HomeMy WebLinkAboutContract 41806-CO1C) N I N 0 I -0 0 N 0 0 F0 1!_T ;ORTH . City of Fort Worth Change Order Request Project Namel 2007 Critical Captical Project District 5 C -DOE# 5878 Client Project #(s)I C295-541200950 , P253-541200950 , P258-541200950 Capers , Osborne , Ransom and Plant CITY SECRETARX I l , _ rf"'I \ CONTRACT NO. _'-"'1_'6;....0_'-E,.'_--L.,V' __ City Sec # 41806 .__ _____ __. Project' Description ::=============================-.-------------------...J Contractor~! _C_o_na_ts_e_r C_o_n_st_ru_ct_io_n_T_X,_L_P _____ ___. Date City Project Mg r. I Khal Jaafari ~-------------___. Change Order # City Inspector John Crowley Dept. TPW Water Sewer Original Contract Amount $1,034 ,534 .25 $192 ,151 .00 $162 ,628.50 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,034 ,534.25 $192 ,151.00 $162,628 .50 IAmount of Proposed Change Order $13,136.00 $0.00 $15,500.16 Revised Contract Amount $1 ,047 ,670 .25 $192,151 .00 $178 ,128 .66 Original funds Available for Change Orders $31 ,036 .02 $20 ,041 .00 $18 ,011 .00 Remaining Funds Available for this CO $31 ,036 .02 $20 ,041 .00 $18 ,011.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1 ,389 ,313.75 $1 ,389 ,313 .75 $28,636.16 $1,417 ,949 .91 $69 ,088 .02 $69 ,088 .02 2.06% $1 ,736 ,642 .19 1/9/2013 Contract Time (CD) 360 360 30 390 During excavation for the Sewer Line on Plant Ave , the contractor encountered Fiber Optic lines that where in conflic t. Extra care and digging by hand was necessary to work around the large banks of Fiber Optics . Item # 17 is needed to cover labor , material and equipment to expose SWB lines . Also item # 18 is needed for the backfilling of the Large Banks of Fiber Optics as was directed by AT&T. During construction for storm drain on Plant and Osborne it was necessary to util ize 2" Temp HMAC to achieve acceptable street surface until permanent pavement could be installed . During construction , the contractor encountered various utilities obstructions that caused extended delays in progress and delayed the completion of the project. The delays included but not limited to conflicts with large banks of commun ication fibers , utility poles and gas lines where all found to be in conflict with construction on Plant Ave . Also , gas lines and serv ices were found to be in conflict on Osborne , Ransom Terrace and Capers . 30 days are requested ford~, conflicts . .o-~ ...... f.OR? i.:~» ~ 'fcJPoOOOo0!r,.Q'c'~ · t,yi G OiP °'t~\ n),,~ i-', ~ ~!:i 8s M&C Number City of Fort Worth Change Order Request Project Name! 2007 Critical Captical Project District 5 C -DOE# 5878 Client Project #(s)! C295-541200950 , P253-541200950 , P258 -541200950 Capers , Osborne , Ransom and Plant L-\ I~ o<-R -CO\ City Sec # 41806 Project' Description ::==============================-.----------------------1 Contractor .... ! _C_o_n_at_se_r_C_on_s_tr_uc_ti_on_T_X...;.,_L_P _____ __, Date City Project Mgr .! Khal Jaafari ......_ ______________ __. Change Order# City Inspector John Crowley ' Dept. TPW Water Sewer Original Contract Amount $1 ,034 ,534.25 $192 ,151 .00 $162 ,628 .50 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,034 ,534 .25 $192 ,151.00 $162 ,628 .50 !Amount of Proposed Change Order $13,136.00 $0.00 $15,500.16 Revised Contract Amount $1 ,047 ,670 .25 $192 ,151 .00 $178 ,1 28 .66 Original Funds Available for Change Orders $31 ,036.02 $20 ,041 .00 $18 ,011 .00 Remaining Funds Available for this CO $31 ,036 .02 $20 ,041 .00 $18,011 .00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1 ,389 ,313.75 $1 ,389 ,313.75 $28,636.16 $1 ,417 ,949.91 $69 ,088 .02 $69 ,088 .02 2.06% $1 ,736,642 .19 1/9/2013 Contract Time (CD) 360 360 30 390 During excava ti on for the Sewer Line on Plant Ave , the contractor encountered Fiber Optic lines that where in conflict. Extra care and digging by hand wa~ necessary to work around the large banks of Fiber Optics . Item # 17 is needed to cover labor , material and equipment to expose SWB lines . Also item # 18 is needed for the backfilling of the Large Banks of Fiber Optics as was directed by AT&T. During construction for storm drain on Plant and Osborne it was necessary to utilize 2" Temp HMAC to achieve acceptable street surface until permanent pavement could be installed . During construction , the contractor encountered various utilities obstructions that caused extended delays in progress and delayed the completion of the project. The delays included but not limited to conflicts with large banks of communication fibers, utility poles and gas lines where all found to be in conflict with construction on Plant Ave . Also, gas lines and services were found to be in conflict on Osborne , Ransom Terrace and Capers . 30 days are requested for delays due to utility conflicts. It is understood and agreed that th acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. M&C Number City of Fort Worth Change Order Request Project Namel 2007 Critical Captical Project District 5 C -DOE# 5878 Client Project #(s)I C295-541200950 , P253-541200950 , P258-541200950 Capers , Osborne , Ransom and Plant City Sec # 41806 Project' Description ::==============================-.-----------------------1 Contractor .... ! _C_o_n_at_se_r_C_on_s_tr_uc_ti_on_T_X_, _L_P _____ __, Change Order # City Inspector Date 1/9/2013 City Project Mgr. I Khal Jaafari _______________ __, John Crowley Dept. TPW Water Sewer Contract Time Original Contract Amount $1 ,034 ,534 .25 $192 ,151 .00 $162 ,628 .50 Extras to Date Credits to Date Pend ing Change Orders (in M&C Process) Contract-Cost .to Date $1 ,034 ,534 .25 $192 ,151 .00 $162 ,628.50 IAmount of Proposed Change Order $13,136.00 $0.00 $15,500 .16 Revised Contract Amount $1 ,047 ,670 .25 $192 ,151 .00 $178 ,128.66 Original Funds Available for Change Orders $31 ,036.02 $20 ,041.00 $18 ,011 .00 Remaining Funds Available for this CO $31 ,036.02 $20 ,041.00 $18 ,011 .00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals (CD) $1 ,389 ,313.75 360 $1 ,389,313 .75 360 $28,636.16 30 $1 ,417 ,949 .91 390 $69 ,088.02 $69 ,088.02 2.06% $1 ,736 ,642 .19 During excavation for the Sewer Line on Plant Ave , the contractor encountered Fiber Optic lines that where in conflict. Extra care and digg ing by hand was necessary to work around the large banks of Fiber Optics . Item # 17 is needed to cover labor , material and equipment to expose SWB lines . Also item# 18 is needed for the backfilling of the Large Banks of Fiber Optics as was directed by AT&T. During construction for storm drain on Plant and Osborne it was necessary to utilize 2" Temp HMAC to achieve acceptable street surface until permanent pavement could be installed . During construction , the contractor encountered various utilities obstructions that caused extended delays in progress and delayed the completion of the project. The delays included but not limited to conflicts with large banks of communication fibers , utility poles and gas lines where all found to be in conflict with construction on Plant Ave . Also , gas lines and services were found to be in conflict on Osborne , Ransom Terrace and Capers . 30 days are requested for delays due to utility conflicts . I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of , or incidental to , the above Change Order. Contractor's Com an Name Contractor Name Contract Si nature Date M&C Number City of Fort Worth Change Order Request Project Name! 2007 Critical Captical Project District 5 C -DOE# 5878 Client Project #(s)! C295-541200950 , P253-541200950 , P258-541200950 ( I City Sec# 41806 Project! Capers , Osborne , Ransom and Plant Description~-------------------------------------' Contractor! Conatser Construction TX , LP ;:=============================:::::: Date City Project Mgr.~! _K_h_al_J_aa_f_ar_i __________ __, Change Order # City Inspector John Crowley Dept. TPW Water Sewer Original Contract Amount $1 ,034 ,534 .25 $192 ,151 .00 $162 ,628 .50 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,034 ,534 .25 $192,151.00 $162 ,628 .50 !Amount of Proposed Change Order $13,136.00 $0.00 $15,500.16 Revised Contract Amount $1 ,047 ,670 .25 $192 ,151.00 $178 ,128 .66 Original Funds Available for Change Orders $31 ,036 .02 $20 ,041 .00 $18 ,011 .00 Remaining Funds Available for this CO $31,036 .02 $20 ,041 .00 $18 ,011 .00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $1 ,389 ,313 .75 $1 ,389 ,313.75 $28,636.16 $1 ,417,949 .91 $69 ,088 .02 $69 ,088.02 2.06% $1,736 ,642.19 1/9/2013 Contract Time (CD) 360 360 30 390 During excavation for the Sewer Line on Plant Ave , the contractor encountered Fiber Optic lines that where in conflict. Extra care and digging by hand was necessary to work around the large banks of Fiber Optics. Item # 17 is needed to cover labor , material and equipment to expose SWB lines . Also item# 18 is needed for the backfilling of the Large Banks of Fiber Optics as was directed by AT&T . During construction for storm drain on Plant and Osborne it was necessary to utilize 2" Temp HMAC to achieve acceptable street surface until permanent pavement could be installed . During construction , the contractor encountered various utilities obstructions that caused extended delays in progress and delayed the completion of the project. The delays included but not limited to conflicts with large banks of communication fibers , utility poles and gas lines where all found to be in conflict with construction on Plant Ave . Also , gas lines and services were found to be in conflict on Osborne , Ransom Terrace and Capers. 30 days are requested for delays due to utility conflicts. I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of , or incidental to , the above Change Order. Contractor's Com an Name Contractor Name Contract s· nature Date Date Date Assistant Director Date Director, Contractin Date ; ,;_ M&C Number City of Fort Worth Change Order Additions Project Name 2007 Critical Captical Project District 5 C -DOE# 5878 Client Project# C295-541200950 , P253-541200950 , P258-541200950 Project Description Capers , Osborne , Ransom and Plant Contractor Conatser Construction TX, LP Change Order # City Project Mgr . Khal Jaafari ....._ ______________ __. City Inspector John Crowley ADDITIONS 11 t:IVI !...l!:~l,~11-· I IVN Utt-'I \.II)' unit 1:>-New IZ " 1 emp HMAl; Asphalt on t>" r1exoase ror ;;u I !""VY tsZl.UU Lr 17-New D1g-up and expose ;;vvts rmer !-'none Line Banks (not on plans) sewe r 2.00 Days 18-New Washed Rock bacKn11 for SWB r1oer !-'none Banks !Sewer 48 .00 (.;Y .. Change Order Add1t1ons Page 1 of 2 City Sec# 41806 Date 1/9/2013 Unit l;OSt IOtal :jilb .UI.. :jilJ ,lJO .UU $7 ,ZUU.uu :ii14 ,quu .uu $22 .l:.IL :jil ,lUU .lti , TPW $13,136 .00 Water $0 .00 Sewer $15 ,500.16 Sub I ota1 Aaa1t1ons ~LO,OJO . 1 t5 Change Order Additions Page 2 of 2 FORT WORTH ---.----City of Fort Worth Change Order Deletions Project Name 2007 Critical Captical Project District 5 C -DOE# 5878 Client Project# C295-541200950 , P253-541200950 , P258-541200950 Project Description Capers , Osborne , Ransom and Plant Contractor Conatser Construction TX, LP Change Order# City Project Mgr . Khal Jaafari ....._ ______________ ___. City Inspector John Crowley DELETIONS 111:M Ul:~(.;KII"' I ION DEPT ~ty Change Order Deletions Page 1 of 2 City Sec# 41806 Date 1/9/2013 unit Unit vOSt Total TPW $0 .00 Water $0 .00 Sewer $0 .00 ~uo I otal ue1et1ons Change Order Deletions Page 2 of 2 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 '' , ... Previous Change Orders CO# DATE AMOUNT Total $0.00 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME : 2007 Critical Capital Project District SC Capers, Osborne, Ransom, Plant BuySpeed No (T/PW): P0-11-00066358 BuySpeed No (Water): P0-11-00067054 City Project No: Original M & C = C-24898, approved 05-03-11 Contract No : 41806 I D.O .E. No : 5878 I Attachment to Change Order No : 1 Today's Date : 1/5/13 TOTAL Orig inal Contract Amount: $ 1,389,313.75 $ 1,034,534.25 $ 192,151.00 Extras to Date : $ -$ . $ - Credits to Date: $ -$ -$ - Contract Amount to Date : $ 1,389,313.75 $ 1 ,034 ,534 .25 $ 192,151.00 Amount of Proposed Change Order: $ 28,636.16 $ 13,136.00 Revised Contract Amount: $ 1,417,949.91 $1 ,047 ,670 .25 $ 192,151 .00 Contingency Funds Avail. for Admin. Change Orders: $ 69,088.02 $ 31,036.02 $ 20 ,041 .00 Remaining Funds Available for Change Orders: $ 69,088.02 $ 31,036 .02 $ 20 ,041.00 Additional Funding (if necessary): $ 40,451.86 $ 17,900.02 $ 20 ,041 .00 Prepared By : Etta Bacy T/PW Construction Services I $ 162 ,628 .50 $ - $ - $ 162 ,628 .50 $ 15 ,500.16 $ 178,128 .66 $ 18,011.00 $ 18,011.00 $ 2 ,510.84