Change Order Request
Project Name! Concrete Restoration (2011-10) at Various Locations
Client Project #(s)! GG01-537110-0202002
Project Description Concrete Panel Replacement in various locations
City Sec# 41667
DOE# 6668
Contractor! Jet Underground Utilities , Inc. Change Order # Da te 3/20/2012
City Project Mgr.! Tariqul Islam (817) 392-2486 City Inspector Candace Klenk (817) 319-6452
Dept. TPW Water Sewer Contract Time
Totals (CD)
Original Contract Amount $593 ,747 .75 $0 .00 $0 .00 $593 ,747.75 150
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $593,747 .75 $0 .00 $0 .00 $593,747 .75 150
IAmount of Proposed Change Order $17,548.74 $0.00 l0.00 l17,548.74 95 ·
Rev ised Contract Amount $611 ,296 .49 $0 .00 $0.00 $611 ,296 .49 245
Original Funds Available for Change Orders $0 .00
Rema ining Funds Available for th is CO $0 .00 $0 .00 $0.00
Additional Funding (if necessary) $17 ,548.74 $17 ,548 .74
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.96%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $742,184 .69
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The purpose of this change order is to add/increase , decrease and delete line items for project close out. Two (2) ramps were added on Bellaire
Drive at the request of Parks and Community Services so that pedestrians cou ld have access to the Trinity Trails . The extra joint seal was used
on Bellaire Drive to reseal joints due to pavement movement. The inlet top , on Bellaire Dr S., was replaced to improve drainage on the street.
The 95 days added to this contract for the time that elapsed while waiting on a decision to install the ramps and the extra time needed to
complete this work . :<:>-~~"'l:>.i:l."tl.Q'l:J.
,Q-,<;;;,, f OA 1" ~ZJ
~c,_~000000 000/Ji:. Q¢:
~-8 g:X ~
t'.j C.)o o i,-:
!~l~o ooe~. ¢~
0 0 P. -./-+..lJ'i~~~~~---....;~~ 0 ~ j:j ...._ o o Ta
'A 'T"" 00 00 1:1
V>,. Ooooooo -0' '{~ s -0'
:0..-U.'\l.~~
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
~~~~~~L-~~k-:~4~~~~~~~~.4~~_J ~~
~~~~~====--¥--=':.tt::...:L~~:_____.:::.~~~-,,,L---=--4~~~~r
M&C Number I ;;J/ A,..
fORTWORTH ----.--City of Fort Worth
Change Order Additions
Project Name Concrete Restoration (2011-10) at Various Locations
Client Project# GG01-537110-0202002
Project Descript ion Concrete Panel Replacement in various locations
Contractor Jet Underground Utilities , Inc .
DOE# 6668
Change Order#
City Project Mgr . ......_T_ar_iq,_ul_ls_la_m ____ (..._8_17 ...... ) _39_2_-2_48_6 ___ ___, City Inspector Candace Klenk
ADDITIONS
11 t:M Ut:::iliKlt"' 1 IUN Ut:1-' I Uty unit
3 ,INC/ Kemove ana Keplace t-a1led Keintorced concrete Pavement lr-'W 1,au.81 ;:, T
b ,INC/ Kemove and Keplace /" concrete curb IPW 3,805 .31 LF
1U (AUU/ Kemove and Keplace Inlet lop IPW 1.UU LS
11 (ADD) Extra Wide Joint :seal (l:lellaire unve) IPW 1,IUU .UU LF
12 (ADD) Ramps (l:le11a1re unve) IPW 2.UU EA
.. Change Order Add1t1ons Page 1 of 2
City Sec# 41667
Date 3/20/2012
(817) 319-6452
Unit LiOSt IOtal
;:J>'IU.UU :j,4!S ,OJL.4lJ
$7.UU ;:J>LO ,OJ/.1/
:j)L ,!S:>U .UU ;:J>L ,OOU .UU
$3 .1U ;:J>O, /U .UU
~is:,u .uu :j)l , /UV .VU
TPW $85 ,289 .57
Water $0 .00
Sewer $0.00
Sub Total Add1t1ons ~l:lO,ltl!:l .57
Change Order Additions Page 2 of 2
FORT WORTH ----..---City of Fort Worth
Change Order Deletions
Project Name Concrete Restoration (2011-10) at Various Locations
Client Project# GG01-537110-0202002
Project Description Concrete Panel Replacement in various locations
Jet Underground Utilities , Inc .
DOE# 6668
Change Order# Contractor
City Project Mgr. Tariqul Islam (817) 392-2486 City Inspector Candace Klenk
DELETIONS
111:M :1-W-'IIVN Ul:1-' I Wty Unit
.:'. (Ul:C) U!lllty AOJUStments 11-'W u.ou L::;
4 (Ut:C) ::;111con Joint Sealing tor concrete 1-'avement that are not marked for rep fPW 12,325 .00 LF
0 (Ut:C) Flex Base fPW 1,688 .10 CY
7 (DEL) Unclassified Street Excavation fPW 1,/UU.00 CY
8 (Ul:C) Concrete-Install fPW 73 .32 CY
Change Order Deletions Page 1 of 2
City Sec# 41667
Date 3/20/2012
(817) 319-6452
unit cost 10181
:j,4 ,UUU.uu :j).:'.,UUU .Ul.
$1 .Uo :j)l.:'.,~41.Lt
$19 .uu :i,;;z ,ur;rnu
$9.uu :i,10 ,;;uu .uu
:i;/4 .uu :i;o ,,.Lo .oo
TPW $67 ,740 .83
Water $0 .00
Sewer $0 .00
Sub 1 otal Deletions ~t::,/,740 .83
Change Order Deletions Page 2 of 2
:
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
PROJECT NAME:
BuySpeed No (T/PW):
BuySpeed No (Water):
City Project No:
Contract No:
D.O .E . No :
Attachment to Change Order No :
T oday's Date:
Original Contract Amount:
Extras to Date :
Credits to Date:
Contract Amount to Date :
PROJECT SUMMARY SHEET
(Change Order Attachment)
Conc rete Restoration 2011-10 @ Various Locations
P0-11-00065782
N/A
N/A
CS41667
6668
1
3/26/12
C-24768 approved 03-22-11
TOTAL
$ 593,747.75
$
$
Amount of Proposed Change Order:
$ 593,747.75
$ 17,548.74
$ 611,296.49 Revised Contract Amount:
Contingency Funds Avail. for Admin . Change Orders :
Remaining Funds Available for Change Orders :
Additional Funding (if necessary):
$
$
$ (17,548.74)
Prepared By : Christy Ezernack T/PW Construction Services
' {
FORT WORTH ..
~
..
~ City of Fort Worth
Change Order Request
City Sec # 41667 Project Namel Concrete Restoration (2011-10) at Various Locations
Clie ~t Project #(s)I GG01-537110-0202002
'-------~
DOE# 6668
Project Description Concrete Panel Replacement in var ious locations
/ Contractor! Jet Underground Utilities , Inc. Change Order# Date 3/20/2012
City Project Mgr .I Tariqul Islam (817) 392 -2486 City Inspector Candace Klen k (817) 319-6452
Wate ~'I
-· Contract Time Dept. TPW Sewer
~ 'V /'"'\Totals (CD)
Original Contract Amount $593 ,747 .75 $0 .00 '$0 .00 ' $593,747 .75 150
Extras to Date f /
Credits to Date ' '--\ Ii...
Pending Change Orders (in M&C Process)
Contract Cost to Date $593,747 .75 $0 .00 $0.00 $593,747 .75 150
!Amount of Proposed Change Order $17,548.74 $0.00 $0.00 $17,548.74 95
Revised Contract Amount $611 ,296 .49 $0 .00 $0 .00 $611 ,296.49 245
Original Funds Available for Change Orders $0 .00
Remaining Funds Available for this CO $0.00 $0 .00 $0.00
Additional Funding (if necessary) $17 ,548.74 ,$17 ,548.74
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT I 2.96% I 11-------1 MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) I $742 ,184 .69 I
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The purpose of this change order is to add/increase , decrease and delete line items for project close out. Two (2) ramps were added on Bellaire
Drive at the request of Parks and Community Services so that pedestrians could have access to the Trinity Trails. The extra joint seal was used
~ on Bellaire Drive to reseal joints due to pavement movement. The inlet top , on Bellaire Dr S., was replaced to improve dra inage on the stree t.
The 95 days added to this contract for the time that elapsed while waiting on a decision to install the ramps and the extra time needed to
complete this work .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Orde r.
ui~ \
M&C Number I ;J / A-M&C Date Approved \l\,,C\ \
i__ ___ ____::::::::::::::t::=====::...---------......::::=:=====::...--\)--.l~ ~~,ii
--·
r ,
FORT WORTH ..
~
City of Fort Worth
Change Order Request
Project Name! Concrete Restorat ion (2011-10) at Various Locations
Client Project #(s)! GG01-537110-0202002
Project Description Concrete Panel Replacement in various locations
Contractor! Jet Underground Utilities , Inc.
City Sec # 41667 .__ ______ __.
DOE# 6668
Date 3/20/2012
City Project Mgr.! Tariqul Islam (817) 392-2486
Change Order#
City Inspector Candace Klenk (817) 319-6452
Dept. TPW Wate l Sewer
~
Original Contract Amount $593 ,747 .75 $0.00 . $0 .00
Extras to Date f
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $593 ,747 .75 $0 .00 $0 .00
IAmount of Proposed Change Order $17,548.74 $0 .00 $0.00
Revised Contract Amount $611 ,296.49 $0.00 $0 .00
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0 .00 $0 .00 $0 .00
Additional Funding (if necessary) $17 ,548.74
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$593 ,747 .75 150
$593 ,747.75 150
$17 ,548 .74 95
$611 ,296.49 245
$0 .00
$17 ,548.74
2.96%
$742 ,184 .69
I _;.
The purpose of this change order is to add/increase , decrease and delete line items for project close out. Two (2) ramps were added on Bellaire
Drive at the request of Parks and Community Servi ces so that pedestrians could have access to the Trinity Trails . The extra jo int seal was used
on Bellaire Drive to reseal joints due to pavement movement. The inlet top , on Bellaire Dr S., was replaced to improve drainage on the street.
The 95 days added to this contract for the time that elapsed while waiting on a decision to install the ramps and the extra time needed to
complete this work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order.
M&C Number I Al / A
FORT WORTH ..
~
City of Fort Worth
Change Order Request
City Sec# 41667 Project Name I Concrete Restoration (2011-10) at Various Locations
Cl ient Project #(s)j GG01-537110-0202002
~------~
DOE# 6668
Project Description Concrete Panel Replacement in various locations
Contractor! Jet Underground Utilities , Inc . Change Order #
City Inspector
Date 3/20/2012
City Project Mgr.! Tariqul Islam (817) 392-2486 Candace Klenk (817) 319-6452
Dept. TPW Water Sewer
Original Contract Amount $593 ,747 .75 $0.00 $0 .00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $593 ,747 .75 $0 .00 $0 .00
!Amount of Proposed Change Order $17,548.74 $0.00 $0.00
Revised Contract Amount $611 ,296 .49 $0 .00 $0.00
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0 .00 $0.00 $0 .00
Additional Funding (if necessary) $17 ,548 .74
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$593 ,747.75 150
$593 ,747 .75 150
$17,548.74 95
$611 ,296.49 245
$0 .00
$17 ,548 .74
2.96%
$742,184 .69
The purpose of this change order is to add/increase, decrease and delete line items fo r project close out. Two (2) ramps were added on Bellaire
Drive at the request of Parks and Community Services so that pedestrians could have access to the Trinity Trails . The extra joint seal was used
on Bellaire Drive to reseal joints due to pavement movement. The inlet top , on Bellaire Dr S., was replaced to improve drainage on the street.
The 95 days added to this contract for the time that elapsed while waiting on a decision to install the ramps and the extra time needed to
complete this work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order .
Contractor's Compan Name Contractor Name Contract Si nature Date
Jet Under round Utilities , Inc . ( • f
,, r ) '"'1 '
Inspector/Inspection Supervisor Date Project Manaqer/Proqram Manaqer Date
'-f I\,._ i<.I I •, --I ..
Assistant Director (Dept) Date Director , Contracting Department (Dept) Date
.,, .
Assistant City Attorney Date Assistant City Manaqer Date ... -.
I ".:. _,, -_ ...
Council Action if required)
M&C Number I I M&C Date Approved I I
'