Change Order Request
CITY SECRETARY
CONTRACTNO. Lfd-0\"6-C,Ool-
~
Project Name! Silver Creek Rd ., IH820W to WSISD HS City Sec # 42015 ,....._ _____ ____.
Client Project #(s)! T/PW -C204-541200-207230129383 (DOE 6196)
Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement , on Silver Project Description Creek Rd . from Interstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd .
Change Order # 2 Date 2/6/2012 Contractor! JLB Contracting , LLC
City Project Mgr.! Leon Wilson , P.E. City Inspector Joe Rogers ~-----''-------------'
Dept. TPW Water Sewer
Original Contract Amount $1 ,271 ,792.41 $120,413 .90 $51 ,688 .25
Extras to Date $12 ,895 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1 ,284 ,687 .41 $120,413 .90 $51 ,688 .25
!Amount of Proposed Change Order -$3,375.00 $0 .00 $0.00
Revised Contract Amount $1 ,281 ,312.41 $120 ,413 .90 $51 ,688 .25
Original Funds Available for Change Orders $40 ,570 .00 $6 ,000 .10 $3 ,311 .75
Remaining Funds Ava ilable for th is CO $27 ,675 .00 $6 ,000.10 $3 ,311 .75
Addit ional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$1 ,443 ,894 .56 180
$12 ,895 .00
$1 ,456 ,789 .56 180
-$3 ,375.00 14
$1,453,414 .56 194
$49 ,881.85
$36 ,986.85
0.66%
$1 ,804 ,868.20
The existing asphalt roadway will be pulverized and ove rlayed due to its detoriating condition . Th is was not included in the orig inal plans
because the project construct ion budget was insufficient to cover these costs based on the op inion of probable costs prepa red by the consultan
in advance of the actual bid . This change order includes an 8" pulverization with a 4" asphalt overlay for the roadway with in the lim its of the
project. The two-lane concrete roadway will be constructed north of the existin ~sphalt road . The permanent asphalt repair in the areas of the
storm dra inage const ruction wi ll be deducted from the contract. -<>--<>~f OA'l:i~
#o~0"i"J.~A p uo oo Y;.. A t f/~0o o tlf\~ • ~,-0 O~\~ P.-o i ~ ~c.>i fXp tr:.--~~~-.;.;-. .... _...;;;~_,.'""' ___ ~ i O §
~Q* 00 000~..0' ~~ ~Oooooo5o q.t::/
~ • E'X~ <>-,cy
It is understood and agreed that the acceptance of this Change Order by the contrac tor constitutes an accord and satisfaction and represents paymen t
in fu ll (both time and money) for all costs arising ou t of, or incidental to , the above Change Order.
I'?..-
M&C Number I ij /k
FORT WORTH -----.----City of Fort Worth
Change Order Additions
Project Name Silver Creek Rd ., IH820W to WSISD HS City Sec#
T/PW-C204-541200-207230129383 (DOE 6196)
Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement , on Silver Creek Rd .
from Interstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd .
JLB Contracting , LLC Change Order# I 2 Date 2/6/2012
42015
Client Project#
Project Description
Contractor
City Project Mgr. Leon Wilson , P.E. City Inspector ... I _J_oe_Ro_.g._e_rs ________ ___,
ADDITIONS
11 t:M ut::,1.,;KIP I IUN Utt-'I Uty unit Unit L;OSt 1ota1
31 l:l" Pulverize / ~tab1l1ze t:x1st1ng Koadway IPW 3 ,bUU .UU .:>T :jiJ.~Z :jil 3 , / LU .UU
32 I c.;ement ~tab111zed ~ub -Grade @ 30# sy 11-'VV 52 .50 TN $115 .00 :jiti ,UJ/.OU
33 14" HMAc.; overlay 11-'VV 3 ,bUU .UU ::,y $19.16 :!iti/,uou.uu
34 14' Pvc.; drain pipe to divert U/G water into drainage easement -Install I 1-'VV JU.VU LF $17 .00 :jibl u .uu
.. Change Order Add1t1ons Page 1 of 2
TPW $87 ,327 .50
Water $0 .00
Sewer $0 .00
Sub Total Additions :jiti/,ji/.50
Change Order Additions Page 2 of 2
fORTWORTH ------.---City of Fort Worth
Change Order Deletions
Project Name Silver Creek Rd ., IH820W to WSISD HS City Sec#
Client Project #
Project Description
Contractor
T/PW-C204-541200-207230129383 (DOE 6196)
Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement , on Silver Creek Rd .
from Interstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd.
JLB Contracting , LLC Change Order# I 2 I Date 2/6/2012
42015
City Project Mgr. Leon Wilson , P.E. City Inspector! .... _J_oe_R_o-g_er_s ________ ~
DELETIONS
111:M Ut:::>l-t<II" I ION Ut:I" I wiy Unit unit cost Total
1U 1-'avement -HMAC /" I ype ~ lt-'W L ,000 .UU ::>Y $£7 .LO :J,t:>~1t>LJ./O ,, 1-'avement -, .. I ype u lt-'W L ,000.UU ::>Y $8 .:.15 :i>L1 ,urn.to
Change Order Deletions Page 1 of 2
TPW $90,702 .50
Water $0 .00
Sewer $0 .00
Sub Total Deletions :i;~u .ruz .50
Change Order Deletions Page 2 of 2
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
., , .
...
City of Fort Worth
Change Order Request
Project Name! Silve r Creek Rd ., IH820W to WSISD HS
Client Project#(s)j T/PW-C204-541200-207230129383 (DOE 6196)
City Sec # 42015
Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement , on Silver Project Description Creek Rd . from Inte rstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd .
Contractor! JLB Contracting , LLC Change Orde r# 2 Date 2/6/2012
City Project Mgr.! Leon Wilson , P.E. City Inspector ...._J_o_e_R_og::....e_rs _________ _i
Wat ef 1"'-'' 1----... ... 1-Contract Time Dept. TPW , Sewer .(
,.1~ -_ Totals (CD)
Original Contract Amount $1 ,271 ,792.41 $120 .41 e:9o $51 ,688"'2 5 -$1~43 ,894 .56 180
Extras to Date $12 ,895.00 $12 ,895 .00
Cred its to Date
Pending Change Orders (in M&C Process )
Contract Cost to Date $1 ,284 ,687.41 $120,413 .90 $51 ,688 .25 $1 ,456,789 .56 180
IAmount of Proposed Change Order ·$3 ,375.00 $0.00 $0.00 -$3,375.00 14
Revised Contract Amount $1 ,281 ,312.41 $120 ,413 .90 $51 ,688 .25 $1 ,453,414 .56 194
Origina l Funds Available for Change Orders $40 ,570.00 $6 ,000 .10 $3 ,311.75 $49 ,881 .85
Remaining Funds Available for this CO $27 ,675.00 $6 ,000 .10 $3 ,311 .75 $36 ,986 .85
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.66%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1 ,804 ,868 .20
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The exist ing as phalt roadway will be pulve rized and overlayed due to its detoriat ing cond ition . This was not included in the or iginal plans
because the pro ject construction budget was insufficient to cover these costs based on the opinion of probab le costs prepared by the consultant
in advance of the actual bid . This change order includes an 8" pulverization with a 4" asphalt overlay for the roadway within the lim its of the
project. The two-lane concrete roadway will be constructed north of the existing asphalt road . The permanent asphalt repair in the areas of the
storm drainage construction will be deducted from the contract.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment ,
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Contractor's Com an Name Contractor Name
JLB Contractin , LLC ...-. i>-1 o/ 1 -...
Date
Date
Date
3 8 12.
M&C Number
-
City of Fort Worth
Change Order Request
Project Name! Silver Creek Rd ., IH820W to WSISD HS
Client Project#(s)! T/PW-C204-541200-207230129383 (DOE 6196)
City Sec # 42015
Pavement and Storm Water Drainage const ruction , and Water and Sanitary Sewer Force Main replacement, on Silver Project Description Creek Rd . from Interstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd .
Contractor! JLB Contracting , LLC Change Order # 2 Date 2/6/2012
City Project Mgr.! Leon Wilson , P.E. City Inspector Joe Rogers '------'=--------------'
Dept. TPW Water -Sewer
Original Contract Amount $1 ,271,792 .41 $120,413 .90 $51 ,688 .25
Extras to Date $12 ,895 .00
Credits to Date
Pend ing Change Orders (in M&C Process)
Contract Cost to Date $1 ,284 ,687.41 $120,413.90 $51,688 .25
!Amount of Proposed Change Order ·$3,375.00 $0.00 $0.00
Revised Contract Amount $1 ,281 ,312.41 $120,413 .90 $51 ,688 .25
Original Funds Available for Change Orders $40 ,570 .00 $6 ,000 .10 $3 ,311 .75
Remaining Funds Available for th is CO $27 ,675 .00 $6 ,000 .10 $3 ,311 .75
Addit ional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$1 ,443 ,894 .56 180
$12 ,895.00
$1,456 ,789.56 180
·$3,375.00 14
$1 ,453,414 .56 194
$49 ,881 .85
$36 ,986 .85
0.66%
$1 ,804 ,868 .20
The existing asphalt roadway will be pulverized and overlayed due to its detoriating condition . This was not included in the original plans
because the project construction budget was insufficient to cover these costs based on the opinion of probable costs prepared by the consultant
in advance of the actual bid . This change order includes an 8" pulverization with a 4" asphalt overlay for the roadway within the limits of the
project. The two-lane concrete roadway will be constructed north of the existing asphalt road. The permanent asphalt repair in the areas of the
sto rm drainage construction will be deducted from the cont ract.
._,,,,
I·), I (,/
..../
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Contractor's Com an Name Contractor Name
Date Date
l
Assistant Director De t Date Date
/ ,, , .,,. -... --( I -e.J
Attorne Date
WL
M&C Number Jl k
FORT WORTH .
~
City of Fort Worth
Change Order Request
Project Name I Silver Creek Rd ., IH820W to WSISD HS
Client Project #(s)I T/PW -C204-5 41200-207230129383 (DOE 6196)
City Sec # 420 15 ~-------J
Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement , on Silver Project Description Creek Rd. from Inte rstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Cree k Rd .
Change Order # 2 Date 2/6/2012 Contractor! JLB Contra cting , LLC
City Project Mgr .I Leon Wilson , P.E. City Inspector Joe Rogers ~----''------------'
Dept. TPW Water Sewer
Ori ginal Contract Amount $1 ,271 ,792.41 $120,413.90 $51 ,688 .25
Extras to Date $12 ,895 .00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1 ,284 ,687 .41 $120,413 .90 $51 ,688 .25
!Amount of Proposed Change Order -$3,375.00 $0.00 $0.00
Rev ised Contract Amount $1 ,281 ,312 .41 $120,413.90 $51 ,688.25
Original Funds Ava ilable for Change Orders $40,570 .00 $6,000 .10 $3,311 .75
Remaining Funds Available for this CO $27 ,675 .00 $6 ,000 .10 $3 ,31 1.75
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$1 ,443 ,894 .56 180
$12,895.00
$1 ,456 ,7 89 .56 180
·$3,375.00 14
$1,453 ,414 .56 194
$49 ,881 .85
$36 ,986 .85
0.66 %
$1 ,804 ,868.20
The existing as ph alt roadway will be pulverized and overlayed due to its detoriating condition . Th is was not included in the original plans
because the project construction budget was insufficient to cover these costs based on the opinion of probable costs prepa red by the consultant
in advance of the actual bid. This change order includes an 8" pulver izat ion with a 4" aspha lt overlay for the roadway within the limi ts of the
project. The two-lane concrete roadway will be constructed north of the existing asphalt road . The permanent asphalt repa ir in the areas of the
storm drainage construction will be deducted from the contract.
/
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or inc idental to , the above Change Order .
Contractor's Compan Name Contractor Name Date
JLB Contractin , LLC
Inspector/Inspection Supervisor Date Proj~ct Manager/Program Manager Date
\ 1,
I~ '1 .. ·/
Assistant Director (Dept) Date Director , Contract inQ Department (Dept) Date -
Ass istant City Attorney Date Assistant City Manager Date
i,,., -
--"I'"--'--... -:" .. I /4
Council Action if required)
M&C Number I I M&C Date Approved I I