Loading...
HomeMy WebLinkAboutContract 42015-CO3FORT WORTH . ~ City of Fort Worth Change Order Request Project Name! Silver Creek Rd ., IH820W to WSISD HS Client Project #(s)! T/PW -C204-541200-207230129383 (DOE 6196) CitySec# 420 15 .__ _____ __. Pavement and Storm Water Drainage construction, and Water and Sanitary Sewer Force Main replacement , on Silver Project Description Creek Rd . from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . Contractor! JLB Contracting , LLC Change Order# 3 Date 3/27/2012 City Project Mgr.! Leon Wilson , P.E. City Inspector Joe Rogers '-----"----------' Dept. TPW Water Sewer Original Contract Amount $1 ,271,792 .41 $120 ,413 .90 $51 ,688.25 Extras to Date $12 ,895 .00 Credits to Date $3 ,375 .00 Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,281 ,312 .41 $120,413 .90 $51 ,688.25 !Amount of Proposed Change Order $1,498.55 $1,150.00 $14,120.00 Revised Contract Amount $1 ,282 ,810 .96 $121 ,563 .90 $65 ,808 .25 Orig inal Funds Available for Change Orders $40 ,570.00 $6,000 .10 $3 ,311 .75 Remaining Funds Available for this CO $31 ,050 .00 $6,000 .10 $3 ,311.75 Additional Funding (if necessary) $10 ,808.25 CHANGE ORDERS to DATE (INCLUDING THIS ONE} AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%} JUSTIFICATION (REASONS) FOR CHANGE ORDER Contract Time Totals (CD) $1 ,443 ,894.56 224 $12 ,895.00 $3 ,375 .00 $1 , 453,41 4..56 224 $16,768.55 14 $1,470 ,183.11 238 $49 ,881 .85 $40,361.85 $10 ,B08.2.5 1.82% $1 ,804 ,868 .20 Existing electrical vault had to be removed and replaced to run new 12'' PVC water main tie 0 in to existing. Existing 16'' SSWR FM in conflict with· drop inlet@ 8t 50 line B. Whip around of SSWR FM required at this location ; as actual SSWR FM is not where shown on plans . ll.'tl.'\l.~~~~ OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or inciden tal to , the above Change Order. 06-19- /• L ,· X L/70)5 -t03 FORT WORTH .. ~ · Cify of Fort Worth ChaJg6 Order Request Project Name I Silver Creek Rd ., IH820W to WSISD HS Client Project #(s)I T/PW -C204-541200-207230129383 (DOE 6196) City Sec# 42015 '---------J Pavement and Storm Water Drainage construction, and Water and Sanitary Sewer Force Main replacement , on Silver Project Description Creek Rd. from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . Contractor! JLB Contracting, LLC Change Order# 3 Date 3/27/2012 City Project Mgr.I Leon Wilson , P.E. City Inspector Joe Rogers L...----''-------------' ,. Water I JI Ji ~1 f, ,i, Contract Time Dept. I TPW Sewer 4,J'; • ~ Totals (CD) Original Contract Amount $1 ,271,792 .41 $120,413 .90 $51 ,688 .25 / '$1,443,894.56 224 Extras to Date $12 ,895 .00 $12 ,895 .00 Credits to Date $3 ,375.00 $3 ,375 .00 Pending Change Orders (in M&C Process) \I. Contract Cost to Date $1 ,281 ,312 .41 $120,413.90 $51 ,688 .25 $1,453,414 .56 224 !Amount of Proposed Change Order $1,498.55 $1,150.00 $14,120.00 $16,768.55 14 Rev ised Contract Amount $1 ,282 ,'810 .~6 I , -$121 ,563 .90 $65 ,808 .25 $1 ,470 ,183.11 238 Original Funds Available for Change Orders $40 ,570 .00 I $6,000.10 $3 ,311 .75 $49 ,881 .85 Remaining Funds Available for this CO $31 ,050.00 $6 ,000 .10 $3 ,311 .75 $40 ,361 .85 Additiona l Fun ding (if necessary) $10,808 .25 $10 ,808 .25 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT 1.82% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1,804,868.20 JUSTIFICATION (REASONS) FOR CHANGE ORDER Existing electric al vault had to be removed and replaced to run new 12" PVC water main tie-in to existing . Existing 16" SSWR FM in conflict with drop inlet @ 8+50 line B. Whip around of SSWR FM required at th is location ; as actual SSWR FM is not where shown on plans. ,.,,,,-,,_ '-" , t -, II c.- 1t is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arisi ng out of, or in cidental to , the above Change Order. Date fi /1 Date fo/111 lJ/L M&C Number /~ FORT WORTH . ~ .. City of Fort Worth Change Order Request Project Name! Silver Creek Rd ., IH820W to WSISD HS Client Project #(s)j T/PW -C204 -541200-207230129383 (DOE 6196) City Sec# 42015 ~--------' Pavement and Storm Water Drainage construction , and Water and San itary Sewe r Fo rc e Ma in rep lacement , on Sil ver Project Description Creek Rd . from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . Contractor! JLB Contracting , LLC Change Order # 3 Date 3/27/2012 City Project Mgr .! Leon Wilson , P.E. City Inspector Joe Rogers ____________ __, . Dept. TPW Water , ' Sewer Original Contract Amount $1 ,271,792 .41 $120,413 .90 $51 ,688 .25 Extras to Date $12 ,895 .00 Credits to Date $3 ,375.00 Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,281 ,312 .41 $120 ,413 .90 $51 ,688 .25 IAmount of Proposed Change Order $1,498.55 $1,150.00 $14,120.00 Revised Contract Amount $1 ,282 ,810 .96 $121 ,563 .90 $65 ,808 .25 Original Funds Ava ilable for Change Orde rs $40 ,570 .00 $6 ,000 .10 $3 ,311 .75 Remaining Funds Available for this CO $31 ,050 .00 $6 ,000 .10 $3 ,311.75 Additional Fund ing (if necessary) $10 ,808.25 CHANGE ORDERS to DATE (INCWDING THIS ONE) AS % OF ORIGJNAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER J 1; ' 'l. Contract Time Totals (CD) $1 ,443 ,894 .56 224 $12 ,895.00 $3 ,375 .00 $1 ,453,414 .56 224 $16 ,768 .55 14 $1,470 ,183 .11 238 $49 ,881 .85 $40 ,361 .85 $10 ,808 .25 1.82 % $1 ,804 ,868 .20 Existing electrical vault had to be removed and replaced to run new 12 " PVC water main tie-in to ex isting . Existing 16" SSWR FM in conflict with drop inlet@ 8+50 line B. Wh ip around of SSWR FM required at th is location ; as actual SSWR FM is not where shown on plans . I I I //I/ 1r II - Vfff/1(..... It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both ti me and money) for all costs arising out of, or incidental to , the above Change Order. ( M&C Number ,II I ,, • FORT WORTH .. ~ City of Fort Worth Change Order Request Project Name! Silver Creek Rd ., IH820W to WSISD HS Client Project #(s}! T/PW-C204-541200-207230129383 (DOE 6196) City Sec# 42015 ...._ _____ __, Pavement and Storm Water Drainage construction , and Water and Sanitary Sewer Force Main replacement, on Silver Project Description Creek Rd . from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . Contractor! JLB Contracting , LLC Change Order# 3 Date 3/27/2012 City Project Mgr .! Leon Wilson , P.E. City Inspector Joe Rogers '-------''------------' ~ Contract Time Dept. TPW Water Sewer Totals (CD) Original Contract Amount $1 ,271 ,792 .41 $120,413 .90 $51,688 .25 $1 ,443 ,894 .56 224 Extras to Date $12 ,895 .00 $12 ,895 .00 Credits to Date $3 ,375 .00 $3 ,375 .00 Pending Change Orders (in M&C Process) Contract Cost to Date $1 ,281 ,312 .41 $120 ,413 .90 $51 ,688 .25 $1,453,414 .56 224 IAmount of Proposed Change Order $1,498.55 $1,150.00 $14,120.00 $16,768.55 14 Revised Contract Amount $1 ,282 ,810 .96 $121,563.90 $65 ,808 .25 $1 ,470 ,183.11 238 Original Funds Available for Change Orders $40 ,570 .00 $6 ,000 .10 $3 ,311 .75 $49 ,881 .85 Remaining Funds Available for this CO $31 ,050 .00 $6,000 .10 $3 ,311.75 $40 ,361 .85 Additional Funding (if necessary) $10 ,808 .25 $10 ,808 .25 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.82% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1,804 ,868 .20 JUSTIFICATION (REASONS) FOR CHANGE ORDER Existing electrical vault had to be removed and replaced to run new 12" PVC water main tie-in to existing . Existing 16" SSWR F-M in conflict with drop inlet@ 8+50 line B. Whip around of SSWR FM required at this location; as actual SSWR FM is not where shown on plans . I., I I, - II < It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. ,,. Ji ' ,:--/ Date Date ' I Date Date { I Assistant f:i Date Date t:... ,( - Council Action if f M&C Number FORT WORTH ---..,..--City of Fort Worth Change Order Additions Project Name Silver Creek Rd ., IH820W to WSISD HS City Sec# Client Project# T/PW-C204 -541200-207230129383 (DOE 6196) Pavement and Storm Water Drainage construction , and Water and' Sanitary Sewer Force Main replacement , on Silver Creek Rd. from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd. JLB Contracting , LLC Change Order# I 3 I Date 3/27/2012 42015 Project Description Contractor City Project Mgr . Leon Wilson , P.E. City Inspector I....._J_oe_Ro ..... g'-e_rs ________ ___. ADDITIONS 11 t:M ut::;vKII-' IION Ut:1-' I Uty Unit unit L;ost 1ota1 14 Kernove and replace ex1st1ng concrete ut111ty vault water 1.UU L:; :!>1 ,1bU .UU $1 , 1 OU .VU 8 1 fj" PVC SSWR Force Main Whip around Sewer 4U .UlJ LF $JMUU $14 ,1LU .Uli Jo Kemove Exist. concrete Paving 1t-JW b~f .UC :;t-:j)l .10 $1 ,'l~O .bt .. Change Order Add1t1ons Page 1 of 2 TPW $1 ,498 .55 Water $1 ,150 .00 Sewer $14 ,120 .00 Sub Total Additions $16,768.55 Change Order Additions Page 2 of 2 FORT WORTH -----w---City of Fort Worth Change Order Deletions Project Name Silver Creek Rd ., IH820W to WSISD HS City Sec# Client Project# T /PW -C204-541200-207230129383 (DOE 6196) Pavement and Storm Water Drainage construction, and Water and Sanitary Sewer Force Main replacement , on Silver Creek Rd . from lnterserstate 820 W through Intersection of Brewer St. then ends at 9450 Silver Creek Rd . JLB Contracting , LLC Change Order# ! 3 I Date 3/27/2012 42015 Project Description Contractor City Project Mgr. Leon Wilson , P.E. City Inspector ._J_oe_Ro_.g..._e_rs ________ __, DELETIONS 11 t:M Ut:::>LiKlt-' I IVN Ut:t-' I Qty Unit Unit LiOSt 1ota1 IPW lt-'W Change Order Deletions Page 1 of 2 TPW $0 .00 Water $0 .00 Sewer $0 .00 Sub Total Deletions Change Order Deletions Page 2 of 2 M/WBE Breakdown for this Change Order MWBESub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME : Silver Creek Road, IH 820 West to Brewer High School Driveway BuySpeed No (T/PW): BuySpeed No (Water): City Project No : Contract No: D.O .E. No : Attachment to Change Order No : Today's Date: O ri ginal Contract Amount: Extras to Date : Credits to Date : Contract Amount to Date : P0-11-00067804 P0-12-00068935 01293 CS42015 6196 3 4/24/12 Amount of Proposed Change Order: Revised Contract Amount: Contingency Funds Avai l. for Admin . Change Orders : Remain ing Funds Available for Change Orders : Additional Funding (if necessary): TOTAL T /PW {C204) T/PW {P227) $ 1,443,894.56 $ 1 ,141 ,792.41 $ $ 12,895.00 $ 12,895 .00 $ $ (3,375.00) $ (3 ,37 5 .00) $ $ 1,453,414.56 $ 1 ,151 ,3 12.41 $ $ 16,768.55 $ 1 ,498 .55 $ $ 1,470,183.11 $1,152 ,810.96 $ $ $ $ 49,881.85 $ 40,361.85 $ (10,808.25) $ 40 ,570.00 $ 31 ,050.00 $ $ 130,000 .00 $ $ $ 130 ,000.00 $ $ 130 ,000 .00 $ $ $ $ Prepared By: Christy Ezernack T/PW Cohstruction Services 120 ,413.90 $ 51 ,688 .25 $ $ 120,413.90 $ 51 ,688.25 1 ,150.00 $ 14,120.00 121,563.90 $ 65,808.25 6 ,000 .10 $ 3 ,311 .75 6 ,000 .10 $ 3 ,311 .75 $ (10 ,808 .25)