HomeMy WebLinkAboutContract 41592-CO1DISTRIBUTION:
;~Ai:~'.toNSTRClfit~ARV. {Q~ CITY OF FORT WORTH
Plr'J'"-PROiECT M~&CT NO. bl l:f(IHANGE ORDER REQUEST
GO"LDENROD-CON:r°'~~TOir"
CHANGE ORDER NO . DATE
December 6 , 2011
D .O.e. NO.
City Project
00186
PROJECT NO .
PROJECT DES CRIPTION: Village Creek WRF Modifications to Bar Screen Bldg. 3 and
Junction Box Rehabilitation
ORJGINAL CONTRACT AMOUNT ........................................... $ ___ _,_7=.3'-'--7"-'9 "'-34~5=.o=o
EXTRAS TO DATE ............................................... $ ______ 0~.o=o
CREDITS TO DATE .............................................. $ _____ ~0'-'-.0=0
P275-701300018683
CITY SECRETARY CONTRACT NO.
41592
JAN O 9 2012
WATER DEPARTMENT
CONTRACT COST TO DATE .............................................................................................................................................................. $ ___ 7'-".3""'7-"--9=3_,_,45'"".0=0
AMOUNT OF PROPOSED CHANGE ORDER .................................................................................................................................... $ ___ .,_,_l 6=6=0'-'-.1"""'95,..,_.7=0
REVISED coNTRACT AMOUNT ............................................................................. ··oFFt·c,·AL ·RiCORD · .......................... $ __ ~9-~o3~9=.s~4o~.7~o
ORJGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ................................... ···CITY··SECRETARY .......................... $ ___ =22~1=.0=00=.0=0
ADDITIONAL FUNDING (IF NECESSARY) ............................................................ ·····Fr,··WORTH,.TX .............................. $ __ ~1.=66=0..,_,_.1=950..C...C.7~0
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER................................... . .................................................................. $ ___ ~2=2~1 =00=0=.0=0
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete ,
functional , and operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached.
CMR-00 2 MO DIFI CA TI ONS TO BY-PASS PUMPING SET UP -----------------------------------------------------------------------------$41 ,697 .70
The Contractor shall modify the installed pumping set up to accommodate plant operations. Hydraulic restrictions through the existing Bar
Screen Building No. 2 and the detritors require the u se of more primary clarifiers to achieve the required pumping capacity of 150 MGD. This
modified set up requires additional piping to reach the designated discharge point. The Contractor has provided a cost of $41,697.70 for this
work and requested no additional time.
CMR-005 REROUTE 39-INCH DRAIN LINE ------------------------------------------------------------------------------------------------------$60 ,3 5 5 . 00
The Contractor shall reroute the 39-inch drain line in conflict with the tunnel to terminate to a new manhole at the tunnel. The drain line was
not shown on the contract plans . The Contractor has provided a cost of $60 ,355.00 for this work and requested no additional time.
The Revised Substantial Completion date for the contract is June 04, 2012 .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accor M~iiill'
cos ts ari s ing out of, or incidental to , the Change Order.
ORJGINAL CONTRACT TIME
360 Calendar Days
CONTRACTOR
ADDIT IO N AL APPROVED TIME TO DATE
None
APPROVED CONTRACT TIME TO DATE
360 Calendar Days
DATE FIELD ENGINEER
JJ..-9 -11
DATE DIRECTOR/MANAGING DEPT.
12.-12-\\
DATE
or all
ADDITIONAL TIME FOR THIS CHANGE ORDER
60 Calendar Days.
DATE
DATE
DATE
c-z.53.31 DATE
APPROVED O DISAPPROVED O OTHER ___ _ 12-o\o-t I
09 -05 -12 PJ4 :'.2Q I N
i City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 12/6/2011
DATE: Tuesday, December 06, 2011 REFERENCE NO.: C-25339
LOG NAME: 60ARK CHANGE ORDER 1 BARSCREEN3
SUBJECT:
Authorize Execution of Change Order No.1 to City Secretary Contract No. 41592 in the Amount of
$1,660,195.70 for a Total Contract Amount of $9,039,540.70 with Ark Contracting Services LLC, for the
Modifications to Bar Screen Building 3 and Junction Box Rehabilitation at Village Creek Water Reclamation
Facility (ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 1 to a construction
contract with Ark Contracting Services LLC, in the amount of $1,660,195.70 for the Modifications to Bar
Screen Building 3 and Junction Box Rehabilitation at Village Creek Water Reclamation Facility, increasing
the total contract cost to $9,039,540.70.
DISCUSSION:
On January 25, 2011 , (M&C C-24719) City Council authorized a construction contract with Ark Contracting
Services , LLC, for $7,379,345.00 for the Modifications to Bar Screen Building 3 and Junction Box
Rehabilitation at Village Creek Water Reclamation Facility .
During the construction of Junction Box 4-B it became apparent that the 96-inch influent line is severely
deteriorated , making it difficult to complete the connection to the new work and revealing a serious
weakness in the City's critical infrastructure. A thorough inspection of the pipe condition, including a laser
procedure to determine the remaining pipe thickness found that the crown of the pipe is severely corroded
and subject to failure.
The original pipe wall thickness was 9-3/4-inches . Approximately 50 percent of the pipeline thickness has
been lost to corrosion and in some locations less than two inches crown thickness remains . This line was
installed in 1975 and was considered industry standard at that time. The portion of the pipe proposed to
be replaced is located downstream of a junction structure with turbulent flow conditions , which facilitates
the release of hydrogen sulfide gas from the wastewater. The hydrogen sulfide gas reacts with the
moisture in the pipe and corrodes the concrete . The concrete pipe is proposed to be replaced in this
Change Order No . 1 with a fiberglass pipe, which is resistant to the corrosive effects of hydrogen sulfide
gas .
Bypass pumping is cu r rently set up for t he project and will be necessary for replacem e nt of the 96-inch
influent lin e . Replacing the line under this cont ract may save the City more th a n $2 ,000 ,000 i n bypass
pumping costs should it have to be completed und e r a sepa rate cont ract at anoth e r time .
Th is p ropo s ed Ch a nge Order No . 1 w ill com pe nsate the Contracto r fo r repla cemen t o f 883 li ne ar feet of
96 -inch p ipe , tun ne li ng und e r th e lev e e , inst alla tion of a new a c cess ma nhol e, and fo r t he neces sary
bypass pump in g services t o keep the work area dry. The contractor has requested a n additio na l 6 0
Logname: 60ARK CHANGE ORDER 1 BARSCREEN3 Page 1 of 2
calendar days to complete the work.
Other work proposed to be completed under this change order No . 1 includes :
• the installation of a 39-inch manhole to resolve an underground conflict,
• contract modifications to non-intrusive valve actuators ,
• additional length of bypass pumping hose required to meet plant operating constraints , and
• the fabrication of additional stainless steel wire plate for Bar Screen Building 3 influent channel at
flume 7 .
Malcolm Pirnie , Inc., the design engineer and Camp Dresser & McKee , Inc., the construction manager
have reviewed the costs , consider them to be fair and reasonable and recommend approval. City Staff
concurs with the recommendations .
MWBE -Ark Contracting Services LLC , agrees to maintain its initial M/WBE commitment of 22 percent
that it made on the original contract and extend and maintain that same M/WBE commitment of 22 percent
to this first change order. Therefore Ark Contracting Serv ices LLC , remains in compliance with the City's
M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE
Comm itment form executed by an authorized representative of its company .
The Village Creek Water Reclamation Facility is located in COUNCIL DISTRICT 5 and serves ALL
COUNCIL DISTRICTS .
FISCAL INFORMATION/ CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget , as appropriated, of the Sewer Capital Projects Fund .
FUND CENTERS:
TO Fund/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
FROM Fund/Account/Centers
P258 54 1200 701300018680
Fernando Costa (6122)
S . Frank Crumb (8207)
Madelene Rafalko (8215)
1. 6 0A rk C h a nge Order 1 Barscreen3 FAR.pdf (CFW Internal )
2 . 6 0AR K CH A NG E ORD ER 1 BA RSCREEN3 MWBE.pdf (CFW Internal )
3. 60AR K C HANG E ORDER 1 BA RSCREE N 3 RE V ISED Mao .odf (Public)
4 . P25 8 -476045-7 0 1 139990 100.doc (CFW Internal)
Logname: 60ARK CHANGE ORDER 1 BARSCREEN3
$1 ,660 ,195.70
Page 2 of 2