 40 1 .5 17 .6 2 .64 64.24 36.5
2 14.08 23 323 .84 40 1 .5 129 .54 21 .12 474 .5 33 .7
1 7 .04 15 105.6 40 1 .5 42 .24 10 .56 158.4 22.5
3 .25 22 .88 20 .69 473.44 40.001 1 .5 189.38 34.32 697.14 30.47
MA TE RIAL SUMMARY
Description Qty Price Net Price Labor Total Mat($) Total Hours
1" CONDUIT -EMT 120 111 .88 72.72 4 .48 87 .26 5.38
2" CONDUIT -EMT 80 248 .36 248 .36 7 .6 198 .69 6 .08
2" ELBOW 90 DEG -EMT 3 2236 .54 2236.54 45 67 .1 1.35
2" ELBOW 30 DEG -EMT 4 2460 .19 2460 .19 45 98.41 1 .8
2" COUPLING SS STL -EMT 10 1649.68 1649 .68 0 164 .97 0
2" CONN SS STL INSUL -EMT 2 1863.02 1863.02 18 37 .26 0.36
2" BUSHING -PLASTIC 2 159.38 159.38 5.8 3.19 0 .12
2" SPRING STL CONDUIT CLAMP W/ BO 8 85 .66 85.66 10 .1 6 .85 0 .81
2" FLEX -ALUMINUM 4 386 .51 386 .51 14 .8 15.46 0.59
2" CONN FLEX DC SQUEEZE STRAIGHT 1 5379.12 5379 .12 25 53 .79 0.25
2" CONN FLEX DC SQUEEZE 90 DEG IN! 1 6733 .28 6733.28 27 67.33 0.27
2" CONDUIT -PVC40 20 366.46 366.46 7 .6 73 .29 1.52
12x 12x 6" BOX CONT HNG -NEMA 12 2 133 .9 133.9 0.9 267 .8 1.8
2" FIELD CUT KO 2 0 0 0.5 0 1
1/4-20 MACHINE SCREW ANCHOR 8 63.83 63.83 8 5.11 0.64
1/4" THREADED ROD -PLTD 24 88 .5 88.5 2 .5 21 .24 0 .6
1/4-20 HEX NUT -PL TD STL 16 1.71 1.71 2 0.27 0.32
Totals 1168.02 22 .88
. ' fflsuMMIT® Quatat,an/Purchase Agreement iilELECTR1c ·suPPLY'
mnumunnummnunmn11m11umm11mm11111111U1111111u1111unmnnnm11111omunummuun111mmmm fl,,wt1i,,,,,, ,j 11 .,,, 10011110
C BASECO M Inc u s 5209 Vesta Farley
T FORT WORTH T X 7 611 9-6529 0
M
E
R
Thank you for the opportunity to earn your
business! Please find the requested quotation
and upon your signed approva l or purchase orde r,
we will process your order.
RE FEREN CE
RFI 170
RE Q~_ESTED BY
MARK TOSH
SHIP TO
BAS ECOM Inc
5 209 Vesta Farley
FORT WORTH TX 76 11 9 -6529
Accou Nf Nu MB eR QUOTATIO N. NUMBER
1005108 2000745341
VALID FROM VAUD UNTIL
01/10/2012 02/09/2012
SU MMIT S ERVICE CENTER
Fort Worth Service Center
500 North Beach St
FORT WORTH TX 76111
Telephone: 817-831-4500
Fax: 817-222-9200
Contact: Robert Fincher
Printed: 1/24/2012 3:40:35 PM rfincher@summ it .com
·QUANTITY .
20 1
30
40
MANUFACTURER, PART NUMBER AN f? DESCRIPTION
FD2100
CHD!S FD2100 100A 2P CKT BRKR
Fits panel type 088
*****we do not have in stock******
*****stock in Duncan SC**********
BAB1020
C-H/WEST BAB 1020 TYPE BAB BREAKER, 20A 1-POLE, 120/240 VOLT
FD2050
CHDIS FD2050 SOA 2P CKT BRKR
Cus t omer Accept~nc e/Orde r C_ommitme nt
BAS EC OM Inc accepts your proposal to supply the above material at price(s) show n.
Pleas e deliver _ brochures to be submitted for approval .
Please us e ou r Purch ase Order number --------for processing t his order
AUTHORIZ ED BY:
PLE AS E PRIN T YOUR NAME
Returned goods are subject to restocking charges and approval Is required for credit on all returns. Return
of non-stock material may also be subject to cancellation and/or return freight ch arges or co ul d be
n on -returnable. Non -stock material wi ll not be taken back until ail charges and contingencies are
explained an d accepted.
~. ·..-.-:-uoM E :XTENSI O~ ~ ~-~
552.00 y V 552.00 E
A ~~..,..,-~_..-.....__....,.v ---~· ..... ._ ---' -
7.37 E 7.37 Y
474.66 E 474.66 Y
SUBTOTAL 1,034.03
TAX 85.31
TOTAL 1,119.34
Tota l May Not lndude Additional
Shipp ing and Handling Charges
Quotation Is subject to credit approval and ou r standard tenns and
co nditions of sale. Prices are valid until the date noted except for
conduit, wire, and cable products which are va l id for the day of
quote on ly un less noted other wise. PAGE 1 OF 1
J
Rogers-O'Brien Construction
February 23, 2012
City of Forth VVorth
401 West 13th Street
Fort Worth, TX 76102
Ph : (817)392-7913 Fax : (817)392-8488
ATTN : Jack Durham
RE:RFI # 174 -Elev. Equip . Room Heat & Ventilation Req .
10022 Will Rogers Memoria l Cntr East
Change Request# 11 O
Dear Jack:
Per RFI #174 response, provide heater and ventilation to room A 107 as per the state elevator inspector.
Price includes wall mounted thermostat. Electrical cost includes added breaker, conduit and wire as well
as disconnect provided at unit heater .
Attached please find our pricing for the above referenced revis ion item .
1901 Regal Row The total amount to provide this work is :
Dallas, Texas 7523 5
Main 214 .962 .3000
Fax 214.962.3 0 01 Please note the attached exclusions/qualifications .
3901 S. Lamar Blvd. #200
$2,427 .00
Austi n, Texas 7970 4 If you have any questions or need further clarification, please contact me at (214)962-3000 .
Main 51 2 .486.3800
Fa x 512.486.3701
www.roge r s -o bri e n .c o m
Trey Carroll
Rogers-O'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATTACHMENT
Dallas J Austin
Change Request 110 Price Breakdown
Job Name: Will Rogers Memorial Cn t r East
Description: RFI # 174 -Elev . Equip. Room Heat & Vent ilation Req.
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment
1 Door Louv er 100 .00
2 Unit Heater
3 El ectri cal Subcontracto r
****EXC LUSIONS AND QUALIFICATIONS**** Subtotal:
See attached backup for labor, material and su bcontractor and Overhead
supplier detail. Fee
Price excludes all federal, state and local fees .
Price does include sales and / or remodel ta xes .
Written authorization and / or signature on th is PC required prior to
performing the above described work .
Total:
Subcontract
1,110.04
89 1.84
Date: 2/23 /2012
Change Request #:11 O
Other Price
$100.00
$1,1 10.04
$891 .84
$2,101.88
10 .00% $210.19
4.97% $114 .93
$2,427.00
Proje:ct:
Number:
To:
From:
Subject:
Sent Via:
RFI ID:
Hahnfeld
Hoff£!t
Stanford
RFI Response
Transmitt;al IO:
Oate Sent:
07015-01 WRMC East Multi-Purpose Building .
07015-01
Brent MacDon aid
Rogers-O'Brien Construction Co.
1901 Regal Row
Dallas, TX 75235
214-962-3000 (Phone)
214-962-3001 (Fax)
Gary Ryan.
Hahnfeld Hoffer Stanford
200 Baife·r Avenue, Suite 200
Fort Worth, Texas 76107
(8 17) 921-5928 (Phone)
(8 17) 302-0692 (Fax)
00948
1/18/2012
Elevat o r Eq uipment Room Heating and Ventilation Requirements
I nfo E.xch;:mge
00174
Discipline:
Recei've{f:
Question:
Suggestion:
A.nswer:
CC:
1/12/2012
Per the state elevator inspector, the elevator machine room will require
temperature control. Please confirm that a unit heater as well as a 2' x 2' vent
fo r door A107 will be necessary to meet these requirements.
We understand the un it heater. and door louver have been ins ta lled and satisfy
the st:3te inspector.
BHB has no objection,
Tommy Deeds. (H ahnfeld Hoffer Stanford)
Jeff Westhoff(Hahnfeld Hoffer Stanford)
Sean R3th (B3 ird, Hampton & Brown)
Alan Bag a mery (City of Fort Worth)
Pe t.J I }-/-; !i3 ! .9 I IV_
1/11 I~ <J/')_
6405 Airport Freeway
Fort Worth, Texas 761 t7
BUILDERS HARDWARE
P .O . Box 161849
Fort Worth , Texas 76161-1849
.-~/// _,,, .
Phone: (817) 831-6423
www.woodardbuilderssupply .com
. "~ -,•~;~';'-~;:.r:;.:~:;.~ c~t~ . TERMS : NET 30 MERC~~T~5~f~J1,~~(,~~3E . :~~1i l ~11£~ti f-----------------,-"-~~?il .... "'9R
. ~~~-:3:~_!;:~-~~;~':t~~
::_···~\·:~:f Lt: ::-~.{~:r;J~.:
).:~ _:~~-. :;.:~\-:-;A,~~··<.~'?·
~·"!-;.'% ...... ~· ...
HIDALGO
INDUSTRIAL SERVICES, INC.
Hidalgo Industrial -Change Order Request
Date: 30-Jan-12 Hidalgo Job No .: _0_3-_3_2_10_2_0_-0 ____ _
Change Order Req. No.: #23 Customer PO/Contract#: 10022-15-01S
Owner/ Contractor Rogers O'Brien Contact _T_re_,_y_C_a_rr_o_ll ____ _
Description: RF! 174 -Added Electric Unit Heater for elevator machine room per the state elevator
inspecto r.
LABOR
Description
Opera tor
Sheet Metal Journeyman
Plumber Apprentice
Plumber Journeyman
Supervisor
Project Manager
MATERIAL
Description
Electric Unit Heater
SUBCONTRACTORS
Contractor
RENTALS
Description
RECAP
Schedule Impact:
Number of Days Impacted:
Remarks :
None
0
Hours
X
8 X
X
X
1.0 X
1.0 X
Qty
1 1
X
X
X
X
Contractors Name
Rate Qty
Rate Total
$ 26 .00 $ -
$ 24 .00 $ 192 .00
$ 19 .00 $ -
$ 24 .00 $ -
$ 28 .00 $ 28 .00
$ 35 .00 $ 35 .00
Subtotal : $255 .00
Labor Burden: 35% $89.2 5
Total Labor Cost: $344.25
Unit Price Total
621 .00 $621.00,
Subtotal: $621.00
Total
Subtotal: $0.00
Period Total
WEEK $0 .00
Rental Tax 8.25%
Subtotal: $0.00
Labor $344 .25
Materials $621.00
Subcontractors $0.00
Rentals $0.00
Subtotal $965.25
Subcontractors 0% $0.00
Overhead 10% $96.53
Margin 5% $48.26
Sales Tax 0.00% $0 .00
Tota l Cost $·1,110.0 4
BARTOS Proposal
1616 N . SYLVANIA .,. FORT WORTH, TEXAS 76111-4523 .,. (817) 332-7906
P.O. BOX 7709 .,. FORT WORTH, TEXAS 76111-4523 .,. FAX (817) 332-3740
Date: January 30, 2012
To: Blaine Morgan
Company: Hidalgo Industrial
Fax: NIA
Page_1_of ~
-----------------Project: Will Rogers Memorial Center
Location: Fort Worth, Texas
Plan Date: NIA TERMS: NET 30 -F.0.8. FACTORY -FULL FREIGHT ALLOWED(
NO TAXES INCLUDED -----------------
Addend a: NIA -----------------Quote # : MQJAN
We are pleased to quote the following materials for this project:
ELECTRIC UNIT HEATER:
1 -Berko Electric Unit Heater With Thennostat & Mounting Bracket.
Net Cost, FFA, FOB Factory ..................................................................... $621.00
NOTES: Equipment and accessories not specifically mentioned are not included . Taxes are not included.
Products are guaranteed only in so far as warranted by the manufacturer. Equipment for which payment
has not been received operates without benefit of warranty . Credit terms are Net 30 Day s. Freight is
F.O.B. Shipping Point. Returns may not be made without written authorization. This quotation is Signed:-------------
submitted for acceptance within 30 days provided materials are released for production within 60 days . Chris Chambers
Basecom Inc
5209 Vesta Farley Rd
Fort Worth, TX 76119
Rogers-a· Brien
1901 Regal Row
Dallas, TX 75235
Attn:
Owner Doc No: RFI 174
LABOR
MATERIALS
OVERHEAD 10%
PROFIT 5%
SEE ATTACHED LABOR & MATERIAL SUMMARY
Approved Change Order No:
Accepted Date : Accepted By:
Request For Change
Date : 01/23/12
Respond By Date : 01 /30/12
Internal RFC No: 18
Internal Job No: 11-001
Customer Job No: 10022
Status : Pending
Will Rogers Multi Purpose Cntr
1901 Regal Row
Dallas , TX 75235
Total RFC:
234 .05
538 .12
77 .21
42 .46
0 .00
891 .84
Please sign and return a copy as soon as possible 1 of 1
Labor Type
FOREMAN
JOURNEYMAN
APPRENTICE
Totals
LABOR
Crew Hours Rate$ SubTotal Brdn % Frng $ Brdn Tot. Frng Tot. Total Full Rate
0.25 0 .9 25 22 .5 40 1.5 9 1.35 32 .85 36.5
1 3.58 23 82.34 40 1.5 32 .94 5 .37 120 .65 33 .7
1 3 .58 15 53 .7 40 1 .5 21.48 5.37 80 .55 22 .5
2.25 8. 06 19 .67 158.54 40.003 1.5 63.42 12.09 234 .05 29 .04
MA TE RIAL SUMMARY
Description Qty Price Net Price Labor Total Mat($) Total Hours
3/4" CONDUIT -EMT 90 71 .21 71.21 3.52 64 .09 3.17
3/4" CONN COMP STL -E:MT 2 226 .78 226 .78 12 .5 4.54 0.25
3/4" COUPLING COMP STL -EMT 7 266 .12 266 .12 0 18.63 0
1/2" FLEX -LIQUIDTIGHT METALLIC -GRAY 4 116 116 3 .9 4.64 0.16
1/2" CONN STRAIGHT INSUL-LIQUIDTIGHT D 2 395.14 395 .14 15 7.9 0.3
#12 THHN BLACK 560 209.38 209 .38 5.15 117.25 2.88
15A 3P BREAKER BOLT-ON 1 153 .67 153 .67 0.4 153 .67 0.4
30A 250/600V DSN SW NON-FUS -NEMA 1 1 167.4 167.4 0 .9 167.4 0 .9
Tota ls 538 .12 8.06
Rogers-O'Brien Construction
February 23, 2012
City of Forth Worth
401 West 13th Street
Fort Worth , TX 76102
Ph: (817)392-7913 Fax: (817)392-8488
ATIN: Jack Durham
RE:RFI # 20 -Revised Sidewalk Finish @ R-B Bldg.
10022 Will Rogers Memorial Cntr East
Change Request # 113
Dear Jack:
Per RFI # 20 response, provided stamped and stained concrete at South side of R-B Building for (5)
locations as depicted in revised detail provided.
Attached please find our pricing for the above referenced revision item.
The total amount to provide this work is :
1901 Reg al Ro w
Dallas, Te xas 75 235
Main 214.962.30oo Please note the attached exclusions/qualifications .
Fax 21 4.962.3001
$5,671 .00
3901 s. Lama r Blvd. #zoo If you have any questions or need further clarification, please contact me at (214)962-3000 .
Austi n, Tex as 7870 4
Ma in 512.486 .3 800
Fax 512 .486 .37 01
www.ro ge rs-obrien .com
Sincerely,
?~
Trey Carroll
Rogers-O'Brien Construction Co
OWNER AUTHORIZED SIGNATURE
ATIACHMENT
Dallas I Austin
Change Request 113 Price Breakdown
Job Name: Will Rogers Memorial Cntr East
Description : RFI # 20 -Revised Sidewalk Finish@ R-B Bldg .
Labor Material
No Description QTY Unit Unit Total Unit Total Equipment
1 Stamped & Stained Concre te
****EXCLUSiONS AND QUALiFiCATiONS**** Subtotai:
See attached backup for labor, material and subcontractor and Ove rhea d
supp li er detail. Fe e
Price excludes all federal , state and local fees .
Price does include sales and / or remodel taxes.
Written authorization and / or signature on this PC required prior to
performing the above described work .
Total:
Subcontract
4,909.96
-
Date: 2/23/2012
Change Request #:113
Other Price
$4 ,909 .96
$4,909.96
10.00% $491.00
5.00% $270.04
$5,671 .00
Hahnfeld
Hoffer
Stanford
li01111fel<J l1o f fer Stanford I 200 B.:iiley .Cwenue, Su il,-)IJI_; 1·,_,1l \'.',;·::,, r,-:,·,;s 75 10/
Project:
Number:
To:
From:
Subject:
Sent Via:
~FI ID:
Discipline:
Received:
Question:
Suggestion:
RFI Response
Transmittal ID:
Date Sent:
07015-01 WRMC East Multi-Purpose Building
07015-01
Brent MacDonald
Rogers-O'Brien Construction Co.
1901 Regal Row
Dallas, TX 75235
214-962-3000 (Phone)
214-962-3001 (Fax)
Gary Ryan
Hahnfeld Hoffer Stanford
200 Bailey Avenue, Sui t e 200
Fort Worth, Te xas 76107
(817) 921-5928 (Phone)
(817) 302-0692 (Fa x)
Revised Sidewalk Fi nish at the Richardson-Bass Bu il dini;;i
Info Exchange
00020
4/12/2011
0 0317
5/17 /2011
Per on-site discussions the sidewalk finish along the South side of the
Richardson-Bass Bu ildi ng is to be revised. Please provide revised details
regarding the stamped concrete finish at the South side of the Richardson-
Bass building.
Answer: Reference attached sheet C3.0 for revised paving layout at the South side of
the Richardson-Bass bu i lding. Mix design will be as provided by Own er.
CC:
Contents
Quantity Dated Description ,
1 5/17/2011 RFI 020 C3.0 SITE AND PAVING PLAN-SITE PLAN.PDF
\'\ ((Y\
lr-\
~E SHEET C3. OA
.. Grace Construction Co ...
Concrete Construction
11325 Tantor Rd. Ste 200
Dallas, Texas 75229
CHANGE ORDER REQUEST
To: Rogers -O'Bria.n Construction
1901 Regal Row
Dallas. TX 75235
Attn: Trey Carroll
Project: Will Rogers Memorial Center
1401 W .R. Watt Drive
Fort Worth, TX 76107
Tuesday,January 24, 2012
Subject: See attached for additional cost for stamped and
stained concrete sidewalks
Change Order Request 11007-017
North Texas Bomanite
Material
Equipment
S ubcon:tract
$4,269.96
------
Subtotal S 4,269.96
Overhead & Profit 15% $ 640.00 ====== Total Cost: $ 4,909.96
This work has been performed. We request that the Change Order to our contract be is sued as soon
as possible. Should you have any questions, feel free to contac t me.
Sincerely,
Alan J. Haynes, Sr.
Grace Construction Company
Phone: (972) 432 -0800 Fax : (972) 432 -0810
1 of 1
• j ~
Job Name: Will Rogers Coliseum
Job Number: 11159
Customer P.O .#:
Phone : 972-432-0800
Fax : 972-432-081 O
ORM Construction , Inc.
11325 Tantor Road , Ste . 200
Dallas , TX 75229
Contract
1 Place , Color , Imprin t, & Seal SF
Ex tra Work/Change Orders
North Texas Bomanite , Inc.
Invoice
January 10 , 2012
Orig inal Contract:
Change Orders :
Total :
Percent Complete :
Pay Request#: 2
From Jan 1 , 2012 to Jan 31, 2012
$3 ,712 .00
$0 .00
$3,712 .00
115%
Mcirifhly Total · · \No;rk bn worron ..
. :C6rifract Contract ... Unit .Pri9e''. Monthly .Work .Total ArnciLJnt
640.00 96 .20 736 .20
Total Amount of Work Performed
Less Retainage
Net Amount Payable on Contract
Less : Special Deductions
Plus: Extra Work
Net Amount Due on Project
Less Payments Rece ived to Date
Current Amount Due on Project
Amounts Unpaid from Prio r Invoices
Amounts Due From Current Invoice
Current Amount Due North Te xas Bomanite
$5 .8 0 $557.96
$557 .96
$0 .00
$557 .96
$4,269 .96
$4 ,269.96
$0 .00
$4 ,269 .96
$4 ,269.96
$3 ,712 .00
$557.96
$557 .96
$557 .96
11107 Morrison Lane * Dallas, Texas 75229-5608 * 972-484-8465 * 972-484-8466 Fax
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME: East Multi-Purpose Facility WRMC
Contract No : CS41332
Attachment to Change Order No: 7
Today's Date: 3/28/12
Original Contract Amount:
Extras to Date :
Credits to Date :
Contract Amount to Date :
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail. for Adm in. Change Orders:
Remaining Funds Available for Change Orders :
Additional Funding (if necessary):
TOTAL
$ 15,443,305.00 $15,443 ,305 .00
$ 2,856,974.00 $ 2 ,856,974 .00
$
$ 18,300,279.00 $18,300,279.00
$ 45,440.00 $ 45,440 .00
$ 18,345,719.00 $18 ,345 ,719.00
$
$
$
436,000.00 $ 436 ,000 .00
390,560.00 $ 390 ,560.00
Prepared By: Karen Striker T/PW Business Support