Change Order Request
CITY SECRETARY A.\n--J-2 (() CONTRACT NO. _, ____ -_\.-, .... J __
Change Orde r No . Date TPW Proj ect No . Fund ing (FAC )
01 1-13-12 GR76 541200 005206929880
Facil ity and Proj ect Descri ptM a
,,lb&~ ~/Cb '7fc6;t;,rL) al'ffoft/f.Jtrf' ~H
ORIGINAL CONTRACT AMOUNT ............................................................... .
EXTRAS TO DATE .................................................................... .
CREDITS TO DATE ................................................................... .
City Secret ary Contract No .
L/19~3 .
$
$
$
489 ,824 .00
0 .00
0 .00
CONTRACT COST TO DATE ................................................................................................. . $ 489 ,824 .00
AMOUNT OF PROPOSED CHANGE ORDER .................................................................. . $ 22,767 .00
REVISED CONTRACT AMOUNT ............................................................................................ . $ 512 ,591 .00
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... . $ 51 ,883 .00
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ . $ 29 ,116 .00
ADDITIONAL FUNDING (IF NECESSARY) ............................................................................... . $ 0 .00
IN ACCORDANCE WITH THIS CHANGE ORDER , THE CONTRACTOR SHAL L:
SEE ATTACHED
It is und erstoo d and agreed th at the acce ptance o f thi s C ha nge O rd er by the contractor constitutes an accord and sati sfacti on and re prese nt s payment in fu ll (both time
and money) for all costs arising o ut of, or in c idental to, th e a bove Change O rder.
Contractor's Name
Scott Dennett Construction , LLC
Origin al Contract Ti me Additional Approved Time To Date A pproved Co ntract Time To Date
0 165 Calendar Days
Contractor
Council Acti on (If Required )
0 App roved O M&C #
0 Disapprove X Not Appl icable
Additi onal Time For This Change Ord er
0
Date
/-/i7-'/
Da te
I /-z'S'/ ,1-
Date
,_ 2..b-(?-
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH-TRANSPORTATION & PUBLIC WORKS
FACILITIES MANAGEMENT DIVISION
CONSTRUCTION CHANGE ORDER
ADDITIONS
1. Electrical -provide additional roughin conduits and outlets for communication jacks in
office areas by request of Police Department ; add ground wire from main panel to IT
Room comm rack; provide additional 250 LF of 1" conduit for power and security for two
added security card-readers at entry/exit swing gates , controllers , and security pedestals ;
relocate security outlets into security cabinet in IT Room ; provide and install additional
conduit , J-boxes and wire for five sets duplex outlets for power, data/telephone and cable
TV at requested TV monitor locations in Camera Room (4) and Community Room (1) by
request of Police Department; and provide two isolated quad outlets on the cable tray
frame in Camera Room for exterior camera system .
ADD $ 3,716.00
2. Miscellaneous -provide substitute upgrade ceramic tile due to discontinued planned tile ;
by request of security contractor ; change two storefront locks to electric lock type ($883);
change planned corian countertop material to granite in Breakroom and window sills
($332); provide clear security film on all windows by request of TPW Facilities staff due to
proximity of R.O.W . sidewalk to storefront ; per architect's drawing , construct a heavy-duty
countertop along the Camera Room 's north wall for camera staff monitoring stations ;
provide additional sawing , excavation , roadbase material and 3" HMAC tie-in along
Lancaster Avenue due to poor condition of adjacent roadway ($13 ,916); and provide
miscellaneous minor masonry changes by request of architect ($3 ,920).
ADD $ 19,051.00
TOTAL CHANGE ORDER $ 22,767.00
..
Proposed Change Request Project East Lancaster NPO
PM/ Supt SM/ RD Date 10-Jan
Description: Electrical Changes PCR # 004
Scope of Work Unit Cost Total
3 Runs 3" PVC Conduit for cameras No Cost
Telephone conduit and# 6 ground wire to phone board $ 759
Added and changed conduits at gate $ 902
Relocate security plugs to cabinet on wall $ 253
Additional duplexes and boxes for wall mounted TV's in camera room $ 1,076
Added (2) isolated quads on rack in IT Room $ 328
Subtotal $ 3,318
Overhead & profit $ 332
Bond $ 66
Tax exempt ~
____________________ To_t_al ______ -+-c=:--s ~
----------~ . ·-z-
!DENNETT
· CONSTAUC:TION
Project Name:
Proposed Change Order
Date:
Subcontractor
Deet!rintlon
3u ~~ r/LV-t.7
e_1,,.__// ulr 9~
8'FJ-c );-. >J ~ e R 'I:
Total
Sales Tu
On.nntltJ
,,:Z.~b -
6
~irnY
Overhead 100,<,
Subtotal
l»roftt 10%
Total for this change
Bond 3%
. Total
Unit
:::ZS
~
. J
Q)
Material Total
Cost/tJnlt Material
):Z,ov ~D.J:JC>
?. <PtJ -f,:Z,,PC
..
39~ po
~~.2. o,:)
NIA
, £of -::.2'..P
~9, ... _::?p
'
Other Heavy Labor Total Labor Labor Total Labor
Cost/Unit Equipment Boun/Unlt · Bour Cost/Bour Cost
, .....
J :1 -
'].IJJ)~ i) a, ' ' ..
' Jh ' --~t)II' l~,oO J O .,t::;'"l:),t>f: •. .-,.-'7 .. ..
.. "J!)IJ .flD IJtJSL> ..
Project Name: Proposed Chaage Order Date: Scope of Work: 11-J...JJ. t;ct 1 773L:E p8 l) r./e c.. owd.1A ... irs /N · YR fii,1 e .s · fc..D a~ .s _ .:JI:: Z}v-P. (f?:) . .INS'T'n-LL.e-d._ # .6 .r~ W.VuL 'Jo -;-~)_i3-pfh)NE £ J'J/)J2dt.. , Subcontractor /Y11:}i?/B:l1!»1»8 El£=eT> C!D ':" .:..tton ~ '.}h t::S> ~Ja.i"J F, i17;Al'G-,( ff1c. . 7F :3 ,g,Jj,JJ. }fj).}e}. V Total Sales Tax Ouantltv )<J.1;" -.SpJ Overhead ---710% Subtota~ e tJ 1'11£ r il¥D Proflt t~ 'rotal for this change Bond 3% . Total Ualt J9J Jq .,2/l)rr Material Total CoatltJnlt Material ..115.. .t>b "J,S .~P 5, J)r;; 9S,Dli) .. /HR -7;;; '? .I) .,~17 ~ ~· 'tJ. 0£) J '. t{, '70, ~6 NIA /£ z. _oD ~~ . Other COfltlUalt .. Beavy Labor T~Labor Labor Total Labor Eqldpment Boan/Unit· Hour Collt/HOl!r COit 17,_ -~.5"f r:' . 1'.Dl-?' .,/).£/),VD , ... :, ."i .. . ~· a c:.3:----'7 ,l, . i::10 /J,. . ~.,.. ' /j ,g j) ,.Pi' ..
ProjectName: ScopeofWork: /I~~~ /1~Jl eitP:tN-~£= Size
pr c¥;n,,1~ T.t> G-17 7""..F .-5: .
ProposedCh:amgeOrder 7r7/.)fb'Q?= Cr?) S<fi'E E'?--/ .J;i-.z.-7.,e..?i. ·'#=-:Zef .ss.
Date:
Subcontractor JQ»RJr)l)f '7:;!J;r» cl:.fEa.T., C-t> .
M.teriel Totd -:..tloll OaaatJty Ullit Colt/Unit Material
J"" e.1;:,v.~2.Y ..
J:/77};-vGS .. PTc:..
Total
Sales Tu
Overhead A !t:a:,-
Snbtotal
Profit-
Total for this change
Boad
Total
~!:>" .:2.S. 4 .. 00 /ef)z; .. ~ ·-- -
)!JP
9~.orib
N/A
10% ~,~ei
-
10% -~~-c
3%
.
p,s;;
Otlter Heavy
Cost/Unit Eqalpment
. .
Labor Total Labor Labor
Boun/UnU · Hour CoatJB011r
~ ·.'zf "'9,flfZJ/ %s
'2b~ fjJ ~~-.1? '· .~
... -
-·
ToCalLahor
Cost
7"$£)#02
.a...~ _t=, ...
..
.7,;e,o .v~
Project Name:
Proposed Change Order
Date:
Sabcontractor
DestrlntlOll Onantltv
t!b'Jl'l ~-'-H .. r,
I.Bnu.E-s £-:17::!;
PJ •~ ~a:.. ~. -
Total
SalesTa:x ~
Overhead <::f 1KLJrrr 10%
Subtotal
-Proftt 10%
Total for this ehange
Boacl 3%
Total
Scope of Work: ~-.SEc.. l..)...f:...17~ P2-J.-"(g..g TD
C fl Bi JV 6r JPn-' u.J-,=,~ -
#' &u..f? 14)
Material Total Other Heavy L1bor Total Labor Liabor Total Labor
Unit Coat/Unit Material Coat/Unit Equlpment Boan/Unit · Bour Colt/Bour Con ...
/ ,!)>#CJ I.I,,. , .. :--
) ~ "· r2.9 JP>~ I~ '..( : : ,} /75 t) cu: ..
/ c,., 0-e, ~&> .. D.-r:>
, ....
J _., .
3b~ DIIP ~.!> .o ~ ' . . .,
.
50 • OP . . /'$ D.Di
?. ~ 7 /:, . Ob
'f --3~
Project Name:
Proposed Change Order
Date:
Subcontractor
Destriotlon Oaantltv
ec>:w-d., A..// /.4LJ"'
~~>v?;.5 ~-
UJ>2~G.s /...a,'
i~JY.IC:..G.S · ,6
i3'PX--,6.S 2.,,,c
Total
Sales Tu:
Overhead !(7-#a}l'/1 10%
Subtotal
-sProtlt 10%
'l'otal for this change
Bond
Total
3%
Material
Uait Coat/Unit
~;6 ;!,.,,!JI>
.~ , :5,i)
,l.:t!.D ;~
6 .:S,,¢a::J
z..o ~
N/A
Scope of Work:
Total Other Iteavy Labor Total Labor Labor Total Labor
Material Cost/Unit Equipment Hours/Unit · Hour Cost/Hour Coat
41'&.> m»
21D ... ~ i • '.
I / .
:!!S J!:> -'f!1l2 ,. -
~-~ i,_o/<f -;!:>~z:, .. .DJ
~ L>~ .ez.s:, -~/9 -'2._,"7 J:) ~ p..,
,
/6$ .i!H --z?/~ .,t.>.'1-
Project Name: Scope of Work:
Proposed Change Order
Date:
Subcontractor
-;.,tion Qaantitv
I/' re -;; -...I.,~ 'r //!>#'
.JG>~-JS
J;~~ ~e,,
lh7'~ ·4
Unit
,/
-;:g
;:E!, .P
~
Material Total
Cost/Unit Material
!;$.,.DP ~~D
9/~fl/ ~,'2--~
.. ~. 6 .Z/JI.
/LJ/~· ..fl')!) .. '4P
..S-:i?-.Qf;
Total ::z_ 9 ;S _ -J) .ill,?
Sales Tu: . NIA
Overhead ,f,-/i:~rr 10% :12. ~ -~L>
Subtotal
Profi,t---------1 0%-_ ~4&--P-__,
Total for this change
Bond
Total
3%
Other
Cost/Unit
-
Heavy Labor Total Labor Labor Total Labor
Equipment Hours/Unit · Hour Cost/Hour Cost
Jz;,/~ £¥:o.,>-~ ~
--
-
-~.,,b .Pf.
co
I
ADD BOLLARD-a ~
KEY PAD--D
ADD FENCE
:LAZED CM~
=~ I I I'-' I ' / I
' I I )/ I
GL ;E: CMU-11---KEY PAD
0
NEW ENTRY
DESIGN SKETCH FOR GA TE
OPERATORS
[[
NPO
I NPO EAST LANCASTER I ARTHURWEINMAN X-3 ARC H IT .EC TS
...
_______________ __J IIIIOIIALEYAVEIU,lll.nEll2 FORTWO!ffl', TEXA87l1D7 10.20, 11
117.737.11177 FAX:117.737.zm 09.031
ao # 1-f~t:J
ARTHUR WEINMAN
A R C H T E C T S
550 Bai ley Avenu e, Sui te 332 Fo rt Worth Texas 76 107
8 17-737 -0977 8 17-737-2203 fax
awei nm an @ swbell .net www.we inm anarchi tects.com
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
PROJECT:
OWNER:
CONTRACTOR:
DESCRIPTION:
East Lancaster Community Room &
Neighborhood Police Office
City of Fort Worth
401 W . 131h Street
Fort Worth , Texas 76107
Scott Dennett Construction, LC
2313 Cullen Street
Fort Worth , Texas 76107
Date: November 30 , 2011
Project No.: 09-031
AISI No. 7
City has requested the following additions to Report Room #11 :
• Four 110 V AC duplex outlets ; four data outlets; four cable TV J-boxes; for four wall mounted TV ,4-r)i}~ . ,
monitor locations across north wall of room about five feet above finish floor j t) µe ~~1 rJ ~~fir
• Add #6 ground wire from electrical panel "A " to IT Room #10, northwest corner, in hard conduit in 1 rt t1
attic space to J-box, then with sufficient flex conduit with enough slack to reach either west or ~
north interior walls of the room about 5 ft. above finish floor -exact location will be determined in
field by City IT rep Dale Stewart (CFW -IT at 817-475-4077) Project electrician shall contact
Dale so he may ver ify intent of the above onsite , at his convenience
COST AND TIME:
The Contractor shall please give the City their proposal for this requested change in scope of work.
ISSUED BY:
Arthur Weinman, AIA
AWW:hs
Copies to:
Bill Matysek
Shawn Moore
.
,1 J ~ /"""' CJ~I /J /f; sc15L-C,;, /~ (_ ( -L-ih . ~~z_
~V/t ,1$~ ~;;~-:
Description:
Proposed Change Order,q:Ft2'.Y/
PC-12 ~
Scope creep changes 4
Project East Lancaster NPO
PM/ Supt SM/ RD Date
~
8-Dec
Scope of Work Unit Cost Total
ASI #1 (AKA RFI 002) CMU wall, footing, & fence modificatios No Cost Change
Deleteing one pier washes out adding fence return
ASI #2 Additional camera conduit in lieu of IT Vault No Cost Change
AS1#3 AC pad foundation details No Cost Change
AS1#4 Floor tile substitution due to discontinued tile $ 158 / --------------------------------------______ s ~ e 3ttached backup from Business Flooring
ASI #5 Cover masonry with plastic nightly No Cost Change
Work related 1:o Access Control /
------C-h-an_g_e_s-to_r_e_fr_o-nt-lo-ck_s_(_A_ja_x_E_m_a-il_A_t-ta_c_h-ed_) ______ 2 __ e_a ___ $_3_15--$---6-30-t/
Re-work door frames (By security contractor, assuming no cost to SD()
Work related to RFI 006
See attached breakdown from BRJ Paving No Cost Change
Subtotal $ 788
Overhead & profit /~ $ 79
Bond / ?fp $ 16
_______________________ ;_:_;_ae_lx_e_m_p_t--------+(--~
I Z--9-/(
jg~~~~Jo~
7341 Dogw ood Par k
Fort W orth, TX75118
Phone 817 .282 .. 1500 Fax 817.282 .9933
wwvv .bfsflooring .co m
Acct# 97
817 882-9420 Fax 817 882-9424
Scott Dennett Construction
2313 Cullen Street
Fort Worth , TX 76107
Community Room & Neighborhood Police
Office I CO 1 -Floor Tile
1509-1515 E. Lancaster
Fort Worth, TX 76102
125437
Customer PO
Date
111128/20 11
Sales Person 1
!Brando n Sa ther
Sales Person2
Type Quantity Product Description Color/ Item Number Total
Ceramic Tile
-186
Ceramic Tile
186
Page 1 of 2 , 25437
Labor Description Room
8x 8 Des igner Colours Color Group 2
Daltile 8x8 Porcealto -Unpolished
(Natural )
DC10 Midn ight Blue
CD49 Labrado rite
$2 .10 -$390 .60
$2 .95 $548 .70
11/28 /2011 10 :37 :11 AM
Continuation For: Scott Dennett Construction, Quote# 25437
Type Quantity Product Description Color/ Item Number Total
Labor Description Room
Information Totals
Change Order to Switch Dropped Floor Tile Material & Labor
Grand Tota l
I Deposit Date
Ck#
I
I
$158.10
$158.10 1 /
A well-planned maintenance program that includes both preventative maintenance and regular, proper
cleaning is key to making sure your carpet retains its appearance over time. Please contact your salesman
or our Maintenance Department at 817-282-1600 for more details.
STANDARD TERMS & CONDITIONS
A sales tax exempt certificate or resale certificate is required before we can proceed with your order.
Upon credit approval, Business Flooring Specialists will furnish , deliver and install the above material in accordance with all transmitted plans,
specifications and general conditions for the listed price. Job site is to be broom swept and ready for floor coverings with other trades' materials
and trash removed.
Unless specifically included or addressed in this proposal: excludes all demolition, repair or take up of existing floors, double layers of flooring;
excludes vacuuming , damp mopping, buffing, waxing or floor protection; excludes floor floating , leveling or repair; excludes sealing of floor,
cleaning or removal of oil, grease, solvents, paints , plaster, or other foreign substances ; excludes asbestos control abatement; i ncludes no attic
stock of material beyond installation overage ; includes work only during regular hours and for a single phase job; excludes any furniture moving;
excludes any addenda beyond the base bid ;
Floor Preparation will be billed on a time and material basis . Client is subject to payment for stored materials. Business Flooring Specialists will not
accept charge backs of damage or cleaning without the option to inspect claim(s) to repair or without the option to make arrangements for
acceptable repairs at their expense. Business Flooring Specialists is not responsible for any claims that might result from product delivery date
changes beyond their control. If a manufacturer requires a deposit to manufacture/ship certain items, client will pay amount required.
This proposal is valid for thirty (30) days. Full payment is due fifteen (15) days from receipt of invoice unless otherwise specified.
Page 2 of 2, 25437 11/28/2011 10 :37 : 11 AM
Shawn Moore
Subject: FW: NPO Field Report -Further Comments from Site Mtgs. This AM
From: Jimmy Jenkins [mailto:Jimmy@ajaxglass.net]
Sent: Friday, November 18, 2011 4:07 PM
To: Shawn Moore
Subject: RE: NPO Field Report -Further Comments from Site Mtgs. This AM
Shawn ,
The cost to change the locks to latch locks with lever handle and electric strike
Than k you .
Ji mm y
From: Shawn Moore [mailto:ShawnM@dennettconstruction.com]
Sent: Friday, November 18, 2011 3:31 PM
To: Jimmy Jenkins
Cc: Randy Davidson
Subject: FW: NPO Field Report -Further Comments from Site Mtgs. This AM
Jimmy,
l,; there a charge f,,r thi,;'!
Shawn Moore
817.882.9420 Office
817.882.9424 Fax
817.896.9649 Cell
From: Arthur Weinman [mailto:art_wa@swbell.net]
Sent: Friday, November 18, 2011 3:11 PM
To: Matysek, Bill; Shawn Moore
Cc: Randy Davidson; R. Matt bryant; Chuck Gardner; chammock@rockconstructionservices.com; Trent Ulm
Subject: Re: NPO Field Report -Further Comments from Site Mtgs. This AM
To All-
Attached are catalog illustrations of the proposed lockset and electric strike .
Both can be installed by the firm that furnished and installed the door, frame and glass .
Please contact me if more information is needed .
ART
From : "Matysek, Bill" <Bill.Matysek@fortworthtexas.gov>
To: Shawn Moore <ShawnM@dennettconstruction.com>
Cc : Randy D <randyd@dennettconstruction.com>; R. Matt bryant <matt.bryant@sentinelonline.net>; Chuck Gardner
<chuck.gardner@sentinelonline.net>; "chammock@rockconstructionservices.com"
<chammock@rockconstructionservices.com>; Arthur We inman <art_wa@swbell.net>; Trent Ulm
<Trent_wa@SWBell.net>
Se nt: Fri, November 18, 2011 9:11:22 AM
Subject: FW : NPO Field Report -Further Com m ents from Site Mtgs. This AM
For the storefront front door hardware , it is our understanding that what Art is specifying should work w/Sentinel 's
electrified strike and a separate switch to override the lock off & on from three locations w/in the NPO: Reporting/Camera
Room 11 , NPO Officer 3 , and Narcotics Officer 4 , exact locations TBD . Art has agreed to send further hardware specifics
later today, and Shawn will get his hardware supplier to submit actual hardware submittal for it, and will copy the hardware
submittal to Matt Bryant @ Sentinel when he submits to Art .
On the masonry revision , please be advised that a related revision for just the west elevation (north of north window area
only) is forthcoming this afternoon from Art based on field layout conditions found this AM (basically two black EJs
needed). Onsite masonry foreman has been advised and is only laying areas on west wall not affected by the
revision . Acme black brick name has been provided (separate e-mail ) by architect. FYI. THANKS!
.Y]i£t~eli
Senior Building Construction Manager
TPW Dept. Facilities Mgmt., Architectural Services
(817} 392-8078
How am I doing? Please contact my supervisor: dalton.murayama@fortworthtexas.gov
2
BRJ PAVING INCORPORATED
12448 RENDON RD BURLESON, TEXAS
817 478-0927 PHONE 817 478-1672 FAX
September 24, 2011
WBE CERTIFIED WITH NCTRCA
HUB CERTIFIED
CHANGE ORDER
We will provide the labor, equipment, materials and supervision necessary to perform the
following work:
1) Deduct on lime of $6,500.00
1) Add for the additional 1" of concrete and increase in rebar from #3 to #4.
$3,664.20
2) Excavate and haul-off additional material.
$ 809.05
3) Fine grade area for second time.
$1,526.75
4) Survey $ 500 .00 j{/0
«J U'3t
------~~~~~~~~~~~~._!_L~~ 70
Add for additional concrete $6,500.00 /
(?FU/
C~.
Exclusions: testing, chemical treatments, utilities, excavation for utilities, export of spoils ;rz ......--f-L I
from utilities.
"O
Q)
E
Q)
Q)
"O
C:
Q)
"j
1l
~
C:
5 ·c: a.
)
AUGUST2006
EC-97903-05
EXIT INDICATOR
Description: The zinc alloy indicator
escutcheon is 1-3/8 " (34.9) x 2-5/8"
(66.7) and 3/8 ' (9.5) projection from the
door face. It is fin ished with silve r
epoxy and clear enamel. The sign has
black lette ring on an aluminum
background.
Application: This device is optional for
L1se wi th the deadbolt (MS 1850) or
hook bo lt (MS 1850-050) to indicate
the lock position; open or locked . In
some local building safety codes, this
device allows ihe use of a deadlock in
lieu of a panic exit device .
srv,2e,i-' --if 11c :ft 00( /I ·/Y'.,-,9 t L I LO C {__,,,, L f--~ HARDWARE .,
LOCKS/LATCHES ,,.
ADAMS RITE MS+ 1890
DEADLOCK/LATCH COMBINATION
Description: The loc k features two lock points in one
lock housing. The up per hookbolt portion is activated
or thrown with the turn of a cylinder key. The lower
latchlock portion is spring lever or paddle actuated . The
hookbolt is designed to resist sawing or prying attempts .
A standard cylinder diameter of 1-5 /32 ' (29.4) and MS
Cam are. requ ired for the hookbolt. The standard 4560
handle (3-1/8' (88.9) le ngth) are Llsed with the latch lock.
Latch paddle 4590 and 4565 lever handle as described
below may also be used with the latch lock.
Application : Prov ides deadlock security after hours and
selective traffic control during or jus! after business hours.
Both lock po i nts can be retracted for free traffic flow .
Retracting the hookbolt and activating the latch lock wi ll
permit exit-only traffic. The device is appl icable to single or
pairs of doors .
ADAMS RITE 4510 DEAD LATCH
4565 LEVER
Description : Cylinder key operation from the exterior or lever handle interior
operation retracts the spring loaded latch bolt. Deactivation or 'dogging ' is achieved
with a reverse tum of the cylinder key . An auxi liary bolt deadlocks the latch bolt to
prevent unwarranted "loiding ' or caseknife entry . Lever handle 4560, 3-1/2' (88 .9)
is standard . An op tional 4565, 1-1/2" (38.1) handle or 4590 latch paddle may be used .
Backset is 1-1/8" for all doors.
Application: This device offers flexibility of traffic control during and after business
hours. The dev ice can be 'dogged" or retracted for free traffic flow during bL1sine ss
hours or locked on the exterior after hours. When locked, egress from the building is
accomplished by depressing the lever handle. The latch lock does not provide the
security of deadbolt type locks because of the shorter throw.
ADAMS RITE 4590
LATCH PADDLE DEVICE
ADAMS RITE STANDARD
LATCH STRIKES
ADAMS RITE 7130
ELECTRIC STRIKE
Description : The escutcheon is 4' (101 .6)
high by H 1/32' (34 .1) wide . Total width
of paddle and housing is 5-7/16 " (137.9).
Neutral proj ection of the paddle from th e
door face is 2-5/16" (58.6).
Application: Designed for use with the
4510 latch or MS+1890 lock/latch. A latched
entrance ca n be opened by pushing or
pulling the paddle in the directio n of the door
swing .
Description/Application: A flat strike
is jamb mounted for single acting butt
hung or offset pivot doors .
The elongated lip strike is jamb mounted
for cente r hung single acting doors. A
pair of doors requires the radiused
strike mounted on the inactive leaf stile . The
strike plates are satin buffed stainless
steel.
LONG LIP FLAT RADIUSED
Description/Application: The 7130
Series elec tric strike is designed for
use with the 4510 latch lock to
allow remote traffic/door control.
It operates on 24V AC or 12V DC
and is UL listed . For proper
operation the anticipated duty,
intermittent (std.) or continuous , should
be specified . May be jamb mounted
for single door or mounted in
in active leaf for pair of doors .
5
~ IIIIIKawneer
ALCOA www.kawneer.com An Alcoa Company
Proposed Change Request
Description: Scope creep changes
Scope of Work
Change countertop and sill material to stone
Credit for original budget
Add for stone
Project East Lancaster NPO
PM/ Supt SM/ RD Date 22 -Dec
PCR # 002
Unit
Subtotal
Overhead & profit
Bond
Tax exempt
Total
Cost Total
$ (1,804)
$ 2,100
$ 296
$ 30 c.
$ 6 ....
$/?"~7i")
o ~L ======-----(( ~@{)
/ Z-z 3 --II
e I ~~~!::ti'2Jo1:
FRO M :TREE R ENTERP RI SES FAX NO. :8174786736 Jan . 28 2011 11:52AM P1
PROPOSAL
817.572.5652 Date Proposal#
Fax# 817.478.6736
Taber Enterprises, Inc.
1421 JR Hawkins Rd.
Kennedale, TX 76060
sm@taberenterp.r:ises=in:c:.com::::_....:::"'1::/2=8=/=ll===l=S=&S=:=:1
( PROPOSAL SUBMITTED TO :
\.
Scott Dennett Construction, L.C .
23 l 3 Cullen St.
Fort Worth, TX 76107
Description
) ESTIMATOR
Carrie Mayo ....
Ph 817-882~20
F 81711182~2-1
Fabrication and installation of Corian / Cobalt 1/2" solid surface mater ials as per
plans .
Breakroom top -l 1/2" bullnose / no splash
"L'1 shaped 25 " x 68" x 84" w / sink cut out
Window Sills - I /2" thick no drop edge/ approx. 6" wide
A, B, & C -Three sills 56" long
E -One silJ 168" long
J, & K -Two sills 36" long
Total
TERMS:
PROJECT
Commun ity Rm . &
Neigh . Police Off
1515 E. Lancaster
Ft. Worth
Price Quantity Total
1,804.00
! *" Will be taxed unless resale on file. :
No plumbing or electrical ls Included, all supports and substrates by others.
Alterations from the above specifications will be executed only upon written orders, and will become an extra charge over
and above these agreements, contingent upon delays beyond our control.
This proposal is subject to acceptance, and is void 90 days thereafter.
Customer agrees to pay and will be liable for any and all collection costs, attorney fees, and legal fees in case of defaull If
accounts are not paid within terms, 11/2% or 18% annum will be added to past due accounts.
DATED: ( PLEASE SIGN AND RETURN UPON ACCEPTANCE OF PROPOSAL ) Than\; you for the oPPotnmity
_ _ to bid thi.~ project
SIGNATURE ____________ _
-..
Gallant
Marble & Granite, LLC
December 15, 2011
Dennett Construction
RE: Police Sub-station
We bid the following :
Countertops and Windowsills in 2cm Blue Pearl Granite $2 ,100.00 V
• Tax Not Included
• Price is subject to change once actual field measurements are made, if square
footage is different. Final bid will be honored for 6 months.
• A deposit of not less than 50% of the quoted amount is required upon placing an
order. An order is considered placed once site measurements are made and/or
templates have been made, and deposit received. Balance is due upon completion
of granite or marble installation.
1517 E. Lancaster Ave.
Fort Worth, TX 76102
w,vw . GallantMarbleand Granite. com
Office (817) 332-1603
Fax (817) 332-3716
Proposed Change Request
Description: Scope creep changes
Scope of Work
Clear Window Film (Email 11/29)
New countertop in camera room (Email 12/5)
Steel structure :
Countertop {c &P&! IY(l/
Asphalt Modifications at approach, curb, & gutter (Email 12/8)
Mobilize equipment
Excavate & haul -off, provide new flex base
Survey & blue top
Prime & install 3" HMAC
Project East Lancaster NPO
PM/ Supt SM/ RD Date
PCR # 003
Unit Cost
28 cy
700 sf
fl ~ ·3£t9
Subtotal
Overhead & profit
Bond
22-Dec
Total
$ 2,800 I!./'
$ 1,200 ,,/
$ 2,040 ..,,/
$ 1,000
$ 2,700
$ 500
$ 2,185
$ 12,425 /
$ 1,243 v
$ 249
Tax exempt
Total c= $--im[)
' -~
-------------""'--~
I 7 -?3 -//
·10ENNETT
CONSTRUCTION
Tom Watter-son 817-457-1522 p.l
Sun Out Window Tinting
5508 Grantrnont Drive
Arlington, TX 76016
817 457 -9000
972 788 -5100
Name/ Address
DENNETI CONSTRUCTION
2313 CULLEN ST .
FORT WORTH , TX 76107'
Item
Estimate
Date Estimate No.
12/17/2011 11E1117
Sh ip To
FOR T WORIB POL!CD:
I 509 R. LANCASTE R
FORT WORTH , TX
Description Tota l
8mil Clear All:. WINDOWS AND DOORS ( 24 PANES OF GLASS) 2.800.0()
Servi ces INSTALL 8 MIL CLEAR SECURITY FILM ON ALL GLASS 0 .00
St.!:r'Vl ces 12 YEAR WAR.RANTY 0 .00
INCLUDES ALL TAXES
Fax# E-me il Web Site
Kl7-457-1522 salcs@lintdtw. oom www.tintc.Jtw.com
Gary Mc Elyea
1005 Oak Forest Dri ve
Fort Worth, TX 76114
(817) 676-3353
jagmcelyea@yahoo.com
DENNETT CONSTRUCTION
2313 CULLEN STREET
FORT WORTH, TEXAS 76107
Description
STRUCTURALSTEELCOUNTERSUPPORTFABRICATED
AND INSTALLED . PRIMED BLACK. AS PER PLAN. WITH
THREE SUPPORTS. BOLT TOGETHER AT VARIOUS
LOCATIONS. SOME FABRICATION TO BE DONE ON
LOCATION AFTER STUDS IN WALL ARE LOCATED . TOBE
COMPLETED TODAY.
Estimate
Project
NPO EAST LANCASTER, FORT WOR ...
-Total
I 1,200.00 1,200.00
Total $1,200.00
December 22 , 2011
Dennett Construction
RE: Police Sub-station
We bid the following :
Gallant
Marble & Granite, LLC
op , 28 "xl 6 ' l O" with 4" backsplash and 4" drop
Co-!f-r ~ --/?~? ls6.L) r/ZJ.e-.
/'1 ff/ Iv Tl!!F-/VJf Jl./c~ </-
$2 ,04 0 .00 t
~ !VG-c/1?4-dr?-1 ;,7
1517 E. Lancaster Ave.
Fort Worth, TX 76102
wv,rw .GallantMarb leandGranite.com
Office (817) 332-1603
Fax (817) 332-3716
Shawn Moore
From:
Sent:
To:
Subject:
Ray Guerrero < Ray @brjpaving .com >
Thursday, December 22 , 2011 3:11 PM
Shawn Moore
Pricing for New Asphalt connect ion at NPO
Good afternoon Shawn, The following details the cost for the demolition, haul off and repaving of Lancaster Rd . in front
of the NPO project. Saw cut, excavate and haul off of 700 sf of existing asphalt, brick underlayment and road base -
approximately 28 scys. Provide and install 6 " of flex base material, survey and blue top. Pr i me the base material and
install 3" of HMAC. 1) Mobi lize backhoe, skid Joader, paver and roller=$ 1,000.00 2) Saw cut, excavate and haul off of
,/
existing road and install new base= $2,700 .003) Survey and blue top=$ SOD.OD) Prime, install 3" of HMAC and clean
up $ 2,185 "' Total change order pricing= $6,385.00 ,/
Ray Guerrero
BRJ Paving, Inc.
Office 817-478-0927
Fax 817-478-1672
Cell 817-798-5989
•
,-
:s:.
t
"1--ti'.. 11-
it-1 '2-X "2-11
~ " t p 14\ "f,t'J-
l 'h,, ')( _3 /4 M 1..-C V,/ £,/'-e r-i.-/vl? s
J
Co (2-1 A ,,j
IE;,AC-lC:... t fE.1...Jir?
.7f"'"l-,t"1 J; ~
I t 1-xY~ ·1-e:/1
I
f-A S1frJ ¥" W, 7 11 JV
~ A C,l,f f,j.' I.A V 1"'/
7--#:-1 "2--p.~ ""' JJ.e/1 ~
<; C-1~ -e--ll t,,1,1 5 :;i-1 ,:;
r-
:; ~1 ·4' J..J ovr:V ~ /c-H>'.\ l'·~~ r;,,,~tc-i'J
"Gi:, r.> "' ~ r () Fl~ c,t1, O,,j,..-~~
T '1 /? , ~ Ll r,2.. ..,-fS.. /4 •
C,+·X 7 , 1--S--L-G-1'? G E4!_
@ L,,J A 1.,.,1..,. f'C A '-';~_:....t;t N t1 ~1-
e,..-~i.,rl vY -r ~w··ic-.--........
-. ---·-----------·-----··-· ------------------------------------
, .. z.,1-, 1 / ,4--~j ,/ 1-J...'/~~1
1~ 4 ''.,..z.'J,,,}' I. . ,
.a::---
"'3 01,,1Tt.,<:i.,-T3, I Nv'I-, I IJOLIA'-·1 PA-r A"{· ~~I-i;:_
"'(~ f I t'.l\ l. @._ -f' l,,P t::'.,:\-/ I Dt,J_s
1" -Bi --.... .... :::.a,
-EF@-8--~B --BiB
I I I
! !
;;:'
.l: t
\J
; ..... l1 cJ) 'l,, NI",, "'' 11 //--r (;,o ~·A.,-\ Co fe A(.-1 I ·I,~ t....::> t'5-AL,,i
8A C,/"--'f't:) /;;;,.Al.; 5ft.-A ..S H ~~ ~~N~~~r~~~
~-
I
U'j !:
rl
\'\
t :z.x+ f'~-£.i.1i:;l ..
~. n -;:~-
\1\
.,..\4 {' 411 i)/,v'1 1., C.-Pi/\iZ-(3 A .!,1;t;.
~-,.. ... ---·~"" -·-1,,=-. ..... ,
-7f"+'----"'1_ ... · -~ z;_A/ ,.__IA --t---,4_1 .. z__· '/_-:i: H--. ~
......
-"/-I .,, 1 1,1
t
,t 1 1-1
P' .. /,,..:_ ""'.,:.. ~ ~I +
WAw ('10 ,
1.N Hi ~...-,_ ~
-........,...._, .,.,._~
·-:..1 -f11rB--
. '
-
1k 5 ·r 1.,,, J,,J rL 1. •• ~u:--i:>
e,. r~ A'"''""'""-rs r"'rio.
'P'fi....iZ._ D -r v, )<! Ii :z._.
,.
~ :z: ---
....... ·-· -·---~"""""~ _J
,4· '-z_.'/"J.-.V I ~
VA r'-'-'f s-·r A cA,..:. ~ A $ r--i~ Gl b , to ·::, C-tv~.,~ to
'iit~ ~ S,
. I ----·---·---------·---------··--·-·-·-·---------------·-····-·-··---···-···-----·---·---------------~-------,-----------------·----------------------------·--
Proposed Change Request Project East Lancaster NPO
PM/ Supt SM/ RD Date 10-Jan
Description : Masonry Changes PCR # 005
Scope of Work Unit Cost Total
Remediation work associated with Rock Contractor's invoice as described $ 3,500
Subtotal $ 3,500
Overhead & profit $ 350
Bond $ 70
Tax exempt ~)
____________________ T_o_ta_l _______ -1(-~-~ 3,920
r!!3 I DENNETT / r ·-z . ...,,Jz_,
CON5TAUCTION ,._)
Rock Construction Services
1854 E. Belt Line Rd Suite 3
Cop pell , TX 750 19-9607
Tel 469 -635 -4808 ROCK CON
Fax 972 -393 -8679 ROCK CONSTRUCT I ON SERVICES
( BillTo
Dennen Construction
23 13 Cullen Street
Fort Worth , TX 76107
)
Description
SAW CUT BLOCK TO ACCOMMODATE "BRICK EXPANSION JOINTS"
SAW CUT BLOCK TO COVER ANGLE IRON OVER WINDOWS
P .O . No .
SAW CUT BLOCK ON LEFT FRONT WINDOW TO BALANCE THE REVEAL
SAW CUT BLOCK AND COURSE IN ON LEFT AND RIGHT SIDES OF FRONT ENTRY
REMOVE AND REPLACE BLO CK ON LEFT SIDE FOR DESIGN CHANGE
REMAKE CAST STONE CAP DUE TO PLAN CHANGE AND PLAN ERROR
Invoice
Date Invo ice#
12/31 /2011 RC 2011 -549
Project Terms
Lancaster NPO Net 15
LABOR AND MATERIAL TO INSTALL BRICK EXPANS ION JOINTS WITH BLACK MORTAR
Pay online at: https://ipn.intuit.com/2hs2bmq5
Balance Due $3 ,500 .00
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME: Neighborhood Police Office & Community Room
BuySpeed No :
Contract No :
D.O .E. No : N/A
Attachment to Change Order No: 1
Today's Date : 1/24/12
TOTAL
Original Contract Amount: $ 489,824.00 $ 489 ,824 .00
Extras to Date : $ $
Credits to Date : $ $
Contract Amount to Date : $ 489,824.00 $ 489,824 .00
Amount of Proposed Change Order: $ 22,767.00 $ 22 ,767.00
Revised Contract Amount: $ 512,591.00 $ 512 ,591.00
Contingency Funds Avail. for Admin. Change Orders: $ 51,883.00 $ 51,883 .00
Remaining Funds Available for Change Orders: $ 29,116.00 29 ,116.00
Additional Funding (if necessary): $ $
Prepared By: Karen Striker T/PW Business Support