Change Order Request
Project Nam~:! Sanitary Sewer Replacement Contract 65, Part 1 I City Sec No .: ..... I _41_5_32 ___ _...
Project No.(s):j P258-704170073087 DOE No . .---3-5-70-----,! City Proj. No.: I 00730
Project Description : Sanitary Sewer Rehabilitation on Sylvania Avenue, Brentwood Stair Blvd. and Stratford Park Drive
Contractor:! Utilitex Construction, LLP
City Project Mgr.j Roberto C. Sauceda
Phone Number:! 817-392-2387
Original Contract Amount
Extras to Date
Credits to Date
Dept.
Pending Change Orders (in M&C Process)
Contract Cost to Date
IAmount of Prooosed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Sewer
Change Order # j Date:
City Inspector: j Phil Teague
Phone Number:! 817-223-2245
Totals
12/7/2011
Contract Time
(Calendar daM)
$1 ,107 ,520 .00 ~,, ·· $1,101;520·.oo 180
t;. · $t,101;520.00 ~.-,:. · · ,_ ,; __ ··-.. , P;': $1,107,520 .00 r~;,~ \' 180.-~ ,·.
,,;:~· $t i126,5l't:14 ~· Y-.• •. , ... · i'-$.f ;.126,531~14 <t\""· · 21 0'.''
$33 ,226.00 ,. $33;226.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE} AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25")
•
•
•
Sewer rehabilitation of 6 and 12-inch sanitary sewer mains by cured in place method in lieu of pipe
enlargement in order to minimize damage (from the pipe enlargement process) to several large mature
trees located within easement.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
. .
.. FORT WORTH City of Fort Worth
Change Order Additions , • •
Project Name
Project No.(s):
I Sanitary Sewer Replacement Contract 65 , Part 1
! P258-704170073087
City Sec No .: 41532
DOE No .j 3570 I City Proj. No.: I 00730
Project
Description Sanitary Sewer Rehabilitation on Sylvania Avenue Brentwood Stair Blvd. and Stratford Par1( Drive
Contractor Utilitex Construction , LLP I Change Order: [I] Date : I 12/7/2011
City Project Mgr. Roberto C. Sauceda City Inspector! .... _P_hi_l T_e ..... ag..._u_e _____ __.
ADDITIONS
IICIIII': ~;.-· ·. -·-~· .... 'I IU~',, · DEPT· -~ Qty,,,. Un it;,. -Unit Cost, .•. , Tota~:.
42 Sewer Service 4-inch for Clt't' SEWER 28.00 EA $350.00 $9,800.0
55 12 Inch CIPP -Install SEWER 230.00 LF $87.75 $20,182.51
55 6-lnch CIPP -Install SEWER 1098.00 LF $48 .78 $53,560.4
56 2 Inch Water line repiar at Stratford Par1( Dr SEWER 1.00 LS $2 ,900.00 $2,900 .0
57 Bermuda and Hydromulch at Stratford Par1( SEWER 760.00 SY $1 .25 $950.0
58 4-lnch Top Soil SEWER 760 .00 SY $4.52 $3,435.21
59 Water for Bermuda and Hydromulch at Stratford Par1( SEWER 1.00 LS $4,800.00 $4,800.01
60 42-lnch RC storm drain pipe removal and replace with ffowable fill SEWER 1.00 LS $3 ,920 .00 $3,920 .0
61 Contaminated soil lab testing at Sylvania Ave . SEWER 1.00 LS $4 ,200 .00 $4,200.0
Sewer $103,748 .14
Page 2 of 4 Additions Sub Total $103,748.14
.. . -FctR.TWORTH ,. .• City of Fort Worth
Change Order Deletions
!.--S-an-it-ary_Se_w_e_r R-e-pl-ace-m-en-t-Co_n_tr_ac_t 6-5-, -Pa_rt_1------------, r
Project Name City Sec No .:
Project No.(s): I P258-704170073087 DOE No. 3570 City Proj. No.:
Project Description Sanitary Sewer Rehabilitation on Sylvania Avenue Brentwood Stair Blvd . and Stratford Park Drive
Contractor Utilitex Construction , LLP Change Order: [I] Date I 12/7/2011
41532
00730
City Project Mgr. Roberto C. Sauceda City Inspector. !...._P_hi_l T_ea....;;g_ue ______ __.
DELETIONS
ITEt,lr .DE~6if!TIO~e:.:~~~r~~'f;;~~..f4?··J~~::tit~~~s!1·~:(~::~!?:r~~~~~'1f:",.:·~.-".".;~·.;'iJ,~~iti1 ~\'f~.,~~ DEP"F4"$~.-~ · .7':~' Un ~~ Unlt.C~:-+..,,. T~i't•·. ·l'.-·0 ·-.:·, ' -
2 PIPE 12 TO 15 INCH HOPE BY PIPE ENLARGEME SEWER 230 .00 LF $n.OO $17,710.0
9 PIPE 6 INCH TO 8 INCH ENLARGEMENT HOPE SEWER 1271 .00 LF $37 .00 $47,027 .0
15 SEWER SERVICE 4" INCH TAP TO HOPE SEWER 40.00 EA $500 .00 $20,000 .0
Sewer $84 ,737 .01
Page 3 of 4 Deletions Sub Total $84,737.01
,
M/WBE Breakdown for this Change Order
Amount for this co,-.. :·
Total
Previous Change Orders
Page 4 of 4
PROJECT NAME:
BuySpeed No:
City Project No :
Contract No:
D.O.E. No:
PROJECT SUMMARY SHEET
(Change Order Attachment)
SSR Contract LXV (65) Part 1, N. Sylvania, Stratford Park, Brentwood Stair
CSC0-11-00066224
00730
CS41532
3570 Oriyinai M ~ C appro ~'<Jd 01 -04 -1'1, C-24679
Attachment to Change Order No: 1
Today's Date : 12/12/11
Original Contract Amount:
Extras to Date :
Credits to Date:
Contract Amount to Date:
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail. for Admin. Change Orders:
Remaining Funds Available for Change Orders :
Additional Funding (if necessary):
TOTAL Sewer
$ 1,107,520.00 $1,107,520 .00
$ $
$ $
$ 1,107,520.00 $1,107,520.00
$ 19,011.14 $ 19,011 .14
$ 1,126,531.14 $1,126,531.14
$
$
$
33,226.00 $ 33,226 .00
33,226.00 $ 33,226.00
$
Prepared By: Christy Ezernack T/PW Construction Services
\,
-.
,, .