Project Namel Concrete Restoration (2010 -8)
Client Project #(s)I GG01-537110-02022002
City of Fort Worth
Change Order Request
Project Description Concrete Pavement Repair @ Various Locations Throughout the City
CITYSECRETARY. L.~$ C.D 3 CONTRACT NO. ~ \ u'U -
City Sec # 41658 .__ _____ ____,
DOE : 6667
Contractor! Jet Underground Utilities , Inc . Change Order # 3 Date 2/13/2012
City Project Mgr.j Tariqu l Islam (817) 392-2486 City Inspector Gary Deyon (817) 223 -2257 ~--~----------'------'
Dept. TPW Water Sewer
Original Contract Amoun t $495 ,405 .70
Extras to Date $22 ,298.25
Credits to Date
Pend ing Change Orders (in M&C Process)
Contract Cost to Date $517 ,703 .95
IAmount of Proposed Change Order $0.00 $0.00 $0.00
Revised Contract Amount $517,703 .95
Original Funds Ava ilable for Change Orders
Re main in g Fu nds Ava ilable for thi s CO $0 .00
Add itional Fund ing (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals Select Day Type
$495 ,405 .70 150
$22 ,298 .25 35 -
$517 ,703 .95 185
5
$517 ,703 .95 190
$0 .00
4.50%
$619 ,257 .13
This change order is to request the addition of a new line item . On Steinburg Ln . it was determined tha t the existing sidewalk had to be removed
and replaced because it had become a trip hazard and liabil ity . Restoration of the parkway requ ired the use of additional sod . 5 calendar days
are be ing added to the con tract for the additional work .
It is understood and agreed that the acceptance of th is Change Order by the contractor constitutes an accord and satisfaction and represents pay ment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
FORT WORTH ----.---
Project Name
Client Project #
Concrete Restoration (2010-8)
GG01-537110-02022002
City of Fort Worth
Change Order Additions
Project Description Concrete Pavement Repair @ Various Locations Throughout the City
Contractor Jet Underground Utilities , Inc.
City Sec# 41658
DOE: 6667
Change Order# 3 Date 2/13/2012
City Project Mgr. Tariqul Islam (817) 392-2486 City Inspector ....__G_a ..... ry_D_e..._yo_n ___ _,_(8_17 ..... )_2_23_-2_2_57_.....,
ADDITIONS
11t:.M Ut:SL;Klt-' I IUN Utt-'I Qty Unit Unit cost Total
1J 1..Jrass :soa Keplacement IPW 210 .UU sy $3 .85 $808.:>U
Change Order Additions Page 1 of 2
TPW $808 .50
Water $0 .00
Sewer $0 .00
Sub Tota Add1t1ons $808 .50
Change Order Additions Page 2 of 2
FORT WORTH ----.----City of Fort Worth
Change Order Deletions
Project Name
Client Project#
Concrete Restoration (2010-8) City Sec# 41658 :::::==========:::::::::::==============================================--:__~====: GG01-537110 -02022002 DOE : 6667
Project Description Concrete Pavement Repair@ Various Locations Throughout the City
Contractor Jet Underground Utilities , Inc. Change Order# 3 Date 2/13/2012
City Project Mgr . Tariqul Islam (817) 392-2486 City Inspector ,__G_a .... ry_D_e._yo_n ___ .... (8_17 ...... )_2_23_-2_2_57 _ _,
DELETIONS
11 t:M Dc:;:,1..,rm· 1 IUN DEPl Uty Unit Unit L;OSt lota1
f unc1ass1t1ed :5treet 1::xcavation 11-'VV l:S~J.tjj cy :till.UL :til:SUl:S .bL
Change Order Deletions Page 1 of 2
TPW $808 .50
Water $0 .00
Sewer $0 .00
Sub 1 otal Deletions $808 .50
Change Order Deletions Page 2 of 2
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
PROJECT NAME :
BuySpeed No (T/PW):
BuySpeed No (Water):
City Project No:
Contract No :
D.O .E. No :
Attachment to Change Order No :
Today's Date:
Original Contract Amount:
Extras to Date :
Credits to Date :
Contract Amount to Date :
PROJECT SUMMARY SHEET
(Change Order Attachment)
Concrete Restoration 2010-8 @ Six Locations
P0-11-00065783
N/A
N/A
CS41658
6667
3
2/14/12
TOTAL
$ 495,405. 70
$ 22,298.25
$
$ 517,703.95
Amount of Proposed Change Order: Additions
Amount of Proposed Change Order: Deletions
Revised Contract Amount:
$ 805.50
$ (805.50)
$ 517,703.95
Contingency Funds Avail. for Admin. Change Orders : $
Remaining Funds Available for Change Orders: $
Additional Funding (if necessary): $
Prepared By : Christy Ezernack T/PW Construction Services
' ; r-.,
.
fO li,T ;ORTtt ..
Project Name! Concrete Restoration (2010-8)
Client Project #(s)j GG01-537110-02022002
City of Fort Worth
Change Order Request
Project Description Concrete Pavement Repair@ Various Locations Throughout the City
Contractor! Jet Underground Utilities , Inc. Change Order #
j_ of~
City Sec # 41658
DOE : 6667
3 Date 2/13/2012
City Project Mgr.! Tariqul Islam (817) 392 -2486 City Inspector Gary Deyon (817) 223-2257
Original Contract Amount
Extras to Date
Credits to Date
Dept.
Pending Change Orders (in M&C Process)
Contract Cost to Date
!Amount of Proposed Change Order
Revised Contract Amount
Original Funds Avai lable for Change Orders
Remaining Funds Available for this CO
Additional Fund ing (if necessary)
TPW Water Sewer
$495,405 .70
$22 ,298 .25
$517,703.95
$0.00 $0.00 $0.00
$517 ,703.95
$0 .00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals Select Day Type
$495,405.70 150
$22 ,298 .25 35
$517,703 .95 185
5
$517 ,703 .95 190
$0 .00
4.50 %
$619 ,257 .13
This change order is to request the addition of a new line item . On Steinburg Ln . it was determined that the ex isting sidewalk had to be removed
and replaced because it had become a trip hazard and liab il ity . Restoration of the parkway required the use of additional sod . 5 calendar days
are being added to the contract for the add itional work . ,
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an acco rd and satisfaction and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order.
Date
\
~~.omz,;~~~~t:..Lozl.,.~,~~A~::....__~~L..!..=...!~----------+---~t~...x!j
i---,:...:::::::::..::i;i;;..:::.:.:.=.:::..:::.:...i::...::..c..:i.~~~~~~~~---t~___;;,~~-+-.....;D..:.ir..:.e.....;ct.....;or..:..., C.:...o~n~tr~ac~ti-'n,.__De_,p~a~rtm~en~t_,_D~e.J....l..t ~~--t-~~D~a~te~--t a~
Assistant Ci Attorne Date Assistant Ci Mana er Date
~
l\,'Q
Council Action if re uired ,\ · f-----:-:-~------;:::======:::::::----=-=-=-~=.:..:..:..~=.:...:...:~::-:--:----:---:--;:::=======;-----j /,/l,v...
M&C Number M&C Date Approved • i,1\
.....
FORT WORTH .
~
Project Namel Concrete Restoration (2010-8)
Client Project #(s)I GG01-537110-02022002
City of Fort Worth
Change Order Request
Project Description Concrete Pavement Repair@ Various Locations Throughout the City
Contractor! Jet Underground Utilities , Inc .
1. of~
City Sec # 41658
DOE : 6667
3 Date 2/13/2012
City Project Mgr.I Tariqul Islam (817) 392-2486
Change Order#
City Inspector Gary Deyon (817) 223-2257
. Dept. TPW Water Sewer Totals Select Day Type
Original Contract Amount $495,405.70 $495,405 .70 150
Extras to Date $22 ,298.25 $22 ,298 .25 35
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $517 ,703 .95 $517 ,703.95 185
IAmount of Proposed Change Order $0.00 $0.00 ~0.00 5
Revised Contract Amount $517,703 .95 $517 ,703.95 190
Original Funds Available for Change Orders $0 .00
Remaining Funds Available for this CO $0 .00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT 4.50%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $619 ,257 .13
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order is to request the addition of a new line item. On Steinburg Ln . it was determined that the existing sid ewalk had to be removed
and replaced because it had become a trip hazard and liability. Restoration of the parkway required the use of additional sod. 5 calendar days
are being added to the contract for the additional work.
/
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Contractor's Com an Name Contractor Name
J(1c.lt lA:t1J rv,/clP/ ,' 1-
Date
Date
Assistant Ci Attorne Date Date
Council Action if r uired
M&C Number M&C Date Approved
()
I ., ,...,,
~
<ti
/\,'Q
tu.
~
--
fORTWORTH ..
~
Project Name! Concrete Restoration (2010-8)
Client Project #(s)! GG01-537110 -02022002
City of Fort Worth
Change Order Request
Project Description Concrete Pavement Repair @ Various Locations Throughout the City
1. "'f
City Sec # 41658 ~---------'
DOE: 6667
Contractor! Jet Underground Utilities , Inc. Change Order# 3 Date 2/13/2012
City Project Mgr.! Tariqul Islam (817) 392-2486 City Inspector Gary Deyon (817) 223-2257 '-----'--'-----......;_....;_ ___ __,
Dept. TPW Water Sewer
Original Contract Amount $495 ,405 .70
Extras to Date $22 ,298.25
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $517,703.95
!Amount of Proposed Change Order $0.00 $0.00 $0.00
Revised Contract Amount $517 ,703 .95
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0 .00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals Select Day Type
$495 ,405.70 150
$22 ,298 .25 35
$517 ,703.95 185
5
$517 ,703.95 190
$0 .00
4.50%
$619 ,257 .13
This change order is to request the addition of a new line item . On Steinburg Ln . it was determined that the existing sidewalk had to be removed
and replaced because it had become a trip hazard and liability . Restoration of the parkway required the use of additional sod . 5 calendar days
are being added to the contract for the additional work.
I
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order .
Date
Date Date
Assistant Ci Attome Date Date
Council Action if r uired