HomeMy WebLinkAboutContract 41763-CO2i
FORT WORTH . ~ City of Fort Worth
Change Order Request
Project Name! Street Reconstruction .Water and Saintary Sewer Replacements-C .D. 4A
Client Project #(s)I #00939 -DOE# 5871
CDflt; 2 £-2
~~::r::vtt/1lR ,\.,(JJ0
City Sec# I 41763 I
Project Description Street, Water and Sanitary Sewer Reconstruction
Contractor! McClendon Construction Change Order # 2
City Inspector Ariel Duarte
I
Date 4/17/2012
City Project Mgr. I Richard Argomaniz ~--------------'
Dept. TPW Water Sewer
Original Contract Amount $386,983 .96 $168 ,730.50 $168 ,569 .70
Extras to Date $56 ,675.00 $2 ,375 .00 $20 ,800 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $443 ,658 .96 $171 ,105.50 $189 ,369 .70
!Amount of Proposed Change Order $8 ,708.00 $19,729.45 $16,568.40
Revised Contract Amount $452 ,366 .96 $190,834 .95 $205 ,938 .10
Original Funds Avai lable for Change Orders $19 ,349.00 $8 ,436.50 $8 ,428.50
Rema ining Funds Available for this CO $0 .00 $6 ,061 .50 $0 .00
Additional Funding (if necessary) $8,708.00 $13 ,667.95 $16 ,568 .40
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$724 ,284 .16 220
$79 ,850 .00 31
$804 ,134.16 251
$45,005.85 7
$849 ,140 .01 258
$36 ,214.00
$6 ,061 .50
$38 ,944 .35
17 .24%
$905 ,355 .20
The pav ing limi ts on Clarence Street East and on Clarence West were extended out to Marsa li s Street. These two sections were not included in
the original design . The paving demolition crew had to re-mobilize to excavate these two sections of paving . The water line on Clarence Street
East at Station 1 +07 was too high and had to be lowered by using four (4) 45 degree bends . A TxDOT permit was required for the utility work
dor.e within the ROW of SH 121 ar.d the utility crew had to pull off of the project until the permit was obtained . On Arnold Ct the storm drain
existing laterals at Station 1 +45 had to be removed and plugged at the main . The retaining walls were required on W Clarence St , E Clarence
St and Arnold Ct to reta in the integrity of the adjacent properties ; they were not in cluded in the contract. A 6" water line was installed along th e
ROW of SH 121 . This line was not included in the original project. An 8" water line of 40 .5 DIP with cement stabilize£,.~ installed on
Arnold Ct accord ing with plans to protect the existing sewer line. Long sewer services were protected with cemeR£ir~ jf'.!,-~1110'
before and 10' after , where they cross with water line . s~ ,days are re uested fort . additiowro§)u00 00
000~~¢.
. !1i]f \O~
11._ o o:D ~
0!941-! M ~ l c-t £'" D 2 0 I i. ~~1."""'K-----r,_~~ ... ---.... i!-'i ~ ;~ g
'A Oo 0~ t::I '<o...t~~ooo0
,.. .c:t It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and sati~7.fli~:A5>res~ayment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. 11.ll,~'tl.~~~~
M&C Number t .'2 6 618
/.
/, FORT WORTH ..
~ City of Fort Worth
Change Order Request
CDf1 ;;. t>f 2
l//1U ~ (0~
Project Name! Street Reconstruction .Water and Saintary Sewer Replacements-C.D . 4A
Client Project #(s)j #00939 -DOE# 5871
Project Description Street .Water and Sanitary Sewer Reconstruction
Contractor! Mcclendon Construction Change Order # 2
City Sec # 41763 ~---------'
Date 4/17/2012
City Project Mgr. j Richard Argoman iz City Inspector Ariel Duarte .__ ___________ ___,
Dept. TPW Water Sewer
Original Contract Amount $386 ,983.96 $168,730 .50 $168 ,569.70
Extras to Date $56 ,675 .00 $2 ,375.00 $20 ,800 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $443 ,658 .96 $171 ,105.50 $189 ,369 .70
!Amount of Proposed Change Order $8,708.00 $19 ,729.45 $16,568.40
Revised Contract Amount $452 ,366 .96 $190 ,834 .95 $205 ,938 .10
Original F-unds Available for Change Orders $19 ,349 .00 $8 ,436 .50 $8 ,428 .50
Remaining Funds Ava ilable for thi CO $0.00 $6 ,061 .50 $0 .00
Additlonal Funding (if necessary) $8 ,708 .00 $13 ,667.95 $16 ,568.40
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$724 ,284 .16 220
$79 ,850 .00 31
$804 ,134.16 251
$45,005.85 7
$849 ,140 .01 258
$36 ,214.00
$6 ,061 .50
$38 ,944.35
17 .24%
$905 ,355 .20
The paving limits on Clarence Street East and on Clarence West were extended out to Marsalis Street. These two sections were not included in
the original des ign. The paving demolition crew had to re-mobilize to excavate these two sections of paving . The water line on Clarence Street
East at Station 1 +07 was too high and had to be lowered by using four ( 4) 45 degree bends . A T xDOT perm it was requ ired fo r the ut ility work
done within the ROW of SH 121 and the utility crew had to pull off of the project until the permi t was obtained . On Arnold Ct the storm dra in
existing laterals at Station 1+45 had to be removed and plugged at the main. The reta ining walls were required on W Clarence St , E Clarence
St and Arnold Ct to retain the integrity of the adjacent properties ; they were not included in the contract. A 6" water line was installed along the
ROW of SH 121 . This line was not included in the original project. An 8" water line of 40.5 DIP with cement stabilized Back Fill was installed on
Arnold Ct according with plans to protect the ex isting sewe r line . Long sewer servi ces were protected with cement treated sa nd Back Fill 10'
before and 1 O' after , where they cross with water line . Seven (7) Calendar days are requested for th is additional work .
/)~)Cvy
It is understood and agreed that the acceptance of this Change Orde r by the contractor constitutes an acco rd and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or inc idental to , the above Change Order .
Contractor's Com an Name Co tractor a e
Mcclendon Construction ~
Date
Date
M&C Number t:-:z, 6 7 B 7/1o /2-
FORT WORTH .
~ City of Fort Worth
Change Order Request
City Sec # 41763
(('(_,
Project Name! Street Reconstruction .Water and Saintary Sewer Replacements-C.D . 4A
Client Project #(s)! #00939 -DOE# 5871
.__ ______ __,
Project Description Street , Water and Sanitary Sewer Reconstruction
Contractor! McClendon Construction Change Order# 2
City Inspector Ar iel Dua rte
Date 4/17/2012
City Project Mgr.! Richard Argoman iz .__ ____________ _,
Dept. TPW Water Sewer
Original Contract Amount $386 ,983 .96 $168,730 .50 $168 ,569.70
Extras to Date $56 ,675.00 $2 ,375 .00 $20 ,800 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $443 ,658.96 $171 ,105.50 $189 ,369.70
!Amount of Proposed Change Order $8,708.00 $19,729.45 $16,568.40
Revised Contract Amount $452 ,366.96 $190 ,834 .95 $205 ,938 .10
Original Funds Available for Change Orders $19 ,349 .00 $8 ,436 .50 $8 ,428.50
Remaining Funds Available for this CO $0 .00 $6 ,061.50 $0 .00
Additional Funding (if necessary) $8 ,708 .00 $13,667 .95 $16 ,568.40
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$724 ,284 .16 220
$79 ,850 .00 31
$804 ,134 .16 251
$45,005.85 7
$849 ,140.01 258
$36 ,214 .00
$6 ,061 .50
$38 ,944 .35
17.24%
$905 ,355 .20
The paving limits on Clarence Street East and on Clarence West were extended out to Marsalis Street. These two sections were not included in
the original design. The paving demolition crew had to re-mobilize to excavate these two sections of paving . The water line on Clarence Street
East at Station 1 +07 was too high and had to be lowered by using four (4) 45 degree bends . A TxDOT permit was required for the utility work
done within the ROW of SH 121 and the utility crew had to pull off of the project until the permit was obtained . On Arnold Ct the storm drain
existing laterals at Station 1+45 had to be removed and plugged at the main. The retaining walls were required on W Clarence St , E Clarence
St and Arnold Ct to retain the integrity of the adjacent properties ; they were not included in the contract. A 6" water line was installed along the
ROW of SH 121 . This line was not included in the original project. An 8" water line of 40 .5 DIP with cement stabilized Back Fill was installed on
Arnold Ct according with plans to protect the existing sewer line. Long sewer services were protected with cement treated sand Back Fill 10'
before and 10' after , where they cross with water line . Seven (7) Calendar days are requested for this additional work .
I J I
/
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order.
Contractor's Com an Name Contractor
McClendon Construction :re,
M&C Number C•'2 618
·""'
t ,r
I ·r -FORT WORTH .. City of Fort Worth
~ Change Order Request
Project Name! Street Reconstruction .Water and Saintary Sewer Replacements-CD . 4A City Sec# 41763
Client Project #(s)! #00939 -DOE# 5871
Project Description Street , Water and Sanitary Sewer Reconstruction
Contractor! Mcclendon Construction Change Order# 2 Date 4/17/2012
City Project Mgr.! Richard Argomaniz City Inspector Ariel Duarte
Dept. TPW Water Sewer Contract Time
Totals (CD)
Original Contract Amount $386 ,983 .96 $168 ,730 .50 $168 ,569 .70 $724 ,284 .16 220
Extras to Date $56 ,675 .00 $2 ,375.00 $20 ,800 .00 $79 ,850.00 31
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $443 ,658 .96 $171 ,105.50 $189,369.70 $804 ,134 .16 251
Amount of Proposed Change Order $8,708.00 $19,729.45 $16,568.40 $45,005.85 7
Revised Contract Amount $452 ,366.96 $190,834 .95 $205 ,938 .10 $849 ,140 .01 258
Original Funds Available for Change Orders $19 ,349.00 $8 ,436 .50 $8,428 .50 $36 ,214 .00
Remaining Funds Available for this CO $0 .00 $6 ,061.50 $0 .00 $6 ,061 .50
Additional Funding (if necessary) $8,708.00 $13 ,667.95 $16 ,568 .40 $38 ,944 .35
CHANGE ORDERS to DA TE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 17.24%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $905,355.20
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The paving limits on Clarence Street East and on Clarence West were extended out to Marsalis Street. These two sections were not included in
the original design . The paving demolition crew had to re-mobilize to excavate these two sections of paving . The water line on Clarence Street
East at Station 1 +07 was too high and had to be lowered by using four (4) 45 degree bends . A TxDOT permit was required for the utility work
done within the ROW of SH 121 and the utility crew had to pu\\ off of the project until the permit was obtained . On Arnold Ct the storm drain
existing laterals at Station 1+45 had to be removed and plugged at the main. The retaining walls were required on W Clarence St , E Clarence
St and Arnold Ct to retain the integrity of the adjacent properties ; they were not included in the contract. A 6" wate r line was installed along the
ROW of SH 121 . This line was not included in the original project. An 8" water line of 40 .5 DIP with cement stabilized Back Fill was installed on
Arnold Ct according with plans to protect the existing sewer line . Long sewer services were protected with cement treated sand Back Fill 1 O'
before and 10' after , where they cross with water line . Seven (7) Calendar days are requested for this additional work .
....
/.l-l/1 '' L, ..... -' ~ \.. I t ... It.,/
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Mcclendon Construction
Date Date
I I I
Date Date
I· , / I 1
Assistanl Ci Date Date
-< •
Council Action if f
M&C Number 4 7/, ' I
r
",r
FORT WORTH ---,..--
Project Name
Client Project #
Project Description
Contractor
City Project Mgr.
City of Fort Worth
Change Order Additions
Street Reconstruction.Water and Saintary Sewer Replacements-C .D. 4A
#00939 -DOE# 5871
Street, Water and Sanitary Sewer Reconstruction
McClendon Construction Change Order#
City Sec# 41763
2 Date 4/17/2012
Richard Argomaniz City Inspector Ariel Duarte _____________ .....
ADDITIONS
t-"l'l'Tn::::::--~<"'l"i'1'5""7'1~~=:::=n::::-::.r:::r-'1'1':::-:r'l'i::'::l':?!11""-----------n'l~:::-----;----:r~i"iltt--.,.---t----r.l"lM'mf----,,,""""'i'T'l"lffl
1tions
Change Order Additions Page 1 of 1
% {\ 1 A-d.!.. '-(001
FORT WORTH
~ City of Fort Worth
Change Order Deletions
Project Name Street Reconstruction .Water and Saintary Sewer Replacements-C .D. 4A
Client Project# #00939 -DOE# 5871
Street.Water and Sanitary Sewer Reconstruction
McClendon Construction
City Sec# 41763
Change Order# 2 Date 4/17/2012
Project Description
Contractor
City Project Mgr . Richard Argomaniz City Inspector Ariel Duarte ...._ ____________ ....,
DELETIONS
\
t---ior~-t;~""""l'!"'"lorr,;,,;c-n::-:=::r:::z!"l'<'l'\~~-----------t?=:::-----t--"'1771:rm--.-:,.---;-----.~~--'lll'Tl'l"P!'l'l""""'1 ~;,l l ~/o0u._ "l l
TPW 0.00
Water $5 ,136 .00
Sewer $27,765 .35
Change Order Deletions Page 1 of 1
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
·M&C Rev ie w Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA
FORT WORTH
~
COUNCIL ACTION: Approved on 7/10/2012 -Ordinance Nos. 20264 -07-2012 and 20265-07-2012
DATE: 7/10/2012 REFERENCE NO.: **C-25678 LOG NAME: 202007 CONTRACT
4AC02
CODE: C TYPE: CONSENT PUBLIC
HEARING: NO
SUBJECT: Authorize Execution of Change Order No . 2 to City Secretary Contract No . 41763 with
McClendon Construction Company , Inc., in the Amount of $45 ,005.85 for Pavement
Reconstruction and Water and Sanitary Sewer Main Replacements on Arnold Court,
Blevins Street , Clarence Street East and Clarence Street West for a Total Contract Cost
of $849 ,140 .01 and Adopt Appropriation Ordinances (COUNCIL DISTRICT 4)
RECOMMENDATION:
It is recommended that the City Council :
1. Authorize the transfer of $36 ,297 .85 from the Water and Sewer Fund to the Water Capital Projects
Fund in the amount of $19 ,729.45 and Sewer Capital Projects Fund in the amount of $16 ,568.40 ;
2. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in
the Water Capital Projects Fund in the amount of $19 ,729.45 and the Sewer Capital Projects Fund in
the amount of $16 ,568.40 from available funds ; and
3. Authorize the execution of Change Order No . 2 to City Secretary Contract No . 41763 with
McClendon Construction Company , Inc ., in the amount of $45 ,005 .85 for pavement reconstruction
and water and sanitary sewer main replacement for the streets listed below , thereby revising the total
contract amount to $849 ,140.01 .
DISCUSSION:
This project provides for the total pavement reconstruction and replacement of water and sanitary
sewer mains in the following street segments:
Arnold Court
Blevins Street
Clarence Street East
Clarence Street West
Goddard Street to Northwest Cul de Sac
Grapewood Street to Race Street
Marsalis Street to Airport Freeway (S.H . 121)
Marsalis Street to Airport Freeway (S .H . 121)
Estimated quantities on numerous items in the contract were significantly below what was actually
necessary to complete the project. Items such as water pressure pipe , water valves , water pipe
fittings , permanent and temporary asphalt pavement trench repairs and sewer main and services with
cement stabilized backfill for shallow installations , exceeded the designer's estimates . New items
included in this change order are removal and abandoning of old storm drain pipes , gravel driveway
transitions , ductile iron sanitary sewer pipe with cement stabilized backfill , ductile iron water pipe and
a remobilization of the utility crew were found to be necessary during construction.
Also during the construction of Clarence Street West, a 200 foot long water service for a commercial
establishment on the service road of Airport Freeway was discovered . The Water Department has
recommended that a new main be extended in order to provide adequate water service to this
establishment. The delay in obtaining the necessary TXDOT permit for installation of the water main
in the freeway right-of-way resulted in the need for the utility crew to remobilize . In addition , a portion
of a water main that must be lowered to avoid conflict with other utilities will be replaced with ductile
iron pipe which was not included in the original contract proposal.
mhtml:fil e://C :\Document s and Se ttings\arg omar\My Do cument s\20 07 CRI TICAL PROJE ... 7/26/2 01 2
'M&C Review Page 2 of2
On March 22, 2011, (M&C C-24786) City Council authorized the execution of a contract with
McClendon Construction Company , Inc., in the amount of $724,284 .16 for street pavement
reconstruction and water and sanitary sewer replacement on the streets listed above . The street
reconstruction work is funded by the 2007 Critical Capital Projects Fund.
The net effect of the proposed Change Order No. 2 is as follows :
Water Sewer T/PW
$386,983 .96
$ 56,675 .00
$ 8 ,708 .00
$452 ,366 .96
Total
$724 ,284.16
$ 79,850 .00
$ 45,005 .85
$849,140.01
Original Contract Amount
Change Order No . 1
Change Order No . 2
Revised Contract Amount
$168,730.50 $168,569 .70
$ 2,375 .00 $ 20,800 .00
$ 19 ,729.45 $ 16,568.40
$190,834.95 $205,938 .10
This project is located in COUNCIL DISTRICT 4, Mapsco 63R, 64P and 64T.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the 2007 Critical Capital Projects Fund and upon approval of the above
recommendations and adoption of the attached appropriation ordinances , funds will be available in
the current capital budgets, as appropriated, of the Water Capital Projects Fund and the Sewer
Capital Projects Fund .
TO Fund/Account/Centers
1&2)
P253 476045 6041700939ZZ
1&2)
P258 476045 7041700939ZZ
2)P253 541200 604170093983
2)P258 541200 704170093983
$19 ,729.45
$16 ,568.40
$19 ,729 .45
16 568 .40
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
FROM Fund/Account/Centers
1) PE45 538040 0609020 $19,729 .45
1) PE45 538040 0709020 16 568.40
3 P253 541200 604170093983 $19,729.45
3) C295 541200 204400093983 $8,708.00
3) P258 541200 704170093983 $16,568.40
Fernando Costa (6122)
Douglas W . Wiersig (7801)
Richard Argomaniz (8653)
2007 CRITICAL CAPITAL PROJECT 4A CO2 MAP . df
202007 CONTRACT 4A CO2 P253 A012 .doc
202007 CONTRACT 4A CO2 P258 A012 .doc
mhtml:file://C:\Documents and Settings\argomar\My Documents\2007 CRITICAL PROJE... 7/26/2012
PROJECT NAME:
PROJECT SUMMARY SHEET
(Change Order Attachment)
2007 CO's CD4 Neighborhood Streets Group 4A
PROJECT LIMITS: Arnolod Court / Belvins Street / Clarence Street E / Clarence Street W
BuySpeed No (T/PW):
BuySpeed No (Water):
City Project No:
Contract No:
D.O .E . No:
Attachment to Change Order No :
Today's Date :
Original Contract Amount:
Extras to Date :
Credits to Date:
Contract Amount to Date :
P0-11-00066130
P0-11 -00066741
00939
CS41763
5871
2
7/13/12
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail. for Admin. Change Orders :
Remaining Funds Available for Change Orders:
Additional Funding (if necessary):
$
$
$
$
$
$
$
$
$
TOTAL
724,284.16 $
79,850.00 $
$
804,134.16 $
45,005.85 $
849,140.01 $
36,214.00 $
6,061.50 $
(38,944.35) $
T/PW
386 ,983 .96 $
56 ,675 .00 $
$
443 ,658 .96 $
8 ,708.00 $
452 ,366 .96 $
19,349 .00 $
$
(8,708.00) $
Prepared By: Christy Ezernack T/PW Construction Services
Water Sewer
168,730.50 $ 168 ,569 .70
2 ,375 .00 $ 20,800 .00
$
171,105.50 $ 189,369.70
19,729.45 $ 16,568.40
190 ,834 .95 $ 205,938.10
8 ,436 .50 $ 8 ,428 .50
6 ,061.50 $
(13,667.95) $ (16,568 .40)