Loading...
HomeMy WebLinkAboutContract 41332-CO12. -... City of Fort Worth Change Order Request CITY SECRETARY lJJ'3'3l£.D I c... CONT RACT NO . ,_ Change Order No . Date TPW Proj ect No . Fund in g (FAC ) 12 (twelve) 10/12/12 C 234 541200 207060162780 Facility and Project Description Ci ty Secre tary Contra ct No . East Multi-Purpose Facility WRMC ORIGINAL CONTRACT AMOUNT ............................................................... . EXTRAS TO DATE ................................................................... .. CREDITS TO DATE ................................................................... . CS-41332 $15,443 ,305 $ 3 ,065 ,369 $ 0 CONTRACT COST TO DATE ................................................................................................. . AMOUNT OF PROPOSED CHANGE ORDER ...................................................... (DEDUCT) REVISED CONTRACT AMOUNT ............................................................................................ . ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... . REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ . $18 ,508 ,674 $ ( 67 ,113) $ 18,441 ,561 $ 436 ,000 $ 227 ,605 ADDITIONAL FUNDING (IF NECESSARY)................................................................................ $ IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL ; Furnish all labor and material as per the attached Propose Change Requests PCR's -116R, 151 , 153, 154, 155, 156, 157 and 158 (DEDUCT) ($67 ,113) OFFICIAL RECORD Note: PCR -152 is rejected CITY s&CRITARY (DEDUCT) ($67 ,113) It is und erst ood and a greed that th e acc eptance of thi s Cha nge Order by the contractor co nstitutes an acco rd and sati s fa cti o n and represents payment in full (both tim e and money) for all costs a ri s in g o ut o f, o r in cid enta l to , th e above Chan ge O rder Contractor's Name Rogers -O 'Brien Construction Company, Ltd . Origina l Co ntract Ti me Additiona l Approved Time To Date Appro ved Contract Tim e To Date Additional Ti me Fo r This Change Order 590 cd O cd 590 cd O cd Distri buti on: File Constru ction Manager Project Manager Contractor 11 -1 5-1 2 A 1 0 : 2 9 I N Council Action (If Requ ired ) D Approved D Disappro ved D Other TPW Facili t ies Managemen t Division Ch ange Order Fo rm (01 /31 /1 2) Date 11/~(12 Date II /rz/n .. Date . -.... Change Orderl 2 East Multi-Purpose Facility WRMC PCR 116R-relocate damper actuator and add bird screen and break metal trim at Building A PCR 151-add nema 4 junction boxes and waterproof Connectors at RV connections as per Electrical Code PCR 152-Rejected PCR 153-Provide additional SO cord drops at Stall areas As per final stall configuration PCR 154-replace damaged soffit panels at At Building C PCR 155-add additional flashing and cover plates at roof area Building A PCR 156-apply bituminous coating at cattle p en are a PCR 157-paint non removable bollards safety yellow At Rv lot PCR 158-Credit for unused Allowance Allocation Total This Change ADD $16,049 ADD $35 ,159 No Change ADD $10,985 ADD $ 4,489 ADD $ 906 ADD $ 2,599 ADD $ 693 ( DEDUCT) ( $ 137 ,993) (DEDUCT) ($ 67,113) Rogers-O'B rien Construction August 29 , 2012 City of Forth Worth 401 West 13th Street Fort Worth, TX 76102 Ph : (817)392-7913 Fax : (817)392-8488 ATIN: Jack Durham RE:RFI # 165 -Unit 'A' Second Floor Damper Coordination -Rev . 3 10022 Will Rogers Memorial Cntr East Change Reg lJ._~t #__ UliR4 Dear Jack : Per letter forwarded to R-0 on 5/7/12 by Tommy Deeds , locate the damper and actuator in the 10'-0" x 2'-0 " opening per attached detail. Provide brake metal side enclosure pieces as well as a protective screen mesh plate by McNichols to prevent the publ ic from gaining access to the damper blades . Price includes blocking to facilitate installation of brake metal and w ire mesh plate . As discussed with Jack Durham, agreed to spl it cost for added breakmetal ($4 ,775 / 2 = $2 ,387 .50). 1901 Regal Row Attached please find our pricing for the above referenced revision item . Dallas, Texas 75235 Main 214 .962.3000 The total amount to provide this work is : $16 ,049 .00 Fax 214 .962.3001 3901 s. Lamar Blvd . #200 Please note the attached exclusions/qualifications . Austin, Texas 78704 Main 512.486.3800 Fax 512.486.370l If you have any questions or need further clarification, please contact me at (214)962-3000 . www.rogers-obrien.com Sine~/:?: ~ T rey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATIACHMENT Dallas I Austin \ .. Change Request 116R4 Price Breakdown Job Name: Will Rogers Memorial Cntr East Date: 8/29/2012 Description: RFI # 165 -Unit 'A' Second Floor Damper Coordination -Rev. 3 Change Request #:116Ri Labor Material No Description QTY Unit Unit Total Unit Total Equipment Subcontract Other Price 1 Alum Entrances & Storefronts 2,387.50 $2,387 .50 2 HVAC Subcontractor 10,461 .00 $10,461 .00 3 Equipment Rental 1,046 .82 $1,046.82 ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: $13,895.32 See attached backup for labor, material and subcontractor and Overhead 10 .00 % $1 389 .53 supplier detail. Fee 5.00 % $764 .15 Price excludes all federal , state and local fees . Price does include sales and / or remodel taxes. Written authorization and I or signature on this PC required prior to performing the above described work . .• Total: $16,049.00 May 7, 201 2 Mr. Trey Carroll Roge rs-O'Bri en Construction 1901 rl ega l Row Dall as, Texas 75235 Hahnfeld Hoffer StanfonJ Re : R19 ti 165 -Unit "A" Second Floor Damper Coordinator Will Rogers Memorial Cent er East Multi-Purpose Building Ch ange Reque st It 116 Dear Trey: I have reviewe d th e following i nfor m ation: • RFI ti 165, dated 12/29 /11 and response dated 2/21 /12 • Change requ est ii 116 • Damper submittaJs included as part of En erg y Managemen t Control Systems -Produ c t Data, RO Transmittal :fl 2 13 for Spec Section 15970 • Contract Docum ents to includ e Drawings and Specification specifically Salus 15910 and 15970 The review was done in response to th e refused change request t/11 6. Th e Contractor failed to understand th e installation details and requests c le ar on the contract document. In addition, no s hop drawings we re submitted, per the request of th e Contract Documents. cannot see where the lac!< of coo rdin ati on a nd co rnp lete subm itt als of the cont ractor/s ubcontracto r resu lts in a cost to th e owner. Change request i/116 is rejected. Attached please find details wilh proposed so luti ons for existing damper/actuators installation . Adv is e as to acceptance of proposed so lutio n o r schedule for alterna ti ve so luti on(s) fo r Ow ner/Archit ec t re view. If you have any questions or comme nts, please advise. /~~ /fom m y Deeds~ HAHNFELD HOFFER STANFORD archi.tects p l anners int er io rs cc: Jack Durham, (COFW) Eri c Hahn feld, AIA, (HHS) Gary Ryan, AIA, (HHS) , . ., ,.. / \ '/. ,··.) I //jl{ ,j(;:. r">JV. ( ..... '/ ,, ··••" I , J /• J'. •• / /U , . I 1 l 1,.' • • I ' ' '•-../ ,.-, /. I' • . • /' f .f /.' / .. ' ,/ ,··;('. l ~-h --\,' ' ( :··. 'r.., .. ,.. .. ·,/)J'/'/,'. -' . •~ : ' • I \J~lllN3:: Cll2th SLJ L!.t_~l'"l= lVll=s:h VV..~G..\!ilcr t L\ttr:f;j These tab:cs are for sclcc!ing McN fCl-lDLS:"J \'/i re Cloth lha1 Cc!n be . .,.,O'JCn lrom v1nual1•; .:inv me:,.:.I th.~t CJ;n be di.awn .i n:? •.-.,ire. They are arranged b;1 mesh {tti c numbci o! openings per lineL!I inch) unc! 91'.'C ~!l1c ·:.•i:-c c.!1~1mcicr. ·,·.·,G:h 0 ; open in gs in inches, percent of op~n orea '1nd \'/eight pi:::r hundred squ are feet fer s:cel w;re cloth. Sorne mes/Jc~ musr /J~ made to order and minimums may ;ipply. ______ L, , _0.1 :.1.250 .7500155.3 <112.4 ~ 1 fc!i l .250 .50 00 44A 11562.3 ~II .250 ·1.3750 36 .0 !G39.4 ;i~j .105 .1172 27.7 333 .7 ~~ .092 ,.1080 ! 29.2 233.4 [:'..J .092 .0747 120.Z 352 .S ::1c :~~~ :;~~~. ~~:~ ~~~:; :;,ti 1 :~~~ :~~~~ ~~:~ ii~~:~ 1;~\: :~~~ :~;~~ ~~:~ ,~~!:~ 1 :~~~ :;~~~ ~~:~ ~~~:~ . 1 1 :~~~ :i~~~ 1 ~t~ m:~ :~~~ :~~~~ 1 gJ m:~ 1 .192 .:::030 GS.3 240.3 .192 .5seo 55.3 j324.s / 1.rn2 .4330 :, .0 1395.o 1.o72 .1502 45.5 !157 .o 1.053 .mo il ,;5_9 i33 .2 .053 .1037 \ 3.s.9 163.0 1 1-7 82"Q "7-20 7 -1-7 "730 "8? ,n-, -I 177 '""O "1 'I"~"" 06 7 15Q2 ·12 117 9 0'" '''O "3" 95~ Q"' ••27 'GQ ·1--J ,1 . / . .J O ./ v./! . / .:J :J . ..; ·!./"'!./ . .'i;iU J .4 1 .'.IV.J.: . v, ... 0. 1v. 1 . ....,.., .l"10 :) .~ ./ . J'i .I J "i . I/./ I 1G2 "380 -n2 1·02 1 1"2 5""0 5·' 22"2 ''6? ·'6"0 r.4o n -77 O"' 16°7 ~-1.2 ·, "G' I o·-, '"'Q I ""5 7? __ "0 o·-1 «0 -1 1 .;• SI 0 "2 . i • .u IV. , · 1 ,l) .oo l.'1 ~-j.1 .... "1".:i IJ: ..... t./,., -~H. Vl.. .J o .... 1·'1 .,~ .... :,v. ."1 •• 1 .... 1 .. d. 00 . '1 .148 .3520 72.6 141.71 .14 8 .6020 64.4 190.5 I .148 .4770 58.31230.5 .047 .i752 62.0 65.0 I i.041 .1590163.2 54.9 .0-11 :,257 57.2 55.5 , .135 .8650 74.3 . 117.7 .135 .5150 57 .2 158.1 i .135 .4900 61.s 191.0 .041 .1812 66 .3 .;9_2 ·1 , 1 _035 .1550 6S.: 39.S .035 .1317 GZ .7, ~S.i 'I .12~ -~SOO 1 77.4 ~~-B .120 .6300 70.5 12•1.s 'j -!2~ .~050 ~g .3 150.~ .035 .1372 70.S 35.7 .032 .1680 70.6 33.2 .032 .1347 65 .6 t.0 .0 .10J .u950 B0.1 I 1t.O .105 .6450 73 .9 95.0 .10:i .0200 o •. 2 114.:, .032 .1902 73.1 29.8 1 ,.023 .i720 7<1.0 25.3 !.02S ,.13S7\ 69 .5 30.5 .092 .9080 32.4 54.4 .092 .65SO 76.9 72.8 1 ·:092 .5330 ' ·72 .7: '87.9 I i .025 .1750 I 76.5 20.2 . ·, .025 .14171 72.6 24.3 1.oa o .9200 i 34 .6 41.i , .oao .6700 79 .a 54.9 I .oao .54501 76.o 66.1 'i. • 022 .ma1 1 78.3 17.o .023 .1437 74.7 20.s \ .072 .92so I ec., 33.3 J .o72 .6730 au 44.5 1.072 .5530 78.3 53.5 , 1· .020 .1467 77.s 1s.s , i .063 1.9370 87.3 25.5 1 I ·oC~~ .65u9076QO 38~.91 32~-~ .00~~, .~67~00 ~~-~ '1 "3'00 .90 tf.f ! .063 .0799 31.4 1 S4.7 \}f:;,t l _054 .0710 '1 32 .3 162.7 ~~l::\.054 .0571 26.3 1, 17,A l •· "" · ,:,. ' "·"I · :t 1.:i' ""·3 · or.a 0S"9 39u.u0 1°0-, "10'7 0780 ~P91°oo 0 1 7 06" "°2 13 3° I I O '7 5780 o· 5 22 7 I · ;J • • u . .0,.,. I · . ! · '; .· ·1 vu. ~ ·" 1 • ' • 111 0 .:,. ·'-! I · , · u::J . . • 1.047 .0959 45 .2 104.2 :.0-+1 .0840 45.2 90 .6 1.0<11 .0701 39.71103.2 i/'.-:'\ .2so 1.2soo 25.o 894.6 f:~1~, .201 .2374 j 2a.1i Gso.9 .~g .192 .2 oeo 27.0 '!654 .~ , -~;~ .1019 51.o 78.4 1 1 .035 .o9oo ' s1.s Gs .1 .035 .0761 ,0.0 7,:.0 l~!:O:'.• .225 .2750 30.3 710.G , .192 .252,j, 32 .2 578.4 .177 .2230 31.i 54S.2 I·' }179 ·57.2 56.5 .032 .. 0930 55.4 5,1.1 I .0 32 .0791 50.6 51.4 , I .207 11.2930 34.3 593.8 1 .177 .2574 ! 36 .1 485.7 , .162 .23SO 35A J-153.i .0 0 ~2e ., 09 60.4 47.0 1.028 .0970 60.2 41.i .02S .0831 55.S 46.G I I n n · 0 2 O "9 7 '"7 ~ 11~9 6' S 7 5 3 025 1QQO 64.Q 32.5 .025 .0361 59.9 36.9 , .192, .3080 37.9 505.5 .162 .2 32,; ~0 .0 402 . .; ! .14u . 52 .; . i" 3.7 · 025 · '· " · , . · I I I ' " 0 3 9 I o-0 iP9 68 2 I 2~ 4 0?3 1020 65 .5 · 27.5 .023 .0331 62.7 I ~1.1 1, 1 •177 .3230 41.7 .125.,., 1 .14e .2964 44.4 332.5 , .1.;s .255 4 . !3 '·" · · ' · u. · ~ I" I I " i 1 .,62 .33eo i ,15 .7 352 .3 , .13s .3og4 43 _3 m.3 : .120 .2800 49 .o 124 0.6 . .022 .1199 70.6 J 24.0 I 1.020 1.10so 70 .6 20.7 / .020 .0911 I 67.1 I 23A II .148 .3520 I :19.G 292.4 1 .120 .3244 53 .1 214.3 I .105 .2950, 54A 1182.4 .020 .1229 74.1 , 13.1 .018 /.1070 73.3 / 15.8 I i ! 135 .3550 I 53.3 w .7 ! .105 , .3394 5B.2 163.2 i .092 .30 301 59.3 1139.0 .018 .1'.M 76.6 I 14.6 .017 i-1060 74.6 / 14.9 I I I I I j :;6~ :~~~~· ~~:: ;~~:-~I 1, :~~; :~~~~ ~~:; 11 1 ~~:~ '1 :~~~,.:~~: ~;:~1 1 ~::; :l f _.00~71 .. 00~3900 ;~·.:ul h,1,uG'·.~ 1Wi J._oo~~ i, .. _no_~~u-33 25.4 135., /9:.035 '.036•1 25.,; '116.1 I I , u u, u u., , ~3.~ 1 ~2 .• -~ I .032 .0394 29.S 100.5 1 1 ' .092 .~080 65 .G 110.2 .072 .3724 70.i , 75.7 .063 .3370 I 71.0 64 .3 .035 .0550 42.3 33.1 .032 1 1 .0513 7 :i " Q?S Qt.34 'G, •5, .080 -~200 70.G 33.0 1 .063 .3 81!t 73.5 ! 57.a .O~~ -~~~o I :~-~ I ~~-1 .03~ .0680 ~6.2 68.S .023 .0553 ~3:6 s;:~ 1:02~ :0~54 ~1:5 59:3 .072 1.4230 73.3 67.1 !' .05~ .3904, 77.0 j ·12.3 1 1 .O·")·"""D , 11 .• 1 .,:i .6 02 0 .0720 51.8 52 .1 .025 j.0533 43.4150.1 1 .020 .0434 ~5.2 49.8 .052 1.4370 , 76.t; s1 .2 1 ! .047 .::.974 79 .Z 1 32 .01 1, .041 : .. 3590 1 so .G1 1 27.0 ·.0?_~ .o-1 :;0 ~R.<'. d1_2 .O?_~ 1 1.060 " I 1 ' I I " U I Uu U • U U 51.3 ~2.2 ,.020 ,.0514 51.0 I 37.2 ! .os ,1;.4~60179 G 37.G I 1 . 1 1,:1 .!oo3c; 1 s2 2 ; 2c I i i I i .022 .ono ss.3 34.7 1 .020 ,.0633 57.2 1 31.G !.o,s :.os3i; J ss.1 j 29.9 J ·, .0 47 I .,;530 32.1 23.,;' ·, :, i I I i ! 11 O?Q oQnn I '' 0 ?_;;_·, 010 I 0"' "n ~ n--I n-~ I o-I I r.-? I ?G 6 ' 0'11 .'"GQ o,? ?1 5 / i / : I ! I ! 1 · u ,. u .. u . DS. ,., 1· v i !1· oJ,., Ou.u ~::J.~ 1-~ l I 1· J~s t JI._ -. I.·• .tJ" u ·I..; I -· I I I I I I I i .D16 1 .D55•l i 59.3 23.5 1 .035 4650 I S6.5 I i5.7 '1 I I i ! I J.015 1.0564 i 61.5 ! 20.61 I I I i ' I . I I_J , I , I I I ,.01 4 l;om l 53.1 ! 17.9 I tI:\ .162 .1713 , 26.31 560.tl ~:Eli .135,.15071 27.9 1 429 .0i@l .120 .13Do !l 27.0 i333.G iWl l.02S ,.0345! 30.5 I 83.6 ~1.025 1.0306 30.3 75.0 ll'.f-i!.025 '.0250/12s.o i S5.0 11 , •1 .14 8 1853 ::o.s 4Go.2 .120 .1557 33 .e 3,9.9 I .10s .i450 23.61306.2 .025 .0375, 36.D 1 68.9 1.023 1.0320 34..:; 55.o I 1 1 .023 .02,0 29 .2 / ,o.s • 0 -·oa'l 'l'" 0 ··7" 10"' 1°0-··o· ?'"2 I OQ2 --0 0 "9912'' 0 "2" Q"O::; ~go! "7 -I 020 ,~,c;a ... , •qo 020 0'001 ~60 552 '1 ·'v:J .1 ... ..,I v:J . .) Iv/ .l) I . J,'. u / "'-I ., _o.:,. . -.l :Jv IV. ' vi. .u (.) . .j..,,.. .j • .J I :::J,.r ·' 1.v .... ..,o ,1.1 .:.,.... 1· . ... .... . . I , .,20 .2133140.e 293.9 , .092 .1937 46.1 1sg_::; I .oeo .moj ~G .2p72., . 1 .020 j.o42s 1 45.2 , 1 43.o 1.01s 1 .D3,G ~5.s 39.2 ·, 1 .01s .0320 ! :.1.0 ~-1.1 . 1 .105 .2223 , 46 .e 222.0 ! .oao 2057 52.0 143.9 i .072 .1730 5D.7 i13s.2 .. o,s .0445 1 50.7 , 34.5 I.on .02s5 ,i8.3 34 .S 1.01, .o3so 43.G 39 .1 , l .0 9212:,;3 !' 523 163.7 1 .onl .2137 ss.11119.s i .063 .mo 55.0 !104 .8 1.017 .0455 53 .o j 30.71 J.015 .0396 so.s 30.1 1 1.0 10 .03.;0 1 ,:s.2 3~.,: ! .030 253:: 576 12G.,; · .OG3l.22271 G0 .9, 9:.1 i .054 .,ssoj 51.5 ! 75.4 , 1 .016 .0465! 55.4 j 27.1 ,.015 I.040G 53A 25.S I !.~1~ -~~~o ~9 -~ ~~11 , 072 I _2G;3 , 61 .3 i 101 .9 : .os1i 1 1 .2317 65.9 55.5 ! .o~7 .2030 65 .9 i 57 .G 1 .015 .04751 57.s 23.7 1 j .014 .0415 55.1 23.3 I i · 0 ~~-,- 0 ~~~ ~~-~ ;~·; I : .863 .27 03 ! 55 .G I 77 .6 ; .0,17 .2387 70.9 50.2 ; .041 .2090 G9.9 J 43.G .014 .O<l35 , Go.21 20.6 j.Oi35 .0,121 57.4 ;:c.01 .. 05 I! 11 :no_.1:~')?.:~~-S;'~I r_<~ 229'::o~ ! .05 t, .27931 70.1 -G.7 i .041 .2447 73.5 j 3S.1 l .035 .2150 74.0 ! 31.7 1 .0135 .0490, 61.5 ! 19.1 l.013 .0426 5S.S . . _ 1_0J u/ 5 ,.:; ; . ! .0~7 .2ZG3 73 .6 -12.3 ! .035 .. 2507 77.2 1 27 .G i 032 .2180 75 .0 i 26.4 .013 .0495 62.7 i 17.71 1.012 .0~36 51.6 17 .0 I .011 .0390 60.S i5 .9 'o·· 20??• 76-~?-.r.,, 'o·>?J 2"" .. ~90 2"1 '02n ?2?0 7°0 1 "0 7 0'2 o-o-5r,n I 1"0 '01' 0 1 '" 54A ''2 I i ·o;; .29--8~,-rig' -i . "-,· .,~, '· , "· !02~ -~~;o n~·-o i ~'-~ r·o;-·o~-sJ:IG::·~ 11;·" 1· I ,.'4SO l'L I 1.010 .~0400 , G,:.o, 13.1 !I ·o~~ ·~01~ t1··r. 23.7 '1 I ! . :i i, .l.l.:> v i. I 1G.1 1,··010' ·0~2'· 10'·-6· 1~0-~l 1.0101.0455 57.4 11.7 I i .0095 /.0sOS I GS.G I i1.S , . "'·· i ·"' ., ,., .J 1n.7 i 1 I 1 1. • J J . .-; !.0095 .OsGO 55.9 10.5 I i .009 i .0"10 I G,.2 1 10 .s I J / I I i 1 : i l ! .0095 .0530 71.S 9A I l .009 ,.Q,1G6 70.:l 9.5 I , i t , r-:-.r., -:: r:-...r. r· r-.: r..r. c r-,r:=_-. --~ •• , ~-: ~-~ ·,._;,·_ .. ~, t~.~_;1 c:o ~-~-· .• • '._,::,·,,, ·-./.~ ~:?., ?~ .~.:~ f,·' 1 --1 · 1 --~ -(0200G Stoel-: size 01 cu!-!O·size ,oh:1ces! -v _, ~ ~ :..~ -r · .... - Wire C!o!h fillers 2s ii pro1ec1s !his equipn12nt on !he rear of this bus. \lers21ile \1/ire C/0111 is used as roon1 o'h.ria'er in this rcst::1u;,2r;;_ 1ncr1ic hols.co1n • __ 43 Vinyl mesh- ,. M AMI C .::ttC :...£:.::-.. t@illi[(f;fiffi~ill Loci, Crimp • Provides accurate screen openings for life of the screen. Used when pla in weave will not hold accurate openings. Pl:iin Weave -Openings are square and wire sizes are the sa me in both directions. Each warp wire passes allernalely over and under sh ute wires at right angles both direclions. Standard weave used tor wire clolh . (Sometimes called Double Crimp). lntcrcrimp -Used in larger openings with light· wire to provide greater s1abili1y, tighlness of weave a nd maximum rigidity. Ffat Top Wcnve -Flat su rface improves !low r of materials over screen panels by reducing friction . Provides more ,nearing surle.ce than olhcr weaves. Loc~ing ,·,eave assures accurate openings to provide uniform grating and screen-· ing efficiency. Sta Clear a Ha Tri Loclt Wo~vc -Ideal for work- ing with sticky or v,et materinl that normally plugs square or oblong opening screens. Tri Lock Weave holds wire securely in place yet per- mits wires to vibrate slightly lo keep openings free and at peak efliciency. Information on orher weaves anrf crimps Is aval/able. . ~ ·w]illt~(?~1j Cnlentlering -A rolling .operation which llallens the knuc kles of Wi re Cloth gr1ing it n smoother surface . Crimp -Undulations in warp and fill wires which hold each other in place. Fill Wire -aka SHUTE W IRE , wire running across the width ol th e cloth. Filter Clot11 -Cloth used for llattening or straining (pri- marily plain and t\•1illed dutch Wire Cloth and certain specilications of squnrn mesh and off-coun: standard Wire Cloth). Hard\'/aro Ciolli -Plain weave square mesh cloth or relatively light wire galvanized alter weaving. (Usually betw een 2 to 8 openings per lineal inch). Marltel Grade -Applies to wire cloth specilications mos1 commonly used for general work. Market grade cloth is made ol one size wire for each size closed mesh . Mesi, -Number or openings per lineal inch, measured from center of wire to center of wire. r,1icron -1/1000 millimeter, 0.00003937 inch. The unit of mea:;ure for particle retention or filler med ia . • Available in full rolls only • Wire is galvanized before vinyl coated lill1 STOCI< S IZES Oil Tempered Wirn -High carbon steel wire that is heal treated to produce good strength and abrasion resis- tance. Opening -Dimension between parallel adjacent wires. Rectangular Mesh -Wire Cloth wilh different warp and fill wire mesh counts, which re sulls in rectangular open- ings. The most common have a higher warp mesh than fill mesh. Advantages are increased open are a and reduced cost. Selv.:ge -The finished edges of Wire Cloth runn ing the length of the roll which are produced by the weaving operation. Space Cloth -Wire Cloth speci lied by th e opening size rather than by the mesh count. Square Mesi1 -Mesh with equal spacing of warp and shute to give square openings. Warp Wire -Foundation wires running parallel to the length of the cloth. Weaves -Pattern in which wires are interwoven. Wire Diameter or Gau~e -Diameter of wire used in weaving cloth. ~;lilc(fiµ\,r:cW~l1N~W,:'\=1 t1.i.;:;..w(~i.;Ji~i~; ,Wi!o.:;t 4" x 2' WELDED .105 24", 36". 48". 60". 72' .33 2'WELDED .105 24", 3G", 48". 60",:·ik,~~ .43 2"'WELOEO .oeo 2t.·.1:i:>.~4e··. 60". n· .24 2·• x 1' WELDED .080 24".l(.J;'M48", w·. 72"' .37 1" x 2" WELDED .oeo 24", 36", 48", 60" .37 1"WELDED .oeo 24". 36". 72" .49 1" WELDED .063 24".[~Th;l 48" .32 1" x 1/2" WELDED .063 24"'.l'<f:):/\48" .47 l /2" OPG. WELDED .063 48" .45 2 MESH WELDED .063 211··. 36",l ~f!HJ .65 4 MESH I .025 !iJ,:'.I .31 Close-up view of Hook Screen edge. Screens for sizing and slrain ing can be Cumished by McNtCHOLS with any style of edge p:oparalion or hook !.lrip, ready rar in!::lollalion in?o any lype equipment. Oflen the edges 01 sc reens woven o! heavier than .ZSO .. 2rc rabricated to hook on to lhe. vibraling lrclnc, similL?.r to Stylos M-1 and M~. However, mosl screen:; made of .250" and lighter wire have a hook strip supporling the edges si milar to M•2, M-3. OR M-5. Edge lrca1men1. whether simply bent hooks or hoc!-;. strips , should be specified when screens are ordered. Absolutely square hook strips enable sc1reens to be r{cpl under grcaler, more un itorm tension. This protects the m c);gain st distortion and exces:;iva vibralion wh:ch lcauses metal fatigue ar.d breakage. FOR SPECIAL EDGE STYLES NOT SHOWN . PLEASE CALL US. ~il~0JfiiiDK~1~~@)'1V~'.tr!li@ De su;o to allow ilm;:,lo :Jcom ncV for 1~nslon1n g on vl~ralin9 ,crccn. Q\ l'-· L v::::ir~tor ~crccn~ r.c cC time to s~.11 fn!o place. lns1all new zrccn under p.inial tcnsicn wi:hout il 10,ul and allow i: to vibrate fer .1 bric! pe riod o! limo to s~al property. Then lighlcn lut:y :o proper tension. Lo:,:;o ir.!.lalla::oh will ~u:;;c pt,)matcrc brailk.lgo. 2. BucJ:cr up or ctO\'m bur rubb er strip:: shou!d t:-c chcc~cd cvary ~:a~~l~~h~~~c~:~~~~d~~~a~~:.b~~~~::~J;~b~r~·~~a:~ lrcm 3. Check the size of p!cccs bcir.g in ~1.i\!ed. Al'..O make sure ~ccns hilvc hoo~ ~lrips paril!lol. Tcn:.mn un:lormly lo maintain urccn:. in p::i.ra!lcl. Some shaker screens require a ::;pccl.i.l f.1brlc.i.tlon to meet ~lt OEJ,1 spcclfic;Ulons.. Check your :.c:reens or.d note them on yo ur order. 1ex 14 .011 36', ~s · .13 Bronze 1ex 16 .0 11 36", 48' .OS I Aluminum (In quire) 18 X 14 .009 36", •13" .09 S1ainf ess Type 304 18 X 14 .011 36". toa· .13 Stainless T)'pe 304 18 X 14 .009 ~s·. 40' .o9 I Epo,y co,lcd II you h.ivc other ,eo~ir.:men:s lh.-?n shown /JC~·), pl~Jsc J!ik us lor The Hole Sloiv on in'.;CCI screen! STYLE r,~·1 -Hoc,ctJ (d ~,: \'/1:.'lou:fl.tlnl.irtin';l /J f.J;'.2;.,'t;;,C"'""' r;,1 ., ~ Z'.((l;b'tl&l.(ftffi.~.illli.DJI (1ll'J.i\!Jl1JJIJ a@:~~fr;1J~:~, ,__~ll•~•~kit=doc Trnc Recommended \IJltc Ranqe M-1. M-4, M·G .312' d!J. and hoavicr :.1-2. r.1-5 .053 ' dia. :o .2so· fa. r,t-3 er M·3C .054 " dia. ar.d li9hlcr :,,.7 .192· diJ. Jnd hcat.·i~r t.1~8 .11.0' Gb . ~nd he.Wier All al the at>ovc arc based on mJnlJlactu,cr's rccommenda1ions . Nthough it may be possible to Put a particuln:r hook !.tyl~ on a wire diJmcler oulsido a! lhcsc recommended run9es. it will generally rcsull in damJgC lo the screen or the machine. Not :J'./ c~t;o :;1:1:;:.:;, .vo ;u-:ulJb:c. Slotlcd Scrcon5 -On Slotted Scree ns. lhc dircclion al th~ slo t should be speci li cd so as 10 be unmisla !iab:c. Usua:ty !he best way is to :.;pccily ·1009 slots pJml:ct to 'i9. dimension .. ;:i,s in Exampio 1 below. In those :c w ca:::.C!:. where th e length and OB dimension5 arc the sJmc. it is necessary lo tell lho dire\'.:- lion al long 5!ots in relallo n :o lhc len~th. E.:r..:implc 1 ·Jong slols .:ii right anglO!; lo th~ lc:19\h:-and ExJmplo 2 ·to:19 sloi~ p:iral:cl 10 tho length.· •~Leny!>. ~o · ' . . . . . . . \-c-,;g· OIH --1 Cur1J..o ~-·i:,-010.-- :,.:..-:,'-#7 Service • Quality Periormance 1-800-237-3820 "Full /lolls or Cci!:-To-L,2ngi"i1 !' -F-:-H-,-+r+,-+I -·--~r:!: • ,.... ........ ,.....,. -F H++·H-t+h'-t+H-tttf l+t-r~1 -'rl·t-M·n1• ( . ++-H-,-+++t-1-HH-~kt-." .. -J .. .I B5/3B/2B12 B2:59 8173325282 il""\IL'-•;-...., C\.i...lti,t/'"U..L\..(UIJl "J:L •l~I '--'-'• P AGE Bl/01 Out: NOW 05/30/12 15:55 Due: 1W WED 06/06/12 :t5~5s Ho Deliver/No Pickup --=-8 J. an k et Ove. r ride e==-_,.,,. .... No Add'l: N Off Days: 0 Oscnt%: 0(Rntl) 0(Res1) P.o. rox 4707~ FOH WCRTH, TX 71M7 UU(:)TC Invoice Opan-1.ng --=I nv no QTY=D,sscript1on ====·==·.=w.o --.. C J. a S s=R ,!l t e====· -,,,,,,.n=E i':l C h--···-'T O t ~ J. 045-0111 l LIFT, BOOM 45' GENIE Z-45 EQ 275.00 0:0ff 82S.00 825.00 01-0027 SR#23427 016-0950 1 DEL-CONTRACTORS AA :J. 25. ee 0: 0 ff 12 5. 00 12$.00 . -chacqe S·· ·-· ~-surnmo 'y . r--Pa yment r~Autlaoci ,ation- D ?.UY; 0.001 Dl,..JC; 0,0~ ot ; 104(;>,$2 : Copies! Fax: Clean: 0.00 Taxi 96,82 Paybl: 10qs.S2 lvl/Why: / Labor: 0.00 Prev: 0,00 Chk: opar ro1 Par-ts: 0.0<Zl "'--==tlepoe:lt=-'"""""'l' 8,-,1: 1046.82 O:sh~ svsr IDi Mtso: 0.00 Amt! 0.00 Ref: Cng: Txn: R 11.0.0 Copyright 2000, Solutions by Computer, Inc .• Springfield, Maas. W~D 05/30/12 15:55 ,J 10 39t'd Ajax Glass & Mirror Company 6200 Southwest Blvd Fort Worth, Texas 76109 817-732-3359 817-732-3339 Fax 817-732-4785 Contract Fa."< Fax Transmittal Fenn Me_ss~. . :r: ) K.~:r Lu:::r.,. At:!,f"),. bQoc,,4 P~ Q~ \ :::..Tw-tE N~,. A~ ~11~no ~ ~ lt:;.J M'J hlor:u Qr,:; S/\ 0 U...t cz: \, r::::oCY>,1 • ::: • • • ••• • • • .. HIDALGO INDUSTRIAL SERVICES, INC. Commercial & Industrial Contractors August 14, 2012 Roger's 0-Brien Construction 1901 Regal Row Dallas, TX 7 523 5 Attn: Trey Carroll Subject: PC0#31 Will Rogers East Multi-Purpose Facility Hidalgo Job# 03-321020-0 REF : RFI 165 Attached is our 12ricing tiroposal for the labor and materials associated with installing _ McNichols wire cloth for dampers and actuators at Qty of 36 louvers on second level A. We exclude brake metal and painting. Our proposal is based on using 0 .120 wire mesh and 12 gauge steel frames because 0.092 is not in stock. Excludes tax and bond. Total add for this Proposed Change ..................................................... $10,461.00 Per your direction we have procured materials and are currently installing these materials based on pre io us pricing. Please forward change order in the above amount. Respect:full ~ ~ Jim Schneider EVP 3525 Brennan Ave• Ft. Worth, TX. 76106 • (817) 625-8222 • Fax (817) 625-8227 M-39633 Regulated by the Texas State Board of Plumbing Examiners, P.O. Box 4200, Austin, Tx. 78765; · 1-800-845-6584, 512-936-5200 TACLA27289C Regulated by the Texas Department of Licensing and Regulation, P.O. Box 12157, Austin, Tx. 78711; 1-800-803-9202,512-463-6599 HIDALGO Iii . . INDUSTRIAL SERVICES, INC. Hidalgo Industrial -Change Order Request Date : 14-Aug-12 Hidalgo Job No.: _0_3-__ 3 __ 2_10;....2 __ 0_-0,-::------ Change Order Req. No.: 31 Customer PO/Contract#: 10022-15-01S Owner I Contractor Rogers O'Brien Contact..;T..;..re;:..;y __ C;;;.;.a;;;.;.r...;.ro;..;.;11 ____ _ Description: Install Mcnichols wire cloth for dampers & actuators on second floor A louvers per architects comments in RFl#165. Total Quantity of 36 louvers . LABOR Descri ption Operator Sheet Metal ~o urn_ev.rri..?I'!. Welder Plumber Apprentice · Plumber Joumeyman Supe rviso r PEQje£1 M~na9.e r · · MATERIAL Descriptio n M&M Quote for wire cloth Lumber Quote Misc. Screws & Fasteners · SUBCONTRACTORS Contractor RENTALS . Description Backhoe Fuel RECAP Hours Qty ..... l ..... 1 I o l -. T 1 X ! $ .x .......... '.$ ...... . X : $ X ·····, $. X .$ X "if x .$ Rate Total 26 .00 ! $ '-=-----_24 .00 ;$ 24.00 '. $ ·}}~g f{ 28.00 ; $ . ..672.00 - 35 .00 ~l . . -.. -... . 35.00 Subtotal : $2,627.00 Labor Burden: -35o/~ ··· S919 .45 Total Labor Cost: $3,546.45 Unit Price I .. s,4os .oo : 468 .00 i 144.00 ! ·-i Total $5,406.00 .. "' ·-·· . $0.00 ---$144.00 $0.00 -···-----··-----:---:-~=========:::::;::::::::::::::: Subtotal: $5;55().00 Contractors Name Total , .. ,, _____ ...... --- ................................................................................................. ,,l========-====:=;;= Subtotal : $0 .00 Rate Qty .Period Total ,., .J _ $500.00 .. J .. 0 I $50.00 I o -···--·-··" -. WEEK $0.00 DAY ,_,,.~=----·""-$0 .00 __ Rental Tax -8.25% =========== Subtotal: $0.00 =================================:=:========= Labor $3,546.45 Materials $5,550.00 Schedule Impact: Yes Subcontractors $0.00 Number of Days Impacted: 5 Rentals $0.00 Remarks: Subtotal $9,096.45 Subcontractors 0% $0.00 Overhead 10% $909 .65 Margin 5% $454.82 Sales Tax 0.00% $0.00 Total Cost $10,461 Date : To: Attn: From: Ref: Qty 35 1 M & M MANUFACTURING CO. (817)334-0034 metro (817)654-4131 7/5/2012 HIDALGO INDUSTRIAL GARY MICALETTI MARVIN PETERSON WILL ROGERS MC -WIRE MESH fax (817)336 -5247 Quote# Phone: Fax: Q070512MP-1 Validity: 30 DAYS Availablil ity: SEE NOTE "WE ARE PLEASED TO QUOTE AS FOLLOWS" U/M EACH EACH Description WIRE MESH FRAMES AND ANGLES PER DRAWING 12 GAGE GALVANIZED .120 WIRE MESH 5/B"SQUARE OPENING WIRE MESH FRAMES AND ANGLES PER DRAWING 12 GAGE GALVANIZED .120 WIRE MESH 5/B"SQUARE OPENING WIRE MESH LEAD TIME FROM FACTORY 1-2 WEEKS WILL HAVE JOB COMPLETE WITHIN 2 DAYS OF GETTING WIR E MESH FREIGHT--------1 LOAD ALLOWED FORT WORTH* DALLAS• HOUSTON * UTILE ROCK 200 ADOLPH ST. FORT WORTH,TEXAS 76107 Weight Amount $5,046.00 $360.00 TOTAL $5.406.00 ' I. HIDALGO INDUSTRIAL SERVICES, INC. Commercial & Industrial Co11trnctors May 23rd, 2012 Roger's 0-Brien Construction 1901 Regal Row Dallas, Tx 75235 Attn: Trey Canoll Subject: PC0#3 l Will Rogers East Multi-Purpose Facility Hidalgo Job # 03-321020-0 REF:RFI 165 Attached is our pricing proposal for the labor and materials associated with the installing 2"x4" wood backing and McNichols wire cloth for dampers and act1iators at Qty of 36 lou vers on second level A. We exc lud e brake metal and painting. Our proposal is based on using O .1 20 wire mesh and 12 gauge steel fram es because O. 092 is not in stock. Excludes tax and bond. Total add for this Proposed Change ..................................................... $ 13,831.00 If you hav e any questions regarding this proposal , please contact me at your earli est convernenc e. Respectfully, ~~/ki;;J Shaun Pittman Estim ating Manager 3525 Brennan Ave• Ft. Worth, TX. 76 106 • (817) 625-8222 • Fax (S 17) 62 5-8227 111-39633 Regulated by th e T exas State Board of Plumbing Examiners, P.O . Box 4200, Austin, Tx. 78765; l-SOO-S45-6584, 512,93 6-5200 TACLA27289C Regulated by the T exas Department of Li censing and Regulation, P.O. Box 121 57, Austin, Tx. 787 1 I; l-S00-803-9202, 5 12 -463-6599 t' I • J.. HIDALGO INDUSTRIAL SERVICES, INC. Hidalgo Industrial -Change Order Request Date: 23-May-12 Hidalgo Job No.: _0_3-_3_2_10_2_0_-0 ____ _ Change Order Req . No .: 31 Customer PO/Contract#: 10022-15-01S Owne r/ Contractor Rogers O'Brien Contact_T_re__,_y_C_a_r_ro_ll ____ _ Description: Install 2"x4" wood backing and Mcnichols wire cloth for dampers & actuators on second floor A lou ver s per architects comments in RFl#165 . Total Quantity of 36 lou vers. LABOR Description Hours Rate Total Operator 0 X $ 26.00 $ ---------------Sheet Metal Journeyman 144 X $ 24 .00 $ 3,456.00 Welder O·, X $ 24 .00 $ Plumber Apprentice 0 X $ 19.00 $ Plumber Journeyman 0 X $ 24.00 -$ ·--------- ( Supervisor 40 X $ 28.00 $ 1,120.00 PrQiec t Manager 1.0 X $ 35 .00 $ 35.00 Subtotal : $4,611.00 Labor Burden: 35% $1,613.85 Total Labor Cost: $_6;22_1.ss ~ MATERIAL Description Qty Unit Price Total M&M Quote for wire cloth 1 X 5,190.00 $5,190 .00 Lumber Quote 1 X 468.00 $468.00 Misc. Screws & Fastene rs 1 X 144.00 $144.00 X $0 .00 Subtotal: $5 802.00 SUBCONTRACTORS Contractor Contractors Name Total Subtotal: 0.00 RENTALS Description Rate Qty Period Total Backhoe $500.00 0 WEEK $0.00 Fuel $50.00 0 DAY $0.00 Rental Ta x 8.2 5% Subtotal: 0.00 RECAP Labor $6,224.85 Materials $5,802 .00 Schedule Impact: Yes Subcontractors $0.00 Number of Days Imp acted: 5 Rentals $0 .0 0 Remarks: Subtotal $12,026.85 Subcontracto rs 0 % $0.00 Overhead 10% $1,202 .69 Margin 5% $601.34 Sales Ta x 0 .0 0% $0.00 Tota l Cost $13,831 j t' I -,. 11 Date: To: Attn: From : Ref: Qty 1 M & M MANUFACTURING CO. (817)334-0034 metro (817)654-4131 5/22/2012 HIDALGO INDUSTRIAL SHAUN PITTMAN MARVIN PETERSON WIL L ROGERS MC -WIRE MESH fax (817)336-5247 Quote# Phone: Fax: Q052212MP-1 Validity: 30 DAYS Availablility: 10-14 WORK DAYS "WE ARE PITASEDro QUOTE AS FOLLOWS" U/M LOT Description WIRE MESH FRAMES AND ANGLES PER DRAWI NG 12 GAGE COLD ROLLED STEEL .120 W IRE MESH 5/8"SQ UARE OPENING FREIGHT--------1 LOAD ALLOWED FORT WORTH * DALLAS * HOUSTON * LITTLE ROCK 200 ADOLPH ST. FORT WORTH,TEXAS 76107 Weight TOTAL Amount $5 ,190.00 ---·,, /' \ I \ \ . $5,190 .00 4041 Meacham Blvd. Fort Worth TX 76117 (817) 58 ·1-1344 Bill To: 1-IIDALGO INDUSTRIAL SERVICES 2535 BRENNAN AVE FTW 53-E FORT WORTH TX 76106 Phone: (817) 625-8222 Purchase Order No. Custom er ID . I sa1esperso'r1 .. HIQ0001 I MULLINS -0rdered Shipped Quote Ship To: :'batet:;:r:::t 512312012 R;J, i{Td\ PO so'x 489 Colleyville TX 76034 HIDALGO INDUSTRIAL SERVICES 2535 BRENNAN AVE FTW63-E FORT WORTH TX 76106 Phone: (817) 625-8222 I NET 10TH I I BILLING 72 0 LUMBER 2X4X16' FIRE-TREATED LUMBER Each $6 .50 $468 .00 Shipping Method QUO TE FOR CHRISTINA I PICKUP Materials not returnable without prior approval and rec eipt RetL1rns subject to a rest ocking fe e \ :rdrnt '.:., ·· ... ·.·· $468.00 $0 .00 $0.00 $0 .00 $38 .61 $000 $506.61 revised damper installation detai ls do not add any scope to JC l's instal lation therefore there should be no added cost. We can't p roceed until JCI responds. Th a nks, Shaun Shaun Pittman HIDALGO INDUSTRIAL SERVICES, INC . Cell: 469.500 .9719 O ffice: 81 7 .625.8222 Fa x: 81 7.625.8227 spittman@h ida lg oindustria l.com(attachme nt "Damper Coordination Email.pdf" dele ted by Scott J McCollam/NA/Johnson Controls) (attachment "Damper Coord Drawings.pdf" deleted by Scott J McCollam/N A/Jo hnson Co ntrols) 2 Shaun Pittman From: Sent: To : Subject: Shawn , Scott.J.McCollam@jci .com Tu esday , May 29, 2012 2:18 PM Shaun Pittm an Re : FW: Will Rogers Dampe r Coordination Th e dampers are back to the original design, JCI will not ask for a change order. Scott McCo l lam , LEED AP Senio r Account Execut ive 7461 Airport Freewa y Richland Hills Te xa s 76118 Tel.: 972-743-8497 Fax: 866-621-0399 scott.j.mccollam@jci.com F rom : T o: D ate: Subject: Scott, "S haun Pittman" <spi1tman@h id alqoindustria l.com> "Scott McCollam" <scott.j.mccollam@ici.com> 05/29/2012 10:44 AM FW: Will Rogers Dampe r Coordination A re you wo r ki ng on thi s? This has been outstanding sinc e Ma y 8th. Is there someone else I need t o.contact? Shaun Pittman HIDALGO INDUSTRIAL SERVICES. INC . Cell: 469.500.9719 Office: 817 .625 .82 22 Fa x : 817 .625 .8227 spittman@hidalqoindustrial.com From: Shaun Pittman Sent: Thursday, May 24, 2012 10:30 AM To: Scott Mccollam Cc: Jim Schneider Subject: Will Rogers Dampe r Coordinatio n Importance: High Scott, We need your re sponse to the architects r ev ised damper installation detai l. Hidal go has pri ce d the wood blocking and the mes h to co ver the bottom of th e damper per Roger O'Bri e n's in st r uc ti ons . Th e ow ner and arch itects position is the V ry:rv C -• I :;:f' ' Roge r s-O'B r ien Const ruction September 06, 2012 City of Forth Worth 401 West 13th Street Fort Worth, TX 76102 Ph : (817)392-7913 Fax: (817)392-8488 ATIN : Jack Durham RE :ASI # 40 & # 43 -RV Lot Pedestal Elec. With SOOW Chord 10022 Will Rogers Memorial Cntr East Ghange -Request #-151 Dear Jack: Per ASI #40 & #43 documents as well as directives from Jack Durham and Ken Randall, provide twist-lock connection from permanent vault power to individual pedestal power at each pedestal location on the equestrian multi-purpose parking facility . Each vault is to include (1) NEMA 4X junction box for permanently connecting the THWN power supply wire with the SOOW chord , flexible conduit connection and waterproof junction box penetration from the NEMA 4x junction box to existing supply conduit, waterproof penetration into NEMA 4X junction box for SOOW chord to each pedestal power module, copper ground with mechanical connection from ground rod to each pedestal power module, Insulated tap 1901 Re al Rowconnectors for the female ends of the twist-lock plugs , and suppo~ hooks for hang!ng each SOOW chord Dallas Texa! 75235to the wall of the vault when not connected to the pedestals . Cost includes restocking fee for ILSCO Main Z14 .962 .30oosplices . Fax 214 .962.3001 3901 s. Lamar Blvd. #2o oAttached please find our pricing for the above referenced revision item . Austin, Texas 78704 Main 512.486.3800 Fax 512 .4 863701 The total amount to provide this work is : $35 ,159.00 www.rogers-obrien.com p1ease note the attached exclusions/qualifications . If you have any questions or need further clarification, please contact me at (214)962-3000 . Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATIACHMENT Dallas I Austin ., ' . -Change Request 151 Price Breakdown Job Name: Will Rogers Memorial Cntr East Description: ASI # 40 & # 43 -RV Lot Pedestal Elec. With SOOW Chord Labor Material No Description QTY Unit Unit Total Unit Total Equipment 1 Electrical Subcontractor ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: See attached backup for labor, material and subcontractor and Overhead supplier detail. Fee Price excludes all federal, state and local fees . Price does include sales and / or remodel taxes . Written authorization and / or signature on this PC required prior to performing the above described work . Total: Subcontract 30,440 .99 Date: 9/6/2012 Change Request #:151 Other Price $30,440 .99 $30,440 .99 10 .00% $3 044 .10 5.00% $1 673 .91 $35,159.00 0 Hahnfeld Hoffer Stanford • j • ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Project Name: EAST MULTI-PURPOSE FACILITY AT WILL ROGERS MEMEORIAL CENTER CITY OF FORT WORTH FORT WORTH, TEXAS Owner: City of Fort Worth 401 West 13th Street Fort Worth, Texas 76102 Contractor: ROGERS ~O'BRIEN CONSTRUCTION 1901 Regal Row Dallas , Texas 75235 ASI No.: 40 Issue Date: 05 /14/12 Project No.: 07015-01 Contract For : General Construction Contract Date: January 6, 2011 Owner: [X) Architect: [X) Consultant: [X) Contractor: [X] Field: [X) Other: [ ) File: [X) The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates the Contractor's acknowledgement that there will be no change in the Contract Sum or Contract Time . Description : Reference the attached drawing for modifications to the receptacle connections to the pedestal power panels. Attachments: E.RV.2 , REV . 2 Issued by Hahnfeld Hoffer Stanford: William Westhoff/ PA (Signature) (Printed Name I Title) t .. (";'\ Dl8TRIBUTION BOARD DETAlL '::!.J---""'·' ... N ~ (.\l ELECTRICAL SITE PLAN '\..V \.V ..,..., .. ,._ (:;\ RI SER DIAGRAM 'I..V-.......... 0 ~A2~:_o TRANSFORMER ENCLO$URE PLAN ::: .. .. '" .. " " .. ,. PEDESTAL FEEDER TABLE ::: = ;: -------MfMl'lO($f~(TVl'.J) -.,~CO,UlO OWOI on, .... ~-. ,_ QIIT "'"· ~-=,~~Of'CNN(; Id-ft' UIM: P\.()111(1$( f°"' lOC....:0 1n u.s.,1,·•oa,om,,c•TlllMOS(•II• ....u:•rtWAU:COl<NCCTIOHl(lYP,1) IWMOl QI.IO: C(IOIIO(CT$ -.mt -Af '°'" PGi (tff',) §§~~~l~~;,~!~~~on&& ~~o~:,)~~ ____ ..... _ ........... __ .... ___ _ --.,u;t f 1001.111.-TUAS 11£c,:,111,,_ ..a.•--• NOTES ._. 0 111 CIIA-.QJ 1. IIC._PIIT""°"""'•UGH•ltLl'Dl.Ll'OU =.:-..:z:+~=- z. ii*l--l.ll>lfl0- 1. (mTINDllllUTLDfTlO- L---~ro• ~,,._,_,,o,....,,l><"o ... -..OCUOSTHI.-- ··~-=~=::: l,-V05TH(ll'Vll,O--C,, o. ;;;::...-o & ... v..·---.,oou:~ -.::, .... ,CM. SHEET NOTES : >."'S1....._,1lOIMN1'WU.N- .._. .. n._'IHT--.a-...10 ---,--. 1.-(l(INT_ .... ~,;I ICN _.,,....-.u • ..,, .. .......:, __ -.,MC"l--~ANCLl,UICIMI: CCOIO~IM.a.-..... lUICOIO<llf;'I ICl<L tlM1DP£ Hahnfeld Hoffer Stanford 200 Bailoy Avo .. Suilo 200 FOft Worth. T exas 76107 81 7 .92 1 .5928 lax 817 .302.0692 Lffll&IIJJCll.lllll.OfG.MEM L1.C Tt.l,l,!ll'ltDl'!TMllONOC)f.WII ""-CIIMOIC,00011:lfl •Nt-UIDl'Gl .. fll: ... I -T.TPM~ fll l"*-,,.,,.,, ..... ,. a: w .... I-z Cl LI.I .... c::, (.) z _. Si: c:i: a: ii: c:i: a. 0 LLI ::E :z: (I) w .... (I) Cl ::E a: ~ a. Cl a: en 3: LLI = .... a. a: .... :z:~ I w a: j:: Cl .... Cl a: .... 0 u. = Cl ::E a: u. 3: Cl .... ...I .... ...I t: (I) i a: c:i: Cl LLI y u. ELECTRICAL SITE PLAN AND DETAILS SHCET E.RV.2 Of 2E SHEHS -·---- Hahnfeld Hoffer Stanford ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Project Name: EAST MULTI-PURPOSE FACILITY AT WILL ROGERS MEMEORIAL CENTER CITY OF FORT WORTH FORT WORTH, TEXAS Owner: City of Fort Worth 401 West 13111 Street Fort Worth, Texas 76102 Contractor: ROGERS -O'BRIEN CO NSTRUCTION 1901 Regal Row Dallas , Texas 75235 ASI No .: 43 Issue Date: 06/11 /i 2 Project No.: 070 15-01 Contract For: General Construction Contract Date: January 6, 2011 Owner: [X] Architect: [X] Consultant: [X] Con tra cto r: [X] Fie ld: [X] Other : [ ] File: [X] The Work sha ll be carried out in accordance with the follo wi ng supp lemental inst ructions issued in accordance with the Contract Documents wit hout change in Contract Sum or Con tract Time . Proceed in g with the Work in accordance with these instructions ind icates the Contractor's acknowle dgement that the re will be no change in the Cont ract Su m o r Con t ract Time. Description : Mod ify Deta il 2 on Sheet E.RV .2 as ind icate d in the attached letter from Ba ird Hamp t on & Brown . Attachments: 8 1 /2 x 11 Letter dated 06/11 /12 regarding WRMC RV Lot , Pedistal Wiring Change . Issued by Hahnfe ld Hoffer Stan ford: Gary A. Ryan / Project Manager (Prin te d Name/ Title) Baird, Hampton & Brown, Inc. t I 5 I J June 11 , 2012 Mr. Gary Ryan, AJA Hahnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth, TX 76107 RE: WILL ROGERS MEMORIAL CENTER RV LOT PEDESTAL WIRING CHANGE FORT WORTH, TEXAS BHB PROJECT 2011.111.000 Gary, Engineering & Surveying Please issue the following information to the Contractor regarding wiring of the RV pedestal power panels: Pertaining to Sheet E.RV .2 , Detail 2 , RV POWER/WATER PEDESTAL DETAIL: 1. Delete the waterproof splices, wet location receptacle and plug, and SOOW cord connections to each pedestal. Turn over all materials rendered unused to the Owner that cannot be returned to the manufacturer for ful l credit. 2 . Extend the 3#6 THWN feeder conductors through the handhole and make permanent connection to the pedestal power panel(s). Coil five (5) feet of slack conductors in the handhole for each pedestal power panel. 3. Provide a 5/8 " x 8' long copper clad steel ground rod in each handhole. E:xtend the feeder equipment ground to the ground rod and make a mechanical connection to the rod. 4. Provide a #8 grounding electrode conductor from the ground bus in each pedestal power panel and make a mechanical connection to the ground rod in its associated handhole. Sincerely, BAIRD, HAMPTON & BROWN, INC. Ken Randall, P.E., LEED AP Principal, Electrical Engineer 6300 Rid glea Pla ce, Ste 700 , Fort Worth , Te xas 76116 Tel: 817-338-1277 , Fa x : 817-338-9245, E-Ma il : ma il@b hb inc.com E:STIMATE RV LOT Plug/ Receptacle Code DESCRIPTION Qty THHN Wi re#4 630 THHNWire#6 640 THHNWire#8 360 THHN Wi re# 10 110 TH HNWire#2 1,560 THHNWire# 1 360 THHN Wire# 1/0 60 5/8" Copper clad steel a ro und rod 8' 54 #8 AWG Ground to Power Pa ne l 540 Ground Rod Clarno 54 Labor for wire and around rod 58 Labor to co nnect THWN to pedestals 27 Labor to diconnecl THWN from ped . 18 Restocking charge for ILSCO splices 1 Nema 4X j-boxes (8"x8"x4 ") 54 Prep j-box for soow & lhwn -labor 40 Liquid Tiaht Conduit -2" 160 Liquid Tight Conduit -1 112" 110 2" PVC Connector 32 1 1/2" PVC Conneclor 22 Galv. Coupling 54 2" Water tight couplings 108 2" wate r tight locknul 54 1" water tiaht lock nut 108 Grav/ Blue Wi renuts (bucket of 50) 10 Tapcons 1/4" x 1 1/4"(baa of 75) 2 In sulated Tap connectors 1/o -14 AWG 186 Insulated Tap connectors 4 63 Proiect Manaaement 40 Dura tio n: Must Fini sh in: Unit Labor LF $ - LF $ - L F $ - LF $ - L F $ - L F $ - LF $ - EA LF EA HR $ 49.90 HR $ 49.90 HR $ 49.90 LS EA HR $ 49.90 LF LF EA EA EA EA EA EA BG BG EA EA HR $ 37.68 0 0 UNIT PRICE Material $ 0.67 $ 0 .39 $ 0.26 $ 0.17 $ 1.09 $ 1.55 $ 1.80 $ 19.75 $ 0.32 $ 2.33 $ 2,105.19 $ 24.78 $ 2.2 1 $ 2.10 $ 0.74 $ 0 .74 $ 3 .41 $ 28.65 $ 7 .36 $ 5.62 $ 8.00 $ 15.41 $ 20.45 $ 14.77 $ $ $ $ $ $ $ weeks weeks Eq uip -$ -$ -$ -$ -$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Direct Job Cost: $ Payment & Performance Bonds: Insurance OH NOTE: Labor fo r termina tio ns is included in oriai nal scooe and was not includ ed on this oro oosa l. PROFIT TOTAL JOB CO ST: Sell Price: Prepa red by Ba secom Inc. Page 1 of 1 SUB TOTAL Labor Mate rial -$ 422.82 -$ 252.04 $ 92 .15 -$ 18.76 $ 1,70 0.40 $ 558.00 -$ 108.00 -$ 1,066.50 -$ 172.80 -$ 125.82 2,894.20 $ 1,347.30 $ 898.20 $ -$ 2,105.19 -$ 1,338.12 1,996.00 $ -$ 353.60 -$ 23 1.00 -$ I 23.68 -$ 16.28 -$ 1184.14 -$ 3,094 .20 -$ 397.44 -$ 606 .96 -$ 80.00 -$ 30.82 -$ 3,803.70 -$ 930.51 1,507.20 $ - 8,642.90 $ 17,7 12.93 No 0 0.0•1. 10 .0•1. s.0•1. Run Date By Checked Equipment $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - - - - - - - - - - - - - - - - - - - - - - - - $ 0 .B BASECOM INC. 915/20 12 16:43 Subcontract TOTAL $ 422.82 $ 2 52.04 $ 92 .15 $ 18.76 $ 1,700 .40 $ 558 .00 $ 108 .00 $ 1,066.50 $ 172.80 $ 125.8 2 $ 2,894.20 $ 1,347.30 $ 898.20 $ 2,105.19 $ 1,338.12 $ 1,996.00 $ 353.60 $ 231.00 $ 23.68 $ 16.28 $ 184.14 $ 3,094.20 $ 397.44 $ 606.96 $ 80.00 $ 30.82 $ 3,803.70 $ 930.51 $ 1,507 .20 $ 26,3 55.83 $ $ $ 2,635.58 $ 1,449.57 $ 30,440.99 $ 30,440.99 9/5/2012 Rogers-O'Br ie n Co ns t r uction September 06 , 2012 City of Forth Worth 401 West 13th Street Fort Worth , TX 76102 Ph : (817)392-7913 Fax : (817)392-8488 ATTN : Jack Durham RE :Unit B -Chord Drop Replacement 10022 Will Rogers Memorial Cntr East Change ~quest# 151_ Dear Jack : Per site directive from Jack Durham , provide (170) 15'-0" chord drops to replace (12) chord drops on the West side of unit 'B' below the ductwork for fan VF-3A , (8) chord drops at the South side of unit 'B ' below the ductwork for fan VF-38 , and (150) chord drops to replace miscellaneous chord drops throughout the first level of unit 'B'. Cost includes removal of the existing 8'-0" chord , reutilization/reinstallation of the existing chord grips , male twist-lock connectors and female plug connectors . Labor breakdown is given in combined hours for 1 Journeyman ($30 .50/HR)and 1 Apprentice ($19.40/HR) for a cumulative total of $49 .90/HR (total hours for the Journeyman is 67, total hours for Apprentice is 67), Project Supervisor is l billed at $37 .68/HR 1901 Rega Ro w Dallas, Te xas 75235 Main 214 .962.3000 Att h d I fi d . . f th b f d . . ·t Fa x 214 _9623001 ac e p ease in ou r pricing or ea ove re erence rev1s1on I em. 3901 s. Lam ar Blvd . #ZOO The total amount to provide this work is : Austin , Texas 78704 $10 ,985 .00 Main 512.486 .3800 Fa x 512.486.3701 Please no te the attached exclusions/qualifi cations . www.rogers-ob rien.com If you have any questions or need further clarification , please contact me at (214)962 -3000 . Sincerely , ~ Trey Carroll Rogers-O'Brien Const ruct ion Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas I Austin Change Request 153 Price Breakdown Job Name: Will Rogers Memorial Cntr East Unit B -Chord Drop Replacement Description: Labor No Description QTY Unit Unit Total 1 Electrical Subcontractor ****EXCLUSIONS AND QUALIFICATIONS**** See attached backup for labor, material and subcontractor and supplier detail. Price excludes all federal , state and local fees . Price does include sales and I or remodel taxes . Material Unit Total Subtotal: Overhead Fee Written authorization and / or signature on this PC required prior to performing the above described work. Total : Equipment Date: 9/6/2012 Change Request #:153 Subcontract Other Price 9,511 .12 $9,511 .12 $9,511.12 10 .00% $951 .11 5.00% $522 .77 $10,985.00 ESTIMATE Chord Drop Additional Length Reusing exis ting plug s, receptacl es, & grips Code DESCRIPTION Qty Unit Fem ale Ch ord receptacl e 0 EA Ma le Chord plug s 0 EA St ai nl ess Stee l Chord Grips 0 EA S/0 C hord 12/3 2,550 LF Labor to subassembl e new ch ord s 40 HR Re move ex ist ing ch ord s 8 HR Lab or to dis ass embl e exi sting c hord s 11 HR Labor to install new chord s 8 HR Proje ct supervi sor 8 HR Prepared by Basecom Inc. Duration: Mu st Fini sh in : Labor $ 4 9 .90 $ 4 9.90 $ 4 9 .90 $ 49.9 0 $ 37 .68 0 0 UNIT PRICE Material $ 5 .10 $ 8.75 $ 32 .75 $ 1.80 weeks weeks Equip Direct Job Cost: Payment & Performance Bonds : In surance OH PROFIT TOTAL JOB COST: Sell Price: 1 of 1 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Labor -$ -$ -$ -$ 1,996.00 $ 399 .20 $ 548.90 $ 399 .20 $ 301 .44 $ -$ -$ -$ -$ -$ -$ $ -$ -$ -$ -$ -$ -$ 3,644.74 $ No 0.0% 10.0% 5.0 % SUBTOTAL Material - - - 4 ,590.00 - - - - - - - - - - - - I - - - - - - 4 ,590 .00 0 I Run Date By Checked Equipment $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ : n BASECOM INC.: 9/512 01 2 16 :36 Subcontract T OTAL -$ - -$ - -$ - -$ 4,590.00 -$ 1 ,996 .00 -$ 399.20 -$ 548.90 -$ 399.20 -$ 301 .44 -$ - -$ - -$ - -$ - -$ - -$ - -$ - -$ - -$ - -$ - -$ - -$ - -$ - $ -$ 8 ,234.74 $ $ $ 823.47 $ 452.91 $ 9,511 .12 $ 9,511.12 9/5/2012 . -V Rogers -O'Br ie n Con stru cti on September 06 , 2012 City of Forth Worth 401 West 13th Street Fort Worth , TX 76102 Ph : (817)392-7913 Fax : (817)392-8488 ATIN : Jack Durham RE :Unit C -Metal Soffit Panel Repair 10022 Will Rogers Memorial Cntr East Change Reguest # 154 Dear Jack : As requested by Jack Durham, replace damaged 12" metal soffit panels located at the South end of unit C. Damage occurred as a result of non-construction related activity. Cost includes removal of the tongue and groove metal panels to the north of the damaged panels to facil itate replacement and maintain the concealed fastening system . Cost excludes equipment , per Kevin Kemp's request. Equipment rental will be coordinated through Kevin Kemp and will include 2 large platform lifts for a minimum of 3 days ; specific equipment size requirements to be coo rdinated w ith the subcontractor. 1901 Regal Row Attached please find our pricing for the above referenced rev ision item. Dallas, Texas 75235 Main 214 .962.3000 Fa x 214 .962.3001 The tota l amount to provide this work is : 3901 5. Lamar Blvd. #200 Austin, Texas 78704 Please note the attached exclusions/qual ifications . Main 512.486.3800 Fax 512.486.3701 $4,489 .00 If you have any questions or need further clarification, please contact me at (214)962-3000 . www.rogers-obrien .com $~ Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATIACHMENT Dallas I Austin • Change Request 154 Price Breakdown Job Name: Will Rogers Memorial Cntr East Unit C -Metal Soffit Panel Repair Description: Labor No Description QTY Unit Unit Total 1 Metal Soffit Panels ****EXCLUSIONS AND QUALIFICATIONS**** See attached backup for labor, material and subcontractor and supplier detail. Price excludes all federal , state and local fees . Price does include sales and / or remodel taxes . Material Unit Total Subtotal: Overhead Fee Written authorization and / or signature on this PC required prior to performing the above described work . Total: Equipment Date: 9/6/2012 Change Request #:154 Subcontract Other Price 3,887 .12 $3 ,887 .12 $3,887.12 10 .00 % $388 .71 4.99 % $213 .17 $4,489.00 , WRMC CONSTRUCTION PRICE CHANGE ESTIMATE Project: Owner: ARS# SUB CONTRACTOR CONTRACTOR Basis of Estimate Date of Estimate: Estimated By: ICost Data : CHANGE: Comments : WILL ROGERS MEMORIAL CENTER CITY of FORT WORTH ANCHOR ROOFING SYSTEMS ROGERS-O'BRIEN TIME, MATERIAL AND EQUIPMENT PLUS 10% P&OH 08/28/12 JS STANDARD BU ILDING "C" SOFFIT SOFFIT DAMAGED BY OTHERS REMOVE EXISITNG PANELS TO ACCESS DAMAGED PANELS REPLACE DAMAGED PANELS, RE-INSTALL REMOVED PANELS AND TRI M Published Location Factor: RS Means (Dallas.Texas). Project Remoteness: NA Federal Wage Rate Factor: NA Design Contingency: NA Taxes: Standard General Conditions: Within Normal Range 18 Percent. Government General Conditions : 10 Percent Bonds and Permits: 1.5 percent Historic Preservation Factor: Not applicabl e. Overhead: Small Job , Limited to sub-contractors. Profit: Standard Contracting Method Adjustment: NA lnflaton Escalation: Assume start of construction to be 2011 Infla tio n predictions indicate 4 % per year. PER REQUEST OF PM -ROGERS-O'BRIEN & CITY of FT. WORTH Ba sis of Estimate Print Date : 8/29/2012 SUB CONTRACTOR DATE : LABOR COST: DESCR IPTION FOREMAN -SM JOURNEYMAN -SM JOURNEYM AN-SM SM LABORER SM LABORER ROOFER LABORER LA BORE R LABORER FABRICAT ION FABRICAT ION MATERIAL COST· DESCRIPTION NEW SO FFIT PANELS FLAT SHEETS TRIM ATIACHMENT FREIGHT/ CHANGE ORDER REQUEST ANCHOR ROOFIN G SYSTE MS 3/20/2012 JOB#: 11-04 2 JOB NAME: W ILL ROGERS MEMORIAL CENTER QUANITITY UNIT COST/UNIT AMOUNT$ BURDEN% BURDEN COST 16 MH $2B .7S $460.00 42% $193.20 16 MH $19.55 $312.BO 42% S131.3B 16 MH $19.SS $3 12.80 42% $131.38 16 M H $17.60 $2 81.60 42% $118.27 16 M H $17.60 $28 1.60 42% $118 .27 0 M H $17.60 $0 .00 42% $0.00 3 MH $13.S7 $40.71 42% $17.10 0 MH $13.S7 $0.00 42% $0.00 0 MH $13.S7 $0.00 42% $0.00 S MH $1S.28 $76.41 42% $32.09 0 MH $1S.28 $0.00 42% $0.00 QUANITITY UNIT COST/UNIT AMOUNT $ TAX% TAXC05T 2 EA $ 88.00 $176.00 0.00% $0.00 2 EA $ 45 .00 $90.00 0.00% $0.00 1 LS $ 50.00 $50.00 0 .00% $0.00 1 FLAT $ 205.15 $205.15 0.00% $0.00 $0.00 0.00% $0.00 $0.00 0 .00% $0.00 $0.00 0 .00% $0.00 $0.00 0.00% $0.00 EQU IP MENT -PR OJE CT MANAGEMENT COST· DESCR IPTION QUANITITY UNIT COST/UNIT AMOUNT$ TAX% TAX COST LIFT 0 W EE K s 1,500.00 $0 .0 0 0 .00% $0.00 CRA NE 0 HO UR s 95.00 $0.00 0 .00% $0.00 DISP OS AL 1 LS $ 95 .00 $95.00 0 .00% $0.00 MISC. 1 LS $ SO.OD $SO.OD 0 .00% $0.00 PM/CFC 1 LS s 150.00 $150.00 0 .00% $0.00 IN SGL 1 LS s 210.00 $0.00 0 .00% $0.00 Warr anty 0 MIN s 1,S 00.00 $0.00 0.00% $0.00 $0.00 0 .00% $0.00 $0.00 0.00% $0.00 $0.00 0.00% $0.00 $0.00 0 .00% $0.00 PC SUB TOTA L O H & PRO FIT 10% TOTAL ... TOTAL $653.20 $444 .1 8 $444 .18 $399.87 $3 99.87 $0 .00 $57.8 1 $0.00 $0.00 $108.50 $0.00 $2,507.60 TOTAL $176.00 $90.00 $50.00 $205.15 $0.00 $0.00 $0.00 $0 .00 $S21.15 TOTAL $0.00 $0 .00 $95.00 $50.00 $150.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $SOS.CO $3,S33.75 $353.37 $3,887.12 �� � f .' � � ' • • _' ' .' . ' I �9• � , -: ".i � \� . i. . . � � :: ~�_ ' � 'v � " j � � � _ - � . � ti 1 �� �. ,-j - � �� fJa��� ` f.` � 7^f� _ _ — _ ' . �. .�� _ . +. . - ' .._ . .�.j � ',�.�- . �'+� " . � . _ - . _ . � . �� `J� �,� - i� ��--. ---� , ' ' - ��.�- . . . � +, � s, �� - a �}='�� � r x��. �; Y�—�` �,r�� ' • . • - -- - ' s���� t w. i "— - `=` �- .—.._ , . L� • � � ' --. � — _ -- - -- � -- . - , �— . -- -- — ���—� _ _ _r-- _—_---_- -_-' `� � rr - �! . . rr' � ..-.'� - . }��' � � ' . 1�� l.� � }' • -— ' ' • ' '� �•�'f}�► � .. i . -_� _ - . �� ��� . . � y� i. - -�� . . '�� - �x� . ��� "-t � �5 � _ � ___ ' �� � �� �' � . ._� �.`__� ; `� _� � . . __ �� �� �4 � � � �`+l �� i -� )`_ - , . � . � . . . `;1 t . � ;. 1 f : �'� s � . � r � —ti - __ � . .! � - - ��� ;��, � z . ■� � �:j �* �' � i� � �' �' . �M�� '�'•� t- . � , —"1 M1 1 �� �r' ' . . � ��R - � �. " ' 4 � i ' . � ,� �- �- jjjjjj''' • � ' . ' � ! -�- � ��".� . ' i ' ' + . . y°��_ _.� �-�+'' '� "_' ���... � , � ' � � -��yl; ? �' - ' 'i . F . �; �,'�. R ' . 7' ��� � _ �-4—��f[ii:.�i.��1 �! � . ..;�.1 t .'' •t _ 'c . 5� ' • _ . . . , k�' r �� i ' I° I � , . � � �' � � I' • . , - �. . . �2 � � • _ _ _ F R�. T % . �' ' ' , . � � � �, I� �' • � ,'�� ' WIC �. � �I > •. - - �I � � �� . . y � � � - Ee . � Y ' �i.+ _ _ _ yY ' . j - ` 1 T � i �p. M i r �_� � . � E�r�T;��« :-,' � 'I . � �l � � � f i 4 i i�� � i "�. 'y�� i , � �� , r e �� i Y j\ 1'�+t •� i ! �4 � � , •• 'y � �r �ti f �e�1 . _ 4 •� 7 . • 4 � � _ �i� ,� . � {a} 1. ; -- � `*r. , � " ,� ! ' it- . ' . ' �:} r � ' j ��Y�.�_ ��-S ,, . l` � �� � r! E , •►, �, � A - ♦ i • ' • Nr � �, � '+ `( � ✓� _ � ' �'♦ , . r '..� _ i � ' � t�`_ ' y ••',t ,:�'� .. ti� a' F _ ' �:�. � �h t 4 � _ yi�w �,�'• h� - { .• ` � _±�;`:� S �� �i� .,�:�, .� • : , _.. . r,� _ ;� �' f � .� � '� . j j+�` +► r P �C,.. � : �:� � .L , . �• ��',�� 7y r�1k�` ' i : - ' _ (':� ��C__.- •,S; - •'.? ��� ' - ' - Ka. ; . �. i�+�! ���+, � � _ . ,� r�?�r.r1f' � :r r ��;.�, f:�;.' . `�� ' . ��}��. .,� ,,:r:^' � ' ;'; ' ".} i � 1 t�. � �:i� `�F. �: i Ro ge rs-O'B r ie n Co nstruct ion September 06 , 2012 City of Forth Worth 401 West 13th Street Fort Worth, TX 76102 Ph : (817)392-7913 Fax: (817)392-8488 ATIN : Jack Durham RE:Unit A -Column Flashing at West Int. Roof 10022 Will Rogers Memorial Cntr East Change Request# 155 Dear Jack : As requested by Tommy Deeds and Alan Bagamery during the roof punch list review on 7/25/12, provide flashing closure plates to prevent water from infiltrating the building through the CMU column surrounds at the west intermediate roof of building A. Cost includes sealants from the flashing to surrounding material. Attached please find ou r pricing for the above referenced revision item . 1901 Regal Row The total amount to provide this work is : $906 .00 Dalla s, Texas 75235 Main 214 .962 .3000 Fax 214 .962.3001 Please note the attached exclusions/qualifications . 3901 5A· LatmaTr Blvd.7#8 2 7°0°4 if you have any questions or need further clarification , please contact me at (214)962-3000 . us in, exas Main 512.486 .3800 Fax 512.486 .3701 www.roge rs-ob r ie n.co m s~ Trey Carroll Rogers-O'Brien Construction Co ATIACHMENT OWNER AUTHORIZED SIGNATURE Dallas I Au stin . ~, Change Request 155 Price Breakdown Job Name: Will Rogers Memorial Cntr East Description: Unit A -Column Flashing at West Int. Roof Labor Material No Description QTY Unit Unit Total Unit Total Equipment 1 Flashing ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: See attached backup for labor, material and subcontractor and Overhead supplier detail. Fee Price excludes all federal, state and local fees. Price does include sales and I or remodel taxes . Written authorization and / or signature on this PC required prior to performing the above described work . Total: Subcontract 783 .98 Date: 9/6/2012 Change Request #:155 Other Price $783 .98 $783 .98 10 .00 % $78.40 5.06 % $43 .62 $906.00 WRMC CONSTRUCTION PRICE CHANGE ESTIMATE Project: WILL ROGERS MEMORIAL CENTER Owner: CITY of FORT WORTH ARS# SUB CONTRACTOR ANCHOR ROOFING SYSTEMS CONTRACTOR ROGERS-O'BRIEN Basis of Estimate TIME , MATERIAL AND EQUIPMENT PLUS 10% P&OH Date of Estimate: 08/28/12 Estimated By: JS Cost Data: STANDARD CHANGE : INSTALL SHEET METAL CAP AT CAST STONE WEST SIDE "A" FABRICATE AND CUT STONE TO PROVIDE SHEET METAL COVER Comments: 1 Published Location Factor: RS Means (Dallas .Texas). Project Remoteness : NA Federal Wage Rate Factor: NA Design Contingency: NA Taxes: Standard General Conditions: Within Normal Range 18 Percent. Government General Conditions: 10 Percent Bonds and Permits: 1.5 percent Historic Preservation Factor: Not applicable. Overhead: Small Job, Limited to sub-contractors. Profit: Standard Contracting Method Adjustment: NA lnflaton Escalation: Assume start of construction to be 2011 Inflation predictions indicate 4% per year. PER REQUEST OF PM -ROGERS-O'BRIEN & CITY of FT . WORTH Basis of Estim ate Print Dat e: 8 /28/2012 SUBCONTR ACTOR DATE: LA BOR COST: DES CRI PTION FOREMA N-SM JOURNEYMAN -SM JO URNEYMAN-SM SM LABORER SM LABORER ROOFER LABORER LABORER LABORER FABR ICATI ON FABR ICATI ON MATER IAL COST · DE SCRIPTION FLAT SHE ETS TRI M ATIACHMENT FREIGHT/ CHANGE ORDER REQUEST ANCHOR ROO FING SYST EMS 3/20/2012 JOB#: 11-042 JOB NAME : W ill ROGERS M EM OR IAL CENTE R QUANITITY UNIT COST/UNIT AMOUNT $ BURDEN% BURD EN CO ST 4 M H $28.75 $11 5.00 42% $48.30 4 M H $19.SS $78.20 42% $32.84 0 M H $19.55 $0.00 42% $0.00 0 M H $17.60 $0.00 42% $0.00 4 MH $17.60 $70.40 42% $29.57 0 M H $17.60 $0.00 42% $0.00 0 M H $13.57 $0.00 42% $0.00 0 M H $13.57 $0.00 42% $0.00 0 MH $13.57 $0.00 42% $0.00 2 M H $15.28 $30.56 42% $12.84 0 MH $15.28 $0.00 42% $0.00 QUANITITY UN IT COST/UNIT AM OUNT $ TAX% TAX COST 0 EA $ 88.00 $0.00 0.00% $0.00 1 EA $ 45.00 $45.00 0.00% $0.00 1 LS $ 50.00 $50.00 0.00% $0.00 1 FLAT $ 25.00 $25.00 0.00% $0.00 $0.00 0.00% $0.00 $0.00 0.00% $0.00 $0.00 0.00% $0.00 $0.00 0.00% $0.00 EQUIPMENT -PROJECT MANAGEMENT COST: DES CR IPTI ON QUAN ITITY UNIT COST/UN IT AMOUNT $ TAX% TAX COST LIFT 0 W EE K $ 1,500.00 $0.00 0 .00% $0.00 CRA NE 0 HOUR $ 95.00 $0.00 0 .00% $0.00 DISPOSA L 0 LS $ 95.00 $0.00 0.00% $0.00 M ISC. 1 LS s 50 .00 $50 .00 0 .00% $0.00 PM/OFC 1 LS $ 75.00 $75.00 0.00% $0 .00 INS GL l LS $ 50.00 $0.00 0.00% $0.00 Warra nty 0 M IN $ 1,500.00 $0.00 0.00% $0.00 $0.00 0.00% $0.00 SO.DO 0 .00% $0.00 $0.00 0.00% $0.00 $0.00 0.00% $0.00 PC SUB TOTAL OH & PROFIT 10% TOT AL • .. ., TOTAL $163.30 $111.04 $0.00 $0.00 $99.97 $0.00 $0.00 $0.00 $0.00 $43.40 $0.00 $41 7.71 TOT AL $0.00 $45.00 $50.00 $25.00 $0.00 $0.00 $0.00 $0.00 $120 .00 TOT AL $0.00 $0.00 $0.00 $50.00 $75.00 $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $175.00 $712.71 $71 .27 $783 .98 : - , � � �y +� � �� ,�.�`"— � . � � , . 'i' i'.� i, . � �� ' • �'�� �•'�� �, � W ! . �'Y . .�' _ , +��_ . �,Y'.� � � � .' � ,,w.,,, : �.;. . �s . - � �; . ' ' , �,,,' � � �' . r ,�„„. / ` . }� ' `; , ��'° s� � r � ~ � I , . �. - �'� .c . . 4.� �" j - _ . . , F�,��,Y` . - -.�.- _ . . ��' � _; � , , r� ����� - . � �r � �� .� ' � �. F�� �.: � , ,� - ' r r �. .,��{ i�4. ,a- f`"" ,�� ;� . ' : , :� .. ���� ; . -.��' � . � �fs;`; � � . i' �� . . � � - ` � : � �' , - � - •> � � �'i' . �., �i. . �r�. _ + 7 ' f �� � :4.� ,, � , . � �t�, . n , �ti� , �; . � " � � --- .- -- � �,� , i .� :Y ' , r���` . � • �'� 'w �: ; �- � � ?k . , , r..',` �;� r, %. I' + !' 1' tir � ; .' ,. ,��:` -,, ,- - , - · ...... · -~·odesk ···-.,ksF,~~ :ti ·--~q_~4l18-J9.2011,n~cf ._. ft-:~\ ~ _ Imation View Output a • . ,, I Persp1"ctive ,. ?18-19·2011.nwd F.O .u. 65 .66 l0 •$• Ali gn C.Jrnera • ~ Show Til t Bar ......... _.,, ...... -.. ·-··-····· Llnear Speed (Nsec): 145ft 1L58 Angular Speed ("/sec): 4 5.00 ~ * ~ 0 l@l/la0 al T Rea lism Lighting Mode l•I~I A J Rogers-O 'Brie n Cons t ruct io n 1901 Regal Row September 28, 2012 City of Forth Worth 401 West 13th Street Fort Worth , TX 76102 Ph : (817)392-7913 Fax : (817)392 -8488 ATTN : Jack Durham RE:Richardson-Bass -Paint at Base of Cattle Pens 10022 Will Rogers Memorial Cntr East Change Request# 156 Dear Jack: As requested by Tommy Deeds and Alan Bagamery , apply bituminous paint to the base of each accessible cattle pen support post that was removed and reinstalled to facilitate tunnel construction . Paint to extend from lowest horizontal fence strut to top of grade , which is approximately a 12 " wide band . Price include preparation of post for painting. Attached please find our pricing for the above referenced revision item . Dallas , Te xas 75235 The total amount to provide this work is : $2 ,599.00 Main 214 .962.3000 Fax 214 .962.3001 3901 S. Lam ar Blvd. #ZOO Please note the attached exclusions/qualifications. Austin, Te xas 78704 Ma in 512 _4863800 If you have any questions or need further clarification , please contact me at (214)962-3000 . Fa x 512.486.3701 www.rogers-obr ien.com Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas I Austin . .. .. Change Request 156 Price Breakdown Job Name: Description: Will Rogers Memorial Cntr East Richardson-Bass -Paint at Base of Cattle Pens Labor Material No Description QTY Unit Unit Total Unit Total 1 Painting & Wall Coverings ****EXCLUSIONS AND QUALIFICATIONS**** Subtotal: See attached backup for labor, material and subcontractor and Overhead supplier detail. Fee Price excludes all federal , state and local fees . Price does include sales and/ or remodel taxes . Written authorization and / or signature on this PC required prior to performing the above described work . Total: Equipment Subcontract 2,250 .00 Date: 9/28/2012 Change Request #:156 Other Price $2,250 .00 $2,250.00 10.00% $225 .00 5.01 % $124 .00 $2,599.00 . ' 1225 W. College Av e., Suite 408 Can-ollton, TX 75006 Sep tern her 27, 20 l 2 Rogers O'Brien 1901 Regal Row Dallas~ 7323 5 Attn: Brent RE: Will Rog ers .Memorial Center East COMMERCIAL PAINTING WAU..CCVJ:fRINCl, TAPE! ANO SEC (972) 323-6899 Phone (972) 245-5794 Fax PROPOSED CHANGE Deur Brcnl, Per your request we hav e the follo\ving; Item #1. Add: $2 250.00 Scrape loose dirt away, sand , wipe clean, and paint bottom P of post with bitumous paint where sleev e was added on the bottom of corral post at Ri.chardson Bass Arena . Item #2 Add: $600.0U Prin1e and paint new bollards at RV Jot safety yellow around electrical panels. Total Add: $2,850.00 Willr og c,~9 -2i·2 012 .. \ . .. ( Rogers-O'Brie n Construction September 28 , 2012 City of Forth Worth 401 West 13th Street Fort Worth, TX 76102 Ph: (817)392-7913 Fax: (817)392-8488 ATTN : Jack Durham RE :RV Lot -Bollard Paint 10022 Will Rogers Memorial Cntr East Ghange Request #---157 ~ Dear Jack: As requested by Alan Bagamery, apply 'Safety Yellow' paint to the non -removable bollards at the RV Lot. Price includes primer. Attached please find our pricing for the above referenced revision item . The total amount to provide this work is : 1901 Regal Row Dallas, Te xas 75235 Main 214.962.3000 Please note the attached exclusions/qualifications . Fax 214.962.3 0 01 $693 .00 3901 s. Lamar Blvd . #ZOO If you have any questions or need further clarification , please contact me at (214)962-3000 . Austin, Texas 78704 Main 512 .486.3800 Fax 512.486.3701 www.rogers-obrien.com Sincerely, Trey Carroll Rogers-O'Brien Construction Co OWNER AUTHORIZED SIGNATURE ATTACHMENT Dallas I Au s tin Change Request 157 Price Breakdown • t Job Name: Will Rogers Memorial Cntr East RV Lot -Bollard Paint Description: Labor No Description QTY Unit Unit Total 1 Painting & Wall Coverings ****EXCLUSIONS AND QUALIFICATIONS**** See attached backup for labor, material and subcontractor and supplier detail. Price excludes all federal , state and local fees . Price does include sales and / or remodel taxes. Material Unit Total Subtotal: Overhead Fee Written authorization and / or signature on this PC required prior to performing the above described work . Total: Equipment Subcontract 600.00 Date: 9/28/2012 Change Request #:157 Other Price $600 .00 $600.00 10 .00% $60 .00 5.00% $33.00 $693.00 • 1225 W. Co ll ege Ave., Suite 408 Can-ollton. TX 75006 _____ __ September 27, 20 l 2 Rogers O'Brien 1901 Regal Row Dall as, TX 75235 Attn: Brent RE: Will Rogers .Memorial Center Ea.-;t COMME'RCIA.L PAINTINa WALLCOVE~ING, TAPE A.NO aec (972) 323-6899 Phone (972 ) 245-5794 Fax PROPOSED CHANGE Dear Brent, Per your request \Ve h ave the follovving; Item #1. Add: $2 250.00 Scrap e loos e dirt away, sand , wipe clean, and paint bottom l' of post with bitumous paint where sleeve was added on the bottom of corra l post at Richardson Bass Arena. Jtem #2 Add: $6 00 .00 Prime and paint new bollards al RV lot safety yellow around electrical panels. Total Add: $2,850.00 Willrogcr)9·27-2 012