HomeMy WebLinkAboutContract 41358-CO2CITY SECRETARY CONTRACTNO. 4\3S'a -C02 City of Fort Worth Change Order Request Co rac or l Archer Wstem Contractors . ltd City Pro,ect Mgr I Farida S Gode a PhD , PE Change Order# ~=2===---o_at_e-===7/=18/=2=0=11~ Crty Inspector ~M.:..:;.ik~e .:..:;.Hi;.._11 ________ _J Original Contract Amoun t Extras to Date Credits to Date Dept . Pending Change Orders (In M&C Process ) Con Cost to Dale e Contract Amo unt OrigiM Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water $1.793 ,00000 $19 .652 .00 S4 9 0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE} AS " OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%} JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No . 2 covers the follOWing : -CMR 001 -Sidewalk on East Side of UV Structure • PCM 002 -Energy Usage Monitoring This Change Order No. 2 is fo r a combined sum amountofS41 ,910.00 and OCalendar Days . A by: See attached pages for more details Totals Select Day Type $1 ,793 ,000.00 $19 ,652.00 $1 .812.652.00 $41,910.00 $1 ,854,562 .00 $0 .00 $41 .910.00 3.43% $2,24 ,250.00 II is understood and agreed that the acceptance of thrs Change Order by the contractor constilules an accord and satisfactJon and represents payment in run (both time and money) ror 1il costs arising out or. or incidental to . the above Change Order ~ ~" =~=--:.~~'l--f,/-J,,~~..::::.:.=:.:::~~~~'""-4---~--l Assistan C, , Council Action tt u red ,--UMAi&C:jN~u;;m;;;:be:;rr==~C-~25~1~52~=,---.::.::.=:.:.:::.:..::::::::.:x:~~;!M;:&C:;-D~a=te:--;Ap:=:p~=ov=ed:--;::::::;:;:a~Ar~r,n:ir!n:bD y 12 -EJ -" 1 P04 ::; '"°· WORTH, TX Fo1n \VORTH ----,-----City of Fort Worth Change Order Additions ~Project Name I Village Creek Reclaimed Water Quality Improvements ; UV System Client Project# . I CFW 00213 ; APAI 00318-042 ; Archer Western 210138 .. Project Description Contractor . Archer Wstern Contractor.s Ltd City Sec# 41358 Change Order# 2 Date 07/18/2011 Ci 'y Project Mgr. Farida S Goderya, PhD, PE City Inspector Mike Hill L.._ ___________ __J ADDITIONS 11 t:M DESCRII-' i lUN Ut.1-'I Qfy Dnff Unit Cost Total 1 . CMR 001-Side Walk on East Side of UV Structure Water 1.00 LS $4 ,246 .00 $4 ,246.00 2 PCM 02 -Energy Usage Monitoring Water 1.00 LS $37 ,664 .00 $37 ,664 .00 3 , Water LS . Water $41 ,910 .00 Sub Total Additions $41 ,910 .00 Change Order Additions Page 1 of 1 ROBERT fADAM~. DC. Pt JAt'-1ES t. Al TST . .i\fTTE-K. PE STEPHEN j cc,ONA.N. Pt JO H N M u·ANTONI, DL Pt [;A.VIC A GUDAl Pt' BFTT, , .. JORDAN. PE Ji,)HN ~. MINAHAN, Pt TIMOTHY j. !<.iOA(K. N'· AlAN H ?!.UMMfR.)R, Pf. BChl Wlt.UAM C. RACKL.E\ Pt: AtAN R. rucr.rn. Pf l 320 SOUTH UhHVrn&iTY Ok!Vf. SUIT£ JOO FORS WOkTH.TEXAS 1"J07 PHONE 817.606 1700 f.AX 8 1 l 8/C.25l6 TBPF. Fl rrn N<'~ ! ) ENVIRONMENTAL ENGINEERS AND SCIEhJT ISTS 0318-042-24 June 20 , 2011 Dr. Farida Goderya, PE , PhD Project Manager C ity of Fort Worth Water Department 1000 Throckmorton Street Fort Worth , Texas 761 02 Re: C ity of Fort Worth V ill age C reek Reclaimed Water Eastern Deli very System UV Water Q u ality Improvements c__ri t\. o o \ ---- Contractor Modificatio n Request No. 1 : Sidewalk on East Side of UV Structure Dear Dr. Goderya: T his is a letter of recommendation for approval of CMR-001 for the above-referenced proj ect. CMR-001 concerns the 4-foot wide concrete s idewalk referenced in t he response to RFl -16. Pe r RFl-16, the existin g ductba n k u nder the slab conflicted w ith the locatio n of the new ductba nk feeding the new pa ne ls east of the UV outlet box. To resolve the confli ct, the new panels were shifted west, resu lting in a less than ideal c learance between the electrical panels and edge of slab. It was determined that adding a s idewalk that ru ns a long the east s ide of the UV s la b would a llow for better access and mobility a round the panels. T he contractor's cost estimate for t hi s work is $4,246.94 w ith no additional time requested. If you shoLt ld have any questions regard ing th is proposed change, p lease contact me. Sincerely, ALAN PLUMMER ASSOC IATES, INC. Je~.C4h / P(:ft ~n ager / , ~ J EC/vlw En cl osu res f:\proj ects\03 18\042-24 \con stra dmin\constru ction modificatio ns\cm r\re com men dati on letters\cm r 00 1 reco mmend at ion.doc Bid Item CMR 1 Village Creek WWTP Village Creek Reclaimed Water Eastern Delivery System OWNER: ENG INEER: City of Fort Worth Texas Alan Plummer Associates, In c. 1320 South University Drive, Suite 300 Fort Worth , TX 76107 CONTRACT OR: ARCHER WESTERN CONT RACTORS, LTD 2121 AVENUE J , SUITE #103 ARLIN GTON , TEXAS 76006 Description LABOR Excavate to bottom of Select Fill Backfil l Select Material ine Grade and Compact Select Fill Form Sidewalk/Strio In stall Expansion Boa rd Pour Sidewalk in ish Sidewalk Concrete, Rebar and Form Materials Exoansion Board 430 Backhoe ••uu~vnl=~• I I I I MISCt:.LLANt:OUS 111:M:> ,urALS: La bor Burden @ 48% of Labor Small Tools@ 15% of Labor Safetv Succlies@ 7 .5% of Labor I U I AI. U l "t:\,I \,U;)I ;) Qt-\,UNI l'A\,IU": OH&P@15% Subcontra ctor Cost OH&P for Subcontractor@ 10% Insurance and Bond @1.5% Qty Subtotal : I UIAL!"'l.nm.JUNI 1-i•~ ~~, I ,SLH~M~~ ............. pag e 1 7 .00 5.00 6 .00 27 .00 6 .00 15 .00 11.00 4 .00 1.00 0 .50 Unit UniVPrice Labor MH $19.00 $133.00 MH 19.00 $95.00 MH 19.00 S114.00 MH 19.00 S513 .00 MH 19.00 >114.00 MH 19.00 $285.00 MH 19.00 :,209.00 MH 19.0 0 S0 .00 MH $19.00 $0 .00 MH 19.00 $0 .00 MH 19.00 0.00 MH 19.00 0 .00 M H 19.00 0 .00 MH 19.00 0 .00 0.00 $0.00 CY $211 .00 LS $100.00 Dav $400.00 I I I I I I I I I I I >1 ,463.00 S702.24 :,219.45 $109.7 3 WORK DESCRIPTI ON : Add sidewalk to t he east side of the UV slab and to the South per RFI 16 response . Material Eauioment Subcontractor $844.00 $100.00 :,0.00 $0 .00 :,0.00 S0 .00 $200.00 S0 .00 :,o .oo $0.00 $0.00 I :,0.00 I S0 .00 I :,0.00 I S0 .00 ;li~44 .uu a£uu.UU = I Totals :,133.00 $95.00 $114.00 S513.00 S114 .00 :,285.00 S209.00 >0 .00 $0 .00 $0.00 $0.00 $0 .00 >0.00 $0 .00 >0.00 $0.00 >844.00 $100.00 S0.00 :,0.00 S0.00 :,0.00 $200.00 :,0.00 S0.00 S0.00 S0.00 so.oo S0.00 $0 .00 $0.00 S0 .00 ::tiL.,ou .UU $702.24 $219.45 :,1 us.7 :, :,:,,n.,n.4~ $545.76 >U.UU >U.UU .,n,.fb $4,'l4H.94 $4 ,246.~4 o n south si de. ~z -- ELEC TfUCA PAO 60'-o" 36" O'Ml FJELD VERIFY LOCAIION UV SYSTEM PIPING 0 15 JO i--i--SCALE: I"• i,• -4-• VC CHLORINE Sot TION LINES PLAN .. EXPANSION JOINT EJ40J W/llMlT ROOS, T'l'PC 304 SS. AS MANllrACTUREO BY ROMA C lNDUSmIES -CR -BAKER SER IES 403 FlANGEO EXPANSION JOINT WITH 304 SS SLIP PIPE, TYP 315-S IL REMO'Vf: BF AND CONNECT Wmi HARNESSED rt==t~,tt=r,........t-• T l• nus PI PE SECTION REQUIRES SEPARATE NOllCE TO I PROCEED FROM CIIY PRIOR r TO INS TALLATION I vrni FLG I I I I 1 1 I 11 I I I I I I I I I I , 1 -30 .. I FLANGED AOAPT[R r:mwcii:i:iiai~iiiJiiaiiiiit:-1 14'-o• SQ 0 ~ SCAI..[: 1•,. 15' l E!lEI&:. FOR PIPE SUPPORTS ABOVE THE Clil ORIN[ CCtHACT BASIN: l!J -f lXEO PIPE SUPPOR T. SEE SHEET S-903 ll] -ROLLER TWE PIPE SUPPORT. SEE St tE[T S-90J FOR PIPE SUPPOR TS ON C:RADE:: f' -fl)([O P IPE SUPPOR T. SE[ SHEET M··102 ft ~,;-:'!,~""'--~~~~ l ~ S ·· ROLLER TYPE PIPE SUPPORT, SEE SHEET M-102 r -8 ~ 1. CON TR/\CTOR SHALL COORD I NATE TOP Of STEEL BEAM ELEVATION WITH j ~~Jif~i~ci~T r°~E~Fs ~it=~~l~~E~A"il~sELfri~~:Ni:Ror()R & APPROVAL PR IOR TO FABRICATION . ~ij Cu_ s.ECTI O,N. 2. CONTRAC TOR TO PROVIDE ,. MAX CRUSH ED ROCK 12" DEEP ON e· 8 '7 30 45 6) SECTION COMl'AC IEU SU9CR AOE {95X) IN AREAS AAOU NO UV SYSTEM J\S p-s;. I ~ NTS SH Viti N Pl.AA ,.-,,.",t SCALE: 19 • I~' 3. CON TRACTOR SHALL COOROJNAT[ St tUlUOYIN Of FlLlER B'r'PASS ct!ANNELS WI TH O~ER. SHUTDOWN S WILL ONLY BE ALLOWEO DUR ING ~ WATDt a TY Of FORT WOR TH, lE XAS WATER DEPARTMENT VILLAGE CREEK RECLAIMBD WATER EASTERN DP.LJVBRY SYSTBM .& PERIODS Of LOW PLANT r LOWS . CON mACTOR WIL L ONL y BE ALLOM:O I TO SHUTDOWN ONE OIANNEL AT A TIME. SHUTOOSN S Of EAO< B'IT'ASS -.... , CHANNEL SHALL NOT EXCEED 6 HOUR S. .....,., PRO.CCI NO. SHEET .,,~:._::!,,. .. M-100 o L-------------------------------------------------_:::::::::;;;;;:::::aa:::::::a::::::aa::::::.a:::::,;,a::::::a..:::::a~:;;;:::::::::::::::::::::..:::::.... ___ ...L""~acm~.a....!~-.l.~ )A."1P L.~IJSTAETTill. ?f: "TcPHEN ). COONAN. Ff JO HN H.O"A;"'1T0Nl.. DE. PE P'E-GC"i Y'f'I. Gt.i•5S. Phi> f:.£:X H.HUNT,Pf BfTTl' L.JOROAN,l'Ii ELLEN!. Mt:DONALP. F~O. PF. JOHN~. HIN!IHAN. PE TIHGTtiY f. !''iOAf;K, PE: Al.AN rt. P.LUM!·lE!t JR... j)S DUE WILUAt-1 C. R/,CKLEl'..Pf. A.LAN R.TUC!C.t.Jt PE : JlJl SOUTH U NIVEllS;n' D SIV! .UJTEJC/0 FOITTWORTH,TEXAS i&I07 '?M ON: 817.806 .i 100 FAX 81 7.e702Slo T8PE fi rrn N4. IJ 0318-042-24 July 12, 2011 Dr. Farida Goderya , PE, PhD Project Manager City of Fort Worth W ater Department 1000 Throckmorton Street Fort Worth, Texas 76102 Re : City of Fort Worth -· ---------· ........... _. _ _. __ . ----·---·-···· ---- Village C reek Reclaimed Water Eastern Delivery System UV Water Quality Improvements Proposed Contract Modification No. 2 : Energy Usage Monitoring Dear Dr. Goderya: This is a letter of recommendation for approval of PCM-002 for the above-referenced project. PCM-002 .addresses the City's request to have the capability of monitoring energy usage r elated to the UV disinfection system . The scope of this PCM includes conduit, wiring, switchgear, a Multilin converte r, cable, fiber, panels , receivers, and the labor associated wi th installing and progran,ming those various components. The contractor's cost estimate for this work is $37,663 .24 with no additional time requested. If you should have an y questions regarding this proposed change, please contact me . Sincerely., Ad1)Z~~ES~NC . J;(t {. efafle~, P.{/ 0 Project Manager JEC/vlw Enclosures f :lprojeds\0318'.D<l2-2(1ConotrA<lmin\Construc:tion Mooificalions\PCM\Recom,oonaotiun Lallors\PCM 002 Recommonc!ation.doc CITY OF FORT WORTH PROPOSED CONTRACT MODIFICA TTON (PCM) Project Village Creek Reclaim -UV S~st em Project N o. P275-70530023183 Fund: ACCOllllt Center C.ontractor Archer Western Contracior's Project N<>. Engineer Afan Plummer Associates , Inc. Engineer's Project Number CFW080&5 Construction Farida Goderya, Ph.D., P.E. Construction Manager 's 00213 Manager Project Number Cont.41358 PCM Description Energy Usa~c Mon itorin~ PCMNo. 002A\V_ NOTIFICATION TO CONTRACTOR: We are considering making the change to the contract described in the attached materials, and request that you take the following action : Notify us that you concurthnt this change does not require a change in contract time or amount. --A field order will be issued .. _X_ Submit a price proposnl with detailed cost breakdown oflabor, materials, equipment, and an other costs associated wr-..h this change , and a revised s chedule for performing the described change. __ Proceed with the change order under time and material s provisions oftbe contract. BY: ~~,'==&-Date: ,141 h1 I I CONTRACTOR'S RESPONSE: We respond to your request as follows : __ We concur that this is a no cost or time change. See attached field order. _X __ We submit the attached price proposal wi th detailed cost breakdown an~ revised schedule for . Perfonning the described change .. __ We arc proceeding with change under time and materials provisions oftbe contract. BY: ~~ Rt(J Date: 7-)~-// \l I VI ~ ACTION TAKEN: /) __ Proposed C',0ntract Modification rejected. Contractor notified not to respond. BY: Date --Field Order Issued: No. Dale By --- _ Change Order .Issued: No. Date By - Page 1 of2 ' CITY OF FORT WORTH PROPOSED CONTRACT MODIFICATION (PCM) Project Village Creek Reclaim -UV System Project No . P275-70530023183 Fund: Account Center Contractor Archer Western Contractor's Project No. Engineer Alan Plummer Associates, Inc. Engineer's Project Number CFW08085 Construction Farida Goderya, Ph.D., P.E Construction Manager's 00213 Manager Project Number Cont. 41358 PCM Description Energy Usa~e Monitorin!1; PCM No . 002AW The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents. The goal of this PCM is to enable plant DCS to monitor the reclaim UV system energy usage . There will be one new PQMil ad<!£d for the UV system. h:iaiffl f!HJHfl statien energy usage monitor: ~u.. One new PQMII as part of this PCM wilJ be install at the UV system power feed at MCC SWP, for the remaining of the document the following abbreviation will be use: • RCUV _PQM -Reclaim UV system PQMII Provide the following cable run and equipment: • Provide PCUV _PQM, associated CT's, PT's and MultiNet serial-to-Ethernet converter at the UV system MCC SWP. The PQM shall monitor the branch circuit that feeds the UV Panel only . Mount PQM on the door of the MCC. • Run a CAT.6 Ethernet cable between the UV remote I/0 panel and MCC SWP and connect the Multilin MultiNet serial-to-Ethernet converter. Use the 2" spare conduit between the Remote 1/0 Panel and communication pull box CPB-002. Provide new 2-2"conduits (I-spare) from CPB-002 toMCCSWP. • Run twelve strands multimode fiber optic cable between the reclaim pump station and the UV system RIO panel in the same conduit as the Belden 9463 RIO cable from the Remote 1/0 Panel up to CBP-002 and then run in spare conduit back to PLC-REP . Minimum equipment configuration steps are listed below: • Program LP. address into the MultiNet, obtain I.P. addresses assignment from the C[TY per plant SCADA system I.P. standard • Program MODBUS serial addresses to the PQMII • Program the AB SLC Prosoft MOD BUS TCP/IP module to poll the PQM energy usage register every five seconds. Energy registers information are listed at the end of this document • In the AB SLC convert the energy usage register raw value to an engineering unit in floating point or real number fonnat and display the energy usage value RCUV _PQM _ KW at the PLC-REP's OIT. Totalize the energy usage in a similar fashion as the discharge flow reading detail of the energy usage totalization is listed at the end of this document. The engineering scale for the energy usage shall be adjustable by operators via the OIT and initially set at 0-300 KW for the UV. Transmit RCUV _PQM value via a spare 4-20 ma analog output channel. • Tenninate fiber optic on patch panel at both ends. Provide two fiber optic patch panel, patch panel shall be SNAP Compact Fiber Optic Patch Panel SNAP-12SC-MM. Provide two DIN Rail l00Base-TX/FX Transceiver, Multimode Hirschmann RT2-TX/FX 943 658-002 one on each end. Provide all fiber optic patch cable as needed. Twelve strands fiber optic cable shall be Coming Altos outdoor dielectric gel-free cable. Provide 24 VDG power supply as needed. PQMII energy registers information : 02FO (hex) 3 Phase Real Power (high) 02Fl (hex) 3 Phase Real Power (low) 0.01 xkW F4 Simed Long Integer -Numerical Data FFFFFFFF Programming requirement of each energy usage totalization: • Current Reading • Energy Usage Communication Alann • Energy Usage Totalization-Today • Energy Usage Totalization-Yesterday • ·Energy Usage Totalization-Since Last Reset • Energy Usage Totalization Reset • Energy Usage Totalization Last Reset Date and Time I have reviewed the construction documents with the Contractor and the proposed Time and Material estimates provided by the Contractor. The estimated costs appear reasonable for the proposed work. The work has also been coordinated with plant staff as well as our design team. No additional contract time is requ.ested by~he:r~:c~ / ReviewedBy. ~~ Date: 7 ltsz(f l ; BY: 7 G\ \.' Page 2 of2 PCM#2 Village Creek W'NTP Village Creek Reclaimed Water Eastern Delivery Systom I OWNER: ENGINEER: Cily ar Fart Warth Toxas Alan Plummer Assooate&, tr.c, 1320 t.outh Umvers11y Dnve, sune JCO Fcrt Worth, TX 76101 CONTRAL"TOR: ARCHER W&'TERN <."ON I RACTORt>, LTD 2121 AVENUE J, SU1TE#103 ARLINGTON, TEXAS 76006 -~IDC.Gn ··,.: .... ;. ;;·;.:i.::ac· . .-,:.::·· .. _,, ..... . hor 1:.1ean:. ·~· ... '!'!~ ;, .: ;:1c;:,.:;,;.L; O,,>; ",,"I'' Labor Burden@ 48% of Labor Small Tools@ 15% or Lal>or Sale!)' SuPPlie& I,!!! 7 ,5'11, or Laber TOTAL OIRl;CT COSTS .OF CONTRACTOR: OH&P@15•4 Subcontrac:or Cost OH&P Subconlractor@ 10% Insurance and Bond@!1 .5'h UIY ,::.:."I·:'". Subtotal : TOTAUII.IOUNTTHIS COST PROPOSAL SUI.IMARY ............ -. ;,age l ~·'· '"" '"" ... ... '"" UOIUl""IICO :,,1~.uu ¥1.:1'.UU ... ~ltt.UU --~.U\,jl .,, ... VII ......... ,uu ....... uu .......... vv ;.1=,,uu ~,~.uu I ;a.>o,,.,,, . .,, I I t .. u.uu ~v .u u ..u .. w :.u,vu >U.W .OU.OU "'1.1.lU ...,,,,., WORK DESCRIPTION : Energy Usage Morifoo ng '""" ~:w ;alJ.W ,>U.UU I I I -··.:·•~ -~- a,u .w ·.011.UII I .,~ . .i, :w.w SJa.733,31 .;,iJ.uU · ~U-W "'-'·VU ·,D,;J.VU ov.uv ;au,w .ou.w :ou :w :.u.uu ""·""' ;au. ~.l..-..>1 1 i>U,UU w .w >0.00 .S0.00 i33,73U1 ~373$.l l:,:,o.60 s:l7,663.2< $:S7 ;!l53,2~ WHF ELECTRICAL CONTRACTORS-80 1 JUP ITER RD . STE. 104, PLANO,TX.75074 ADJUSTMENT FOR CHANGES IN WORK PROJECT NO. PROJECT NAME: DESC . OF CHANGES DESCRIPT ION 2" A lum Conduit 2 " Expansion Joint 2" Alum LB 2" Hubs 2 " PVC Adaptor 2" PVC Conduit 2" PVC Coated Alum 90's Sand Concrete Instrumentation Switchgear unlstrut Ground W ire Caldweld 253 Village Creek WWTP Energy Usage Monitoring QNT'Y LABOR REQ'D UNIT UN IT LABOR 10 LF $4 .00 $40 .00 2 EA $25 .00 $50 .00 2 EA $18 .75 $37 .50 i EA $10.00 $20 .00 G. LF $1.50 $3 .00 40 EA $0.60 $24.00 2 LF $42.000 $2 10 .00 z CY $45.00 $315 .00 3 .5 CY $37.50 $131 .25 1 LS $0.00 $0 .00 1 LS $0.00 $0 .00 4 LF $2.25 $9.00 80 LF $0.50 $40.00 1 EA $15.00 $1 5.00 $0.00 $894 .75 j SUBTOTAL (LABOR, MAT., EQUIP., SUB .) LABOR BURDEN 36% OF LABOR FRINGE BENIF ITS 5% OF LABOR REVISION NO . 2R2 DATE: 6/13/2011 M/E M/E UNI T TOTAL $4.40 $44.00 $135.00 $270 .00 $35 .00 $70.00 $12.50 $25.00 $0.75 $1 .50 $0 .62 $24.80 $198 .00 $990.00 $25 .00 $175 .00 $125 .00 $437.50 $0 .00 $0 .00 $0 .00 $0 .00 $15 .00 $60.00 $6 .50 $520.00 $8 .50 $8 .50 $0.00 s2.626.3o 1 PLUS OH&P 15%-QF-ldNE-A,B;G--------.. -- SALES TAX BOND ADDER TOTAL (A+B+C+D+E+F) Equipment/ SUBCONTRACT $14,599.97 $10,130 .00 $24,729.97 $28,251.02 $322.11 $44 .74 $4 ,292.68 $0.00 $822.76 $33,733.31 PRIME CONTROLS 815 OFFICE PARK CIRCLE CJ LEWISVILLE, TX 75057 PHONE 972-221 •4849 (J FAX 972•420-4842 June 16, 2011 To: WHF Electric Attn: Greg Miller Ref: Energy Usage Monitoring COR Prime Controls Quote No.: VC_COR1_061610McM Greg, The following is an explanation / justification for the costs associated with the Eneryy Usage Monitoring additions. In response to the fiber optic cable cost, we have found a mistake in the quote from our vendor who quoted a gel-filled cable in error. l have updated the quote to i nclude the proper cable, and the quote is attached . The following is justification of the Project Engineering hours included in this proposal. Enaineerina Task # of Hours seedfy System Comeorients 8 Conflciure Mu ltlnet IP address 4 PLC Proorammino 16 OIT Proarammina 12 Drawina Modifications / Additions B Testinc:i 8 __ .,. .. ··----.... ---·----·--·..----·--·-· Total Hours 56 Hours We sincerely appreciate this opportunity and look forward to being of service for this work. Thanks again and please feel free to call if there are any questions. Si ncerely, Prime controls, LP ;i-~ .. ~ James McM lllon Prime Controls Proposal Page 1 of 1 PRIME CONTROLS CHANGE ORDER ReQuESI Dalo s.,i,,.IUod· ..•.•.••...•••••..••.••••....•.••....•..•••.. _...................................... Si1512a11 PC C~nge OrClr R1H1u•R (COR) Mumb.r;._ ..................... 0# ....... ,-.................... COR-1 r2 CEM'll1t.act ar Suhe:cniract l'fumb•r: ............ -,,,,, ...................... _ •• , ...................... .. Projact Nam,· ••••••. _., .............................................. ,, .................................... ,,. Ctty orft. Worth; V'1 1•;• cre,k. WWTP t1trn PNemtfon; PCM.002AW Enafgy U1i1g& Monitoring ft NIDO for Ct,aao, Ra~cs!cd b~· Gcne:111 Mat1rl•l DESCRIPTION MLiu"m Mu11Jno1 Kina! ::a e!M,no: Q:111ffltt:ff' ea ta cab!e ~ 2 1lrand mulltmodc fit11>r {Mo1) fin.rccnnec!ors '""' pnlcil po-(S>V.F•liSC-MM) fibe.r rro n,cicvc r:s {Hirs.:hmnnn R1'2·1XIFX> 2(Nx@ v~ liXn':m:mttnn ~etot• '93Et'M O) Stlbt:ltal Sillca TllX on t.At:tor~I M.,tori.d Cmi t:r ·Subtatal h!!M (Hourly ~at.ec. lndt.idD PaJTQ~ TaXAS & ll"l5Ut'DnCO) r.e=unt Ma.'lil;J!U P,oji=cl MenRger QA/QC/Safety Superviso r Sr,S~ctam>ll11 ly:.t Projocl Engi!\aar FiotCI Engine~r Cad/Druflsman Co ,,1,0: To:h~clan Pri0jec.t Sup9,1indenl Jaumsymen tnstall~ Hoipar lnstnlklrs PaniJC Snao M.111agar Pan-' A!lsambiy Labor CJe,fcsl LiJbcr Labe r Costs Sab~ota:r Trt1v•I E•plMH Nr F""' (V.111 Oolo;O Lodgl~g Ctlar~es (PuOaylFler Man) ?er Dtcrn Ctla:gdl (Per Day/Per MDnJ LaborTr.aval E•pe:nse, Sub\oti.l Subcoru:asto r ChfrpfS Bcclricel SUioon!ractor (XYZ Ct:intraclor) Mach.Jr-cot Subccnlracl.or Civil Subcon1r.!c tar Otner Subonu.ctor. &ubcontr.aclorCoil$ Sut>lotal DJract Jpbsjta Coati (Appli~blo ror E.illar.ded Scl1odu!e a.ndlor Spei:lal Cowtn) 01focc Trallcr(f'crWeel<CtmrgeJ Ge!"temlor Rental (Per Weak Chsrga} Gu;wralcr Puol {Per Week. ctu:rga) SIOtilgo Tr21tor Rent.a! (Per Wf!ek Ch.rgn) f>o~-1,.John R•nlS I (P&r\'Jae, Cha111•) On-Sit. d.mpmr Ronin! (Per \Vock Ch:lrge) Pnat"I;: & UtlA::a; {Pe r Wook Cn.l!o e) Tn,;k II. G°" (?DI V/ocl< C>1a'1JO) Sp1:l>I To-..11=<,uip Re/\tal (PerWeek Che'llol Diroctj09il• Cos" Subtotal ~ T :t!al Dir•et CQtts Owmead & Profil Chorga (15% for Md>• 100:. f0< Crodib) Tot•I COR Amoun1 Q!Y Jl!ill.f!!!l:I, EXT. PRJC:E I 859..'!8 BS&.38 1 68.75 98 .75 7ll1) 2.50 1.820.00 24 15.!l-l 392"11 2 205.25 412.50 2 720 .00 1.4~0.DO 2 131 .25 262 SO 0 0 .00 O.llO 0 0 00 o.co 0 0.00 o.co 0 0.00 o.ao Q o.oo 0.00 0 0.00 000 0 0.(11] Q.00 5.245 .63 0 0.0825 o.no I 148.CO 145.00 .6 SB.CO 52B .OO 0 64.CO 0.00 ll 136.00 O.OQ -511 BUXl 4$36.00 IC 51.00 ~.OBS.CG • 42.00 !SD.DO 0 84.0D D.00 0 6-'i .DD o.oo ii 41 .00 328.00 l l 21.00 0.00 0 44.DO 0.00 0 27.00 DOD 2 27.00 54.00 0 soc.no 0.00 0 . 150.00 0.00 0 ,oo.oo 0.00 a 000 o.ao 0 000 o.oo 0 0.00 o.oo 0 0.00 0.00 0 350.IY.l 0.00 0 <00.00 O.® 0 Soo.QO Dl!O 0 100.0U o:oo- 0 50111) D.Gfi 0 ·llQ.OD o.oo 200.00 2'.'0.00 ~00.00 •oo :oo 5"0Q.00 a.oo 15% ~,.24 5.63 6,850.00 0.00 0.00 800.00 1:!.,8D5 .63 1.904.34 $14,5!1.17 To: PR IME CONTROLS LP PR IME CONTROLS LP 815 OFFICE PARK CIRCLE LEWISVILLE TX 75057 Attn: Lyle Grisso Phone: 972-221-4849 Fax: 972-420-4842 Email: dena.lovlck@graybar.com '4601 CAMBRIDGE RC - FORT WORTH TX 76155 Phone: 817-213-1300 Fax: 817-213-1339 Date: Proj Name: GB Quote#: Valid From: Valid To: Contact: Email : Proposal 06/15/2011 213294603 06/15/2011 07/15/2011 DENA LOVICK dena.lovick@graybar.com We Appreciate Your Request and iake Pleasure in Respond in g As Follows Item 200 Quarititv Supplier CataloQ Nbr .Pes.i;ri oJio n 700 EA CORNING CBL. M•OP-12-L T-A-L-BK-012KU4--T4130D20 SIC-5 GB Pert IF: 22120084 UPC#: STock in Houston non-returnable Price Unit $2,600.00 1DOO Total in USO (Tax not included): Ext.Price $1,820.00 $1,820 .00 l!"h eq uli;:T'.unt oo j 3$.S Cc-;iltad ir:stall .=.ilc.r. ~ha,s;1 ,~s miy bo fii'Ul r.c oti k.r a ic-.Js mcr.lrJy payrr.e :it !ni"tX.Jph Cmyt'}a;fim1n:;',;if 5e; .. i:;nt: (;;u~ect toCl~ti :f.a~;:rwaf). Formoro informa ll :,..1 cafi 1...aoo-2~1.:,.:oe ll, ap{!ak wilt) n l.r;;;!liti; spDc!..Ji~L To learn more abDut Graybar, visit our website at www.grayb11r.com 2'4-Hour E.mar111ncy Phone#: 1-800-0RAYBAR lubjecl to Ille atandard tom>a 1nd eondltkiM ut fol1h In thla dacumont. Unlno otl,orwlu noted,l'rel;hl wmt1 .,. F.O.B. ahll'flintl point prapold and b W. Unlan noted th• nthnalad ahlp dill w!U bo datormlnad ol llre..,. o( ordor pl ... mont. Page 'l. of 2: ,\\If~ ~ THE REYNOLDS COMPANY • ELECTRICAL SUPPLY May 12, 2011 Quotation-Village Creek Reclaim UV System Energy Usage Monitoring Qty 1-Add to Existing MCC Bucket w/ PQM meter, CT's, PT's Cost: $8,750.00 Qty 1-One Day of Field Services to program PQM meter by manufacturer's trained representative • This quote is valid for 30 days from date of origin. Prepared by Chris Conmy Switchgear Dept. 214-560-2662 direct 214-560-5376 fax cmconmy@reynco.com Cost: $1,380.00 Total Cost: $10,130.00 Ac1lr.\-Abi~-C.iGr. r.o.;r;e-k~a::,nt .... Oa!la:-fort Wurltl-lfoo,too-l.Ahyrlll!-UHl.ltChuk-5-l t il,;.;i• Nl:'1'0il.r»M-Ord~-P•:-b -Shtnn.vt-TI'"'°-Wr.Q-Wic'hJI " , .... City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION : App roved on 9/13/2011 DATE: Tuesday, September 13 , 2011 REFERENCE NO.: **C -25152 LOG NAME : 60RECLAIMED WATER QUALITY IMP (UV SYSTEM) CO2 SUBJECT : Authorize Change Order No. 2 in the Amount of $41,910 .00 for a Total Contract Amount of $1 ,854,562.00 to City Secretary Contract No. 41358 with Archer Western Contractors , Ltd., for the Village Creek Reclaimed Water Quality Improvements Located at the Village Creek Wastewater Treatment Plant (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of Change Order No. 2 in the amount of $41 ,910.00 to City Secretary Contract No. 41358 with Archer Western Contractors, Ltd., for the Village Creek Reclaimed Water Quality Improvements located at the Village Creek Wastewater Treatment Plant, thereby revising the total contract to $1,854,562.00. DISCUSS ION : On January 4, 2011, (M&C C -24678) the City Council authorized the City Manager to execute a constructi on-contra t i1i the-a-mou nt of $1 ,793 ,000 .00 with Archer Western Contractors, Ltd., for the Village Creek Reclaimed Water Quality Improvements (UV System). Change Order No. 1 in the amount of $19,652.00 was authorized to re -route existing utilities, which were found during the excavation of UV foundation. Change Order No . 2 includes an installation of energy usage monitors for the Reclaim UV Disinfection System and a small sidewalk addition around UV structure. Staff has reviewed this change order and is in agreement with the scope of work and costs associated with the work. This project serves the eastern and northern parts of the City and is located in COUNCIL DISTRICT 5, MAP SC068N. FIS CAL INFORMA T ION : The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CE NTERS: TO Fund/Account/C enters CE RTIFIC ATIONS: Submitted for City M anager's Office by: Originating Department Head: Additional Information Contact: FROM Fund/Account/Cente rs Pl70 541200 070170290010 Fernando Costa (6122) S. Frank Crumb (8207) Farida S. Goderya (8214) $41 ,910 .00 ATTACHMENTS 1. 60Rec)aim Water Quality Imp CUY System) CO2 BFT pdf 2 . 60RECLAIMED WATER QUALITY IMP CUV SYSTEM) CO2 map.pctf 3. 60RECLAIMED Water Quality IMP CUV SYSTEM)C02 FAR pdf .4. P 170-541200-0701702900 IO.doc l