Loading...
HomeMy WebLinkAboutContract 41807-CO1,:-.. • ~ l FORT WORTH --. --City of Fort Worth Change Order Request CITY SECRETAR"' / -· CONTRACTNOZ1 l//'J{f}-CP / _ I Project Name! Sanitary Sewer Rehabilitation Contract, LVI (56) Part 2 !City Sec No . ! 41807 I Project No .(s)! P258-709170102983 DOE No . .__6_0_19 _ _...lcity Proj . No . ! 01029 I Sanitary Sewer Rehabilitation on portions of W. Peter Smith Street W. Cannon Street, W. Leuda Street, W. Terrell Avenue Project Description Coll e Avenue , Alston Avenue and Li scomb Street Contractor! Conatser Construction TX, LP City Project Mgr. j Susan Schwinger Phone Number: I 817-392-6529 Dept Orig inal Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Water Change Order# I Date : City Inspector j Billy (Mark) Owen Phone Number: I 817-223-2267 Sewer Totals $696,387 .00 $696,387.00 - -oc.' .... .. , $696,387.00 ' $696,387.00 '. .. ·$3,952.00 ~· •$3,9~2.U~ 8/15/2011 Contract Time (Calendar days) 150 150 Revised Contract Amount • ' -~ :.. .""":<;-: .. · •,-. ·~ $692;435.0C ~tij~-:· .. . .. ~-;.,._ -~ $692,435.00 ~'-~". ·.• 15(),> Or iginal Funds Available for Change Orders $25 ,000.00 $25 ,000.00 Remaining Funds Available for th is CO $25,000.00 · $25,000.00 Additional Fund ing (if necessary) ... . -~'"'·'>·'~ ... ' ".; • ~1t, ,.·_ -'i •. ,:; ·\, .;r-"\.~ ~-''!>-~,. -=: ........... ' -.:;''\~~ ::-,.,.•::,:. '·tr~ ... ·"'-· CHANGE ORDERS to DATE (INCLUDING THIS ONE} AS% OF ORIGINAL CONTRACT .:,. -9:57% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $870,483 :75 The change order will provide additional pay item quantities for the following: • Service pipe installation by other than open-cut in lieu of trench excavation in order to minimize disruption to patients, employees and customers at two health care facilities and a convenient store whose access would be impacted by open cut installation . • • l--"------,-~---,-:----~,:-----..,,--:-.........+------,-~---,----,--,-----€,,,,---,----,-.::::.,_.---,--1-----,-~, C~v..~ ~~~~~~~~~~:::p.......~~~F!-=-=..i.:.:...:.:...:.::i::.:t;.~~~~-1fb:i '· ,,; Date --f . , _, . . ., ' M&C Number M&C Date Appro ved I \ Iv I \~ i F<::>RT '-'VORTH ----. City of Fort Worth Change Order Additions Project Name I Sanitary Sewer Rehabilitation Contract, LVI (56) Part 2 Project No .(s) I P258-709170102983 City Sec No . 41807 DOE No . 6019 City Proj. No . 01029 Project Description Sanitary Sewer Rehabilitation on portions of W. Peter Smith Street W. Cannon Street , W. Leuda Street , W. Terrell Avenue College Avenue , Alston Avenue and Lipscomb Street Contractor Conatser Construction TX, LP I Change Order # [TI Date : City Project Mgr. Susan Schwinger City Inspector j Billy (Mark) Owen ADDITIONS 11 t:M UE:SCKIP I JUN DEPl Otv Unit I Unit Cost 2 Pipe-Pressure-8 lnch-C900 (DR 18) (Sanitary Sewer)(AII Depths)-Install Sewer 110.00 LF $38.00 51 Sewer Service-4 lnch-BOTC -Install Sewer 198 .00 LF $85 .00 52 Pipe-Pressure 4 Inch -Install (sheet 24 :DIP SS Service No. 6 thru ex 6'x5' SD) Sewer 26 .00 LF $45 .00 53 Structure-Core Ex 6'x5' Storm Drain for 4 inch SS Service -Install Sewer 1.00 LS $1 ,050 .00 54 Pipe-Pressure-10 Inch-Pressure Class 350 DIP w/ Protecto 401 Lining (All Depths) -Install Sewer 207 .00 LF $72.00 55 Pipe-Sewer-10-inch BOTC w/Pressure Grout -Install Sewer 45.00 LF $180.00 56 Water Service-Cut and Cap (unused services) Sewer 9.00 EA $300 .00 Water Sewer Additions Sub Total Page 2 of 4 8/15/2011 1ota1 $4,180 .00 $16,830.00 $1,170 .00 $1 ,050 .00 $14,904 .00 $8,100 .00 $2,700.00 $48,934 .00 548 ,934.00 I FORT WORTH City of Fort Worth -------,,..----Change Order Deletions Project Name I Sanitary Sewer Rehabil itation Contract, LVI (56) Part 2 Project No .(s) I P258-709 170102983 ! DOE No . 6019 City Sec No . City Proj . No . 41807 01029 Project Description Contractor City Project Mgr. Sanitary Sewer Rehabilitation on portions of W. Peter Smith Street W. Ca nnon Street , W. Leuda Street, W. Terrell Avenue College Avenue , Alsto n Aven ue and Li mb Street Conatser Construction TX , LP Change Order #[I] Date j 8/1 5/2011 Susan Schwinger City Inspector j Bil ly (Mark) Owen DELETIONS ITEM DES CRIPTION DEPT Qty Unit Unit Cos t Total 4 Pipe-Sewer -8-inch PVC (All Depths) Sewer 110.00 LF $32 .00 $3 ,520 .C 6 Pipe-Sewer-10-inch PVC (Ag Depths) Sewer 214 .00 LF $40 .00 $8,56 0.C 7 Pipe-Sewer-10-inch -SOR 26(AII Depths) lnstaU with cement stabilized sand embedment Sewer 18.00 LF $42 .00 $756 .C 9 Pipe-Casing-16 Inch-Casing Pipe Open Cut (Steet)-lnstall Sewer 20 .00 LF $70 .00 $1 ,400 .C 11 Plumbing Service 4-lnch Schedule 40 Sewer 198 .00 LF $40 .00 $7 ,920 .0 27 Manhole-32" Diameter Watertight Insert, Tethered, Stain less Steel-lnstaU Sewer 30 .00 EA $300 .00 $9 ,000 .0 35 Pavement-2-lnch Min HMAC Replacement on Existing Base (and on 2127 Conaete Base (STR-029) -lnstaN Sewer 1079.00 LF $20 .00 $21 ,58 0.0 50 Fill Material-Type B Backfill-lnstaN Sewer 10.00 CY $15.00 $150 .0 Water Sewer $5 2,886 .0 0 Deletions Su b Total $5 2,886 .00 Page 3 of 4 M/WBE Breakdown for this Change Order MWBESub Type of Service Amount for this CO Total $0.00 Previous Change Orders 1, ~' CO#••·· .. , ,, DATE"" ,. " -~~ ... , AMOUNT ' .. ., $0.00, Total Page 4 of 4 PROJECT NAME: PROJECT LIMITS : BuySpeed No : City Project No : Contract No : D .0.E. No : Attachment to Change Order No: Today's Date : Original Contract Amount: Extras to Date : Cred its to Date : Contract Amount to Date: PROJECT SUMMARY SHEET (Change Order Attachment) Sanitary Sewer Rehabilitation Contract LVI (56) Part 2 W. Peter Smith, W. Cannon, W. Lueda, W. Terrell, College CSC0-11-00066739 01029 CS41087 6019 1 8/24/11 TOTAL $ 696,387.00 $ $ $ 696,387.00 Amount of Proposed Change Order: $ (3,952.00) Revised Contract Amount: $ 692,435.00 Contingency Funds Avail. for Admin. Change Orders : $ 25,000.00 Remaining Funds Available for Change Orders : $ 25,000.00 Additional Funding (if necessary): $ Prepared By : Christy Ezernack DOE Constructions Services ,I