HomeMy WebLinkAboutContract 42015-CO1CITY SECRETARY CONTRACT NO . 41..() \ 5-CD\ FORTWORTR. ~ City of Fort Worth Change Order Request Project Name! Silver Creek Rd ., IH820W to WSISD HS Client Project#(s)! T/PW-C204-541200-207230129383 (DOE 6196) City Sec# 42015 ------~ Pavement and Storm Water Drainage construction, and Water and Sanitary Sewer Force Main replacement , on Silver Project Description Creek Rd . from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . Contractor! JLB Contracting , LLC Change Order# Date 12/2/2011 City Project Mgr.! Leon Wilson, P.E. City Inspector _J_o_e_R~og~e_rs _______ __,__. Dept. TPW Water Sewer Original Contract Amount $1,271,792.41 $120,413 .90 $51,688.25 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,271,792.41 $120,413.90 $51,688 .25 IAmount of Proposed Change Order $12,895.00 $0.00 $0.00 Revised Contract Amount $1,284,687.41 $120,413.90 $51 ,688 .25 Original Funds Available for Change Orders $40 ,570 .00 $6,000 .10 $3 ,311 .75 Remaining Funds Available for this CO $40 ,570.00 $6,000.10 $3,311.75 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE} AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) Contract Time Totals (CD) $1 ,443 ,894 .56 180 $1 ,443 ,894 .56 180 $12,895 .00 0 $1 ,456 ,789.56 180 $49 ,881 .85 $49 ,881.85 0.89% $1 ,804,868.20 The existing driveway entry for Silver Creek Stables had an overhead wooden structure which was decayed. The widening of the ROW requires the relocation of the entrance gate and overhead structure . The property owner has requested that a 41 /2 " pipe replace the decayed overhead wooden structure . Also , during construction of the drainage channel a conflict with a Cross Tex natural gas main was discovered . The drainage channel flowline elevations were adjusted and Cross Tex requested a~-ilhoo. in the location of the gas ma in crossing. '°''V' f OR F ~Qq #~~o~~ ,=I._ ouo 000 tlf\ ~ by: u.~: ~~~ . 0 a ~-g g:Z:~ tLJ--/. rm J_ ~fl'l> 0 p ~.,.. -.... \ l-¥-# nald P. Gomales, City Secntary '(>,. ,,.-Oo 00 /:I v/l Ooooooo /:f ~ 1". S.c::,.-0- It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. Date (~,.;.;i;,~;.;.;..;;.~=~,;;.i;.;;:.,;..;.;;.;.;;.;._--,'9,-----+--=;;;.__-+__;_µ;;.~~=;.;.;_.;.;;.,;i.;.;;;.;.;.;_;.;.;.;;;;.;.;;;,;i.;;,;.__--'-_+-_...::.::~--l (1-o:,,"-c,,..L----r-+'-l.-'-.;....o...;:-,..,.-t--P'-' ........ ;;lll"'---f&="--Jl........,f--+--+----1rf-..a..._;;'-----------t-,-------I Fo ,n W ORT H ----.---- Project Name Client Project# City of Fort Worth Change Order Additions Silver Creek Rd ., IH820W to WSISD HS T/PW -C204-541200-207230129383 (DOE 6196) City Sec# Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement, on Silver Creek Rd . from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . JLB Contracting , LLC Change Order# I 1 Date 12/2/2011 42015 Project Descr iption Contractor Ci ty Project Mgr. Leon Wilson , P.E. City Inspector ... I _J_oe_Ro_.g __ e_rs ________ __. ADD1T10N5 I I C.M Ut:SCRII"' I IUN Ut:I"' I Uty Unit unit cost 1ota1 JU 14 11z· steel Pipe overhead Entry@ Silvercreek Stables -Install I l"'VV 1.UU LS ~1,fl10 .UU ~1,fl10.UU zu 1,otu :si-x 5· Concrete Apron w/ 18" Perimeter Toewall -install I l"'VV JU .uu \.,Y ~J/U.UU ~11 ,1UU .UU Change Order Additions Page 1 of 2 TPW $12 ,895 .00 Water $0 .00 Sewer $0.00 Sub Iota Add1t1ons $12 ,ts~0 .00 Change Order Additions Page 2 of 2 FO t-ff W O RT H -----.--- Project Name Cli ent Project # Proj ect Description Contractor City of Fort Worth Change Order Deletions Silve r Creek Rd ., IH820W to WSISD HS T/PW -C204-541200-207230129383 (DOE 6196) City Sec# Pavement and Storm Water Drainage construction, and Water and Sanitary Sewer Force Main replacement, on Silver Creek Rd. from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd. JLB Contracting , LLC Change Order# I 1 Date 12/2/2011 42015 Ci ty Project Mg r. Leon Wilson , P.E. City Inspector ...._J_oe_R_o..,.g'-er_s ________ __, DELETIONS l 1t:.M Ut~L,;Klt-' I IUN Utt-'I Uty Unit unit c.;ost 1ota1 Change Order Deletions Page 1 of 2 TPW $0 .00 Water $0.00 Sewer $0 .00 Sub 1 otal Deletions Change Order Deletions Page 2 of 2 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00