FORT WORTH. City of Fort Worth CONTRACT NO. q \ ~S<3' .. "
~ ChangeOrderReq VED ..-----------~ ........ Project Name Village Creek Reclaimed Water Quality Improvements; UV System 41358
Client Project #(s) !:::::============================================:::::::
Project Description .... ! _____________ C_ity_of_F_o_rt 'M>_rth_Wa_te_r o_e_pt_. ------
Contractor! Archer Wstem Contractors, Ltd Change Order# I 1 I Date 3/10/2011
City Project Mgr.! Farida S Goderya, PhD, PE City Inspector ... ! _M_ik_e_H_ill _________ _
Original Contract Amount
Extras to Date
Credits to Date
Dept.
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Water
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
Totals Select Day Type
$1,793,000.00
$19,652 .00
[ . ~. .
'
Change Order No . 1 covers PCM 001. This PCM is issued to reroute three existing utilities found under the proposed UV foundation . The
scope of work for the PCM 001 include :
-Excavate around existing duct banks to expose and identify .
-Demolish concrete cap on all existing duct banks within the permimeter of UV foundation .
-Machine Excavate and Hand Excavate around Existing Pipe.
-Encase the east duct bank (running north and south) in concrete.
-Pull back communications/plant phone cable, remove existing conduit, re-establish at a lower elevation after excavation of site, and install
new pull box.
-Re-Route the 480V feed to backwash electric station . Pull out feeders, re-route conduit and pull feeders back adding a new #4 ground.
This Change Order No. 1 is for a combined sum amount of $19,652.00 and O Calendar Days.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
7
CITY OF FORT WORTH
PROPOSED CONTRACT MODIFICATION {PCM)
Project Vill!!!e Creek Reclaim-UV S~m Project No. P275-70530023 l83
Fund: Accollllt Center
Contractor Archer Western Contractor's Project No.
Engineer Alan Plummer Associates1 Inc. Engineer's Project Number CFW08085
Construction Farida Goderya, Ph. D., P.E Construction Manager's 00213
Manager Project Number Cont. 41358
PCM Description _R_e_locati __ ·on_o_f_e_xi_stmg_· __ w_·_1m_·es_in_UV __ fo_1D1_dati_·o_n __ PCM No. OOIA W
Tile Owner propoaes to make the following additio~ modifications or deletiom to the work
described in the Coatract Documents. Autborizatioa to proceed wit• tbae changa must be
approved by Field Order or Change Order in accordance with the Contract Documents.
I. Demolish all concrete associated with existing ductbanks within the perimeter of the new UV
building foundation.
2. Encase in concrete the existing conduits running north and south to the existing actuators on the
east side of the foundation
3. Pull back existing communications/telephone cable and install new pull box and conduit as
descnl>ed with the attached drawing.
4. Relocate existing ductbank to the Backwash Electrical Station as shown in the attached drawing.
5. Provide a new #4 ground wire when re-pulling existing wire. Wire shall meet project
specifications
6. Provide temporary power to feed existing Backwash Electrical Station during relocation shutdown
7. Include breakdown of costs associated with exploration of existing utilities.
See Attached: Drawing for details.
I have reviewed the construction documents with the Contractor and the proposed Time and Material
estimates provided by the Contractor. The estimated costs appear reasonable for the proposed work. The
work has also been coordinated with plant staff as well as our design team. No additional contract time is
requested by the Con is amendment.
BY:
Page 2 of2
'
.,.
Project
Fund:
CITY OF FORT WORTH ·
PROPOSED CONTRACT MODIFICATION (PCM)
_V_il_la_.,g._e_C_r_ee_k_R_ec_J_ai_m_-_U_V_Sy._s_te_m _____ Project No. P275-70530023I83
Account Center ------------
Contractor
Engineer
Construction
Manager
_Ar_c_h_e_r _W_e_st_e_m __________ Contractor's Project No.
_A_la_n_P_l_u_m_m_er_A_ss_oc_ia_t_e_s __ , _ln_c_. ___ Engineer's Project Number _C_F_W_0_8_0_85 __
Farida Goderya, Ph .D., P.E. Construction Manager's 00213
-------------Project Number Cont. 41358
PCM Description _R_el_o_ca_ti_·o_n_o_f_e_x_is_tin __ g_u_til_iti_·e_s_in_UV __ fo_un_da_n_·o_n __ PCM No. _O_O_l_A_W ___ -1
NOTIFICATION TO CONTRACTOR:
We are considering making the change to the contract described in the attached materials, and
request that you take the following action:
Notify us that you concur that this change does not require a change in contract time or amount.
A field order will be issued ..
X Submit a price proposal with detailed cost breakdown of labor, materials, equipment, and all
other costs associated with this change, and a revised schedule for performing the described
change.
Proceed with the change order under time and materials provisions of the contract.
BY:
CONTRACTOR'S RESPONSE:
We respond to your request as follows:
___ We concur that this is a no cost or time change. See attached field order.
__){_ We submit the attached price proposal with detailed cost breakdown and revised schedule for .
Performing the described change ..
We are proceeding with change under time and materials provisions of the contract.
5>-/'r-/
__ Proposed Contract Modification rejected. Contractor notified not to respond.
BY: -------------------Date
Field Order Issued: No. Date ---____ By
_ Change Order Issued: No. ____ By Date ---
Pagel of2
,
i,ia11em
PCM #1
Village Creek WWTP
Village Creek Reclaimed Water Eastern Delivery System
OWNER:
EN(jJNEER:
City of Fort Worth Texas
Alan Plummer AsSOciates , Inc.
1320 SOUttJ University Drive, suite 300
Fort Worth , TX 76107
<.:UN TRA<.:TUR: ARCHER WESTER N <.:UNT RA<.:TURS , LTD
2121 AVENUE J, SUITE #103
ARLINGTON, TEXAS 76006
uescnpuon
t:.xcavate arouna uuct i,anKs a. uncover
1 tternave 1.,oncrete 1.,aps a. u ispose ·-ine t:XC. o. Mana t:.xcavate encasement on east uuu "'
1~.K ,t', encasement
vonaete, """"' ana ~orm Matena1s
,= DH<a\IJUOI
vvnr c"""""
1e1a cng 1neenng ~ vices Tor u 1scovery ana --a1u11t OJ
1c>isung Ullll1 18S
iUIALS:
Labor Burden @ 48% of Labor
Small Tools@ 15% of Labor
Safety Supplies t!i 7.5% of Labor
IV•""-u-1n1;\JI '-'"V~,;::, Vt' \.IVl"!II ~ ..... 1ur,:
OH&Pl!!l 15%
Subcontractor Coll
OH&P for Subcontractor @ 1 O'II,
ln....-anc:e and Bond @1 . 5'!4.
Qlv Unit
:>4.UU m,
LI.UU 1m,
.>t).UU 1m,
L'I.UU 1m,
1m,
IMM
IMM
MM
MM
.MM
MM
MM
MM
m,
tH.XJ v
1.UU ··~
1.00 s
~L.UU ""
Subtotal:
IIV 1r,.L,.r-vTnJU1'11I I nr,.;, ~uo~I
page 1
WORK DESCRIPTION:
Existing Dudbank Woik @ UV Slab
Note: Delays to Contractors Work 8egan on 2117/11.
Urnvnice Lil Material Equipment :SUUI. ur nractor
•1d.UU s1 . mu
••d .UU ~,soo
•n:HXJ """"'~ .. ,,,.uu ,, .. .,,.,~
.,;J,00 --sow .. , ... oo --sow .. ,,,.oo --sow .. , ... oo -WW
$19.00 -w.oo
.. , ... oo -WW
$19.00 -WW .. ,,,.oo -WW .. ,,,.uu -WW .. ,,,.uu -W.uu
,W.UU
:w.uu
;Ji.C: ,.uo :n , 7fif<. oo
S0 .00
S0 .00
S0 .00
so.uu
:w .uu
$1 , ••. uu S1 , •• .00
S0 .00
S0 .00
S0 .00
S0 .00
$7,/Hl.96 "'·"~--:w.uu
:w.uu
:w.uu
.-d.UU ,.,,~.,.,.uu
M ,215.00 ·-si ,,-;:oo 'TT ,•••IUJ
:52 ,'" 1.20
-·,.25
S3Hi.13
~,. 10 .;Jllll1
101819
,.,,u.<0.UU
...,,.,.uu
illOO"t .UU
""""·UU
:w.uu
:w .uu
:w .uu
:w.uu
:w.uu
:w.uu
:w.uu
:w.uu
:w.uu
w .uu
w .uu
w .uu
:il ,L~.IJU
jU.IJU
jU.IJU
jU.UU
jU.UU
jU.UU
'>l ,u •-'.UU
..-,.uu
..-,.uu
..-,.uu
..-,.uu
"'·""·"" :w,JU
:W.'JU
:W.'JU
'>1,-.IU
~.&fO .I.JU
'IL,uL.i.LU
~.LO
~1,g,l.:I
""·-·"" .. ,, .. II .O~
;JI , 10.l:,O
"" '·""' ___ ....
.,.,.~,.,"
.,.:,,u .... (14
•
WHF ELECTRICAL CONTRACTORS-801JUPITER RD. STE. 104, PLANO,TX.75074
ADJUSTMENT FOR CHANGES IN WORK
PROJECT NO.
PROJECT NAME:
DESC. OF CHANGES
DESCRIPTION
Pull Out 2/0 Feeder
Replace 2/0 Feeder
#4 wire Min. Purchase
#4 Wire Labor
2" PVC Coated Alum 45's
2" PVC Adaptor
2" PVC Conduit
2" PVC Coated Alum 90's
Pull Box
Pull Out Tel cable
Replace Tel Cable
Sand
Concrete
Sand Under Slab/DB
Connect Generator
Generator Cables/By Others
2" Grounding Bushings
Backhoe
3/4 Ground Rod @ Handhole
Caldweld
253
Village Creek WWTP
Relocate Duct Banks
QNTY LABOR
REQ'D UNIT UNIT LABOR
675 LF $0.90 $607.50
675 LF $0.90 $607.50
fill!! LF $0.00 $0 .00
225 LF $0.60 $135.00
2 EA $42.00 $84.00
§ LF $1.50 $9.00
50 EA $0 .60 $30.00
i LF $42 .000 $84 .00
1 EA $90.00 $90.00
200 LF $0.80 $160.00
200 LF $0 .80 $160.00
~ CY $45.00 $135.00
3 CY $37.50 $112.50
~ CY $90 .00 $270.00
1 LS $0.00 $0.00
1 LS $0 .00 $0 .00
2 EA $1.50 $3.00
1 LS $0.00 $0 .00
1 EA $30.00 $30.00
1 EA $15.00 $15.00
$0.00
$0.00
$0 .00
$0.00
$0 .00
s2.s32.50 i
SUBTOTAL (LABOR, MAT., EQUIP., SUB.)
LABOR BURDEN 36% OF LABOR
FRINGE BENIFITS 5% OF LABOR
PLUS OH&P 15% OF LINE A,B,C
SALES TAX
BOND ADDER
TOTAL {A+B+C+D+E+F)
REVISION NO. 1 R3
DATE: 3./9/11
M/E M/E
UNIT TOTAL
$0.00 $0.00
$0.00 $0.00
$1.36 $680.00
$0 .00 $0 .00
$162.00 $324.00
$0.75 $4 .50
$0 .62 $31 .00
$198.00 $396.00
$950.00 $950 .00
$0.00 $0.00
$0.00 $0.00
$25.00 $75 .00
$0.00 $0 .00
$25 .00 $75 .00
$0 .00 $0 .00
$0.00 $0 .00
$32 .00 $64.00
$0.00 $0 .00
$125 .00 $125 .00
$8.50 $8.50
$0.00
$0.00
$0.00
$0.00
$0 .00
s2.133.oo i
Equipment/
SUBCONTRACT
$244.60
b:U.80 .
$5,510.10
$911.70
$126.83
$982 .28
$0.00
$188 .27
$7 ,718 .96
~ ..
1'-6" l (Top)
31" 4 (Bot.) _j 1,--
1100 Heritage Parkway, i.tan11field, Texae 76063
Phone : 817 .453.1054 Fox : 81 7 .453.4007
SCALE : 3/4" = 1'-o"
PB-1822
FU: NAME: 260UEHPB-1622 -TXU_F .dwg
ISSUE DATE: January. 2006
Pull Box
Weight -552 Lbs.
Item# -1512600
18"x22" STEEL
FRAME(CAST-IN)
& COVER (ELEC)
1/2"0 INSERT
FOR HANDLING
SPECIFICATIONS:
1. Concrete: Has a Design
Strength of 5,000 psi
at 28 Days .
2. Steel Reinforcement:
ASTM A-6 15, Grade 60.
J. Loading : Designed for
H20 Load ing.
1'-6" x 1'-10" x 1'-6" I.D.
Pull Box