CITY OF FORT WORTH
CHANGE ORDER REQUEST CITY SECRETARY, 1) ,,,c-/-c_o j_
CONTRACT N0._"1:......::'t=..)...,;._____.
CHANGE ORDER N0.1 DATE 06-21-11 D.O.E. NO 6576
/
PROJECT NO. C282/541600/807370151883
/
PROJECT DESCRIPTION Parking Improvements at Marion Sansom CITY SECRETARY CONTRACT NO. 41651
Park
ORIGINAL CONTRACT AMOUNT... ................................... $ 156 ,256 .25
EXTRAS TO DA TE ............................................ $ -0 -
CREDITS TO DA TE .............................................. S -0-
CONTRACT COST TO DATE ......................................................................................................................................... $ 156,256 .25 /
AMOUNT OF PROPOSED CHANGE ORDER ............................................................................................................................ $ 23 ,150 .20 ,.
REVISED CONTRACT AMOUNT ................................................................................................................................................... $ 179,406.45 I
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ...................................................................................... $ NA
REMAINING FUNDS AV AI LAB LE FOR CHANGE ORDERS ............................................................................... $ NA
ADDITIONAL FUNDING (IF NECESSARY) ...................................................................................................................... $ NA
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
SEE ATTACHED .
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Ir is understood and agreed that the acceptance of th is Change Order by the contractor constitutes an accord and satisfaction and represents
Payment in full (both time and money ) for all costs arising out of, or incidental to , the above Change Order
CONTRACTOR'S NAME :
CE COOK & SONS , INC .
ORIGINAL CONTRACT TIMI: ADDITIONAL APPROVED TIME TO DA Tl: APPROVED CONTRACT TIME TO DA Tl: ADDmONAL TIME FOR THIS C HANGE ORDER
45 Working Days 0 Working Days 45 Working D ys 15 Working Days
DATE DATE LR-i. -a.~ 1.--~-=-~-=---L--'--~~~-+-~~-+---A--....--.~--=-~~~--+--=--~~-lc1_,.r
DATE DATE y
~---¢;~~:;-;:~6--.::-;~-+-...!_.7~-J~J-_!.,1~,i:---!:::::=-7'f~~~-P~:----+-'.LJ....!...f..!..Jc;~UJ~, -~N
DATFtt "'t..c( l( DATE
'7.i). l (
DA T [ C O UNCIL ACTION (IF REQ UIRED) DAT[
9 APPROV[D 9 DISAPPROV[D 9 OTHER
/ l I : I .' I :I
NO M&C EQUIRED OIMINAL
DEPARTMENT OF ENGINEERING
CHANGE ORDER JUSTIFICATION RECORD
DATE 06-21-1 I
PROJECT NAME: Parking Improvements at Marion Sansom Park
CHANGE ORDER: DOE NO. 6576 CLIENT PROJECT NO C282/54l600/807370151883
INSPECTOR: Donald Watson PHONE NO: 817-205-891 I
PROJECT MANAGER : Scott E. Penn PHONE NO: 817-392-5750
REASON (S) FOR CHANGE:
Upon perfonning 2" milling of existing asphalt drive, per contract documents, it was detennined that exposed subgade
would not provide an adequate base for a 2" HMAC overlay -which is what was called for in the contract. TPW
Inspection, CE Cook & Sons, Inc. and the Parks & Community Services Dept. were in agreement that additional subgrade
would need to be removed and a 6" HMAC installed in the drive areas, this would match the new parking stalls area paving
section. This revision to the paving section in this area will provide for a7onger lastin product and a more unifonn paving
operation & finished appearance.
Sufficient funds are available to accommodate this construction change .
l(
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
--J-/'f -/1
lJOAIGINAL
No. PAY ITEM DESCRIPTION
UNIT ONE -SITE PREPARATION ITEMS
l. Delete Unit One -Installation of2" min. Overla~
Line Item #9 HMAC 'Type C'
2. Delete Unit One -Installation of 6" HMAC
Line Item #10
3. Add-Unit One -2 -4" PVC (sched. 40) Conduit
Line Item #26 Under Paving, through Island
4 . Add-Unit One -Grading and 2' Bermuda Sod Band
Line Item #27 And additional seeding around
shelter area
5. Add-Unit One -Remove 4" subgrade
Line Item #28
6 . Add-Unit One-4" Type 'B' HMAC-Base
Line Item #29
7 . Add-Unit One -2" Type 'D' HMAC -Surface
Line Item #30
QUANTITY
11241 SF
19120 SF
150 LF
LS
8352 SF
30361 SF
30361 SF
UNIT PRICE
$1.60
$2 .30
$15 .00
$1,000.00
$.35
$1.60
$1.00
TOTAL:
TOTAL
<$17,985.60>
<$43,976.00>
$2,250.00
$1,000 .00
$2.923.20
$48,577.60
$30,361 .00
$23,150.20
lJORIGINAL
•, . . .
, •.•.... : ·-~ .
CE Cook Sons Inc.
PO Box 1155 Roanoke, Tx 76262
City of Ft. Worth: Marion Sansom Park
DOE: 6576 -Change Order Request
• 1!1!!8181!!!1,.~
Item# Quantity un it Descr i ption unit price Total
1 150.00 If 2-4" PVC Conduit ran thru island area. $15.00 $2,250.00
Grading and 2' sod and additional seeding around pav ilion
2 1.00 Is area . $1,000 .00 $1,000.00
Total : $3 ,250.00
ii l!I ii I 1.i !f
It em# Quantity un it Descript ion unit price Total
1 8,352 .00 sf Remove 4" subgrade $0 .35 $2 ,923 .20
2 30,361.00 sf 4" Type 'B' HMAC $1.60 $48,577 .60
3 30,361 .00 sf 2" Type 'D' HMAC $1 .00 $30,361 .00
Total : $81 ,861 .80
Delet ion Items -
Item # Quantity unit Description unit price Tota l
9 (11 ,241 .00) sf Delete : lnstal 2" Overlay $1 .60 -$17,985.60
10 (19,120.00) sf Delete : lnstal 6" HMAC $2.30 -$43 ,976 .00
Total Deduct : -$61 ,961.60
TOTAL CHANGE ORDER: $23,150.20
INCLUSIONS:
---All work is guaranteed to be in accordance with the drawings and specifications submitted for the above bid items. The above prices
include all materials, labor and equipment to complete the work in a substantial workmanlike manner and will be billed by the unit
price for completed work.
• • • We are requesting 15 additional working days t o complete J>roposed work.
••• Please note the original price totals$ 73 .90 per ton and the new price is$ 70 .91 per ton.
Charlie Cook
817-994-9408
7
I
I
!
I
I I
l)
[]ORIGINAL
) ··,
/)
t •. , .. ,4 .
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME:
..... BuySpeed No:
Marion Sansom Park -Parking Improvements
P0-11-00066161
Contract No: CS41651
D.O.E. No: 6576 C-24776, approved 03-08-11
Attachment to Change Order No: 1 ------Today's Date: 7/12/11
Original Contract Amount
Extras to Date:
Credits to Date:
Contract Amount to Date:
------
Amount of Proposed Change Order:
Revised Contract Amount
Contingency Funds Avail. for Admin. Change Orders:
Remaining Funds Available for Change Orders:
Additional Funding (if necessary):
$
$
$
$
$
$
$
$
$
TOTAL
156,256.25 $
$
$
156,256.25 $
23,150.20 $
179,406.45 $
$
$
(23,150.20) $
Prepared By: Christy Ezernack T/PW Construction
35,597.15 $120,659.10
$
$
35,597.15 $120,659.10
$
35 ,597.15 $120,659 .10
$
$
$
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME:
BuySpeed No:-
Contract No:
0.0.E. No:
Parking Improvements at Marion Sansom Park
P0-11-0006618't
CS41651
6576
Attachment to Change Order No: 1
Today's Date: 7/19/11
Original Contract Amount: $
Extras to Date: $
Credits to Date: $
Contract Amount to Date: $
Amount of Proposed Change Order: $
Revised Contract Amount: $
Contingency Funds Avail. for Admin. Change Orders: $
Remaining Funds Available for Change Orders: $
Additional Funding (if necessary): $
M&C: C-24776
Date: 03-08-11
TOTAL PACS C111 PACS C282
156,256.25 $ 35,597.15 $120,659.10
$ $
$
156,256.25 $
23,150.20 $
179,406.45 $
$
$
$
$
35,597.15 $120,659.10
$ 23,150.20
35,597.15 $143,809.30
$
$
$
Prepared By: Karen Striker T/PW Business Support