Change Order Request
C 'lJP'-f ~ * ~
c1rv SECRETARY .
CONTRACT NO. L/ jq (R)( ,, ( nL ~
Project Name! HMAC Surface Overlay (2011-7) At Various Locations
Client Project #(s)j C293-541200 -203620171683 City Project No .: 01716
Project Description HMAC Surface Overlay At Various Locations
l City Sec# l 41968
DOE : 6655
Contractor! JLB Contracting , LLC
City Project Mgr.! Kristian Sugrim
Change Order# 2 Date 8/4/2012
(817) 392-8902 City Inspector David W. Bowers (817) 350-3522
Enter Department(s) to the Right and TPW Contract Day Type
Original Contract Amount $777 ,943.65
Extras to Date $0 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $777 ,943 .65
IAmount of Proposed Change Order $63,932.76
Revised Contract Amount $841 ,876 .41
Origina l Funds Available for Change Orders
Rema ining Funds Available for this CO $0 .00
Additiona l Funding (if necessary) $63 ,932 .76
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals Contract Time
(CD)
$777 ,943 .65 120
$0 .00 128
$777 ,943 .65 248
l63,932.76 0
$841 ,876 .41 248
$0 .00
$63 ,932.76
8.22%
$972,429 .56
This change order is requested to cover line items quantity overruns due to the addition of S. Chandler Dr. (E. 4th i -Galvez Ave .) as a
Pulverization and Overlay (POL). Th is project was added to the contract per TP&W Asst. Dir ., George Behmanesh . Additionally , there were
sidewalk , handicap ramps and drive approaches replaced on E. 4th St. (S . Riverside Dr. -S. Chandler Dr.). The required construction calendar
days required to do the work was ad~ed to this contract on Change Order #1. .. _,1 •
~~il.ro~ CrobStw~ e..~/Vc:,,t:<oh-~+-W?J'S e,/ascdOYu~ r/-<J Y\tl~e.rousve,h_J -
1 tft. J..s r tv1fYoV~ fo C'hrr/1,,d/e,, Weft--rt:,,'jlltretf {-0 -tr~tY1 oCC...I e--wr~ . +-" I J
?
• J 1 • t,l<-;rd fe.-~~'P.1f"r>V1 0 cc.e. .. s.S {o 'ftu-. tie.I diA b or Lao ,
1 o V 1,,0,e-VG--~ l. ,('J' O'F' t:o "'lJ. 2) "'"
It
in
#,A.,".4oo<.,0000oo'f/J/;q Al~ ~oN.53
f U'ol 0\~ \ OFFICIAL RECORD
~1'-{ gg~ CITY SECRETARY
/. . . ' . . .
, Y FORTWORTH ..
~ City of Fort Worth
Change Order Request
Project Name! HMAC Surface Overlay (2011-7) At Various Locations
Client Project #(s)! C293-541200-203620171683 City Project No .: 01716
Project Description HMAC Surface Overlay At Various Locations
C f/Jj)L/ :i.. of;;._
L/ ic, lf) tot
City Sec# 41968 .__ _____ __,
DOE : 6655
Contractor! JLB Contracting , LLC
City Project Mgr.! Kristian Sugrim
Change Order# 2 Date 8/4/2012
(817) 392-8902 City Inspector David W. Bowers (817) 350-3522
Enter Department(s) to the Right and TPW Contract Day Type
Orig inal Contract Amount $777 ,943.65
Extras to Date $0 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $777 ,943 .65
!Amount of Proposed Change Order $63,932.76
Revised Contract Amount $841 ,876.41
Original Funds Available for Change Orde rs
Remaining Funds Available for this CO $0 .00
Additional Funding (if necessary) $63 ,932 .76
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals Contract Time
(CD)
$777 ,943 .65 120
$0.00 128
$777 ,943 .65 248
$63,932.76 0
$841 ,876 .41 248
$0 .00
$63 ,932 .76
8.22%
$972 ,429 .56
This change order is requested to cover line items quantity overruns due to the addition of S. Chandler Dr. (E . 4th St. -Galvez Ave .) as a
Pulverization and Overlay (POL). This project was added to the contract per TP&W Asst. Dir., George Behmanesh . dditionally , there were
sidewalk , handicap ramps and drive approaches replaced on E. 4th St. (S . Riverside Dr . -S. Chandler Dr.). The required construction calendar
days required to do the work was added to this contract on Change Order #1 . .
:;.--R;,, /,.-& ") ~ C ( os s: t1 a e G-;:, I Ve "t 'S-h· tc +-W·:n ( /., sJ clv t. f0 '(\II~ LV V v'.S \le kl d -
' ',.;; ts T..wfYoi/e~ -{-0 Ch ",.,,d fer we.Jc re 'f ll1re.f {a -{:.r.?)tY1 0cC I eyt.,f. • I J
br • d \\.1 l lc...-(1 d pe-de s-f YJ 7) .-1 UC CeS.:S {o itv-Ile J '1.kb Ori lJO r• ov, e..--Vt:. J /J r-'
.i--)f ~
Date
%\\t.; 1'2..
FORT WORTH ..
~ City of Fort Worth
Change Order Request
Project Name! HMAC Surface Overlay (2011-7) At Various Locations
Client Project #(s)! C293-541200-203620171683 City Project No.: 01716
C 'op t ~ of :}._
Lflr,lf fl L
City Sec # 41968
DOE : 6655
Project Description HMAC Surface Overlay At Various Locations
Contractor! JLB Contracting , LLC Change Order# 2 Date 8/4/2012
City Project Mgr.! Kristian Sugrim (817) 392-8902 City Inspector David W. Bowers (817) 350-3522
Enter Department(s) to the Right and
TPW Totals Contract Time
Contract Day Type
Original Contract Amount $777 ,943 .65
Extras to Date $0 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $777 ,943 .65
IAmount of Proposed Change Order $63 ,932.76
Revised Contract Amount $841 ,876 .41
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0 .00
Additional Funding (if necessary) $63 ,932 .76
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
(CD)
$777 ,943 .65 120
$0.00 128
$777 ,943 .65 248
$63,932 .76 0
$841 ,876 .41 248
$0 .00
$63 ,932 .76
8.22%
$972 ,429.56
This change order is requested to cover line items quantity overruns due to the addition of S. Chandler Dr. (E. 4th St. -Galvez Ave .) as a
Pulverization and Overlay (POL). This project was added to the contract per TP&W Asst. Dir ., George Behmanesh . :A.dditionally , there were
sidewalk , handicap ramps and drive approaches replaced on E. 4th St. (S . Riverside Dr. -S. Chandler Dr .). The required const ruction calendar
days required to do the work was added to this contract on Change Order #1 .
,ri-,!... f ~' '-'S),· 'j C.;;lv-. tSt,
t J .../.. ( Ch",1 lf,,t.vr:.I( r t ( yf ') < ( I t/( I I, s . L * r It, (/t' rlt C ,J..,f S'
• • f / /) / f ') 1 ) (' c t-S 5 'i-, t tu. pc ov,J~ ve..\'\.,l c... 'l dt' s ,
'\" ~ ve r,1
f t/t~ ~ /, { J
ftc;)~biirA v
IJ r),
(.
/ / ,, I ~ -
It is understoo and -a'greed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for' all costs arising out of , or incidental to , the above Change Order.
Contractor's Com an Name Contractor Name
JLB Contractin , LLC --'. ~,IS
Date
Date
• / -I?
M&C Number I t, }.. ') X t,j I 11..-1
City of Fort Worth
Change Order Request
' I l (.
City Sec # 41968 Project Name! HMAC Surface Overlay (2011-7) At Various Locations ._ ______ __,
Client Project #(s}! C293-541200-203620171683 City Project No.: 01716 DOE: 6655
Project Description HMAC Surface Overlay At Various Locat ions
Contractor! JLB Contracting , LLC
City Project Mgr.! Kristian Sugrim
Change Order #
City Inspector
2 Date 8/4/2012
(817) 392-8902 David W. Bowers (817) 350-3522
Enter Department(s) to the Right and TPW Contract Day Type
Original Contract Amount $777 ,943 .65
Extras to Date $0 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $777 ,943 .65
IAmount of Proposed Change Order $63,932.76
Revised Contract Amount $841 ,876.41
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0 .00
Additional Funding (if necessary) $63 ,932.76
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals Contract Time
(CD)
$777 ,943.65 120
$0 .00 128
$777 ,943 .65 248
$63,932 .76 0
$841 ,876.41 248
$0 .00
$63 ,932 .76
8.22%
$972 ,429 .56
This change order is requested to cover line items quantity overruns due to the addition of S. Chandler Dr . (E . 4th St. -Galvez Ave .) as a
Pulverization and Overlay (POL). This project was added to the contract per TP&W Asst. Dir., George Behmanesh . Addit ionally , there were
sidewalk , handicap ramps and drive approaches replaced on E. 4th St. (S . Riverside Dr . - S. Chandler Dr.). The required construction calendar
days required to do the work was added to this contract on Change Order #1 .
ti
I
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order .
JLB Contractin , LLC ' " ., 'd"'-
Inspector/Inspection Supervisor . Date Project Manager/Program Manager Date
,; '·"---f ...
Assistant Director (Dept) Date Director , Contracting Department (Dept) Date
Assistant City Attorney Date _. --'---{;ffY'*Manager -Date
~ ,..r'J..-. ~ l..H;(,....,. , •a,:/1. _,. ~ l
·--"'-. __ ... .,.-----
Council Action if required)
M&C Number I ;.. I M&C Date Approved I , f I ' I
,..
\
\'
( ·" \
FORT WORTH ---.--
Project Name
Client Project#
City of Fort Worth
Change Order Additions
HMAC Surface Overlay (2011-7) At Various Locations
C293-541200-203620171683 City Project No .: 01716
Project Description HMAC Surface Overlay At Various Locations
JLB Contracting, LLC
DOE : 6655
Change Order# 2 Contractor
City Project Mgr. Kristian Sugrim (817) 392-8902 City Inspector David W. Bowers
ADDITIONS
1 IE:M Ut:::ii...;KII"' I IVN Ut:I"' I Uty unit
18 (Inc) tl " Pulverization 11-'W 4,/tlU .04 ::,y
19 (Inc) c.;ement Moa1t1cat1on 11-'W o4 .UU IN
L!U (Inc) I Unc1ass1t1ed 1::xcavat1on 1 l"'VV 40 .UU i...;y
£7 (Inc) ic.;racl< ~ea1mg 11-'W ,~o.uu LF
L!tl (Inc) IL!" HMAc.; ~urtace c.;ourse I ype v Mix 11-'W 4,1!:!4.oo ~y
.. Change Order Add1t1ons Page 1 of 2
City Sec# 41968
Date 8/4/2012
(817) 350 -3522
unit c.;ost 1ota1
:!,J.tl1 ~1B ,L!11.!:lo
~1UU.UU ~b ,400 .UU
:!,LJ .75 ;i,~:iu .uu
:!,U.Jt :!,(4.4tl
;i,~.,~ ~Jtl,L~O.JJ
TPW $63,932 .76
Sub Total Add1t1ons :jibj,932 .76
Change Order Additions Page 2 of 2
Project Name
Client Project#
City of Fort Worth
Change Order Deletions
HMAC Surface Overlay (2011-7) At Various Locations
C293-541200-203620171683 City Project No.: 01716
City Sec# 41968
DOE : 6655
Project Description HMAC Surface Overlay At Various Locations
11 l:M
Contractor
City Project Mgr.
JLB Contracting , LLC
Kristian Sugrim
Ut:;:i\.,Klt' 1 IUN
(817) 392-8902
Change Order# 2 Date 8/4/2012 ....-...=::::::::::. __ _.::::====~
City Inspector David W. Bowers (817) 350-3522
DELETIONS
Ut:t' I Uty Unit Unit l:OSt IOtal
Change Order Deletions Page 1 of 2
TPW $0 .00
Sub l otal Deletions
Change Order Deletions Page 2 of 2
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME :
BuySpeed No (T/PW):
HMAC 2011-7 Surface Overlay @ various locations
P0-11-00067164
BuySpeed No (Water): N/A
City Project No: 01716
Contract No: CS41968
D.O.E. No: 6655
Attachment to Change Order No: 2
Today's Date : 8/8/12
Original Contract Amount:
Extras to Date :
Credits to Date :
Contract Amount to Date:
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail. for Admin. Change Orders :
Remaining Funds Available for Change Orders :
Additional Funding (if necessary):
Original Days: 120
Additional Time Requested C0#1: 128
Total Days: 248
Pending M & C approval
TOTAL
$ 777,943.65
$
$
$ 777,943.65
$ 63,932.76
$ 841,876.41
$
$
$ (63,932.76)
Prepared By: Christy Ezernack T/PW Construction Services
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 9/18/2012
DATE: Tuesday, September 18, 2012 REFERENCE NO.: **C-25835
LOG NAME: 20HMAC SURFACE OVERLAY 2011-7 CO2
SUBJECT:
Authorize Execution of Change Order No. 2 to City Secretary Contract No. 41968 with JLB Contracting,
LLC, in the Amount of $63,932 .76 for Hot Mix Asphaltic Concrete Surface Overlay 2011-7 at Multiple
Locations, Thereby Increasing the Total Contract Amount to $841,876.41 (COUNCIL DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No. 2 to City Secretary
Contract No . 41968 with JLB Contracting, LLC, in the amount of $63,932.76 for Hot Mix Asphaltic
Concrete Surface Overlay 2011-7 at multiple locations, thereby increasing the total contract amount to
$841,876.41 .
DISCUSSION:
This project is a part of the Contract Major Maintenance Program which provides for the rehabilitation of
deteriorated asphalt streets where various pavement repair techniques are utilized depending upon the
level of pavement deterioration. Funding for this contract is included in the Contract Street Maintenance
Fund.
During construction on this project, one street, Chandler, was added due to the emergency closure of the
railroad grade crossing at Galvez Street associated with numerous vehicle-train accidents. Improvements
to Chandler were required to accommodate pedestrian and vehicle access to the neighborhood and area
business. This addition increased line item quantities necessitating this request for Change Order No. 2 in
the amount of $63,932.76.
'.Streets Locations r ·-------------------1s. Chandler Drive ;E. 4th Street to Galvez Avenue -(MAPSCO 63V, COB)
On June 14, 2011, (M&C C-24957) the City Council authorized the execution of a contract in the amount
of $777,943.65 for Hot Mix Asphaltic Concrete Surface Overlay 2011-7 at multiple locations . On June 15,
2012, Change Order No . 1 was authorized to increase the contract time by 128 calendar days .
Staff has reviewed Change Order No. 2 and verified the quantities for the additional work.
JLB Contracting, LLC, agrees to maintain its initial M/WBE commitment of 20 percent that it made on the
original contract and extend and maintain that same M/WBE commitment of 20 percent on to all prior
change orders up to and inclusive of this Change Order No . 2 . Therefore, JLB Contracting, LLC , remains
in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the
Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its
company .
Logname : 20HMAC SURF ACE OVERLAY ?O I 1-7 f'O ?
/
The projects is located in COUNCIL DISTRICT 8.
FISCAL INFORMATION/ CERTIFICATION:
The Financial Management Serv ices Director certifies that funds are available in the current capital
budget, as appropriated, of the Contract Street Maintenance Fund .
·---------··-------·-------·----
FUND CENTERS:
TO Fund/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
FROM Fund/Account/Centers
C293 541200 203620171683
Fernando Costa (6122)
Douglas W . Wiersig (7801)
Kristian Sugrim (8902)
1. 20HMAC SURFACE OVERLAY 2011-7 CO2 FAR .pdf (CFW Interned)
2. 20HMAC SURFACE OVERLAY 2011-7 CO2 MWBE .pdf (CFW Internal)
3. 20HMAC 2011-7 CO2 MAP PAGE 1.pdf (Public)
4. 34. 20HMAC Surface Overlay 2011-7 CO2 (JCT 8-22-2012).docx (CFW Internal)
$63 ,932 .76
Log name: 20HM AC SU RFACE OVE RL A Y 2011-7 CO2 D <>n P 'J ,-,f 'J